Blasting shock wave blocking device for underwater rock plug blasting

By using slag collecting pits and deflector structures to attenuate shock waves in underwater rock plug blasting, the impact of blasting shock waves on tunnels and gates is solved, construction efficiency and safety are improved, engineering processes are simplified, and costs are reduced.

CN118936259APending Publication Date: 2024-11-12CHINA WATER RESOURCES PEARL RIVER PLANNING SURVERYING & DESIGNING
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411301865.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the blasting of underwater rock plugs, the impact of blasting shock wave on the tunnel and surrounding structures is difficult to effectively control, resulting in safety risks and low construction efficiency. Traditional methods require casting and dismantling of plugs, which increases the cost and complexity of the project.

Method used

A blasting shock wave barrier device for underwater rock plug blasting is designed, including slag collecting pits, water pads, recoil arcs and deflectors. These structures attenuate the intensity of the shock wave, and avoid the use of plugs, and use slag collecting The water pads and deflectors in the pit reflect and divert the fluid multiple times, reducing the fluid velocity and reducing the risk of splashing and blockage of rock slag.

Benefits of technology

It effectively reduces the damage to tunnels and gates by blasting shock waves, improves construction efficiency, reduces project costs, simplifies construction processes, avoids pouring and demolition of plugs, and improves construction safety and project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936259A_ABST
    Figure CN118936259A_ABST
Patent Text Reader

Abstract

The invention provides a blasting shock wave blocking device for underwater rock plug blasting, which comprises a tunnel with a water inlet provided with a rock plug; the slag collecting pit is located at the water inlet of the tunnel, a water cushion is arranged in the slag collecting pit, the slag collecting pit is provided with a slag collecting pit inlet and a slag collecting pit outlet, the slag collecting pit inlet is located on one side of the rock plug, and the slag collecting pit outlet is communicated with the water outlet of the tunnel; the first recoil arc is positioned in the slag collecting pit; the first flow guide plate is located in the first recoil arc, a first drainage area is formed on the side, away from the first recoil arc, of the first flow guide plate, a first flow guide area is formed on the side, close to the first recoil arc, of the first flow guide plate, and the first drainage area and the first flow guide area form a first hedging area close to the outlet of the slag collecting pit. Due to the fact that the slag collecting pit, the first recoil arc and the first flow guide plate are arranged, under the condition that a plug is not arranged for plugging, damage of blasting shock waves to the service gate is avoided, pouring and dismantling of a traditional plug and drainage of a gate shaft are avoided, the construction efficiency is improved, and the engineering cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of blasting devices, and in particular to a blasting shock wave barrier device for underwater rock plug blasting. Background Art

[0002] With the development of industrial and agricultural production and life, it is often necessary to divert water from water-rich areas to water-deficient areas in order to achieve resource allocation and water balance between regions and promote social and economic development. When the water level of the reservoir in the water supply area is high and the water level in the water receiving area is low, the water from the reservoir can be diverted to the water receiving area by gravity by building water diversion tunnels and channels, without the need to use water pumps, thereby saving operating costs. In this water intake method, when the elevation of the water intake sill of the water diversion tunnel is low and the reservoir is a newly built reservoir, the water level in the reservoir area is low, the water intake is exposed above the water surface, and construction can be carried out on dry land, and the reservoir hole of the water intake is easy to achieve. However, in many cases, the reservoir has been stored and operated, and the sill of the water intake of the newly built water diversion tunnel is often located near the dead water level of the reservoir, which is tens of meters or even hundreds of meters below the water surface of the reservoir. At this time, there are two conventional methods to achieve the penetration of the reservoir hole:

[0003] 1) Lower the reservoir water level to below the sill elevation of the tunnel water intake to create dry land construction conditions for the water intake. This method is stable and reliable, but it requires lowering the reservoir water level to below the sill elevation of the water intake of the diversion tunnel, which will affect the operation efficiency of the reservoir, is too costly, and may not even be allowed.

[0004] 2) Build a deep water cofferdam in the reservoir area near the water intake of the water diversion tunnel to enclose the water intake, and then drain the water in the cofferdam to create dry land construction conditions for the water intake construction. After the project is completed, the cofferdam will be removed to achieve the connection of the reservoir tunnel. This method will bring huge engineering investment and a long construction period, which is very uneconomical.

