Intelligent quality control system and method for automobile part machining process

Through an intelligent quality control system, the budget and recording units are used to compare data, faulty equipment is located and repaired, the problem of failure in the existing technology cannot be discovered, and the operation efficiency and product quality of the production line are improved.

CN118941130APending Publication Date: 2024-11-12DEYANG TIANHE MASCH MFG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410859322.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing automotive parts production quality control methods cannot effectively detect and locate damaged production line equipment, resulting in a continuous increase in the unqualification rate.

Method used

An intelligent quality control system for the processing process of automobile parts is designed, including component budget unit, production recording unit, preliminary detection unit, fault detection unit and improvement unit. By precalculating and recording actual data, data consistency is detected. Position the fault link and mark and repair the faulty equipment.

Benefits of technology

Can detect and deal with damaged equipment in a timely manner, avoid unqualified products entering the downstream process, reduce production line downtime, and improve production efficiency and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941130A_ABST
    Figure CN118941130A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of automobile part quality management and control, and discloses an intelligent quality control system and method for an automobile part machining process, and the system comprises a part budgeting unit; a production recording unit; a preliminary detection unit; a fault detection unit; and an improvement unit. The preliminary detection unit and the fault detection unit are used for comparing budget data with actual data to judge the consistency of the budget data and the actual data, if the data are inconsistent, problems exist in the production process, and if the data are inconsistent, the fault detection unit is used for further analyzing fault links to which the inconsistent data belong, and determining specific abnormal equipment or process links; and once the fault link is determined, the improvement unit can mark the fault equipment in a targeted manner and carry out maintenance or adjustment, so that the beneficial effect that the damaged equipment can be positioned according to the unqualified parts is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of automobile parts quality control, and in particular to an intelligent quality control system and method for an automobile parts processing process. Background Art

[0002] Auto parts are the various units that make up the whole car and a kind of product that serves the car. There are many kinds of auto parts. With the improvement of people's living standards, people's consumption of cars is increasing, and the market of auto parts is getting bigger and bigger. In recent years, auto parts manufacturers have also developed rapidly.

[0003] After searching, a method and system for production quality control of automobile parts with an existing publication number of CN 116934170 A was found. The technical solution includes S1, identifying and recording the produced automobile parts, and entering the identification part information into a label; S2, matching the corresponding production setting data according to the identified automobile part type; the present invention can efficiently perform quality inspection on automobile parts, which is conducive to corresponding inspection of different types of parts, improving the effect of quality inspection of parts production, and can classify and process qualified and unqualified parts, improve the effect of parts quality control, and can also rework unqualified parts, which is conducive to quality processing of parts and improves the quality of overall parts production, and can classify and manage scrapped parts and parts that are qualified after rework, and improve the accuracy of automobile parts production control.

[0004] Although the above-mentioned technical solution improves the accuracy of parts production control, in actual production, since the parts processing production line is a batch manufacturing process, once a batch of parts is found to be damaged and unqualified, it means that a certain equipment on the assembly line is damaged, and subsequent parts will all have a substandard rate. Even if the above-mentioned technical solution can detect unqualified parts, it cannot detect damaged production line equipment, resulting in a continuous increase in the subsequent substandard rate. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the deficiencies in the prior art, the present invention provides an intelligent quality control system and method for the automotive parts processing process, which has the advantages of being able to locate damaged equipment based on unqualified parts, and being able to promptly handle damaged parts of production parts after locating them, thereby improving production quality, thereby solving the above-mentioned technical problems.

[0007] (II) Technical solution

[0008] To achieve the above object, the present invention provides the following technical solution: an intelligent quality control system for automobile parts processing, the control system comprising:

[0009] A parts budget unit, which is used to pre-calculate the materials, time and loss required for batch parts processing;

[0010] A production record unit, which is used to access the production line and record the actual production materials, time and loss;

[0011] A preliminary detection unit, which is used to calculate whether the production record unit data is consistent with the component budget unit data, and if the two data are inconsistent, the next procedure is entered;

[0012] A fault detection unit, the fault detection unit is used to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs;

[0013] The improvement unit is used to determine the individual equipment with defective rate in the fault link, mark it, repair the equipment after marking, and put it into production after maintenance.

