Lossless fixing device and application of lossless fixing device in clean room cleanliness monitoring device
By installing a cleanliness monitoring system with non-destructive fixtures and wireless communicators in a clean room, the problem that the existing technology cannot monitor cleanliness and temperature and humidity in real time is solved, and comprehensive real-time monitoring of the clean room environment and improvement of construction quality is achieved.
Patent Information
- Application Number
- CN202410815202.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-18
- Publication Date
- 2024-11-12
AI Technical Summary
The existing clean room monitoring devices cannot conduct real-time monitoring of all-round cleanliness and temperature and humidity in a timely and effective manner, which affects the construction quality.
Design a clean room cleanliness monitoring device, use a lossless fixture to install a monitoring system in the clean area, and use a wireless communicator to transmit and control data, realize real-time monitoring of cleanliness, temperature and humidity and construction environment, and move it on the mobile phone The terminal performs visual display and alarm.
It realizes comprehensive and real-time monitoring of clean room cleanliness and temperature and humidity, improves construction quality, and ensures effective control of the clean room construction process.
Smart Images

Figure CN118937353A_ABST
Abstract
Description
Technical Field
[0001] This application is a divisional application. The application date of the original application is January 18, 2022. The application number of the original application is 2022100538413. The name of the original application is a clean room cleanliness monitoring device.
[0002] The invention relates to the technical field of cleanliness control, and in particular to a non-destructive fixing device and its application in a clean room cleanliness monitoring device. Background Art
[0003] Clean room, also known as dust-free workshop, clean room or clean room; the main function of the clean room is indoor pollution control. Without a clean room, pollution-sensitive parts cannot be mass-produced; in FED-STD-2, a clean room is defined as a room with air filtration, distribution, optimization, construction materials and equipment, in which specific regular operating procedures are used to control the concentration of airborne particles to achieve the appropriate particle cleanliness level;
[0004] Therefore, in order to ensure the cleanliness of the clean room, it is necessary to effectively control the cleanliness of the clean room during the construction process of the clean room, so as to achieve the purpose of clean management of the clean room by managing the on-site work process; However, in the prior art, the monitoring device for clean management is relatively simple in composition, and it is impossible to timely and effectively monitor and control the cleanliness of the clean room in an all-round way, which affects the monitoring of the cleanliness and temperature and humidity of the clean room during the construction process, thereby affecting the construction quality of the clean room;
[0005] Therefore, it is urgent to design a device that can be used to monitor the cleanliness and temperature and humidity in the clean room in real time during the construction process to monitor the temperature and humidity in the clean room in real time to improve the construction quality of the construction personnel during the construction process. Summary of the invention
[0006] In view of the above-mentioned problems, the present invention aims to provide a clean room cleanliness monitoring device. The device installs the monitoring system in each measuring area of the clean area by using a non-destructive fixing device, and communicates by using a wireless communicator. It can realize real-time monitoring of the cleanliness, temperature and humidity and on-site construction environment of the corresponding measuring area positions in the clean area, facilitates the effective control of the clean room construction, and has the characteristics of comprehensive monitoring and easy use and installation.
[0007] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0008] A non-destructive fixing device, the non-destructive fixing device comprising a fixing plate 1, a first integrated installation box 2, a temperature and humidity monitoring mechanism 5 and a second integrated installation box 7;
[0009] The fixing plate 1 is arranged on the upper side of the first integrated installation box 2 through a mechanical telescopic rod 12, and is connected to the ceiling or the floor of the clean room through tie bolts 11;
[0010] The first integrated installation box 2 is a box structure, and a first hanging adjustment mechanism 3 and a rotating connection mechanism 4 are integrated in the internal cavity of the first integrated installation box 2, wherein the first hanging adjustment mechanism 3 passes through the side wall of the box body and is connected to the fixing plate 1, and the rotating connection mechanism 4 is arranged at the lower side of the first hanging adjustment mechanism 3;
[0011] The temperature and humidity monitoring mechanism 5 is movably arranged on the piston rod of the rotating connection mechanism 4 and is used in conjunction with the rotating connection mechanism 4;
[0012] The second integrated installation box 7 is arranged at the lower end of the piston rod of the rotary connection mechanism 4 and is flange-connected to the rotary connection mechanism 4 . A cleanliness monitoring mechanism 8 is also arranged in the second integrated installation box 7 .
