Virtual power plant building method and system based on distributed energy management
By constructing an energy distribution map and a demand distribution map, determining the priority of electricity consumption and selecting power generation units, the problem of priority optimization in the construction of virtual power plants is solved, the flexibility and reliability of the power system are improved, and economic benefits are improved.
Patent Information
- Application Number
- CN202410964632.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-12
AI Technical Summary
In the prior art, the construction process of virtual power plants lacks the optimization of demand and power supply processes, especially the optimization of priority, which leads to insufficient flexibility and reliability of the power system.
By querying the boundary coordinates of the power generation unit, building an energy distribution map and demand distribution map, determining the power consumption priority, and selecting the power generation unit based on the priority to establish a transmission channel, calculating the unused power generation as backup power generation, and achieving flexible adjustment of power output .
Improves the flexibility, reliability and sustainability of the power system, and can achieve the best economic benefits in the energy market.
Smart Images

Figure CN118940365A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power resource management, and in particular to a method and system for building a virtual power plant based on distributed energy management. Background Art
[0002] A virtual power plant is a system that integrates multiple energy resources (such as solar energy, wind energy, energy storage, etc.) and energy management technologies to provide power services and optimize the operation of the power system. It provides electricity in a similar way to traditional power plants by intelligently controlling and coordinating decentralized energy resources. The core concept of a virtual power plant is to integrate decentralized energy resources onto a unified platform and monitor, optimize, and manage their operation through advanced technologies.
[0003] In the prior art, the process of building a virtual power plant is actually missing, especially the relationship between demand and power supply, which involves a priority issue. How to optimize the priority is the technical problem that the technical solution of the present invention aims to solve. Summary of the invention
[0004] The purpose of the present invention is to provide a method and system for building a virtual power plant based on distributed energy management to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A method for building a virtual power plant based on distributed energy management, the method comprising:
[0007] Query the boundary coordinates of the power generation unit, map the boundary coordinates to the regional map, and obtain the power generation outline;
[0008] Calculate the distance between any two points on the power generation contour, query and connect the two points corresponding to the maximum distance to obtain the baseline;
[0009] The power generation of each power generation unit is obtained, and the midpoint of the baseline is used as the scaling point, and the power generation profile is scaled based on the power generation;
[0010] When all power generation contours are scaled, a regional map containing the scaled power generation contours is output as an energy distribution map;
[0011] Querying the power consumption units in the area, and constructing a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map;
[0012] Determine the electricity priority of each point in the demand distribution map based on the energy distribution map;
[0013] When a power demand is received, a power generation unit is selected based on the power priority and a transmission channel is established; wherein, in the process of selecting the power generation unit, the unused power generation of each power generation unit is calculated as a backup power generation unit.
[0014] As a further solution of the present invention: the step of constructing a demand distribution map of power consumption units in the query area according to the power consumption information of the power consumption units includes:
[0015] Query the filing information of each building in the area and obtain the maximum building height and minimum building floor height;
[0016] Establish an arithmetic progression based on the preset initial height, minimum building height and maximum building height;
[0017] Constructing sections with the ground plane based on the arithmetic progression; all sections contain height labels;
[0018] For each slice, copy a regional map and query the intersection of the slice and the buildings in the region;
[0019] Obtain the demand information of the intersection and insert the regional map as a slice layer; wherein the slice layer contains the time span;
[0020] The slice layers of the same time span are stacked in order according to the slice heights to obtain the demand distribution map.
