Smooth blasting hole structure for smooth blasting of single-track railway tunnel and blasting method

By using plug covers and spacers in the light burst holes to control the explosive structure, the problems of large number of drilling holes, long operating time and uneven blasting effect in the existing light burst hole construction are solved, and low-cost and efficient blasting is achieved Effects are especially suitable for small section tunnel construction.

CN118936258APending Publication Date: 2024-11-12CCCC SECOND HIGHWAY ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410088532.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing light burst hole construction method, the annular uncoupled continuous loading structure leads to a large number of drilling holes and a long operating time. The traditional axial air-spaced loading is not ideal in a groundwater rich environment, and it is difficult to control the spacing of the medicine rolls, resulting in blasting. The effect is uneven, and serious problems of super under-excavation and surrounding rock disturbance.

Method used

Use explosive filling pipes with plug covers to prevent groundwater from affecting, and strictly control the spacing between the main medicine roll and the auxiliary medicine roll through the spacer strip. Use low-cost auxiliary materials to arrange the charging structure according to the design, and combine the detonation cable and wedge block to fix the explosive Fill the pipe to ensure that the blasting profile is clearly visible and reduce costs and operating time.

Benefits of technology

It effectively reduces the number of drilling holes and operating time, improves the blasting effect, especially in small-section tunnel construction, which significantly reduces the cost and time, ensuring the clarity of the blasting profile and the uniformity of the blasting effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936258A_ABST
    Figure CN118936258A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of tunnel engineering, and particularly relates to a smooth blasting hole structure for smooth blasting of a single-track railway tunnel and a blasting method. A smooth blasting hole structure for smooth blasting of a single-track railway tunnel comprises a smooth blasting hole, an explosive filling pipe is arranged in the smooth blasting hole, a plug cover is arranged at the end, close to the bottom of the smooth blasting hole, of the explosive filling pipe, a main cartridge, a plurality of auxiliary cartridges and a detonating cord are arranged in the explosive filling pipe, and the main cartridge and the auxiliary cartridges are arranged at intervals and sequentially connected through the detonating cord. Stemming is arranged at one end, away from the bottom of the smooth blasting hole, of the explosive filling pipe. The influence of underground water on the charging structure is prevented by arranging the explosive filling pipe provided with the plug cover, the main cartridge and the auxiliary cartridges are arranged at intervals, the charging structure can be well arranged according to a blasting design file, the blasting contour line is clear and visible after smooth blasting, the cost is low, the whole blasting process consumes less time, and the blasting efficiency is improved. The method is suitable for blasting construction of small-section single-track railway tunnels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a smooth blasting hole structure and a blasting method for smooth blasting of a single-track railway tunnel. Background Art

[0002] Smooth blasting is often used as the main excavation method in the construction of highway tunnels and railway tunnels. Its biggest feature is that it can better control over-excavation and under-excavation. The effect of smooth blasting mainly depends on whether the position and angle of the smooth blasting hole are set reasonably and whether the charging structure matches the geological conditions and construction methods of the tunnel. Therefore, the setting of the parameters of the smooth blasting hole will directly affect the progress and cost of the project. At present, the charging structures for smooth blasting holes include annular uncoupled continuous charging and axial air interval charging. These two charging structures are simple to operate, can save explosives in actual operation, and have a good effect on the excavation contour line during blasting. The external rock mass is less disturbed, and the excavation contour line is clearly visible after blasting. It is currently widely used in most tunnel excavation blasting. In recent years, tunnel blasting construction still mostly adopts axial air-spaced charging. Chinese patent CN212778921U "A simple and efficient hole plugging device" mainly discloses a simple and efficient hole plugging device, including a blasthole, an expansion material, an initiating device, a buffer material, an auxiliary plugger, and a plug. Its main feature is that it can improve the quality of hole plugging, prolong the action time of the expansion material, improve the crushing degree of rock and the effective energy utilization rate of the expansion material, and ensure the tunnel blasting effect.