[0014] Preferably, the component budget unit expression formula is:

[0015] T is the processing time, H is the loss, and B is the processing batch;

[0016] [M=f(B,M R )]

[0017] [T=g(B,E)]

[0018] [H=h(B,M P ,P)]

[0019] M R For parts and components material requirements;

[0020] E is the efficiency of production equipment;

[0021] M P is the material property;

[0022] P is the production process.

[0023] Preferably, the preliminary detection unit expression formula is:

[0024] P i It is the budget unit data of parts;

[0025] R i Production record unit data;

[0026] nThe number of data items;

[0027] C i is the consistency judgment of the i-th data item;

[0028] C i ={cases}1,&P i =R i \0,&P i ≠R i {cases}.

[0029] Preferably, the logic for defining the consistency judgment C of the overall data as the consistency judgment of all data items is:

[0030]

[0031] If the consistency judgment of all data items is C i If both are 1, then C is 1, indicating that the data are consistent;

[0032] Otherwise, C is 0, indicating that the data is inconsistent.

[0033] Preferably, the formula for entering the next program is:

[0034] [D={cases}1,&C=0\0,&C=1{cases}]

[0035] Where D is the sign for entering the next program.

[0036] An intelligent quality control method for automobile parts processing includes the following steps:

[0037] Step 1: Pre-calculate the materials, time and loss required for batch parts processing, and use the budget data to provide the necessary preparation information for the production line;

[0038] Step 2: Connect the production record unit to the production line to record the materials, time and loss used in actual production;

[0039] Step 3: Using the preliminary inspection unit to calculate whether the production record unit data is consistent with the component budget unit data;

[0040] Step 4: If the preliminary inspection unit detects that the two data are consistent, then all parts in this batch meet the standards. If the two data are inconsistent, then enter the next procedure for processing;

[0041] Step 5: Use the fault detection unit to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs, analyze the problem and determine the cause of the fault, and accurately locate the fault link;

[0042] Step 6: Identify the individual equipment that produces defective rates in the faulty link, mark the faulty equipment, repair or adjust it after marking, maintain and test the equipment after the repair is completed to ensure its normal operation, put it into production after the repair is completed, and restore the normal operation of the production line.

[0043] Preferably, the step 1 further comprises the following detailed steps:

[0044] S1.1. Collect relevant data: It is necessary to collect data related to parts processing, including parts design drawings, processing parameters, material specifications, and processing equipment performance parameters.

[0045] S1.2. Establish a budget model: Based on the collected data, a budget model is established. The budget model includes a material consumption model, a processing time model, and a loss estimation model. These models are established based on empirical formulas, historical data analysis, and mathematical modeling.

[0046] S1.3. Calculate budget data: Use the established budget model to calculate the materials, time and losses required for batch component processing. These data include but are not limited to: the quantity and type of raw materials required for each component, the time required to process each component, and the expected loss.

[0047] S1.4. Provide preparation information: Provide the calculated budget data to the production line to carry out preparation work, including preparing the required raw materials, adjusting production equipment parameters, and arranging production plans.

[0048] Preferably, the step 2 further comprises the following detailed steps:

[0049] S2.1. Install the production recording unit at an appropriate location on the production line, connect it to the production equipment and record the production data;

[0050] S2.3, connect the production record unit with each key node on the production line to obtain data in the production process in real time;

[0051] S2.4. For each key node, set the data collection parameters, including the type of data to be recorded and the collection frequency;

[0052] S2.5. The production recording unit monitors various data in the production process in real time, records them, and stores them in a database or other data management system;

[0053] S2.6. Transmit the recorded data to the control system for analysis.

[0054] Preferably, the data types in S2.4 include material consumption, processing time and loss.