[0021] As a further solution of the present invention: the step of obtaining the intersection demand information and inserting the regional map as a section layer includes:
[0022] Query the number of meters in each intersection according to the meter record data;
[0023] The intersection is divided according to the number of electric meters to obtain sub-areas, and the corresponding relationship between the sub-areas and the electric meters is established;
[0024] Based on the corresponding relationship, the meter data including the time acquired by the meter is filled into the sub-area, and when the data filling in any sub-area is completed, the regional map is output as a section layer;
[0025] The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
[0026] As a further solution of the present invention: the filling rule of the electric meter data is:
[0027]
[0028] Z(i,j)=αΔ1(t)+βΔ2(t);
[0029] Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
[0030] As a further solution of the present invention: the step of determining the power usage priority of each point in the demand distribution map based on the energy distribution map includes:
[0031] Copy the generation profile in the energy distribution map and insert it into the demand distribution map;
[0032] Calculate the power consumption priority of each point based on the power generation profile in the demand distribution map;
[0033] Among them, the electricity priority is determined by the threshold reached by the evaluation value of each point, the threshold and the electricity priority correspond one to one and are predetermined by the staff; the calculation process of the evaluation value is:.
[0034]
[0035] Where P(i,j) is the evaluation value of point (i,j) in the demand distribution diagram, (x k ,y k ) is the coordinate of a point in the kth power generation contour, X k and Y k is the length and width of the kth power generation profile; S k is the area of the kth power generation contour; L is the total number of power generation contours.
[0036] As a further solution of the present invention: when receiving the electricity demand, the step of selecting the power generation unit based on the electricity priority and establishing the transmission channel includes:
[0037] When receiving a power demand, obtaining the range and power consumption of the power consumption unit;
[0038] Calculate the average priority of all points within the range of the power consumption unit in the demand distribution diagram;
[0039] For each power generation unit, query the power consumption of the power consumption range in descending order based on the average priority. When the power consumption is less than the remaining power generation, establish a transmission channel between the power generation unit and the power consumption range;
[0040] Subtract the power consumption from the remaining power generation to obtain the new remaining power generation;
[0041] The cycle is executed until the power consumption is greater than the remaining power generation;
[0042] The remaining power generated by the power generation unit is stored as backup power to build a backup power generation unit.
[0043] The technical solution of the present invention also provides a system for building a virtual power plant based on distributed energy management, the system comprising:
[0044] A power generation profile building module is used to query the boundary coordinates of the power generation unit, map the boundary coordinates to the regional map, and obtain the power generation profile;
[0045] The baseline selection module is used to calculate the distance between any two points on the power generation contour, query and connect the two points corresponding to the maximum distance to obtain the baseline;
[0046] A profile scaling module is used to obtain the power generation of each power generation unit, taking the midpoint of the baseline as the scaling point, and scaling the power generation profile based on the power generation;
[0047] An energy information statistics module is used to output a regional map containing scaled power generation profiles as an energy distribution map after all power generation profiles have been scaled;
[0048] An energy consumption information statistics module is used to query the power consumption units in the area and construct a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map;
[0049] A priority determination module, used to determine the power consumption priority of each point in the demand distribution map based on the energy distribution map;
[0050] The power supply channel establishment module is used to select a power generation unit based on the power priority when receiving power demand and establish a transmission channel; wherein, in the process of selecting the power generation unit, the unused power generation of each power generation unit is calculated as a backup power generation unit.
[0051] As a further solution of the present invention: the energy consumption information statistics module includes:
[0052] A building information acquisition unit is used to query the filing information of each building in the area and obtain the maximum building height and the minimum building floor height;
[0053] A gradient determination unit, used for establishing an arithmetic progression based on a preset initial height, a minimum building layer height, and a maximum building height;
[0054] A section construction unit, used to construct sections with the ground plane based on the arithmetic progression; all sections contain height labels;
[0055] The intersection calculation unit is used to copy a regional map for each slice and query the intersection of the slice and the buildings in the region;
[0056] The layer establishment unit is used to obtain the required information of the intersection and insert the regional map as a section layer; wherein the section layer contains a time span;
[0057] The layer overlay unit is used to overlay the slice layers of the same time span according to the height sequence of the slices to obtain a demand distribution map.