[0013] Application of a non-destructive fixing device in a clean room cleanliness monitoring device, the clean room cleanliness monitoring device includes several monitoring systems, a data transmission system, a control system, a display system, a network transmission system and a mobile phone mobile terminal;
[0014] The monitoring system is arranged in each measuring area inside the clean room maintenance system through a non-destructive fixing device, and is used to monitor the cleanliness, temperature and humidity of each measuring area in the clean room and supervise on-site construction;
[0015] The data transmission system is a multi-channel wireless communicator, which is used to transmit the clean area data detected by the monitoring system to the control system through wireless data transmission, and transmit the control command of the control system to the monitoring system;
[0016] The control system is a central processor, which is used to receive the measurement area data transmitted by the data transmission system, decode the data, and send the decoded data packets to the data display system, and control the monitoring system action through control commands;
[0017] The data display system is a display arranged at the entrance and exit of the clean room, and a host computer software is arranged in the display, which is used to visualize the data sent by the control system and send control commands to the control system through input;
[0018] The network transmission system is used to connect with the mobile terminal to transmit the cleanliness, temperature and humidity of the measurement area and the on-site construction conditions to the mobile terminal;
[0019] The mobile phone terminal is used to view the cleanliness, temperature and humidity of the clean room during the construction process and the on-site construction status in real time.
[0020] The beneficial effects of the present invention are as follows: the present invention discloses a clean room cleanliness monitoring device. Compared with the prior art, the present invention has the following improvements:
[0021] (1) The present invention designs a clean room cleanliness monitoring device, including several monitoring systems, data transmission systems, control systems, display systems, network transmission systems and mobile phone terminals. When in use, the monitoring system is installed in each measurement area of the clean area using a non-destructive fixing device, and the cleanliness, temperature and humidity and on-site construction conditions of each measurement area in the clean room are monitored in real time. At the same time, a wireless communicator is used for communication to visualize the cleanliness, temperature and humidity in the measurement area and the on-site construction conditions, and an alarm is issued for areas where the cleanliness and temperature and humidity exceed the standards, so that project management personnel can effectively control the clean room construction, thereby improving the construction quality. The device has the advantages of comprehensive monitoring and easy use and installation.
[0022] (2) At the same time, the non-destructive fixing device can be installed on the ceiling or the floor of the clean room, and the operating radius, operating height and operating direction can be adjusted through the rotating connection mechanism, the temperature and humidity monitoring machine and the cleanliness monitoring mechanism to conduct all-round monitoring of the measurement area environment, thereby effectively avoiding operation blind spots to ensure the quality of engineering construction, and has the advantages of comprehensive coverage and good monitoring effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic structural diagram of the non-destructive fixing device of the present invention;
[0024] Figure 2 is a cross-sectional view of the non-destructive fixing device of the present invention;
[0025] Figure 3 is a cross-sectional view of a first integrated installation box of the present invention;
[0026] Figure 4 It is a structural schematic diagram of the temperature and humidity monitoring mechanism of the present invention;
[0027] Figure 5 It is a cross-sectional view of the first limiting sleeve and the second limiting sleeve of the present invention;
[0028] Figure 6 is a top view of the turntable of the present invention;
[0029] Figure 7 is a cross-sectional view of a second integrated installation box of the present invention;
[0030] Figure 8 It is a structural schematic diagram of the third hanging adjustment assembly of the present invention;
[0031] Fig. 9 It is a schematic diagram of the structure of the dustproof component of the present invention;
[0032] Fig.10 This is a drawing showing the effect of the non-destructive fixing device of the present invention being hoisted on a ceiling pipe support;
[0033] Fig.11 This is an installation effect diagram of the non-destructive fixing device of the present invention being hoisted on the clean room floor;
[0034] Fig.12 This is an installation effect diagram of the non-destructive fixing device of the present invention being hoisted on a lattice beam in a clean room;
[0035] Fig.13 This is a control principle diagram of the clean room cleanliness monitoring device of the present invention;
[0036] Fig.14 This is a control principle diagram of the monitoring system of the present invention.
