Method and device for measuring and calculating culture requirements of operators of nuclear power plant

By using methods and devices to calculate the training needs of nuclear power plant operators, the problem of insufficient scientific rigor in existing training programs has been solved, enabling accurate demand forecasting and adequate reserve capacity, thus ensuring the rational planning and training needs of nuclear power plant operators.

CN118941420APending Publication Date: 2024-11-12CNNC NUCLEAR POWER OPERATION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310511081.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing training program for nuclear power plant operators lacks scientific rigor, resulting in inaccurate forecasting of operator demand and insufficient reserve of personnel, thus failing to effectively address the shortage of personnel for operator positions.

Method used

This invention provides a method and apparatus for calculating the training needs of nuclear power plant operators. By inputting basic data, it predicts the future number of operators, calculates the number of personnel who need to pass exams and participate in training each year, and corrects the data to achieve accurate prediction of training needs and scientific and appropriate reserve.

Benefits of technology

This has enabled the precision of the operator training program and the calculation of annual personnel gaps, ensuring adequate personnel reserves and improving the scientific nature and effectiveness of nuclear power plant operator training.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941420A_ABST
    Figure CN118941420A_ABST
Patent Text Reader

Abstract

The invention particularly relates to a nuclear power plant operator cultivation demand measuring and calculating method. The method comprises the following steps: inputting basic data; predicting the number of operators at the beginning of the (N + 1) th year; predicting the number of persons who need to pass the operator license application examination in the year, the number of operators at the end of the year and the number of training persons who need to participate in operator selection in the year within the operator training plan duration; predicting a corrected average value of the number of trainers selected by operators needing to participate in the year within the duration of the operator training plan; predicting the number of persons who need to pass the operator to apply for the license examination in the corrected year within the operator training plan duration; and predicting the number of the last operators in the corrected year within the operator cultivation plan duration. The invention further relates to a nuclear power plant operator cultivation demand measuring and calculating device, computer equipment and a storage medium. According to the method, the overall plannability of nuclear power plant operator cultivation, the accuracy of demand early-stage prediction analysis and the scientificity of personnel moderate margin reserve are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power plant operator training demand calculation, and in particular to a nuclear power plant operator training demand calculation method and device. Background Art

[0002] Operators are the core human resources of nuclear power plants, the cornerstone of safe and stable operation of operating units, and the key prerequisite for the commercial operation of new nuclear power projects. With the rapid development of my country's nuclear power industry, the demand for operators is increasing day by day, and the dilution of talent in operator positions is serious. The pre-training plan for operators has become a common issue faced by all nuclear power plants.

[0003] At present, the training plan for nuclear power plant operators is mainly formulated based on factors such as the demand for existing unit operator positions, the number of operators who have applied for licenses on site, and the results of operators' license examinations in previous years. This training model has certain defects in the overall planning of operator training, the scientific nature of early demand forecasting and analysis, and the appropriate reserve of personnel. Summary of the invention

[0004] Based on this, it is necessary to provide a method and device for estimating the demand for nuclear power plant operator training to address the problems in the overall planning of existing nuclear power plant operator training, the preliminary demand forecasting and analysis, and the scientific nature of appropriate margin reserves of personnel, so as to achieve the overall planning of nuclear power plant operator training, the accuracy of preliminary demand forecasting and analysis, and the scientific nature of appropriate margin reserves of personnel.

[0005] In order to solve the above technical problems, the present invention provides a method for calculating the training requirements of nuclear power plant operators, comprising the following steps:

[0006] S101. Enter basic data;

[0007] S102. Predict the number of operators at the beginning of year N+1;

[0008] S103. Forecast the number of personnel who need to pass the operator license examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year;

[0009] S104. Forecast the revised average number of personnel who need to participate in operator selection and training within the operator training plan period;

[0010] S105. Forecast the number of personnel who need to pass the operator license examination in the revised year within the operator training program duration;

[0011] S106. Forecast the number of operators at the end of the year after the revision within the duration of the operator training plan.

[0012] Further, the basic data in step S101 include the number of standard staffing of existing operator positions, the number of existing operators, the number of personnel expected to be newly issued operator licenses in the Nth year, the number of operator training needs for new projects, the duration of operator training plans, the number of personnel transferred from operator positions in the past three years, the number of personnel participating in operator selection and training in the past three years, and the number of personnel who passed the operator license application examination in the past three years; the year in which the operator training demand calculation of the nuclear power plant is carried out is represented by the Nth year, the year before the operator training demand calculation of the nuclear power plant is represented by the N-1th year, the year after the operator training demand calculation of the nuclear power plant is carried out is represented by the N+1th year, and so on; the operator training demand calculation of the nuclear power plant starts from the N+1th year until the set operator training plan duration;

[0013] The existing standard establishment number of operator positions is the standard establishment number of operator positions set by the existing organizational structure of the nuclear power plant when the operator training needs of the nuclear power plant are calculated; the existing number of operators is the number of personnel holding operator licenses when the operator training needs of the nuclear power plant are calculated; the estimated number of newly licensed personnel in the Nth year is the number of personnel who passed the operator license application examination in the N-1th year when the operator training needs of the nuclear power plant were calculated but were not issued an operator license; the number of operator training needs for new projects is the number of operators required for the newly built nuclear power plant; the duration of the operator training plan is the time when the operator training needs of the nuclear power plant are calculated. When estimating the demand for operator training, the duration in years is set according to the time nodes of nuclear power plant operation and new project construction; the number of personnel transferred from operator positions in the past three years is the number of personnel transferred from operator positions in the N-1th year, the N-2nd year and the N-3th year; the number of personnel participating in operator selection and training in the past three years is the number of personnel participating in operator selection and training in the N-1th year, the N-2nd year and the N-3th year; the number of personnel who passed the operator license application examination in the past three years is the number of personnel who passed the operator license application examination in the N-1st year, the N-2nd year and the N-3rd year; operators include operators and senior operators.

[0014] Furthermore, step S102 specifically includes the following steps:

[0015] Step S1021, calculating the average annual pass rate of operators applying for license examinations in the past three years and the average annual number of personnel transferred from operator positions in the past three years;

[0016] Step S1022, predicting the number of people who pass the operator license application test in year N;

[0017] Step S1023, predicting the number of operators that will be reduced due to operators being promoted to senior operators in year N;

[0018] Step S1024: predict the number of operators at the beginning of the N+1th year.

[0019] Further, in step S1021, the annual average pass rate of the operator license application examination in the past three years = (the number of personnel who passed the operator license application examination in the N-1th year + the number of personnel who passed the operator license application examination in the N-2th year + the number of personnel who passed the operator license application examination in the N-3th year) / (the number of personnel who participated in the operator selection and training in the N-1st year + the number of personnel who participated in the operator selection and training in the N-2nd year + the number of personnel who participated in the operator selection and training in the N-3rd year); the annual average number of personnel transferred from operator positions in the past three years = (the number of personnel transferred from operator positions in the N-1st year + the number of personnel transferred from operator positions in the N-2nd year + the number of personnel transferred from operator positions in the N-3rd year) / 3.

[0020] Furthermore, in step S1022, the predicted number of personnel who pass the operator license application test in the Nth year = the number of personnel who participate in the operator selection training in the Nth year * the average annual pass rate of the operator license application test in the past three years.

[0021] Furthermore, in step S1023, the number of operators predicted to be reduced in the Nth year due to operators being promoted to senior operators = the number of persons expected to be newly issued senior operator licenses in the Nth year + the number of persons predicted to pass the senior operator license application examination in the Nth year.

[0022] Further, in step S1024, the predicted number of operators at the beginning of the N+1 year = the number of existing operators + the expected number of personnel with operator licenses to be newly issued in the N year + the predicted number of personnel who passed the operator license in the N year - the average annual number of personnel who have been transferred from operator positions in the past three years - the predicted number of operators who will be reduced in the N year due to the promotion of operators to senior operators; the predicted number of senior operators at the beginning of the N+1 year = the number of existing senior operators + the expected number of personnel with senior operator licenses to be newly issued in the N year + the predicted number of personnel who passed the senior operator license application examination in the N year - the average annual number of personnel who have been transferred from senior operator positions in the past three years.

[0023] Furthermore, step S103 specifically includes the following steps:

[0024] Step S1031, predicting the number of operators required to be trained for new projects within the operator training plan period;

[0025] Step S1032, predicting the number of operators who need to pass the operator license examination each year within the operator training plan and the number of operators at the end of the year;

[0026] Step S1033: predict the number of personnel who need to participate in operator selection and training each year within the duration of the operator training plan.

[0027] Furthermore, step S1031 specifically includes the following steps:

[0028] Step S10311, predicting the annual average number of new project operator training requirements within the operator training plan duration;

[0029] Step S10312, predicting the number of operators required to be trained for new projects within the operator training plan period;

[0030] The annual training demand for new project operators within the operator training plan includes the training demand for new project operators in the N+i year;

[0031] The number of new project operators required for training in the N+i year = i*the average annual number of new project operators required for training within the operator training plan duration;

[0032] The annual average number of new project operators required to be trained within the operator training program = the number of new project operators required to be trained / the operator training program duration;

[0033] i=1,2,...,E-1,E.

