Checking method for telecontrol configuration of transformer substation, computer program product and electronic equipment
By converting the SCD file under the IEC61850 communication standard to the files under the IEC60870-5-104 communication standard and comparing and verifying it, the inefficiency problem caused by manual point-to-point work in the remote-motion point-to-point work of the intelligent substation is solved, and the inefficiency problem is achieved. Efficient and accurate point-to-point debugging reduces costs.
Patent Information
- Application Number
- CN202411025004.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-12
AI Technical Summary
In the remote-to-point work of intelligent substations, the existing technology mainly adopts manual-to-point approach, which leads to low debugging efficiency and prone to errors, lack of effective debugging tools, resulting in large manpower and material consumption.
By receiving the SCD file under the IEC61850 communication standard, convert it into the file under the IEC60870-5-104 communication standard according to the preset mapping rules, and send the target SCD file to the main station and the monitoring background to generate record files for comparison and calibration Verify that the monitoring background and remote device are correct in point, and avoid manual one-to-point operation.
It improves point-to-point debugging efficiency, reduces debugging costs, does not require the installation of communication specification converters, ensuring the accuracy and efficiency of point-to-point debugging.
Smart Images

Figure CN118941241A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of substations, and in particular to a verification method for substation telecontrol configuration, a computer-readable storage medium, a computer program product, and an electronic device. Background Art
[0002] The development of smart grid benefits from the accurate operation information of all substation equipment obtained by the power dispatching center. Therefore, it is necessary to ensure that the telecontrol communication equipment can accurately and real-time upload the operation data of the substation before it is put into operation. Therefore, before the substation is put into operation, it is necessary to check whether the operation information received by the remote dispatching center is consistent with the information actually sent in the station. This is called substation telecontrol point-to-point.
[0003] Smart grid consists of many modules, among which the smart digital substation plays an important role and plays a very critical role. It provides intelligent remote dispatch information. The dispatch center receives relevant operation information of the substation through the measurement and control equipment and telecontrol equipment of the substation, and performs remote control operations according to the operation of the power grid to ensure the safe operation of the power grid. Relying on telecontrol to ensure the consistency of information at both ends is a necessary step in the acceptance of smart substations.
[0004] At present, there are few studies on the remote point-to-point work of smart substations in China, and most of them still use manual point-to-point method, that is, manually check the dispatching master station table information with the actual substation information one by one. The point-to-point debugging achieved in this way requires a lot of manpower and material resources and is prone to errors due to the lack of effective debugging tools. Summary of the invention
[0005] The main purpose of the present application is to provide a verification method for substation telecontrol configuration, a computer-readable storage medium, a computer program product and an electronic device, so as to at least solve the problem that in the prior art, most of the telecontrol point-to-point work of smart substations is done manually, resulting in low debugging efficiency.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a verification method for substation telecontrol configuration is provided, the substation includes a primary device, and the method includes: receiving an SCD file under the IEC (International Electrotechnical Commission) 61850 communication standard, the SCD (Substation Configuration Descripition) file representing the operating data of the primary device; according to a preset mapping rule, converting the SCD file into a file under the IEC60870-5-104 communication standard to obtain a target SCD file; sending the target SCD file to a master station through a telecontrol device to generate a first record file at the master station; sending the target SCD file to a monitoring background to generate a second record file at the monitoring background; at least inputting the first record file and the second record file into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report; according to the verification report, determining whether the monitoring background and the telecontrol device are correctly aligned.
[0007] Optionally, the preset mapping rules include a first mapping rule, and according to the preset mapping rule, the SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain a target SCD file, including: at least according to the first mapping rule, the SCD file is converted to obtain the target SCD file, and the first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard.
[0008] Optionally, the preset mapping rules also include a second mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first mapping rule and the second mapping rule, the SCD file is converted, and the second mapping rule is: mapping the ACSI (Advanced Communication Service Interface) service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard.
[0009] Optionally, the first mapping rule includes a first sub-mapping rule and a second sub-mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first sub-mapping rule and the second sub-mapping rule, the SCD file is converted, the first sub-mapping rule is: mapping the logical device in the IEC61850 communication standard to the application service data unit public address in the IEC60870-5-104 communication standard, and the second sub-mapping rule is: mapping the logical node in the IEC61850 communication standard to the information body address in the IEC60870-5-104 communication standard.