[0058] As a further solution of the present invention: the layer establishment unit includes:
[0059] A quantity query subunit is used to query the quantity of electric meters in each intersection according to the electric meter record data;
[0060] A sub-division unit is used to divide the intersection according to the number of electric meters to obtain sub-areas and establish a corresponding relationship between the sub-areas and the electric meters;
[0061] A filling subunit is used to fill the electric meter data containing time acquired by the electric meter into the sub-area based on the corresponding relationship, and when the data in any sub-area is filled, output the regional map as a section layer;
[0062] The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
[0063] As a further solution of the present invention: the filling rule of the electric meter data is:
[0064]
[0065] Z(i,j)=αΔ1(t)+βΔ2(t);
[0066] Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
[0067] Compared with the prior art, the invention has the following beneficial effects: the invention can flexibly adjust the power output to meet the actual demand and obtain the best economic benefits in the energy market. It can improve the flexibility, reliability and sustainability of the power system and is one of the important directions for the development of the future energy system. BRIEF DESCRIPTION OF THE DRAWINGS
[0068] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention.
[0069] Figure 1 A flowchart of a method for building a virtual power plant based on distributed energy management.
[0070] Figure 2 A structural diagram of the system for building a virtual power plant based on distributed energy management. DETAILED DESCRIPTION
[0071] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0072] Figure 1 The flowchart of the method for building a virtual power plant based on distributed energy management is as follows. In an embodiment of the present invention, a method for building a virtual power plant based on distributed energy management includes:
[0073] Step S100: querying the boundary coordinates of the power generation unit, mapping the boundary coordinates to the regional map, and obtaining the power generation outline;
[0074] A power generation unit is a unit that generates electricity in a region, including thermal power plants, hydroelectric power plants, nuclear power plants, wind power plants, solar power plants, biomass power plants, and tidal power plants. Obtaining the boundary coordinates of a power generation unit and representing them in a map is called a power generation contour.
[0075] Step S200: Calculate the distance between any two points on the power generation contour, query and connect the two points corresponding to the maximum distance, and obtain a baseline;
[0076] Calculate the distance between any two points on the power generation contour and select the maximum distance. The two points corresponding to the maximum distance are generally on opposite sides. Connect these two points to obtain a line segment running through the power generation contour, and regard the midpoint of the line segment as the center of the power generation contour.
[0077] Step S300: obtaining the power generation of each power generation unit, taking the midpoint of the baseline as the scaling point, and scaling the power generation profile based on the power generation;
[0078] The power generation of each power generation unit is obtained, the area of the power generation contour (total number of pixels) is determined, and the power generation contour is scaled based on the determined baseline midpoint. While retaining the shape of the power generation contour, the relationship between area and power generation is established. Generally speaking, the greater the power generation, the larger the scaled area.
[0079] Step S400: when all power generation profiles are scaled, a regional map containing the scaled power generation profiles is output as an energy distribution map;
[0080] When all power generation contours are scaled, the resulting regional map is called an energy distribution map; the power generation contours in the energy distribution map (after scaling) represent the location of the power generation unit, the plant area contour and the power generation (corresponding to the contour area).
[0081] Step S500: querying the power consumption units in the area, and constructing a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map;
[0082] The electricity-consuming units in the query area are units that consume electricity in production and life, including households and workshops. Different electricity-consuming units have different electricity consumption at different times. According to the electricity consumption, a demand distribution map can be constructed to represent the electricity consumption of each location. It should be noted that the energy distribution map and demand distribution map constructed in this application are both generated based on the regional map, and the regional map is a two-dimensional map of the area to be analyzed.
[0083] Step S600: determining the power consumption priority of each point in the demand distribution map based on the energy distribution map;
[0084] Since both the energy distribution map and the demand distribution map are generated based on the regional map, the two maps can be directly merged and the spatial relationship between the power generation units and the power consumption units can be calculated. On this basis, since the power generation is taken into account in the construction of the energy distribution map, and the power consumption is taken into account in the construction of the demand distribution map, when calculating the spatial relationship between the power generation units and the power consumption units, the matching degree of the power generation and the power consumption can be calculated synchronously, thereby determining the power consumption priority of each location in the map.