[0037] Among them: 1. Fixed plate, 11. Tie bolt, 12. Mechanical telescopic rod, 2. First integrated installation box, 21. Upper cavity of middle platform, 22. Lower cavity of middle platform, 23. Rotating groove, 3. First hanging adjustment mechanism, 31. Second motor, 32. Third spur gear, 33. Fourth spur gear, 34. First stranded wire, 35. First winder, 36. First padlock hook, 4. Rotating connection mechanism, 41. Hydraulic parts, 42. First motor, 43. First spur gear, 44. First bearing, 45. Pressing sleeve, 46. .Second spur gear, 47. Spline sleeve, 48. Piston rod, 49. Turntable, 491. Second suspension adjustment assembly, 492. Spline shaft, 493. First stranded wire transmission hole, 40. First flange, 5. Temperature and humidity monitoring mechanism, 51. First limit sleeve, 52. Second limit sleeve, 53. First pull rod, 54. Second pull rod, 55. Hook ring, 56. Limit ring, 57. Buffer shock-absorbing ring, 58. First shock-absorbing spring, 6. Temperature and humidity monitor, 7. Second integrated installation box, 71. Upper cavity, 72. Middle 73. Lower cavity, 74. Make way slot, 75. Second flange, 76. Movable slot, 8. Cleanliness monitoring mechanism, 81. Third hanging adjustment assembly, 811. Fifth spur gear, 812. First electric telescopic rod, 813. First bevel gear, 814. Second wire winder, 815. Sixth spur gear, 816. Third dual-axis motor, 817. Second stranded wire, 818. Second padlock hook, 82. Gear train transmission assembly, 821. Second bearing, 822. Sixth bevel gear, 823. Fifth bevel gear, 8 24. Second transmission rod, 825. Rotating connecting seat, 826. Fourth bevel gear, 827. Third bevel gear, 828. Second bevel gear, 829. First transmission rod, 820. Second electric telescopic rod, 83. Dust particle counter mounting frame, 831. First threaded connection block, 84. Threaded adjustment rod, 85. Dustproof assembly, 851. Traction rod, 852. Second threaded connection block, 86. Dust particle counter, 87. Dustproof plate, 88. Camera, 9. Ceiling, 91. Clean room floor, 92. Lattice beam. DETAILED DESCRIPTION
[0038] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0039] Example 1
[0040] A non-destructive fixing device, comprising a fixing plate 1, a first integrated installation box 2, a temperature and humidity monitoring mechanism 5, and a second integrated installation box 7;
[0041] The fixing plate 1 is arranged on the upper side of the first integrated installation box 2 through a mechanical telescopic rod 12, and is connected to the clean room ceiling or the ground through a tie bolt 11. When the clean room cleanliness monitoring device is suspended on the lower side of the clean room ceiling, the mechanical telescopic rod 12 can be extended as the first integrated installation box 2 is suspended downward, and at the same time, it plays a limiting role on the torque of the first integrated installation box 2. When the clean room cleanliness monitoring device is fixed, the mechanical telescopic rod 12 is completely retracted and can serve as the bottom bracket of the first integrated installation box 2;
[0042] The first integrated installation box 2 is a box structure, and a first hanging adjustment mechanism 3 and a rotating connection mechanism 4 are integrated and installed in the internal cavity of the first integrated installation box 2, wherein the first hanging adjustment mechanism 3 passes through the side wall of the box body and is connected to the fixed plate 1, that is, the fixed plate 1 is connected to the first integrated installation box 2 through the first hanging adjustment mechanism 3. When the device is suspended on the lower side of the clean room ceiling, the relative distance between the fixed plate 1 and the first integrated installation box 2 can be adjusted by the first hanging adjustment mechanism 3; the rotating connection mechanism 4 is arranged on the lower side of the first hanging adjustment mechanism 3, and is used to connect and drive the lower structure to rotate;
[0043] The temperature and humidity monitoring mechanism 5 is movably arranged on the piston rod of the rotating connection mechanism 4 and is used in conjunction with the rotating connection mechanism 4. A temperature and humidity monitor 6 is arranged on the temperature and humidity monitoring mechanism 5. When in use, the temperature and humidity monitor 6 is used to monitor the temperature and humidity in the clean room;
[0044] The second integrated installation box 7 is arranged at the lower end of the piston rod of the rotating connection mechanism 4 and is flange-connected to the rotating connection mechanism 4. A cleanliness monitoring mechanism 8 is also arranged in the second integrated installation box 7. A dust particle counter 86 and a camera 88 are respectively arranged in the cleanliness monitoring mechanism 8, which are used to monitor the cleanliness of the floor in the clean room and the on-site construction conditions, respectively.
[0045] Preferably, in order to facilitate the installation of the first hanging adjustment mechanism 3 and the rotating connection mechanism 4, a middle plate is provided in the middle of the first integrated installation box 2, and the cavity of the first integrated installation box 2 is divided into an upper cavity 21 of the middle plate and a lower cavity 22 of the middle plate through the middle plate. The first hanging adjustment mechanism 3 is integrated and installed in the upper cavity 21 of the middle plate, and an inspection port is provided on the outer sides of the upper cavity 21 of the middle plate and the lower cavity 22 of the middle plate.
[0046] Preferably, the rotary connection mechanism 4 is integrated in the cavity 22 at the lower side of the middle plate, and includes a rotary extension component and a second suspension adjustment component 491. The rotary extension component includes a hydraulic component 41, a first motor 42, a first spur gear 43, a second spur gear 46 and a turntable 49. The hydraulic component 41 is rotatably mounted in the cavity 22 at the lower side of the middle plate through a first bearing 44 and a pressing sleeve 45. The second spur gear 46 is arranged on the hydraulic component 41 and meshes with the first spur gear 43. The first spur gear 43 is arranged at the transmission end of the first motor 42. When in use, the hydraulic component 41 is driven to rotate by the first motor 42, and then the mounting structure below is driven to rotate to perform all-round monitoring; a spline sleeve 47 is also provided on the piston rod 48 of the hydraulic component 41, and the spline sleeve 47 is used in conjunction with a spline shaft 492 arranged at the center of a turntable 49, and the turntable 49 is rotatably arranged in a rotating groove 23 on the lower side of the cavity 22 on the lower side of the middle plate, and the turntable 49 is driven to rotate by the first motor 42, and the second hanging adjustment component 491 is symmetrically installed on the turntable 49, and is used in conjunction with the temperature and humidity monitoring mechanism 5.