[0005] How to efficiently and economically connect the reservoir tunnel without lowering the water level of the reservoir and affecting the operation of the reservoir is a difficult problem that needs to be solved urgently. Experts at home and abroad have proposed the use of underwater rock plug blasting to achieve the connection between the existing reservoir and the newly built tunnel. Underwater rock plug blasting is an effective, convenient and economical construction method for building a tunnel inlet on an existing reservoir or lake. Its construction process is characterized by excavating the tunnel to the bottom of the reservoir, adjacent to a certain thickness of rock mass (i.e., rock plug). After the tunnel is built, the reserved rock mass is blasted away at one time by blasting, so that the tunnel and the reservoir are connected. In this way, the blasted inlet has the expected shape and meets the hydraulic requirements for the inlet. At the same time, it is necessary to ensure that the impact of the blasting on the surrounding rock mass and nearby buildings is reduced to an acceptable level.

[0006] Rock plug blasting has the characteristics of low cost, fast construction speed, and the construction period is not affected by seasons. Therefore, it has been increasingly used in the construction of underwater water inlet projects. However, underwater rock plug blasting is usually close to various hydraulic structures and hillsides, and some are even close to river dams. In addition, the construction work is carried out under deep water pressure, so the safety issue is very prominent and the absolute safety of blasting must be guaranteed. At the same time, rock plugs can only be blasted through once, which requires the water inlet to be well formed and the surrounding rock to be stable. Therefore, blasting must be carefully designed and constructed.

[0007] However, since the rock plug blasting method involves many influencing factors, complex technology, and very little related theoretical analysis and computational research, the method is still almost at the level of empirical judgment.

[0008] The main processes of rock blasting at present are:

[0009] 1) The gate well construction is completed and the tunnel construction reaches the downstream of the rock plug;

[0010] 2) The tunnel downstream of the gate shaft is sealed with a concrete plug;

[0011] 3) Networking of charging in rock plugs;

[0012] 4) Fill the tunnel with water through the gate well;

[0013] 5) Carry out rock plug blasting to achieve the connection between the reservoir and the tunnel;

[0014] 6) After blasting, conduct underwater inspection;

[0015] 7) After passing the inspection, close the emergency gate in the gate well;

[0016] 8) Drain the water between the emergency gate and the tunnel plug by means of water pumps or other methods;

[0017] 9) Manually remove the concrete plug of the tunnel downstream of the gate shaft, discharge the slag through the gate shaft, and clean it up;

[0018] 10) Working gate in the gate well

[0019] 11) After the emergency gate is lifted in the gate shaft, the working gate can be used to control the water supply from the reservoir to the tunnel to realize water diversion.

[0020] During blasting, water is usually injected into the tunnel for pre-pressure (the water level is lower than the reservoir water level). On the one hand, the water injected into the tunnel can dissipate the energy of the blasted rock debris, preventing the rock debris from flying into the tunnel and causing blockage; on the other hand, water is injected into the tunnel to basically balance the water pressure of the reservoir after the blasting, effectively preventing the reservoir water from rushing into the tunnel in large quantities and quickly after the blasting, carrying rock debris into the tunnel and causing blockage or siltation. In order to maintain a certain water pressure in the tunnel, water can be blocked by the working gate under the gate shaft, or a plug can be used to block water in the tunnel downstream of the gate shaft. However, when the rock plug is blasted, the tunnel water flow can transmit the blasting shock wave to the gate shaft, generating a large impact force and endangering the safety of the gate. In order to prevent the blasting shock wave from damaging the gate, the gate is not used to directly block water at present, but a concrete plug is used in the tunnel downstream of the gate shaft for temporary blocking. This method can ensure the safety of the gate, but there are also the following problems: before blasting, a temporary reinforced concrete plug needs to be poured in the deep well tunnel, and after blasting, the water in the deep well needs to be drained first, and then the plug in the deep well tunnel needs to be removed. However, due to the small space in the deep well, the pouring and removal of the plug is large, and the hard plug needs to be removed manually, which has low removal efficiency. Summary of the invention

[0021] The embodiment of the present application provides a blasting shock wave barrier device for underwater rock plug blasting to solve the problems existing in the related technology. The technical solution is as follows:

[0022] The embodiment of the present application provides a blasting shock wave blocking device for underwater rock plug blasting, comprising:

[0023] Tunnels, the water inlets of which are provided with rock plugs;

[0024] A slag collection pit, which is located at the water inlet of the tunnel, is provided with a water cushion, has a slag collection pit inlet and a slag collection pit outlet, the slag collection pit inlet is located on one side of the rock plug, and the slag collection pit outlet is connected to the water outlet of the tunnel;

[0025] The first recoil arc is located in the slag collection pit;

[0026] The first guide plate is located in the first recoil arc, the side of the first guide plate away from the first recoil arc forms a first drainage area, the side of the first guide plate close to the first recoil arc forms a first guide area, and the first drainage area and the first guide area form a first counter-attack area near the slag pit outlet.