[0085] Step S700: when receiving a power demand, selecting a power generation unit based on the power priority and establishing a transmission channel; wherein, in the process of selecting a power generation unit, calculating the unused power generation of each power generation unit as a standby power generation unit;
[0086] Step S700 is the application stage. When a power demand is received, it means that a certain power-consuming unit needs power. At this time, a power generation unit is selected according to its power priority and a power transmission channel is established.
[0087] Among them, since the power generation of the power generation unit is much greater than the power consumption of a single power consumption unit, a power generation unit often establishes a transmission channel with multiple power consumption units. However, the power generation unit is discrete, and there will always be a situation where the remaining power generation cannot support a certain power consumption unit. At this time, the remaining power generation is used as backup power generation. When there are some sudden demands, the backup power generation will supply them.
[0088] In some examples of the present invention, the step of querying the power consumption units in the area and constructing a demand distribution map according to the power consumption information of the power consumption units includes:
[0089] Query the filing information of each building in the area and obtain the maximum building height and minimum building floor height;
[0090] Establish an arithmetic progression based on the preset initial height, minimum building height and maximum building height;
[0091] Constructing sections with the ground plane based on the arithmetic progression; all sections contain height labels;
[0092] For each slice, copy a regional map and query the intersection of the slice and the buildings in the region;
[0093] Obtain the demand information of the intersection and insert the regional map as a slice layer; wherein the slice layer contains the time span;
[0094] The slice layers of the same time span are stacked in order according to the slice heights to obtain the demand distribution map.
[0095] The above content specifically limits the construction process of the demand distribution map. The function of the demand distribution map is to reflect the location of each power consumption unit and the power consumption in the power consumption process; in the existing building background, most of the buildings are multi-story buildings, so it is necessary to analyze the area at different heights.
[0096] Specifically, query the registered information of all buildings in the area to obtain the height of the highest building, obtain the maximum building height, obtain the height of the building with the smallest floor height, and obtain the minimum building height; construct an arithmetic sequence with the preset initial height as the first term and the minimum building height as the tolerance, and output the arithmetic sequence when the last term just exceeds the maximum building height. Each value in the arithmetic sequence corresponds to a height, and all buildings are divided based on the height in the arithmetic sequence, so that the electricity consumption units in all buildings in the area can be comprehensively obtained.
[0097] When analyzing each height, determine a height surface and create a new regional map. Get the intersection of the height surface and each building and insert it into the regional map to get the shape of all buildings at each height. For the intersection corresponding to each building, get the power consumption within the intersection and represent it in the regional map. The obtained regional map containing power consumption is called a section layer. Analyze each height in turn to get the section layer at each height. Each section layer completely covers the power consumption of each power unit at a height.
[0098] By overlaying all the slice layers together, we can get the comprehensive electricity consumption of all buildings, which is called the demand distribution map.
[0099] In some examples of the present invention, the step of obtaining the intersection demand information and inserting the regional map as a slice layer includes:
[0100] Query the number of meters in each intersection according to the meter record data;
[0101] The intersection is divided according to the number of electric meters to obtain sub-areas, and the corresponding relationship between the sub-areas and the electric meters is established;
[0102] Based on the corresponding relationship, the meter data including the time acquired by the meter is filled into the sub-area, and when the data filling in any sub-area is completed, the regional map is output as a section layer;
[0103] The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
[0104] The above content specifically limits the process of obtaining the slice layer. First, each electricity consumption unit needs to be registered before using electricity. After registration, each electricity consumption unit will be equipped with an electricity meter. According to the meter registration data, it can be queried how many electricity meters are in each intersection; among them, it should be noted that the intersection in this application in most cases refers to the first floor of a building.
