Circulating cooling equipment for drilling fluid special for shale gas deep well drilling and production

By adopting air-cooling-water-cooling combination and vacuum cooling technology in shale gas deep well drilling equipment, the problems of low cooling efficiency and lack of dilution function of existing equipment are solved, and efficient cooling and dilution of drilling fluid are achieved, and the drilling fluid is extended The use cycle is reduced, and the safety is improved.

CN118935902APending Publication Date: 2024-11-12ZUNYI NORMAL COLLEGE
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411026808.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing shale gas deep well drilling and deep drilling equipment is inefficient and lacks the circulating cooling function, which makes it difficult to effectively control the drilling fluid temperature, affecting the equipment performance and worker safety, and does not have dilution function, which may lead to slowing down the drilling speed.

Method used

A circulating cooling device including a filter, an air-cooled-water-cooled combination device and a vacuum cooling device is designed. Through a combined cooling mechanism of cooling water pipe, an air-cooled casing and a vacuum cooling body, multi-stage cooling of the drilling fluid is achieved and in a dilution box. dilution treatment is carried out to ensure the concentration and performance of the drilling fluid.

Benefits of technology

It realizes efficient cyclic cooling of drilling fluid, ensures that the temperature is within a controllable range, extends the use cycle of drilling fluid, reduces the demand for new drilling fluid, reduces material costs, and improves drilling speed and equipment reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118935902A_ABST
    Figure CN118935902A_ABST
Patent Text Reader

Abstract

The invention provides circulation cooling equipment for drilling fluid special for shale gas deep well drilling and production, and belongs to the technical field of cooling equipment. Comprising a filter, an air cooling-water cooling combined device and a vacuum cooling device which are sequentially connected in the flowing direction of drilling fluid, a drilling fluid casing pipe is arranged on the outer wall of a cooling water pipe in a winding mode, the inner wall of the cooling water pipe is cooled for the first time through the cooling water pipe, and meanwhile the drilling fluid casing pipe is sleeved with an air cooling casing pipe; a gap is reserved between the air cooling sleeve and the drilling fluid sleeve, cooling air sprayed into the gap is used for cooling the outer wall of the drilling fluid sleeve, the drilling fluid is pre-cooled in an air cooling and water cooling combined mode in the cooling process, and in order to guarantee the cooling reliability, cooling is conducted again through a vacuum cooling device, so that the cooling reliability is improved. A composite cooling mechanism is formed, the temperature of the drilling fluid can be more effectively controlled, and various complex and changeable working conditions can be adapted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cooling and temperature reduction equipment, in particular to a circulating cooling equipment for drilling fluid specially used for shale gas deep well drilling. Background Art

[0002] Drilling fluid is an essential fluid in the process of oil and gas drilling. It plays a variety of important roles in the drilling process. Special drilling fluid for deep shale gas well drilling is a type of drilling fluid designed to adapt to the special geological conditions of shale gas reservoirs. Since shale gas reservoirs are usually located in deeper formations, with low permeability, high viscosity and complex structures, special drilling fluid for deep shale gas well drilling usually contains a variety of additives such as water-soluble polymers, clay stabilizers, filtration control agents, lubricants, corrosion inhibitors, etc., and is customized according to specific well conditions and geological conditions.

[0003] Since the drilling depth can reach several thousand meters, the bottom hole temperature reaches about 130 degrees, and the temperature of the drilling fluid after returning from the formation is as high as about 90 degrees. Long-term high-temperature drilling work will have many adverse effects on the performance of the drilling fluid. At the same time, the high-temperature drilling fluid causes the performance of the rotary guide instrument and downhole equipment to decrease or even fail to work normally, resulting in significant economic losses. In addition, the excessively high temperature of the drilling fluid will scald the workers and cause safety accidents.