[0055] Preferably, the other data management systems in S2.5 include a data warehouse, a big data platform, a real-time data processing system, an industrial Internet of Things platform and a production execution system.

[0056] Compared with the prior art, the present invention provides an intelligent quality control system and method for automobile parts processing, which has the following beneficial effects:

[0057] 1. The present invention estimates the materials, time and loss required for parts processing through calculation by the calculation unit. The budget is a model established based on the design drawings, processing parameters, material specifications and other data of the parts, while the production recording unit is responsible for recording the materials, time and loss used in the actual production process. By comparing the budget and actual data, it is timely discovered whether there are production anomalies. The budget data and actual data are compared by the preliminary detection unit and the fault detection unit to determine their consistency. If the data are inconsistent, there are problems in the production process. The fault detection unit further analyzes the fault link to which the inconsistent data belongs, and determines the specific equipment or process link where the abnormality occurs. Once the fault link is determined, the improvement unit will mark the faulty equipment in a targeted manner, and repair or adjust it, thereby achieving the beneficial effect of being able to locate damaged equipment based on unqualified parts.

[0058] 2. Through data comparison between the budget unit and the production record unit, as well as the functions of the preliminary detection unit and the fault detection unit, the present invention enables the system to promptly detect abnormal conditions in the parts production process and accurately locate damaged parts or equipment, which helps to prevent unqualified products from entering the downstream process and ensure the normal operation of the production line. Once damaged parts or equipment are found, the system will quickly trigger the improvement unit for processing. The improvement unit will mark the faulty equipment and perform repairs or adjustments to restore the normal operation of the production line. The ability to quickly respond to and handle abnormal conditions helps to reduce the downtime of the production line and improve production efficiency, achieving the beneficial effect of locating the damaged parts of the production parts and components and being able to handle them in a timely manner to improve production quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 Schematic diagram of the system of the present invention. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] See also Figure 1 , an intelligent quality control system for automobile parts processing, the control system comprising:

[0062] A parts budget unit, which is used to pre-calculate the materials, time and loss required for batch parts processing;

[0063] A production record unit, which is used to access the production line and record the actual production materials, time and loss;

[0064] A preliminary detection unit, which is used to calculate whether the production record unit data is consistent with the component budget unit data, and if the two data are inconsistent, the next procedure is entered;

[0065] A fault detection unit, the fault detection unit is used to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs;

[0066] The improvement unit is used to determine the individual equipment with defective rate in the fault link, mark it, repair the equipment after marking, and put it into production after maintenance.

[0067] The system monitors key data such as materials, time and loss required in the process of parts processing in real time through the budget unit and production record unit, and can capture abnormal situations in the production process in time, so that problems can be discovered and solved at the earliest stage, thereby avoiding further production of defective products and improving production efficiency and product quality. Through the preliminary detection unit, the system can compare the actual production data with the expected budget data to determine the consistency between the two. The fault detection unit can further analyze the fault link to which the inconsistent data fed back by the preliminary detection unit belongs, thereby accurately locating the equipment or process link with the problem.

[0068] Preferably, the component budget unit expression formula is:

[0069] T is the processing time, H is the loss, and B is the processing batch;

[0070] [M=f(B,M R )]

[0071] [T=g(B,E)]

[0072] [H=h(B,M P ,P)]

[0073] M R For parts and components material requirements;

[0074] E is the efficiency of production equipment;

[0075] M P is the material property;

[0076] P is the production process.

[0077] In the formula [M=f(B,MR )] is used to estimate the amount of material M required in the processing of parts, by processing batch B and the material demand M of the parts R The system estimates the amount of materials required for each batch of processing, thereby helping companies to rationally arrange material procurement and inventory management, and avoid production interruptions or waste of resources due to insufficient or excessive materials.

[0078] Preferably, the preliminary detection unit expression formula is:

[0079] P i Budget unit data for parts;

[0080] R i Production record unit data;

[0081] nThe number of data items;

[0082] C i is the consistency judgment of the i-th data item;

[0083] C i ={cases}1,&P i =R i \0,&P i ≠R i {cases}.

