Power distribution network high-voltage transmission line planning method, device, equipment and storage medium
By overlapping relevant layers on the GIS layer and using a planar scanning algorithm to optimize and evaluate the high-voltage transmission lines of the distribution network, the problems of planning efficiency and accuracy in traditional methods are solved, and a more efficient and accurate planning process is achieved.
Patent Information
- Application Number
- CN202411166343.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-12
AI Technical Summary
The traditional high-voltage transmission line planning method of distribution networks relies on manual experience and simple data analysis, lacks accuracy and efficiency, and is difficult to meet the needs of the growth of power demand and urbanization process.
Overlap relevant layers on the geographic information system (GIS) layer, use a plane scanning algorithm to scan multiple distribution network equipment and geographical environment information, determine candidate planning lines, and determine target planning lines through optimization adjustment and risk assessment to improve planning level of automation and intelligence.
Through automated and intelligent methods, improve the efficiency and accuracy of high-voltage transmission line planning in the distribution network, reduce planning costs, and are suitable for different line planning needs and scenarios.
Smart Images

Figure CN118941056A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power technology, and in particular to a method, device, equipment and storage medium for planning high-voltage transmission lines in a distribution network. Background Art
[0002] With the continuous growth of electricity demand and the acceleration of urbanization, the planning and construction of high-voltage transmission lines in distribution networks are becoming increasingly important. The traditional planning methods of high-voltage transmission lines in distribution networks mainly rely on manual experience and simple data analysis, which lacks accuracy and efficiency.
[0003] Therefore, how to improve the efficiency and accuracy of high-voltage transmission line planning in distribution networks has become an urgent problem to be solved. Summary of the invention
[0004] The embodiments of the present application provide a method, device, equipment and storage medium for planning high-voltage transmission lines in a distribution network, which can improve the efficiency and accuracy of planning high-voltage transmission lines in a distribution network.
[0005] In a first aspect, an embodiment of the present application provides a method for planning high-voltage transmission lines in a distribution network, the method comprising:
[0006] On a Geographic Information System (GIS) layer for planning high-voltage transmission lines of a distribution network, one or more associated layers related to site selection of high-voltage transmission lines of the distribution network are superimposed to obtain a new data layer;
[0007] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0008] Based on multiple scanning results, N candidate planning routes are determined;
[0009] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0010] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0011] In one of the embodiments, based on multiple scanning results, N candidate planned routes are obtained, including: performing geographical location analysis on the multiple scanning results respectively to obtain multiple candidate distribution network high-voltage transmission line site selection points; based on the multiple candidate distribution network high-voltage transmission line site selection points, N candidate planned routes are determined.
[0012] In one of the embodiments, based on multiple candidate distribution network high-voltage transmission line site selection points, N candidate planned lines are determined, including: eliminating intersection points of different geographical environments and / or currently existing line intersection points among the multiple candidate distribution network high-voltage transmission line site selection points to obtain multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; combining the multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points according to preset rules to obtain M candidate planned lines.
[0013] In one embodiment, based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planning routes, a target planning route is determined from the N adjusted candidate planning routes, including: for each adjusted candidate planning route, determining the difference between the predicted annual maximum load value corresponding to the adjusted candidate planning route after the adjusted candidate planning route is added to the existing route and the annual maximum load value of the existing route; based on the difference, construction cost deviation rate and review results corresponding to each adjusted candidate planning route, M target candidate planning routes are selected from the N adjusted candidate planning routes; M is less than N; the review result is determined in response to a user operation input to a user interface after a user operation is detected, and the user operation is used to indicate a score for each adjusted candidate planning route; based on the risk assessment results respectively corresponding to the M target candidate planning routes, a target planning route is determined from the M target candidate planning routes.
[0014] In one embodiment, the predicted annual maximum load value corresponding to each adjusted candidate planning line after being added to the existing line is determined by:
[0015]
[0016] Among them, P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S iIt represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0017] In one embodiment, the construction cost deviation rate is determined by:
[0018]
[0019] Among them, P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; i represents the i-th influencing factor; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0020] In a second aspect, the present application provides a distribution network high-voltage transmission line planning device, the device comprising:
[0021] A processing module, for superimposing one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network on the geographic information system layer for the planning of the high-voltage transmission line of the distribution network to obtain a new data layer;
[0022] A scanning module is used to scan the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information;
[0023] A determination module, used to determine N candidate planning routes based on multiple scanning results;
[0024] An adjustment module, used for optimizing and adjusting N candidate planning routes based on geographical environment information to obtain N adjusted candidate planning routes;
[0025] The determination module is also used to determine the target planning route from the N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planning routes.