[0004] Therefore, there is an urgent need for a cooling device for drilling fluid specially used for shale gas deep well drilling. The existing equipment adopts a single cooling method, which has poor cooling effect and low efficiency. At the same time, it does not have the effect of circulating cooling, has low reliability, and does not have the dilution function for the cooled drilling fluid, which makes it difficult to remove drill cuttings, which may slow down the drilling speed. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention provides a circulating cooling device for drilling fluid specially used for shale gas deep well drilling.

[0006] The technical solution of the present invention is: a circulating cooling device for drilling fluid specially used for shale gas deep well drilling, comprising a filter, an air cooling-water cooling combination device, and a vacuum cooling device which are sequentially connected along the flow direction of the drilling fluid;

[0007] The filter is connected to the bottom end of the oil well through a connecting pipe;

[0008] The air-cooling-water-cooling combination device comprises a combined cooling body, a cooling water pipe arranged in the combined cooling body, a drilling fluid casing sleeved on the outside of the cooling water pipe and connected to a filter on the water inlet side, an air-cooling casing sleeved on the outside of the drilling fluid casing and having a gap between the casing and the outer wall of the drilling fluid casing, a cooling water storage tank connected to the cooling water pipe, and an air cooler connected to the air-cooling casing, wherein a plurality of jet holes are arranged on the inner wall of the air-cooling casing, the water outlet side of the drilling fluid casing is connected to the vacuum cooling device and a temperature sensor is arranged at the connection, the drilling fluid casing and the vacuum cooling device are respectively connected to the oil well and a drilling fluid dilution box is arranged at the connection, and the drilling fluid dilution box and the drilling fluid casing are connected by a circulation pipe.

[0009] Furthermore, a pumping pump is provided at the connection between the filter and the oil well, and opening and closing valves are provided between the filter and the drilling fluid casing, between the drilling fluid casing and the vacuum cooling device, between the drilling fluid casing and the drilling fluid dilution tank, and between the vacuum cooling device and the drilling fluid dilution tank.

[0010] Description: The drilling fluid in the oil well is pumped to the filter through the pump to meet the use requirements. By setting the opening and closing valves between the various components and ensuring their reliable opening and closing, the drilling fluid can flow smoothly between different components and improve the reliability of the overall operation of the equipment.

[0011] Furthermore, the cooling water pipe is a bent serpentine coil, and a first fixing sleeve is respectively provided on the inner wall of the combined cooling body and on the outside of the water inlet and water outlet sides corresponding to the cooling water pipe, and a second fixing sleeve is provided on the inner wall of the combined cooling body and at each bending point corresponding to the cooling water pipe.

[0012] Description: The first fixing sleeve and the second fixing sleeve have the same structure and both serve to fix the cooling water pipe to ensure the reliability and durability of the cooling water pipe connection.

[0013] Furthermore, the drilling fluid casing is wrapped around the outer wall of the cooling water pipe, and a plurality of guide blocks are evenly arranged on the outer wall of the drilling fluid casing, and a plurality of supporting connecting columns are arranged between the air-cooling casing and the drilling fluid casing.

[0014] Description: The drilling fluid casing is wrapped around the outer wall of the cooling water pipe in a winding manner, which increases the surface area in contact with the cooling water pipe, thereby enhancing the heat exchange process and making the cooling of the drilling fluid more rapid and effective. At the same time, the drilling fluid casing can also serve as a protective layer to reduce the wear of the cooling water pipe. The guide block changes the path of the airflow, which helps to achieve uniform cooling of all parts of the outer wall of the drilling fluid casing, avoids local overheating or insufficient cooling, slows down the airflow speed, and helps to form a stable cooling boundary layer on the outer wall of the pipeline.

[0015] Furthermore, the vacuum cooling device includes a vacuum cooling body connected to the water outlet side of the drilling fluid casing, a vacuum suction head arranged at the upper end of the vacuum cooling body, a vacuum pump connected to the vacuum suction head, and a guide groove assembly arranged in the vacuum cooling body.

