Device and method for testing performance of gas environment material
By designing a gas environment material performance testing device, and utilizing strain gauges and inert gas inside the reactor, the problems of inaccurate strain measurement and safety hazards under high-pressure hydrogen environment were solved, realizing material performance testing under high pressure and high temperature conditions, and improving testing accuracy and safety.
Patent Information
- Application Number
- CN202310533194.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-12
AI Technical Summary
Existing technologies struggle to achieve accurate strain measurement in high-pressure hydrogen environments and pose safety hazards. They also fail to meet the experimental requirements for high pressure or high temperature. Furthermore, hydrogen diffusion is difficult to control, affecting the accuracy and safety of material performance testing.
A gas environment material performance testing device was designed, including a reaction vessel, a sample, a telescopic rod, and a test gas tube. The sample is fixed by a detachable connection, and a strain gauge is installed inside the reaction vessel. The telescopic rod provides tensile or compressive force. Gas is injected into the reaction vessel to balance the sample pressure. Inert gas is used to improve safety and avoid hydrogen leakage that could cause fire or explosion.
It improves hydrogen purity and testing accuracy, reduces sealing requirements, enhances safety, and enables accurate material performance testing in a high-pressure hydrogen environment, avoiding the risk of fire and explosion.
Smart Images

Figure CN118937041A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of material performance testing, and in particular, relates to a gas environment material performance testing device and a gas environment material performance testing method. Background Art
[0002] Hydrogen energy is a clean and efficient energy source, and an important way to transform and upgrade energy and achieve green development. Hydrogen storage is a key link in the development of the hydrogen energy industry. Storage methods include gaseous hydrogen storage, liquid hydrogen storage, and solid hydrogen storage. High-pressure gaseous hydrogen storage is currently the most important hydrogen storage method, among which high-pressure hydrogen storage bottles are the main one. However, after long-term operation in a high-pressure hydrogen environment, equipment and pipeline materials are prone to hydrogen damage, resulting in reduced material properties, usually resulting in reduced plasticity, increased crack growth rate, and reduced fatigue life. It seriously affects the long-term safe operation of the equipment. In order to ensure the long-term, safe, stable and reliable operation of the high-pressure hydrogen system, the various properties of the material in a hydrogen environment must be tested and evaluated.
[0003] However, due to the high pressure of hydrogen storage containers, the commonly used hydrogen storage equipment in hydrogen refueling stations is 45MPa, and 90MPa-level hydrogen storage containers are also being developed. Under such high pressure environmental conditions, coupled with the high permeability of hydrogen, it is difficult to seal the simulation equipment. Hydrogen has low ignition energy and a wide explosion limit. Once leaked, it is easy to cause fire and explosion accidents, threatening the safety of the experiment. Therefore, it is necessary to design a safe and controllable high-pressure hydrogen environment material compatibility test method and device.
[0004] Chinese patent document CN113884383A provides a slow tensile test device for pipeline steel in a hydrogen environment, which can realize the test in a medium and low pressure hydrogen environment. However, the experimental temperature applicable to the experimental device is relatively low, and it cannot meet the experimental requirements of high pressure or high temperature.
[0005] Chinese patent documents CN109142065B and patent CN104142271B both provide a high-pressure hydrogen environment mechanical test device that can achieve testing under 30-70MPa high-pressure hydrogen conditions. However, due to the small space between the sample and the main cavity, it is impossible to install strain measurement sensing equipment, and strain measurement is affected by the deformation of the pull rod and the thread gap. In addition, a large number of seals in the device form a tiny space, and hydrogen enters and exits obliquely, which is not conducive to hydrogen replacement and it is difficult to meet high purity (above 99.99%) requirements.
[0006] Therefore, it is urgent to establish a safer high-pressure hydrogen environment material compatibility testing device and method to address the above-mentioned problems of inaccurate strain measurement, low experimental temperature, low pressure, and testing of low hydrogen diffusion coefficient materials. Summary of the invention
[0007] In view of the technical problems mentioned above, the present invention aims to provide a gas environment material performance testing device, which can perform performance testing on experimental materials in a high-pressure hydrogen environment.
[0008] The present invention also proposes a method for testing the performance of gas environment materials. The method uses the gas environment material performance testing device proposed by the present invention to perform performance testing on experimental materials in a high-pressure hydrogen environment.
[0009] According to the present invention, a gas environment material performance testing device is provided, comprising:
[0010] Reactor;
[0011] Fixing the sample disposed in the reactor in a detachable manner;
[0012] A telescopic rod connected to the sample in a detachable manner, wherein the telescopic rod provides tension or pressure to the sample;
[0013] and a test air pipe, wherein a cavity is provided in the sample, one end of the test air pipe is connected to the cavity, and the other end of the test air pipe extends out of the reactor,
[0014] The reaction kettle and the test air pipe pressurize the outside and inside of the sample respectively.
[0015] In a preferred embodiment, the specimen includes a main body and a first joint and a second joint arranged at both ends of the main body, the first joint and the second joint are respectively connected to the telescopic rod and the reactor in a detachable manner, and a strain gauge is arranged on the main body.
[0016] In a preferred embodiment, the outer diameter of the body of the sample is smaller than the outer diameters of the first joint and the second joint.
[0017] In a preferred embodiment, the test air pipe is sealedly connected to the first joint or the second joint.
[0018] In a preferred embodiment, a transition rod is coaxially fixed between the sample and the telescopic rod by means of a threaded connection, and the test air pipe enters from the side wall of the transition rod and is coaxially sealed and connected to the first joint or the second joint.
[0019] In a preferred embodiment, the transition rod is cylindrical, and a through hole for the test air pipe to pass through is provided on the side wall of the transition rod.
[0020] In a preferred embodiment, the telescopic rod is slidably sealed and arranged on the reactor, and an end of the telescopic rod away from the sample extends to the outside of the reactor.
