Sampling device for soil remediation for greening

By using a casing and protective cover to block wastewater in the open-pit mining area soil sampling device, combined with the design of backfill system and pipe extraction assembly, the problems of soil pollution and pollutant diffusion are solved, and the accuracy of soil analysis and repair effect are improved.

CN118936976AInactive Publication Date: 2024-11-12ZHONGSHU (SHANDONG) AGRI SCI & TECH DEV CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411325546.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When sampling soil in open-pit mining areas, wastewater in the pit is prone to flow into the drilling holes, resulting in inaccurate soil pollution and analysis, affecting the ecological greening restoration effect, and wastewater pollutants spread to the underlying strata, increasing the difficulty of soil restoration.

Method used

A sampling device including a sampling drill rig, drill rod, sampling tube, protective cover, casing, pipe draw assembly, backfilling system and auxiliary system is designed to block wastewater from entering the drilling hole through the casing, and the protective cover and casing are enlarged and The contact area of ​​the sludge, the backfill soil is evenly filled from bottom to top, and the rotary plate extruded soil is compacted at the bottom of the drill hole to reduce the risk of collapse.

Benefits of technology

It effectively avoids soil pollution, improves the accuracy of soil analysis, ensures the stability and backfill quality of drilling holes, reduces the diffusion of wastewater pollutants, and reduces the difficulty of subsequent soil repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936976A_ABST
    Figure CN118936976A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of environmental protection, in particular to a greening soil remediation sampling device which comprises a sampling drilling machine, a drilling rod, a sampling pipe and the like. A plurality of drill rods sleeve the lower side of the sampling drilling machine; the drill rods are connected through threads; the drill rod positioned on the lowermost side is in threaded connection with a sampling pipe; the sampling tube is composed of two tube bodies, a connecting ring and a cutting ring. According to the invention, wastewater in the pit is prevented from entering the pile casing through the pile casing, the wastewater is prevented from entering the drill hole to pollute the sampled soil by the wastewater, the accuracy of subsequent soil analysis is improved, and the surrounding sludge is supported through the pile casing, so that the part of the drill hole located in the sludge soil layer is protected, hole collapse is avoided, and the construction efficiency is improved. When the protective cover is inserted into sludge, the contact area with the sludge is increased through the baffle ring, so that the baffle ring is attached to the surface of the sludge, the protective cover is prevented from settling downwards in the sampling process, and the stability of the protective cover in the sludge is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of environmental protection, and in particular to a sampling device for soil restoration for greening. Background Art

[0002] Since the mining of open-pit mines causes great damage to the ecological environment, after the mining of existing open-pit mines, it is usually necessary to carry out ecological greening restoration of the open-pit mines, including but not limited to restoring vegetation and soil reconstruction. Before carrying out ecological greening restoration of open-pit mines, it is usually necessary to sample and analyze the soil in the open-pit mines. The existing soil sampling method is usually to drill holes in the soil layer through soil sampling equipment, and then preserve the drilled soil cores as samples. However, there are some pits in the mining area for collecting and discharging mining wastewater. When sampling the soil at the bottom of the pits, the wastewater in the pits easily flows into the boreholes, causing the sampled soil to be contaminated by the wastewater, affecting the accuracy of subsequent soil analysis, and then affecting the effect of ecological greening restoration. In addition, pollutants in the wastewater flow into the underlying strata through the boreholes, expanding the impact range of the wastewater pollutants, thereby increasing the difficulty of subsequent soil remediation. Summary of the invention

[0003] In order to overcome the disadvantages that when sampling the soil at the bottom of a pit in an open-pit mine, wastewater in the pit easily flows into the borehole, causing the sampled soil to be contaminated by the wastewater, affecting the accuracy of subsequent soil analysis, and pollutants in the wastewater flow into the underlying strata through the borehole, expanding the impact range of the wastewater pollutants, thereby increasing the difficulty of subsequent soil remediation, the present invention provides a sampling device for soil remediation for greening.