[0026] In a third aspect, the present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0027] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0028] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0029] Based on multiple scanning results, N candidate planning routes are determined;
[0030] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0031] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0032] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the following steps are implemented:
[0033] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0034] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0035] Based on multiple scanning results, N candidate planning routes are determined;
[0036] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0037] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0038] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0039] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0040] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0041] Based on multiple scanning results, N candidate planning routes are determined;
[0042] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0043] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0044] The above-mentioned distribution network high-voltage transmission line planning method, device, equipment and storage medium, the computer equipment can superimpose one or more associated layers related to the site selection of the distribution network high-voltage transmission line on the geographic information system layer used for the distribution network high-voltage transmission line planning to obtain a new data layer; use the plane scanning algorithm to scan the new data layer to obtain scanning results for multiple distribution network equipment data information and geographic environment information; based on multiple scanning results, determine N candidate planning lines; optimize and adjust the N candidate planning lines based on the geographic environment information to obtain N adjusted candidate planning lines; based on the predicted annual maximum load value, construction cost deviation rate and risk assessment results corresponding to the N adjusted candidate planning lines, determine the target planning line from the N adjusted candidate planning lines. Using this method, the distribution network high-voltage transmission line planning can be realized in an automated and intelligent manner, thereby, compared with the traditional method of relying on manual experience for simple data analysis, the efficiency and accuracy of the distribution network high-voltage transmission line planning can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 It is a schematic diagram of an application scenario of a method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application;
[0047] Figure 2 It is a flow chart of a method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application;
[0048] Figure 3It is a flowchart of another method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application;
[0049] Figure 4 It is a structural schematic diagram of a distribution network high-voltage transmission line planning device provided in an embodiment of the present application;
[0050] Figure 5 It is a structural diagram of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0052] The following introduces the application scenarios of the distribution network high-voltage transmission line planning method provided in the embodiments of the present application.
[0053] See also Figure 1 , Figure 1 Schematic diagram of an application scenario of a method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application. Figure 1 As shown, the computer device 101 ( Figure 1 In the figure, the computer device 101 is drawn as an example of a terminal device) and a database server 102, wherein data can be transmitted between the computer device 101 and the database server 102 via a network.
[0054] The computer device 101 can obtain the GIS layer of the distribution network high-voltage transmission line planning from the database server 102; then, the computer device 101 can superimpose one or more associated layers related to the site selection of the distribution network high-voltage transmission line on the GIS layer to obtain a new data layer; use the plane scanning algorithm to scan the new data layer to obtain scanning results for multiple distribution network equipment data information and geographical environment information; based on multiple scanning results, determine N candidate planning lines; optimize and adjust the N candidate planning lines based on the geographical environment information to obtain N adjusted candidate planning lines; based on the predicted annual maximum load value, construction cost deviation rate and risk assessment results corresponding to the N adjusted candidate planning lines, determine the target planning line from the N adjusted candidate planning lines. By adopting this method, the distribution network high-voltage transmission line planning can be realized in an automated and intelligent manner, thereby improving the efficiency and accuracy of the distribution network high-voltage transmission line planning compared with the traditional method of relying on manual experience for simple data analysis.
[0055] Optionally, the computer device 101 may be a terminal device or a server. The terminal device mentioned here may include but is not limited to: a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart watch, a smart TV, a smart car terminal, etc. The server mentioned here may be an independent physical server, or a server cluster or a distributed system composed of multiple physical servers.
[0056] See also Figure 2 , Figure 2 1 is a flow chart of a method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application. The method can be executed by a computer device (for example, the above-mentioned computer device 201). Figure 2 As shown, the distribution network high-voltage transmission line planning method may include but is not limited to the following steps:
[0057] S201. Overlaying one or more associated layers related to the site selection of the high-voltage transmission lines of the distribution network on the geographic information system layer used for the planning of the high-voltage transmission lines of the distribution network to obtain a new data layer.
[0058] Among them, geographic information system can also be called "geo-information system". Geographic information system is a specific and very important spatial information system. It is a technical system that collects, stores, manages, calculates, analyzes, displays and describes the geographical distribution data in the whole or part of the earth's surface (including the atmosphere) space with the support of computer hardware and software systems. Geographic information system combines maps, geographic location and attribute data, as well as various data sources related to geography, to effectively organize, store, query, analyze and display geographic information.
[0059] Optionally, one or more associated layers related to the site selection of high-voltage transmission lines in the distribution network include at least one of the following: an urban road layer, an urban underground pipeline corridor layer, and an existing power grid layer.
[0060] S202: Scan the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information.
[0061] Among them, the main content of the plane scanning algorithm is to scan the spatial object once and complete the analysis of the properties of the spatial object or the relationship between the spatial objects during the scanning process.