[0034] Further, in step S1032, the number of personnel who need to pass the operator license application examination in the operator training program includes the number of personnel who need to pass the operator license application examination in the N+i year, and the number of operators at the end of the year in the operator training program includes the number of operators at the end of the N+i year;

[0035] Step S1032 specifically includes the following steps: traversing and predicting the number of operator vacancies in the N+i year, the number of personnel who need to pass the operator license examination in the N+i year, and the number of operators at the end of the N+i year in order of year;

[0036] Senior operators can replace operators. The number of operators who need to pass the operator license examination in the N+i year is determined based on the number of operator vacancies in the N+i year and the total number of operator vacancies in the N+i year.

[0037] The number of operator vacancies in the N+i year = the number of operators at the beginning of the N+i year - the number of standard staffing for existing operator positions - the number of operator training needs for the N+i new project - the average number of personnel transferred from operator positions in the past three years. The total number of operator vacancies in the N+i year = the number of operator vacancies in the N+i year + the number of senior operator vacancies in the N+i year; the number of operators at the end of the N+1 year is based on the number of operators who have passed the operator examination. The number of operators at the beginning of the N+j year = the number of operators at the end of the N+j-1 year;

[0038] If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≤0, and the total number of operator vacancies in the N+i year is ≤0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year;

[0039] If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≥0, and the total number of operator vacancies in the N+i year is ≤0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is = 0;

[0040] If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≥0, and the total number of operator vacancies in the N+i year is ≥0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be 0, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be 0;

[0041] If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≤ 0, and the total number of operator vacancies in the N+i year is ≥ 0, then the number of personnel who need to pass the operator license application examination in the N+i year is determined to be 0, and the number of personnel who need to pass the senior operator license application examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year;

[0042] If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≤ 0, and the total number of operator vacancies in the N+i year is ≤ 0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year;

[0043] If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≥ 0, and the total number of operator vacancies in the N+i year is ≥ 0, then the number of personnel who need to pass the operator license examination in the N+i year is 0, and the number of personnel who need to pass the senior operator license examination in the N+i year is 0;

[0044] The number of operators at the end of the N+i year = the predicted number of operators at the beginning of the N+i year + the number of personnel who need to pass the operator license examination in the N+i year - the average number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the N+i year;

[0045] The number of senior operators at the end of the N+i year = the predicted number of senior operators at the beginning of the N+i year + the number of personnel who need to pass the senior operator license examination in the N+i year - the average number of personnel transferred from the senior operator position in the past three years;

[0046] i=1,2,…,E-1,E; j=2,3,…,E-1,E.

[0047] Further, in step S1033, the number of personnel who need to participate in the selection and training of operators in the operator training plan period includes the number of personnel who need to participate in the selection and training of operators in the N+kth year;

[0048] The number of personnel who need to participate in operator selection training in the N+k year = the number of personnel who need to pass the operator license examination in the N+k+1 year / the average annual pass rate of the operator license examination in the past three years;

[0049] k=0,1,2,……,E-1.

[0050] Furthermore, step S104 specifically includes the following steps:

[0051] Step S1041, predicting the number of personnel who need to participate in operator selection and training within the operator training plan duration;

[0052] Step S1042, the number of personnel who need to participate in operator selection and training within the operator training plan duration is evenly distributed to each year according to the operator training plan duration, and a corrected average number of personnel who need to participate in operator selection and training within the operator training plan duration is obtained;

[0053] The number of personnel who need to participate in the operator selection and training during the operator training plan is the sum of the number of personnel who need to participate in the operator selection and training in each year during the operator training plan;

[0054] The revised average number of personnel who need to participate in operator selection and training within the duration of the operator training program = number of personnel who need to participate in operator selection and training within the duration of the operator training program / duration of the operator training program.

[0055] Further, in step S105, the number of personnel who need to pass the operator license application examination in the revised annual period within the operator training plan = the number of personnel who need to participate in operator selection and training in the revised annual period within the operator training plan * the average annual pass rate of the operator license application examination in the past three years.

[0056] Further, in step S106, the number of operators at the end of the year after correction within the operator training plan duration includes the number of operators at the end of the N+ith year after correction;

[0057] Step S106 specifically includes the following steps:

[0058] Step S1061, according to the revised number of personnel who need to pass the operator license application test in the N+1 year, the number of operators at the end of the N+1 year is revised to obtain the revised number of operators at the end of the N+1 year;

[0059] Step S1062, correcting the number of operators at the end of the N+jth year according to the corrected number of operators at the end of the N+1th year, to obtain the corrected number of operators at the end of the N+jth year;

[0060] The number of operators at the end of the N+i year after correction = the number of operators at the beginning of the N+i year + the number of personnel who need to pass the operator license examination in the revised year within the operator training plan - the average number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan;

[0061] The number of senior operators at the end of the revised N+i year = the number of senior operators at the beginning of the N+i year + the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan - the average number of personnel transferred from the senior operator position in the past three years;

[0062] The number of operators at the beginning of the revised year N+j = the number of operators at the end of the revised year N+j-1;

[0063] i=1, 2, 3,..., E-1, E; j=2, 3,..., E-1, E.

[0064] In order to solve the above technical problems, the present invention provides a device for calculating the training requirements of nuclear power plant operators, comprising:

[0065] An input module 201 is used to input basic data;

[0066] The first prediction module 202 is used to predict the number of operators at the beginning of the N+1 year;

[0067] The second prediction module 203 is used to predict the number of personnel who need to pass the operator license application examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year;

[0068] The first correction module 204 is used to predict the corrected average number of operators who need to participate in operator selection and training within the operator training plan period;

[0069] The second correction module 205 is used to predict the number of personnel who need to pass the operator license application examination in the revised year within the operator training plan duration;

[0070] The third correction module 206 is used to predict the number of operators at the end of the year after the correction within the operator training plan duration;

[0071] The input module 201 , the first prediction module 202 , the second prediction module 203 , the first correction module 204 , the second correction module 205 and the third correction module 206 are communicatively connected with each other.

[0072] In order to solve the above technical problems, the present invention provides a computer device, including a memory and a processor, wherein the memory stores computer-readable instructions, and when the processor executes the computer-readable instructions, the steps of the above-mentioned method for estimating the training requirements of nuclear power plant operators are implemented.

[0073] In order to solve the above technical problems, the present invention provides a computer-readable storage medium, on which computer-readable instructions are stored. When the computer-readable instructions are executed, the steps of the above-mentioned method for estimating the training requirements of nuclear power plant operators are implemented.

[0074] Beneficial technical effects of the present invention:

[0075] The method and device for calculating the demand for operator training in a nuclear power plant of the present invention calculate the annual operator shortage within the operator training plan time, thereby achieving the accuracy of the early forecast analysis of the operator training demand and the overall planning of operator training; the number of operators at the end of the year within the operator training plan time is calculated, thereby achieving the scientific nature of the appropriate margin reserve for operators. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] Figure 1 A flowchart of an embodiment of a method for estimating training requirements for nuclear power plant operators of the present invention;

[0077] Figure 2A schematic structural view of an embodiment of a nuclear power plant operator training demand estimation device according to the present invention.

[0078] Figure 3 The figure is a schematic structural view of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0079] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used in the specification of the application are only for the purpose of describing specific embodiments and are not intended to limit this application; the term "including" in the specification and claims of this application and the above-mentioned figure descriptions and any form of its deformation are intended to cover non-exclusive inclusions.

[0080] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0081] The technical solution of the present invention is clearly and completely described below in conjunction with the accompanying drawings and specific embodiments.

[0082] refer to Figure 1 , shows a flow chart of an embodiment of a method for calculating the training needs of nuclear power plant operators, the method for calculating the training needs of nuclear power plant operators comprising the following steps:

[0083] S101. Enter basic data;

[0084] S102. Predict the number of operators at the beginning of year N+1;

[0085] S103. Forecast the number of personnel who need to pass the operator license examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year;

[0086] S104. Forecast the revised average number of personnel who need to participate in operator selection and training within the operator training plan period;

[0087] S105. Forecast the number of personnel who need to pass the operator license examination in the revised year within the operator training program duration;

[0088] S106. Forecast the number of operators at the end of the year after the revision within the duration of the operator training plan.

[0089] In this embodiment, known basic data information is represented by uppercase English letters, and predicted data information calculated through basic data is represented by lowercase English letters; operator information is represented by "letter + 1", such as "A1"; senior operator information is represented by "letter + 2", such as "A2"; the combined information of operators and senior operators is represented by "letter + 3", such as "A3", A3 = A1 + A2.

[0090] In this embodiment, the year in which the nuclear power plant operator training demand calculation is carried out is represented by the Nth year, the year before the year in which the nuclear power plant operator training demand calculation is carried out is represented by the N-1th year, the year after the nuclear power plant operator training demand calculation is carried out is represented by the N+1th year, and so on.

[0091] In this embodiment, the operating personnel include operators and senior operators; existing operators are selected and trained among on-site operators, and an operator license is issued after passing the operator license examination; existing senior operators are selected and trained among operators, and a senior operator license is issued after passing the senior operator license examination.