[0047] Preferably, the first hanging adjustment mechanism 3 and the second hanging adjustment component 491 have the same structure and both include a second motor 31, a third spur gear 32, a fourth spur gear 33, a first winder 35 and a first stranded wire 34. The first winder 35 is fixedly mounted in the cavity 22 on the lower side of the middle plate or on the turntable 49. The fourth spur gear 33 is arranged on a side coupling of the first winder 35 and meshes with the third spur gear 32. The third spur gear 32 is arranged at the transmission end of the second motor 31. When in use, the first winder 35 is driven to rotate by the second motor 31. The first stranded wire 34 is wound around the first winder 35 and meshes with the first stranded wire. The free end of the wire 34 is provided with a first padlock hook 36, and the first padlock hook 36 is used in conjunction with a hook ring 55 arranged on the upper end of the fixed plate 1 and the temperature and humidity monitoring mechanism 5, that is, when the first padlock hook 36 is connected to the hook ring 55 arranged on the fixed plate 1, the connection between the fixed plate 1 and the first integrated installation box 2 is realized, which is used to adjust the relative distance between the fixed plate 1 and the first integrated installation box 2; when the first padlock hook 36 is connected to the hook ring 55 arranged on the temperature and humidity monitoring mechanism 5, the connection between the first integrated installation box 2 and the temperature and humidity monitoring mechanism 5 is realized, which is used to adjust the distance between the two symmetrically arranged temperature and humidity monitors 6, thereby adjusting the monitoring radius.
[0048] Preferably, the temperature and humidity monitoring mechanism 5 is movably sleeved on the piston rod 48, including a first limiting sleeve 51, a second limiting sleeve 52, a first pull rod 53 and a second pull rod 54, the second limiting sleeve 52 is movably sleeved in the first limiting sleeve 51, and is connected to the first limiting sleeve 51 by a clamping connection, the lower end of the first limiting sleeve 51 is used in conjunction with a first flange 40 provided at the end of the piston rod 48, the first flange 40 is used to limit the first limiting sleeve 51, one end of the first pull rod 53 is connected to the first limiting sleeve The tube 51 is hingedly connected, and the other end of the first pull rod 53 is installed with a temperature and humidity monitor 6 for monitoring the temperature and humidity in the clean room, and the middle hinge point of the first pull rod 53 is connected to one end of the second pull rod 54, and the other end of the second pull rod 54 is hingedly connected to the second limiting sleeve 52. When in use, the relative distance between the first limiting sleeve 51 and the second limiting sleeve 52 is adjusted by utilizing the second hanging adjustment component 491, thereby realizing the adjustment of the relative distance of the temperature and humidity monitors 6 on the two first pull rods 53, that is, adjusting their monitoring radius.
[0049] Preferably, in order to realize the staggered connection between the first limiting sleeve 51 and the second limiting sleeve 52,
[0050] A limiting ring 56 is also provided at the lower end of the second limiting sleeve 52. The limiting ring 56 is used in conjunction with the convex ring provided at the upper end of the first limiting sleeve 51 to prevent the second limiting sleeve 52 from being pulled off during the stretching process, and is not used for shock absorption to avoid damage to the temperature and humidity monitor 6. A first shock-absorbing spring 58 is also provided at the upper end of the second limiting sleeve 52. The lower end of the first shock-absorbing spring 58 is connected to a buffer shock-absorbing ring 57. The buffer shock-absorbing ring 57 is used in conjunction with the convex ring at the upper end of the first limiting sleeve 51 to absorb shock during the adjustment process to avoid damage to the temperature and humidity monitor 6.
[0051] Preferably, in order to check the cleanliness of the floor in the clean room and the on-site construction environment, the cleanliness monitoring mechanism 8 includes a third hanging adjustment component 81, a gear group transmission component 82, a dust particle counter installation frame 83, a threaded adjustment rod 84 and a dustproof component 85; the third hanging adjustment component 81 is integrated and installed in the lower cavity 73 of the second integrated installation box 7, and is used in conjunction with the temperature and humidity monitoring mechanism 5. When the device is installed on the ground, the third hanging adjustment component 81 pulls the first limiting sleeve 51 to move to adjust the working radius of the temperature and humidity monitor 6; the gear group transmission component 82 is arranged in the middle cavity 72 on the upper side of the lower cavity 73, and is used in conjunction with the third hanging adjustment component 81. The hanging adjustment component 81 is used in conjunction with the threaded adjustment rod 84, which passes through the middle cavity 72 and the upper cavity 71 on the upper side of the middle cavity 72, and is rotatably installed on both sides of the middle cavity 72 and the upper cavity 71 through the second bearing 821. A dust particle counter 86 is installed in the dust particle counter mounting frame 83, and first threaded connection blocks 831 are provided on both sides of the dust particle counter mounting frame 83. The first threaded connection block 831 is connected to the threaded adjustment rod 84, that is, when the threaded adjustment rod 84 rotates, the extension length of the dust particle counter mounting frame 83 is adjusted, and the dust particle counter 86 is protected by the cavity of the second integrated mounting box 7 when it is not in use.