[0004] The technical scheme of the present invention is: a sampling device for soil remediation for greening, including a sampling drill, a drill rod and a sampling tube; a plurality of drill rods are sleeved on the lower side of the sampling drill; each drill rod is connected by a thread; the drill rod at the bottom is connected to the sampling tube by a thread; the sampling tube consists of two tube bodies, a connecting ring and a ring cutter; the tube body is connected to the connecting ring by a thread, and the tube body is connected to the ring cutter by a thread; the connecting ring is connected to the drill rod by a thread; the outer diameter of the drill rod is set to be smaller than the outer diameter of the sampling tube; and a protective cover, a casing, and a suction tube are also included. Components, backfill systems and auxiliary systems; a protective cover is set under the sampling drill to prevent dust particles from affecting the respiratory health of operators; a retaining ring is connected to the outside of the protective cover; a casing is installed in the middle of the inner side of the protective cover to prevent wastewater from entering the borehole; through holes are opened in the middle of the protective cover and the middle of the casing, and the through holes on the protective cover and the casing are opposite to each other; a pipe extraction component for removing the drill rod and the sampling tube from the soil is set on the protective cover; a backfill system is connected to the protective cover to prevent wastewater from flowing into the borehole; an auxiliary system for preventing the collapse of the borehole is installed on the protective cover.

[0005] As a further preferred embodiment, the pipe suction assembly includes a first driving member, a fixing ring and an arc-shaped clamping plate; a plurality of first driving members are fixedly connected to the upper side of the protective cover; the telescopic ends of the plurality of first driving members are commonly fixedly connected to the fixing ring; two left-right symmetrical arc-shaped clamping plates are sleeved on the upper side of the fixing ring; the two arc-shaped clamping plates are connected by a spring; and the drill rod is located between the two arc-shaped clamping plates.

[0006] As a further preferred solution, the backfill system includes a fixed frame, a sliding frame and a jacking pipe; a plurality of fixed frames are fixedly connected to the protective cover; a sliding frame is slidably connected to the plurality of fixed frames; a jacking pipe is fixedly connected to the sliding frame; the jacking pipe is a hollow structure; a through hole is provided inside each drill rod; the upper side of the jacking pipe is connected to an external soil transporting equipment; and an extrusion portion is provided on the lower side of the jacking pipe.

[0007] As a further preferred solution, the backfill system also includes a bracket; a limiting slide groove is provided on each fixed frame; and a bracket is connected to the limiting slide groove of each fixed frame through a spring to prevent the sampling drill from deviating during the sampling process.

[0008] As a further preferred solution, the backfill system also includes an extrusion ring; the lower side of the pipe body can be connected to the extrusion ring through threads; the lower side of the extrusion ring is rotatably connected to a plurality of rotating plates through a torsion spring.

[0009] As a further preferred solution, several rotating plates are arranged to have a convex arc-shaped surface after closing.

[0010] As a further preferred solution, the auxiliary system includes a second driving member and a pressure plate; a plurality of second driving members are fixedly connected to the lower side of the protective cover; the telescopic ends of the plurality of second driving members are commonly fixedly connected to a pressure plate; the pressure plate is slidably connected to the protective cover; and a protruding surface is provided in the middle of the pressure plate.

[0011] As a further preferred solution, the auxiliary system also includes round rods; a plurality of round rods arranged in a ring shape are fixedly connected to the lower side of the pressure plate.

[0012] As a further preferred solution, a pressure sensor is provided at the connection between the second driving member and the pressure plate.

[0013] As a further preferred solution, the lower side of the pressing plate is configured as a conical surface. Beneficial Effects