[0092] It is a relatively long process from participating in operator selection training to participating in the operator license application examination, which generally takes about a year, that is, the operator selection is started in the Nth year, and the training is carried out after the personnel are determined. The trainees will participate in the operator license application examination in the N+1th year. The special case is that the operator selection training is started in the Nth year, and the license application examination is taken in the Nth year, which is relatively rare. Therefore, in this embodiment, the number of personnel who participate in the operator license application examination in the Nth year is determined by the N-1th year, and the number of personnel who participate in and pass the operator license application examination in the Nth year is not within the controllable range of this measurement method.

[0093] In this embodiment, the calculated number of operators required for training is calculated from the N+1th year until the set duration of the operator training plan. For example, the duration of the operator training plan is 5 years. The number of operators required for training calculated by this application is the total number from the N+1th year to the N+5th year.

[0094] In this embodiment, the basic data described in step S101 include the standard establishment number of existing operator positions, the number of existing operators, the expected number of new operator licenses to be issued in the Nth year, the number of operators trained for new projects, the duration of the operator training plan, the number of personnel transferred from operator positions in the past three years, the number of personnel who participated in operator selection and training in the past three years, and the number of personnel who passed the operator license application examination in the past three years.

[0095] In this embodiment, the existing standard number of operator positions in the basic data is the standard number of operator positions set by the existing organizational structure of the nuclear power plant when calculating the demand for operator training in the nuclear power plant, including the existing standard number of operator positions A1 and the existing standard number of senior operator positions A2.

[0096] In this embodiment, the number of existing operators in the basic data is the number of personnel holding operator licenses when calculating the demand for training of nuclear power plant operators, including the number of existing operators B1 and the number of existing senior operators B2.

[0097] In this embodiment, the estimated number of personnel who will be newly issued operator licenses in the Nth year in the basic data is the number of personnel who passed the operator license application examination in the N-1th year but were not issued an operator license when calculating the demand for nuclear power plant operator training, including the estimated number of personnel C1 who will be newly issued operator licenses in the Nth year and the estimated number C2 who will be newly issued senior operator licenses in the Nth year.

[0098] After passing the operator license application examination, you need to wait for the regulatory department to review and approve the issuance of the operator license. This process usually takes about 3 months. Therefore, there is a situation where an operator passes the operator license application examination in the same year, but the operator license is issued in the next year.

[0099] It should be pointed out that in this embodiment, when carrying out the calculation work, the estimated number of new operator licenses issued in year N is not included in the number of existing operators in year N; when carrying out the calculation of the training needs of nuclear power plant operators, if the personnel who passed the operator license application examination in year N-1 have been issued an operator license, the estimated number of new operator licenses issued in year N is 0.

[0100] In this embodiment, the number of new project operator training requirements in the basic data is the number of operators required for a new nuclear power plant, including the number of new project operator training requirements D1 and the number of new project senior operator training requirements D2.

[0101] In this embodiment, the operator training plan duration E in the basic data is the duration in years set according to the nuclear power plant operation and new project construction time nodes when carrying out nuclear power plant operator training demand estimation, including the operator training plan duration and the senior operator training plan duration. The operator training plan duration is the same as the senior operator training plan duration.

[0102] In this embodiment, the number of personnel transferred from the operator position in the past three years is the number of personnel transferred from the operator position in the N-1th year, the N-2th year and the N-3th year, including the number of personnel transferred from the operator position F1 in the N-1th year, the number of personnel transferred from the operator position G1 in the N-2th year, the number of personnel transferred from the operator position H1 in the N-3th year, the number of personnel transferred from the senior operator position F2 in the N-1th year, the number of personnel transferred from the senior operator position G2 in the N-2th year and the number of personnel transferred from the senior operator position H2 in the N-3th year.

[0103] In this embodiment, the number of personnel participating in the operator selection and training in the past three years is the number of personnel participating in the operator selection and training in the N-1th year, the N-2th year and the N-3th year, including the number of personnel participating in the operator selection and training in the N-1th year I1, the number of personnel participating in the operator selection and training in the N-2th year J1, the number of personnel participating in the operator selection and training in the N-3rd year K1, the number of personnel participating in the senior operator selection and training in the N-1th year I2, the number of personnel participating in the senior operator selection and training in the N-2th year J2 and the number of personnel participating in the senior operator selection and training in the N-3rd year K2.

[0104] It should be pointed out that, in this embodiment, the number of persons who have participated in the operator selection and training in the past three years is not the same as the number of persons who have participated in the operator license application examination in the past three years, because persons who have participated in the operator selection and training may not necessarily participate in the operator license application examination. For example, persons who have participated in the operator selection and training may drop out midway, resulting in the inability to participate in the operator license application examination.

[0105] In this embodiment, the number of persons who passed the operator license examination in the past three years is the number of persons who passed the operator license examination in year N-1, year N-2 and year N-3, including the number L1 of persons who passed the operator license examination in year N-1, the number M1 of persons who passed the operator license examination in year N-2, the number P1 of persons who passed the operator license examination in year N-3, the number L2 of persons who passed the senior operator license examination in year N-1, the number M2 of persons who passed the senior operator license examination in year N-2 and the number P2 of persons who passed the senior operator license examination in year N-3.

[0106] In this embodiment, step S102 specifically includes the following steps:

[0107] Step S1021, calculating the average annual pass rate of operators applying for license examinations in the past three years and the average annual number of personnel transferred from operator positions in the past three years;

[0108] Step S1022, predicting the number of people who pass the operator license application test in year N;

[0109] Step S1023, predicting the number of operators that will be reduced due to operators being promoted to senior operators in year N;

[0110] Step S1024: predict the number of operators at the beginning of the N+1th year.

[0111] In this embodiment, in step S1021, the annual average pass rate of the operator license application examination in the past three years = (the number of personnel who passed the operator license application examination in the N-1th year + the number of personnel who passed the operator license application examination in the N-2th year + the number of personnel who passed the operator license application examination in the N-3th year) / (the number of personnel who participated in the operator selection training in the N-1th year + the number of personnel who participated in the operator selection training in the N-2th year + the number of personnel who participated in the operator selection training in the N-3th year), including the annual average pass rate a1 of the operator license application examination in the past three years and the annual average pass rate a2 of the senior operator license application examination in the past three years; a1 = (L1 + M1 + P1) / (I1 + J1 + K1), a2 = (L2 + M2 + P2) / (I2 + J2 + K2).

[0112] In this embodiment, in step S1021, the annual average number of personnel transferred from operator positions in the past three years = (the number of personnel transferred from operator positions in the N-1th year + the number of personnel transferred from operator positions in the N-2th year + the number of personnel transferred from operator positions in the N-3th year) / 3, including the annual average number of personnel transferred from operator positions in the past three years b1 and the annual average number of personnel transferred from senior operator positions in the past three years b2; b1 = (F1 + G1 + H1) / 3, b2 = (F2 + G2 + H2) / 3.

[0113] In this embodiment, in step S1022, the predicted number of personnel who pass the operator license examination in the Nth year = the number of personnel who participate in the operator selection training in the N-1th year * the average annual pass rate of the operator license examination in the past three years, including the predicted number of personnel c1 who pass the operator license examination in the Nth year and the predicted number c2 who pass the senior operator license examination in the Nth year; c1 = I1*a1, c2 = I2*a2.

[0114] In this embodiment, in step S1023, it is predicted that the number of operators d1 that will be reduced in the Nth year due to the promotion of operators to senior operators is equal to the sum of the expected number of new senior operator licenses issued in the Nth year C2 and the predicted number of people who pass the senior operator license application examination in the Nth year; d1 = C2 + c2.

[0115] In this embodiment, in step S1024, the predicted number of operators at the beginning of the N+1th year includes the predicted number of operators e1 at the beginning of the N+1th year and the predicted number of senior operators e2 at the beginning of the N+1th year; e1=B1+C1+c1-b1-d1, e2=B2+C2+c2-b2.

[0116] In this embodiment, step S103 specifically includes the following steps:

[0117] Step S1031, predicting the number of operators required to be trained for new projects within the operator training plan period;

[0118] Step S1032, predicting the number of operators who need to pass the operator license examination each year within the operator training plan and the number of operators at the end of the year;

[0119] Step S1033: predict the number of personnel who need to participate in operator selection and training each year within the duration of the operator training plan.

[0120] In this embodiment, step S1031 specifically includes the following steps:

[0121] Step S10311, predicting the annual average number of new project operator training requirements within the operator training plan duration;

[0122] Step S10312: predict the number of operators required to be trained for new projects within the operator training plan period.

[0123] In this embodiment, the annual average number of new project operators required for training within the operator training plan duration = the number of new project operators required for training / operator training plan duration, including the annual average number of new project operators required for training within the operator training plan duration f1 and the annual average number of new project senior operators required for training within the operator training plan duration f2; f1 = D1 / E, f2 = D2 / E;

[0124] The annual training demand for new project operators within the operator training plan includes the training demand for new project operators in the N+ith year, i=1,2...E-1,E;

[0125] The training demand for operators of new projects in the N+i year includes the training demand for operators of new projects in the N+i year and the training demand for senior operators of new projects in the N+i year;

[0126] The number of operators required for training of new projects in the N+i year = i*f1, and the number of senior operators required for training of new projects in the N+i year = i*f2.

