Full-load denitration system for once-through boiler of power station
By using circulating pumps and economizer grading subsystems in the DC boiler of the power station, adjusting the soda and water system and SCR inlet smoke temperature during low load operation, the problem of inability to operate and insufficient hydropower at low load is solved, and denitrition is achieved The stable operation of the system and pollutant emission reduction.
Patent Information
- Application Number
- CN202411079968.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-12
AI Technical Summary
When the thermal generator set is running at low load, the smoke temperature at the entrance of the SCR denitrification system is too low, resulting in the denitrification device being unable to operate, and the water power of the soda system is insufficient, threatening the safety of the unit.
Adopt the power station DC boiler full load denitrification system including starter subsystem and economizer grading subsystem. Through technical means such as circulation pump, cold water bypass and water supply bypass, the water power and SCR inlet smoke temperature are adjusted to ensure the denitrification device. Operation normally under low load conditions.
Increase the smoke temperature at the inlet of denitrification device under low load conditions, ensure the normal operation of the unit's denitrification system, reduce pollutant emissions, extend the service life of boilers and denitrification devices, and avoid the risk of excessively tempered pipe bursting in the water-cooled wall.
Smart Images

Figure CN118935429A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of power generation in the electric power industry, and in particular to a full-load denitration system for a direct-current boiler in a power station. Background Art
[0002] In recent years, with the continuous increase of power grid capacity and the change of power consumption structure, the peak-to-valley difference of the power grid has become larger and larger. Some thermal power units will face the requirement of participating in the peak load regulation of the power grid. The general load rate is not high, and the units are operated at low load for a long time. When the unit load is low, the flue gas temperature at the inlet of the denitrification device may be lower than the minimum allowable operating temperature of the catalyst, resulting in the inability of the denitrification system to operate and NOx emissions exceeding the standard.
[0003] At present, the measures to control NOx emissions from thermal power plants are mainly divided into two categories. One is low-nitrogen combustion technology, that is, reducing NOx emissions through improvements in combustion technology; the other is flue gas denitrification technology, that is, installing a flue gas denitrification device at the tail of the boiler. According to practical experience, low-nitrogen combustion technology has certain limitations, and there are many difficult adjustment constraints. The use of low-NOx combustion technology to remove NOx from coal-fired boilers is limited. Flue gas denitrification technology mainly includes selective non-catalytic reduction flue gas denitrification technology (SNCR), selective catalytic reduction (SCR) and SNCR / SCR combined denitrification process. Comparing the advantages and disadvantages of the three, because the selective catalytic reduction (SCR) uses NH3 as a reducing agent to reduce NOx to nitrogen (N2). NH3 is selective and only reacts with NO, but not with oxygen (O2) in the flue gas. If other reducing agents, such as CH4, CO, H2, etc., are used, they will also react with O2, thus consuming more reducing agents and increasing the flue gas temperature. Therefore, a selective reducing agent is better than a non-selective reducing agent. At present, the mainstream denitrification process technology mainly adopts SCR denitrification process technology. In the SCR denitrification process technology, because a catalyst is used, in order to ensure the maximum activity of the catalyst, the normal operating temperature range of the SCR flue gas system should be between 310 and 420 ° C. This has certain limitations and the following problems: when the unit load is high, the flue gas temperature at the inlet of the denitrification device is just in the normal operating range of the catalyst, and when the unit load is low, the flue gas temperature at the inlet of the denitrification device is low, lower than the normal use temperature of the catalyst. If the design flue gas temperature at the inlet of the denitrification device is increased to meet the requirements of the catalyst at low load, the flue gas temperature will be higher at high load, which will cause problems such as high exhaust temperature, low boiler efficiency, and high coal consumption. Therefore, in general, when designing a boiler, it is designed to meet a lower exhaust temperature at high load to ensure the high efficiency of the boiler and improve the economy of the unit. However, this will cause the flue gas temperature of the power plant to fail to reach the allowable operating temperature range of the SCR denitrification catalyst when the power plant is under low load. At this time, the denitrification device can only be decoupled and operated, which cannot meet the requirements of the latest nitrogen oxide emission indicators of power plants.