[0014] The casing blocks the wastewater in the pit from entering the casing, preventing the wastewater from entering the borehole and causing the sampled soil to be contaminated by the wastewater, thereby improving the accuracy of subsequent soil analysis. The casing also supports the surrounding silt, thereby protecting the part of the borehole located in the silt soil layer and preventing the hole from collapsing. When the protective cover is inserted into the silt, the contact area with the silt is increased by the retaining ring, so that the retaining ring fits on the silt surface, preventing the protective cover from sinking downward during the sampling process, and improving the stability of the protective cover in the silt; Compared with the conventional method of pouring backfill soil directly from the top of the borehole, when the borehole diameter is small, the method of backfilling soil from the bottom to the top can ensure that the borehole can be filled evenly, avoiding the backfill soil getting stuck in the borehole, leaving part of the borehole unfilled, and causing the hole to collapse later, thereby improving the quality of borehole backfill; In the process of extracting and recovering the drill rod, the backfill soil in the borehole is compacted simultaneously to further improve the quality of the backfill of the borehole. When the rotary plate squeezes the soil, it closes in a convex arc shape, so that part of the soil at the bottom of the borehole is squeezed toward the inner wall of the borehole, thereby compacting the inner wall of the borehole, reducing the impact of the borehole on the surrounding soil, avoiding the collapse of the borehole in the later stage, and ensuring the stability of the soil layer at the sampling point; When the sludge in the pit is thick and the casing is usually difficult to insert to the bottom of the sludge, the density of the sludge around the round rod is increased by squeezing the surrounding sludge with the round rod. At the same time, the surrounding sludge is supported by the round rod to prevent the sludge under the casing from collapsing. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the sampling device for soil restoration for greening of the present invention; Figure 2 It is a schematic diagram of the combined three-dimensional structure of the sampling drill, the drill rod and the pipe extraction assembly of the present invention; Figure 3 It is a schematic diagram of the three-dimensional structure of the suction tube assembly of the present invention; Figure 4 It is a schematic diagram of the combined three-dimensional structure of the sampling drill, drill rod and sampling tube of the present invention; Figure 5 An exploded view of the sampling tube of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure of the backfill system of the present invention; Figure 7 It is a schematic diagram of the combined three-dimensional structure of the pipe extraction assembly and the backfilling system of the present invention; Figure 8 It is a schematic diagram of the three-dimensional structure of the extrusion ring of the present invention; Fig. 9 It is a schematic diagram of the three-dimensional structure of the auxiliary system of the present invention; Fig.10 It is a cross-sectional view of the protective cover and the pressure plate combination of the present invention.

[0016] Wherein: 1-sampling drill, 2-drill rod, 3-sampling tube, 3001-tube body, 3002-connecting ring, 3003-ring knife, 4-protective cover, 4001-blocking ring, 5-casing, 201-first driving member, 202-fixing ring, 203-arc clamping plate, 204-fixing frame, 205-sliding frame, 206-top pipe, 20601-extrusion part, 207-bracket, 208-extrusion ring, 20801-rotating plate, 301-second driving member, 302-pressing plate, 30201-convex surface, 30202-conical surface, 303-round rod. DETAILED DESCRIPTION

[0017] The preferred technical solutions of the present invention are described in detail below with reference to the accompanying drawings. Example 1

[0018] like Figure 1-Figure 8 As shown, a sampling device for soil remediation for greening includes a sampling drill 1, a drill rod 2 and a sampling tube 3; a plurality of drill rods 2 are sleeved on the lower side of the sampling drill 1; each drill rod 2 is connected by a thread; the drill rod 2 located at the lowermost side is connected with the sampling tube 3 by a thread; the sampling tube 3 is composed of two tube bodies 3001, a connecting ring 3002 and a ring cutter 3003; the tube body 3001 is connected to the connecting ring 3002 by a thread, and the tube body 3001 is connected to the ring cutter 3003 by a thread; the connecting ring 3002 is connected to the drill rod 2 by a thread; the outer diameter of the drill rod 2 is set to be smaller than the outer diameter of the sampling tube 3; It also includes a protective cover 4, a casing 5, a pipe extraction assembly, a backfilling system and an auxiliary system; a protective cover 4 is arranged under the sampling drill 1; a retaining ring 4001 is detachably connected to the outer side of the protective cover 4; a casing 5 is installed in the middle of the inner side of the protective cover 4; through holes are opened in the middle of the protective cover 4 and the middle of the casing 5, and the through holes on the protective cover 4 and the casing 5 are opposite to each other; a pipe extraction assembly is arranged on the protective cover 4; the protective cover 4 is connected to the backfilling system; and the auxiliary system is installed on the protective cover 4.

[0019] The pipe extraction assembly includes a first driving member 201, a fixing ring 202 and an arc-shaped clamping plate 203; two left-right symmetrical first driving members 201 are fixedly connected to the upper side of the protective cover 4, and the first driving member 201 is an electric push rod; the telescopic ends of the two first driving members 201 are commonly fixedly connected to a fixing ring 202; two left-right symmetrical arc-shaped clamping plates 203 are sleeved on the upper side of the fixing ring 202; the two arc-shaped clamping plates 203 are connected by a spring; the drill rod 2 is located between the two arc-shaped clamping plates 203.