[0010] Optionally, at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, including: generating a third record file according to the SCD file; inputting the first record file, the second record file and the third record file into the offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain the verification report.
[0011] Optionally, receiving an SCD file under the IEC61850 communication standard includes: receiving an initial SCD file, where the initial SCD file is a file representing information and configuration of the substation; and parsing the initial SCD file to obtain the SCD file.
[0012] Optionally, determining whether the monitoring backend and the remote control device are correctly aligned based on the verification report includes: when the verification report indicates that the similarity between the first record file and the second record file is greater than a preset threshold, determining that the monitoring backend and the remote control device are correctly aligned.
[0013] According to another aspect of the present application, a computer-readable storage medium is provided, the computer-readable storage medium including a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the methods for verifying the telecontrol configuration of a substation.
[0014] According to another aspect of the present application, there is provided a computer program product, comprising computer instructions, which, when executed by a processor, implement any one of the methods for verifying the telecontrol configuration of a substation.
[0015] According to another aspect of the present application, an electronic device is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a verification method for executing any one of the substation telecontrol configurations.
[0016] By applying the technical solution of the present application, an SCD file representing the operating data of a primary device under the IEC61850 communication standard is first received, and then the SCD file is converted into a file under the IEC60870-5-104 communication standard according to a preset mapping rule to obtain a target SCD file, and the target SCD file is sent to a master station and a monitoring background respectively to generate a first record file and a second record file at the master station and the monitoring background respectively, and at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, and finally, according to the verification report, it is determined whether the monitoring background and the remote control device are correctly aligned. Compared with the problem of low debugging efficiency in the prior art that most remote point-to-point work of smart substations is done manually, this application converts the SCD file under the IEC61850 communication standard into a file under the IEC60870-5-104 communication standard according to a preset mapping rule, and sends the target SCD file to the master station and the monitoring background respectively, so as to generate a first record file and a second record file at the master station and the monitoring background respectively, and then input the first record file and the second record file into the offline processing tool for comparison and verification, and no longer needs manual one-to-one point-to-point, thereby ensuring high point-to-point debugging efficiency. In addition, there is no need to install a communication protocol converter to convert files under the IEC61850 communication standard into files under the IEC60870-5-104 communication standard, thereby ensuring low debugging costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1 A hardware structure block diagram of a mobile terminal for executing a verification method for substation telecontrol configuration provided in an embodiment of the present application is shown;
[0019] Figure 2 A schematic flow chart of a method for verifying a substation telecontrol configuration according to an embodiment of the present application is shown;
[0020] Figure 3A structural block diagram of a method for verifying a substation telecontrol configuration provided according to an embodiment of the present application is shown;
[0021] Figure 4 A structural block diagram of a communication gateway configuration tool information flow provided according to an embodiment of the present application is shown;
[0022] Figure 5 A schematic diagram of a mapping rule between IEC60870-5-104 and IEC61850 protocols provided according to an embodiment of the present application is shown.
[0023] The above drawings include the following reference numerals:
[0024] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] As introduced in the background technology, in the prior art, most of the remote control point-to-point work of smart substations is done manually, resulting in low debugging efficiency. To solve the above problem, the embodiments of the present application provide a verification method for substation remote control configuration, a computer-readable storage medium, a computer program product and an electronic device.
[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0030] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 FIG. 1 is a hardware structure block diagram of a mobile terminal of a method for verifying a substation telecontrol configuration according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.
[0031] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the verification method of the substation telecontrol configuration in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal through a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0032] In this embodiment, a method for verifying the telecontrol configuration of a substation running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0033] Figure 2 1 is a flow chart of a verification method for a substation telecontrol configuration according to an embodiment of the present application. The substation includes a primary device, such as Figure 2 As shown, the method comprises the following steps:
[0034] Step S201, receiving an SCD file under the IEC61850 communication standard, wherein the SCD file represents the operation data of the primary equipment;
[0035] Specifically, the SCD file can be collected by using a substation measurement and control device, and the SCD file includes information required by a MMS (Measurement and Monitoring System) point to point.