[0027] In one embodiment, the blasting shock wave barrier for underwater rock plug blasting further comprises:

[0028] The first speed limit pit is located in the tunnel, the first speed limit pit is located downstream of the slag collection pit, the first speed limit pit has a first speed limit entrance and a first speed limit exit, the first speed limit entrance is connected with the slag collection pit exit, and the first speed limit exit is connected with the water outlet of the tunnel.

[0029] In one embodiment, the first speed limit pit includes a second recoil arc and a second guide plate. The second guide plate is located in the second recoil arc. The side of the second guide plate away from the second recoil arc forms a second diversion area. The side of the second guide plate close to the second recoil arc forms a second guide area. The second diversion area and the second guide area form a second counter-attack area near the second speed limit exit.

[0030] In one embodiment, the blasting shock wave barrier for underwater rock plug blasting further comprises:

[0031] The second speed limit pit is located in the tunnel, the second speed limit pit is located downstream of the first speed limit pit, the second speed limit pit has a second speed limit entrance and a second speed limit exit, the second speed limit entrance is connected with the first speed limit exit, and the second speed limit exit is connected with the water outlet of the tunnel.

[0032] In one embodiment, the second speed limit pit includes a third recoil arc and a third guide plate. The third guide plate is located in the third recoil arc. The side of the third guide plate away from the third recoil arc forms a third diversion area. The side of the third guide plate close to the third recoil arc forms a third diversion area. The third diversion area and the third guide area form a third counter-attack area near the second speed limit exit.

[0033] In one embodiment, a first slope section is provided in the tunnel, one end of the first slope section is connected to the slag collection pit outlet, the other end of the first slope section is connected to the first speed limit entrance, and one end of the first slope section is inclined upward relative to the other end.

[0034] In one embodiment, a second slope section is provided in the tunnel, one end of the second slope section is connected to the first speed limit exit, the other end of the second slope section is connected to the second speed limit entrance, and one end of the second slope section is inclined upward relative to the other end.

[0035] In one embodiment, the fluid flowing through the first drainage area and the fluid flowing through the first flow guide area have an impact angle α in the first impact area, and the range of the impact angle α is: 0°≤α≤90°.

[0036] In one embodiment, one end of the first recoil arc is connected to the bottom of the slag collection pit, the other end of the first recoil arc is located above one end of the first recoil arc, and the first recoil arc protrudes to the outside of the slag collection pit.

[0037] In one embodiment, the first guide plate is located above the water pad.

[0038] The advantages or beneficial effects of the above technical solution include at least:

[0039] The blasting shock wave barrier device for underwater rock plug blasting of the embodiment of the present application includes a tunnel, a slag collection pit, a first recoil arc and a second recoil arc. A rock plug is provided at the water inlet of the tunnel, a water cushion is provided in the slag collection pit, and the first recoil arc is located inside the slag collection pit, and the first guide plate is located inside the first recoil arc. The side of the first guide plate away from the first recoil arc forms a first drainage area, and the side of the first guide plate close to the first recoil arc forms a first diversion area. The first diversion area and the first diversion area form a first counter-charge area near the exit of the slag collection pit. The blasting shock wave barrier device of the embodiment of the present application can be used in combination with the accident gate and the working gate on the existing blasting device. The accident gate is used to block water during blasting, and the working gate is used to control the water flow in the tunnel after blasting. During rock plug blasting, the water cushion provides strong resistance to the rock debris flying into the water cushion, dissipates and absorbs the kinetic energy of the rock debris, reduces the rock debris flying out of the slag pit, and prevents the flying rock debris from blocking the tunnel and causing damage to the working gate. Due to the provision of the first recoil arc and the first guide plate, the blasting shock wave entering through the entrance of the slag pit can be reflected multiple times in the slag pit to attenuate its intensity, block the shock wave from entering the tunnel, and prevent the working gate from being damaged by the impact. The mixed fluid of water, gas, etc. entering through the entrance of the slag pit is diverted after encountering the first guide plate. Part of the fluid enters the first drainage area, and part of the fluid enters the first diversion area. The fluid entering the first drainage area and the fluid entering the first diversion area collide with each other in the first counter-charge area, producing a blocking effect, greatly reducing the speed of the fluid, and preventing the fluid from bringing rock debris into the tunnel to cause siltation and blockage. Since the embodiment of the present application is provided with a slag collecting pit, a first recoil arc and a first guide plate, damage to the working gate by the blasting shock wave is avoided without providing a plug for sealing, and the casting and removal of the traditional plug and the drainage of the gate well are avoided, thereby improving the construction efficiency and reducing the project cost.

[0040] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present application will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.