[0020] The backfill system includes a fixed frame 204, a sliding frame 205 and a jacking pipe 206; two left-right symmetrical fixed frames 204 are fixedly connected to the protective cover 4; the sliding frame 205 is slidably connected to the two fixed frames 204; the jacking pipe 206 is fixedly connected to the sliding frame 205; the jacking pipe 206 is a hollow structure; a through hole is opened inside each drill rod 2; the upper side of the jacking pipe 206 is connected to the external soil transport equipment; the lower side of the jacking pipe 206 is provided with an extrusion part 20601.

[0021] The backfilling system further includes a bracket 207; a limiting slide groove is provided on each fixing frame 204; and a bracket 207 is connected to the limiting slide groove of each fixing frame 204 via a spring.

[0022] The backfill system also includes an extrusion ring 208; the lower side of the pipe body 3001 can be connected to the extrusion ring 208 through threads; the lower side of the extrusion ring 208 is rotatably connected to six rotating plates 20801 arranged in an annular shape through a torsion spring.

[0023] Furthermore, in order to reduce the impact of the drilling on the surrounding soil and ensure the stability of the soil layer at the sampling point, the six rotating plates 20801 are configured to have a convex arc surface after closing.

[0024] The following is a detailed description of the soil sampling process in an open pit mine: Before soil sampling, first determine the points where soil sampling is required in the mining area, and then drill holes for sampling at the sampling points in turn. When the soil sampling point is in the exposed soil part of the mining area, first align the center of the protective cover 4 with the center of the sampling point, and insert the protective cover 4 into the soil surface. The protective cover 4 provides support for subsequent drilling operations, and then the sampling tube 3 passes through the arc clamp 203, the protective cover 4 and the casing 5 in turn to contact the sampling point. At this time, the sampling tube 3 is in a vertical downward state, and then the first section of the drill rod 2 is screwed on the upper end of the sampling tube 3. Then the sampling drill 1 is placed on the upper end of the first section of the drill rod 2, and the sampling drill 1 is controlled to start working. The sampling drill 1 applies downward pressure and vibration force to the drill rod 2 through the operation of the sampling drill 1, so that the drill rod 2 moves downward. The sampling drill 1 is moved downward, and the pressure is transmitted to the sampling tube 3 through the drill rod 2, so that the ring cutter 3003 cuts into the soil vertically, and the soil inside the ring cutter 3003 is squeezed into the sampling tube 3. As the sampling drill 1 continues to apply pressure to the first section of the drill rod 2, the sampling drill 1 is controlled to stop working until the sampling tube 3 is completely driven into the soil. At this time, the sampling tube 3 is full of soil samples. At this time, the sampling drill 1 is removed from the upper end of the first section of the drill rod 2, and then the first driving member 201 is controlled to drive the fixing ring 202 to move upward, so that the fixing ring 202 squeezes the two arc-shaped clamping plates 203 upward, so that the two arc-shaped clamping plates 203 move toward each other, and the spring between the two arc-shaped clamping plates 203 is compressed until the arc-shaped clamping plates 203 clamp the drill rod 2. At this time, the first driving member 201 drives the fixing ring 202 to move upward. The ring 202 continues to move upward, so that the arc clamping plate 203 drives the drill rod 2 and the sampling tube 3 to move upward, so that the sampling tube 3 is extracted from the soil. At the same time, the soil layer at the sampling point is drilled by the drill rod 2 and the sampling tube 3 to form a borehole. Then the sampling tube 3 is removed from the drill rod 2, and the connecting ring 3002 and the ring knife 3003 are removed from the two tube bodies 3001 respectively, so that the two tube bodies 3001 are in a separated state. At this time, the cylindrical soil sample stored in the sampling tube 3 is taken out and stored, so as to achieve sampling of the first layer of soil. Subsequently, the connecting ring 3002 and the ring knife 3003 are screwed back onto the tube body 3001, and the sampling tube 3 is screwed back onto the first section of the drill rod 2, and then the sampling tube 3 and the first section of the drill rod 2 are put back into the formed borehole. , then screw the second drill rod 2 onto the upper end of the first drill rod 2, and then control the sampling drill 1 to apply pressure to the second drill rod 2, and repeat the above steps to complete the sampling of soil layers at different depths of the sampling point. In this process, since the drill rod 2 and the sampling tube 3 are constantly vibrating during the downward movement, the dust on the surface around the drill rod 2 is constantly raised, which can easily affect the respiratory health of the operators. For this reason, the protective cover 4 is covered on the outside of the borehole to prevent the dust from being raised to the outside, so as to prevent the dust particles from affecting the respiratory health of the operators. On this basis, the outer diameter of the drill rod 2 is set to be smaller than the outer diameter of the sampling tube 3, so that the diameter of the borehole is larger than the outer diameter of the drill rod 2, so as to prevent the drill rod 2 from contacting the inner wall of the borehole.The friction force on the drill rod 2 when drilling in and out is reduced, so as to facilitate the drilling of the drill rod 2. It is explained here that when the first driving member 201 drives the drill rod 2 to move upward, due to the limited stroke of the first driving member 201, when the drill rod 2 rises, the first driving member 201 usually needs to be lifted and lowered several times. When the first driving member 201 is reset downward, the fixing ring 202 and the two arc-shaped clamping plates 203 move downward synchronously, and the two arc-shaped clamping plates 203 lose the squeezing of the fixing ring 202. Under the action of the spring between the two arc-shaped clamping plates 203, the two arc-shaped clamping plates 203 move back to back, so that the arc-shaped clamping plates 203 are separated from the drill rod 2. Therefore, when the first driving member 201 moves downward, it is necessary to manually hold the drill rod 2 to prevent the drill rod 2 from sliding downward. When the connection between the two adjacent drill rods 2 is located above the arc-shaped clamping plates 203, the drill rod 2 located on the upper side can be screwed out.