[0105] Then, the intersection is divided equally according to the number of electricity meters to obtain multiple small areas, called sub-areas; the power consumption (meter data) collected by the electricity meter is obtained in real time and filled into the sub-areas; the same operation is performed on each intersection to obtain a graph representing the power consumption of all electricity-consuming units at a certain height, called a slice layer; the slice layer is generated based on the regional map, that is, its size is the same as the regional map.
[0106] Finally, electricity consumption is a function of time. The electricity consumption at different times is different. A sub-area can be filled with data at different times. However, since the filling amount of each sub-area is limited, when the filling amount in any sub-area reaches the preset condition, it is considered to be filled. At this time, the output section layer is the section layer within the filling time span. The time span is obtained as the time label.
[0107] Specifically, the filling rules for the meter data are as follows:
[0108]
[0109] Z(i,j)=αΔ1(t)+βΔ2(t);
[0110] Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
[0111] The above filling process is to fill in order, multiply the time by the frequency to get the total number of data of the electric meter data, and then divide it by the number of columns and round up to get the row of the filling position; divide the total number of data by the number of columns, round down, and multiply it by the column to get the number of data in all previous rows, and subtract the number of data in all previous rows from the total number of data to get the column of the filling position.
[0112] Regarding the filling value, this application mainly analyzes the change between the data at the current moment and the data at the previous moment, and the change can be obtained by calculating the first-order difference and the second-order difference;
[0113] In some examples of the present invention, the step of determining the power usage priority of each point in the demand distribution map based on the energy distribution map includes:
[0114] Copy the generation profile in the energy distribution map and insert it into the demand distribution map;
[0115] Calculate the power consumption priority of each point based on the power generation profile in the demand distribution map;
[0116] The electricity priority is determined by the threshold value reached by the evaluation value of each point, and the threshold value and the electricity priority are one-to-one corresponding and predetermined by the staff; the calculation process of the evaluation value is:
[0117]
[0118] Where P(i,j) is the evaluation value of point (i,j) in the demand distribution diagram, (x k ,y k ) is the coordinate of a point in the kth power generation contour, X k and Y k is the length and width of the kth power generation profile; S k is the area of the kth power generation contour; L is the total number of power generation contours.
[0119] Both the energy distribution map and the demand distribution map are generated based on the regional map. By merging them, we can get a map that can reflect both power supply information and power consumption information. By analyzing this map, we can determine the relationship between the power generation profile and each power consumption unit.
[0120] The calculation process of the above content is:
[0121] The sum of the distances between all points in each power generation contour and point (i, j) is calculated. The larger the sum of the distances, the farther the point (i, j) is from the surrounding power generation contours, making it more difficult to supply power and giving it a higher priority in terms of power use. On this basis, an area parameter is introduced. After scaling, the area of the power generation contour represents the power supply capacity, which is used to adjust the distance. If the area is larger and the power supply capacity is stronger, the distance will be more significantly reduced.
[0122] The distance calculated for each power generation profile is accumulated, and the value obtained is called the evaluation value. The evaluation value is compared with the preset threshold. Every time a threshold is reached, it is considered that a power priority is reached. The relationship between the threshold and the power priority is preset. When the evaluation value is calculated, it can be directly queried, which is equivalent to gradienting the data.
[0123] Specifically, the present application takes the power generation profile as a benchmark, analyzes each power generation profile in turn, and determines the power supply difficulty of all coordinates (points) in the figure. The higher the power supply difficulty, the higher the power use priority.