[0127] In this embodiment, the number of operators required for training in the new project in the N+1th year is f1 people; the number of operators required for training in the new project in the N+2th year is the number of operators required for training in the new project in the N+1th year + the annual average number of operators required for training in the new project within the operator training plan, that is, the number of operators required for training in the new project in the N+2th year = f1 + f1 = 2*f1 people; the number of operators required for training in the new project in the N+3th year is the number of operators required for training in the new project in the N+2th year + the annual average number of operators required for training in the new project within the operator training plan, that is, the number of operators required for training in the new project in the N+3th year = 2*f1 + f1 = 3*f1 people; and so on, the number of operators required for training in the new project in the N+Eth year is the number of operators required for training in the new project in the N+E-1th year + the annual average number of operators required for training in the new project within the operator training plan, that is, the number of operators required for training in the new project in the N+Eth year = (E-1)*f1+f1 = E*f1 = D1 people;

[0128] The number of senior operators required for training in the new project in the N+1 year is f2 people; the number of senior operators required for training in the new project in the N+2 year is the number of senior operators required for training in the new project in the N+1 year + the annual average number of senior operators required for training in the new project during the operator training plan, that is, the number of senior operators required for training in the new project in the N+2 year = f2 + f2 = 2*f2 people; the number of senior operators required for training in the new project in the N+3 year is the number of senior operators required for training in the new project in the N+2 year + the operator training plan The annual average number of senior operators trained for new projects within the duration, that is, the number of senior operators trained for new projects in year N+3 = 2*f2+f2 = 3*f2 people; and so on, the number of senior operators trained for new projects in year N+E is the number of senior operators trained for new projects in year N+E-1 + the annual average number of senior operators trained for new projects within the duration of the operator training plan, that is, the number of senior operators trained for new projects in year N+E = (E-1)*f2+f2 = E*f2 = D2 people.

[0129] In this embodiment, in step S1032, the number of personnel who need to pass the operator license application examination in the operator training program includes the number of personnel who need to pass the operator license application examination in the N+i year, and the number of operators at the end of the year in the operator training program includes the number of operators at the end of the N+i year; i=1,2,...,E-1,E;

[0130] Step S1032 specifically includes the following steps:

[0131] Step S10321, predicting the number of operator vacancies in year N+1, the number of personnel who need to pass the operator license examination in year N+1, and the number of operators at the end of year N+1;

[0132] Step S10322, predicting the number of operator vacancies in year N+j, the number of personnel who need to pass the operator license examination in year N+j, and the number of operators at the end of year N+j;

[0133] j=2,3,……,E-1,E.

[0134] In this embodiment, in step S10321, the number of operator vacancies in the N+1th year = the predicted number of operators at the beginning of the N+1th year - the standard number of existing operator positions - the number of operator training needs for the N+1th new project - the average annual number of people transferred from operator positions in the past three years, including the number of operator vacancies g1 in the N+1th year and the number of senior operator vacancies g2 in the N+1th year; g1 = e1-A1-f1-b1, g2 = e2-A2-f2-b2; the total number of operator vacancies g3 in the N+1th year = g1+g2.

[0135] In this embodiment, in step S10321, the number of personnel who need to pass the operator license examination in the N+1 year includes the number of personnel h1 who need to pass the operator license examination in the N+1 year and the number of personnel h2 who need to pass the senior operator license examination in the N+1 year;

[0136] Because the working skills of senior operators are higher than those of operators, senior operators can replace operators; according to the number of operator vacancies in the N+1th year and the total number of operator vacancies in the N+1th year, the number of people who need to pass the operator license examination in the N+1th year is determined:

[0137] If g1≤0, g2≤0, g3≤0, then h1=-g3, h2=-g2;

[0138] If g1≤0, g2≥0, g3≤0, then h1=-g3, h2=0;

[0139] If g1≤0, g2≥0, g3≥0, then h1=0, h2=0;

[0140] If g1≥0, g2≤0, g3≥0, then h1=0, h2=-g2;

[0141] If g1≥0, g2≤0, g3≤0, then it is determined that h1=-g3, h2=-g2;

[0142] If g1≥0, g2≥0, g3≥0, then it is determined that h1=0, h2=0.

[0143] In this embodiment, if g1≤0, g2≤0, g3≤0, then it is determined that h1=-g3, h2=-g2. For example, g1=-5, indicating that the number of operator vacancies in the N+1th year is 5; g2=-10, indicating that the number of senior operator vacancies in the N+1th year is 10; the actual number of senior operator vacancies in the N+1th year is 10, h2=10, indicating that the number of personnel who need to pass the senior operator license application examination in the N+1th year is 10; senior operators are generated by operators who pass the senior operator license application examination, and the number of senior operators increased is equal to the number of operators reduced. After compensating for the number of operators reduced due to the increase in the number of senior operators, the actual number of operator vacancies in the N+1th year is 15, h1=-g3, indicating that the number of personnel who need to pass the operator license application examination in the N+1th year is 15.

[0144] In this embodiment, if g1≤0, g2≥0, g3≤0, then it is determined that h1=-g3, h2=0. For example, g1=-5, indicating that the number of operator vacancies in the N+1th year is 5; g2=2, indicating that the number of surplus senior operators in the N+1th year is 2; the surplus senior operators can replace the operators, and the actual number of operator vacancies in the N+1th year after the replacement is 3, h1=3, indicating that the number of personnel who need to pass the operator license application examination in the N+1th year is 3; after the surplus senior operators replace the operators, the actual number of senior operators vacancies in the N+1th year is 0, h2=0, indicating that the number of personnel who need to pass the senior operator license application examination in the N+1th year is 0.

[0145] In this embodiment, if g1≤0, g2≥0, g3≥0, then it is determined that h1=0, h2=0, for example, g1=-5, indicating that the number of operator shortages in the N+1th year is 5; g2=10, indicating that the number of surplus senior operators in the N+1th year is 10; the surplus senior operators can replace the operators, and after the replacement, the actual number of operator shortages in the N+1th year is 0, h1=0, indicating that the number of personnel who need to pass the operator license application examination in the N+1th year is 0; after the surplus senior operators replace the operators, the surplus number of senior operators in the N+1th year is 5, h2=0, indicating that the number of personnel who need to pass the senior operator license application examination in the N+1th year is 0.

[0146] In this embodiment, if g1≥0, g2≤0, g3≥0, then it is determined that h1=0, h2=-g2. For example, g1=5, indicating that the surplus number of operators in the N+1th year is 5; g2=-2, indicating that the number of vacancies for senior operators in the N+1th year is 2; the surplus operators cannot replace the work of senior operators, and the actual vacancies for senior operators in the N+1th year is 2, h2=2, indicating that the number of personnel who need to pass the senior operator license application examination in the N+1th year is 2; the surplus number of operators in the N+1th year is greater than the number of vacancies for senior operators, and there is still a surplus after the operators pass the senior operator license application examination to become senior operators and make up for the number of vacancies for senior operators, h1=0, and the number of personnel who need to pass the operator license application examination in the N+1th year is 0.

[0147] In this embodiment, if g1≥0, g2≤0, g3≤0, then it is determined that h1=-g3, h2=-g2. For example, g1=5, indicating that the surplus number of operators in the N+1th year is 5; g2=-7, indicating that the number of vacancies for senior operators in the N+1th year is 7; the surplus operators cannot replace the work of senior operators, and the actual number of vacancies for senior operators in the N+1th year is 7, h2=7, indicating that the number of personnel who need to pass the senior operator license application examination in the N+1th year is 7; the surplus number of operators in the N+1th year is less than the number of vacancies for senior operators. After the operator passes the senior operator license application examination and becomes a senior operator, the actual number of vacancies for operators in the N+1th year is 2, h1=2, indicating that the number of personnel who need to pass the operator license application examination in the N+1th year is 2.

[0148] In this embodiment, if g1≥0, g2≥0, g3≥0, then it is judged that h1=0, h2=0, for example, g1=-5, indicating that the surplus number of operators in the N+1th year is 5 people; g2=8, indicating that the surplus number of senior operators in the N+1th year is 8 people; the actual shoring number of senior operators in the N+1th year is 0 people, h2=0, indicating that the number of personnel who need to pass the senior operator license examination in the N+1th year is 0; the actual shoring number of operators in the N+1th year is 0 people, h1=0, indicating that the number of personnel who need to pass the operator license examination in the N+1th year is 0.

[0149] In this embodiment, in step S10321, the number of operators at the end of the N+1th year includes the number of operators i1 at the end of the N+1th year and the number of senior operators i2 at the end of the N+1th year; i1=e1+h1-b1-h2, i2=e2+h2-b2.