[0025] During the process of the sampling drill 1 applying pressure to the drill rod 2, it is usually necessary to manually support the sampling drill 1 to keep the sampling drill 1 in a stable state. In order to reduce the work intensity of the operators, when using the sampling drill 1, the sampling drill 1 is placed on two brackets 207. The brackets 207 limit the sampling drill 1 to prevent the sampling drill 1 from moving in the front and back directions and left and right directions during the sampling process. At this time, only a slight manual support of the sampling drill 1 is required, and then the sampling drill 1 moves downward synchronously with the drill rod 2, thereby driving the bracket 207 to move downward in the limiting slide groove on the fixed frame 204, and the spring between the bracket 207 and the limiting slide groove of the fixed frame 204 is stretched by force, so that the downward pressure applied by the sampling drill 1 does not deviate, thereby preventing the drill rod 2 from being distorted due to force displacement.

[0026] When the soil sampling point is located in a pit in a mining area for collecting and discharging mining wastewater, there is usually wastewater remaining in the pit and silt at the bottom of the pit. When drilling sampling is performed in a conventional manner, the wastewater in the pit is easy to flow into the borehole, thereby causing the soil sampled subsequently to be contaminated by the wastewater. To this end, the center of the protective cover 4 is aligned with the center of the sampling point, and the protective cover 4 and the casing 5 are inserted into the silt in the pit, and then the sampling tube 3 is inserted into the protective cover 4 and the casing 5 for drilling sampling. In this process, the protective cover 4 is inserted into the silt to block the wastewater outside the protective cover 4, thereby preventing the wastewater from affecting the soil sampling work. At the same time, when the protective cover 4 is inserted into the silt, the upper side of the protective cover 4 is still higher than the water surface of the wastewater, thereby utilizing the protective cover 4 to provide a The stable soil sampling platform is convenient for the staff to carry out sampling construction. Compared with the conventional sampling method, since the casing 5 is inserted into the silt in the pit, the casing 5 blocks the wastewater in the pit from entering the casing 5, thereby preventing the wastewater from entering the borehole and causing the sampled soil to be contaminated by the wastewater, thereby improving the accuracy of subsequent soil analysis. In addition, during the sampling process, the drill rod 2 and the sampling tube 3 need to be repeatedly inserted and removed, but the silt soil is relatively soft. When the drill rod 2 and the sampling tube 3 are removed, the borehole loses the support of the drill rod 2 and the sampling tube 3, and the portion of the borehole in the silt soil layer is prone to collapse, thereby causing silt to fall into the borehole, thereby affecting the accuracy of the soil sample. Therefore, the surrounding silt is supported by the casing 5, thereby protecting the portion of the borehole in the silt soil layer to avoid collapse.

[0027] On this basis, when the protective cover 4 is inserted into the silt, the contact area with the silt is increased by the retaining ring 4001, so that the retaining ring 4001 fits the silt surface, preventing the protective cover 4 from sinking downward during the sampling process and improving the stability of the protective cover 4 in the silt.

