Double-layer coordinated optimization active configuration method and system considering water, light and storage
By constructing a double-layer optimization configuration model of water-optical storage, combining the operating characteristics of pumped storage and photovoltaic power generation, the effective efforts of water-optical storage resources are coordinated and complementary, and the problems of degraded power grid regulation capacity and insufficient anti-interference capacity are solved, and the problem of reduced power grid regulation capacity and insufficient anti-interference capacity is improved. The absorption capacity of photovoltaic power generation and the stability of the power grid.
Patent Information
- Application Number
- CN202410920853.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-12
AI Technical Summary
After large-scale wind power and photovoltaics are connected to the power system, the power grid regulation capacity has decreased, and the ability to resist external risks and anti-interference is insufficient. How to achieve complementary coordination control of water-optical storage while taking into account the operation constraints of the power market and power stations.
By constructing a double-layer optimization configuration model based on water and light storage, including a coordinated optimization model and a dedicated coordinated configuration model, combining the operating characteristics of pumped storage and photovoltaic power generation, the lower layer optimization model and the upper layer optimization model are built to achieve the effective use of water and light storage resources. The coordination and complementary output of output will curb the fluctuations in photovoltaic output and promote photovoltaic absorption.
The system's ability to absorb photovoltaic power generation is improved, the impact of photovoltaic output on the power grid is reduced, and the anti-interference and regulation capabilities of the power grid are enhanced.
Smart Images

Figure CN118944050A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water conservancy and hydropower, and in particular to a double-layer coordinated optimization active power configuration method and system considering hydropower, photovoltaic and storage. Background Art
[0002] With the development of new power systems, the proportion of renewable energy such as wind power and solar energy in the power system has gradually increased. However, wind power, photovoltaic and other new energy power generation are greatly affected by environmental conditions such as wind speed, light intensity, and temperature, and the output shows random fluctuation characteristics, which makes it more difficult to connect to the grid. At the same time, my country's hydropower has developed rapidly. As high-quality adjustable resources, hydropower and pumped storage can flexibly adjust the power output by adjusting the start and stop of units and reservoir capacity.
[0003] The large-scale access of wind power and photovoltaic power to the power system will cause the grid's regulation capacity to decline, and the ability to resist external risks and interference will be insufficient. The flexible regulation characteristics of hydropower and pumped storage power stations can be used to smooth the output of photovoltaic power generation and promote photovoltaic grid connection and consumption. However, the reservoir capacity of pumped storage power stations is limited, and the operating condition conversion takes time. It is an urgent problem to achieve complementary coordinated control of hydropower, photovoltaic and storage under the consideration of the power market and power station operation constraints. Summary of the invention
[0004] The technical problem to be solved by the present invention is that the large-scale connection of wind power and photovoltaic power to the power system will cause the regulation capacity of the power grid to decline, and the ability to resist external risks and interference will be insufficient. The purpose is to provide a two-layer coordinated optimization active power configuration method and system considering hydropower, photovoltaic and storage. By considering the power market and power station operation constraints, the impact of photovoltaic output fluctuations on the power grid system can be reduced, and the system's ability to absorb photovoltaic power generation can be improved.
[0005] The present invention is achieved through the following technical solutions:
[0006] The first aspect of the present invention provides a two-layer coordinated optimization active power configuration method considering hydro-solar-energy storage, comprising the following specific steps:
[0007] Acquire regional hydropower, photovoltaic and pumped storage and operation data, and construct a two-layer optimization configuration model based on active power coordination of hydropower, photovoltaic and storage to realize regional active power coordinated control. The two-layer optimization configuration model includes a coordinated optimization model and an active power coordinated configuration model;
[0008] With the goal of maximizing the benefits of pumped storage power stations, a photovoltaic-storage coordinated optimization constraint model is constructed and the coordinated optimization model is optimized.
[0009] Taking the minimum total regional power generation cost in the power market as the goal, an active power coordination configuration optimization constraint model is constructed to optimize the active power coordination configuration model.
[0010] The Pareto optimal solution with maximum benefit of pumped-storage power station and minimum total regional power generation cost is obtained, and the optimal active power allocation strategy for regional hydro-solar-storage coordination is determined.