[0124] In some examples of the present invention, when receiving a power demand, the step of selecting a power generation unit based on the power priority and establishing a transmission channel includes:
[0125] When receiving a power demand, obtaining the range and power consumption of the power consumption unit;
[0126] Calculate the average priority of all points within the range of the power consumption unit in the demand distribution diagram;
[0127] For each power generation unit, query the power consumption of the power consumption range in descending order based on the average priority. When the power consumption is less than the remaining power generation, establish a transmission channel between the power generation unit and the power consumption range;
[0128] Subtract the power consumption from the remaining power generation to obtain the new remaining power generation;
[0129] The cycle is executed until the power consumption is greater than the remaining power generation;
[0130] The remaining power generated by the power generation unit is stored as backup power to build a backup power generation unit.
[0131] The above content specifically limits the application stage. When the power demand sent by the power unit is received, the range of the power unit is queried, the power priorities of all points within the range are obtained, and the average value is calculated as the energy supply priority of the power unit.
[0132] Then, for each power generation unit, a power consumption unit is selected in descending order of average priority to supply power until the load reaches saturation. At this time, the next power generation unit is selected for analysis, and a power consumption unit is selected in descending order of average priority to supply power until the load reaches saturation, and so on, until all power consumption units have at least one power generation unit to supply power to them.
[0133] It should be noted that, in the process of selecting power consumption units in descending order of average priority, power consumption units that have established transmission channels with power generation units will no longer be selected. A solution to achieve this effect may be that once a power consumption unit has established a transmission channel with a power generation unit, it will be marked so that it cannot be selected.
[0134] In the above process, each power generation unit will have some surplus power generation when the load reaches saturation. The surplus power generation is sealed as backup power, and a backup power generation unit is built to supply power to certain additional demands, thereby improving the robustness of the entire system.
[0135] It is worth mentioning that the matching process between the power generation unit and the power consumption unit can also introduce the spatial distance factor, so that the power generation unit only supplies power to the power consumption units around it.
[0136] Figure 2 The structure diagram of the system for building a virtual power plant based on distributed energy management is shown in FIG. 1 . In an embodiment of the present invention, a system for building a virtual power plant based on distributed energy management is shown in FIG. 1 . The system 10 includes:
[0137] The power generation profile establishment module 11 is used to query the boundary coordinates of the power generation unit, map the boundary coordinates to the regional map, and obtain the power generation profile;
[0138] The reference line selection module 12 is used to calculate the distance between any two points on the power generation profile, query and connect the two points corresponding to the maximum distance, and obtain the reference line;
[0139] A profile scaling module 13 is used to obtain the power generation of each power generation unit, take the midpoint of the baseline as the scaling point, and scale the power generation profile based on the power generation;
[0140] The energy information statistics module 14 is used to output a regional map containing the scaled power generation profiles as an energy distribution map after all power generation profiles are scaled;
[0141] The energy consumption information statistics module 15 is used to query the power consumption units in the area and construct a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map;
[0142] A priority determination module 16, for determining the power usage priority of each point in the demand distribution map based on the energy distribution map;
[0143] The power supply channel establishment module 17 is used to select a power generation unit based on the power priority when receiving power demand and establish a transmission channel; wherein, in the process of selecting the power generation unit, the unused power generation of each power generation unit is calculated as a backup power generation unit.
[0144] Furthermore, the energy consumption information statistics module 15 includes:
[0145] A building information acquisition unit is used to query the filing information of each building in the area and obtain the maximum building height and the minimum building floor height;
[0146] A gradient determination unit, used for establishing an arithmetic progression based on a preset initial height, a minimum building layer height, and a maximum building height;
[0147] A section construction unit, used to construct sections with the ground plane based on the arithmetic progression; all sections contain height labels;
[0148] The intersection calculation unit is used to copy a regional map for each slice and query the intersection of the slice and the buildings in the region;
[0149] The layer establishment unit is used to obtain the required information of the intersection and insert the regional map as a section layer; wherein the section layer contains a time span;
[0150] The layer overlay unit is used to overlay the slice layers of the same time span according to the height sequence of the slices to obtain a demand distribution map.