[0028] When the soil sampling in the pit is completed, the protective cover 4 and the casing 5 need to be taken out of the silt. At this time, the wastewater flows into the lower stratum through the borehole, so that the pollutants in the wastewater are diffused into the lower stratum, expanding the impact range of the wastewater pollutants and increasing the difficulty of subsequent soil remediation. Therefore, when the soil sampling is completed, the sampling tube 3 and the drill rod 2 are reinserted into the borehole, and the sliding frame 205 and the top pipe 206 are moved forward by manually pulling the sliding frame 205 until the extrusion part 20601 of the top pipe 206 is aligned with the center position of the drill rod 2 and then the movement is stopped. The first driving member 201 is controlled to drive the drill rod 2 to move upward, so that the squeezing part 20601 squeezes the soil inside the drill rod 2 downward, so that the soil is discharged from the sampling tube 3 and then falls into the sampling tube 3. The top pipe 206 is inserted into the bottom of the borehole. As the drill rod 2 continues to rise, when the top pipe 206 is completely inserted into the upper drill rod 2, the upper drill rod 2 can be screwed out. At this time, the upper drill rod 2 is separated from the lower drill rod 2, and then the sliding frame 205 is pushed to move backward, thereby driving the top pipe 206 and the upper drill rod 2 to move backward. Then, the upper drill rod 2 is removed from the top pipe 206, and the sliding frame 205 is pulled forward to align the top pipe 206 with the through hole of the lower drill rod 2 again, and the drill rod 2 is continued to be controlled to move upward. Thereby, the soil in the drill rod 2 is pushed into the borehole, thereby realizing backfilling of the borehole from bottom to top, preventing wastewater from entering the underlying stratum through the borehole, and reducing the impact of soil sampling on the existing stratum environment. Compared with the conventional borehole backfilling method of directly pouring backfill soil from the upper end of the borehole, when the borehole diameter is small, the method of backfilling soil from bottom to top can ensure that the borehole can be filled evenly, avoiding the backfill soil from being stuck in the borehole, leaving part of the borehole unfilled, resulting in subsequent collapse of the borehole, and improving the quality of borehole backfilling.

[0029] On this basis, when the first driving member 201 drives the drill rod 2 to move upward, due to the limited stroke of the first driving member 201, it needs to be lifted and lowered multiple times. When the first driving member 201 moves downward to reset, it is not necessary to hold the drill rod 2 manually, so that the drill rod 2 moves downward under the action of gravity, so that the drill rod 2 and the sampling tube 3 fall back downward. When the sampling tube 3 falls back, the soil in the borehole is squeezed, so that during the process of extracting and recovering the drill rod 2, the backfill soil in the borehole is compacted simultaneously, and the quality of the borehole backfill is further improved. Furthermore, in order to reduce the impact of the borehole on the surrounding soil, before the sampling tube 3 and the drill rod 2 are reinserted into the borehole, the ring cutter 3003 is removed from the tube body 3001, and the squeezing ring 208 is screwed on the tube body 3001 as a replacement. In the initial state of the squeezing ring 208, the six rotating plates 20801 are in the expanded state, and the sampling tube 3 is in the The soil falls into the borehole through the six rotating plates 20801. When the sampling tube 3 falls back under the action of gravity, the squeezing ring 208 first contacts the soil at the bottom of the borehole. Under the obstruction of the soil, the six rotating plates 20801 close toward the middle, and the torsion spring between the rotating plates 20801 and the squeezing ring 208 is compressed. Since the six rotating plates 20801 are in a closed state, the soil at the bottom of the borehole is blocked from entering the sampling tube 3 again. At the same time, the soil is squeezed downward by the six rotating plates 20801 to make the soil more compact. On this basis, when the rotating plates 20801 squeeze the soil downward, since the six rotating plates 20801 are set to have a convex arc shape on the surface after closing, part of the soil at the bottom of the borehole is squeezed toward the inner wall side of the borehole, thereby compacting the inner wall of the borehole, reducing the impact of the borehole on the surrounding soil, avoiding the collapse of the borehole in the later stage, and ensuring the stability of the soil layer at the sampling point. Example 2

[0030] On the basis of Example 1, Figure 1 , Fig. 9 and Fig.10 As shown, the auxiliary system includes a second driving member 301 and a pressure plate 302; two left-right symmetrical second driving members 301 are fixedly connected to the lower side of the protective cover 4, and the second driving members 301 are electric push rods; the telescopic ends of the two second driving members 301 are commonly fixedly connected to a pressure plate 302; the pressure plate 302 is slidably connected to the protective cover 4; a protruding surface 30201 is provided in the middle of the pressure plate 302.