[0011] Based on the analysis of the operating characteristics of photovoltaic, pumped storage and hydropower generation, and combined with the current operating status of the energy market and the frequency regulation market, the present invention constructs a lower-level optimization model for the complementarity of pumped storage and photovoltaic power generation and an upper-level optimization model for the coordinated optimization of water, photovoltaic and storage. Based on the double-layer optimization model, the coordinated complementarity of the active output of hydro, photovoltaic and storage resources is achieved, the fluctuation of photovoltaic output is suppressed, and the photovoltaic consumption is promoted.
[0012] Furthermore, the coordination optimization model building step includes:
[0013] The benefits of the pumped-storage power station participating in the energy market and frequency regulation market at time t, the benefits of the complementarity between the pumped-storage power station and the photovoltaic power station at time t, and the power generation cost of the pumped-storage power station at time t are obtained, and the total benefit of the pumped-storage power station is obtained, and a coordinated optimization model with the maximum benefit of the lower-level pumped-storage power station is constructed.
[0014] Furthermore, the steps for obtaining the benefits of the pumped storage power station participating in the energy market and the frequency regulation market at time t, the benefits of the pumped storage power station complementing the photovoltaic power station at time t, and the power generation cost of the pumped storage power station at time t include:
[0015] According to the price of energy market clearing at time t, the generating power and pumping power of the pumped storage power station at time t are expressed, and the benefits of the pumped storage power station participating in the energy market and frequency regulation market at time t are obtained;
[0016] According to the upper frequency regulation capacity price, lower frequency regulation capacity price and frequency regulation mileage price cleared by the frequency regulation market at time t, the upper frequency regulation capacity and lower frequency regulation capacity, frequency regulation mileage and frequency regulation capacity ratio provided by the pumped storage power station at time t, the benefits of the pumped storage power station participating in the frequency regulation market at time t are obtained;
[0017] According to the power generation price and pumping price of the pumped storage power station and the photovoltaic power station at time t, the planned power and actual power of the photovoltaic power station at time t, the benefits of the complementarity between the pumped storage power station and the photovoltaic power station at time t are obtained;
[0018] According to the power cost per unit time of the pumped-storage power station and the amount of electricity per unit time of the pumped-storage power station at time t, the power generation cost of the pumped-storage power station at time t is obtained.
[0019] Furthermore, the coordinated optimization constraint condition model includes: a pumped storage unit output constraint model, a pumped storage unit reservoir capacity constraint model and a pumped storage unit waterway constraint model in the same waterway.
[0020] Furthermore, the steps for constructing the coordinated optimization constraint model for maximizing the benefit of the lower pumped storage power station include:
[0021] Obtain the lower and upper limits of the power units of the pumped-storage power station, the lower and upper limits of the power units of the pumped-storage power station, and the power generation power and pumping power of the units in the process of power complementarity between the pumped-storage power station and the photovoltaic power station, and construct an output constraint model for the pumped-storage units;
[0022] Obtain the upper reservoir capacity of the pumped storage power station at time t, the lower and upper limits of the upper reservoir capacity of the pumped storage power station, the conversion coefficient between the reservoir capacity of the pumped storage power station and the unit power, and the power generation efficiency of the pumped storage power station, and construct a reservoir capacity constraint model for the pumped storage unit;
[0023] The time when the units in the same waterway are in the power generation state or the pumping state at time t, the next time the constrained waterway is allowed to be controlled, the time when the previous unit on the constrained waterway ends the occupation and the time when the same waterway is controlled and shielded are obtained, and the waterway constraint model of the pumped-storage units in the same waterway is constructed.
[0024] Furthermore, the active power coordination configuration model construction step includes:
[0025] Obtain the total electric energy in the energy market at time t, the total upward bid capacity in the frequency regulation market, the downward bid capacity in the frequency regulation market, the total power generation cost at time t, the total number of pumped storage power stations, the total number of hydropower stations, and the total number of photovoltaic power stations;
[0026] The total cost is obtained, and an active power coordination configuration model with the minimum total cost of regional power generation considering the power market is constructed.