[0042] Figure 1 It is a cross-sectional view of a counter-pressure deceleration and air-tight underwater rock plug blasting device;

[0043] Figure 2 Another cross-sectional view of the counter-deceleration air-tight underwater rock plug blasting device;

[0044] Description of reference numerals:

[0045] 1. Tunnel; 2. Rock plug; 3. Slag pit; 4. Water cushion; 31. Slag pit entrance; 32. Slag pit exit; 5. First recoil arc; 6. First guide plate; 7. First diversion area; 8. First diversion area; 9. First counter-flow area; 10. Working gate; 16. Working gate; 11. First speed limit pit; 111. First speed limit entrance; 112. First speed limit exit; 113. Second recoil arc; 114. The second guide plate; 115, the second diversion area; 116, the second diversion area; 117, the second counter-attack area; 12, the second speed limit pit; 121, the second speed limit entrance; 122, the second speed limit exit; 123, the third recoil arc; 124, the third guide plate; 125, the third diversion area; 126, the third diversion area; 127, the third counter-attack area; 13, the first slope section; 14, the second slope section; 15, the reservoir. DETAILED DESCRIPTION

[0046] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present application. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0047] like Figure 1 , Figure 2 As shown, the embodiment of the present application provides a blasting shock wave barrier device for underwater rock plug blasting, comprising a tunnel 1, a slag collecting pit 3, a first recoil arc 5 and a first guide plate 6. The water inlet of the tunnel 1 is provided with a rock plug 2. The slag collecting pit 3 is located at the water inlet of the tunnel 1. A water cushion 4 is provided in the slag collecting pit 3. The slag collecting pit 3 has a slag collecting pit inlet 31 and a slag collecting pit outlet 32. The slag collecting pit inlet 31 is located on one side of the rock plug 2. The slag collecting pit outlet 32 ​​is connected to the water outlet of the tunnel 1. The first recoil arc 5 is located in the slag collecting pit 3. The first guide plate 6 is located in the first recoil arc 5. The side of the first guide plate 6 away from the first recoil arc 5 forms a first diversion area 7. The side of the first guide plate 6 close to the first recoil arc 5 forms a first diversion area 8. The first diversion area 7 and the first guide area 8 form a first counter-impact area 9 near the slag collecting pit outlet 32.

[0048] The blasting shock wave barrier device for underwater rock plug blasting of the embodiment of the present application can be used in combination with the accident gate 10 and the working gate 17 on the existing blasting device when in use. The accident gate 10 is used to block water during blasting, and the working gate 17 is used to control the water flow in the tunnel 1 after blasting. When the rock plug 2 is blasted, the water cushion 4 provides a strong resistance to the rock debris flying into the water cushion 4, dissipates and absorbs the kinetic energy of the rock debris, reduces the rock debris flying out of the slag pit 3, and prevents the flying rock debris from blocking the tunnel 1 and causing damage to the accident gate 10. Due to the provision of the first recoil arc 5 and the first guide plate 6, the blasting shock wave entering through the slag pit entrance 31 can be reflected multiple times in the slag pit 3 to attenuate its intensity, block the shock wave from entering the tunnel 1, and prevent the accident gate 10 from being damaged by the impact. The mixed fluid of water, gas, etc. entering through the slag pit inlet 31 is diverted after encountering the first guide plate 6, and part of the fluid enters the first diversion area 7, and part of the fluid enters the first diversion area 8. The fluid entering the first diversion area 7 and the fluid entering the first diversion area 8 collide in the first counter-charge area 9, producing a blocking effect, greatly reducing the speed of the fluid, and preventing the fluid from bringing rock slag into the tunnel 1 to cause siltation and blockage. The embodiment of the present application is provided with a slag pit 3, a first recoil arc 5 and a first guide plate 6, and in the case of no plugging, the damage of the blasting shock wave to the accident gate 10 is avoided, and the casting and removal of the traditional plug and the drainage of the gate well are avoided, thereby improving the construction efficiency and reducing the project cost.

[0049] In one embodiment, one end of the first recoil arc 5 is connected to the bottom of the slag collection pit 3, and the other end of the first recoil arc 5 is located above one end of the first recoil arc 5, and the first recoil arc 5 protrudes outside the slag collection pit 3. The first guide plate 6 is located above the water cushion 4.

[0050] Since a water cushion 4 is provided in the slag collection pit 3, the water cushion 4 dissipates and absorbs the kinetic energy of the slag when the rock plug 2 is blasted, and the greater the speed of the slag, the more significant the energy dissipation effect, thereby greatly limiting the movement distance of the slag, and effectively preventing the slag from directly colliding with the lining in the tunnel 1 and causing damage to the lining. The water cushion 4 can also absorb the heat of the high-temperature blasting gas very well, reduce the temperature of the blasting gas, and thus reduce the pressure of the blasting gas. In addition, the slag entering the slag collection pit 3 can be reflected in the slag collection pit 3, thereby effectively preventing the slag from splashing and rebounding into the interior of the tunnel 1 during blasting, and avoiding siltation and blockage in the tunnel 1 caused by the entry of slag.