[0036] Step S202, converting the SCD file into a file under the IEC60870-5-104 communication standard according to a preset mapping rule to obtain a target SCD file;
[0037] Step S203, sending the target SCD file to the master station via the telecontrol device to generate a first record file at the master station;
[0038] Specifically, the telecontrol device is a telecontrol communication device.
[0039] Step S204, sending the target SCD file to the monitoring background to generate a second record file in the monitoring background;
[0040] Step S205, at least inputting the first record file and the second record file into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report;
[0041] Specifically, the above-mentioned offline processing tool is a multi-data source offline processing tool.
[0042] Step S206, based on the verification report, determine whether the monitoring background and the remote control device are correctly aligned.
[0043] Through the above embodiment, the SCD file representing the operation data of the primary equipment under the IEC61850 communication standard is first received, and then the SCD file is converted into a file under the IEC60870-5-104 communication standard according to the preset mapping rule to obtain the target SCD file, and the target SCD file is sent to the main station and the monitoring background respectively, so as to generate the first record file and the second record file at the main station and the monitoring background respectively, at least the first record file and the second record file are input into the offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, and finally, according to the verification report, it is determined whether the monitoring background and the remote control device are correctly aligned. Compared with the problem of low debugging efficiency in the prior art that most remote point-to-point work of smart substations is done manually, this application converts the SCD file under the IEC61850 communication standard into a file under the IEC60870-5-104 communication standard according to a preset mapping rule, and sends the target SCD file to the master station and the monitoring background respectively, so as to generate a first record file and a second record file at the master station and the monitoring background respectively, and then input the first record file and the second record file into the offline processing tool for comparison and verification, and no longer needs manual one-to-one point-to-point, thereby ensuring high point-to-point debugging efficiency. In addition, there is no need to install a communication protocol converter to convert files under the IEC61850 communication standard into files under the IEC60870-5-104 communication standard, thereby ensuring low debugging costs.
[0044] Specifically, Figure 3 As shown, the control subject of the present application is an IED (Intelligent Electronic Device) simulation tool.
[0045] Specifically, Figure 3 As shown, the first record file, the second record file and the control information table can be input together into an offline processing tool for comparison and verification, wherein the control information table represents the control status information of a primary device.
[0046] In an optional solution, the preset mapping rule includes a first mapping rule, and according to the preset mapping rule, the SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain a target SCD file, including: at least according to the first mapping rule, the SCD file is converted to obtain the target SCD file, and the first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard. In this embodiment, the SCD file is converted to ensure high conversion efficiency and accuracy between the two communication standards, and ensure that the target SCD file obtained is relatively accurate.
[0047] In other embodiments, the preset mapping rule further includes a second mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first mapping rule and the second mapping rule, the SCD file is converted, and the second mapping rule is: mapping the ACSI service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard. In this embodiment, the SCD file is converted according to the first mapping rule and the second mapping rule, which further ensures that the conversion efficiency and accuracy between the two communication standards are high, and further ensures that the obtained target SCD file is more accurate.
[0048] Specifically, the IED simulation tool must not only parse the SCD file to obtain the IEC61850 protocol point table, but also simulate the master station to receive the IEC104 protocol point table information. Therefore, the IED simulation tool contains a protocol conversion module, so it is necessary to establish a mapping relationship between IEC61850 and IEC60870-5-104. IEC61850 is an object-oriented data structure. It separates the communication technology protocol according to its standard and implements the specification of information semantics by decomposing the function into an information model of standard modules. The IEC60870-5-104 communication standard not only includes communication constraints but also statements for information transmission. The 104 communication protocol is not a complete communication standard. Therefore, there is a big difference between the IEC60870-5-104 and IEC61850 standards. This is a mapping between two standards of different systems.
[0049] Specifically, due to the protocol rules of IEC60870-5-104, the TCP (Transmission Control Protocol) / IP (Internet Protocol) standard must be followed when receiving information. MFC (Microsoft Foundation Class) uses CSocket to package the TCP / IP protocol to protect the TCP / IP protocol transmission information from being destroyed. In operation, the communication function of Ethernet communication can be realized by using CSocket. At the beginning of the communication transmission, the CSocket library is initialized first, and the connection is created by calling the Create() function; after the connection is created, the information transmission path is monitored by the Listen() function; if no request is detected, the program will be interrupted; if a relevant request is detected, the Accept() function is called immediately to connect. After the connection is successfully connected, the program can automatically call the OnReceive() function to parse the received message, that is, start parsing.