[0027] Furthermore, the active power coordinated configuration optimization constraint condition model construction step includes:
[0028] Obtain the generating power and pumping power of the pumped-storage power station at time t, the upward frequency regulation capacity and downward frequency regulation capacity provided by the pumped-storage power station at time t, the fixed cost of the pumped-storage unit, the average electricity price of the pumped-storage power station, and the loss rate of the pumping process and the loss rate of the power generation process of the pumped-storage unit, and obtain the power generation cost of the pumped-storage power station;
[0029] Obtain the current capacity of the hydropower unit, the upward frequency regulation capacity, the downward frequency regulation capacity, the fixed cost coefficient of the hydropower unit's power generation cost, and the unit's variable cost coefficient to obtain the hydropower unit's power generation cost;
[0030] Obtain the power generation of photovoltaic power generation equipment, the unit power generation cost coefficient of the photovoltaic power station and the total cost of the photovoltaic power generation equipment to obtain the photovoltaic power generation cost;
[0031] A power generation cost accounting model is generated based on the power generation cost of pumped storage power stations, the power generation cost of hydropower units and the power generation cost of photovoltaic power plants.
[0032] Furthermore, the active power coordinated configuration optimization constraint model includes: power balance constraint, unit output limit constraint, frequency regulation capacity demand constraint and unit climbing constraint.
[0033] Furthermore, the active power coordinated configuration optimization constraint condition model construction step includes:
[0034] Obtain the power of the pumped storage power station at time t and the total load of the system at time t, and construct a power balance constraint;
[0035] Obtain the power of the i-th unit at time t, the frequency regulation capacity of the i-th unit at time t, and the upper and lower limits of the power of the i-th unit at time t, and construct the unit output limit constraint;
[0036] Obtain the frequency regulation capacity of the i-th unit at time t and the total frequency regulation power demand of the power grid at time t, and construct the frequency regulation capacity demand constraint;
[0037] Obtain the power of the i-th unit at the t-th time, the frequency regulation capacity of the i-th unit at the t-th time, the power of the i-th unit at the t-1-th time, the frequency regulation capacity of the i-th unit at the t-1-th time, and the climbing ability of the i-th unit in adjacent time periods to construct the unit climbing constraints.
[0038] The second aspect of the present invention provides a two-layer coordinated optimization active power configuration system considering hydro-solar-storage, including:
[0039] Data acquisition module, which obtains hydropower data in the regional power grid;
[0040] The lower-layer photovoltaic-storage complementary module is used to build a coordinated optimization model that takes into account the maximum benefits of pumped-storage power stations. It is used to complement photovoltaic power stations through the active power adjustment capabilities and actively absorb photovoltaic output fluctuations.
[0041] The upper-level regional active power coordination module is used to build an active power coordination configuration model that minimizes the total cost of regional power generation considering the power market. It is used to participate in the energy market and frequency regulation market through its active power adjustment capabilities. Photovoltaic generators participate in the energy market and coordinate with pumped storage units for optimization.
[0042] The two-layer optimization configuration module is used to obtain the Pareto optimal solution with maximum pumped storage benefits and minimum regional total power generation cost through multi-objective optimization based on the coordinated optimization model and the active power coordinated configuration model, and to determine the optimal active power allocation strategy for regional hydro-solar-storage coordination.
[0043] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0044] Based on the analysis of the operating characteristics of photovoltaic, pumped storage and hydropower generation, and combined with the current operating status of the energy market and frequency regulation market, a lower-level optimization model for the complementarity of pumped storage and photovoltaic power generation and an upper-level optimization model for the coordinated optimization of hydropower, photovoltaic and storage are constructed. Based on the two-layer optimization model, the coordinated complementarity of the active output of hydropower, photovoltaic and storage resources is achieved, the fluctuation of photovoltaic output is suppressed, and the consumption of photovoltaic is promoted. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0046] Figure 1 A flowchart of a two-layer coordinated optimization active power configuration method considering hydro-solar-storage provided by an embodiment of the present invention;
[0047] Figure 2 A diagram of the hydropower, pumped storage and photovoltaic composition of a regional control area provided in an embodiment of the present invention;
[0048] Figure 3 A schematic diagram of the structure of a double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage provided by an embodiment of the present invention;
[0049] Figure 4 A structural schematic diagram of a two-layer coordinated optimization active power configuration system considering hydro-solar-energy storage provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0050] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0051] Acquire regional hydropower, photovoltaic and pumped storage operation data, and construct a two-layer optimization configuration model based on the coordination of hydropower, photovoltaic and storage power to realize regional active power coordinated control. The two-layer optimization configuration model includes a coordinated optimization model and an active power coordinated configuration model.