[0031] The auxiliary system also includes round rods 303 ; a plurality of round rods 303 arranged in a ring shape are fixedly connected to the lower side of the pressing plate 302 .

[0032] A pressure sensor is provided at the connection between the second driving member 301 and the pressing plate 302 .

[0033] Furthermore, in order to prevent the backfill soil from being carried away by the water flow, the lower side of the pressing plate 302 is set to a conical surface 30202.

[0034] When the silt in the pit is thick, the protective cover 4 and the casing 5 are usually difficult to insert into the bottom of the silt. At this time, the casing 5 has limited protection effect on the drilling hole located in the silt soil part. After the drill rod 2 and the sampling tube 3 are taken out, the drilling hole is prone to collapse due to the lack of the casing 5 to support the drilling hole located in the silt soil part. For this reason, when the sampling tube 3 is drilled into the silt soil layer, the drilling is first suspended. At this time, the protective cover 4 is inserted into the silt, the retaining ring 4001 is located on the surface of the silt soil layer, and the protruding surface 30201 of the pressure plate 302 is located on the upper side of the silt soil layer. At this time, the second driving member 301 is controlled to drive the pressure plate 302 and the round rod 303 to move downward, so that the pressure plate 302 and the round rod 303 are inserted into the silt. The pressure sensor at the connection between the second driving member 301 and the pressure plate 302 detects that the pressure plate 3 02 and the round rod 303 encounter resistance when inserted into the silt. When the round rod 303 moves downward and is inserted into the soil layer at the bottom of the silt, the round rod 303 encounters greater resistance and transmits the resistance to the pressure plate 302. When the resistance is greater than the threshold set by the pressure sensor, the second driving member 301 stops moving downward. At this time, the round rod 303 is located in the silt below the casing 5, and the surrounding silt is supported by the round rod 303 to prevent the silt below the casing 5 from collapsing. At the same time, in the process of moving downward, the pressure plate 302 drives the protruding surface 30201 to squeeze the silt downward, and squeezes the silt outward along the circumference of the pressure plate 302, thereby inserting the pressure plate 302 into the silt, and supporting the silt layer between the casing 5 and the round rod 303 through the pressure plate 302 to prevent the borehole from collapsing.

[0035] Furthermore, when the backfill fills the borehole, the protective cover 4 needs to be removed from the silt. However, the backfill is exposed to the wastewater. When the wastewater in the pit flows, the flowing wastewater easily carries away the backfill located on the surface, thereby reducing the sealing effect of the backfill. For this reason, by setting the circumferential surface of the lower end of the pressing plate 302 to a conical surface 30202, when the convex surface 30201 squeezes the silt downward, the silt density at the conical surface 30202 near the bottom of the cone is greater than the silt density at the conical surface 30202 near the top of the cone. When filling to the bottom of the casing 5, the protective cover 4 is manually pulled out of the silt. During this process, the protective cover 4 gradually moves upward and separates from the silt, synchronously driving the casing 5, the pressure plate 302 and the round rod 303 to move upward until they are pulled out of the silt. At this time, the silt loses the support of the pressure plate 302, and the silt density located on the conical surface 30202 near the bottom of the cone is greater than the silt density located on the conical surface 30202 near the top of the cone. The silt on the upper side easily slides to the center and then covers the backfill soil, thereby preventing the backfill soil from being exposed to water and being carried away by the water flow.

[0036] Those skilled in the art should understand that the above embodiments do not limit the present invention in any form, and any technical solutions obtained by equivalent replacement or equivalent transformation shall fall within the protection scope of the present invention.