[0016] Description: When the drilling fluid enters the vacuum cooling body, it first flows downward from the uppermost downward inclined guide groove. When the drilling fluid flows to the first upper inclined guide groove, the drilling fluid flows downward in the opposite direction and flows to the second downward inclined guide groove again. Then, the above steps are repeated until the drilling fluid passes through the last downward inclined guide groove in turn and flows out of the vacuum cooling body. The above process prolongs the residence time of the drilling fluid in the vacuum cooling body. At the same time, it also increases the contact area between the drilling fluid and the cooling medium of the vacuum environment, so that the drilling fluid is cooled more thoroughly.

[0017] Furthermore, each of the downwardly inclined guide grooves and each of the upwardly inclined guide grooves are composed of a plurality of sub-guide grooves which are partially overlapped head to tail and distributed sequentially from top to bottom, and the bottom end of each sub-guide groove is an arc-shaped structure.

[0018] Description: When the drilling fluid flows through each downward inclined guide groove and the upper inclined guide groove, each flow process is segmented and extended again through each sub-guide groove, which further extends the residence time of the drilling fluid in the vacuum cooling body and increases the contact area with the cooling medium of the vacuum environment. The bottom end of each sub-guide groove is set as an arc structure, the purpose of which is to guide the drilling fluid to flow in a more continuous and orderly manner, thereby improving the flow efficiency.

[0019] Furthermore, a drilling fluid dilution assembly is provided in the drilling fluid dilution box, and the drilling fluid dilution assembly includes two sliding adjustment plates that can slide up and down along the inner wall of the drilling fluid dilution box, a plurality of dilution rods arranged on opposite sides of the two sliding adjustment plates and staggered, a water storage tank connected to each of the dilution rods, a hydraulic drive element that drives the two sliding adjustment plates to slide, and a concentration sensor arranged on the water inlet side of the drilling fluid dilution box, and a plurality of dilution holes are evenly arranged on the side wall of the dilution rod from top to bottom.

[0020] Description: When dilution is required, the hydraulic drive element drives two relatively distributed sliding adjustment plates to move toward each other. At the same time, the water in the water storage tank is evenly sprayed into the drilling fluid through the dilution holes on the side walls of each dilution rod by a pump for dilution, which can better mix with the drilling fluid and improve the dilution efficiency.

[0021] Furthermore, each dilution rod is covered with a protective mesh cover.

[0022] Description: It can not only ensure the spraying of water flow, but also protect the dilution rod to prevent the dilution hole on the dilution rod from being blocked.

[0023] Compared with the prior art, the beneficial effects of the present invention are:

[0024] When the equipment of the present invention cools the drilling fluid, first, the drilling fluid casing is arranged on the outer wall of the cooling water pipe in a winding manner, and the inner wall is cooled for the first time by using the cooling water pipe. At the same time, an air-cooling casing is arranged on the outside of the drilling fluid casing, and a gap is left between the air-cooling casing and the drilling fluid casing. The outer wall of the drilling fluid casing is cooled by spraying cooling air in the gap. The above cooling process uses a combination of air cooling + water cooling to pre-cool the drilling fluid. In order to ensure the reliability of cooling, the vacuum cooling device is used for cooling again, forming a composite cooling mechanism, which can more effectively control the temperature of the drilling fluid and can adapt to various complex and changeable working conditions. Whether it is a high temperature or low temperature environment, the temperature control can be met by adjusting the working state of different cooling methods. According to the actual situation, the working intensity and time of various cooling methods can be flexibly adjusted to achieve the most ideal cooling effect. When the temperature of the drilling fluid after cooling by the vacuum cooling device 3 is still greater than the preset value, the drilling fluid is repeatedly cooled and cooled through the circulation pipe to form a closed-loop circulation cooling system. In order to meet the concentration requirements of the cooled drilling fluid for reuse, the chloride ion concentration, sulfur ion concentration and potassium ion concentration of the drilling fluid are diluted by the drilling fluid dilution component to maintain its key properties such as viscosity, density and pH value, ensure the lubrication, cooling and cuttings carrying functions of the drilling fluid, and extend the service life of the drilling fluid. Reasonable dilution can reduce the demand for new drilling fluid, save material costs, and reduce the additional costs caused by frequent replacement of drilling fluid. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 It is a schematic diagram of the internal structure of the combined cooling body of the present invention;