[0003] In the process of realizing the embodiments of the present invention, the inventors found that there are at least the following problems in the background technology: if an annular uncoupled continuous charging structure is used as a light blasting hole construction method, there are problems of a large number of holes drilled and a long operation time; if traditional axial air-spaced charging is used, when constructing a tunnel with abundant groundwater, some holes often have a large amount of water when drilling holes on the face, which is not conducive to charging operations and the blasting effect is not very ideal; and in the actual on-site operation process, it is found that the traditional light blasting hole charging generally has the problem that the operator cannot control the spacing and size between the charge rolls well, and the human subjective control factor is obvious, which will cause the charging to be too concentrated in most of the peripheral holes of the smooth surface blasting, and the detonation energy after detonation is unevenly distributed along the longitudinal direction of the light blasting hole, which will lead to serious over-excavation and under-excavation, and excessive disturbance of the surrounding rock. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a smooth blasting hole structure and a blasting method for smooth blasting of a single-track railway tunnel. An explosive filling pipe equipped with a plug cover is provided to prevent the influence of groundwater on the charging structure. The spacing between the main charge roll and the auxiliary charge roll, and between the auxiliary charge rolls, is strictly controlled by setting spacers. The auxiliary materials used can be processed and used at low cost. The charging structure can be well arranged according to the blasting design documents. After smooth blasting, the blasting contour line is clearly visible, the cost is low, and the entire blasting process takes less time. It is more effective for blasting construction of small-section tunnels.

[0005] The technical solution of the present invention is: a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, comprising a smooth blasting hole, an explosive filling tube is arranged in the smooth blasting hole, a plug cover is arranged at one end of the explosive filling tube close to the bottom of the smooth blasting hole, a main explosive roll, a plurality of auxiliary explosive rolls and a detonating cord are arranged in the explosive filling tube, the main explosive roll and the plurality of auxiliary explosive rolls are arranged at intervals and connected in sequence by the detonating cord, and taphole mud is arranged at one end of the explosive filling tube away from the bottom of the smooth blasting hole.

[0006] A plurality of wedge blocks are arranged circumferentially on the outer side of one end of the explosive filling tube away from the bottom of the smooth blasting hole, and the wedge blocks fix the explosive filling tube in the smooth blasting hole. The diameter of the smooth blasting hole is greater than 1.5 times the diameter of the explosive filling tube.

[0007] The main charge roll is installed at one end of the explosive filling tube close to the bottom of the light blasting hole, and the auxiliary charge roll is installed in the explosive filling tube between the main charge roll and the gun mud according to the designed spacing. The gun mud blocks the end of the explosive filling tube away from the bottom of the light blasting hole and contacts with the auxiliary charge roll.

[0008] One end of the detonating cord is installed on the main charge roll in the explosive filling tube, and the other end is led out of the light explosion hole along the inner wall of the explosive filling tube.

[0009] A No. 1 partition bar is arranged between the main medicine roll and the auxiliary medicine roll, and a No. 2 partition bar is arranged between the auxiliary medicine rolls. The No. 1 partition bar and the No. 2 partition bar can be made of wooden strips or plastic PVC pipes.

[0010] The height of the No. 1 and No. 2 spacers is less than the inner diameter of the explosive filling tube, and the length of the No. 1 and No. 2 spacers is determined according to the designed light blasting hole depth, the length of the main explosive roll and the auxiliary explosive roll, as shown below: (1) (2) (3) (4) (5) In the formula: L1 represents the longitudinal length of the No. 1 spacer; L2 represents the longitudinal length of the No. 2 spacer; L3 represents the longitudinal length of the taphole mud; A1 represents the longitudinal length of the main charge roll; A2 represents the longitudinal length of the auxiliary charge roll; L represents the longitudinal length of the explosive filling tube; Q1 represents the length of the rock emulsion explosive, the longitudinal length L1 of the No. 1 spacer is 10~15cm longer than the longitudinal length L2 of the No. 2 spacer; for the Grade III surrounding rock of the single-track railway tunnel, the L value range is 310~320cm, and for the Grade IV surrounding rock of the single-track railway tunnel, the L range is 360~370cm.

[0011] The length of the explosive filling tube exceeds the depth of the smooth blasting hole, and the length of the explosive filling tube exceeds the depth of the smooth blasting hole by 2 cm to 5 cm.