[0051] For the fluid flowing from the tunnel 1 into the slag collection pit 3, the first recoil arc 5 and the first guide plate 6 will not have a blocking effect on the fluid, and the fluid can flow through with low resistance, and the flow rate of the fluid changes slightly after passing through the first recoil arc 5 and the first guide plate 6. For the fluid flowing from the slag collection pit inlet 31 into the slag collection pit 3, the first guide plate 6 and the first recoil arc 5 can achieve low-resistance flow of low-speed fluid and high-resistance flow of high-speed fluid.

[0052] like Figure 1 As shown by the arrow in the middle, assuming that the pressure value of the mixed fluid ① of water, gas, etc. is P1, the fluid ① is divided into fluid ② and fluid ③ after encountering the first guide plate 6. After the fluid ② enters the first drainage area 7, it flows to the slag pit outlet 32, and the fluid ③ enters the first guide area 8 and flows to the slag pit outlet 32. Under the guidance of the first recoil arc 5 and the first guide plate 6, the fluid ③ forms a backflow, and collide with the fluid ② in the first counter-attack area 9 at an angle α, resulting in a blocking effect, hindering the overall forward flow of the fluid, greatly reducing the overall speed of the fluid, and thus greatly reducing the ability of the water flow to carry slag, so as to avoid the water flow bringing rocks into the tunnel 11 and causing siltation and blockage. After the counter-attack and energy dissipation, the fluid ② and the fluid ③ converge into the fluid ④. Assuming that the pressure value of the fluid ④ is P4, the resistance pressure Pc of the first guide plate 6 and the first recoil arc 5 is P4-P1.

[0053] In this embodiment, the size of fluid ② and fluid ③ can be adjusted by adjusting the position and setting angle of the first guide plate 6 in the circuit, and the impact angle α of fluid ② and fluid ③ can be adjusted by adjusting the curvature of the first recoil arc 5, 0°≤α≤90°.

[0054] The blocking effect is closely related to the density and velocity of fluid ①, the position and angle of the first guide plate 6 in the circuit, and the impact angle α of fluid ② and fluid ③. The greater the velocity of fluid ①, the greater the impact strength, the greater the resistance pressure Pc, and the more significant the blocking effect; the smaller the velocity of fluid ①, the smaller the impact strength, the smaller the resistance pressure Pc, and the less obvious the blocking effect. Compared with the flow velocity V0 without the impact blockage, the flow velocity after the speed limit by the first guide plate 6 and the first recoil arc 5 can be reduced by 1% to 80%, wherein the greater the velocity of fluid ①, the greater the percentage of the flow velocity reduced after the speed limit, and the smaller the velocity of fluid ①, the smaller the percentage of the flow velocity reduced after the speed limit. Therefore, by selecting the appropriate position and angle of the first guide plate 6 and the impact angle α of fluid ② and fluid ③, the effect of low-speed fluid low-resistance flow and high-speed fluid high-resistance flow blocking can be achieved.

[0055] The blasting shock wave and the blasting gas generate huge pressure at the slag pit entrance 31 of the slag pit 3, and act on the water cushion 4. The closer to the rock plug 2, the greater the pressure, and the greater the pressure on the water surface, and vice versa. In the slag pit 3, near the slag pit entrance 31, the water cushion 4 is impacted by the shock wave, squeezed by the high-pressure blasting gas, and collided with the high-speed rock slag, forming a high-pressure and high-speed "water-gas" mixed fluid ① with the blasting gas, and is separated into an upper fluid ② and a lower fluid ③ when encountering the first guide plate 6. The upper fluid ② moves rapidly toward the low-pressure tunnel 1 along the side of the first guide plate 6 away from the first recoil arc 5, and at the same time, the lower fluid ③ moves toward the low-pressure tunnel 1 along the side of the first guide plate 6 close to the first recoil arc 5, and is guided by the first recoil arc 5 to form a backflow. The lower fluid ③ collides with the fluid ② at a high speed in the first collision area 9, encounters great resistance, and forms a blocking effect, which greatly reduces the speed and flow rate of fluid ② and fluid ③ entering the tunnel 1, thereby greatly reducing the ability of the water flow to carry rock debris, so as to effectively prevent fluid ② and fluid ③ from carrying rock debris to the tunnel 1 to form siltation and blockage.