[0062] S203: Determine N candidate planning routes based on the multiple scanning results.
[0063] In an optional embodiment, the computer device determines N candidate planned routes based on multiple scanning results, which may include: performing geographic location analysis on the multiple scanning results to obtain multiple candidate distribution network high-voltage transmission line site selection points; and determining N candidate planned routes based on the multiple candidate distribution network high-voltage transmission line site selection points.
[0064] S204: Optimize and adjust the N candidate planning routes based on the geographic environment information to obtain N adjusted candidate planning routes.
[0065] In an optional embodiment, before step S204, the computer device may also receive an adjustment instruction for N candidate planned routes, where the adjustment instruction is used to instruct optimization adjustment of the N candidate planned routes, and the adjustment instruction includes adjustment content for each candidate planned route, and the adjustment instruction is determined by the user based on geographic environment information; in response to the adjustment instruction, step S204 is executed.
[0066] S205. Determine a target planning route from the N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results respectively corresponding to the N adjusted candidate planning routes.
[0067] In an optional implementation, before step S205, the computer device may also determine the predicted annual maximum load values and construction cost deviation rates corresponding to the N adjusted candidate planning routes.
[0068] In the embodiment of the present application, the computer device can superimpose one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network on the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network to obtain a new data layer; use the plane scanning algorithm to scan the new data layer to obtain scanning results for multiple distribution network equipment data information and geographic environment information; based on multiple scanning results, determine N candidate planning lines; optimize and adjust the N candidate planning lines based on the geographic environment information to obtain N adjusted candidate planning lines; based on the predicted annual maximum load value, construction cost deviation rate and risk assessment results corresponding to the N adjusted candidate planning lines, determine the target planning line from the N adjusted candidate planning lines. By adopting this method, the planning of the high-voltage transmission line of the distribution network can be realized in an automated and intelligent manner, thereby improving the efficiency and accuracy of the planning of the high-voltage transmission line of the distribution network compared with the traditional method of relying on manual experience for simple data analysis.
[0069] See also Figure 3 , Figure 3 1 is a flow chart of another method for planning high-voltage transmission lines in a distribution network provided in an embodiment of the present application. Figure 2Compared with the high-voltage transmission line planning method of the distribution network shown in Figure 3 The method shown also describes how the computer device determines the target planning route from the N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results corresponding to the N adjusted candidate planning routes. Figure 3 As shown, the distribution network high-voltage transmission line planning method may include but is not limited to the following steps:
[0070] S301. On a geographic information system layer used for planning high-voltage transmission lines of a distribution network, one or more associated layers related to site selection of high-voltage transmission lines of the distribution network are superimposed to obtain a new data layer.
[0071] In an optional implementation, the relevant description of step S301 can refer to the description of the aforementioned step S201, which will not be repeated here.
[0072] In an optional implementation, before step S301, the computer device may also obtain basic data for the planning of high-voltage transmission lines in the distribution network based on GIS technology, the basic data including topographic data, meteorological conditions data, land use data and urban planning data; extract various business system data from the distributed power grid platform through Extract Transform Load (ETL) data processing tools; and determine the geographic information system layer for the planning of high-voltage transmission lines in the distribution network based on the basic data and various business system data. Among them, the various business system data may include but are not limited to power grid equipment data, main transformer, distribution transformer, feeder data of substations, dispatching operation data (such as voltage, current, load, power, etc.), etc.
[0073] Among them, the ETL data processing tool can support task configuration through visual drag-and-drop operations and Flink SQL statements, and combined with the efficient streaming data replication capability of the Data Transmission Service (DTS), it can realize streaming data extraction, data conversion and processing, and data loading.
[0074] S302: Scan the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information.
[0075] Among them, the main content of the plane scanning algorithm is to scan the spatial object once and complete the analysis of the properties of the spatial object or the relationship between the spatial objects during the scanning process.
[0076] In an optional embodiment, the computer device uses a plane scanning algorithm to scan the new data layer to obtain scanning results for multiple distribution network equipment data information and geographic environment information, which may include: determining the starting position, moving direction and line site selection constraints of the scanning line; based on the determined starting position, moving direction and trigger event point requirements, scanning the new data layer to obtain scanning results for multiple distribution network equipment data information and geographic environment information.
[0077] In this embodiment, the starting position of the scanning line, the moving direction and the constraints of the line selection can be preset. Optionally, the constraints of the line selection can be determined based on the geographical environment area to which the scanning position point belongs. The geographical environment area to which the scanning position point belongs includes but is not limited to natural disaster risk areas, river-dense areas, important facility construction areas, crowded areas, obstacle areas, etc.