[0004] In summary, in the prior art, the main problems faced by the coal-fired boiler denitrification system when operating at full load are: first, when the boiler is operating at low load, the SCR inlet flue gas temperature is too low, which will cause the SCR denitrification system to be unable to be put into operation; second, when the boiler is operating at low load, the water-cooled wall is prone to overheating due to insufficient water power in the steam-water system, and the water-cooled wall is prone to bursting when it is overheated for a long time, threatening the safe operation of the unit. Summary of the invention
[0005] The present invention provides a full-load denitrification system for a power station direct-current boiler that can achieve safe adjustment of the hydrodynamics of a steam-water system under low load and optimized adjustment of the SCR inlet flue gas temperature, which can solve at least one of the above-mentioned technical problems.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions: a full-load denitration system for a power station once-through boiler, including an SCR reactor, a starter subsystem and an economizer classification subsystem;
[0007] The starter subsystem comprises: a starter separator, a water storage tank, a circulation pump, a circulation pump inlet pipe, a circulation pump outlet pipe, a circulation pump recirculation pipe and a cold water bypass pipe, wherein the starter separator is connected to the water storage tank, the circulation pump is installed on a direct current boiler, the circulation pump inlet pipe is connected between the water storage tank and the circulation pump, the circulation pump outlet pipe is connected to the output end of the circulation pump, the circulation pump recirculation pipe is connected between the circulation pump outlet pipe and the water storage tank, and the cold water bypass pipe is led out from the main water supply pipe and connected to the water storage tank;
[0008] The economizer grading subsystem includes a first-stage economizer, a second-stage economizer, a connecting pipe and a feed water bypass pipe. The first-stage economizer is arranged in the flue before the SCR reactor, and the second-stage economizer is arranged in the flue after the SCR reactor. The connecting pipe is connected between the first-stage economizer and the second-stage economizer. The feed water bypass pipe is led out from the main feed water pipe and connected to the inlet of the second-stage economizer. The outlet of the second-stage economizer is connected to the startup separator through the boiler water-cooled wall.
[0009] Furthermore, the circulating pump establishes forced circulation of the direct current boiler working fluid, feed water is input into the direct current boiler, and after being heated in the furnace of the direct current boiler, the working fluid flows into the starting separator for steam-water separation, and the hot water after steam-water separation is re-sent into the economizer grading subsystem by the circulating pump. The starting mode of the circulating pump is manual start, and the starting permission condition is that the cooling water flow rate of the circulating pump is greater than the preset minimum value of the cooling water volume.
[0010] Furthermore, the circulating pump inlet pipe is used to supply the water stored in the water tank to the circulating pump. A stop valve is provided on the circulating pump inlet pipe. The stop valve is used to conduct or isolate the circulating pump. A bypass valve is connected in parallel to the stop valve. The bypass valve is used to inspect the stop valve and the circulating pump inlet pipe.
[0011] Furthermore, the circulating pump outlet pipe is used to regulate the furnace feed water flow of the direct current boiler. A first water level control valve group is arranged on the circulating pump outlet pipe. The first water level control valve group is used to control the normal water level of the water tank when the steam flow through the starting separator exceeds the feed water pump flow of the direct current boiler. When the water level of the water tank is high, the first water level control valve group is fully opened, and when the water level of the water tank is low, the first water level control valve group is fully closed.
[0012] Furthermore, the circulating pump recirculation pipeline is used to ensure the minimum flow rate of the circulating pump. An electric valve is arranged on the circulating pump recirculation pipeline. The electric valve is used to automatically control the opening and closing of the circulating pump recirculation pipeline. When the flow rate from the circulating pump through the first water level control valve group is less than the minimum flow rate allowed by the circulating pump, the electric valve automatically opens. When the flow rate through the first water level control valve group exceeds the minimum flow rate allowed by the circulating pump and has a margin, the electric valve automatically closes.
[0013] Furthermore, the cold water bypass pipe is used to introduce low-temperature cold water directly into the water storage tank to reduce the heat absorption of the economizer, and is also used to provide the circulating pump with a supercooled water pressure head and a net positive pressure head to prevent the economizer from boiling. A second water level control valve group is provided on the cold water bypass pipe. When the first water level control valve group is about to close, the flow rate of the second water level control valve group is reduced to zero. When the water level of the water storage tank reaches the high water level or MFT, the second water level control valve group is closed in an interlocking manner.