[0150] In this embodiment, in step S10322, the number of operator vacancies in the N+jth year = the predicted number of operators at the beginning of the N+jth year - the number of standard establishments of existing operator positions - the number of operators required to be trained for new projects in the N+jth year - the average number of personnel transferred from operator positions in the past three years, including the number of operator vacancies in the N+jth year and the number of senior operator vacancies in the N+jth year; j = 2, 3, ..., E-1, E;

[0151] The number of operator vacancies in the N+j year = the predicted number of operators at the beginning of the N+j year - the number of standard staffing for existing operator positions - the number of operators required for training for new projects in the N+j year - the average number of personnel transferred from operator positions in the past three years, including the number of operator vacancies j1 in the N+2 year, the number of operator vacancies o1 in the N+3 year, and the number of operator vacancies s1 in the N+E year;

[0152] The number of senior operator vacancies in the N+j year = the predicted number of senior operators at the beginning of the N+j year - the number of existing senior operator positions with standard staffing - the number of senior operator training needs for new projects in the N+j year - the average number of personnel transferred from senior operator positions in the past three years, including the number of senior operator vacancies j2 in the N+2 year, the number of senior operator vacancies o2 in the N+3 year, and the number of senior operator vacancies s2 in the N+E year;

[0153] The total number of operator vacancies in the N+j year = the number of operator vacancies in the N+j year + the number of senior operator vacancies in the N+j year, including the total number of operator vacancies j3 in the N+2 year, the total number of operator vacancies o3 in the N+3 year, and ... the total number of operator vacancies s3 in the N+E year;

[0154] The number of operators at the beginning of the N+j year = the number of operators at the end of the N+j-1 year, including the number of operators at the beginning of the N+j year and the number of senior operators at the beginning of the N+j year;

[0155] The number of operators at the beginning of the N+jth year = the number of operators at the end of the N+j-1th year, including the number of operators i1 at the beginning of the N+2th year, the number of operators m1 at the beginning of the N+3th year, and the number of operators r1 at the beginning of the N+Eth year;

[0156] The number of senior operators at the beginning of the N+jth year = the number of senior operators at the end of the N+j-1th year, including the number of senior operators i2 at the beginning of the N+2th year, the number of senior operators m2 at the beginning of the N+3rd year, and the number of senior operators r2 at the beginning of the N+Eth year;

[0157] The number of operators at the end of year N+j-1 includes the number of operators at the end of year N+j-1 and the number of senior operators at the end of year N+j-1;

[0158] The number of operators at the end of the N+j-1th year includes the number of operators i1 at the end of the N+1th year, the number of operators m1 at the end of the N+2th year, the number of operators q1 at the end of the N+3th year, and ... the number of operators r1 at the end of the N+E-1th year;

[0159] The number of senior operators at the end of the N+j-1th year includes the number of senior operators i2 at the end of the N+1th year, the number of senior operators m2 at the end of the N+2th year, the number of senior operators q2 at the end of the N+3th year, and ... the number of operators r2 at the end of the N+E-1th year;

[0160] j1=i1-A1-2*f1-b1,o1=m1-A1-3*f1-b1,and so on,s1=r1-A1-D1-b1;

[0161] j2=i2-A2-2*f2-b2, o2=i2-A2-2*f2-b2, and so on, s2=r2-A2-D2-b2; j3=j1+j2, o3=o1+o2, and so on, s3=s1+s2.

[0162] It should be pointed out that, in this embodiment, the number of operators at the end of year N+1 is based on the statistical standard of those who have passed the operator license application examination. Therefore, the forecast of the number of operators at the beginning of year N+j does not have the difference in the number of operators due to the expected issuance of new operator licenses in year N+j-1, that is, there is no factor of review by the competent authority, that is, the number of operators at the beginning of year N+j = the number of operators at the end of year N+j-1.

[0163] In this embodiment, in step S10322, the number of personnel who need to pass the operator license examination in the N+j year includes the number of personnel who need to pass the operator license examination in the N+j year and the number of personnel who need to pass the senior operator license examination in the N+j year;

[0164] The number of personnel who need to pass the operator license examination in year N+j includes the number of personnel k1 who need to pass the operator license examination in year N+2, the number of personnel p1 who need to pass the operator license examination in year N+3, and so on, the number of personnel t1 who need to pass the operator license examination in year N+E;

[0165] The number of personnel who need to pass the senior operator license examination in year N+j includes the number of personnel k2 who need to pass the senior operator license examination in year N+2, the number of personnel p2 who need to pass the senior operator license examination in year N+3, and so on, the number of personnel t2 who need to pass the senior operator license examination in year N+E;

[0166] Because the working skills of senior operators are higher than those of operators, senior operators can replace operators; according to the number of operator vacancies in year N+j and the total number of operator vacancies in year N+j, the number of people who need to pass the operator license examination in year N+j is determined:

[0167] If the number of operator vacancies in the N+j year is ≤0, the number of senior operator vacancies in the N+j year is ≤0, and the total number of operator vacancies in the N+j year is ≤0, then the number of personnel who need to pass the operator license examination in the N+j year is determined to be = - the total number of operator vacancies in the N+j year, and the number of personnel who need to pass the senior operator license examination in the N+j year is determined to be - the number of senior operator vacancies in the N+j year;

[0168] If the number of operator vacancies in the N+jth year is ≤0, the number of senior operator vacancies in the N+jth year is ≥0, and the total number of operator vacancies in the N+jth year is ≤0, then the number of personnel who need to pass the operator license examination in the N+jth year is determined to be = - the total number of operator vacancies in the N+jth year, and the number of personnel who need to pass the senior operator license examination in the N+jth year is = 0;

[0169] If the number of operator vacancies in the N+j year is ≤0, the number of senior operator vacancies in the N+j year is ≥0, and the total number of operator vacancies in the N+j year is ≥0, then the number of personnel who need to pass the operator license examination in the N+j year is 0, and the number of personnel who need to pass the senior operator license examination in the N+j year is 0;

[0170] If the number of operator vacancies in the N+j year is ≥ 0, the number of senior operator vacancies in the N+j year is ≤ 0, and the total number of operator vacancies in the N+j year is ≥ 0, then the number of personnel who need to pass the operator license application examination in the N+j year is determined to be 0, and the number of personnel who need to pass the senior operator license application examination in the N+j year is determined to be - the number of senior operator vacancies in the N+j year;

[0171] If the number of operator vacancies in the N+j year is ≥ 0, the number of senior operator vacancies in the N+j year is ≤ 0, and the total number of operator vacancies in the N+j year is ≤ 0, then the number of personnel who need to pass the operator license examination in the N+j year is determined to be = - the total number of operator vacancies in the N+j year, and the number of personnel who need to pass the senior operator license examination in the N+j year is determined to be - the number of senior operator vacancies in the N+j year;

[0172] If the number of operator vacancies in the N+j year is ≥0, the number of senior operator vacancies in the N+j year is ≥0, and the total number of operator vacancies in the N+j year is ≥0, then the number of people who need to pass the operator license application examination in the N+j year is = 0, and the number of people who need to pass the senior operator license application examination in the N+j year is = 0.

[0173] In this embodiment, if j1≤0, j2≤0, j3≤0, it is judged that k1=-j3, k2=-j2; if j1≤0, j2≥0, j3≤0, it is judged that k1=-j3, k2=0; if j1≤0, j2≥0, j3≥0, it is judged that k1=0, k2=0; if j1≥0, j2≤0, j3≥0, it is judged that k1=0, k2=-j2; if j1≥0, j2≤0, j3≤0, it is judged that k1=--j3, k2=-j2; if j1≥0, j2≥0, j3≥0, it is judged that k1=0, k2=0;

[0174] If o1≤0, o2≤0, o3≤0, then p1=-o3, p2=-o2; if o1≤0, o2≥0, o3≤0, then p1=-o3, p2=0; if o1≤0, o2≥0, o3≥0, then p1=0, p2=0; if o1≥0, o2≤0, o3≥0, then p1=0, p2=-o2; if o1≥0, o2≤0, o3≤0, then p1=--o3, p2=-o2; if o1≥0, o2≥0, o3≥0, then p1=0, p2=0;

[0175] By analogy, if s1≤0, s2≤0, s3≤0, then judge that t1=-s3, t2=-s2; if s1≤0, s2≥0, s3≤0, then judge that t1=-s3, t2=0; if s1≤0, s2≥0, s3≥0, then judge that t1=0, t2=0; if s1≥0, s2≤0, s3≥0, then judge that t1=0, t2=-s2; if s1≥0, s2≤0, s3≤0, then judge that t1=--s3, t2=-s2; if s1≥0, s2≥0, s3≥0, then judge that t1=0, t2=0.

[0176] In this embodiment, in step S10322, the number of operators at the end of the N+jth year includes the number of operators at the end of the N+jth year and the number of senior operators at the end of the N+jth year; j=2, 3, ..., E-1, E;

[0177] The number of operators at the end of the N+j year = the predicted number of operators at the beginning of the N+j year + the number of personnel who need to pass the operator license examination in the N+j year - the average annual number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the N+j year, including the number of operators at the end of the N+2 year m1, the number of operators at the end of the N+3 year q1, ... the number of operators at the end of the N+E year u1;

[0178] The number of senior operators at the end of the N+j year = the predicted number of senior operators at the beginning of the N+j year + the number of personnel who need to pass the senior operator license examination in the N+j year - the average number of personnel transferred from senior operator positions in the past three years, including the number of senior operators at the end of the N+2 year m2, the number of senior operators at the end of the N+3 year q2, ... the number of senior operators at the end of the N+E year u2;

[0179] m1=i1+k1-b1-k2, q1=m1+p1-b1-p2, and so on. Assuming that the number of operators is r1 at the end of the N+E-1th year, then u1=r1+t1-b1-t2; m2=i2+k2-b2, q2=m2+p2-b2, and so on. Assuming that the number of senior operators is r2 at the end of the N+E-1th year, u2=r2+t2-b2.