[0078] Optionally, the computer device may also update the information of the scanned location point based on the geographical environment area to which the scanned location point belongs. For example, if the geographical environment area to which location point A belongs is determined to be a natural disaster risk area, location point A is marked as a point that affects the route location.
[0079] S303, performing geographic location analysis on the multiple scanning results respectively to obtain multiple candidate distribution network high-voltage transmission line site selection points.
[0080] In an optional implementation, the computer device performs geographic location analysis on multiple scanning results respectively to obtain multiple candidate distribution network high-voltage transmission line site selection points, which may include: removing intersection points of different geographical environments and / or currently existing line intersection points from multiple candidate distribution network high-voltage transmission line site selection points to obtain multiple candidate distribution network high-voltage transmission line site selection points after removing intersection points; combining multiple candidate distribution network high-voltage transmission line site selection points after removing intersection points according to preset rules to obtain M candidate planning lines. Among them, the geographical environment intersection point is, for example, the intersection point of a river and a lake.
[0081] S304: Determine N candidate planning lines based on multiple candidate distribution network high-voltage transmission line site selection points.
[0082] Among them, steps S301 to S304 can be regarded as a spatial analysis process based on GIS, and the N candidate planning routes can also be called spatial analysis results.
[0083] In an optional implementation, the computer device determines N candidate planning lines based on multiple candidate distribution network high-voltage transmission line site selection points, which may include: determining a line site selection strategy; and combining multiple candidate distribution network high-voltage transmission line site selection points based on the line site selection strategy to obtain N candidate planning lines. Optionally, the line site selection strategy may be predefined.
[0084] In an optional implementation, after step S304, the computer device may also output the N candidate planning routes to the GIS map displayed on the user interface, so that the user can easily view the candidate planning routes.
[0085] S305. Optimize and adjust the N candidate planning routes based on the geographic environment information to obtain N adjusted candidate planning routes.
[0086] In an optional implementation, the relevant description of step S305 can refer to the description of the aforementioned step S204, which will not be repeated here.
[0087] S306. For each adjusted candidate planned line, determine the difference between the predicted annual maximum load value corresponding to the adjusted candidate planned line after it is added to the existing line and the annual maximum load value of the existing line.
[0088] In an optional implementation, the computer device may determine the predicted annual maximum load value corresponding to each adjusted candidate planning line after it is added to the existing line by using the following formula (1).
[0089] (1)
[0090] In formula (1), P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line, where the annual maximum load refers to the maximum load in a year; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S iIt represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0091] In an optional embodiment, the computer device determines the difference P between the predicted annual maximum load value corresponding to each adjusted candidate planning route after it is added to the current route and the annual maximum load value of the current route. 差 The following formula (2) can be used.
[0092] (2)
[0093] In formula (2), P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation.
[0094] S307. Based on the difference corresponding to each adjusted candidate planning route, the construction cost deviation rate and the review result, M target candidate planning routes are selected from the N adjusted candidate planning routes; M is less than N.
[0095] The review result is determined in response to the user operation after the user operation input to the user interface is detected, and the user operation is used to indicate the score of each adjusted candidate planning route. The score of each adjusted candidate planning route is determined by the user based on future development plans and social factors. For example, assuming that the adjusted candidate planning route 1 is not a preferred route, but the user has learned that the government department has planned to develop the area where the candidate planning route 1 is located in the next few years, in this case, the user can give the adjusted candidate planning route 1 a higher score.
[0096] In an optional implementation, the computer device selects M target candidate planning routes from N adjusted candidate planning routes based on the difference value, construction cost deviation rate and review result corresponding to each adjusted candidate planning route, which may include: sorting the N adjusted candidate planning routes from high to low priority based on the difference value, construction cost deviation rate and review result corresponding to each adjusted candidate planning route to obtain sorted N adjusted candidate planning routes; and selecting the first M adjusted candidate planning routes from the sorted N adjusted candidate planning routes as target candidate planning routes. Optionally, the value of M can be 3.
[0097] In an optional implementation, before step S307, the computer device may also determine the construction cost deviation rate corresponding to each adjusted candidate planning route by using the following formula (3).
[0098] (3)
[0099] In formula (3), P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0100] S308. Determine a target planning route from the M target candidate planning routes based on the risk assessment results corresponding to the M target candidate planning routes.
[0101] In an optional implementation, before step S308, the computer device may also determine the risk assessment results corresponding to the M target candidate planning routes. Optionally, the process of the computer device determining the risk assessment result corresponding to each target candidate planning route may include but is not limited to the following steps:
[0102] Step 1: Identify different risk types and determine the risk levels associated with each risk type.