[0056] like Figure 2 As shown, in one embodiment, the blasting shock wave barrier device for underwater rock plug blasting further includes a first speed limit pit 11, which is located in the tunnel 1, and the first speed limit pit 11 is located downstream of the slag collection pit 3. The first speed limit pit 11 has a first speed limit inlet 111 and a first speed limit outlet 112, the first speed limit inlet 111 is connected to the slag collection pit outlet 32 ​​of the slag collection pit 3, and the first speed limit outlet 112 is connected to the water outlet of the tunnel 1. The first speed limit pit 11 includes a second recoil arc 113 and a second guide plate 114, the second guide plate 114 is located in the second recoil arc 113, the side of the second guide plate 114 away from the second recoil arc 113 forms a second diversion area 115, the side of the second guide plate 114 close to the second recoil arc 113 forms a second diversion area 116, and the second diversion area 115 and the second guide area 116 form a second counter-charge area 117 near the second speed limit outlet 122.

[0057] The first speed limit pit 11 is set in the tunnel 1 adjacent to the slag collection pit 3. The first speed limit pit 11 includes a second recoil arc 113 and a second guide plate 114, which are similar to the structure composed of the first recoil arc 5 and the first guide plate 6, and the working principle is also similar. Similarly, for the fluid flowing from the tunnel 1 to the slag collection pit 3, the second recoil arc 113 and the second guide plate 114 can achieve low-resistance flow; for the fluid flowing from the slag collection pit 3 to the first speed limit pit 11, the second recoil arc 113 and the second guide plate 114 can achieve low-resistance flow of low-speed fluid and high-resistance flow of high-speed fluid.

[0058] like Figure 2As shown in , the fluid ④ flowing out of the slag pit 3 is divided into fluid ⑤ and fluid ⑥ after encountering the second guide plate 114. After the fluid ⑥ enters the second diversion area 115, it flows toward the first speed limit outlet 112. After the fluid ⑤ enters the second guide area 116, it flows toward the first speed limit outlet 112. Under the guidance of the second recoil arc 113 and the second guide plate 114, the fluid ⑤ forms a backflow, and is collided with the fluid ⑥ at an angle β in the second counter-attack area 117 to converge into fluid ⑦. Due to the blocking effect caused by the counter-attack, the overall forward flow of the fluid is hindered, and the overall speed of the fluid is greatly reduced, thereby greatly reducing the ability of the water flow to carry rock slag, so as to avoid the water flow bringing rocks into the tunnel 1 and causing siltation and blockage. The setting of the first speed limit pit 11 can prevent the shock wave transmitted from the slag pit 3 from directly impacting the accident gate 10, and further reflect the blasting shock wave, dissipate the energy of the shock wave, and avoid the blasting shock wave from causing damage to the accident gate 10. The first speed limiting pit 11 further increases the resistance of the water flow from the reservoir 15 to enter the tunnel 1 after blasting, thereby significantly reducing the maximum water flow speed and the ability of the water flow to carry rock debris, so as to avoid the water flow bringing rock debris into the tunnel 1 and causing siltation and blockage.

[0059] In one embodiment, the blasting shock wave barrier for blasting underwater rock plug 2 further comprises a second speed limit pit 12, the second speed limit pit 12 is located in the tunnel 1, and the second speed limit pit 12 is located downstream of the first speed limit pit 11. The second speed limit pit 12 has a second speed limit entrance 121 and a second speed limit exit 122, the second speed limit entrance 121 is connected to the first speed limit exit 112, and the second speed limit exit 122 is connected to the water outlet of the tunnel 1. The second speed limit pit 12 comprises a third recoil arc 123 and a third guide plate 124, the third guide plate 124 is located in the third recoil arc 123, a side of the third guide plate 124 away from the third recoil arc 123 forms a third diversion area 125, a side of the third guide plate 124 close to the third recoil arc 123 forms a third diversion area 126, and the third diversion area 125 and the third guide area 126 form a third counter-charge area 127 near the second speed limit exit 122.

[0060] The second speed limit pit 12 includes a third recoil arc 123 and a third guide plate 124, which are similar in structure to the first recoil arc 5 and the first guide plate 6, and have similar working principles. Similarly, for the fluid flowing from the tunnel 1 to the slag collection pit 3, the third recoil arc 123 and the third guide plate 124 can achieve low-resistance flow; for the fluid flowing from the slag collection pit 3 to the first speed limit pit 11, the third recoil arc 123 and the third guide plate 124 can achieve low-resistance flow for low-speed fluids and high-resistance flow for high-speed fluids.

