Digital construction management platform
Through the digital construction management platform, combined with multiple systems and BIM platforms, the full-dimensional data analysis and display of the construction site is realized, which solves the problem that data cannot be converted into useful information under the traditional management model, and improves the management efficiency and decision-making support of the construction site. ability.
Patent Information
- Application Number
- CN202410980241.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-12
AI Technical Summary
Traditional construction site management models are difficult to achieve scientific and effective management, and cannot realize digital monitoring and visual BIM of people, machines, materials, methods and rings. Data cannot be converted into useful information, and it is difficult for managers to make decisions and support. The information is not comprehensive. , rely on experience to make decisions.
Provide a digital construction management platform to realize a three-layer architecture system for management dimensions. Multi-dimensional data is obtained by connecting multiple systems, configuring display pages to realize full-dimensional analysis, combining BIM platform and video monitoring to realize real-time monitoring and display of data. The map library API and rendering engine are used to display model data, developed based on the SpringMVC framework, and deployed with a distributed architecture.
Real-time interoperability of information at all levels has been achieved, and the management efficiency and decision-making support capabilities of the construction site have been improved. Through automatic data collection and analysis, staff can be assisted in on-site management, saving project personnel costs, and improving project supervision capabilities and work efficiency.
Smart Images

Figure CN118941012A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a digital construction management platform. Background Art
[0002] Traditional project construction sites are generally complex environments with complex personnel, scattered construction sites, and difficult safety and personnel management at construction sites. It is difficult to manage scientifically and effectively through the original method of personnel inspection. At the same time, the traditional construction site management model is increasingly unable to meet the management and development requirements of modern construction in terms of speed, reliability and economy.
[0003] The construction projects are geographically wide, scattered, and inconvenient to manage, making it impossible to meet the needs of people, machines, materials, methods, environment, digital monitoring, digital construction, visual BIM, video monitoring, and display of construction progress.
[0004] Although a large amount of business data has been accumulated in traditional smart construction sites, except for query and tracking operations, the data is basically dormant. The data cannot be converted into useful information, and it is difficult to analyze and report the data. It is still difficult for managers to obtain the necessary decision-making information. Among them, the project management system focuses on process management, and the business process operates according to a solidified model. We cannot know how to optimize it to better improve efficiency. Among them, the smart construction site series products only understand the current operation data, and cannot obtain historical, comprehensive, and full-process data, so it is difficult to analyze historical data. It is impossible to understand the trend of changes through the analysis of historical data, and decision support lacks a data foundation. It is difficult to quickly correlate and analyze related businesses across systems, resulting in incomplete information and being forced to make decisions based on experience under incomplete information conditions.
[0005] Traditional information technology involves entering data by filling out forms, which increases the workload of staff and the authenticity and real-time nature of the data cannot be guaranteed. Summary of the invention
[0006] The embodiment of the present application provides a digital construction management platform to implement a three-layer architecture system in the management dimension, realize all-round monitoring information of corresponding permissions in real time at each level, and promote the real-time exchange of information at each level.
[0007] To achieve the above-mentioned purpose, the embodiment of the present application provides a digital construction management platform, whose first-level display page is configured to include: a safety management module, a labor management module, a ship and machinery management module, a digital monitoring module, a quality management module, a digital construction module and a material management module or any combination thereof;
[0008] The digital construction management platform is connected to the safety management system, labor service system, ship and machinery management system, engineering management system, quality management system, intelligent construction IoT system, and material scale system to obtain the information of the projects to be displayed in the safety management module, labor management module, ship and machinery management module, digital monitoring module, quality management module, digital construction module, and material management module, and realize the confirmation and docking of data in multiple dimensions, so as to facilitate full-dimensional analysis of all projects on this platform;
[0009] The digital construction management platform is connected to a BIM platform, and the BIM platform stores project preview model data;
[0010] The display page of the digital construction management platform is configured to include more than three data display permissions, the data display permissions include: global level, company level, project level, and the data range that can be obtained for each data display permission is configured from large to small to be global level, company level, and project level;
[0011] The display page of the digital construction management platform is configured to include more than three data levels, receive a preset operation on the display information included in the data level displayed in the display page, display the display information included in the next data level of the operated display information, enter the next level display page for data drilling, the display information included in each data level can be the classification information, detailed data or chart of the next data level, and the preset operation can be a click operation or a hover operation. If it is set to a click operation, when a click operation is received in the display page, it is identified as a preset operation.