[0103] Step 2: Construct a risk assessment matrix based on multiple risk types and the risk levels associated with each risk type.
[0104] Optionally, the elements in each row of the risk assessment matrix may represent a risk level, and the elements in each column of the risk assessment matrix may represent a risk type.
[0105] Optionally, the risk level may be determined based on environmental impact assessment results, safety risk assessment results, economic benefit assessment results, and social responsibility assessment results.
[0106] Step 3: Based on the risk assessment matrix, determine the risk assessment results corresponding to each target candidate planning route.
[0107] In an optional embodiment, a computer device determines a target planning route from M target candidate planning routes based on risk assessment results corresponding to the M target candidate planning routes, which may include: sorting the M target candidate planning routes in order of priority from high to low based on the risk assessment results corresponding to the M target candidate planning routes, to obtain M sorted target candidate planning routes; and selecting the target candidate planning route ranked first from the sorted M target candidate plans as the target planning route.
[0108] In an optional implementation, after step S308, the computer device may also output the target planned route to the user interface in the form of a layout of the GIS route selection result, and output the data in the route selection process to the user interface in the form of a table. In this way, by visually displaying the route selection result (i.e., the target planned route) in the form of GIS, the route selection result can be more intuitively displayed to the user, thereby facilitating the user's understanding and analysis.
[0109] In another optional embodiment, after executing step S307, the computer device may not execute step S308, but instead execute the following steps: displaying M target candidate planning routes and the risk assessment results corresponding to each target candidate planning route in the user interface; detecting a user operation input for any one of the M target candidate planning routes in the user interface, the user operation being used to indicate a determined target candidate route; and determining the target planning route in response to the above user operation.
[0110] In this implementation, after determining the risk assessment result corresponding to each target candidate planning route, the user can determine the feasibility of the target candidate planning route when the risk assessment result corresponding to the target candidate planning route is determined to be high risk, and determine whether to adopt other target candidate planning routes based on the feasibility of the target candidate planning route; when the risk assessment result corresponding to the target candidate planning route is determined to be medium or low risk, a comparative evaluation can be conducted on different target candidate planning routes to select the most appropriate target candidate planning route as the target planning route; when the risk assessment result corresponding to the target candidate planning route is determined to be medium risk, the feasibility of the target candidate planning route can be further determined based on social impact and social responsibility. Afterwards, the user can input a user operation for indicating the determined target candidate planning route for any of the M target candidate planning routes in the user interface.
[0111] In an embodiment of the present application, a computer device may superimpose one or more associated layers related to the site selection of high-voltage transmission lines in a distribution network on a geographic information system layer used for planning high-voltage transmission lines in a distribution network to obtain a new data layer; use a plane scanning algorithm to scan the new data layer to obtain scanning results for multiple distribution network equipment data information and geographic environment information; determine N candidate planning routes based on multiple scanning results; optimize and adjust the N candidate planning routes based on the geographic environment information to obtain N adjusted candidate planning routes; determine a target planning route from the N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results corresponding to the N adjusted candidate planning routes. By adopting this method, on the one hand, the planning of high-voltage transmission lines in the distribution network is realized in an automated and intelligent manner, which can improve the efficiency and accuracy of the planning of high-voltage transmission lines in the distribution network compared with the traditional method of relying on manual experience for simple data analysis; on the other hand, since the target planning line is determined based on the predicted annual maximum load value, the construction cost deviation rate and the risk assessment result corresponding to the N adjusted candidate planning lines, that is, the construction cost deviation rate is taken into account in the process of determining the target planning line, the planning cost can be reduced by adopting the embodiments of the present application.
[0112] In addition, the distribution network high-voltage transmission line planning method provided in the embodiment of the present application can be applied to different line planning requirements and scenarios, that is, it has strong adaptability.
[0113] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0114] Based on the same inventive concept, the embodiment of the present application also provides a distribution network high-voltage transmission line planning device for implementing the distribution network high-voltage transmission line planning method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more distribution network high-voltage transmission line planning device embodiments provided below can refer to the limitations of the distribution network high-voltage transmission line planning method above, and will not be repeated here.
[0115] See also Figure 4 , Figure 4 Schematic diagram of a high-voltage transmission line planning device for a distribution network provided in an embodiment of the present application. Figure 4 As shown, the distribution network high-voltage transmission line planning device may include but is not limited to:
[0116] The processing module 401 is used to superimpose one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network on the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network to obtain a new data layer;
[0117] Scanning module 402, used to scan the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information;
[0118] A determination module 403 is used to determine N candidate planning routes based on the multiple scanning results;
[0119] An adjustment module 404 is used to optimize and adjust the N candidate planning routes based on the geographical environment information to obtain N adjusted candidate planning routes;
[0120] The determination module 403 is further used to determine the target planned route from the N adjusted candidate planned routes based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planned routes.