[0180] What needs to be emphasized is that in actual use, when predicting the number of operators who need to pass the operator license examination during the operator training program and the number of operators at the end of the year, corrections can be made based on actual data. For example, when calculating the data for a certain year, the calculation method of this application can be modified based on actual conditions such as "the actual number of operators who left their jobs in the previous year", "the actual number of operators who passed the examination in the previous year", and the "actual number of operators required for new project reserves" in that year, so as to gradually improve the accuracy of the calculation during use.

[0181] In this embodiment, in step S1033, the number of operators who need to participate in operator selection and training in the operator training plan includes the number of operators who need to participate in operator selection and training in the N+kth year, k=0, 1, 2, ..., E-1;

[0182] The number of personnel who need to participate in operator selection training in year N+k = the number of personnel who need to pass the operator license application examination in year N+k+1 / the average annual pass rate of the operator license application examination in the past three years, including the number of personnel who need to participate in operator selection training in year N+k and the number of personnel who need to participate in senior operator selection training in year N+k;

[0183] The number of personnel who need to participate in operator selection and training in the N+k year includes the number of personnel who need to participate in operator selection and training in the N year v1, the number of personnel who need to participate in operator selection and training in the N+1 year w1, the number of personnel who need to participate in operator selection and training in the N+2 year x1, ... the number of personnel who need to participate in operator selection and training in the N+E-1 year y1;

[0184] The number of personnel who need to participate in the selection and training of senior operators in the N+k year includes the number of personnel who need to participate in the selection and training of senior operators v2 in the N year, the number of personnel who need to participate in the selection and training of senior operators w2 in the N+1 year, the number of personnel who need to participate in the selection and training of senior operators x2 in the N+2 year, and so on, the number of personnel who need to participate in the selection and training of senior operators y2 in the N+E-1 year;

[0185] The number of personnel who need to pass the operator license examination in year N+k+1 includes the number of personnel who need to pass the operator license examination in year N+1 h1, the number of personnel who need to pass the operator license examination in year N+2 k1, the number of personnel who need to pass the operator license examination in year N+3 p1, ... the number of personnel who need to pass the operator license examination in year N+E t1;

[0186] The number of personnel who need to pass the senior operator license examination in year N+k+1 includes the number of personnel who need to pass the senior operator license examination in year N+1 h2, the number of personnel who need to pass the senior operator license examination in year N+2 k2, the number of personnel who need to pass the senior operator license examination in year N+3 p2, ... the number of personnel who need to pass the senior operator license examination in year N+E t2;

[0187] v1=h1 / a1, w1=k1 / a1, and so on, y1=t1 / a1; v2=h2 / a2, w2=k2 / a2, and so on, y2=t2 / a2.

[0188] It should be noted that, in this embodiment, the operator selection and training work for the same batch of personnel must be carried out one year before they take the operator license application examination, that is, the same batch of personnel completes the operator selection in the Nth year, carries out operator training for about one year, and then takes the operator license application examination in the N+1th year. Therefore, the operator selection and training work for the last batch of personnel is completed one year before the duration of the operator training program. When the duration of the operator training program is E years, the operator selection and training work for the last batch of personnel is completed in the E-1th year, and they take the operator license application examination in the N+E year.

[0189] According to the calculation in step S1033, it can be known that the number of personnel who need to participate in the operator selection and training in each year during the duration of the operator training plan is different, which may lead to an imbalance in the annual operator training volume, the number of personnel applying for license examinations and even the number of on-site staff during the duration of the operator training plan. Therefore, based on the calculation data in step S1033, without changing the number of personnel selected and trained by operators during the duration of the operator training plan, the number of personnel who need to participate in the operator selection and training in each year during the duration of the operator training plan is corrected on average.

[0190] In this embodiment, step S104 specifically includes the following steps:

[0191] Step S1041, predicting the number of personnel who need to participate in operator selection and training within the operator training plan duration;

[0192] Step S1042, distribute the number of personnel who need to participate in operator selection and training within the operator training plan duration to each year according to the operator training plan duration, and obtain the revised average number of personnel who need to participate in operator selection and training within the operator training plan duration.

[0193] In this embodiment, in step S1041, the number of personnel who need to participate in operator selection and training within the duration of the operator training program is the sum of the number of personnel who need to participate in operator selection and training in each year within the duration of the operator training program, including the number of personnel z1 who need to participate in operator selection and training within the duration of the operator training program and the number z2 who need to participate in senior operator selection and training within the duration of the operator training program; z1=v1+w1+x1+…+y1, z2=v2+w2+x2+…+y2.

[0194] In this embodiment, in step S1042, the revised average number of personnel who need to participate in operator selection and training annually within the duration of the operator training plan = the number of personnel who need to participate in operator selection and training annually within the duration of the operator training plan / the duration of the operator training plan, including the revised average number of personnel who need to participate in operator selection and training annually within the duration of the operator training plan n1 and the revised average number of personnel who need to participate in senior operator selection and training annually within the duration of the operator training plan n2; n1 = z1 / E, n2 = z2 / E.

[0195] In this embodiment, in step S105, the number of personnel who need to pass the operator license application examination in the revised year within the operator training program duration = the number of personnel who need to participate in the operator selection and training in the revised year within the operator training program duration * the average annual pass rate of the operator license application examination in the past three years, including the number of personnel l1 who need to pass the operator license application examination in the revised year within the operator training program duration and the number l2 who need to pass the senior operator license application examination in the revised year within the operator training program duration; l1=n1*a1, l2=n2*a2.

[0196] In this embodiment, in step S106, the number of operators at the end of the year after correction within the operator training plan duration includes the number of operators at the end of the N+ith year after correction, i=1, 2, 3, ..., E-1, E;

[0197] Step S106 specifically includes the following steps:

[0198] Step S1061, according to the revised number of personnel who need to pass the operator license application test in the N+1 year, the number of operators at the end of the N+1 year is revised to obtain the revised number of operators at the end of the N+1 year;

[0199] Step S1062, correct the number of operators at the end of the N+jth year according to the corrected number of operators at the end of the N+1th year to obtain the corrected number of operators at the end of the N+jth year; j=2, 3, ..., E-1, E.

[0200] In this embodiment, in step S1061, the corrected number of operators at the end of the N+1th year includes the corrected number of operators i1' at the end of the N+1th year and the corrected number of senior operators i2' at the end of the N+1th year;

[0201] The number of operators at the end of the N+1th year after correction i1' = the number of operators at the beginning of the N+1th year e1 + the number of personnel who need to pass the operator license examination in the revised year within the operator training plan duration l1 - the average number of personnel transferred from the operator position in the past three years b1 - the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan duration l2;

[0202] The corrected number of senior operators at the end of year N+1, i2', = the number of senior operators at the beginning of year N+1, e2 + the corrected number of personnel who need to pass the senior operator license examination within the operator training program, l2 - the average annual number of personnel transferred from senior operator positions in the past three years, b2.

[0203] In this embodiment, in step S1062, the corrected number of operators at the end of the N+jth year includes the corrected number of operators at the end of the N+jth year and the corrected number of senior operators at the end of the N+jth year;

[0204] The number of operators at the end of the revised year N+j = the number of operators at the beginning of the revised year N+j + the number of personnel who need to pass the operator license examination in the revised year within the operator training plan - the average annual number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan, including the number of operators at the end of the revised year N+2 m1', the number of operators at the end of the revised year N+3 q1', ... the number of operators at the end of the revised year N+E u1';

[0205] The revised number of senior operators at the end of the N+j year = the revised number of senior operators at the beginning of the N+j year + the revised number of personnel who need to pass the senior operator license examination in the operator training plan - the average annual number of personnel transferred from senior operator positions in the past three years, including the revised number of senior operators at the end of the N+2 year m2', the revised number of senior operators at the end of the N+3 year q2', ... the revised number of senior operators at the end of the N+E year u2';

[0206] The revised number of operators at the beginning of the N+j year = the revised number of operators at the end of the N+j-1 year, including the revised number of operators at the beginning of the N+j year and the revised number of senior operators at the beginning of the N+j year;

[0207] The corrected number of operators at the beginning of the N+j year = the corrected number of operators at the end of the N+j-1 year, including the corrected number of operators i1' at the beginning of the N+2 year, the corrected number of operators m1' at the beginning of the N+3 year, ... the corrected number of operators r1' at the N+E year;

[0208] The revised number of senior operators at the beginning of the N+jth year = the revised number of senior operators at the end of the N+j-1th year, including the revised number of senior operators i2' at the beginning of the N+2th year, the revised number of senior operators m2' at the beginning of the N+3th year, ... the revised number of senior operators r2' at the beginning of the N+Eth year;

[0209] m1'=i1'+l1-b1-l2, q1'=m1'+l1-b1-l2, and so on. Assuming the number of operators at the end of the revised N+E-1 year is r1', then u1'=r1'+l1-b1-l2;

[0210] m2'=i2'+l2-b2, q2=m2'+l2-b2, and so on. Assuming that the number of senior operators is r2' at the end of year N+E-1, then u2'=r2'+l2-b2.