[0061] like Figure 2As shown in , the fluid ⑦ flowing out of the first speed limit pit 11 is divided into fluid ⑧ and fluid ⑨ after encountering the third guide plate 124. After the fluid ⑨ enters the third diversion area 125, it flows toward the second speed limit outlet 122. After the fluid ⑧ enters the third guide area 126, it flows toward the second speed limit outlet 122. Under the guidance of the third recoil arc 123 and the third guide plate 124, the fluid ⑧ forms a backflow, and collide with the fluid ⑨ in the second collision area 117 to converge into fluid ⑩. Due to the blocking effect caused by the collision, the overall forward flow of the fluid is hindered, which greatly reduces the overall speed of the fluid, thereby greatly reducing the ability of the water flow to carry rock debris, so as to avoid the water flow bringing rocks into the tunnel 1 and causing siltation and blockage. The setting of the second speed limit pit 12 can prevent the shock wave transmitted from the first speed limit pit 11 from directly impacting the accident gate 10, and further reflect the blasting shock wave, dissipate the energy of the shock wave, and avoid the blasting shock wave from causing damage to the accident gate 10. The second speed limiting pit 12 further increases the resistance of the water flow from the reservoir 15 to enter the tunnel 1 after blasting, thereby significantly reducing the maximum water flow speed and the ability of the water flow to carry rock debris, so as to avoid the water flow bringing rock debris into the tunnel 1 and causing siltation and blockage.

[0062] In order to achieve the connection between the slag pit 3 and the first speed limit pit 11, a first slope section 13 is provided in the tunnel 1, one end of the first slope section 13 is connected to the slag pit outlet 32, the other end of the first slope section 13 is connected to the first speed limit entrance 111, and one end of the first slope section 13 is inclined upward relative to the other end. In order to achieve the connection between the first speed limit pit 11 and the second speed limit pit 12, a second slope section 14 is provided in the tunnel 1, one end of the second slope section 14 is connected to the first speed limit exit 112, the other end of the second slope section 14 is connected to the second speed limit entrance 121, and one end of the second slope section 14 is inclined upward relative to the other end. By setting the first slope section 13 and the second slope section 14, it is ensured that the accident gate 10 is located at a high place in the tunnel 1, so that the bottom height of the accident gate 10 is higher than the heights of the slag pit 3, the first speed limit pit 11 and the second speed limit pit 12.

[0063] The blasting shock wave barrier device for underwater rock plug blasting in the embodiment of the present application does not need to set a plug, thus avoiding the pouring and removal of the plug and the filling and drainage operations of the gate well in the traditional blasting process, simplifying the process, improving the project quality, shortening the construction period, and greatly saving the project investment. It avoids the damage to the lining of the tunnel 1, the gate well and the gate slot caused by the removal of the plug and the slag discharge construction, simplifies the operation process and steps of underwater rock plug blasting, which is conducive to the control of the construction process, improves the project quality, and reduces the construction safety risk.

[0064] The embodiment of the present application can effectively eliminate the adverse effects of the blasting shock wave on the accident gate 10 through the provision of the slag collecting pit 3, the water cushion 4, the first recoil arc 5, the first guide plate, the first speed limit pit 11, the second speed limit pit 12, etc., effectively avoid the damage of the gate shaft groove by the water hammer wave, effectively prevent the gushing water from bringing rock debris to the tunnel 1 to form siltation and blockage, effectively reduce the transient flow pressure peak of the tunnel 1, and effectively reduce the oscillation time of the transient flow in the tunnel 1.

[0065] The embodiment of the present application can greatly buffer the water hammer pressure of the water flow in the tunnel 1, thereby effectively reducing the dynamic load impact of the transient flow of the gushing water on the accident gate 10. Therefore, compared with the gate of the normal working of the conventional tunnel 1, the embodiment of the present application can create a better hydraulic environment in the tunnel, so that the dynamic load pressure borne by the gate is smaller. When designing the structural strength of the accident gate 10, it is not necessary to increase the design load due to the blasting shock wave and the gushing water impact, thereby improving the material utilization rate of the accident gate 10. Although the present application directly adopts the accident gate 10 to seal the tunnel 1, the accident gate 10 still only needs to design the bearing capacity according to the static and dynamic water pressure of the normal working of the tunnel 1, and there is no need to increase the design bearing capacity due to the blasting water blocking situation, that is, there is no need to increase the cost of the accident gate 10 due to the blasting water blocking. The water cushion 4 in the slag collection pit 3 plays an energy dissipation role on the high-speed rock slag, greatly reducing the movement speed of the rock slag, thereby reducing the collision and damage of the rock slag to the lining, and also reducing the possibility of rock slag splashing into the tunnel 1 to cause siltation and blockage. In addition, the present application can also optimize the speed limiting effect by selecting appropriate positions and angles of the first guide plate 6, the second guide plate 114 and the third guide plate 124, and the impact angles α and β, and is flexible to use.