[0050] Specifically, the IEC61850 model is divided into the ACSI service model and the information model. The mapping includes two parts: 1. The general data class of the IEC61850 standard is mapped to the application service data unit of IEC60870-5-104; 2. The ACSI service model of the IEC61850 standard has been mapped to the IEC60870-5-104 service.
[0051] In some other optional schemes, the first mapping rule includes a first sub-mapping rule and a second sub-mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first sub-mapping rule and the second sub-mapping rule, the SCD file is converted, the first sub-mapping rule is: mapping the logical device in the IEC61850 communication standard to the public address of the application service data unit in the IEC60870-5-104 communication standard, and the second sub-mapping rule is: mapping the logical node in the IEC61850 communication standard to the information body address in the IEC60870-5-104 communication standard. In this embodiment, the SCD file is converted according to the more specific first sub-mapping rule and the second sub-mapping rule, which further ensures that the conversion efficiency and accuracy between the two communication standards are high, and further ensures that the obtained target SCD file is more accurate.
[0052] In some further optional solutions, at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, including: Figure 3As shown, according to the SCD file, a third record file is generated; the first record file, the second record file and the third record file are input into the offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain the verification report. In this embodiment, the third record file is generated according to the SCD file, and the first record file, the second record file and the third record file are input into the offline processing tool to compare and verify, which further ensures that the obtained verification report is more accurate, and further ensures that the alignment of the telecontrol configuration is more accurate.
[0053] Specifically, a third record file is generated in the IED simulation tool.
[0054] In some other exemplary embodiments, receiving an SCD file under the IEC61850 communication standard includes: receiving an initial SCD file, the initial SCD file being a file representing information and configuration of the substation; parsing the initial SCD file to obtain the SCD file. In this embodiment, the initial SCD file is parsed to obtain the SCD file, which ensures that the information in the SCD file is valid information, and prepares for subsequent point-to-point.
[0055] Specifically, the IED simulation tool needs to perform protocol conversion between IEC61850 and IEC60870-5-104, so that it can receive the message information fed back by the remote control device and play the role of simulating the master station. Therefore, the IED device simulation tool must be able to send IEC61850 protocol information and receive IEC60870-5-104 protocol information sent by the remote control device. IEC61850 is object-oriented modeling, and IEC60870-5-104 is a point-oriented protocol. In order to enable the two to communicate with each other, this application realizes the conversion between protocols by designing a communication gateway. The communication gateway contains four modules, and its structure is as follows: Figure 4 As shown: the protocol conversion module can parse the initial SCD file to obtain the relevant message information under the IEC61850 protocol to obtain the remote signal value, obtain the SCD file, and then write this information into the IEC61850 real-time library according to the corresponding mapping rules, thereby realizing the protocol conversion. At the same time, the protocol conversion module can also convert the message information under the IEC61850 protocol into the ASDU (Application Service Data Unit) format information or control information under the IEC60870-5-104 protocol.
[0056] Specifically, the modeling methods of IEC60870-5-104 and IEC 61850 are different. In order to achieve the conversion between the two, it is necessary to establish the conversion of the information expression mode between the two. IEC61850-80-1 stipulates that the application service unit public address (CASDU, Controlled Access Specific Data Unit) and information body address (IOA, Indexed Object Address) in the 104 protocol are mapped to the data model in IEC61850, and the CDC (Communication Data Code) in the IEC61850 protocol accommodates some functions specified in the 104 protocol. The information features included in the 104 protocol include CASDU and IOA. The two-point telesignaling includes QDS (Quality of Service Data Standards) and cp56time2a (Control and Protection Unit56Time Delay 2A) time stamp. By parsing this information, it is mapped one by one in the IEC61850 data model, among which LD (Logical Device) and CASDU are mapped correspondingly, and LN (Logical Node) and IOA are mapped correspondingly.
[0057] Specifically, in order to avoid confusion and non-standard mapping problems, Chapter 7 of the IEC61850-80-1 communication protocol makes detailed mapping provisions and establishes the mapping relationship between data addresses and logical node data attributes. Figure 5 shown.