[0021] In a preferred embodiment, a first pressure sensor and a temperature sensor are provided on the reactor, and a second pressure sensor is provided on the test gas pipe.
[0022] In a preferred embodiment, the reaction kettle comprises a kettle body and a kettle cover, and the kettle cover is sealed and fixed to the upper end of the kettle body by bolts.
[0023] In a preferred embodiment, the telescopic rod is coaxially slidably sealed and penetrated on the kettle cover.
[0024] In a preferred embodiment, a safety valve and a first gas inlet and outlet are provided on the kettle cover, and a second gas inlet and outlet is provided at the bottom of the kettle body.
[0025] In a preferred embodiment, a heating jacket is provided on the exterior of the kettle body.
[0026] According to the present invention, a method for testing the properties of materials in a gas environment is also provided. Using the gas environment material performance testing device provided by the present invention, test gas is injected into the interior of the sample, and gas is injected into the reactor to balance the test gas pressure in the sample. Stress is applied to the sample through a telescopic rod, and the strain of the sample is detected at the same time.
[0027] Compared with the prior art, the advantages of the present application are as follows.
[0028] The present invention injects high-pressure hydrogen into the internal cavity of the sample. The cavity has a simple structure and is conducive to hydrogen replacement, thereby improving the purity of the hydrogen in the cavity.
[0029] The present invention arranges the sample in a reactor and fills the reactor with gas. On the one hand, pressure is applied to the periphery of the sample to balance the hydrogen pressure inside the sample and increase the hydrogen pressure that can be applied inside the sample. On the other hand, the pressure inside the reactor is lower than the pressure inside the sample, and the sealing requirements between the telescopic rod and the reactor cover are lower, which is conducive to improving safety. Furthermore, inert gas can be used to provide pressure in the reactor, so even if the hydrogen in the sample leaks out, it will not cause fire or explosion, further improving safety.
[0030] The strain gauge of the present invention is arranged inside the reactor and connected to the main body of the sample, thereby avoiding the influence of other factors such as the joint threads at both ends of the sample on the strain measurement, thereby improving the accuracy of the test. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The present invention will be described below with reference to the accompanying drawings.
[0032] Figure 1A schematic diagram showing an embodiment of a gas environment material performance testing device according to the present invention;
[0033] Figure 2 A schematic diagram showing an embodiment of a test piece according to the present invention;
[0034] Figure 3 A schematic diagram of an embodiment of a transition rod according to the present invention is shown.
[0035] In the figure: 1, reaction kettle; 11, kettle body; 12, kettle cover; 13, fixing seat;
[0036] 2. Sample; 21. Cavity; 22. Main body; 23. First joint; 24. Second joint;
[0037] 3. telescopic rod; 31. first sealing member;
[0038] 4. Test air pipe; 41. Second sealing member;
[0039] 5. transition rod; 51. perforation; 52. middle hole;
[0040] 61. First pressure sensor; 62. Temperature sensor; 63. Second pressure sensor; 64. Safety valve; 65. First gas inlet and outlet; 66. Second gas inlet and outlet; 67. Bolt hole;
[0041] 7. Heating jacket;
[0042] 8. Strain gauge; 100. Gas environment material performance testing device.
[0043] In the present application, all drawings are schematic drawings, which are only used to illustrate the principles of the present invention and are not drawn according to the actual scale. DETAILED DESCRIPTION
[0044] The present invention will be described below with reference to the accompanying drawings.
[0045] It should be noted that the directional terms or qualifiers "upper", "lower", "left", "right", etc. used in this application are all with reference to the drawings to which they are referred. They are not used to limit the absolute positions of the components involved, but can be changed according to specific circumstances.
[0046] Embodiment 1:
[0047] Figure 1 The structure of the gas environment material performance testing device 100 according to the present invention is shown. Figure 1 As shown, the gas environment material performance testing device 100 includes a reaction kettle 1, a sample 2, a telescopic rod 3 and a test gas pipe 4.
[0048] The sample 2 is made of the material to be tested. In the present embodiment, the sample 2 is fixedly arranged in the reactor 1 in a detachable manner, so that it is convenient to replace the sample 2 made of different materials and test a variety of materials.
[0049] One end of the telescopic rod 3 is detachably connected to the sample 2. The telescopic rod 3 can provide tension or pressure to the sample 2, and then obtain the material performance-related values through the strain of the sample 2 after being stressed in a high-pressure hydrogen environment, providing data support for material performance evaluation.
[0050] A cavity 21 is provided in the sample 2 , one end of the test air pipe 4 is communicated with the cavity 21 , and the other end of the test air pipe 4 extends out of the reactor 1 .
[0051] When the material properties are tested using the present invention, the reactor 1 and the test gas pipe 4 respectively pressurize the outside and inside of the sample 2. Specifically, high-pressure hydrogen is injected into the cavity 21 through the test gas pipe 4, and gas is injected into the reactor 1 at the same time. Then, the telescopic rod 3 provides tension or pressure to the sample 2, and the strain data of the sample 2 is detected and recorded at the same time, providing data support for the evaluation of material properties.
[0052] Injecting gas into the reactor 1 can, on the one hand, exert pressure on the periphery of the sample 2, balance the hydrogen pressure inside the sample 2, and thus increase the hydrogen pressure that can be applied inside the sample 2. On the other hand, the pressure inside the reactor 1 is lower than the pressure inside the sample 2, so the sealing requirements of the reactor 1 are relatively low, which is conducive to reducing the difficulty of design and improving safety. Furthermore, inert gas can be injected into the reactor 1 to provide pressure, so that even if the hydrogen in the sample 2 leaks out, it will not cause fire or explosion, further improving safety.
[0053] Although this embodiment is a performance test of various materials in a high-pressure hydrogen environment, it is easy to understand that the present invention is not limited to high-pressure hydrogen environment testing. As needed, hydrogen can be replaced with other gases, and such replacement should be within the scope of protection of the present invention.