[0121] In one embodiment, when the determination module 403 is used to obtain N candidate planned routes based on multiple scanning results, it is specifically used to: perform geographic location analysis on the multiple scanning results respectively to obtain multiple candidate distribution network high-voltage transmission line site selection points; determine N candidate planned routes based on the multiple candidate distribution network high-voltage transmission line site selection points.
[0122] In one embodiment, when the determination module 403 is used to determine N candidate planned routes based on multiple candidate distribution network high-voltage transmission line site selection points, it is specifically used to: eliminate the intersection points of different geographical environments and / or the currently existing line intersection points among the multiple candidate distribution network high-voltage transmission line site selection points to obtain multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; combine the multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points according to preset rules to obtain M candidate planned routes.
[0123] In one embodiment, when the determination module 403 is used to determine the target planned route from N adjusted candidate planned routes based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planned routes, it is specifically used to: determine, for each adjusted candidate planned route, the difference between the predicted annual maximum load value corresponding to the adjusted candidate planned route after the adjusted candidate planned route is added to the existing route and the annual maximum load value of the existing route; based on the difference, construction cost deviation rate and review results corresponding to each adjusted candidate planned route, select M target candidate planned routes from the N adjusted candidate planned routes; M is less than N; the review result is determined in response to the user operation input to the user interface after detecting the user operation, and the user operation is used to indicate the score of each adjusted candidate planned route; based on the risk assessment results respectively corresponding to the M target candidate planned routes, determine the target planned route from the M target candidate planned routes.
[0124] In one embodiment, the predicted annual maximum load value corresponding to each adjusted candidate planning line after being added to the current line is determined by the determination module 403 in the following manner:
[0125]
[0126] Among them, P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S i It represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0127] In one embodiment, the construction cost deviation rate is determined by the determination module 403 in the following manner:
[0128]
[0129] Among them, P rrepresents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; i represents the i-th influencing factor; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0130] Each module in the above-mentioned distribution network high-voltage transmission line planning device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the terminal device in the form of hardware, or can be stored in the memory in the terminal device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0131] In an exemplary embodiment, the present application provides a computer device, which may be a terminal, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, near field communication (Near Field Communication, NFC) or other technologies. When the computer program is executed by the processor, a method for planning high-voltage transmission lines in a distribution network is implemented.
[0132] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0133] In an exemplary embodiment, the present application provides a computer device, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0134] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0135] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0136] Based on multiple scanning results, N candidate planning routes are determined;
[0137] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0138] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0139] In one embodiment, when the processor executes a computer program to obtain N candidate planned routes based on multiple scanning results, the following steps are specifically implemented: geographical location analysis is performed on the multiple scanning results to obtain multiple candidate distribution network high-voltage transmission line site selection points; based on the multiple candidate distribution network high-voltage transmission line site selection points, N candidate planned routes are determined.
[0140] In one embodiment, when a processor executes a computer program to determine N candidate planned routes based on multiple candidate distribution network high-voltage transmission line site selection points, the following steps are specifically implemented: intersection points of different geographical environments and / or currently existing line intersection points in the multiple candidate distribution network high-voltage transmission line site selection points are eliminated to obtain multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; the multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points are combined according to preset rules to obtain M candidate planned routes.
[0141] In one embodiment, a processor executes a computer program to determine a target planning route from N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results respectively corresponding to the N adjusted candidate planning routes, and specifically implements the following steps: for each adjusted candidate planning route, determine the difference between the predicted annual maximum load value corresponding to the adjusted candidate planning route after the adjusted candidate planning route is added to the existing route and the annual maximum load value of the existing route; based on the difference, construction cost deviation rate, and review results corresponding to each adjusted candidate planning route, select M target candidate planning routes from the N adjusted candidate planning routes; M is less than N; the review result is determined in response to a user operation input to a user interface after a user operation is detected, and the user operation is used to indicate a score for each adjusted candidate planning route; based on the risk assessment results respectively corresponding to the M target candidate planning routes, determine the target planning route from the M target candidate planning routes.
[0142] In one embodiment, the processor executes the computer program to further implement the following steps: determining the predicted annual maximum load value corresponding to each adjusted candidate planning line after it is added to the current line by the following method:
[0143]
[0144] Among them, P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S i It represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0145] In one embodiment, the processor executes the computer program to further implement the following steps: determining the construction cost deviation rate by:
[0146]
[0147] Among them, P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; i represents the i-th influencing factor; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0148] In an exemplary embodiment, the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the following steps are implemented:
[0149] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0150] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0151] Based on multiple scanning results, N candidate planning routes are determined;
[0152] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0153] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0154] In one embodiment, when a computer program is executed by a processor to obtain N candidate planned routes based on multiple scanning results, the following steps are specifically implemented: geographical location analysis is performed on the multiple scanning results to obtain multiple candidate distribution network high-voltage transmission line site selection points; based on the multiple candidate distribution network high-voltage transmission line site selection points, N candidate planned routes are determined.