[0151] Wherein, the layer establishing unit comprises:
[0152] A quantity query subunit is used to query the quantity of electric meters in each intersection according to the electric meter record data;
[0153] A sub-division unit is used to divide the intersection according to the number of electric meters to obtain sub-areas and establish a corresponding relationship between the sub-areas and the electric meters;
[0154] A filling subunit is used to fill the electric meter data containing time acquired by the electric meter into the sub-area based on the corresponding relationship, and when the data in any sub-area is filled, output the regional map as a section layer;
[0155] The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
[0156] Specifically, the filling rules for the meter data are as follows:
[0157]
[0158] Z(i,j)=αΔ1(t)+βΔ2(t);
[0159] Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
[0160] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for building a virtual power plant based on distributed energy management, characterized in that: The method comprises: Query the boundary coordinates of the power generation unit, map the boundary coordinates to the regional map, and obtain the power generation outline; Calculate the distance between any two points on the power generation contour, query and connect the two points corresponding to the maximum distance to obtain the baseline; The power generation of each power generation unit is obtained, and the midpoint of the baseline is used as the scaling point, and the power generation profile is scaled based on the power generation; When all power generation contours are scaled, a regional map containing the scaled power generation contours is output as an energy distribution map; Querying the power consumption units in the area, and constructing a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map; Determine the electricity priority of each point in the demand distribution map based on the energy distribution map; When a power demand is received, a power generation unit is selected based on the power priority and a transmission channel is established; wherein, in the process of selecting the power generation unit, the unused power generation of each power generation unit is calculated as a backup power generation unit.
2. The method for building a virtual power plant based on distributed energy management according to claim 1 is characterized in that: The step of querying the power consumption units in the area and constructing a demand distribution map according to the power consumption information of the power consumption units comprises: Query the filing information of each building in the area and obtain the maximum building height and minimum building floor height; Establish an arithmetic progression based on the preset initial height, minimum building height and maximum building height; Constructing sections with the ground plane based on the arithmetic progression; all sections contain height labels; For each slice, copy a regional map and query the intersection of the slice and the buildings in the region; Obtain the demand information of the intersection and insert the regional map as a slice layer; wherein the slice layer contains the time span; The slice layers of the same time span are stacked in order according to the slice heights to obtain the demand distribution map.
3. The method for building a virtual power plant based on distributed energy management according to claim 2 is characterized in that: The step of obtaining the intersection demand information and inserting the regional map as a slice layer includes: Query the number of meters in each intersection according to the meter record data; The intersection is divided according to the number of electric meters to obtain sub-areas, and the corresponding relationship between the sub-areas and the electric meters is established; Based on the corresponding relationship, the meter data including the time acquired by the meter is filled into the sub-area, and when the data filling in any sub-area is completed, the regional map is output as a section layer; The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
4. The method for constructing a virtual power plant based on distributed energy management according to claim 3 is characterized in that: The filling rules for meter data are: Z(i,j)=αΔ1(t)+βΔ2(t); Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
5. The method for building a virtual power plant based on distributed energy management according to claim 1 is characterized in that: The step of determining the power usage priority of each point in the demand distribution map based on the energy distribution map includes: Copy the generation profile in the energy distribution map and insert it into the demand distribution map; Calculate the power consumption priority of each point based on the power generation profile in the demand distribution map; The electricity priority is determined by the threshold value reached by the evaluation value of each point, and the threshold value and the electricity priority are one-to-one corresponding and predetermined by the staff; the calculation process of the evaluation value is: Where P(i,j) is the evaluation value of point (i,j) in the demand distribution diagram, (x k ,y k ) is the coordinate of a point in the kth power generation contour, X k and Y k is the length and width of the kth power generation profile; S k is the area of the kth power generation contour; L is the total number of power generation contours.