[0211] The method for calculating the training needs of nuclear power plant operators in this embodiment realizes the analysis of the training needs of operating unit operators and new project operators based on the existing known basic data, and through a complete and reasonable logical calculation, it can reasonably, quickly and easily calculate key data such as the annual number of selected and trained personnel, the annual number of personnel who pass the examination, and the number of operators at the end of the year within the duration of the operator training plan, and can modify the model parameters according to the actual situation of the year, so as to further improve the accuracy of the calculation, thereby providing a training plan with reference value for the operator training.

[0212] It should be understood that the multiple steps or sub-steps in the method for estimating the training requirements of nuclear power plant operators do not necessarily have to be executed at the same time, but can be executed at different times, and the order of execution is not necessarily one by one, but can be executed in turn or alternately with other steps or sub-steps of other steps or at least part of the stages.

[0213] refer to Figure 2 As an implementation of the above method, the present invention provides an embodiment of a device for estimating the training requirements of nuclear power plant operators. The embodiment of the device corresponds to the embodiment of the above method, and the device can be specifically applied to various electronic devices.

[0214] The nuclear power plant operator training demand calculation device described in this embodiment includes:

[0215] An input module 201 is used to input basic data;

[0216] The first prediction module 202 is used to predict the number of operators at the beginning of the N+1 year;

[0217] The second prediction module 203 is used to predict the number of personnel who need to pass the operator license application examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year;

[0218] The first correction module 204 is used to predict the corrected average number of operators who need to participate in operator selection and training within the operator training plan period;

[0219] The second correction module 205 is used to predict the number of personnel who need to pass the operator license application examination in the revised year within the operator training plan duration;

[0220] The third correction module 206 is used to predict the number of operators at the end of the year after the correction within the operator training plan duration;

[0221] The input module 201 , the first prediction module 202 , the second prediction module 203 , the first prediction module 204 , the second correction module 205 and the third correction module 206 are communicatively connected with each other.

[0222] The nuclear power plant operator training demand calculation device proposed in this embodiment realizes the training demand analysis of the operating unit operators and the new project operators based on the existing known basic data. Through a complete and reasonable logical calculation, the key data such as the number of personnel who need to participate in the operator selection training each year within the operator training plan, the number of personnel who pass the operator license application examination each year, and the number of operators at the end of the year are reasonably, quickly and easily calculated, providing a reference plan for operator training.

[0223] As an implementation of the above method, the present invention provides an embodiment of a computer device, and the embodiment of the computer device corresponds to the embodiment of the above method.

[0224] The computer device described in this embodiment includes a memory 301, a processor 302 and a network interface 303 that are interconnected and communicated through a system bus. It should be noted that the figure only shows a computer device with components 301-303, but it should be understood that it is not required to implement all the components shown, and more or fewer components can be implemented instead. Among them, those skilled in the art can understand that the computer device here is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application-specific integrated circuits, programmable gate arrays, digital processors, embedded devices, etc.

[0225] The computer device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The computer device may interact with a user through a keyboard, a mouse, a remote controller, a touch pad, or a voice control device.

[0226] The memory 301 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, hard disk, multimedia card, card-type memory, random access memory, static random access memory, read-only memory, electrically erasable programmable read-only memory, programmable read-only memory, magnetic memory, disk, optical disk, etc. In some embodiments, the memory 301 can be an internal storage unit of the computer device, such as a hard disk or memory of the computer device. In other embodiments, the memory 301 can also be an external storage device of the computer device, such as a plug-in hard disk, smart memory card, secure digital card, flash memory card, etc. equipped on the computer device. Of course, the memory 301 can also include both the internal storage unit of the computer device and its external storage device. In this embodiment, the memory 301 is generally used to store the operating system and various application software installed on the computer device, such as the computer-readable instructions of the above method, etc. In addition, the memory 301 can also be used to temporarily store various types of data that have been output or are to be output.

[0227] The processor 302 may be a central processing unit, a controller, a microcontroller, a microprocessor, or other data processing chip in some embodiments. The processor 302 is generally used to control the overall operation of the computer device. In this embodiment, the processor 302 is used to run the computer-readable instructions stored in the memory 301 or process data, such as running the computer-readable instructions of the method for calculating the training requirements of nuclear power plant operators.

[0228] The network interface 303 may include a wireless network interface or a wired network interface. The network interface 303 is generally used to establish a communication connection between the computer device and other electronic devices.

[0229] The computer equipment proposed in this embodiment realizes the training demand analysis of operating crew operators and new project operators based on the existing known basic data. Through a complete and reasonable logical calculation, key data such as the annual number of selected and trained personnel, the annual number of personnel who pass the examination, and the number of operators at the end of the year within the duration of the operator training plan are reasonably, quickly and easily calculated, providing a reference plan for operator training.

[0230] As an implementation of the above method, the present invention provides an embodiment of a computer-readable storage medium, and the embodiment of the computer-readable storage medium corresponds to the embodiment of the above method.

[0231] The computer-readable storage medium described in this embodiment stores computer-readable instructions, and the computer-readable instructions can be executed by at least one processor to enable the at least one processor to perform the steps of the above method.

[0232] The computer-readable storage medium proposed in this embodiment realizes the analysis of the training needs of operating crew operators and new project operators based on the existing known basic data. Through a complete and reasonable logical calculation, key data such as the annual number of selected and trained personnel, the annual number of personnel who pass the examination, and the number of operators at the end of the year within the duration of the operator training plan are reasonably, quickly and easily calculated, providing a reference plan for operator training.

[0233] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A method for calculating the training needs of nuclear power plant operators, characterized in that: The following steps are involved: S101. Enter basic data; S102. Predict the number of operators at the beginning of year N+1; S103. Forecast the number of personnel who need to pass the operator license examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year; S104. Forecast the revised average number of personnel who need to participate in operator selection and training within the operator training plan period; S105. Forecast the number of personnel who need to pass the operator license examination in the revised year within the operator training program duration; S106. Forecast the number of operators at the end of the year after the revision within the duration of the operator training plan.

2. The method for calculating the training demand for nuclear power plant operators according to claim 1, characterized in that: In step S101, the basic data includes the number of standard staffing of existing operator positions, the number of existing operators, the number of personnel expected to be newly issued operator licenses in the Nth year, the number of training requirements for new project operators, the duration of operator training plans, the number of personnel transferred from operator positions in the past three years, the number of personnel participating in operator selection training in the past three years, and the number of personnel who passed the operator license application examination in the past three years; The year in which the estimation of the demand for training of nuclear power plant operators is carried out is represented by the Nth year, the year before the year in which the estimation of the demand for training of nuclear power plant operators is carried out is represented by the N-1th year, the year after the estimation of the demand for training of nuclear power plant operators is represented by the N+1th year, and so on; the estimation of the demand for training of nuclear power plant operators starts from the N+1th year until the set duration of the operator training plan; The existing standard establishment number of operator positions is the standard establishment number of operator positions set by the existing organizational structure of the nuclear power plant when the operator training needs of the nuclear power plant are calculated; the existing number of operators is the number of personnel holding operator licenses when the operator training needs of the nuclear power plant are calculated; the estimated number of newly licensed personnel in the Nth year is the number of personnel who passed the operator license application examination in the N-1th year when the operator training needs of the nuclear power plant were calculated but were not issued an operator license; the number of operator training needs for new projects is the number of operators required for the newly built nuclear power plant; the duration of the operator training plan is the time when the operator training needs of the nuclear power plant are calculated. When estimating the demand for operator training, the duration in years is set according to the time nodes of nuclear power plant operation and new project construction; the number of personnel transferred from operator positions in the past three years is the number of personnel transferred from operator positions in the N-1th year, the N-2nd year and the N-3th year; the number of personnel participating in operator selection and training in the past three years is the number of personnel participating in operator selection and training in the N-1th year, the N-2nd year and the N-3th year; the number of personnel who passed the operator license application examination in the past three years is the number of personnel who passed the operator license application examination in the N-1st year, the N-2nd year and the N-3rd year; operators include operators and senior operators.

3. The method for calculating the training demand for nuclear power plant operators according to claim 2, characterized in that: Step S102 specifically includes the following steps: Step S1021, calculating the average annual pass rate of operators applying for license examinations in the past three years and the average annual number of personnel transferred from operator positions in the past three years; Step S1022, predicting the number of people who pass the operator license application test in year N; Step S1023, predicting the number of operators that will be reduced due to operators being promoted to senior operators in year N; Step S1024, predicting the number of operators at the beginning of the N+1th year.

4. The method for calculating the training demand for nuclear power plant operators according to claim 3 is characterized in that: In step S1021, the annual average pass rate of the operator license application examination in the past three years = (the number of personnel who passed the operator license application examination in the N-1th year + the number of personnel who passed the operator license application examination in the N-2th year + the number of personnel who passed the operator license application examination in the N-3th year) / (the number of personnel who participated in the operator selection and training in the N-1st year + the number of personnel who participated in the operator selection and training in the N-2nd year + the number of personnel who participated in the operator selection and training in the N-3rd year); the annual average number of personnel transferred from operator positions in the past three years = (the number of personnel transferred from operator positions in the N-1st year + the number of personnel transferred from operator positions in the N-2nd year + the number of personnel transferred from operator positions in the N-3rd year) / 3.

5. The method for calculating the training demand for nuclear power plant operators according to claim 3 is characterized in that: In step S1022, the predicted number of personnel who pass the operator license examination in the Nth year = the number of personnel who participate in the operator selection training in the Nth year * the average annual pass rate of the operator license examination in the past three years.