[0014] Furthermore, the main water supply pipe is connected to the inlet of the first-stage economizer, the water supply bypass pipe bypasses the first-stage economizer, and is connected to the inlet of the second-stage economizer, the mainstream water volume flowing through the main water supply pipe and the bypass water volume flowing through the water supply bypass pipe are mixed at the outlet of the second-stage economizer, and the water supply bypass pipe is provided with a control valve and a pressure-holding valve, which are respectively used to adjust the ratio of the mainstream water volume to the bypass water volume.
[0015] Furthermore, the pipe diameter of the connecting pipe is larger than the conventional pipe diameter.
[0016] Furthermore, there are multiple startup separators, which are respectively connected to the water storage tank for capacity expansion and steam-water separation. The water storage tank and the multiple startup separators are all connected to the ceiling inlet header of the direct current boiler.
[0017] Furthermore, the starter subsystem also includes a hydrophobic expansion tank and a hydrophobic tank, and the water storage tank is connected to the hydrophobic tank via the hydrophobic expansion tank.
[0018] The beneficial effects of the present invention are embodied in:
[0019] 1. During deep peak regulation or low-load operation in the initial stage of grid connection, when the water supply bypass pipeline needs to increase its flow, more cold water will be diverted to the water supply bypass pipeline through the pressure-holding effect of the pressure-holding valve on the main water supply pipeline, thereby increasing the regulation capacity, reducing the cold water flow entering the economizer to participate in flue gas heat exchange, reducing the heat absorption of the economizer, and increasing the flue gas temperature at the inlet of the denitrification equipment, ensuring the normal operation of the unit's low-load denitrification.
[0020] 2. During deep peak regulation or low-load operation in the initial stage of grid connection, the pressure head of the boiler water circulation pump is used to force the valve group on the recirculation pipeline to adjust part of the hot water at the economizer outlet and return it to the economizer inlet pipeline. This can increase the economizer inlet water temperature, reduce the heat exchange end difference between economizer water and flue gas, and reduce the flue gas heat exchange, thereby increasing the inlet flue gas temperature of the denitrification equipment and ensuring the normal operation of the unit's low-load denitrification.
[0021] 3. During deep peak regulation or low-load operation in the initial stage of grid connection, the feed water is directly led to the second-stage economizer located behind the SCR reactor, and then led to the first-stage economizer located in front of the SCR reactor through a connecting pipe. By reducing the heat absorption of the economizer in front of the SCR reactor, the inlet temperature of the SCR reactor is increased above the lower limit of the denitrification reaction temperature, so as to ensure that the SCR can operate normally under full load conditions.
[0022] 4. The operation of denitrification equipment under full load not only reduces the emission of pollutants, but is also one of the future development directions of environmental protection in power plants. It reduces system shutdowns caused by low inlet temperatures and is beneficial to the long-term stable operation of boiler steam-water systems and denitrification equipment.
[0023] 5. The present invention does not substantially change the entire heat distribution, operation and regulation mode of the direct current boiler, and has a large adjustable range with load changes. While meeting the flue gas temperature requirements of the denitrification equipment, the overall boiler performance, such as boiler steam temperature, water spray volume, and boiler efficiency, is substantially maintained as is. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0025] Figure 1 It is a schematic diagram of the system principle of an embodiment of the present invention. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0027] It should be noted that if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, "multiple" refers to more than two.