[0027] Figure 3 It is a cross-sectional view of the connection of the cooling water pipe, the drilling fluid casing and the air cooling casing of the present invention;

[0028] Figure 4 It is a schematic diagram of the internal structure of the vacuum cooling body of the present invention;

[0029] Figure 5 It is a schematic structural diagram of the sub-guiding groove of the present invention;

[0030] Figure 6 It is a schematic diagram of the internal structure of the drilling fluid dilution box of the present invention;

[0031] Figure 7 It is a schematic diagram of the installation structure of the protective screen cover of the present invention outside the dilution rod.

[0032] Among them, 1-filter, 10-oil well, 100-vibrating screen, 101-centrifugal pump, 11-drilling fluid dilution box, 110-circulating pipe, 12-liquid pump, 13-opening and closing valve, 14-drilling fluid dilution component, 140-sliding adjustment plate, 141-dilution rod, 142-water storage tank, 143-hydraulic drive element, 144-concentration sensor, 145-dilution hole, 146-protective mesh cover, 2-air cooling-water cooling combination device, 20-combined cooling body, 21-cooling Cooling pipe, 22-drilling fluid casing, 220-temperature sensor, 221-guide block, 23-air cooling casing, 230-jet hole, 231-support connecting column, 24-cooling water storage tank, 25-air cooler, 26-first fixed sleeve, 27-second fixed sleeve, 3-vacuum cooling device, 30-vacuum cooling body, 31-vacuum suction head, 32-vacuum pump, 33-guide trough assembly, 330-lower inclined guide trough, 331-upper inclined guide trough, 332-sub-guide trough. DETAILED DESCRIPTION

[0033] In order to further understand the content of the present invention, the present invention is described in detail below through examples.

[0034] Example 1

[0035] like Figure 1 As shown, a circulating cooling device for drilling fluid specially used for shale gas deep well drilling comprises a filter 1, an air cooling-water cooling combination device 2, and a vacuum cooling device 3 which are sequentially connected along the flow direction of the drilling fluid;

[0036] The filter 1 is connected to the bottom of the oil well 10 through a connecting pipe, and the filter 1 includes a vibrating screen 100 connected to the oil well 10, and a centrifugal pump 101 connected to the vibrating screen 100, and the vibrating screen 100 adopts the BOS GNZS series, and the centrifugal pump 101 is an existing model SM 200 mud centrifuge;

[0037] like Figure 2 , 3As shown, the air-cooling-water-cooling combined device 2 includes a combined cooling body 20, a cooling water pipe 21 arranged in the combined cooling body 20, a drilling fluid casing 22 sleeved on the outside of the cooling water pipe 21 and connected to the filter 1 on the water inlet side, an air-cooling casing 23 sleeved on the outside of the drilling fluid casing 22 and with a gap between the outer wall of the drilling fluid casing 22, a cooling water storage tank 24 connected to the cooling water pipe 21, and a cooling fan 25 connected to the air-cooling casing 23. The inner wall of the air-cooling casing 23 is provided with 30 jet holes 230. The water outlet side of the drilling fluid casing 22 is connected to the vacuum cooling device 3 and a temperature sensor 220 is provided at the connection. The temperature sensor 220 is used to detect the drilling fluid temperature on the water outlet side of the drilling fluid casing 22. No, cool to less than 30°C. When it is greater than 30°C, continue to cool through the vacuum cooling device 3. When it is less than 30°C, the drilling fluid directly flows into the drilling fluid dilution tank 11 to ensure that the coolant is kept at a relatively low and stable level. The drilling fluid casing 22 and the vacuum cooling device 3 are respectively connected to the oil well 10 and a drilling fluid dilution tank 11 is provided at the connection. The drilling fluid dilution tank 11 and the drilling fluid casing 22 are connected through a circulation pipe 110 and an opening and closing valve 13 is provided at the connection. When the temperature of the drilling fluid after cooling by the vacuum cooling device 3 is still greater than 30°C, the drilling fluid is re-pumped to the drilling fluid casing 22 through the circulation pipe 110 for repeated cooling and temperature reduction. The temperature sensor 220 adopts the existing technology of model PT 1000;