[0054] Embodiment 2:
[0055] In a specific embodiment, based on the first embodiment, Figure 1 and Figure 2 As shown, the sample 2 includes a main body 22 and a first joint 23 and a second joint 24 arranged at both ends of the main body 22. The first joint 23 and the second joint 24 are respectively connected to the telescopic rod 3 and the reactor 1 in a detachable manner, and a strain gauge 8 is arranged on the main body 22.
[0056] In this embodiment, since the sample 2 is arranged inside the reactor 1, the internal space of the reactor 1 is large and can accommodate the strain gauge 8. The strain gauge 8 is directly arranged on the main body 22, so that all the data measured by the strain gauge 8 are derived from the material properties of the sample 2 itself, thereby eliminating the influence of the deformation of the upper and lower ends of the sample 2 and the connection between the reactor 1 and the telescopic rod 3 during the test, and the influence of the deformation of irrelevant parts such as the telescopic rod 3 on the test, thereby improving the accuracy of the test.
[0057] In a preferred embodiment, the strain gauge 8 is connected to a control system (not shown in the figure).
[0058] Furthermore, the sample 2 includes a main body 22 and a first joint 23 and a second joint 24 disposed at both ends of the main body 22, the first joint 23 and the second joint 24 are respectively used to be fixedly connected to the telescopic rod 3 and the reactor 1. The test air pipe 4 is sealedly connected to the first joint 23 or the second joint 24.
[0059] This arrangement avoids the connection between the main body 22 measured by the strain gauge 8 and the test gas pipe 4, thereby ensuring the integrity of the main body 22 and further improving the measurement of the strain of the main body 22 in a high-pressure hydrogen environment by the strain gauge 8.
[0060] In a preferred embodiment, Figure 2 As shown, the sample 2 is cylindrical as a whole, and the first joint 23 and the second joint 24 are coaxially fixed at the upper and lower ends of the main body 22. A cavity 21 is provided along the central axis of the sample 2, that is, the cavity 21 extends downward from the upper end of the first joint 23, and passes through the first joint 23, the main body 22, and the second joint 24 in sequence.
[0061] In a preferred embodiment, the diameter of the cavity 21 is 0.5-2 mm.
[0062] In this embodiment, the outer diameter of the first joint 23 and the second joint 24 is larger than the outer diameter of the main body 22. Threads are provided on the circumferential outer walls of the first joint 23 and the second joint 24, and the first joint 23 and the second joint 24 are respectively fixedly connected to the telescopic rod 3 and the reactor 1 by threaded connection. The main body 22 with a smaller size can produce a larger strain when subjected to the same stress of the telescopic rod 3, thereby facilitating the collection of strain values by the strain gauge 8.
[0063] A test air pipe 4 is coaxially sealed and fixed at the upper end of the first joint 23 and the lower end of the second joint 24. Specifically, the two test air pipes 4 extend into the cavities 21 of the first joint 23 and the second joint 24, respectively, and a second sealing member 41 for sealing is provided between the test air pipe 4 and the first joint 23 and the second joint 24. The other end of the test air pipe 4 sealed with the first joint 23 extends upward to the outside of the reactor 1, and the other end of the test air pipe 4 sealed with the second joint 24 extends downward to the outside of the reactor 1.
[0064] The two test gas pipes 4 are coaxially connected to the cavity 21, and the interior of the cavity 21 is smooth, and there is no space that is difficult to purge. Under this setting, the two test gas pipes 4 cooperate with each other to purge the cavity 21 more thoroughly, so that the purity of the hydrogen in the cavity 21 can reach at least 99%.
[0065] In a specific embodiment, transition rods 5 are coaxially arranged at both upper and lower ends of the sample 2 , the transition rod 5 at the upper end of the sample 2 is coaxially fixedly connected to the telescopic rod 3 , and the transition rod 5 at the lower end of the sample 2 is fixedly connected to the reactor 1 .
[0066] like Figure 3 As shown, the transition rod 5 is set in a cylindrical shape, and a middle hole 52 is set along the central axis of the transition rod 5, and internal threads are set at the upper and lower ends of the inner wall of the middle hole 52. The internal thread at one end of the middle hole 52 is connected to the external thread of the first joint 23 or the second joint 24 of the sample 2, and the internal thread at the other end of the middle hole 52 is fixedly connected to the telescopic rod 3 or the reactor 1. A through hole 51 is set on the side wall of the transition rod 5 for connecting the middle hole 52 and the outside of the transition rod 5, and the through hole 51 is used for the test air pipe 4 to pass through.
[0067] Specifically, Figure 1 As shown, the connection structure of the transition rod 5 located at the upper end of the sample 2 is described. The internal thread at the lower end of the middle hole 52 of the transition rod 5 is connected to the external thread of the first joint 23, and the internal thread at the upper end of the middle hole 52 of the transition rod 5 is connected to the external thread at the lower end of the telescopic rod 3. The test air pipe 4 sealed with the first joint 23 passes upward through the middle hole 52 and the through hole 51 of the transition rod 5, and finally extends upward to the outside of the reactor 1.
[0068] The connection structure of the transition rod 5 located at the lower end of the sample 2 is described. A fixing seat 13 is coaxially sealed and fixed on the bottom surface of the reactor 1. In a preferred embodiment, the fixing seat 13 is sealed and fixed to the bottom of the reactor 1 by welding or other means. The lower end of the fixing seat 13 is located outside the reactor 1, and the upper end of the fixing seat 13 is located inside the reactor 1, and an external thread for connecting with the transition rod 5 is provided at the upper end of the fixing seat 13. The internal thread at the upper end of the middle hole 52 of the transition rod 5 is connected to the external thread of the second joint 24, and the internal thread at the lower end of the middle hole 52 of the transition rod 5 is connected to the external thread of the fixing seat 13. The lower end of the test air pipe 4, which is sealed and connected to the second joint 24, passes through the middle hole 52 and the through hole 51 of the transition rod 5, and finally extends downward to the outside of the reactor 1.