[0012] A blasting method of a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, using the above-mentioned smooth blasting hole structure for smooth blasting of a single-track railway tunnel, comprises the following steps: S1: Processing an explosive loading tube, the length of which exceeds the depth of the smooth blasting hole by 2 cm to 5 cm, and installing a plug cap on the end of the explosive loading tube, and then inserting it into the smooth blasting hole that has been drilled; S2: Use a special tamping rod to insert the main charge roll connected with the detonating cord into the bottom of the hole in the explosive filling tube; S3: Multiple auxiliary charge rolls are sequentially filled into the explosive filling pipe using a special tamping rod, wherein the No. 1 spacer between the main charge roll and the auxiliary charge roll and the No. 2 spacer between the auxiliary charge rolls are cut and installed according to the length calculated in advance, and after the explosives are filled, the vacant area of ​​the explosive filling pipe near one end of the tunnel working face is blocked with taphole mud; S4: Using a wedge block to plug the gap between the explosive loading tube and the smooth blasting hole completed in step S3 above, to ensure that the explosive loading tube will not be separated from the smooth blasting hole due to blasting connection lines and groundwater; S5: Connect and detonate after safety check.

[0013] A blasting method of a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, using the above-mentioned smooth blasting hole structure for smooth blasting of a tunnel, comprises the following steps: S1: Determine the length of the explosive filling tube according to the surrounding rock conditions of the tunnel and complete the processing of the explosive filling tubes of all smooth blasting holes outside the tunnel. The length of the explosive filling tube exceeds the depth of the smooth blasting hole by 2cm to 5cm, and install the plug cap at the end of the explosive filling tube; S2: The explosive charging pipe processed outside the tunnel and installed with the plug cap is transported to the charging area of ​​the tunnel face, and the main charge roll connected with the detonating cord is inserted into the bottom of the hole of the explosive charging pipe with a special tamping rod; S3: Load the No. 1 spacer into the end of the main charge roll near the orifice in the above step S2, then load one section of the auxiliary charge roll into the explosive filling tube in sequence, and then load one section of the No. 2 spacer continuously, and after all the auxiliary charge rolls and No. 2 spacers in the entire explosive filling tube are loaded, use taphole mud to block the remaining space in the explosive filling tube; S4: repeat the above steps S1 to S3 in sequence until all the explosive filling pipes are filled with explosives and sealed with taphole mud; S5: The operator inserts the explosive filling tube that has been filled with explosives and sealed with taphole mud into the pre-drilled smooth blasting hole in sequence, and uses a wedge block to plug the gap between the explosive filling tube and the aperture of the smooth blasting hole to ensure that the explosive filling tube will not be separated from the smooth blasting hole due to blasting connection lines and groundwater. S6: Connect and detonate after safety check.

[0014] The technical effects of the present invention are as follows: 1. The present invention prevents the influence of groundwater on the charging structure and blasting by arranging an explosive filling pipe equipped with a plug cover, and uses spacer bars to strictly control the spacing between the main charge roll and the auxiliary charge roll, and between the auxiliary charge rolls. The auxiliary materials used can be processed and used at low cost, and the charging structure can be well arranged according to the blasting design documents. After smooth blasting, the blasting contour line is clearly visible, the cost is low, and the entire blasting process takes less time, which is especially effective for small-section tunnel blasting construction; 2. The present invention uses spacer bars to control between the main charge roll and the auxiliary charge roll, and between the auxiliary charge rolls. Compared with the construction method of the annular uncoupled continuous charging structure as a smooth blasting hole, the number of drilled holes is small and the operation time is short. 3. When using explosive filling tube to assist smooth surface blasting, the loading of emulsion explosive can be divided into first installing the explosive filling tube in the smooth blasting hole and then filling the emulsion explosive and gun mud, or first filling the emulsion explosive and gun mud in the explosive filling tube and then installing the explosive filling tube into the smooth blasting hole after the charging is completed. Compared with the traditional charging method, both methods can save a lot of charging time, are easy for operators to install, and the smooth blasting effect is very obvious after detonation.

[0015] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The diagram is a longitudinal section of a smooth blasting hole structure for smooth blasting in a single-track railway tunnel according to an embodiment of the present invention.