[0028] See also Figure 1 , an embodiment of the present invention provides a full-load denitration system for a power station direct-flow boiler, including an SCR reactor, a starter subsystem and an economizer grading subsystem;
[0029] The starter subsystem comprises: a starter separator, a water storage tank, a circulation pump, a circulation pump inlet pipe, a circulation pump outlet pipe, a circulation pump recirculation pipe and a cold water bypass pipe, wherein the starter separator is connected to the water storage tank, the circulation pump is installed on a direct current boiler, the circulation pump inlet pipe is connected between the water storage tank and the circulation pump, the circulation pump outlet pipe is connected to the output end of the circulation pump, the circulation pump recirculation pipe is connected between the circulation pump outlet pipe and the water storage tank, and the cold water bypass pipe is led out from the main water supply pipe and connected to the water storage tank;
[0030] The economizer grading subsystem includes a first-stage economizer, a second-stage economizer, a connecting pipe and a feed water bypass pipe. The first-stage economizer is arranged in the flue before the SCR reactor, and the second-stage economizer is arranged in the flue after the SCR reactor. The connecting pipe is connected between the first-stage economizer and the second-stage economizer. The feed water bypass pipe is led out from the main feed water pipe and connected to the inlet of the second-stage economizer. The outlet of the second-stage economizer is connected to the startup separator through the boiler water-cooled wall.
[0031] This system is mainly divided into the following two technical solutions:
[0032] 1. Technical solution for hydraulic safety adjustment of steam-water system under low load
[0033] (1) Use a starter subsystem with a circulating pump. At low load, especially during the grid connection stage, the boiler load is about 10-15% BMCR, which is lower than the DC load operation. The operation of the circulating pump can effectively recover heat, more effectively control the feed water temperature entering the furnace, reduce the excessive heat absorbed by the boiler water, and reduce the flue gas temperature. The large reduction in flue gas temperature is not conducive to denitrification investment, protect the boiler furnace water-cooled wall to adapt to the needs of peak load regulation and denitrification, and improve the denitrification investment reliability and furnace stable combustion capacity during low load operation. On the other hand, it reduces or eliminates the situation that the overall flow of the boiler is low during ultra-low load operation, the flow deviation between the boiler water-cooled wall circuits increases, and the excessive steam content deviation between the circuits causes the temperature difference between the water-cooled wall tubes to increase or even exceed the allowable value, avoiding the formation of high-strength thermal stress accumulation in some local tube panels of the water-cooled wall, which in turn causes water-cooled wall damage and failure, unit shutdown and other problems.
[0034] (2) Use a starter subsystem with a cold water bypass and a pressure-holding valve. During the load reduction period of the unit, according to the needs of denitrification, open the cold water bypass in a timely manner, adjust the pressure-holding valve on the water supply pipeline, and introduce some water with lower temperature directly into the downcomer to reduce the heat absorption of the economizer, thereby increasing the inlet flue gas temperature of the denitrification device to ensure the normal operation of the boiler denitrification device within the full load range of the boiler.
[0035] 2. Technical solution for optimizing the SCR inlet smoke temperature under low load
[0036] (1) Adopting economizer grading subsystem with water bypass. In this scheme, the economizer feed water inlet is divided into mainstream water and bypass water. The mainstream water enters the economizer to absorb heat and heat up, while the bypass water bypasses the economizer. Finally, the two are mixed at the economizer outlet. The flue gas temperature at the SCR reactor inlet is regulated by adjusting the ratio of the bypass water volume to the mainstream water volume. Since the heat transfer coefficient on the water side is much larger than the heat transfer coefficient on the flue gas side, the flue gas temperature at the SCR reactor inlet is improved to a certain extent after the water volume of the water bypass is adjusted.
[0037] (2) Adopting a graded economizer subsystem. Since there are certain limitations on the economizer feedwater bypass to increase the flue gas temperature at the SCR reactor inlet, in order to further increase the flue gas temperature at the SCR reactor inlet when the boiler is under low load, the heat exchange area of the original economizer is reduced on the basis of the boiler thermal calculation, and a certain economizer heating surface is added after the SCR reactor. The feedwater is directly led to the second-stage economizer located behind the SCR reactor, and then to the first-stage economizer located in front of the SCR reactor through a connecting pipe. By reducing the heat absorption of the economizer in front of the SCR reactor, the purpose of increasing the SCR reactor inlet temperature above the lower limit of the denitrification reaction temperature is achieved, so as to ensure that the SCR can operate normally under full load conditions.