[0052] With the goal of maximizing the benefits of pumped storage power stations, a photovoltaic-storage coordinated optimization constraint model is constructed and the coordinated optimization model is optimized.
[0053] Taking the minimum total regional power generation cost in the power market as the goal, an active power coordination configuration optimization constraint model is constructed to optimize the active power coordination configuration model.
[0054] The Pareto optimal solution with maximum benefit of pumped-storage power station and minimum total regional power generation cost is obtained, and the optimal active power allocation strategy for regional hydro-solar-storage coordination is determined.
[0055] Example 1
[0056] Specifically, Figure 1 As shown,
[0057] S(1) Obtain the output power and power regulation upper and lower limits of hydropower and pumped storage units in the regional power grid, the power forecast value of photovoltaic power generation units, the power generation costs of hydropower, pumped storage units and photovoltaic power generation in each period, and the electricity prices of energy market and frequency regulation market in the power market in each period.
[0058] like Figure 2 As shown in Figure 1, a certain power grid control area includes 1 hydropower station, 2 pumped storage power stations and 3 photovoltaic power stations.
[0059] S(2.1), in the complementary regulation area of the lower pumped-storage power station and the photovoltaic power station, a coordinated optimization model considering the maximum benefit of the pumped-storage power station is constructed.
[0060] In this step, the coordinated optimization calculation model for maximizing the benefit of the lower pumped storage power station is as follows:
[0061]
[0062] Where W sto represents the total revenue of the pumped storage power station; W t ene and W t tp They represent the benefits of the pumped storage power station participating in the energy market and frequency regulation market at time t; W t com represents the complementary benefits of the pumped storage power station and the photovoltaic power station at time t; represents the power generation cost of the pumped storage power station at time t.
[0063] In this step, the calculation model of the benefits of the lower-level pumped storage power station participating in the energy market, frequency regulation market and coordinating and complementing with photovoltaic power generation is as follows:
[0064]
[0065] In the formula, represents the price at which the energy market clears at time t; and They represent the generating power and pumping power of the pumped-storage power station at time t respectively; and They represent the upper frequency regulation capacity price, lower frequency regulation capacity price and frequency regulation mileage price of the frequency regulation market clearing at time t respectively; and They represent the upward frequency regulation capacity and downward frequency regulation capacity provided by the pumped storage power station at time t respectively; Indicates the ratio of FM mileage to FM capacity; and They represent the electricity price and pumping price of the power complementarity between the pumped storage power station and the photovoltaic power station at time t respectively; and They represent the planned power and actual power of the photovoltaic power station at time t; μ gen represents the power cost per unit time of the pumped storage power station; P t It represents the amount of electricity per unit time of the pumped-storage power station at time t.
[0066] In this step, the coordinated optimization constraint model for maximizing the benefit of the lower pumped storage power station is as follows:
[0067] The output constraint model of the pumped storage unit is as follows:
[0068]
[0069] In the formula, and They represent the lower power limit and upper power limit of the generating unit of the pumped storage power station respectively; and They represent the lower power limit and upper power limit of the unit pumping in the pumped storage power station respectively; and They respectively represent the generating power and pumping power of the units during the power complementarity process between the pumped-storage power station and the photovoltaic power station.
[0070] The reservoir capacity constraint model of the pumped storage unit is as follows:
[0071] V0=V T
[0072] V min ≤V t ≤V max
[0073]
[0074] Where V t V represents the upper reservoir capacity of the pumped storage power station at time t; min and V max They respectively represent the lower and upper limits of the reservoir capacity of the pumped-storage power station; α represents the conversion coefficient between the reservoir capacity and the unit power of the pumped-storage power station; β represents the power generation efficiency of the pumped-storage power station.