[0017] Figure 2 It is an enlarged schematic diagram of the face end of a smooth blasting hole structure for smooth blasting in a single-track railway tunnel according to an embodiment of the present invention.

[0018] Figure 3 Schematic diagram of a plug cover according to an embodiment of the present invention.

[0019] Figure numerals: 1-light blasting hole; 2-explosive filling tube; 201-plug cover; 202-wedge block; 3-main charge roll; 4-auxiliary charge roll; 5-detonating cord; 6-No. 1 spacer; 7-No. 2 spacer; 8-gun mud. DETAILED DESCRIPTION Example 1

[0020] like Figure 1~Figure 3 As shown, a smooth blasting hole structure for smooth blasting of a single-track railway tunnel comprises a smooth blasting hole 1, wherein an explosive loading tube 2 is arranged in the smooth blasting hole 1, wherein one end of the explosive loading tube 2 close to the bottom of the smooth blasting hole 1 is provided with a plug cover 201, wherein a main charge roll 3, a plurality of auxiliary charge rolls 4 and a detonating cord 5 are arranged in the explosive loading tube 2, wherein the main charge roll 3 and the plurality of auxiliary charge rolls 4 are arranged at intervals and are sequentially connected through the detonating cord 5, and wherein one end of the explosive loading tube 2 away from the bottom of the smooth blasting hole 1 is provided with taphole mud 8.

[0021] During actual use, the plug cover 201 of the present invention can be connected to the explosive filling pipe 2 as a whole by gluing or threading. The explosive filling pipe 2 equipped with the plug cover 201 is provided to prevent the influence of groundwater on the charging structure. The main charge roll 3 and the plurality of auxiliary charge rolls 4 are arranged at intervals. The charging structure can be well arranged according to the blasting design documents. After smooth blasting, the blasting contour line is clearly visible, the cost is low, and the entire blasting process takes less time. It is suitable for small-section tunnel blasting construction. Example 2

[0022] Preferably, on the basis of Example 1, in this embodiment, a plurality of wedge blocks 202 are circumferentially arranged on the outer side of one end of the explosive loading tube 2 away from the bottom of the light blasting hole 1, and the wedge blocks 202 fix the explosive loading tube 2 in the light blasting hole 1, and the diameter of the light blasting hole 1 is greater than 1.5 times the diameter of the explosive loading tube 2.

[0023] During actual use, the explosive loading tube 2 of the present invention is circumferentially provided with a plurality of wedge blocks 202 at the outer side of one end away from the bottom of the light blasting hole 1. The wedge blocks 202 fix the explosive loading tube 2 in the light blasting hole 1. The wedge blocks 202 can be made of wood or plastic and processed in batches for use, so as to ensure that the explosive loading tube 2 remains stable during the charging process. Example 3

[0024] Preferably, on the basis of Example 1 or Example 2, in this embodiment, the main drug roll 3 is installed at one end of the explosive filling tube 2 close to the bottom of the light blasting hole 1, and the auxiliary drug roll 4 is installed in the explosive filling tube 2 between the main drug roll 3 and the gun mud 8 according to the designed spacing. The gun mud 8 blocks the end of the explosive filling tube 2 away from the bottom of the light blasting hole 1 and contacts with the auxiliary drug roll 4.

[0025] During actual use, the main charge roll 3 of the present invention is installed at one end of the explosive filling tube 2 close to the bottom of the light blasting hole 1, and the auxiliary charge roll 4 is installed in the explosive filling tube 2 between the main charge roll 3 and the taphole mud 8 according to the designed spacing. The taphole mud 8 blocks the end of the explosive filling tube 2 away from the bottom of the light blasting hole 1 and contacts with the auxiliary charge roll 4. The blasting contour line produced after blasting is clearly visible and the cost is low. Example 4

[0026] Preferably, based on Example 1 or Example 3, in this embodiment, one end of the detonating cord 5 is installed on the main charge roll 3 in the explosive filling tube 2, and the other end is led out of the light explosion hole 1 along the inner wall of the explosive filling tube 2.