[0058] Specifically, the specific mapping method from IEC60870-5-104 to IEC61850 is as follows: (1) According to Figure 5Establish service mapping rules and establish mapping relationships between different data models; (2) The telesignaling information established in IEC60870-5-104 should correspond to the telesignaling information established in IEC61850 object-oriented. For example, the protection device, accident alarm, measurement value and switch open and closed positions of 104 protocol correspond to IEC61850's PDIF (Power Distribution Interface Device), PDIS (Power Distribution Information System), PDIR (Power Distribution Inspection Robot), GGIO (GridGuard Interface Organization), MMXU-MV-instMag-i / f (Measurement of Magnitude of Instantaneous Current in Medium Voltage Systems), and CSWI-pos-stval (Current Switch Position StatusValue); (3) Use the CID (Circuit ID) generated by the IED configuration tool to generate the Identification, circuit identification) file, the point information represented by 104 protocol in the file library corresponds to the information of logical nodes in IEC61850, to form a mapping relationship, according to which the data information under 104 protocol can be converted into data attributes with logical nodes.
[0059] In other embodiments, determining whether the monitoring background and the telecontrol device are correctly aligned according to the verification report includes: determining that the monitoring background and the telecontrol device are correctly aligned when the verification report indicates that the similarity between the first record file and the second record file is greater than a preset threshold. In this embodiment, when the similarity is greater than the preset threshold, it is determined that the monitoring background and the telecontrol device are correctly aligned, further ensuring that the alignment of the substation telecontrol configuration is relatively accurate.
[0060] In actual application, technicians in this field can set the above preset thresholds based on empirical values, or obtain them through multiple experiments, and this application does not impose any specific restrictions on this.
[0061] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the substation telecontrol configuration verification method of the present application will be described in detail below in conjunction with specific embodiments.
[0062] This embodiment relates to a specific method for verifying substation telecontrol configuration, including the following steps:
[0063] Step S1: receiving an SCD file under the IEC61850 communication standard, where the SCD file represents the operation data of a primary device;
[0064] Step S2: According to the first mapping rule and the second mapping rule, the SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain a target SCD file, wherein the first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard, and the second mapping rule is: mapping the ACSI service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard;
[0065] Step S3: sending the target SCD file to the master station through the telecontrol device to generate a first record file at the master station, and sending the target SCD file to the monitoring background to generate a second record file at the monitoring background;
[0066] Step S4: Generate a third record file according to the SCD file;
[0067] Step S5: inputting the first record file, the second record file and the third record file into an offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain a verification report;
[0068] Step S6: According to the verification report, determine whether the monitoring background and the remote control device are correctly aligned.
[0069] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0070] An embodiment of the present invention provides a computer-readable storage medium, the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the verification method of the substation telecontrol configuration. The substation includes a primary device.
[0071] Specifically, the verification method of substation telecontrol configuration includes:
[0072] Step S201, receiving an SCD file under the IEC61850 communication standard, wherein the SCD file represents the operation data of the primary equipment;
[0073] Specifically, the SCD file can be collected by using a substation measurement and control device, and the SCD file includes information required by a MMS (Measurement and Monitoring System) point to point.
[0074] Step S202, converting the SCD file into a file under the IEC60870-5-104 communication standard according to a preset mapping rule to obtain a target SCD file;
[0075] Step S203, sending the target SCD file to the master station via the telecontrol device to generate a first record file at the master station;
[0076] Specifically, the telecontrol device is a telecontrol communication device.
[0077] Step S204, sending the target SCD file to the monitoring background to generate a second record file in the monitoring background;
[0078] Step S205, at least inputting the first record file and the second record file into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report;
[0079] Specifically, the above-mentioned offline processing tool is a multi-data source offline processing tool.
[0080] Step S206, based on the verification report, determine whether the monitoring background and the remote control device are correctly aligned.
[0081] Optionally, the above-mentioned preset mapping rules include a first mapping rule. According to the preset mapping rule, the above-mentioned SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain the target SCD file, including: at least according to the above-mentioned first mapping rule, the above-mentioned SCD file is converted to obtain the above-mentioned target SCD file, and the above-mentioned first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard.