[0084] Preferably, the logic for defining the consistency judgment C of the overall data as the consistency judgment of all data items is:

[0085]

[0086] If the consistency judgment of all data items is C i If both are 1, then C is 1, indicating that the data are consistent;

[0087] Otherwise, C is 0, indicating that the data is inconsistent.

[0088] Preferably, the formula for entering the next program is:

[0089] [D={cases}1,&C=0\0,&C=1{cases}]

[0090] Where D is the sign for entering the next program.

[0091] An intelligent quality control method for automobile parts processing includes the following steps:

[0092] Step 1: Pre-calculate the materials, time and loss required for batch parts processing, and use the budget data to provide the necessary preparation information for the production line;

[0093] Step 2: Connect the production record unit to the production line to record the materials, time and loss used in actual production;

[0094] Step 3: Using the preliminary inspection unit to calculate whether the production record unit data is consistent with the component budget unit data;

[0095] Step 4: If the preliminary inspection unit detects that the two data are consistent, then all parts in this batch meet the standards. If the two data are inconsistent, then enter the next procedure for processing;

[0096] Step 5: Use the fault detection unit to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs, analyze the problem and determine the cause of the fault, and accurately locate the fault link;

[0097] Step 6: Identify the individual equipment that produces defective rates in the faulty link, mark the faulty equipment, repair or adjust it after marking, maintain and test the equipment after the repair is completed to ensure its normal operation, put it into production after the repair is completed, and restore the normal operation of the production line.

[0098] Preferably, the step 1 further comprises the following detailed steps:

[0099] S1.1. Collect relevant data: It is necessary to collect data related to parts processing, including parts design drawings, processing parameters, material specifications, and processing equipment performance parameters.

[0100] S1.2. Establish a budget model: Based on the collected data, a budget model is established. The budget model includes a material consumption model, a processing time model, and a loss estimation model. These models are established based on empirical formulas, historical data analysis, and mathematical modeling.

[0101] S1.3. Calculate budget data: Use the established budget model to calculate the materials, time and losses required for batch component processing. These data include but are not limited to: the quantity and type of raw materials required for each component, the time required to process each component, and the expected loss.

[0102] S1.4. Provide preparation information: Provide the calculated budget data to the production line to carry out preparation work, including preparing the required raw materials, adjusting production equipment parameters, and arranging production plans.

[0103] Preferably, the step 2 further comprises the following detailed steps:

[0104] S2.1. Install the production recording unit at an appropriate location on the production line, connect it to the production equipment and record the production data;

[0105] S2.3, connect the production record unit with each key node on the production line to obtain data in the production process in real time;

[0106] S2.4. For each key node, set the data collection parameters, including the type of data to be recorded and the collection frequency;

[0107] S2.5. The production recording unit monitors various data in the production process in real time, records them, and stores them in a database or other data management system;

[0108] S2.6. Transmit the recorded data to the control system for analysis.

[0109] Preferably, the data types in S2.4 include material consumption, processing time and loss.

[0110] Preferably, the other data management systems in S2.5 include a data warehouse, a big data platform, a real-time data processing system, an industrial Internet of Things platform and a production execution system.

[0111] When in use,.

[0112] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations may be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. An intelligent quality control system for automobile parts processing, characterized by: The control system comprises: A parts budget unit, which is used to pre-calculate the materials, time and loss required for batch parts processing; A production record unit, which is used to access the production line and record the actual production materials, time and loss; A preliminary detection unit, which is used to calculate whether the production record unit data is consistent with the component budget unit data, and if the two data are inconsistent, the next procedure is entered; A fault detection unit, the fault detection unit is used to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs; The improvement unit is used to determine the individual equipment with defective rate in the fault link, mark it, repair the equipment after marking, and put it into production after maintenance.