[0069] In a specific embodiment, Figure 1 As shown, the reactor 1 includes a reactor body 11 and a reactor cover 12. The reactor body 11 is configured as a cylindrical structure with an inner cavity and an upper opening, and the reactor cover 12 is coaxially sealed at the upper opening of the reactor body 11, and a sealing gasket is provided between the reactor cover 12 and the reactor body 11. A plurality of bolt holes 67 are uniformly provided along the axial direction on the reactor cover 12 and the reactor body 11, and bolts are provided in these bolt holes 67, so that the reactor body 11 and the reactor cover 12 are fixed and sealed.
[0070] The telescopic rod 3 coaxially penetrates the kettle cover 12, and a first sealing member 31 is provided between the telescopic rod 3 and the kettle cover 12, so that the telescopic rod 3 and the kettle cover 12 can slide relative to each other axially while maintaining a seal. In this arrangement, the lower end of the telescopic rod 3 is located inside the reactor 1 for connection with the sample 2, and the upper end of the telescopic rod 3 is located outside the reactor 1, so that force can be applied to the sample 2 through the telescopic rod 3.
[0071] Specifically, during the test, the lower end of the fixing seat 13 located outside the reactor is connected to the lower connection mechanism of the tensile or fatigue testing machine (not shown in the figure), and the upper end of the telescopic rod 3 located outside the reactor 1 is connected to the upper connection mechanism of the tensile or fatigue testing machine. After the tensile or fatigue testing machine is started, the telescopic rod 3 will move axially relative to the fixing seat 13, thereby applying a force to the sample 2.
[0072] It is easy to understand that the tensile or fatigue testing machine is a prior art and will not be described in detail here.
[0073] According to the present invention, a first pressure sensor 61 and a temperature sensor 62 are provided on the reactor cover 12 of the reactor 1 to detect the pressure and temperature in the reactor 1. A second pressure sensor 63 is provided on the test gas pipe 4 to detect the pressure of hydrogen filled in the cavity 21 of the sample 2.
[0074] In a preferred embodiment, a safety valve 64 and a first gas inlet and outlet 65 are provided on the kettle cover 12 , and a second gas inlet and outlet 66 is provided at the bottom of the kettle body 11 .
[0075] According to the present invention, a heating jacket 7 is provided on the outside of the reactor body 11 to control the temperature in the reactor 1. Specifically, the heating jacket 7 and the temperature sensor 62 are both connected to a control system (not shown in the figure), and the control system controls the heating power of the heating jacket 7 according to the feedback information of the temperature sensor 62.
[0076] It is easy to understand that the control system is a prior art, and its specific features are not the technical points of the present invention, so they will not be repeated here.
[0077] Specifically, one end of the test air pipe 4 extending out of the reactor 1 is provided with a control valve (not shown in the figure) and the test air pipe 4 can be connected to various gas supply equipment according to the test needs. In this embodiment, the material performance test of the hydrogen environment is carried out, so the test air pipe 4 can be connected to hydrogen supply equipment such as a buffer tank, a hydrogen compressor, and a hydrogen bottle (not shown in the figure). In order to realize the function of purging, one of the test air pipes 4 in this embodiment is connected to a buffer tank, a hydrogen compressor or a hydrogen bottle to provide hydrogen to the cavity 21 of the sample 2, and the other test air pipe 4 is connected to the vent pipe for venting.
[0078] In a preferred embodiment, the control valve of the test gas pipe 4 is connected to the control system.
[0079] According to the present invention, when a hydrogen cylinder is used as a hydrogen source, the hydrogen cylinder can select a pressure level of 10, 16, 20, 35 or 70MPa or a combination thereof according to the experimental requirements. For tests with relatively low pressure, hydrogen is directly supplied through the gas cylinder. For experiments with relatively high pressure (≥70MPa), the hydrogen cylinder should be buffered by the buffer tank, then pressurized by the hydrogen compressor, and then filled with the test sample 2 through the test gas pipe 4. When the internal pressure of the sample 2 reaches the experimental requirements, the control valve is closed. Only when the internal pressure fluctuates due to hydrogen penetration or temperature changes and is greater than the set value, the control valve is used to replenish or exhaust gas.
[0080] For experiments with temperature requirements, the required boost pressure should be estimated before heating to avoid excessive pressure due to temperature increase.
[0081] The first gas inlet and outlet 65 and the second gas inlet and outlet 66 in the reactor 1 can also be connected to a hydrogen cylinder, a nitrogen cylinder or other required experimental gases, and connected and switched to a vent pipe according to experimental needs. The pressure in the reactor 1 is controlled below 30 MPa to reduce the requirements for the first sealing member 31. The pressure in the reactor 1 and the pressure in the sample 2 are both controlled by the control system to ensure that the internal pressure of the sample 2 is always ≥ the pressure in the reactor 1.
[0082] When purging and emptying, the first gas inlet and outlet 65, the second gas inlet and outlet 66 and the two test gas pipes 4 should be selected according to the gas density. For example, for hydrogen with a low gas density, the bottom inlet and the top outlet should be selected to facilitate the exhaust of impurity gases in the reactor 1 or the sample 2, thereby ensuring the reliability and safety of the experiment.
[0083] Embodiment three:
[0084] In one embodiment of the present invention, a method for testing the performance of materials in a gas environment is provided. Using the gas environment material performance testing device provided by the present invention, test gas is injected into the interior of the sample 2, and gas is injected into the reactor 1 to balance the test gas pressure in the sample 2. Stress is applied to the sample 2 through the telescopic rod 3, and the strain of the sample 2 is detected at the same time.