[0082] Optionally, the above-mentioned preset mapping rules also include a second mapping rule, and the above-mentioned SCD file is converted at least according to the above-mentioned first mapping rule, including: according to the above-mentioned first mapping rule and the above-mentioned second mapping rule, the above-mentioned SCD file is converted according to the protocol, and the above-mentioned second mapping rule is: mapping the ACSI service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard.
[0083] Optionally, the first mapping rule includes a first sub-mapping rule and a second sub-mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first sub-mapping rule and the second sub-mapping rule, the SCD file is converted, the first sub-mapping rule is: mapping the logical device in the IEC61850 communication standard to the application service data unit public address in the IEC60870-5-104 communication standard, and the second sub-mapping rule is: mapping the logical node in the IEC61850 communication standard to the information body address in the IEC60870-5-104 communication standard.
[0084] Optionally, at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, including: generating a third record file according to the SCD file; inputting the first record file, the second record file and the third record file into the offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain the verification report.
[0085] Optionally, receiving an SCD file under the IEC61850 communication standard includes: receiving an initial SCD file, where the initial SCD file is a file representing information and configuration of the substation; and parsing the initial SCD file to obtain the SCD file.
[0086] Optionally, based on the verification report, determining whether the monitoring backend and the remote control device are correctly aligned includes: when the verification report indicates that the similarity between the first record file and the second record file is greater than a preset threshold, determining that the monitoring backend and the remote control device are correctly aligned.
[0087] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement at least the following method steps: step S201, receiving an SCD file under the IEC61850 communication standard, wherein the SCD file represents the operating data of the primary device; step S202, converting the SCD file into a file under the IEC60870-5-104 communication standard according to a preset mapping rule to obtain a target SCD file; step S203, sending the target SCD file to a master station through a remote control device to generate a first record file at the master station; step S204, sending the target SCD file to a monitoring background to generate a second record file at the monitoring background; step S205, at least inputting the first record file and the second record file into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report; step S206, determining whether the monitoring background and the remote control device are correctly aligned according to the verification report.
[0088] Optionally, the above-mentioned preset mapping rules include a first mapping rule. According to the preset mapping rule, the above-mentioned SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain the target SCD file, including: at least according to the above-mentioned first mapping rule, the above-mentioned SCD file is converted to obtain the above-mentioned target SCD file, and the above-mentioned first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard.
[0089] Optionally, the above-mentioned preset mapping rules also include a second mapping rule, and the above-mentioned SCD file is converted at least according to the above-mentioned first mapping rule, including: according to the above-mentioned first mapping rule and the above-mentioned second mapping rule, the above-mentioned SCD file is converted according to the protocol, and the above-mentioned second mapping rule is: mapping the ACSI service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard.
[0090] Optionally, the first mapping rule includes a first sub-mapping rule and a second sub-mapping rule, and the SCD file is converted at least according to the first mapping rule, including: according to the first sub-mapping rule and the second sub-mapping rule, the SCD file is converted, the first sub-mapping rule is: mapping the logical device in the IEC61850 communication standard to the application service data unit public address in the IEC60870-5-104 communication standard, and the second sub-mapping rule is: mapping the logical node in the IEC61850 communication standard to the information body address in the IEC60870-5-104 communication standard.
[0091] Optionally, at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, including: generating a third record file according to the SCD file; inputting the first record file, the second record file and the third record file into the offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain the verification report.
[0092] Optionally, receiving an SCD file under the IEC61850 communication standard includes: receiving an initial SCD file, where the initial SCD file is a file representing information and configuration of the substation; and parsing the initial SCD file to obtain the SCD file.
[0093] Optionally, based on the verification report, determining whether the monitoring backend and the remote control device are correctly aligned includes: when the verification report indicates that the similarity between the first record file and the second record file is greater than a preset threshold, determining that the monitoring backend and the remote control device are correctly aligned.
[0094] An embodiment of the present application also provides an electronic device, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a verification method for executing any one of the above-mentioned substation telecontrol configurations.