[0038] In this embodiment, the circulating pump establishes a forced circulation of the working medium of the DC boiler. The feed water is input into the DC boiler. After being heated in the furnace of the DC boiler, the working medium flows into the starting separator for steam-water separation. The hot water after steam-water separation is re-sent into the economizer classification subsystem by the circulating pump. The starting mode of the circulating pump is manual starting. The starting permission condition is that the cooling water flow rate of the circulating pump is greater than the preset minimum value of the cooling water volume. When the water level in the water storage tank is too low / the pressure is too high / the pressure head is too low / the amount of supercooled water is low, the circulating pump will trip. When the unit load is higher than the minimum stable combustion load, the circulating pump should be shut down. When the unit load is lower than the minimum stable combustion load and the starting condition of the circulating pump is met, the circulating pump will restart.
[0039] In this embodiment, the circulating pump inlet pipeline corresponds to Figure 1 The J0 pipeline in the water storage tank is used to supply the water in the water storage tank to the circulating pump. A stop valve is provided on the inlet pipeline of the circulating pump, corresponding to Figure 1 The J0-1 valve in the circuit breaker is used to conduct or isolate the circulating pump. A bypass valve is connected in parallel to the circuit breaker, and the bypass valve is used to inspect the circuit breaker and the inlet pipeline of the circulating pump. The J0-1 valve is usually open, and should be closed when the circulating pump needs to be isolated.
[0040] In this embodiment, the circulating pump outlet pipeline corresponds to Figure 1 The J1 pipeline in the figure is used to control the furnace water flow of the direct current boiler. The circulating pump outlet pipeline is provided with a first water level control valve group, corresponding to Figure 1 The first water level control valve group is used to control the normal water level of the water storage tank when the steam flow through the start-up separator exceeds the feed water pump flow of the direct current boiler. When the water level of the water storage tank is high, the first water level control valve group is fully opened, and when the water level of the water storage tank is low, the first water level control valve group is fully closed. When the circulating pump is put into operation normally, the J1 valve group should always be in the open position. When the circulating pump is turned on, the J1 valve group is opened, and when the circulating pump is turned off, the J1 valve group is closed.
[0041] In this embodiment, the circulating pump recirculation pipeline corresponds to Figure 1 The J2 pipeline in the circulation pump is used to ensure the minimum flow rate of the circulation pump. The circulation pump recirculation pipeline is provided with an electric valve, corresponding to Figure 1The J2 valve in the electric valve is used to automatically control the on-off of the recirculation pipeline of the circulation pump. When the starting separator enters a dry state and the flow from the circulation pump through the first water level control valve group J1 is less than the minimum flow allowed by the circulation pump, the electric valve J2 automatically opens; when the flow through the first water level control valve group J1 exceeds the minimum flow allowed by the circulation pump and has a margin, the electric valve J2 automatically closes.
[0042] In this embodiment, the cold water bypass pipeline corresponds to Figure 1 The J3 pipeline in the tank is used to introduce low-temperature cold water directly into the water storage tank to reduce the heat absorption of the economizer, and is also used to provide the circulating pump with a subcooled water pressure head and a net positive pressure head to prevent the economizer from boiling. The cold water bypass pipeline is provided with a second water level control valve group, corresponding to Figure 1 The J3 valve group in the boiler, when the direct current boiler water cleaning is completed, should establish normal circulation and prepare for ignition. At this time, the J3 valve group is in the open position. When the J1 valve group is about to close, the flow of the J3 valve group will be reduced to zero. When the water level of the water storage tank reaches the high water level or MFT, the J3 valve group is interlocked and closed. It should be noted that the regulation of the supercooled water flow should first meet the requirements of the net positive pressure head of the circulating pump.
[0043] In this embodiment, the main water supply pipe is connected to the inlet of the first-stage economizer, and the water supply bypass pipe corresponds to Figure 1 The J5 pipeline in the first stage economizer bypasses the first stage economizer and is connected to the inlet of the second stage economizer. The main water flowing through the main feed water pipeline and the bypass water flowing through the feed water bypass pipeline are mixed at the outlet of the second stage economizer. The feed water bypass pipeline is provided with a control valve and a pressure holding valve, corresponding to Figure 1 The J5-1 valve and J5-0 valve in the system are used to adjust the ratio of the main water flow to the bypass water flow. In this way, the water flow entering the economizer is reduced by bypassing a part of the boiler feed water, thereby reducing the heat exchange of the economizer and increasing the outlet flue gas temperature. It should be noted that the key point of this is that when the feed water bypass pipeline is activated, the outlet water temperature of the suspension pipe must be strictly controlled to leave enough safety margin to ensure that boiling does not occur. At the same time, there will be no water hammer, vaporization and other phenomena in the economizer area pipeline, and there will be no vibration in the pipeline during commissioning and operation to ensure the safe operation of the direct current boiler.