[0085] In a preferred embodiment, by changing the experimental conditions, various material performance tests can be performed. For example: hydrogen environment test inside and outside of sample 2 at the same time, that is, hydrogen is filled inside reactor 1, and hydrogen is also filled inside cavity 21 of sample 2; high-pressure hydrogen environment test inside sample 2 only, that is, high-pressure hydrogen is filled only inside cavity 21 of sample 2, and reactor 1 is not filled with gas or filled with other gases; high-temperature single-sided hydrogen diffusion test, that is, under high temperature conditions, a certain pressure of hydrogen is filled inside sample 2, and it is left to stand for a period of time, and the hydrogen concentration of the first gas inlet and outlet 65 and the second gas inlet and outlet 66 of reactor 1 is detected. Specifically, the first gas inlet and outlet 65 and the second gas inlet and outlet 66 can be connected to a hydrogen analysis system, wherein the hydrogen analysis system is a prior art and will not be described in detail here.
[0086] Embodiment 4:
[0087] According to the present invention, the gas environment material performance testing method specifically includes the following steps.
[0088] according to Figure 1 In the structure shown, after the sample 2 is installed, the reading of the strain gauge 8 is cleared to zero using the control system.
[0089] Adjust the position of the loading head of the tensile or fatigue testing machine, connect the upper end of the telescopic rod 3 to the upper connecting end of the testing machine, and connect the lower end of the fixing seat 13 to the lower connecting end of the testing machine.
[0090] Open Figure 1 The control valves of the two upper and lower test gas pipes 4 are connected, one of which is connected to the hydrogen supply equipment, and the other is connected to the vent pipe to replace the gas in the internal cavity 21 of the sample 2.
[0091] Use a hydrogen analysis system to analyze the purity of the hydrogen in the vent pipe. When the required purity is reached, close the control valve connected to the vent pipe.
[0092] The hydrogen supply device continues to fill hydrogen into the cavity 21 until the pressure reaches about 1 / 3 of the pressure required for the experiment, close the control valve corresponding to the hydrogen supply device, observe the value change of the second pressure sensor 63, and at the same time fill nitrogen or other required gases into the reactor 1 through the first gas inlet and outlet 65 and the second gas inlet and outlet 66 to replace the gas in the reactor 1. During the replacement process, the hydrogen concentration in the replaced gas is detected. If the hydrogen concentration exceeds the standard, it means that the hydrogen in the cavity 21 is leaking, and it is necessary to reopen the reactor to check the sealing of the second sealing components 41 at both ends of the sample 2. After the inspection, the test is restarted.
[0093] After the gas in the reactor 1 is replaced (when the hydrogen concentration does not exceed the standard), the control valve corresponding to the gas outlet is closed, the pressure in the reactor is increased, and the pressure maintenance test is also performed.
[0094] After the pressure test is passed, the pressure in reactor 1 is slowly increased to approach the pressure in sample 2. After that, the pressure in sample 2 and reactor 1 is gradually increased in an alternating manner through the control system until the required pressure value calculated according to the target temperature is reached, or when the pressure in reactor 1 reaches the maximum pressure of 30MPa, the pressure in reactor 1 is stopped from being increased. If the pressure in sample 2 has not reached the required pressure for the experiment at this time, only the pressure inside sample 2 is increased. When the required pressure in sample 2 exceeds the maximum pressure that the hydrogen cylinder can provide, the hydrogen compressor is activated for pressurization.
[0095] When the required pressure is reached after the temperature rise, the heating jacket 7 is turned on and the heating is controlled by the control system. During the temperature rise process, the pressure in the reactor 1 and the sample 2 is monitored. When the pressure exceeds the set maximum pressure, the corresponding control valve is automatically opened to exhaust and reduce the pressure. When the temperature and pressure reach the required conditions, the control valve corresponding to the test gas pipe 4 is closed to control the amount of hydrogen leaking into the reactor 1 when the sample 2 breaks, thereby fundamentally reducing the risk of the experiment.
[0096] After setting the loading conditions of the tensile or fatigue testing machine, start the experiment. During the experiment, monitor the pressure inside the reactor 1 and the sample 2. When the pressure drop exceeds the set deviation, supplement the pressure. At the same time, monitor the hydrogen content in the gas in the reactor 1. When it increases abnormally, it is judged that there is hydrogen leakage inside the sample 2. Take safety measures in time, stop the experiment, and reduce the temperature and pressure.
[0097] After the experiment is completed, the tensile or fatigue testing machine is stopped, the heating jacket 7 is turned off, and the gas inside the reactor 1 and the sample 2 is released alternately through the control system. During the release process, the pressure inside the sample 2 is kept not lower than the pressure inside the reactor 1.
[0098] After releasing to normal pressure, introduce cold inert gas into the reactor 1 and sample 2 for replacement. After the replacement test is qualified, stop the air intake and keep the exhaust open. When the pressure drops to normal pressure and the temperature drops below 40°C, open the reactor cover 12, remove the sample 2, record and save the data, and complete the test experiment.
[0099] Embodiment five:
[0100] The apparatus and method in the above embodiment were used to perform fatigue performance test in a room temperature 35 MPa hydrogen environment on the sample 2 made of 4130X material.
[0101] First follow Figure 1 Installing the sample 2 into the reactor 1 includes the following steps.
[0102] The test air pipe 4 sealed at the bottom of the kettle body 11 passes through the side through hole 51 of the transition rod 5 below the sample 2, then passes upward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the second joint 24 of the sample 2 through the second sealing member 41.
[0103] The external thread of the second joint 24 of the sample 2 is screwed into the internal thread of the lower transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the reactor 1.
[0104] The test air pipe 4 sealed on the kettle cover 12 passes through the side through hole 51 of the transition rod 5 above the sample 2, then passes downward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the first joint 23 of the sample 2 through the second sealing member 41.
[0105] The external thread of the first joint 23 of the sample 2 is screwed into the internal thread of the upper transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the telescopic rod 3.
[0106] A strain gauge 8 is installed on the main body 22 of the sample 2, the strain gauge 8 is communicatively connected to the control system, and the reading of the strain gauge 8 is cleared to zero in the control system.