[0066] The number of the first speed limit pit 11 and the second speed limit pit 12 can be set as needed. The first speed limit pit 11 and the second speed limit pit 12 may not be set, or only the first speed limit pit 11 may be set without the second speed limit pit 12, or the number of speed limit pits may be further increased. The number of speed limit pits may be increased or decreased according to actual usage. When the difference between the water level of the reservoir 15 and the top elevation of the gate well bottom plate is ≥50m, two or more speed limit pits may be set.

[0067] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0068] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0069] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A blasting shock wave barrier for underwater rock plug blasting, characterized in that: include: A tunnel, wherein a water inlet of the tunnel is provided with a rock plug; A slag collecting pit, the slag collecting pit is located at the water inlet of the tunnel, a water cushion is arranged in the slag collecting pit, the slag collecting pit has a slag collecting pit inlet and a slag collecting pit outlet, the slag collecting pit inlet is located on one side of the rock plug, and the slag collecting pit outlet is connected to the water outlet of the tunnel; a first recoil arc, wherein the first recoil arc is located in the slag collection pit; The first guide plate is located in the first recoil arc, the side of the first guide plate away from the first recoil arc forms a first drainage area, the side of the first guide plate close to the first recoil arc forms a first guide area, and the first drainage area and the first guide area form a first counter-attack area near the outlet of the slag collecting pit.

2. The blasting shock wave barrier device for underwater rock plug blasting according to claim 1, characterized in that: The blasting shock wave barrier device for underwater rock plug blasting also includes: A first speed limit pit, wherein the first speed limit pit is located in the tunnel, the first speed limit pit is located downstream of the slag collection pit, the first speed limit pit has a first speed limit entrance and a first speed limit exit, the first speed limit entrance is connected to the slag collection pit exit, and the first speed limit exit is connected to the water outlet of the tunnel.

3. The blasting shock wave barrier device for underwater rock plug blasting according to claim 2, characterized in that: The first speed limit pit includes a second recoil arc and a second guide plate, the second guide plate is located in the second recoil arc, the side of the second guide plate away from the second recoil arc forms a second diversion area, the side of the second guide plate close to the second recoil arc forms a second guide area, and the second diversion area and the second guide area form a second counter-attack area near the second speed limit exit.

4. The blasting shock wave barrier device for underwater rock plug blasting according to claim 2, characterized in that: The blasting shock wave barrier device for underwater rock plug blasting also includes: A second speed limit pit, wherein the second speed limit pit is located in the tunnel, the second speed limit pit is located downstream of the first speed limit pit, the second speed limit pit has a second speed limit entrance and a second speed limit exit, the second speed limit entrance is connected to the first speed limit exit, and the second speed limit exit is connected to the water outlet of the tunnel.

5. The blasting shock wave barrier device for underwater rock plug blasting according to claim 4, characterized in that: The second speed limit pit includes a third recoil arc and a third guide plate. The third guide plate is located in the third recoil arc. The side of the third guide plate away from the third recoil arc forms a third diversion area. The side of the third guide plate close to the third recoil arc forms a third guide area. The third diversion area and the third guide area form a third counter-attack area near the second speed limit exit.

6. The blasting shock wave barrier device for underwater rock plug blasting according to claim 5, characterized in that: The tunnel has a first slope section, one end of which is connected to the slag collection pit outlet, the other end of which is connected to the first speed limit entrance, and one end of the first slope section is inclined upward relative to the other end.

7. The blasting shock wave barrier device for underwater rock plug blasting according to claim 5, characterized in that: The tunnel has a second slope section, one end of the second slope section is connected to the first speed limit exit, the other end of the second slope section is connected to the second speed limit entrance, and one end of the second slope section is inclined upward relative to the other end.

8. The blasting shock wave barrier device for underwater rock plug blasting according to any one of claims 1 to 7, characterized in that: The fluid flowing through the first drainage area and the fluid flowing through the first guide area have an impact angle α in the first impact area, and the range of the impact angle α is: 0°≤α≤90°.

9. The blasting shock wave barrier device for underwater rock plug blasting according to any one of claims 1 to 7, characterized in that: One end of the first recoil arc is connected to the bottom of the slag collection pit, the other end of the first recoil arc is located above one end of the first recoil arc, and the first recoil arc protrudes to the outside of the slag collection pit.

10. The blasting shock wave barrier device for underwater rock plug blasting according to any one of claims 1 to 7, characterized in that: The first guide plate is located above the water pad.