[0012] In some of the embodiments, a hierarchical jump menu is configured in the first-level display page, and the hierarchical jump menu is configured with level options corresponding to the data display permissions. When a preset operation is received in the hierarchical jump menu area of the display page, the page jumps to display information included in the display corresponding to the data display permissions.
[0013] In some of these embodiments, the role account mapping is configured with data display permissions.
[0014] In some embodiments, the level options limit the switchable data display permissions according to the downward permission principle, and the highest switchable level is the level corresponding to the role account.
[0015] In some of the embodiments, the digital construction management platform displays a map in a primary display page through a map library API call, and adds interactive events on the map to detect mouse hover events. When the mouse hovers over a certain area, the number of construction projects in the corresponding area is displayed.
[0016] In some of the embodiments, a preconfigured rendering engine id field is provided in the project information of the digital construction management platform. The digital construction management platform can call the rendering engine according to the rendering engine id field, load the preview model data of the BIM platform, and display the model according to the loaded preview model data in the secondary display page or the tertiary display page according to the project.
[0017] In some of the embodiments, the digital construction management platform is connected to a video surveillance platform, which obtains surveillance video data of each construction project site. The surveillance video data is displayed on the digital construction management platform in a three-level display page according to the project. The user experience is improved and the user can more conveniently view and manage all project video data.
[0018] In some embodiments, the project information to be displayed in the safety management module includes: the total number of risks, the total number of hidden dangers, the number of new problems this month, the number to be rectified, the safety hazard pie chart, the safety acceptance pie chart, etc.
[0019] In some embodiments, the information to be displayed in the labor management module includes: total number of on-site entries, total number of violations, total number of warnings, total number of blacklists, total wages paid this year, number of labor teams that have not yet reported wages, total wages to be approved, and total wages to be paid. The platform automatically summarizes according to the data level.
[0020] In some embodiments, the project information to be displayed of the digital monitoring module includes:
[0021] The number of devices / projects, the number of application projects, and the number of warnings. The number of devices / projects refers to the number of devices of this category that are shared globally; the number of application projects refers to the number of projects applied to this type of equipment; the number of warnings refers to the total number of warnings for this type of equipment. The top 5 devices with the highest number of devices are displayed, and the rest can be displayed by clicking More. The devices include:
[0022] High formwork monitoring equipment, elevators, deep foundation pit equipment, environmental monitoring, tower cranes, large-volume concrete equipment, gantry crane monitoring equipment, water quality monitoring equipment, mechanical Internet of Things monitoring equipment (such as fuel consumption, positioning) and distribution box monitoring equipment, etc.
[0023] In some embodiments, the project information to be displayed in the quality management module includes:
[0024] The number of problems, new problems this month, problems to be rectified, and problems that have not been rectified within the deadline; the total number of problems is summarized based on the problem list in the quality management system, the number of new problems this month is summarized based on the problems in the quality management system whose release time is this month, problems to be rectified are summarized based on the problems in the problem list in the quality management system whose status is to be rectified, and problems that have not been rectified within the deadline are summarized based on the problems in the problem list that have not been rectified within the specified time.
[0025] In some of the embodiments, the intelligent construction IoT system pushes data collected by IoT devices on the construction site to the digital construction management platform, thereby facilitating the digital construction management platform to perform data analysis and achieve early warning of the construction site or display of warning data.
[0026] In some of the embodiments, the material scale system receives and sends materials, processes early warning information, and pushes the statistical index data to the digital construction management platform.
[0027] In another embodiment, in the display information of the first-level display page of the project-level data display authority, the project information to be displayed of the security management module is configured to include:
[0028] Total number of hidden dangers, safety rectification rate, and the latest hidden danger data. The safety rectification rate is calculated based on the total number of rectified safety issues / total number of all safety issues;
[0029] The information of the items to be displayed in the labor management module is configured to also include: attendance rate, which is calculated based on the current month's attendance number / this month's attendance number. If the attendance rate exceeds 100%, it is calculated as 100% attendance;
[0030] The information of the items to be displayed in the quality management module is configured to also include: a quality rectification rate, which is calculated based on the total number of rectified quality problems / the total number of all quality problems.