[0027] In actual use, one end of the detonating cord 5 of the present invention is installed on the main charge roll 3 in the explosive filling tube 2, and the other end is led out of the light explosion hole 1 along the inner wall of the explosive filling tube 2. The detonating cord 5 is used to detonate the main charge roll 3 and the auxiliary charge roll 4. Example 5

[0028] Preferably, based on Example 1 or Example 4, in this embodiment, a No. 1 partition bar 6 is provided between the main medicine roll 3 and the auxiliary medicine roll 4, and a No. 2 partition bar 7 is provided between the auxiliary medicine rolls 4. The No. 1 partition bar 6 and the No. 2 partition bar 7 can be made of wooden strips or plastic PVC pipes.

[0029] During actual use, a No. 1 spacer bar 6 is provided between the main medicine roll 3 and the auxiliary medicine roll 4 of the present invention, and a No. 2 spacer bar 7 is provided between the auxiliary medicine rolls 4. When in use, the No. 1 spacer bar 6, the auxiliary medicine roll 4, the No. 2 spacer bar 7 and the auxiliary medicine roll 6 are sequentially filled into the explosive filling tube using a special tamping rod to ensure that the main medicine roll 3, the No. 1 spacer bar 6, the auxiliary medicine roll 4 and the No. 2 spacer bar 7 are in contact with each other. The present invention uses spacers to control between the main medicine roll and the auxiliary medicine roll, and between the auxiliary medicine rolls. Compared with the construction method of the annular uncoupled continuous charging structure as a light blasting hole, the number of holes drilled is small and the operation time is short. Example 6

[0030] Preferably, on the basis of Example 1 or Example 5, in this embodiment, the height of the No. 1 spacer bar 6 and the No. 2 spacer bar 7 is less than the inner diameter of the explosive filling tube 2, and the length of the No. 1 spacer bar 6 and the No. 2 spacer bar 7 is determined according to the designed depth of the light blasting hole 1, the length of the main charge roll 3 and the auxiliary charge roll 4, as shown below: (1) (2) (3) (4) (5) In the formula: L1 represents the longitudinal length of the No. 1 spacer; L2 represents the longitudinal length of the No. 2 spacer; L3 represents the longitudinal length of the taphole mud; A1 represents the longitudinal length of the main charge roll; A2 represents the longitudinal length of the auxiliary charge roll; L represents the longitudinal length of the explosive filling tube; Q1 represents the length of the rock emulsion explosive, the longitudinal length L1 of the No. 1 spacer is 10~15cm longer than the longitudinal length L2 of the No. 2 spacer; for the Grade III surrounding rock of the single-track railway tunnel, the L value range is 310~320cm, and for the Grade IV surrounding rock of the single-track railway tunnel, the L range is 360~370cm.

[0031] During actual use, the height of the No. 1 spacer 6 and the No. 2 spacer 7 of the present invention is smaller than the inner diameter of the explosive loading tube 2, and the length of the No. 1 spacer 6 and the No. 2 spacer 7 is determined according to the designed depth of the light blasting hole 1, the length of the main charge roll 3 and the auxiliary charge roll 4, which facilitates the charging operation and ensures the tunnel blasting effect. Example 7

[0032] Preferably, based on Example 1 or Example 6, in this embodiment, the length of the explosive loading tube 2 exceeds the depth of the light blasting hole 1, and the length of the explosive loading tube 2 exceeds the depth of the light blasting hole 1 by 2 cm to 5 cm.

[0033] During actual use, the length of the explosive filling tube 2 of the present invention exceeds the depth of the smooth blasting hole 1, and the length of the explosive filling tube 2 exceeds the depth of the smooth blasting hole 1 by 2 cm to 5 cm, which facilitates the installation of the explosive filling tube 2 in the smooth blasting hole 1. Example 8