Claims

1. A sampling device for soil remediation for greening, comprising a sampling drill (1), a drill rod (2) and a sampling tube (3); a plurality of drill rods (2) are sleeved on the lower side of the sampling drill (1); each drill rod (2) is connected by a thread; the drill rod (2) located at the lowermost side is connected to the sampling tube (3) by a thread; the sampling tube (3) is composed of two tube bodies (3001), a connecting ring (3002) and a ring cutter (3003); the tube body (3001) is connected to the connecting ring (3002) by a thread, and the tube body (3001) is connected to the ring cutter (3003) by a thread; the connecting ring (3002) is connected to the drill rod (2) by a thread; the outer diameter of the drill rod (2) is set to be smaller than the outer diameter of the sampling tube (3); the characteristics are as follows: The invention also comprises a protective cover (4), a casing (5), a pipe extraction assembly, a backfill system and an auxiliary system; a protective cover (4) is arranged below the sampling drill (1) to prevent dust particles from affecting the respiratory health of operators; a retaining ring (4001) is connected to the outside of the protective cover (4); a casing (5) is installed in the middle of the inner side of the protective cover (4) to prevent waste water from entering the borehole; through holes are opened in the middle of the protective cover (4) and the middle of the casing (5), and the through holes on the protective cover (4) and the casing (5) are opposite to each other; a pipe extraction assembly for removing the drill rod (2) and the sampling tube (3) from the soil is arranged on the protective cover (4); a backfill system for preventing waste water from entering the borehole is connected to the protective cover (4); and an auxiliary system for preventing the borehole from collapsing is installed on the protective cover (4).

2. The sampling device for soil remediation for greening according to claim 1, characterized in that: The pipe extraction assembly comprises a first driving member (201), a fixing ring (202) and an arc-shaped clamping plate (203); a plurality of first driving members (201) are fixedly connected to the upper side of the protective cover (4); the telescopic ends of the plurality of first driving members (201) are commonly fixedly connected to the fixing ring (202); two left-right symmetrical arc-shaped clamping plates (203) are sleeved on the upper side of the fixing ring (202); the two arc-shaped clamping plates (203) are connected via a spring; and the drill rod (2) is located between the two arc-shaped clamping plates (203).

3. A sampling device for soil remediation for greening according to claim 2, characterized in that: The backfill system comprises a fixed frame (204), a sliding frame (205) and a jacking pipe (206); a plurality of fixed frames (204) are fixedly connected to the protective cover (4); a sliding frame (205) is slidably connected to the plurality of fixed frames (204); a jacking pipe (206) is fixedly connected to the sliding frame (205); the jacking pipe (206) is a hollow structure; a through hole is provided inside each drill rod (2); the upper side of the jacking pipe (206) is connected to an external soil transport device; and a pressing portion (20601) is provided on the lower side of the jacking pipe (206).

4. The sampling device for soil remediation for greening according to claim 3, characterized in that: The backfilling system also includes a bracket (207); each fixed frame (204) is provided with a limit slide groove; and a bracket (207) is connected in the limit slide groove of each fixed frame (204) via a spring to prevent the sampling drill (1) from deflecting during the sampling process.

5. The sampling device for soil remediation for greening according to claim 1, characterized in that: The backfill system also includes an extrusion ring (208); the lower side of the pipe body (3001) can be connected to the extrusion ring (208) via threads; the lower side of the extrusion ring (208) is rotatably connected to a plurality of rotating plates (20801) via torsion springs.

6. The sampling device for soil remediation for greening according to claim 5, characterized in that: A plurality of rotating plates (20801) are arranged so that their surfaces are in a convex arc shape after being closed.

7. The sampling device for soil remediation for greening according to claim 3, characterized in that: The auxiliary system comprises a second driving member (301) and a pressing plate (302); a plurality of second driving members (301) are fixedly connected to the lower side of the protective cover (4); the telescopic ends of the plurality of second driving members (301) are commonly fixedly connected to the pressing plate (302); the pressing plate (302) is slidably connected to the protective cover (4); and a protruding surface (30201) is provided in the middle of the pressing plate (302).

8. The sampling device for soil remediation for greening according to claim 7, characterized in that: The auxiliary system also includes round rods (303); a plurality of round rods (303) arranged in a ring shape are fixedly connected to the lower side of the pressing plate (302).

9. The sampling device for soil remediation for greening according to claim 8, characterized in that: A pressure sensor is provided at the connection between the second driving member (301) and the pressing plate (302).

10. The sampling device for soil remediation for greening according to claim 9, characterized in that: The lower side of the pressing plate (302) is configured as a conical surface (30202).

Citation Information

Cited By

  • Multifunctional sampling device for agricultural environment detection and inspection

    CN118533538A