6. The method for calculating the training needs of nuclear power plant operators according to claim 3, characterized in that: In step S1023, the number of operators reduced due to operators being promoted to senior operators in the Nth year is predicted = the number of personnel newly issued with senior operator licenses in the Nth year + the number of personnel who pass the senior operator license application examination in the Nth year is predicted.

7. The method for calculating the training needs of nuclear power plant operators according to claim 3, characterized in that: In step S1024, the predicted number of operators at the beginning of the N+1 year = the number of existing operators + the expected number of personnel who will be newly issued operator licenses in the Nth year + the predicted number of personnel who will pass the operator license in the Nth year - the average annual number of personnel who have been transferred from operator positions in the past three years - the predicted number of operators who will be reduced in the Nth year due to operators being promoted to senior operators; the predicted number of senior operators at the beginning of the N+1 year = the number of existing senior operators + the expected number of personnel who will be newly issued senior operator licenses in the Nth year + the predicted number of personnel who will pass the senior operator license application examination in the Nth year - the average annual number of personnel who have been transferred from senior operator positions in the past three years.

8. The method for calculating the training needs of nuclear power plant operators according to claim 3, characterized in that: Step S103 specifically includes the following steps: Step S1031, predicting the number of operators required to be trained for new projects within the operator training plan period; Step S1032, predicting the number of operators who need to pass the operator license examination and the number of operators at the end of the year within the duration of the operator training plan; Step S1033: predict the number of personnel who need to participate in operator selection and training each year within the duration of the operator training plan.

9. The method for calculating the training needs of nuclear power plant operators according to claim 8, characterized in that: Step S1031 specifically includes the following steps: Step S10311, predicting the annual average number of new project operator training requirements within the operator training plan duration; Step S10312, predicting the number of operators required to be trained for new projects within the operator training plan period; The annual training demand for new project operators within the operator training plan includes the training demand for new project operators in the N+i year; The number of new project operators required for training in the N+i year = i*the average annual number of new project operators required for training within the operator training plan duration; The annual average number of new project operators required to be trained within the operator training program = the number of new project operators required to be trained / the operator training program duration; i=1,2,...,E-1,E.

10. The method for calculating the training needs of nuclear power plant operators according to claim 8, characterized in that: In step S1032, the number of personnel who need to pass the operator license application examination in the operator training program includes the number of personnel who need to pass the operator license application examination in the N+i year, and the number of operators at the end of the year in the operator training program includes the number of operators at the end of the N+i year; Step S1032 specifically includes the following steps: traversing and predicting the number of operator vacancies in the N+i year, the number of personnel who need to pass the operator license examination in the N+i year, and the number of operators at the end of the N+i year in order of year; Senior operators can replace operators. The number of operators who need to pass the operator license examination in the N+i year is determined based on the number of operator vacancies in the N+i year and the total number of operator vacancies in the N+i year. The number of operator vacancies in the N+i year = the number of operators at the beginning of the N+i year - the number of standard staffing for existing operator positions - the number of operator training needs for the N+i new project - the average number of personnel transferred from operator positions in the past three years. The total number of operator vacancies in the N+i year = the number of operator vacancies in the N+i year + the number of senior operator vacancies in the N+i year; the number of operators at the end of the N+1 year is based on the number of operators who have passed the operator examination. The number of operators at the beginning of the N+j year = the number of operators at the end of the N+j-1 year; If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≤0, and the total number of operator vacancies in the N+i year is ≤0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year; If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≥0, and the total number of operator vacancies in the N+i year is ≤0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is = 0; If the number of operator vacancies in the N+i year is ≤0, the number of senior operator vacancies in the N+i year is ≥0, and the total number of operator vacancies in the N+i year is ≥0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be 0, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be 0; If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≤ 0, and the total number of operator vacancies in the N+i year is ≥ 0, then the number of personnel who need to pass the operator license application examination in the N+i year is determined to be 0, and the number of personnel who need to pass the senior operator license application examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year; If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≤ 0, and the total number of operator vacancies in the N+i year is ≤ 0, then the number of personnel who need to pass the operator license examination in the N+i year is determined to be = - the total number of operator vacancies in the N+i year, and the number of personnel who need to pass the senior operator license examination in the N+i year is determined to be - the number of senior operator vacancies in the N+i year; If the number of operator vacancies in the N+i year is ≥ 0, the number of senior operator vacancies in the N+i year is ≥ 0, and the total number of operator vacancies in the N+i year is ≥ 0, then the number of personnel who need to pass the operator license examination in the N+i year is 0, and the number of personnel who need to pass the senior operator license examination in the N+i year is 0; The number of operators at the end of the N+i year = the predicted number of operators at the beginning of the N+i year + the number of personnel who need to pass the operator license examination in the N+i year - the average number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the N+i year; The number of senior operators at the end of the N+i year = the predicted number of senior operators at the beginning of the N+i year + the number of personnel who need to pass the senior operator license examination in the N+i year - the average number of personnel transferred from the senior operator position in the past three years; i=1,2,…,E-1,E; j=2,3,…,E-1,E.

11. The method for calculating the training requirements of nuclear power plant operators according to claim 8, characterized in that: In step S1033, the number of operators who need to participate in the operator selection and training each year within the operator training plan includes the number of operators who need to participate in the operator selection and training in the N+kth year; The number of personnel who need to participate in operator selection training in the N+k year = the number of personnel who need to pass the operator license examination in the N+k+1 year / the average annual pass rate of the operator license examination in the past three years; k=0,1,2,……,E-1.

12. The method for calculating the training needs of nuclear power plant operators according to claim 8, characterized in that: Step S104 specifically includes the following steps: Step S1041, predicting the number of personnel who need to participate in operator selection and training within the operator training plan duration; Step S1042, the number of personnel who need to participate in operator selection and training within the operator training plan duration is evenly distributed to each year according to the operator training plan duration, and a corrected average number of personnel who need to participate in operator selection and training within the operator training plan duration is obtained; The number of personnel who need to participate in the operator selection and training during the operator training plan is the sum of the number of personnel who need to participate in the operator selection and training in each year during the operator training plan; The revised average number of personnel who need to participate in operator selection and training within the duration of the operator training program = number of personnel who need to participate in operator selection and training within the duration of the operator training program / duration of the operator training program.

13. The method for calculating the number of nuclear power plant operators at the end of the year within the duration of the training plan according to claim 8, characterized in that: In step S105, the number of personnel who need to pass the operator license examination in the revised year within the operator training plan duration = the number of personnel who need to participate in operator selection and training in the revised year within the operator training plan duration * the average annual pass rate of the operator license examination in the past three years.

14. The method for calculating the training demand for nuclear power plant operators according to claim 13, characterized in that: In step S106, the number of operators at the end of the year after correction within the operator training plan duration includes the number of operators at the end of the N+ith year after correction; Step S106 specifically includes the following steps: Step S1061, according to the revised number of personnel who need to pass the operator license application test in the N+1 year, the number of operators at the end of the N+1 year is revised to obtain the revised number of operators at the end of the N+1 year; Step S1062, correcting the number of operators at the end of the N+jth year according to the corrected number of operators at the end of the N+1th year, to obtain the corrected number of operators at the end of the N+jth year; The number of operators at the end of the N+i year after correction = the number of operators at the beginning of the N+i year + the number of personnel who need to pass the operator license examination in the revised year within the operator training plan - the average number of personnel transferred from the operator position in the past three years - the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan; The number of senior operators at the end of the revised N+i year = the number of senior operators at the beginning of the N+i year + the number of personnel who need to pass the senior operator license examination in the revised year within the operator training plan - the average number of personnel transferred from the senior operator position in the past three years; The number of operators at the beginning of the revised year N+j = the number of operators at the end of the revised year N+j-1; i=1, 2, 3,..., E-1, E; j=2, 3,..., E-1, E.

15. A device for calculating the training needs of operators in a nuclear power plant, characterized in that: include: An input module 201 is used to input basic data; The first prediction module 202 is used to predict the number of operators at the beginning of the N+1 year; The second prediction module 203 is used to predict the number of personnel who need to pass the operator license application examination each year within the duration of the operator training plan, the number of operators at the end of the year, and the number of personnel who need to participate in operator selection training each year; The first correction module 204 is used to predict the corrected average number of operators who need to participate in operator selection and training within the operator training plan period; The second correction module 205 is used to predict the number of personnel who need to pass the operator license application examination in the revised year within the operator training plan duration; The third correction module 206 is used to predict the number of operators at the end of the year after the correction within the operator training plan duration; The input module 201 , the first prediction module 202 , the second prediction module 203 , the first correction module 204 , the second correction module 205 and the third correction module 206 are communicatively connected with each other.

16. A computer device comprising a memory and a processor, wherein the memory stores computer-readable instructions, characterized in that: When the processor executes the computer-readable instructions, the steps of the method for estimating the training requirements of nuclear power plant operators as described in any one of claims 1-14 are implemented.

17. A computer-readable storage medium having computer-readable instructions stored thereon, characterized in that: When the computer-readable instructions are executed, the steps of the method for estimating the training requirements of nuclear power plant operators described in any one of claims 1-14 are implemented.