[0075] Since there are multiple pumped storage units in a pumped storage power station that share the same waterway, the start and stop processes of the units cannot occur at the same time, that is, the units cannot be started or stopped at the same time, and one unit cannot be started while other units are stopped. The waterway constraint model for pumped storage units in the same waterway is as follows:
[0076]
[0077] t cont >t endc +T waterway
[0078] In the formula, and They respectively indicate that the units in the same waterway at time t are in power generation state or pumping state. When they are in the corresponding state, their value is 1, otherwise it is 0; t cont represents the next time the restricted waterway is allowed to be controlled; t endc Indicates the time when a unit on the constrained waterway ends its occupancy; T waterway The shielding time for controlling the same waterway is generally set to 2 to 3 minutes.
[0079] S(2.2), in the upper hydro-solar-storage coordinated control area, the active power coordinated configuration model considering the minimum total regional power generation cost in the power market is as follows:
[0080]
[0081] Where W tot represents the total cost; P t ENE , and They represent the total electric energy in the energy market, the total upward bid capacity in the frequency regulation market, and the downward bid capacity in the frequency regulation market at time t respectively; represents the total power generation cost at time t; M, N and L represent the total number of pumped storage power stations, the total number of hydropower stations and the total number of photovoltaic power stations in the system, respectively.
[0082] In this step, the power generation cost accounting model of regional hydropower, photovoltaic power generation and pumped storage power stations is as follows:
[0083]
[0084] In the formula, and They represent the total power generation cost of the pumped-storage power station, the total power generation cost of the hydropower station and the total power generation cost of photovoltaic power generation at the t moment respectively.
[0085] The cost of a pumped storage unit is calculated by the combination of fixed cost and variable cost, where the variable cost mainly includes pumping cost and unit loss cost. The cost of a pumped storage unit can be described by a univariate linear function:
[0086]
[0087] Where, a1 represents the fixed cost of the pumped storage unit; represents the average electricity price of the pumped-storage power station; β1 and β2 represent the loss rate of the pumping process and the loss rate of the power generation process of the pumped-storage unit, respectively.
[0088] The cost of a hydropower unit mainly consists of fixed cost and operating cost, and its cost can be described by a quadratic function:
[0089]
[0090] In the formula, a2 represents the fixed cost coefficient of hydropower generation cost; b2 and c2 represent the variable cost coefficients of the unit.
[0091] The photovoltaic cost is described by the equipment aging cost, and its cost function is expressed as
[0092]
[0093] Where, k represents the unit power generation cost coefficient of the photovoltaic power station; G solar Represents the total cost of photovoltaic power generation equipment.
[0094] In this step, the upper layer considers the optimization constraint model of active power coordination configuration with the minimum total cost of regional power generation in the power market as follows:
[0095] The constraints mainly consider the system power balance constraint, unit output limit constraint, frequency regulation capacity demand constraint and unit climbing constraint. The constraint expression is:
[0096] P t ENE =P t LOAD
[0097]
[0098] Where P t LOAD represents the total load of the system at time t; and They represent the upper and lower limits of the power of the ith unit at time t respectively; P represents the total frequency regulation power demand of the power grid at time t; i ramp It represents the climbing ability of the i-th unit in adjacent time periods.
[0099] S(3), such as Figure 3 As shown in the figure, based on the two-layer optimization model, the Pareto optimal solution with maximum pumped storage benefits and minimum regional total power generation cost is obtained by optimizing the multi-objective optimization algorithm, thereby obtaining the optimal active power allocation strategy for regional hydro-solar-storage coordination.
[0100] Example 2
[0101] like Figure 4 As shown, the patent implementation of the present invention discloses a two-layer coordinated optimization active power configuration system considering hydro-photovoltaic storage, which specifically includes:
[0102] The data acquisition module obtains the output power and power regulation upper and lower limits of hydropower generation and pumped storage units in the regional power grid, the power forecast value of photovoltaic generators, the power generation costs of hydropower generation, pumped storage units and photovoltaic power generation in each period, and the electricity prices of the energy market and frequency regulation market in the power market in each period;
[0103] The lower-layer photovoltaic-storage complementary module is used to build a coordinated optimization model that takes into account the maximum benefits of pumped-storage power stations. Pumped-storage power stations complement photovoltaic power stations through their active up and down regulation capabilities, actively absorbing photovoltaic output fluctuations;
[0104] The upper-level regional active power coordination module is used to construct an active power coordination configuration model that minimizes the total cost of regional power generation considering the power market. Hydropower stations and pumped storage power stations in the region participate in the energy market and frequency regulation market through their active power adjustment capabilities, and photovoltaic generators participate in the energy market and coordinate with pumped storage units for optimization;
[0105] The two-layer optimization configuration module is used to obtain the Pareto optimal solution with the maximum pumped storage benefit and the minimum regional total power generation cost through multi-objective optimization solution based on the above two-layer active power optimization coordination configuration model, so as to obtain the optimal active power allocation strategy for regional hydro-solar-storage coordination.