[0107] The telescopic rod 3 is slidably inserted into the kettle cover 12 through the first sealing member 31, a sealing gasket is arranged between the kettle cover 12 and the kettle body 11, and the kettle cover 12 is coaxially buckled onto the kettle body 11, and bolts are passed through the bolt holes 67 to seal and fix the kettle cover 12 and the kettle body 11 to each other.
[0108] Adjust the position of the loading head of the tensile or fatigue testing machine, connect the upper end of the telescopic rod 3 to the upper connecting end of the testing machine, and connect the lower end of the fixing seat 13 to the lower connecting end of the testing machine. At this point, the installation process of the present invention is completed.
[0109] Open Figure 1 The control valves of the two upper and lower test gas pipes 4 are connected, one of which is connected to the hydrogen supply equipment, and the other is connected to the vent pipe to replace the gas in the internal cavity 21 of the sample 2.
[0110] Use a hydrogen analysis system to analyze the purity of the hydrogen in the vent pipe. When the hydrogen purity reaches 99.99%, close the control valve connected to the vent pipe.
[0111] The hydrogen supply equipment continues to fill the cavity 21 with hydrogen, so that the pressure reaches about 10 MPa which is the pressure required for the experiment, and the control valve corresponding to the hydrogen supply equipment is closed. The value change of the second pressure sensor 63 is observed, and nitrogen or other required gases are filled into the reactor 1 through the first gas inlet and outlet 65 and the second gas inlet and outlet 66 to replace the gas in the reactor 1. During the replacement process, the hydrogen concentration in the replaced gas is detected. If the hydrogen concentration exceeds the standard, it means that the hydrogen in the cavity 21 is leaking, and it is necessary to reopen the reactor to check the sealing of the second sealing member 41 at both ends of the sample 2. After the inspection, the test is restarted.
[0112] After the gas in the reactor 1 is replaced (when the hydrogen concentration does not exceed the standard), the control valve corresponding to the gas outlet is closed, and the pressure in the reactor 1 is increased to 8MPa, and the pressure holding test is also performed.
[0113] After the pressure test is passed, the pressure in the reactor 1 is slowly increased to approach the pressure in the sample 2 of 10MPa. After that, the pressure in the sample 2 and the reactor 1 are gradually increased in an alternating manner through the control system until the pressure in the reactor 1 and the sample 2 reaches 30MPa. The pressure in the reactor 1 is stopped and only the pressure in the sample 2 is increased. When the pressure in the sample 2 reaches 35MPa, the control valve corresponding to the test gas pipe 4 is closed.
[0114] After setting the loading conditions of the tensile or fatigue testing machine, start the experiment. During the experiment, monitor the internal pressure of sample 2, and when the pressure drops by more than 3MPa, add pressure. At the same time, monitor the hydrogen content in the gas in the reactor 1. When it increases abnormally, it is judged that there is hydrogen leakage inside sample 2. Take safety measures in time, stop the experiment, and reduce the temperature and pressure.
[0115] After the experiment is completed, the tensile or fatigue testing machine is stopped, the heating jacket 7 is turned off, and the gas inside the reactor 1 and the sample 2 is released alternately through the control system. During the release process, the pressure inside the sample 2 is kept not lower than the pressure inside the reactor 1.
[0116] After releasing to normal pressure, nitrogen is introduced into the reactor 1 and sample 2 for replacement. After the replacement test is qualified, the air intake is stopped and the exhaust is kept open. When the pressure drops to normal pressure and the temperature drops below 40°C, the reactor cover 12 is opened, the sample 2 is removed, and the data is recorded and saved to complete the test experiment.
[0117] Embodiment six:
[0118] The fatigue performance test of sample 2 made of 4130X material was carried out in a room temperature 140MPa hydrogen environment.
[0119] First follow Figure 1 Installing the sample 2 into the reactor 1 includes the following steps.
[0120] The test air pipe 4 sealed at the bottom of the kettle body 11 passes through the side through hole 51 of the transition rod 5 below the sample 2, then passes upward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the second joint 24 of the sample 2 through the second sealing member 41.
[0121] The external thread of the second joint 24 of the sample 2 is screwed into the internal thread of the lower transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the reactor 1.
[0122] The test air pipe 4 sealed on the kettle cover 12 passes through the side through hole 51 of the transition rod 5 above the sample 2, then passes downward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the first joint 23 of the sample 2 through the second sealing member 41.
[0123] The external thread of the first joint 23 of the sample 2 is screwed into the internal thread of the upper transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the telescopic rod 3.
[0124] A strain gauge 8 is installed on the main body 22 of the sample 2, the strain gauge 8 is communicatively connected to the control system, and the reading of the strain gauge 8 is cleared to zero in the control system.
[0125] The telescopic rod 3 is slidably inserted into the kettle cover 12 through the first sealing member 31, a sealing gasket is arranged between the kettle cover 12 and the kettle body 11, and the kettle cover 12 is coaxially buckled onto the kettle body 11, and bolts are passed through the bolt holes 67 to seal and fix the kettle cover 12 and the kettle body 11 to each other.
[0126] Adjust the position of the loading head of the tensile or fatigue testing machine, connect the upper end of the telescopic rod 3 to the upper connecting end of the testing machine, and connect the lower end of the fixing seat 13 to the lower connecting end of the testing machine. At this point, the installation process of the present invention is completed.
[0127] Open Figure 1The control valves of the two upper and lower test gas pipes 4 are connected, one of which is connected to the hydrogen supply equipment, and the other is connected to the vent pipe to replace the gas in the internal cavity 21 of the sample 2.
[0128] Use a hydrogen analysis system to analyze the purity of the hydrogen in the vent pipe. When the hydrogen purity reaches 99.99%, close the control valve connected to the vent pipe.