[0038] A pump 12 is provided at the connection between the filter 1 and the oil well 10, and opening and closing valves 13 are provided between the filter 1 and the drilling fluid casing 22, between the drilling fluid casing 22 and the vacuum cooling device 3, between the drilling fluid casing 22 and the drilling fluid dilution tank 11, and between the vacuum cooling device 3 and the drilling fluid dilution tank 11. The opening and closing valve 13 can be one of the existing ball valves, gate valves, regulating valves or solenoid valves;

[0039] like Figure 4 , 5As shown, the vacuum cooling device 3 includes a vacuum cooling body 30 connected to the water outlet side of the drilling fluid casing 22, a vacuum suction head 31 arranged at the upper end of the vacuum cooling body 30, a vacuum pump 32 connected to the vacuum suction head 31, and a guide groove assembly 33 arranged in the vacuum cooling body 30. The air in the vacuum cooling body 30 is extracted by the vacuum pump 32 and the vacuum suction head 31, ensuring that the high vacuum state inside the vacuum cooling body 30 is maintained, and the inner wall of the vacuum cooling body 30 is provided with a heat-insulating material, which is mainly used to slow down the heat passing through the vacuum cooling body 30. The vacuum cooling body 30 is transferred from the inner wall of the vacuum cooling body 30 to the external environment, and the insulation material can be one of polyurethane foam, rock wool, glass wool or reflective insulation material. The joints, ports and openings of the vacuum cooling body 30 are also provided with sealing materials to ensure that there is no air leakage at the joints, ports and openings of the vacuum cooling body 30 to maintain the internal vacuum state. The sealing materials include rubber such as silicone rubber, polytetrafluoroethylene PTFE tape or gasket, and metal or non-metallic sealing rings. The vacuum suction head 31 and the vacuum pump 32 adopt existing technology;

[0040] The guide groove assembly 33 includes three downwardly inclined guide grooves 330 arranged in parallel from top to bottom, and two upwardly inclined guide grooves 331 arranged between two adjacent downwardly inclined guide grooves 330 and staggered with each downwardly inclined guide groove 330;

[0041] Each downwardly inclined guide groove 330 and each upwardly inclined guide groove 331 are composed of three sub-guide grooves 332 which partially overlap each other and are distributed from top to bottom, and the bottom of each sub-guide groove 332 is an arc-shaped structure. When the drilling fluid enters the vacuum cooling body 30, it first flows downwardly from the uppermost downwardly inclined guide groove 330. When the drilling fluid flows to the first upwardly inclined guide groove 331, the drilling fluid flows downward in the opposite direction and flows to the second downwardly inclined guide groove 330 again. Then, the above steps are repeated until the drilling fluid passes through the last downwardly inclined guide groove 330 in sequence and flows out of the vacuum cooling body 30. The purpose of the above process is to greatly prolong the residence time of the drilling fluid in the vacuum cooling body 30, and at the same time, increase the contact area between the drilling fluid and the cooling medium of the vacuum environment. , so that the drilling fluid is cooled more thoroughly. The long cooling process helps to make the temperature distribution inside and outside the drilling fluid more uniform, reducing problems caused by temperature differences, such as the formation of sediments or changes in the properties of the drilling fluid. When the drilling fluid flows through each lower inclined guide groove 330 and the upper inclined guide groove 331, each flow process is segmented and extended again through each sub-guide groove 332, further extending the residence time of the drilling fluid in the vacuum cooling body 30 and increasing the contact area with the cooling medium of the vacuum environment. The bottom end of each sub-guide groove 332 is set as an arc structure, the purpose of which is to guide the drilling fluid to flow in a more continuous and orderly manner, thereby improving the flow efficiency. At the same time, it helps the drilling fluid to transition smoothly and reduce the turbulence and eddy currents generated during the diversion process, which is conducive to maintaining the uniformity and stability of the drilling fluid.