[0052] Preferably, in order to adjust the working radius of the temperature and humidity monitor 6, the third hanging adjustment assembly 81 includes a fifth spur gear 811, a first electric telescopic rod 812, a second winder 814, a sixth spur gear 815 and a third dual-axis motor 816, wherein the third dual-axis motor 816 is installed in the lower cavity 73, and the two power output shafts of the third dual-axis motor 816 are connected to the fifth spur gear 811 through the first electric telescopic rod 812 (the first electric telescopic rod 812 can be extended or shortened as needed to achieve differentiated work), the second winder 814 is rotatably installed in the lower cavity 73, and the sixth spur gear 815 is arranged on the second winder 81 4 is a side driving end, and is meshed with the fifth spur gear 811. A second strand 817 is also wound around the second winder 814. A second padlock hook 818 arranged at the free end of the second strand 817 is used in conjunction with a hook ring 55 arranged at the lower end of the temperature and humidity monitoring mechanism 5. A second flange 75 is also arranged on the lower side of the lower cavity 73. When in use, the first flange 40 and the second flange 75 are connected by bolts to achieve the installation of the second integrated installation box below the first integrated installation box. When the device is installed on the ground, the first limiting sleeve 51 is pulled to move by the third hanging adjustment component 81 to adjust the working radius of the temperature and humidity monitor 6.
[0053] Preferably, in order to drive the dust particle counter mounting frame 83 to move in the upper cavity 71, the dust particle counter 86 is extended when in use, and the dust particle counter 86 is retracted when not in use, so as to avoid contamination and damage of the dust particle counter 86, the gear group transmission assembly 82 includes a first bevel gear 813, a first transmission rod 829 and a second transmission rod 824 arranged on the transmission rod of the third dual-axis motor 816, the first transmission rod 829 is vertically arranged between the lower cavity 73 and the middle cavity 72, and the lower end of the first transmission rod 829 is provided with a second bevel gear 828 through a second electric telescopic rod 820 (the second electric telescopic rod 820 can be extended or shortened as needed to achieve differentiated work), the second bevel gear 828 is used in conjunction with the first bevel gear 813, and a third bevel gear 824 is arranged at the upper end of the first transmission rod 829. Gear 827, the second transmission rod 824 is horizontally installed in the middle cavity 72 through the rotating connecting seat 825, and a fourth bevel gear 826 is arranged on the inner end of the second transmission rod 824, and the fourth bevel gear 826 is used in conjunction with the third bevel gear 827. The outer end of the second transmission rod 824 is also provided with a fifth bevel gear 823, and the fifth bevel gear 823 is used in conjunction with the sixth bevel gear 822 arranged on the threaded adjustment rod 84, that is, during use, the threaded adjustment rod 84 is driven to rotate by the rotation of the third dual-axis motor 816, and then the dust particle counter installation frame 83 is driven to move in the upper cavity 71, so that the dust particle counter 86 is extended when in use, and the dust particle counter 86 is retracted when not in use, so as to avoid contamination and damage of the dust particle counter 86 and protect the dust particle counter 86.
[0054] Preferably, the dustproof assembly 85 includes a traction rod 851 and a dustproof plate 87, the dustproof plate 87 is symmetrically arranged at the upper end of the upper cavity 71, and moves along the movable groove 6 on the second integrated installation box 7 under the action of the traction rod 851, the traction rod 851 moves along the yield groove 74 arranged on the second integrated installation box 7, and one end of the traction rod 851 is connected to the tail end hinge seat of the dustproof plate 87, and the other end is hingedly connected to the second threaded connection block 852, the second threaded connection block 852 is threadedly connected to the threaded adjustment rod 84, that is, the relative height of the second threaded connection block 852 is adjusted by rotating the threaded adjustment rod 84, and then the traction action of the traction rod 851 is used to drive the extension and closing of the two dustproof plates 87, so as to protect the dust particle counter 86 and ensure the accuracy of its data collection.
[0055] Preferably, in order to monitor the internal environment and construction process of the clean room in real time, a camera 88 is also installed on the top of the dust particle counter installation frame 83, and the dustproof plate 87 also protects the camera 88.
[0056] The principle of the clean room cleanliness monitoring device of the present invention includes: first, the monitoring system, data transmission system, control system and display system of the present invention are arranged in the clean room, and debugged after the arrangement is completed, and then the temperature and humidity monitor 6, dust particle counter 86 and camera 88 of the monitoring system are used to collect the on-site conditions of the clean room by partition, and after the collection, the data is transmitted to the central processing unit through a multi-channel wireless communicator, the central processing unit decodes the data, and sends the decoded data packet to the data display system, and the data display system is used to display it; at the same time, the data information is transmitted to the mobile terminal of the mobile phone through the network transmission system, and the cleanliness, temperature and humidity and on-site construction conditions of the clean room during the construction process are displayed by the mobile terminal of the mobile phone;
[0057] In the above data collection process, the non-destructive fixing device includes three optional fixing methods, specifically including hanging only on the ceiling, installing only on the ground, and setting on both the ground and the ceiling.