[0106] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A two-layer coordinated optimization method for active power allocation considering hydro-solar-storage. It is characterized in that The specific steps include: Acquire regional hydropower, photovoltaic and pumped storage operation data, and construct a two-layer optimization configuration model based on the coordination of hydropower, photovoltaic and storage power to realize regional active power coordinated control. The two-layer optimization configuration model includes a coordinated optimization model and an active power coordinated configuration model. With the goal of maximizing the benefits of pumped storage power stations, a photovoltaic-storage coordinated optimization constraint model is constructed and the coordinated optimization model is optimized. Taking the minimum total regional power generation cost in the power market as the goal, an active power coordination configuration optimization constraint model is constructed to optimize the active power coordination configuration model. The Pareto optimal solution with maximum benefit of pumped-storage power station and minimum total regional power generation cost is obtained, and the optimal active power allocation strategy for regional hydro-solar-storage coordination is determined.
2. According to the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage as described in claim 1, It is characterized in that The coordination optimization model building step comprises: The benefits of the pumped-storage power station participating in the energy market and frequency regulation market at time t, the benefits of the complementarity between the pumped-storage power station and the photovoltaic power station at time t, and the power generation cost of the pumped-storage power station at time t are obtained, and the total benefit of the pumped-storage power station is obtained, and a coordinated optimization model with the maximum benefit of the lower-level pumped-storage power station is constructed.
3. According to claim 2, the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage, It is characterized in that The steps to obtain the benefits of the pumped storage power station participating in the energy market and frequency regulation market at time t, the benefits of the pumped storage power station complementing the photovoltaic power station at time t, and the power generation cost of the pumped storage power station at time t include: According to the clearing price of the energy market at time t, the power generation and pumping power of the pumped storage power station at time t, the income of the pumped storage power station participating in the energy market at time t is obtained; According to the upper frequency regulation capacity price, lower frequency regulation capacity price and frequency regulation mileage price cleared by the frequency regulation market at time t, the upper frequency regulation capacity and lower frequency regulation capacity, frequency regulation mileage and frequency regulation capacity ratio provided by the pumped storage power station at time t, the benefits of the pumped storage power station participating in the frequency regulation market at time t are obtained; According to the power generation price and pumping price of the pumped storage power station and the photovoltaic power station at time t, the planned power and actual power of the photovoltaic power station at time t, the benefits of the complementarity between the pumped storage power station and the photovoltaic power station at time t are obtained; According to the power cost per unit time of the pumped-storage power station and the amount of electricity per unit time of the pumped-storage power station at time t, the power generation cost of the pumped-storage power station at time t is obtained.
4. According to the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage as described in claim 1, It is characterized in that The coordinated optimization constraint condition model includes: a pumped storage unit output constraint model, a pumped storage unit reservoir capacity constraint model and a pumped storage unit waterway constraint model in the same waterway.
5. According to the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage as described in claim 4, It is characterized in that The steps of constructing the coordinated optimization constraint model for maximizing the benefit of the lower pumped storage power station include: Obtain the lower and upper limits of the power units of the pumped-storage power station, the lower and upper limits of the power units of the pumped-storage power station, and the power generation power and pumping power of the units in the process of power complementarity between the pumped-storage power station and the photovoltaic power station, and construct an output constraint model for the pumped-storage units; Obtain the upper reservoir capacity of the pumped storage power station at time t, the lower and upper limits of the upper reservoir capacity of the pumped storage power station, the conversion coefficient between the reservoir capacity of the pumped storage power station and the unit power, and the power generation efficiency of the pumped storage power station, and construct a reservoir capacity constraint model for the pumped storage unit; The time when the units in the same waterway are in the power generation state or the pumping state at time t, the next time the constrained waterway is allowed to be controlled, the time when the previous unit on the constrained waterway ends the occupation and the time when the same waterway is controlled and shielded are obtained, and the waterway constraint model of the pumped-storage units in the same waterway is constructed.