[0155] In one embodiment, a computer program is executed by a processor to determine N candidate planned routes based on multiple candidate distribution network high-voltage transmission line site selection points, and specifically implement the following steps: eliminate intersection points of different geographical environments and / or currently existing line intersection points among the multiple candidate distribution network high-voltage transmission line site selection points to obtain multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; combine the multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points according to preset rules to obtain M candidate planned routes.
[0156] In one embodiment, a computer program is executed by a processor to determine a target planning route from N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results respectively corresponding to the N adjusted candidate planning routes, and specifically implement the following steps: for each adjusted candidate planning route, determine the difference between the predicted annual maximum load value corresponding to the adjusted candidate planning route after the adjusted candidate planning route is added to the existing route and the annual maximum load value of the existing route; based on the difference, construction cost deviation rate, and review results corresponding to each adjusted candidate planning route, select M target candidate planning routes from the N adjusted candidate planning routes; M is less than N; the review result is determined in response to a user operation input to a user interface after a user operation is detected, and the user operation is used to indicate a score for each adjusted candidate planning route; based on the risk assessment results respectively corresponding to the M target candidate planning routes, determine the target planning route from the M target candidate planning routes.
[0157] In one embodiment, the computer program is executed by the processor to further implement the following steps: determining the predicted annual maximum load value corresponding to each adjusted candidate planning line after it is added to the current line by the following method:
[0158]
[0159] Among them, P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S i It represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0160] In one embodiment, when the computer program is executed by the processor, the following steps are further implemented: determining the construction cost deviation rate by:
[0161]
[0162] Among them, P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; i represents the i-th influencing factor; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0163] In an exemplary embodiment, the present application provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0164] On the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer;
[0165] Using the plane scanning algorithm, the new data layer is scanned to obtain the scanning results for multiple distribution network equipment data information and geographical environment information;
[0166] Based on multiple scanning results, N candidate planning routes are determined;
[0167] Optimizing and adjusting N candidate planning routes based on geographic environment information to obtain N adjusted candidate planning routes;
[0168] Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
[0169] In one embodiment, when a computer program is executed by a processor to obtain N candidate planned routes based on multiple scanning results, the following steps are specifically implemented: geographical location analysis is performed on the multiple scanning results to obtain multiple candidate distribution network high-voltage transmission line site selection points; based on the multiple candidate distribution network high-voltage transmission line site selection points, N candidate planned routes are determined.
[0170] In one embodiment, a computer program is executed by a processor to determine N candidate planned routes based on multiple candidate distribution network high-voltage transmission line site selection points, and specifically implement the following steps: eliminate intersection points of different geographical environments and / or currently existing line intersection points among the multiple candidate distribution network high-voltage transmission line site selection points to obtain multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; combine the multiple candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points according to preset rules to obtain M candidate planned routes.
[0171] In one embodiment, a computer program is executed by a processor to determine a target planning route from N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results respectively corresponding to the N adjusted candidate planning routes, and specifically implement the following steps: for each adjusted candidate planning route, determine the difference between the predicted annual maximum load value corresponding to the adjusted candidate planning route after the adjusted candidate planning route is added to the existing route and the annual maximum load value of the existing route; based on the difference, construction cost deviation rate, and review results corresponding to each adjusted candidate planning route, select M target candidate planning routes from the N adjusted candidate planning routes; M is less than N; the review result is determined in response to a user operation input to a user interface after a user operation is detected, and the user operation is used to indicate a score for each adjusted candidate planning route; based on the risk assessment results respectively corresponding to the M target candidate planning routes, determine the target planning route from the M target candidate planning routes.
[0172] In one embodiment, the computer program is executed by the processor to further implement the following steps: determining the predicted annual maximum load value corresponding to each adjusted candidate planning line after it is added to the current line by the following method:
[0173]
[0174] Among them, P B1 It represents the annual maximum load of the line in the first planning year under normal operation after the adjusted candidate planning line is added to the existing line; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S i It represents the load reported by the i-th user in the planned year after considering the expected start time of electricity use; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value. In one embodiment, the method also includes: controlling the handling equipment to carry the sample distribution network materials to the inspection station; determining the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process; based on the dependency relationship between each process in one or more inspection items corresponding to the sample distribution network materials and the corresponding level of each process, determining the execution precondition corresponding to each process in each inspection item.