[0042] Example 2

[0043] The difference between this embodiment and embodiment 1 is that:

[0044] like Figure 4 , 5 As shown, the cooling water pipe 21 is a bent serpentine coil, and the first fixing sleeves 26 are respectively provided on the inner wall of the combined cooling body 20 and the water inlet side and the water outlet side of the cooling water pipe 21, and the second fixing sleeves 27 are provided on the inner wall of the combined cooling body 20 and the respective bending places of the cooling water pipe 21. The first fixing sleeve 26 and the second fixing sleeve 27 have the same structure, and both can adopt the existing flange or clamp, and both play the purpose of fixing the cooling water pipe 21, so as to ensure the reliability and durability of the connection of the cooling water pipe 21;

[0045] The drilling fluid casing 22 is sleeved on the outer wall of the cooling water pipe 21 in a winding manner, and 20 guide blocks 221 are evenly arranged on the outer wall of the drilling fluid casing 22, and 10 supporting connecting columns 231 are arranged between the air-cooling casing 23 and the drilling fluid casing 22. When the jet holes 230 on the inner wall of the air-cooling casing 23 spray cold air to the outer wall of the drilling fluid casing 22, due to the setting of the guide blocks 221 on the outer wall of the drilling fluid casing 22, the path of the airflow is changed, which helps to achieve uniform cooling of various parts of the outer wall of the drilling fluid casing 22, avoid local overheating or insufficient cooling, slow down the airflow speed, and help to form a stable cooling boundary layer on the outer wall of the pipeline, which is beneficial to improving the heat exchange coefficient.

[0046] Example 3

[0047] The difference between this embodiment and embodiment 2 is that:

[0048] like Figure 6 , 7 As shown, a drilling fluid dilution box 11 is provided with a drilling fluid dilution assembly 14, which includes two sliding adjustment plates 140 that can slide up and down along the inner wall of the drilling fluid dilution box 11, three dilution rods 141 that are arranged on opposite sides of the two sliding adjustment plates 140 and are staggered, a water storage tank 142 connected to each dilution rod 141, a hydraulic drive element 143 that drives the two sliding adjustment plates 140 to slide, and a concentration sensor 144 that is arranged on the water inlet side of the drilling fluid dilution box 11. The side wall of the dilution rod 141 is evenly provided with 30 dilution holes 145 from top to bottom. The hydraulic drive element 143 adopts an existing hydraulic cylinder, a hydraulic motor or a hydraulic lift; when the concentration The sensor 144 is composed of a chloride ion concentration sensor, a sulfur ion concentration sensor and a potassium ion concentration sensor, and is used to detect the chloride ion concentration, sulfur ion concentration and potassium ion concentration of the drilling fluid entering the drilling fluid dilution box 11. When dilution is required, the two relatively distributed sliding adjustment plates 140 are driven to move toward each other by the hydraulic drive element 143. At the same time, the water in the water storage tank 142 is evenly sprayed into the drilling fluid through the dilution holes 145 on the side walls of each dilution rod 141 by a pump to dilute it, so that it can be better mixed with the drilling fluid, improve the dilution efficiency, and help prevent the deposition of solid particles caused by local excessive dilution. Finally, it can be discharged into the oil well 10;

[0049] Each dilution rod 141 is provided with a protective mesh cover 146 on its exterior. The protective mesh cover 146 can ensure the spraying of water flow and protect the dilution rod 141 to prevent the dilution hole 145 on the dilution rod 141 from being blocked.