[0058] Example 2
[0059] After the clean room maintenance system is renovated, the cleanliness in the clean room cannot be monitored in real time and effectively to achieve cleanliness control during the construction process, affecting the construction quality.
[0060] Application of non-destructive fixtures in cleanroom cleanliness monitoring devices, cleanroom cleanliness monitoring devices, including several monitoring systems, data transmission systems, control systems, display systems, network transmission systems and mobile terminals;
[0061] The monitoring system is arranged in each measuring area inside the clean room maintenance system through a non-destructive fixing device, and is used to monitor the cleanliness, temperature and humidity of each measuring area in the clean room and supervise on-site construction;
[0062] The data transmission system is a multi-channel wireless communicator, which is used to transmit the clean area data detected by the monitoring system to the control system through wireless data transmission, and transmit the control command of the control system to the monitoring system;
[0063] The control system is a central processor, which is used to receive the measurement area data transmitted by the data transmission system, decode the data, and send the decoded data packets to the data display system, and at the same time control the monitoring system action through control commands to monitor the measurement area;
[0064] The data display system is a display set at the entrance and exit of the clean room, and the upper computer software is set in the display, which is used for the upper computer software to visualize the data sent by the control system, and send control commands to the control system at the input of the data display system to control the operation of the entire program and monitor the internal environment of the clean room;
[0065] The network transmission system is used to connect to the mobile terminal and transmit the cleanliness, temperature and humidity of the measurement area and the on-site construction conditions to the mobile phone through 4G or 5G signals, so that the construction management personnel can monitor the construction conditions and cleanliness conditions in the clean room measurement area in real time, so as to formulate or change the on-site construction plan in time;
[0066] The mobile phone terminal is used to view the cleanliness, temperature and humidity of the clean room during the construction process and the on-site construction status in real time, so as to facilitate the clean management of the site.
[0067] Preferably, in order to facilitate cleanliness monitoring of the corresponding measurement area, the monitoring system includes a dust particle counter, a temperature and humidity monitor, a camera and a PCL controller, one input and output end of the PCL controller is connected to the central processor through a wireless communicator, and the other data input end is connected to the dust particle counter, the temperature and humidity monitor and the camera respectively through a control switch to control the dust particle counter, the temperature and humidity monitor and the camera to work; and the dust particle counter, the temperature and humidity monitor, the camera and the PCL controller are integrated through a non-destructive fixture, and the non-destructive fixture is equidistantly arranged in the clean room measurement area, and the number of non-destructive fixtures is not less than the number of measurement areas N. L ;
[0068] Where N L =A 0.5 , A is the area of the flow air interface in the clean room that is perpendicular to the airflow direction.
[0069] Preferably, in order to facilitate threshold alarms for cleanliness and temperature and humidity in the measurement area, an alarm system is also embedded in the data display system. When in use, the control thresholds for cleanliness and temperature and humidity in the clean room are input into the data display system. When the cleanliness and temperature and humidity monitored on site exceed the set thresholds, the alarm system is triggered and an alarm is sounded on the display screen, which is convenient for construction personnel to monitor in a timely manner.
[0070] Preferably, in order to avoid affecting the ground construction and reduce the weight borne by the ceiling, according to the on-site construction conditions, the non-destructive fixing device can be suspended on the ceiling, installed on the ground (depending on the size of the construction area, too small a space may affect the construction) or on the lattice beam, or the above-mentioned settings can be combined.
[0071] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A non-destructive fixing device, characterized in that: The non-destructive fixing device comprises a fixing plate (1), a first integrated installation box (2), a temperature and humidity monitoring mechanism (5) and a second integrated installation box (7); The fixing plate (1) is arranged on the upper side of the first integrated installation box (2) via a mechanical telescopic rod (12), and is connected to the ceiling or the floor of the clean room via tie bolts (11); The first integrated installation box (2) is a box structure, and a first hanging adjustment mechanism (3) and a rotating connection mechanism (4) are integrated in the internal cavity of the first integrated installation box (2), wherein the first hanging adjustment mechanism (3) passes through the side wall of the box to be connected to the fixed plate (1), and the rotating connection mechanism (4) is arranged on the lower side of the first hanging adjustment mechanism (3); The temperature and humidity monitoring mechanism (5) is movably arranged on the piston rod of the rotating connection mechanism (4) and is used in conjunction with the rotating connection mechanism (4); The second integrated installation box (7) is arranged at the lower end of the piston rod of the rotary connection mechanism (4) and is flange-connected to the rotary connection mechanism (4). A cleanliness monitoring mechanism (8) is also arranged in the second integrated installation box (7).