[0129] The hydrogen supply equipment continues to fill the cavity 21 with hydrogen, so that the pressure reaches about 10 MPa which is the pressure required for the experiment, and the control valve corresponding to the hydrogen supply equipment is closed. The value change of the second pressure sensor 63 is observed, and nitrogen or other required gases are filled into the reactor 1 through the first gas inlet and outlet 65 and the second gas inlet and outlet 66 to replace the gas in the reactor 1. During the replacement process, the hydrogen concentration in the replaced gas is detected. If the hydrogen concentration exceeds the standard, it means that the hydrogen in the cavity 21 is leaking, and it is necessary to reopen the reactor to check the sealing of the second sealing member 41 at both ends of the sample 2. After the inspection, the test is restarted.
[0130] After the gas in the reactor 1 is replaced (when the hydrogen concentration does not exceed the standard), the control valve corresponding to the gas outlet is closed, and the pressure in the reactor 1 is increased to 8MPa, and the pressure holding test is also performed.
[0131] After the pressure test is passed, the pressure in the reactor 1 is slowly increased to approach the pressure in the sample 2 of 10MPa. After that, the pressure in the sample 2 and the reactor 1 is gradually increased in an alternating manner through the control system until the pressure in the reactor 1 and the sample 2 reaches 30MPa. The pressure in the reactor 1 is stopped and only the pressure in the sample 2 is increased. The pressure in the sample 2 is increased using a hydrogen compressor. When the pressure in the sample 2 reaches 140MPa, the control valve corresponding to the test gas pipe 4 is closed.
[0132] After setting the loading conditions of the tensile or fatigue testing machine, start the experiment. During the experiment, monitor the internal pressure of sample 2, and when the pressure drops by more than 10MPa, add pressure. At the same time, monitor the hydrogen content in the gas in the reactor 1. When it increases abnormally, it is judged that there is hydrogen leakage inside sample 2. Take safety measures in time, stop the experiment, and reduce the temperature and pressure.
[0133] After the experiment is completed, the tensile or fatigue testing machine is stopped, the heating jacket 7 is turned off, and the pressure in the sample 2 is first released to 30 MPa through the control system, and then the gas inside the reactor 1 and the sample 2 is released alternately. During the release process, the pressure in the sample 2 is kept not lower than the pressure in the reactor 1.
[0134] After releasing to normal pressure, nitrogen is introduced into the reactor 1 and sample 2 for replacement. After the replacement test is qualified, the air intake is stopped and the exhaust is kept open. When the pressure drops to normal pressure and the temperature drops below 40°C, the reactor cover 12 is opened, the sample 2 is removed, and the data is recorded and saved to complete the test experiment.
[0135] Embodiment seven:
[0136] Sample 2 made of 316L material was hydrogen-filled on both sides at 300°C and 10 MPa hydrogen environment, and then the tensile properties were tested at room temperature and 10 MPa hydrogen environment.
[0137] Since the diffusion rate of hydrogen in austenitic stainless steel at room temperature is extremely low, it is impossible to simulate the actual situation on site through short-term experiments. Therefore, it is necessary to first fill the double-sided hydrogen of sample 2 at high temperature, that is, fill the inner cavity of sample 2 and reactor 1 with 10MPa hydrogen, and let it stand at 300℃ to allow the hydrogen to fully diffuse in sample 2 made of 316L material. Then measure it at room temperature with high pressure 30MPa hydrogen.
[0138] First follow Figure 1 Installing the sample 2 into the reactor 1 includes the following steps.
[0139] The test air pipe 4 sealed at the bottom of the kettle body 11 passes through the side through hole 51 of the transition rod 5 below the sample 2, then passes upward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the second joint 24 of the sample 2 through the second sealing member 41.
[0140] The external thread of the second joint 24 of the sample 2 is screwed into the internal thread of the lower transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the reactor 1.
[0141] The test air pipe 4 sealed on the kettle cover 12 passes through the side through hole 51 of the transition rod 5 above the sample 2, then passes downward through the middle hole 52 of the transition rod 5, and is sealed and connected to the internal cavity 21 of the first joint 23 of the sample 2 through the second sealing member 41.
[0142] The external thread of the first joint 23 of the sample 2 is screwed into the internal thread of the upper transition rod 5 and tightened with a wrench to complete the fixed connection between the sample 2 and the telescopic rod 3.
[0143] A strain gauge 8 is installed on the main body 22 of the sample 2, the strain gauge 8 is communicatively connected to the control system, and the reading of the strain gauge 8 is cleared to zero in the control system.
[0144] The telescopic rod 3 is slidably inserted into the kettle cover 12 through the first sealing member 31, a sealing gasket is arranged between the kettle cover 12 and the kettle body 11, and the kettle cover 12 is coaxially buckled onto the kettle body 11, and bolts are passed through the bolt holes 67 to seal and fix the kettle cover 12 and the kettle body 11 to each other.
[0145] Adjust the position of the loading head of the tensile or fatigue testing machine, connect the upper end of the telescopic rod 3 to the upper connecting end of the testing machine, and connect the lower end of the fixing seat 13 to the lower connecting end of the testing machine. At this point, the installation process of the present invention is completed.
[0146] Open Figure 1 The control valves of the two upper and lower test gas pipes 4 are connected, one of which is connected to the hydrogen supply equipment, and the other is connected to the vent pipe to replace the gas in the internal cavity 21 of the sample 2.
[0147] Use a hydrogen analysis system to analyze the purity of the hydrogen in the vent pipe. When the hydrogen purity reaches 99.99%, close the control valve connected to the vent pipe.
[0148] The hydrogen supply device continues to fill the cavity 21 with hydrogen until the pressure reaches about 5MPa, which is the pressure required for the experiment. The control valve corresponding to the hydrogen supply device is closed, and the value change of the second pressure sensor 63 is observed. At the same time, hydrogen is filled into the reactor 1 through the first gas inlet and outlet 65 and the second gas inlet and outlet 66 to replace the gas in the reactor 1. During the replacement process, the hydrogen concentration in the replacement gas is detected. After the hydrogen purity reaches the standard, the control valve corresponding to the gas outlet is closed, and the pressure in the reactor 1 is raised to 5MPa. The pressure holding test is also performed. At the same time, a hydrogen detector is used to detect each sealing position to avoid hydrogen leakage.