[0050] The method for using the device of this embodiment includes the following steps:

[0051] S1, the drilling fluid at the bottom of the oil well 10 is pumped to the vibrating screen 100 by the pumping pump 12, and the larger solid particles and drill cuttings are separated from the drilling fluid. The drilling fluid is further separated into solid and liquid by the centrifugal pump 101 to remove smaller solid particles and impurities. Then, the drilling fluid enters the drilling fluid casing 22. At the same time, the cooling water in the cooling water storage tank 24 is passed into the cooling water pipe 21 to cool the inner side of the drilling fluid casing 22 wrapped around its outer wall. The cooling air is passed into the air-cooling casing 23 by the air cooler 25. The cooling air is sprayed to the outer wall of the drilling fluid casing 22 through each jet hole 230 and cools the outer wall of the drilling fluid casing 22. Through the above process, the inner and outer sides of the drilling fluid casing 22 are cooled by a combined water cooling + air cooling method;

[0052] S2. Detect whether the temperature of the drilling fluid at the outlet side of the drilling fluid casing 22 is cooled to less than 30°C by the temperature sensor 220. If it is greater than 30°C, continue to cool it by the vacuum cooling device 3. If it is less than 30°C, the drilling fluid directly flows into the drilling fluid dilution tank 11. If the temperature of the drilling fluid after cooling by the vacuum cooling device 3 is still greater than 30°C, the drilling fluid is pumped back to the drilling fluid casing 22 through the circulation pipe 110 for repeated cooling.

[0053] S3, when the drilling fluid is treated by the vacuum cooling device 3, the air in the vacuum cooling body 30 is extracted by the vacuum pump 32 and the vacuum suction head 31, ensuring that the high vacuum state inside the vacuum cooling body 30 is maintained. When the drilling fluid enters the vacuum cooling body 30, first, it flows downward from the uppermost lower inclined guide groove 330. When the drilling fluid flows to the first upper inclined guide groove 331, the drilling fluid flows downward in the opposite direction and flows to the second lower inclined guide groove 330 again. Then, the above steps are repeated until the drilling fluid passes through the last lower inclined guide groove 330 in sequence and flows out of the vacuum cooling body 30. When the drilling fluid flows through each lower inclined guide groove 330 and the upper inclined guide groove 331, each flow process is segmented and extended again through each sub-guide groove 332;

[0054] S4. When the drilling fluid enters the water inlet side of the drilling fluid dilution box 11, the chloride ion concentration sensor, the sulfur ion concentration sensor and the potassium ion concentration sensor are used to detect the chloride ion concentration, the sulfur ion concentration and the potassium ion concentration of the drilling fluid entering the drilling fluid dilution box 11 respectively. When dilution is required, the two relatively distributed sliding adjustment plates 140 are driven to move toward each other by the hydraulic drive element 143. At the same time, the water in the water storage tank 142 is evenly sprayed into the drilling fluid through the dilution holes 145 on the side walls of each dilution rod 141 by a pump for dilution. The diluted drilling fluid is then returned to the oil well 10.

Claims

1. A circulating cooling device for drilling fluid used in deep well drilling of shale gas, characterized in that: It comprises a filter (1), an air cooling-water cooling combination device (2), and a vacuum cooling device (3) which are sequentially connected along the flow direction of the drilling fluid; The filter (1) is connected to the bottom end of the oil well (10) via a connecting pipe; The air-cooling-water-cooling combined device (2) comprises a combined cooling body (20), a cooling water pipe (21) arranged in the combined cooling body (20), a drilling fluid casing (22) sleeved on the outside of the cooling water pipe (21) and connected to the filter (1) on the water inlet side, an air-cooling casing (23) sleeved on the outside of the drilling fluid casing (22) and with a gap between the casing and the outer wall of the drilling fluid casing (22), a cooling water storage tank (24) connected to the cooling water pipe (21), and a cooling water storage tank (24) connected to the air-cooling casing (23). The air cooler (25) is connected to the air cooler (25), the inner wall of the air cooling sleeve (23) is provided with a plurality of jet holes (230), the water outlet side of the drilling fluid sleeve (22) is connected to the vacuum cooling device (3) and a temperature sensor (220) is provided at the connection, the drilling fluid sleeve (22) and the vacuum cooling device (3) are respectively connected to the oil well (10) and a drilling fluid dilution tank (11) is provided at the connection, and the drilling fluid dilution tank (11) and the drilling fluid sleeve (22) are connected via a circulation pipe (110).