[0031] In some of the embodiments, the platform creates a user table to store user information, creates a role table to define roles, and creates a permission table to define data display permissions. Based on the user table and role table, a user-role association table is created to define the roles to which the users belong. Based on the role table and permission table, a role-permission association table is created to define the data display permissions corresponding to the roles. When querying data on the display page, the data is filtered according to the role permissions.
[0032] In some of the embodiments, the platform implements the MVC model development technology framework based on the SpringMVC framework, adopts the B / S structure to implement the multi-layer network distributed system structure, and the system is implemented based on the J2EE standard and uses the Mysql database.
[0033] In some of the embodiments, the platform is deployed in a local Nginx server, and the server deployment adopts a distributed architecture.
[0034] Compared with related technologies, the digital construction management platform provided by the embodiment of the present application realizes automatic data collection, storage, accumulation, calculation, analysis and application, connects data with engineering management, office, personnel management, technology as the horizontal direction and with global level, company level, project level to individual users as the vertical direction, realizes auxiliary managers to carry out project visual monitoring, strengthen business process control, and achieve scientific decision-making; it can assist project managers to remotely understand and operate the key business operation status of the project in real time, so as to analyze and identify the key factors affecting the advancement of the project, so as to make improvements and effective prevention.
[0035] Compared with the existing technology, this application automatically collects and analyzes data through the platform, assists staff in on-site management, and can effectively save project personnel costs.
[0036] Combining the Internet of Things technology and cloud computing technology to realize intelligent online perception of people, machines and materials in the construction industry, forming a monitoring data stream, and combining various business data streams to realize the concentration and integration of construction big data, through the centralized sharing and intelligent analysis and management of construction information big data, it is possible to improve project supervision capabilities, improve project work efficiency, and improve the level of intelligent, coordinated, precise and efficient management of decision-making operations.
[0037] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0039] Figure 1 It is a data connection structure block diagram of the digital construction management platform according to an embodiment of the present application. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0041] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.
[0042] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.
[0043] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.
[0044] This embodiment provides a digital construction management platform. Figure 1A detailed introduction is given to each component module of the digital construction management platform. The first-level display page of the platform is configured to include: one or any combination of a safety management module, a labor management module, a ship and machinery management module, a digital monitoring module, a quality management module, a digital construction module and a material management module;
[0045] like Figure 1 As shown, the digital construction management platform is connected to the safety management system, labor service system, ship and machinery management system, engineering management system, quality management system, intelligent construction IoT system, and material scale system to obtain the project information to be displayed of the safety management module, labor management module, ship and machinery management module, digital monitoring module, quality management module, digital construction module, and material management module, and realize the confirmation and docking of multiple dimensional data, so as to facilitate full-dimensional analysis of all projects on this platform;
[0046] In some embodiments, the safety management system pushes safety management data to the digital construction management platform, such as, but not limited to, safety hazard issues, hazard indicators, etc. The project information to be displayed in the safety management module includes:
[0047] The total number of risks, the total number of hidden dangers, the number of new problems this month, the number to be rectified, the safety hidden danger pie chart, the safety acceptance pie chart, etc.; the total number of risk data is obtained by filling in data on the digital construction management platform to obtain the risk list analysis, and the risk list is pre-configured with hidden danger indicators. The total number of hidden dangers, the number of new problems this month and the number to be rectified are obtained by summarizing the hidden dangers obtained. The number to be rectified is the number of problems configured to be rectified in the safety management system. The safety hidden danger pie chart is a classified display of the obtained safety hidden danger categories, and the safety acceptance pie chart is a classified display of the obtained safety problem status. The safety problem status includes: being rectified, rectified, to be rectified, etc. The safety hidden danger categories are exemplified but not limited to construction safety hidden dangers, fire safety hidden dangers, material safety hidden dangers, etc.;
[0048] In some embodiments, the labor service system pushes labor management data to the digital construction management platform, including, but not limited to, information of labor workers managed according to construction projects, access authorization, blacklist, site registration information, attendance information collected by IoT terminal access control and other devices, contract management, and wage payment records of labor workers in labor subcontracting teams. The project information to be displayed in the labor management module includes:
[0049] The total number of on-site entries, total number of violations, total number of warnings, total number of blacklists, total wages paid this year, number of labor teams that have not yet reported wages, total wages to be approved, and total wages to be paid. The platform automatically summarizes according to the data level.