[0044] In this embodiment, the connecting pipe corresponds to Figure 1 The diameter of the J4 pipeline is larger than that of the conventional pipeline. This design helps to reduce the heat absorption of the economizer before the SCR reactor, thereby achieving the purpose of increasing the inlet flue gas temperature of the SCR reactor.
[0045] In this embodiment, there are multiple start-up separators, which are respectively connected to the water storage tank for capacity expansion and steam-water separation. The water storage tank and the multiple start-up separators are all connected to the inlet header of the direct-current boiler ceiling. In this design, the start-up separator is connected to the boiler water-cooled wall. Through the design of this system, a direct-current boiler low-load start-up system with a circulating pump is used to lead part of the hot water at the economizer outlet back to the economizer inlet pipeline, which can increase the economizer inlet water temperature, reduce the heat exchange end difference between economizer water and flue gas, and reduce the flue gas heat exchange, thereby improving the hydrodynamic safety of the supercritical boiler water-cooled wall and the flue gas temperature at the inlet of the denitrification device.
[0046] In this embodiment, the starter system also includes a drain expansion tank and a drain tank, and the water storage tank is connected to the drain tank via the drain expansion tank. With this design, the drain tank plays a role in steam blocking and water drainage in the steam heating system. Selecting a suitable drain tank can enable the steam heating equipment to achieve the highest working efficiency. The drain expansion tank can reduce the pressure of the drain entering the drain expansion tank, and can also realize the recovery of working medium heat for reuse. The drain expansion tank has three steam-water pipelines: in the middle, the drain entry pipeline; at the bottom, the discharge pipeline of the water after pressure reduction; at the top, the discharge pipeline of the steam flashed after pressure reduction. After the high and low pressure drain is expanded and sprayed with water to reduce temperature, the temperature and pressure are reduced. After the expansion, the steam enters the upper steam space of the condenser, which can reduce the impact on the condenser and reduce the heat load of the condenser; the drain enters the hot water well, which has a heating effect on the condensate and can reduce the supercooling degree.
[0047] In summary, in the present invention, on the one hand, a starting subsystem with a circulation pump, a cold water bypass and a pressure-holding valve is adopted to achieve safe adjustment of the hydraulic power of the steam-water system under low load; on the other hand, an economizer grading subsystem with a water bypass and a graded arrangement is adopted to achieve optimized adjustment of the SCR inlet flue gas temperature under low load.
[0048] It should be understood that the examples and implementation modes described herein are for illustrative purposes only and are not intended to limit the present invention. Those skilled in the art may make various modifications or changes based on the examples and implementation modes. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A full-load denitration system for a power station direct-flow boiler, comprising an SCR reactor, characterized in that: It also includes a starter subsystem and an economizer staging subsystem; The starter subsystem comprises: a starter separator, a water storage tank, a circulation pump, a circulation pump inlet pipe, a circulation pump outlet pipe, a circulation pump recirculation pipe and a cold water bypass pipe, wherein the starter separator is connected to the water storage tank, the circulation pump is installed on a direct current boiler, the circulation pump inlet pipe is connected between the water storage tank and the circulation pump, the circulation pump outlet pipe is connected to the output end of the circulation pump, the circulation pump recirculation pipe is connected between the circulation pump outlet pipe and the water storage tank, and the cold water bypass pipe is led out from the main water supply pipe and connected to the water storage tank; The economizer grading subsystem includes a first-stage economizer, a second-stage economizer, a connecting pipe and a feed water bypass pipe. The first-stage economizer is arranged in the flue before the SCR reactor, and the second-stage economizer is arranged in the flue after the SCR reactor. The connecting pipe is connected between the first-stage economizer and the second-stage economizer. The feed water bypass pipe is led out from the main feed water pipe and connected to the inlet of the second-stage economizer. The outlet of the second-stage economizer is connected to the startup separator through the boiler water-cooled wall.