6. According to claim 1, the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage, It is characterized in that The active power coordination configuration model construction step includes: Obtain the total electric energy in the energy market at time t, the total upward bid capacity in the frequency regulation market, the downward bid capacity in the frequency regulation market, the total power generation cost at time t, the total number of pumped storage power stations, the total number of hydropower stations, and the total number of photovoltaic power stations; The total cost is obtained, and an active power coordination configuration model with the minimum total cost of regional power generation considering the power market is constructed.
7. According to claim 6, the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage, It is characterized in that The active power coordinated configuration optimization constraint condition model construction step includes: Obtain the generating power and pumping power of the pumped-storage power station at time t, the upward frequency regulation capacity and downward frequency regulation capacity provided by the pumped-storage power station at time t, the fixed cost of the pumped-storage unit, the average electricity price of the pumped-storage power station, and the loss rate of the pumping process and the loss rate of the power generation process of the pumped-storage unit, and obtain the power generation cost of the pumped-storage power station; Obtain the current capacity of the hydropower unit, the upward frequency regulation capacity, the downward frequency regulation capacity, the fixed cost coefficient of the hydropower unit's power generation cost, and the unit's variable cost coefficient to obtain the hydropower unit's power generation cost; Obtain the power generation of photovoltaic power generation equipment, the unit power generation cost coefficient of the photovoltaic power station and the total cost of the photovoltaic power generation equipment to obtain the photovoltaic power generation cost; A power generation cost accounting model is generated based on the power generation cost of pumped storage power stations, the power generation cost of hydropower units and the power generation cost of photovoltaic power plants.
8. According to claim 1, the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage, It is characterized in that The active power coordinated configuration optimization constraint model includes: power balance constraint, unit output limit constraint, frequency regulation capacity demand constraint and unit climbing constraint.
9. The double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage according to claim 8, It is characterized in that The active power coordinated configuration optimization constraint condition model construction step includes: Obtain the power of the pumped storage power station at time t and the total load of the system at time t, and construct a power balance constraint; Obtain the power of the i-th unit at time t, the frequency regulation capacity of the i-th unit at time t, and the upper and lower limits of the power of the i-th unit at time t, and construct the unit output limit constraint; Obtain the frequency regulation capacity of the i-th unit at time t and the total frequency regulation power demand of the power grid at time t, and construct the frequency regulation capacity demand constraint; Obtain the power of the i-th unit at the t-th time, the frequency regulation capacity of the i-th unit at the t-th time, the power of the i-th unit at the t-1-th time, the frequency regulation capacity of the i-th unit at the t-1-th time, and the climbing ability of the i-th unit in adjacent time periods to construct the unit climbing constraints.
10. A system applied to the double-layer coordinated optimization active power configuration method considering hydro-solar-energy storage as described in any one of claims 1 to 9, characterized in that: include: Data acquisition module, which obtains hydropower data in the regional power grid; The lower-layer photovoltaic-storage complementary module is used to build a coordinated optimization model that takes into account the maximum benefits of pumped-storage power stations. It is used to complement photovoltaic power stations through the active power adjustment capabilities and actively absorb photovoltaic output fluctuations. The upper-level regional active power coordination module is used to build an active power coordination configuration model that minimizes the total cost of regional power generation considering the power market. It is used to participate in the energy market and frequency regulation market through its active power adjustment capabilities. Photovoltaic generators participate in the energy market and coordinate with pumped storage units for optimization. The two-layer optimization configuration module is used to obtain the Pareto optimal solution with maximum pumped storage benefits and minimum regional total power generation cost through multi-objective optimization based on the coordinated optimization model and the active power coordinated configuration model, and to determine the optimal active power allocation strategy for regional hydro-solar-storage coordination.