[0050] In some embodiments, the ship machinery management system pushes project data to the digital construction management platform, for example but not limited to: ship data, mechanical equipment data, spare parts and material data, etc., ship static data such as ship type, ship name, ship size, deadweight tonnage, draft, etc., ship dynamic data such as ship speed, route type, navigation status, location information (obtained through GPS or AIS system), etc., equipment static data such as equipment name, model, manufacturer, factory date, technical parameters, etc. Equipment dynamic data such as equipment working status, maintenance records, maintenance plans, spare parts replacement, etc.
[0051] The information to be displayed in the ship engine management module includes, but is not limited to, the ship's operating conditions, energy consumption, and the daily, weekly, monthly, and annual changes in indicators such as ship operating efficiency and equipment failure rate. The time distribution and changes of the data are intuitively displayed through timelines, line graphs, bar graphs, and other forms. For equipment of different types and locations, display their operating status, maintenance records, spare parts replacement, etc. Identify and display potential risk factors, such as equipment failure warnings, ship navigation risks, etc. Use warning lights, alarm pop-up windows, and other methods to promptly notify users to pay attention to potential risks and take corresponding measures.
[0052] In some embodiments, the engineering management system pushes engineering data to the digital construction management platform, such as equipment information table (equipment ID, equipment name, equipment type, manufacturer, etc.), project association table, equipment warning record table, etc. For example, a highway construction project also includes pre-stored and real-time maintained highway construction data and foundation treatment construction data. The highway construction data includes: access equipment, construction interview, roller speed alarm, rolling pass rate, etc., so as to facilitate data analysis and data display. The project information to be displayed in the digital monitoring module includes:
[0053] The number of devices / projects, the number of application projects, and the number of warnings. The number of devices / projects refers to the number of devices of this category that are shared globally; the number of application projects refers to the number of projects applied to this type of equipment; the number of warnings refers to the total number of warnings for this type of equipment. The top 5 devices with the highest number of devices are displayed, and the rest can be displayed by clicking More. The devices include:
[0054] High formwork monitoring equipment, elevators, deep foundation pit equipment, environmental monitoring, tower cranes, large-volume concrete equipment, gantry crane monitoring equipment, water quality monitoring equipment, mechanical Internet of Things monitoring equipment (such as fuel consumption, positioning) and distribution box monitoring equipment, etc.
[0055] In some embodiments, the quality management system pushes quality management data to the digital construction management platform, such as a problem list, quality problems of this month, problems to be rectified, etc. The project information to be displayed in the quality management module includes:
[0056] The number of problems, new problems this month, problems to be rectified, and problems that have not been rectified within the deadline; the total number of problems is summarized based on the problem list in the quality management system, the number of new problems this month is summarized based on the problems in the quality management system whose release time is this month, problems to be rectified are summarized based on the problems in the problem list in the quality management system whose status is to be rectified, and problems that have not been rectified within the deadline are summarized based on the problems in the problem list that have not been rectified within the specified time.
[0057] In some of the embodiments, the intelligent construction IoT system pushes data collected by IoT devices on the construction site to the digital construction management platform, such as equipment data, environmental monitoring data, material data, etc., so as to facilitate the digital construction management platform to perform data analysis and realize early warning of the construction site or display the warning data. The project information to be displayed in the digital construction module includes: online equipment status, historical data list / chart, equipment failure warning, environmental monitoring warning, etc.
[0058] In some embodiments, the material weighbridge system processes the sending and receiving of materials and early warning information and pushes the statistical index data to the digital construction management platform. The project information to be displayed in the material management module includes: sending and receiving material data, abnormal weighing warning (such as overload, underload, etc.), total sending and receiving of materials, inventory data, sending and receiving frequency, weighing error rate, etc. The total sending and receiving of materials is the total incoming and outgoing quantity of materials in a certain period of time. The material inventory is the current material inventory calculated based on the sending and receiving material data. The sending and receiving frequency of materials is the number of times materials are sent and received per unit time, reflecting the activity of material flow. The weighing error rate is the error rate calculated based on the weighing data and actual data, reflecting the accuracy of the weighbridge system.
[0059] In another embodiment, in the display information of the first-level display page of the project-level data display authority, the project information to be displayed of the security management module is configured to include:
[0060] The total number of hidden dangers, safety rectification rate, and the latest discovered hidden danger data. The safety rectification rate is calculated based on the total number of rectified safety issues / the total number of all safety issues. The same as the above embodiment is not repeated here. It should be noted that when the number of hidden danger data is greater than 20, they are displayed in a scrolling manner on the display page.