[0175] In one embodiment, when the computer program is executed by the processor, the following steps are further implemented: determining the construction cost deviation rate by:
[0176]
[0177] Among them, P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; i represents the i-th influencing factor; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
[0178] It should be noted that the data involved in this application (including but not limited to geographic information system layers used for distribution network high-voltage transmission line planning, one or more associated layers related to the site selection of distribution network high-voltage transmission lines, scanning results of multiple distribution network equipment data information and geographic environment information, etc.) are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data need to comply with relevant regulations.
[0179] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0180] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0181] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for planning high-voltage transmission lines in a distribution network, characterized in that: The method comprises: On the geographic information system layer used for planning the high-voltage transmission line of the distribution network, one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network are superimposed to obtain a new data layer; Scanning the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information; Based on the plurality of scanning results, determining N candidate planning routes; Optimizing and adjusting the N candidate planning routes based on the geographic environment information to obtain N adjusted candidate planning routes; Based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planning routes, the target planning route is determined from the N adjusted candidate planning routes.
2. The method according to claim 1, characterized in that The obtaining of N candidate planning routes based on the plurality of scanning results includes: Performing geographic location analysis on the plurality of scanning results respectively to obtain a plurality of candidate distribution network high-voltage transmission line site selection points; Based on the plurality of candidate distribution network high-voltage transmission line site selection points, N candidate planning lines are determined.
3. The method according to claim 2, characterized in that The determining of N candidate planning lines based on the plurality of candidate distribution network high-voltage transmission line site selection points comprises: Eliminating the intersection points of different geographical environments and / or the currently existing line intersection points among the plurality of candidate distribution network high-voltage transmission line site selection points, to obtain a plurality of candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points; The plurality of candidate distribution network high-voltage transmission line site selection points after eliminating the intersection points are combined according to preset rules to obtain M candidate planning lines.
4. The method according to claim 1, characterized in that: The determining of the target planning route from the N adjusted candidate planning routes based on the predicted annual maximum load values, construction cost deviation rates, and risk assessment results respectively corresponding to the N adjusted candidate planning routes comprises: For each of the adjusted candidate planning lines, determine the difference between the predicted annual maximum load value corresponding to the adjusted candidate planning line after it is added to the current line and the annual maximum load value of the current line; Based on the difference corresponding to each of the adjusted candidate planning routes, the construction cost deviation rate and the review result, M target candidate planning routes are selected from the N adjusted candidate planning routes; M is less than N; the review result is determined in response to a user operation input to a user interface after the user operation is detected, and the user operation is used to indicate the score of each of the adjusted candidate planning routes; Based on the risk assessment results respectively corresponding to the M target candidate planning routes, a target planning route is determined from the M target candidate planning routes.
5. The method according to any one of claims 1 to 4, characterized in that: The predicted annual maximum load value corresponding to each adjusted candidate planning line after being added to the existing line is determined in the following way: Among them, P B1 It represents the annual maximum load of the line in the first planning year after the adjusted candidate planning line is added to the existing line under normal operation mode; P B0 It represents the annual maximum load of the existing line under normal operation; α B It represents the natural growth rate, which is determined by the load base and economic development level of the predicted area; S i It represents the load reported by the i-th user within the planned year after considering the expected start time of electricity consumption; η represents the simultaneous coefficient of all reports; Q represents the load cut-in value; O represents the load cut-out value.
6. The method according to any one of claims 1 to 4, characterized in that: The construction cost deviation rate is determined in the following manner: Among them, P r represents the construction cost deviation rate; P represents the estimated cost; n represents the number of environmental type influencing factors; α i It represents the influence coefficient corresponding to the influencing factor of the i-th environmental type.
7. A distribution network high voltage transmission line planning device, characterized in that: The device comprises: A processing module, used for superimposing one or more associated layers related to the site selection of the high-voltage transmission line of the distribution network on the geographic information system layer used for the planning of the high-voltage transmission line of the distribution network to obtain a new data layer; A scanning module, used to scan the new data layer using a plane scanning algorithm to obtain scanning results for multiple distribution network equipment data information and geographic environment information; A determination module, used to determine N candidate planning routes based on the plurality of scanning results; An adjustment module, used for optimizing and adjusting the N candidate planning routes based on the geographic environment information to obtain N adjusted candidate planning routes; The determination module is also used to determine the target planned route from the N adjusted candidate planned routes based on the predicted annual maximum load values, construction cost deviation rates and risk assessment results respectively corresponding to the N adjusted candidate planned routes.
8. A computer device, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method according to any one of claims 1 to 6 when executing the computer program.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.