2. The circulating cooling equipment for drilling fluid used for deep well drilling of shale gas according to claim 1 is characterized in that: A pumping pump (12) is provided at the connection between the filter (1) and the oil well (10), and opening and closing valves (13) are provided between the filter (1) and the drilling fluid casing (22), between the drilling fluid casing (22) and the vacuum cooling device (3), between the drilling fluid casing (22) and the drilling fluid dilution tank (11), and between the vacuum cooling device (3) and the drilling fluid dilution tank (11).

3. The circulating cooling equipment for drilling fluid used for deep well drilling of shale gas according to claim 1 is characterized in that: The cooling water pipe (21) is a bent serpentine coil, and the inner wall of the combined cooling body (20) and the outer sides of the water inlet and water outlet of the cooling water pipe (21) are respectively provided with first fixing sleeves (26), and the inner wall of the combined cooling body (20) and the respective bending places of the cooling water pipe (21) are provided with second fixing sleeves (27).

4. The circulating cooling equipment for drilling fluid used for shale gas deep well drilling according to claim 1 is characterized in that: The drilling fluid casing (22) is sleeved on the outer wall of the cooling water pipe (21) in a winding manner, and a plurality of guide blocks (221) are evenly arranged on the outer wall of the drilling fluid casing (22), and a plurality of supporting connection columns (231) are arranged between the air-cooling casing (23) and the drilling fluid casing (22).

5. The circulating cooling equipment for drilling fluid used for shale gas deep well drilling according to claim 1 is characterized in that: The vacuum cooling device (3) comprises a vacuum cooling body (30) connected to the water outlet side of the drilling fluid casing (22), a vacuum suction head (31) arranged at the upper end of the vacuum cooling body (30), a vacuum pump (32) connected to the vacuum suction head (31), and a guide groove assembly (33) arranged in the vacuum cooling body (30).

6. The circulating cooling equipment for drilling fluid used for shale gas deep well drilling according to claim 5 is characterized in that: The guide groove assembly (33) comprises a plurality of downwardly inclined guide grooves (330) distributed in parallel from top to bottom, and a plurality of upwardly inclined guide grooves (331) arranged between two adjacent downwardly inclined guide grooves (330) and distributed in an end-to-end staggered manner with each of the downwardly inclined guide grooves (330).

7. The circulating cooling equipment for drilling fluid used for deep well drilling of shale gas according to claim 6, characterized in that: Each of the downwardly inclined guide grooves (330) and each of the upwardly inclined guide grooves (331) is composed of a plurality of sub-guide grooves (332) that are partially overlapped head to tail and distributed from top to bottom, and the bottom end of each sub-guide groove (332) is an arc-shaped structure.

8. The circulating cooling equipment for drilling fluid used for shale gas deep well drilling according to claim 1 is characterized in that: The drilling fluid dilution box (11) is provided with a drilling fluid dilution assembly (14), the drilling fluid dilution assembly (14) comprising two sliding adjustment plates (140) that can slide up and down along the inner wall of the drilling fluid dilution box (11), a plurality of dilution rods (141) arranged on opposite sides of the two sliding adjustment plates (140) and arranged in a staggered manner, a water storage tank (142) connected to each of the dilution rods (141), a hydraulic drive element (143) that drives the two sliding adjustment plates (140) to slide, and a concentration sensor (144) arranged on the water inlet side of the drilling fluid dilution box (11), and a plurality of dilution holes (145) are evenly arranged on the side wall of the dilution rod (141) from top to bottom.

9. The circulating cooling equipment for drilling fluid used for deep well drilling of shale gas according to claim 8, characterized in that: Each dilution rod (141) is provided with a protective mesh cover (146) on the outside.

Citation Information

Cited By

  • High-performance heat exchanger for recovering heat energy of drilling fluid

    CN121760641A

  • A high-performance heat exchanger for drilling fluid heat energy recovery

    CN121760641B