2. The non-destructive fixing device according to claim 1, characterized in that: A middle plate is provided in the middle of the first integrated installation box (2), and the cavity of the first integrated installation box (2) is divided into an upper cavity (21) of the middle plate and a lower cavity (22) of the middle plate by the middle plate. The first hanging adjustment mechanism (3) is integrated in the upper cavity (21) of the middle plate, and the rotating connection mechanism (4) is integrated in the lower cavity (22) of the middle plate, and includes a rotating extension component and a second hanging adjustment component (491). The rotating extension component includes a hydraulic component (41), a first motor (42), a first spur gear (43), a second spur gear (46) and a turntable (49). The hydraulic component (41) is rotatably installed in the lower cavity of the middle plate through a first bearing (44) and a compression sleeve (45). The second spur gear (46) is arranged on the hydraulic component (41) in the cavity (22), and meshes with the first spur gear (43). The first spur gear (43) is arranged at the transmission end of the first motor (42), and drives the hydraulic component (41) to rotate through the first motor (42). A spline sleeve (47) is also arranged on the piston rod (48) of the hydraulic component (41), and the spline sleeve (47) is used in conjunction with a spline shaft (492) arranged at the center of a turntable (49). The turntable (49) is arranged in a rotating groove (23) on the lower side of the cavity (22) on the lower side of the middle plate. The second hanging adjustment component (491) is symmetrically installed on the turntable (49) and is used in conjunction with the temperature and humidity monitoring mechanism (5).
3. The non-destructive fixing device according to claim 1, characterized in that: The first hanging adjustment mechanism (3) and the second hanging adjustment component (491) both comprise a second motor (31), a third spur gear (32), a fourth spur gear (33), a first wire winder (35) and a first stranded wire (34); the first wire winder (35) is fixedly installed; the fourth spur gear (33) is arranged on a coupling shaft on one side of the first wire winder (35) and is used in conjunction with the third spur gear (32); the third spur gear (32) is arranged at the transmission end of the second motor (31) and drives the first wire winder (35) to rotate through the second motor (31); the first stranded wire (34) is wound around the first wire winder (35), and a first padlock hook (36) is arranged at the free end of the first stranded wire (34); the first padlock hook (36) is used in conjunction with a hook ring (55) arranged on the fixing plate (1) and the upper end of the temperature and humidity monitoring mechanism (5).
4. The non-destructive fixing device according to claim 1, characterized in that: The temperature and humidity monitoring mechanism (5) is movably sleeved on the piston rod (48), and comprises a first limiting sleeve (51), a second limiting sleeve (52), a first pull rod (53) and a second pull rod (54); the second limiting sleeve (52) is movably sleeved in the first limiting sleeve (51), and the lower end of the first limiting sleeve (51) is used in conjunction with a first flange (40) arranged at the end of the piston rod (48); one end of the first pull rod (53) is hingedly connected to the first limiting sleeve (51); the other end of the first pull rod (53) is installed with a temperature and humidity monitor (6), and the middle hinge point of the first pull rod (53) is connected to the second pull rod (54). One end of the second pull rod (54) is connected, and the other end of the second pull rod (54) is hingedly connected to the second limiting sleeve (52), and the relative distance of the temperature and humidity monitor (6) is adjusted by the second hanging adjustment component (491); a limiting ring (56) is also provided at the lower end of the second limiting sleeve (52), and the limiting ring (56) is used in conjunction with the convex ring provided at the upper end of the first limiting sleeve (51), and a first shock-absorbing spring (58) is also provided at the upper end of the second limiting sleeve (52), and the lower end of the first shock-absorbing spring (58) is connected to the buffer shock-absorbing ring (57), and the buffer shock-absorbing ring (57) is used in conjunction with the convex ring at the upper end of the first limiting sleeve (51).
5. The non-destructive fixing device according to claim 1, characterized in that: The cleanliness monitoring mechanism (8) comprises a third hanging adjustment component (81), a gear transmission component (82), a dust particle counter installation frame (83), a threaded adjustment rod (84) and a dustproof component (85); the third hanging adjustment component (81) is integrated in the lower cavity (73) of the second integrated installation box (7) and is used in conjunction with the temperature and humidity monitoring mechanism (5); the gear transmission component (82) is arranged in the middle cavity (72) on the upper side of the lower cavity (73) and is used in conjunction with the third hanging adjustment component (81). The hanging adjustment assembly (81) is used in conjunction with the threaded adjustment rod (84), which passes through the middle cavity (72) and the upper cavity (71) on the upper side of the middle cavity (72), and is rotatably mounted on both sides of the middle cavity (72) and the upper cavity (71) via a second bearing (821); a dust particle counter (86) is mounted in the dust particle counter mounting frame (83), and first threaded connection blocks (831) on both sides of the dust particle counter mounting frame (83) are connected to the threaded adjustment rod (84).