2. The intelligent quality control system for automobile parts processing according to claim 1 is characterized in that: The component budget unit expression formula is: T is the processing time, H is the loss, and B is the processing batch; [M=f(B,M R )] [T = g(B, E)] [H=h(B,M P ,P)] M R For parts and components material requirements; E is the efficiency of production equipment; M P is the material property; P is the production process.

3. The intelligent quality control system for automobile parts processing according to claim 1 is characterized in that: The expression formula of the preliminary detection unit is: P i Budget unit data for parts; R i Production record unit data; nThe number of data items; C i is the consistency judgment of the i-th data item; C i ={cases}1,&P i =R i \0,&P i ≠R i {cases}。 4. The intelligent quality control system for automobile parts processing according to claim 3 is characterized by: The logic of defining the consistency judgment C of the overall data as the consistency judgment of all data items is: If the consistency judgment of all data items is C i If both are 1, then C is 1, indicating that the data are consistent; Otherwise, C is 0, indicating that the data is inconsistent.

5. The intelligent quality control system for automobile parts processing according to claim 4 is characterized in that: The formula for entering the next program is: [D={cases}1,&C=0\0,&C=1{cases}] Where D is the sign for entering the next program.

6. An intelligent quality control method for automobile parts processing, characterized in that: The following steps are involved: Step 1: Pre-calculate the materials, time and loss required for batch parts processing, and use the budget data to provide the necessary preparation information for the production line; Step 2: Connect the production record unit to the production line to record the materials, time and loss used in actual production; Step 3: Using the preliminary inspection unit to calculate whether the production record unit data is consistent with the component budget unit data; Step 4: If the preliminary inspection unit detects that the two data are consistent, then all parts in this batch meet the standards. If the two data are inconsistent, then enter the next procedure for processing; Step 5: Use the fault detection unit to detect the fault link to which the substandard data fed back by the preliminary detection unit belongs, analyze the problem and determine the cause of the fault, and accurately locate the fault link; Step 6: Identify the individual equipment that produces defective rates in the faulty link, mark the faulty equipment, repair or adjust it after marking, maintain and test the equipment after the repair is completed to ensure its normal operation, put it into production after the repair is completed, and restore the normal operation of the production line.

7. The intelligent quality control method for automobile parts processing according to claim 5 is characterized in that: The step 1 also includes the following detailed steps: S1.

1. Collect relevant data: It is necessary to collect data related to parts processing, including parts design drawings, processing parameters, material specifications, and processing equipment performance parameters. S1.

2. Establish a budget model: Based on the collected data, a budget model is established. The budget model includes a material consumption model, a processing time model, and a loss estimation model. These models are established based on empirical formulas, historical data analysis, and mathematical modeling. S1.

3. Calculate budget data: Use the established budget model to calculate the materials, time and losses required for batch component processing. These data include but are not limited to: the quantity and type of raw materials required for each component, the time required to process each component, and the expected loss. S1.

4. Provide preparation information: Provide the calculated budget data to the production line to carry out preparation work, including preparing the required raw materials, adjusting production equipment parameters, and arranging production plans.

8. The intelligent quality control method for automobile parts processing according to claim 5 is characterized in that: The step 2 also includes the following detailed steps: S2.

1. Install the production recording unit at an appropriate location on the production line, connect it to the production equipment and record the production data; S2.

3. Connect the production recording unit to each key node on the production line to obtain data in the production process in real time; S2.

4. For each key node, set the data collection parameters, including the type of data to be recorded and the collection frequency; S2.

5. The production recording unit monitors various data in the production process in real time, records them, and stores them in a database or other data management system; S2.

6. Transmit the recorded data to the control system for analysis.

9. The intelligent quality control method for automobile parts processing according to claim 8 is characterized in that: The data types in S2.4 include material consumption, processing time and loss.

10. The intelligent quality control method for automobile parts processing according to claim 8, characterized in that: The other data management systems in S2.5 include data warehouse, big data platform, real-time data processing system, industrial Internet of Things platform and production execution system.

Citation Information

Cited By

  • Card production monitoring system and method based on Internet of Things

    CN120297783A