[0149] After the pressure test is passed, ensure that there is no hydrogen leakage, turn on the heating jacket 7, and heat the reactor 1. During the heating process, monitor the pressure in the reactor 1 and the sample 2. When the pressure exceeds the set maximum pressure, the control system automatically opens the corresponding control valve to release the pressure. When the pressure is lower than the set pressure, appropriate air replenishment is performed. When the temperature in the reactor 1 reaches 300°C and the pressure is 10MPa, close all control valves. Maintain the temperature and pressure in the reactor 1 and the sample 2, turn off the heating after standing for 100 hours, and when the temperature drops to 100°C, open the control valve of the reactor 1 to slowly reduce the pressure to normal pressure, and then introduce nitrogen for cooling and replacement.
[0150] After the replacement is completed and cooled to room temperature, nitrogen is charged into the reactor 1 and the pressure is increased to 5 MPa, then the hydrogen pressure in the sample 2 is supplemented to 10 MPa, and then the nitrogen pressure in the reactor 1 is increased to 10 MPa. After the pressure is stable, the control valve corresponding to the test gas pipe 4 is closed.
[0151] After setting the loading conditions of the tensile or fatigue testing machine, start the experiment. During the experiment, monitor the internal pressure of sample 2, and when the pressure drops beyond the set value, add pressure. At the same time, monitor the hydrogen content in the gas in the reactor 1. When it increases abnormally, it is judged that there is hydrogen leakage inside sample 2. Take safety measures in time, stop the experiment, and reduce the temperature and pressure.
[0152] After the experiment is completed, the tensile or fatigue testing machine is stopped, the heating jacket 7 is turned off, and the gas inside the reactor 1 and the sample 2 is released alternately through the control system. During the release process, the pressure inside the sample 2 is kept not lower than the pressure inside the reactor 1.
[0153] After releasing to normal pressure, nitrogen is introduced into the reactor 1 and sample 2 for replacement. After the replacement test is qualified, the air intake is stopped and the exhaust is kept open. When the pressure drops to normal pressure and the temperature drops below 40°C, the reactor cover 12 is opened, the sample 2 is removed, and the data is recorded and saved to complete the test experiment.
[0154] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0155] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0156] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0157] Finally, it should be noted that the above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A gas environment material performance testing device, characterized in that: include: Reactor (1); A sample (2) is fixed in the reaction kettle (1) in a detachable manner; A telescopic rod (3) connected to the sample (2) in a detachable manner, wherein the telescopic rod (3) provides tension or pressure for the sample (2); and a test air pipe (4), wherein a cavity (21) is provided in the sample (2), one end of the test air pipe (4) is connected to the cavity (21), and the other end of the test air pipe (4) extends out of the reaction kettle (1), The reaction kettle (1) and the test air pipe (4) pressurize the outside and inside of the sample (2) respectively.
2. The gas environment material performance testing device according to claim 1, characterized in that: The sample (2) comprises a main body (22) and a first joint (23) and a second joint (24) arranged at two ends of the main body (22); the first joint (23) and the second joint (24) are respectively connected to the telescopic rod (3) and the reactor (1) in a detachable manner; and a strain gauge (8) is arranged on the main body (22).
3. The gas environment material performance testing device according to claim 2, characterized in that: The outer diameter of the main body (22) of the sample (2) is smaller than the outer diameters of the first joint (23) and the second joint (24).
4. The gas environment material performance testing device according to claim 2, characterized in that: The test air pipe (4) is sealedly connected to the first joint (23) or the second joint (24).
5. The gas environment material performance testing device according to claim 2, characterized in that: A transition rod (5) is coaxially fixedly arranged between the sample (2) and the telescopic rod (3) by means of a threaded connection, and the test air pipe (4) enters from the side wall of the transition rod (5) and is coaxially sealed and connected to the first joint (23) or the second joint (24).
6. The gas environment material performance testing device according to claim 5, characterized in that: The transition rod (5) is cylindrical, and a through hole (51) for the test air pipe (4) to pass through is provided on the side wall of the transition rod (5).
7. The gas environment material performance testing device according to claim 1, characterized in that: The telescopic rod (3) is arranged on the reactor (1) in a sliding sealing manner, and one end of the telescopic rod (3) away from the sample (2) extends to the outside of the reactor (1).
8. The gas environment material performance testing device according to claim 1, characterized in that: A first pressure sensor (61) and a temperature sensor (62) are arranged on the reaction kettle (1), and a second pressure sensor (63) is arranged on the test gas pipe (4).
9. The gas environment material performance testing device according to any one of claims 1 to 8, characterized in that: The reaction kettle (1) comprises a kettle body (11) and a kettle cover (12), wherein the kettle cover (12) is sealed and fixed to the upper end of the kettle body (11) by bolts.
10. The gas environment material performance testing device according to claim 9, characterized in that: The telescopic rod (3) is coaxially slidably sealed and penetrated on the kettle cover (12).
11. The gas environment material performance testing device according to claim 9, characterized in that: A safety valve (64) and a first gas inlet and outlet (65) are provided on the kettle cover (12), and a second gas inlet and outlet (66) is provided at the bottom of the kettle body (11).
12. The gas environment material performance testing device according to claim 9, characterized in that: A heating jacket (7) is provided on the outside of the kettle body (11).
13. A method for testing the performance of gas environment materials, characterized in that: Using the gas environment material performance testing device according to any one of claims 1 to 12, the test gas is injected into the interior of the sample (2), and the gas is injected into the reactor (1) to balance the test gas pressure in the sample (2), and stress is applied to the sample (2) through the telescopic rod (3), and the strain of the sample (2) is detected at the same time.
Citation Information
Cited By
Atmosphere environment test chamber
CN119574302A
Mobile assembly and disassembly type high-temperature and high-pressure hydrogen environment in-situ tensile test device and method
CN119915614A