6. The non-destructive fixing device according to claim 5, characterized in that: The third suspension adjustment assembly (81) comprises a fifth spur gear (811), a first electric telescopic rod (812), a second winder (814), a sixth spur gear (815) and a third double-axis motor (816), wherein the third double-axis motor (816) is installed in the lower cavity (73), and two power output shafts of the third double-axis motor (816) are connected to the fifth spur gear (811) through the first electric telescopic rod (812), and the second winder (814) is rotatably installed in the lower cavity (73). The sixth spur gear (815) is arranged in the lower cavity (73) at a driving end on one side of the second winder (814) and is used in conjunction with the fifth spur gear (811). A second stranded wire (817) is also wound around the second winder (814). A second padlock hook (818) arranged at the free end of the second stranded wire (817) is used in conjunction with a hook ring (55) arranged at the lower end of the temperature and humidity monitoring mechanism (5). A second flange (75) is also arranged on the lower side of the lower cavity (73).
7. The non-destructive fixing device according to claim 5, characterized in that: The gear train transmission assembly (82) comprises a first bevel gear (813) arranged on a transmission rod of a third dual-axis motor (816), a first transmission rod (829) and a second transmission rod (824), wherein the first transmission rod (829) is vertically arranged between the lower cavity (73) and the middle cavity (72), and a second bevel gear (828) is arranged at the lower end of the first transmission rod (829) via a second electric telescopic rod (820), and the second bevel gear (828) cooperates with the first bevel gear (813), and a third bevel gear (824) is arranged at the upper end of the first transmission rod (829). 27), the second transmission rod (824) is horizontally installed in the middle cavity (72) through a rotating connecting seat (825), and a fourth bevel gear (826) is provided at the inner end of the second transmission rod (824), and the fourth bevel gear (826) is used in conjunction with the third bevel gear (827). A fifth bevel gear (823) is also provided at the outer end of the second transmission rod (824), and the fifth bevel gear (823) is used in conjunction with a sixth bevel gear (822) provided on the threaded adjustment rod (84), and the threaded adjustment rod (84) is driven to rotate by the third dual-axis motor (816).
8. The non-destructive fixing device according to claim 5, characterized in that: The dustproof component (85) comprises a traction rod (851) and a dustproof plate (87); the dustproof plate (87) is symmetrically arranged at the upper end of the upper cavity (71), and moves along the movable groove (76) on the second integrated installation box (7) under the action of the traction rod (851); the traction rod (851) moves along the yield groove (74) arranged on the second integrated installation box (7); one end of the traction rod (851) is connected to the rear end hinge seat of the dustproof plate (87), and the other end is hingedly connected to the second threaded connection block (852); the second threaded connection block (852) is threadedly connected to the threaded adjustment rod (84); and a camera (88) is also installed on the top of the dust particle counter installation frame (83).
9. Application of a non-destructive fixing device in a clean room cleanliness monitoring device, characterized in that: The clean room cleanliness monitoring device includes several monitoring systems, data transmission systems, control systems, display systems, network transmission systems and mobile terminals; The monitoring system is arranged in each measuring area inside the clean room maintenance system through the non-destructive fixing device described in any one of claims 1 to 8, and is used to monitor the cleanliness, temperature and humidity of each measuring area in the clean room and supervise on-site construction; The data transmission system is a multi-channel wireless communicator, which is used to transmit the clean area data detected by the monitoring system to the control system through wireless data transmission, and transmit the control command of the control system to the monitoring system; The control system is a central processor, which is used to receive the measurement area data transmitted by the data transmission system, decode the data, and send the decoded data packets to the data display system, and control the monitoring system action through control commands; The data display system is a display arranged at the entrance and exit of the clean room, and a host computer software is arranged in the display, which is used to visualize the data sent by the control system and send control commands to the control system through input; The network transmission system is used to connect with the mobile terminal to transmit the cleanliness, temperature and humidity of the measurement area and the on-site construction conditions to the mobile terminal; The mobile phone terminal is used to view the cleanliness, temperature and humidity of the clean room during the construction process and the on-site construction status in real time.
10. The application of the non-destructive fixing device according to claim 9 in a clean room cleanliness monitoring device is characterized in that: The monitoring system includes a dust particle counter, a temperature and humidity monitor, a camera and a PCL controller, wherein one input and output end of the PCL controller is connected to a central processor via a wireless communicator, and the other data input end is connected to the dust particle counter, the temperature and humidity monitor and the camera respectively via a control switch to control the operation of the dust particle counter, the temperature and humidity monitor and the camera; and the dust particle counter, the temperature and humidity monitor, the camera and the PCL controller are integrated via the non-destructive fixture according to any one of claims 1 to 8, and the non-destructive fixture is equidistantly arranged in the measurement area of the clean room, and the number of the non-destructive fixtures is not less than the number of measurement areas N. L ; where N L =A 0.5 , A is the area of the flow air interface in the clean room that is perpendicular to the airflow direction.