[0034] A blasting method of a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, using the above-mentioned smooth blasting hole structure for smooth blasting of a single-track railway tunnel, comprises the following steps: S1: Processing the explosive filling tube 2, the length of which exceeds the depth of the smooth blasting hole 1 by 2 cm to 5 cm, and installing a plug cap 201 on the end of the explosive filling tube 2, and then inserting it into the smooth blasting hole 1 which has been drilled; S2: insert the main charge roll 3 connected with the detonating cord 5 into the bottom of the hole of the explosive filling tube 2 using a special tamping rod; S3: Multiple auxiliary drug rolls 4 are sequentially filled into the explosive filling tube 2 using a special tamping rod, wherein the No. 1 spacer 6 between the main drug roll 3 and the auxiliary drug roll 4 and the No. 2 spacer 7 between the auxiliary drug rolls 4 and the auxiliary drug rolls 4 are cut and installed according to the length calculated in advance, and after the explosives are filled, the vacant area of ​​the explosive filling tube 2 near one end of the tunnel working face is blocked with tapping mud 8; S4: Use a wedge block 202 to plug the gap between the explosive loading tube 2 and the smooth blasting hole 1 completed in step S3 to ensure that the explosive loading tube will not be separated from the smooth blasting hole due to blasting connection lines and groundwater. S5: Connect and detonate after safety check. Example 9

[0035] A blasting method of a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, using the above-mentioned smooth blasting hole structure for smooth blasting of a tunnel, comprises the following steps: S1: Determine the length of the explosive filling tube 2 according to the surrounding rock conditions of the tunnel and complete the processing of the explosive filling tube 2 of all smooth blasting holes outside the tunnel. The length of the explosive filling tube 2 exceeds the depth of the smooth blasting hole 1 by 2 cm to 5 cm, and install the plug cap 201 at the end of the explosive filling tube 2; S2: transport the explosive charging pipe 2 processed outside the tunnel and installed with the plug cover 201 to the charging area of ​​the tunnel face, and insert the main charge roll 3 connected with the detonating cord 5 into the bottom of the hole of the explosive charging pipe 2 with a special tamping rod; S3: Load the No. 1 spacer 6 into the end of the main charge roll 3 near the orifice in the above step S2, then load one section of the auxiliary charge roll 4 into the explosive filling tube 2 in sequence, and then continuously load one section of the No. 2 spacer 7, and after all the auxiliary charge rolls 4 and the No. 2 spacer 7 in the entire explosive filling tube 2 are loaded, use the taphole mud 8 to block the remaining space in the explosive filling tube 2; S4: Repeat the above steps S1 to S3 in sequence until all the explosive filling tubes 2 are filled with explosives and sealed with taphole mud 8; S5: The operator inserts the explosive filling pipe 2 which has been filled with explosives and sealed with taphole mud 8 in the above steps into the pre-drilled smooth blasting hole 1 in sequence, and the gap between the explosive filling pipe 2 and the aperture of the smooth blasting hole 1 is plugged with a wedge block 202 to ensure that the explosive filling pipe 2 will not be separated from the smooth blasting hole 1 due to blasting connection lines and groundwater. S6: Connect and detonate after safety check.

[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A smooth blasting hole structure for smooth blasting of a single-track railway tunnel, characterized in that: The invention comprises a light blasting hole (1), wherein an explosive loading tube (2) is arranged in the light blasting hole (1), a plug cover (201) is arranged at one end of the explosive loading tube (2) close to the bottom of the light blasting hole (1), a main charge roll (3), a plurality of auxiliary charge rolls (4) and a detonating cord (5) are arranged in the explosive loading tube (2), the main charge roll (3) and the plurality of auxiliary charge rolls (4) are arranged at intervals and connected in sequence through the detonating cord (5), and a tapping mud (8) is arranged at one end of the explosive loading tube (2) away from the bottom of the light blasting hole (1).

2. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 1, characterized in that: A plurality of wedge-shaped blocks (202) are provided on the outer side of one end of the explosive loading tube (2) away from the bottom of the smooth blasting hole (1), and the wedge-shaped blocks (202) fix the explosive loading tube (2) in the smooth blasting hole (1). The diameter of the smooth blasting hole (1) is greater than 1.5 times the diameter of the explosive loading tube (2).

3. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 1, characterized in that: The main charge roll (3) is installed at one end of the explosive filling tube (2) close to the bottom of the light blasting hole (1), and the auxiliary charge roll (4) is installed in the explosive filling tube (2) between the main charge roll (3) and the tapping mud (8) according to the designed spacing. The tapping mud (8) blocks one end of the explosive filling tube (2) away from the bottom of the light blasting hole (1) and contacts the auxiliary charge roll (4).

4. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 1, characterized in that: One end of the detonating cord (5) is mounted on the main charge roll (3) in the explosive loading tube (2), and the other end is led out along the inner wall of the explosive loading tube (2) to the outside of the light explosion hole (1).

5. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 1, characterized in that: A No. 1 spacer (6) is provided between the main medicine roll (3) and the auxiliary medicine roll (4), and a No. 2 spacer (7) is provided between the auxiliary medicine rolls (4). The No. 1 spacer (6) and the No. 2 spacer (7) can be made of wooden strips or plastic PVC tubes.

6. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 5, characterized in that: The height of the No. 1 spacer (6) and the No. 2 spacer (7) is smaller than the inner diameter of the explosive loading tube (2), and the length of the No. 1 spacer (6) and the No. 2 spacer (7) is determined according to the designed depth of the light blasting hole (1), the length of the main explosive roll (3) and the auxiliary explosive roll (4), as shown below: (1) (2) (3) (4) (5) In the formula: L1 represents the longitudinal length of the No. 1 spacer; L2 represents the longitudinal length of the No. 2 spacer; L3 represents the longitudinal length of the taphole mud; A1 represents the longitudinal length of the main charge roll; A2 represents the longitudinal length of the auxiliary charge roll; L represents the longitudinal length of the explosive filling tube; Q1 represents the length of the rock emulsion explosive, the longitudinal length L1 of the No. 1 spacer is 10~15cm longer than the longitudinal length L2 of the No. 2 spacer; for the Grade III surrounding rock of the single-track railway tunnel, the L value range is 310~320cm, and for the Grade IV surrounding rock of the single-track railway tunnel, the L range is 360~370cm.

7. The smooth blasting hole structure for smooth blasting of a single-track railway tunnel according to claim 1, characterized in that: The length of the explosive loading tube (2) exceeds the depth of the smooth blasting hole (1), and the length of the explosive loading tube (2) exceeds the depth of the smooth blasting hole (1) by 2 cm to 5 cm.

8. A blasting method of a smooth blasting hole structure for smooth blasting of a single-track railway tunnel, using the smooth blasting hole structure for smooth blasting of a single-track railway tunnel as claimed in claim 1, characterized in that: The following steps are involved: S1: processing the explosive loading tube (2), wherein the length of the explosive loading tube (2) exceeds the depth of the smooth blasting hole (1) by 2 cm to 5 cm, and installing a plug cap (201) at the end of the explosive loading tube (2), and then inserting the explosive loading tube (2) into the smooth blasting hole (1) that has been drilled; S2: insert the main charge roll (3) connected with the detonating cord (5) into the bottom of the hole of the explosive filling tube (2) using a special tamping rod; S3: Multiple auxiliary drug rolls (4) are sequentially filled into the explosive filling pipe (2) using a special tamping rod, wherein the No. 1 spacer (6) between the main drug roll (3) and the auxiliary drug roll (4) and the No. 2 spacer (7) between the auxiliary drug rolls (4) and the auxiliary drug rolls (4) are cut and installed according to the length calculated in advance, and after the explosive filling is completed, the vacant area of ​​the explosive filling pipe (2) near one end of the tunnel working face is blocked with tapping mud (8); S4: Using a wedge block (202) to plug the gap between the explosive loading tube (2) and the smooth blasting hole (1) completed in step S3 above, to ensure that the explosive loading tube will not be separated from the smooth blasting hole (1) due to blasting connection lines and groundwater. S5: Connect and detonate after safety check.

Citation Information

Patent Citations

  • Horizontal joint fissure tunnel-smooth-excavation blasting method

    CN108469209A

  • Detonating-cord-free interval charging structure applied to tunnel smooth blasting and construction method

    CN115289928A

  • Arch support foundation pit blasting excavation structure and method

    CN116084423A

  • Water sandbag interval charging smooth blasting structure and blasting method

    CN117268198A

  • Novel tunnel light explodes quick spacing loaded constitution in hole

    CN204594356U