[0095] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0096] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0097] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0098] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0099] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0100] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0101] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0102] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0103] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0104] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0105] In the verification method of the substation telecontrol configuration of the present application, an SCD file representing the operating data of a primary device under the IEC61850 communication standard is first received, and then the SCD file is converted into a file under the IEC60870-5-104 communication standard according to a preset mapping rule to obtain a target SCD file, and the target SCD file is sent to the master station and the monitoring background respectively to generate a first record file and a second record file at the master station and the monitoring background respectively, at least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, and finally, according to the verification report, it is determined whether the monitoring background and the telecontrol device are correctly aligned. Compared with the problem of low debugging efficiency in the prior art that most remote point-to-point work of smart substations is done manually, this application converts the SCD file under the IEC61850 communication standard into a file under the IEC60870-5-104 communication standard according to a preset mapping rule, and sends the target SCD file to the master station and the monitoring background respectively, so as to generate a first record file and a second record file at the master station and the monitoring background respectively, and then input the first record file and the second record file into the offline processing tool for comparison and verification, and no longer needs manual one-to-one point-to-point, thereby ensuring high point-to-point debugging efficiency. In addition, there is no need to install a communication protocol converter to convert files under the IEC61850 communication standard into files under the IEC60870-5-104 communication standard, thereby ensuring low debugging costs.
[0106] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A verification method for substation telecontrol configuration, It is characterized in that The substation includes a primary device, and the method includes: Receiving an SCD file under the IEC61850 communication standard, wherein the SCD file represents operation data of the primary device; According to a preset mapping rule, the SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain a target SCD file; Sending the target SCD file to a master station via a telecontrol device to generate a first record file at the master station; Sending the target SCD file to a monitoring background to generate a second record file in the monitoring background; Inputting at least the first record file and the second record file into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report; According to the verification report, determine whether the monitoring background and the remote control device are correctly aligned.
2. The verification method of substation telecontrol configuration according to claim 1, It is characterized in that The preset mapping rule includes a first mapping rule. According to the preset mapping rule, the SCD file is converted into a file under the IEC60870-5-104 communication standard to obtain a target SCD file, including: At least according to the first mapping rule, the SCD file is converted to obtain the target SCD file, and the first mapping rule is: mapping the general data class in the IEC61850 communication standard to the application service data unit in the IEC60870-5-104 communication standard.
3. The verification method of substation telecontrol configuration according to claim 2, It is characterized in that The preset mapping rule further includes a second mapping rule, and the SCD file is converted according to at least the first mapping rule, including: The SCD file is converted according to the first mapping rule and the second mapping rule, wherein the second mapping rule is: mapping the ACSI service model in the IEC61850 communication standard to the service in the IEC60870-5-104 communication standard.
4. The verification method of substation telecontrol configuration according to claim 2, It is characterized in that The first mapping rule includes a first sub-mapping rule and a second sub-mapping rule. At least according to the first mapping rule, the SCD file is converted into a protocol, including: The SCD file is converted according to the first sub-mapping rule and the second sub-mapping rule, wherein the first sub-mapping rule is: mapping the logical device in the IEC61850 communication standard to the public address of the application service data unit in the IEC60870-5-104 communication standard, and the second sub-mapping rule is: mapping the logical node in the IEC61850 communication standard to the information body address in the IEC60870-5-104 communication standard.
5. The verification method of substation telecontrol configuration according to claim 1, It is characterized in that At least the first record file and the second record file are input into an offline processing tool to compare and verify the first record file and the second record file to obtain a verification report, including: Generate a third record file according to the SCD file; The first record file, the second record file and the third record file are input into the offline processing tool to compare and verify the first record file, the second record file and the third record file to obtain the verification report.
6. The verification method of substation telecontrol configuration according to claim 1, It is characterized in that Receive SCD files under the IEC61850 communication standard, including: Receiving an initial SCD file, wherein the initial SCD file is a file representing information and configuration of the substation; The initial SCD file is parsed to obtain the SCD file.
7. The verification method of substation telecontrol configuration according to claim 1, It is characterized in that Determining whether the monitoring background and the remote control device are correctly aligned according to the verification report includes: When the verification report indicates that the similarity between the first record file and the second record file is greater than a preset threshold, it is determined that the monitoring background and the remote control device are correctly aligned.
8. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the verification method for the substation telecontrol configuration according to any one of claims 1 to 7.
9. A computer program product comprising computer instructions, It is characterized in that When the computer instructions are executed by a processor, the method for verifying the telecontrol configuration of a substation as described in any one of claims 1 to 7 is implemented.
10. An electronic device, It is characterized in that include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a verification method for executing the substation telecontrol configuration described in any one of claims 1 to 7.