2. The full-load denitration system for a power station direct-flow boiler according to claim 1, characterized in that: The circulating pump establishes forced circulation of the direct current boiler working fluid. Feed water is input into the direct current boiler. After being heated in the furnace of the direct current boiler, the working fluid flows into the starting separator for steam-water separation. The hot water after steam-water separation is re-sent into the economizer grading subsystem by the circulating pump. The starting mode of the circulating pump is manual start, and the starting permission condition is that the cooling water flow rate of the circulating pump is greater than the preset minimum value of the cooling water volume.
3. The full-load denitration system for a power station direct-flow boiler according to claim 1, characterized in that: The circulating pump inlet pipe is used to supply the water stored in the water storage tank to the circulating pump. A stop valve is arranged on the circulating pump inlet pipe. The stop valve is used to conduct or isolate the circulating pump. A bypass valve is connected in parallel to the stop valve. The bypass valve is used to inspect the stop valve and the circulating pump inlet pipe.
4. The full-load denitration system for a power station once-through boiler according to claim 1, characterized in that: The circulating pump outlet pipeline is used to regulate the furnace feed water flow of the direct current boiler. A first water level control valve group is arranged on the circulating pump outlet pipeline. The first water level control valve group is used to control the normal water level of the water tank when the steam flow through the starting separator exceeds the feed water pump flow of the direct current boiler. When the water level of the water tank is high, the first water level control valve group is fully opened, and when the water level of the water tank is low, the first water level control valve group is fully closed.
5. The full-load denitration system for a power station once-through boiler according to claim 4, characterized in that: The circulating pump recirculation pipeline is used to ensure the minimum flow rate of the circulating pump. An electric valve is arranged on the circulating pump recirculation pipeline. The electric valve is used to automatically control the opening and closing of the circulating pump recirculation pipeline. When the flow rate from the circulating pump through the first water level control valve group is less than the minimum flow rate allowed by the circulating pump, the electric valve automatically opens. When the flow rate through the first water level control valve group exceeds the minimum flow rate allowed by the circulating pump and has a margin, the electric valve automatically closes.
6. The full-load denitration system for a power station once-through boiler according to claim 4, characterized in that: The cold water bypass pipe is used to introduce low-temperature cold water directly into the water storage tank to reduce the heat absorption of the economizer, and is also used to provide the circulating pump with supercooled water pressure head and net positive pressure head to prevent the economizer from boiling. A second water level control valve group is arranged on the cold water bypass pipe. When the first water level control valve group is about to be closed, the flow rate of the second water level control valve group is reduced to zero. When the water level of the water storage tank reaches the high water level or MFT, the second water level control valve group is closed in an interlocking manner.
7. The full-load denitration system for a power station once-through boiler according to claim 1, characterized in that: The main water supply pipe is connected to the inlet of the first-stage economizer, the water supply bypass pipe bypasses the first-stage economizer, and is connected to the inlet of the second-stage economizer. The mainstream water flow flowing through the main water supply pipe and the bypass water flow flowing through the water supply bypass pipe are mixed at the outlet of the second-stage economizer. The water supply bypass pipe is provided with a control valve and a pressure-holding valve, which are respectively used to adjust the ratio of the mainstream water flow to the bypass water flow.
8. The full-load denitration system for a power station once-through boiler according to claim 1, characterized in that: The pipe diameter of the connecting pipe is larger than the conventional pipe diameter.
9. The full-load denitration system for a power station once-through boiler according to claim 1, characterized in that: There are multiple startup separators, which are respectively connected to the water storage tank for capacity expansion and steam-water separation. The water storage tank and the multiple startup separators are all connected to the direct current boiler ceiling inlet header.
10. The full-load denitration system for a power station once-through boiler according to claim 1, characterized in that: The starter system further comprises a drain expansion vessel and a drain tank, and the water storage tank is connected to the drain tank via the drain expansion vessel.
Citation Information