6. The method for constructing a virtual power plant based on distributed energy management according to claim 1, characterized in that: When receiving the electricity demand, the step of selecting a power generation unit based on the electricity priority and establishing a transmission channel comprises: When receiving a power demand, obtaining the range and power consumption of the power consumption unit; Calculate the average priority of all points within the range of the power consumption unit in the demand distribution diagram; For each power generation unit, query the power consumption of the power consumption range in descending order based on the average priority. When the power consumption is less than the remaining power generation, establish a transmission channel between the power generation unit and the power consumption range; Subtract the power consumption from the remaining power generation to obtain the new remaining power generation; The cycle is executed until the power consumption is greater than the remaining power generation; The remaining power generated by the power generation unit is stored as backup power to build a backup power generation unit.
7. A virtual power plant construction system based on distributed energy management, characterized in that: The system comprises: A power generation profile building module is used to query the boundary coordinates of the power generation unit, map the boundary coordinates to the regional map, and obtain the power generation profile; The baseline selection module is used to calculate the distance between any two points on the power generation contour, query and connect the two points corresponding to the maximum distance to obtain the baseline; A profile scaling module is used to obtain the power generation of each power generation unit, taking the midpoint of the baseline as the scaling point, and scaling the power generation profile based on the power generation; An energy information statistics module is used to output a regional map containing scaled power generation profiles as an energy distribution map after all power generation profiles have been scaled; An energy consumption information statistics module is used to query the power consumption units in the area and construct a demand distribution map according to the power consumption information of the power consumption units; wherein the demand distribution map and the energy distribution map are both generated based on the regional map; A priority determination module, used to determine the power consumption priority of each point in the demand distribution map based on the energy distribution map; The power supply channel establishment module is used to select a power generation unit based on the power priority when receiving power demand and establish a transmission channel; wherein, in the process of selecting the power generation unit, the unused power generation of each power generation unit is calculated as a backup power generation unit.
8. The system for building a virtual power plant based on distributed energy management according to claim 7 is characterized in that: The energy consumption information statistics module includes: A building information acquisition unit is used to query the filing information of each building in the area and obtain the maximum building height and the minimum building floor height; A gradient determination unit, used for establishing an arithmetic progression based on a preset initial height, a minimum building layer height, and a maximum building height; A section construction unit, used to construct sections with the ground plane based on the arithmetic progression; all sections contain height labels; The intersection calculation unit is used to copy a regional map for each slice and query the intersection of the slice and the buildings in the region; The layer establishment unit is used to obtain the required information of the intersection and insert the regional map as a section layer; wherein the section layer contains a time span; The layer overlay unit is used to overlay the slice layers of the same time span according to the height sequence of the slices to obtain a demand distribution map.
9. The system for building a virtual power plant based on distributed energy management according to claim 8 is characterized in that: The layer establishing unit comprises: A quantity query subunit is used to query the quantity of electric meters in each intersection according to the electric meter record data; A sub-division unit is used to divide the intersection according to the number of electric meters to obtain sub-areas and establish a corresponding relationship between the sub-areas and the electric meters; A filling subunit is used to fill the electric meter data containing time acquired by the electric meter into the sub-area based on the corresponding relationship, and when the data in any sub-area is filled, output the regional map as a section layer; The slice layer contains a time tag, and the time tag is the time span of the acquired meter data.
10. The system for building a virtual power plant based on distributed energy management according to claim 9, characterized in that: The filling rules for meter data are: Z(i,j)=αΔ1(t)+βΔ2(t); Where (i, j) is the filling coordinate of the meter data obtained at time t in the sub-area, f is the acquisition frequency of the meter data, t is the relative time of the construction time of the regional map as the starting point, m is the number of columns in the sub-area, Z(i, j) is the filling data of the midpoint (i, j) in the sub-area, α and β are preset coefficients, Δ1(t) is the first-order difference of the meter data at time t, and Δ2(t) is the second-order difference of the meter data at time t.
Citation Information
Cited By
Energy storage power supply management system, method and device based on artificial intelligence
CN120377333A
Artificial intelligence-based energy storage power management system, method and device
CN120377333B