[0061] The information of the items to be displayed in the labor management module is configured to also include: attendance rate, which is calculated based on the current month's attendance number / this month's attendance number. If the attendance rate exceeds 100%, it is calculated as 100% attendance;
[0062] The information of the items to be displayed in the quality management module is configured to also include: a quality rectification rate, which is calculated based on the total number of rectified quality problems / the total number of all quality problems.
[0063] The digital construction management platform is connected to a BIM platform, and the BIM platform stores project preview model data;
[0064] The display page of the digital construction management platform is configured to include more than three data display permissions, including: global level, company level, and project level. The data range that can be obtained for each data display permission is configured from large to small, namely global level, company level, and project level; in addition, it can also include a business level. The data display permission can define the hierarchical data relationship of the global level, company level, and project level by creating a level table in the database;
[0065] The display page of the digital construction management platform is configured to include more than three data levels, receive the preset operation of the display information included in the data level displayed in the display page, display the display information included in the next data level of the displayed information being operated, and enter the next level display page for data drilling. The display information included in each data level can be the classification information, detailed data or chart of the next data level, and the preset operation can be a click operation or a hover operation. If it is set to a click operation, it is recognized as a preset operation when a click operation is received in the display page. For example, a click operation of a module or "more details" corresponding to the first-level display page is received to enter the second-level page to view specific data trends and analysis. Optionally, the data level can also be configured based on the global level, company level, and project level. For example, the company-level summary data of all projects at the global level is displayed on the first-level display page, and the corresponding data indicator / data module is clicked to enter the second-level display page to display the project data of each company, and the corresponding data indicator / data module is clicked to enter the third-level display page to display the summary data of each project, so as to jump to the specific project data source list step by step.
[0066] In some of the embodiments, a hierarchical jump menu is configured in the first-level display page, and the hierarchical jump menu is configured with level options corresponding to the data display permissions. When a preset operation is received in the hierarchical jump menu area of the display page, the page jumps to display information included in the display corresponding to the data display permissions.
[0067] In some of these embodiments, the role account mapping is configured with data display permissions.
[0068] In some embodiments, the level option limits the switchable data display permissions according to the downward permission principle, and the highest level that can be switched is the level corresponding to the role account. For example, the company level can be switched to the project level, but not to the bureau level.
[0069] In some embodiments, the digital construction management platform displays the map in the first-level display page through the map library API call. Optionally, the map can be embedded in the display page.The element acts as a map container, using the map library API to initialize the map and bind it to On the element, the number of construction projects in each region is loaded onto the map, and an interactive event is added to the map to detect the mouse hover event. When the mouse hovers over a certain region, the number of construction projects in the corresponding region is displayed.
[0070] In some of the embodiments, a preconfigured rendering engine id field is provided in the project information of the digital construction management platform. The digital construction management platform can call the rendering engine according to the rendering engine id field, load the preview model data of the BIM platform, and display the model according to the loaded preview model data in the secondary display page or the tertiary display page according to the project.
[0071] In some of the embodiments, the digital construction management platform is connected to a video surveillance platform, such as the Hikvision Security Cloud Platform. The video surveillance platform obtains surveillance video data of each construction project site and can directly use the plug-ins provided by the Hikvision Security Cloud Platform for functional use. The surveillance video data is displayed on the digital construction management platform in a three-level display page according to the project. There is no need to jump to the video surveillance platform to choose to view the video surveillance of a specific project, thereby improving the user experience and allowing users to more conveniently view and manage all project video data.
[0072] In some of the embodiments, the platform creates a user table to store user information, creates a role table to define roles, and creates a permission table to define data display permissions. Based on the user table and role table, a user-role association table is created to define the roles to which the users belong. Based on the role table and permission table, a role-permission association table is created to define the data display permissions corresponding to the roles. When querying data on the display page, the data is filtered according to the role permissions.
[0073] In some of the embodiments, the platform implements the MVC model development technology framework based on the SpringMVC framework, adopts the B / S structure to implement the multi-layer network distributed system structure, the system is implemented based on the J2EE standard, and uses the Mysql database. Such system architecture and design pattern can ensure the maintainability, scalability and reusability of the system, allowing developers to build and modify applications more efficiently.
[0074] In some of the embodiments, the platform is deployed in a local Nginx server, and the server deployment adopts a distributed architecture, which includes an HTTP service layer, a WEB service layer and a persistence layer. Whether to distribute the request to the server of the WEB service layer is determined according to the requested resource type. The user data generated by the platform program operation is stored in the persistence layer database or file system, and the incremental data is backed up to the disaster recovery server every day to prevent the loss of system data due to accidents or damage. The persistence layer is a database server, and the data transmission between the servers of the WEB service layer or between them and the disaster recovery server adopts FTP server transmission, and supports breakpoint resumption function. The resource types include static resources and dynamic resources, and the number of servers in the WEB service layer can be adjusted according to the actual load conditions.
[0075] In some of the embodiments, the title of the homepage of the digital construction management platform is configurable, and the digital construction platform is uniformly displayed if it is not configured.
[0076] The embodiments of the present application realize vertical integration and horizontal coordination of production business, realize comprehensive digital production collaboration for personnel, projects, company-level, bureau-level companies, and group companies, realize real-time, comprehensive, and focused supervision and management of key elements of the construction site, effectively support the development of project management work at all levels such as on-site staff, project managers, and enterprise managers, and improve the digitization of construction quality management, cost management, and progress management.
[0077] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.
[0078] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0079] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A digital construction management platform, characterized in that: The first-level display page of the digital construction management platform is configured to include: a safety management module, a labor management module, a ship and machinery management module, a digital monitoring module, a quality management module, a digital construction module and a material management module or any combination thereof; The digital construction management platform is connected to the safety management system, labor service system, ship and machinery management system, engineering management system, quality management system, intelligent construction IoT system, and material scale system to obtain the project information to be displayed in the safety management module, labor management module, ship and machinery management module, digital monitoring module, quality management module, digital construction module, and material management module; The digital construction management platform is connected to a BIM platform, and the BIM platform stores project preview model data; The display page of the digital construction management platform is configured to include more than three data display permissions, the data display permissions include: global level, company level, project level, and the data range that can be obtained for each data display permission is configured from large to small to be global level, company level, and project level; The display page of the digital construction management platform is configured to include more than three data levels, receive a preset operation on the display information included in the data level displayed in the display page, display the display information included in the next data level of the operated display information, and enter the next level display page for data drilling.
2. The digital construction management platform according to claim 1, characterized in that: The first-level display page is configured with a hierarchical jump menu, and the hierarchical jump menu is configured with level options corresponding to the data display authority. When a preset operation in the hierarchical jump menu area of the display page is received, the page jumps to the display information included in the display corresponding to the data display authority.
3. The digital construction management platform according to claim 2, characterized in that: The role account mapping is configured with data display permissions.
4. The digital construction management platform according to claim 3, characterized in that: The level options limit the switchable data display permissions according to the downward permission principle, and the highest switchable level is the level corresponding to the role account.
5. The digital construction management platform according to claim 1, characterized in that: The digital construction management platform displays the map in the first-level display page through the map library API call, and adds an interactive event on the map to detect the mouse hovering event. When the mouse hovers over a certain area, the number of construction projects in the corresponding area is displayed.
6. The digital construction management platform according to claim 1, characterized in that: A preconfigured rendering engine id field is set in the project information of the digital construction management platform. The digital construction management platform can call the rendering engine according to the rendering engine id field, load the preview model data of the BIM platform, and display the model according to the loaded preview model data in the secondary display page or the tertiary display page according to the project.
7. The digital construction management platform according to claim 1, characterized in that: The digital construction management platform is connected to a video monitoring platform, and the video monitoring platform obtains monitoring video data of each construction project site, and displays the monitoring video data in a three-level display page according to the project on the digital construction management platform.
8. The digital construction management platform according to claim 3, characterized in that: The platform creates a user table to store user information, a role table to define roles, and a permission table to define data display permissions. Based on the user table and role table, a user-role association table is created to define the roles to which users belong. Based on the role table and permission table, a role-permission association table is created to define the data display permissions corresponding to the roles. When querying data on the display page, data is filtered according to role permissions.
9. The digital construction management platform according to any one of claims 1 to 8, characterized in that: The platform implements the MVC model development technology framework based on the SpringMVC framework and adopts the B / S structure to realize the multi-layer network distributed system structure.
10. The digital construction management platform according to claim 9, characterized in that: The platform is deployed in the local Nginx server, and the server deployment adopts a distributed architecture.
