Low-carbon elastic driving source storage multi-stage planning method considering hybrid uncertainty
By constructing a multi-stage deterministic model and expanding it into a random planning model with multiple mixed uncertainties, combined with a random dynamic dual integer programming algorithm, the problem of conflicts between emission reduction and elastic demand in the existing technology is solved, and the low distribution network is achieved Carbon elastic drive source storage multi-stage planning has improved the system's dynamic planning capabilities and new energy consumption capabilities.
Patent Information
- Application Number
- CN202410953173.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-12
AI Technical Summary
The prior art is difficult to meet the system's elastic needs while ensuring emission reduction targets, and traditional static planning methods are difficult to accurately characterize the impact of dynamic uncertainty, ignoring the impact of long-term uncertainty on planning decision results.
Using a low-carbon elastically driven source storage multi-stage planning method that considers mixed uncertainty, the multi-stage deterministic model is constructed and expanded into a random planning model with multiple mixed uncertainty, combined with a random dynamic dual integer programming algorithm, the exogenous sum is included. Short-term and long-term uncertainty driven by endogenous factors, optimize the source storage planning of the distribution network.
It has achieved dynamic planning to meet the system's elastic needs while ensuring emission reduction goals, providing a more economical-technical phased source storage strategy, and improving the performance of the distribution network in extreme events and new energy consumption capabilities.
Smart Images

Figure CN118944191A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of source and reservoir planning, and in particular relates to a low-carbon elastically driven source and reservoir multi-stage planning method considering mixed uncertainty. Background Art
[0002] Climate change has attracted widespread attention to energy conservation and emission reduction worldwide. The large-scale access to renewable energy has greatly promoted the low-carbon transformation of the energy system. In particular, the future low-carbon energy system with the distribution network as the hub will have a high penetration rate of wind power and photovoltaic power. However, as another important impact of climate change, high-impact, low-probability extreme events have caused many countries to worry about the insufficient resilience of energy supply. Therefore, it is crucial to formulate a long-term development strategy to gradually achieve its low-carbon goal while ensuring the climate adaptability of the energy system.
[0003] The distribution network has a relatively flexible organizational form and can be flexibly planned to adapt to the needs of low-carbon transformation, but its weak grid also makes it more vulnerable to extreme events. At present, existing studies have optimized the system configuration on the distribution network side from the two perspectives of system emission reduction and system resilience enhancement. Specifically, some studies start with the problem of system emission reduction and tend to deal with carbon emissions by deploying renewable energy and carbon capture devices in order to achieve relatively high investment economy. On the other hand, some planning methods that focus on enhancing system resilience emphasize the use of gas turbines and energy storage systems, both of which can provide emergency response capabilities, thereby enhancing the performance of the system under extreme events.
[0004] Existing planning research often focuses on one aspect of emission reduction or resilience enhancement on the distribution network side. However, in fact, due to the different costs of various system components and their applicability in terms of emission reduction and resilience enhancement, there are conflicts in planning schemes under different objectives. Energy component planning schemes that are conducive to system emission reduction may damage system resilience under extreme events, and vice versa. In addition, existing research often models planning problems as static two-stage stochastic problems. In this modeling method, investment decision optimization is carried out in the first stage, while operational decision optimization taking into account uncertainty is carried out in the second stage. However, source and storage planning driven by low-carbon resilience is essentially a long-term multi-stage decision-making process. Traditional static planning methods are difficult to accurately characterize the impact of dynamic uncertainty factors on related decisions and have inherent limitations. In addition, few studies have taken into account long-term policy-related uncertainties, such as phased carbon emission reduction requirements, which also have a crucial impact on planning results. In addition, there are many types of exogenous and endogenous uncertainties in the planning decision-making process. Existing studies focus more on exogenous uncertainties, such as load fluctuations and the randomness of renewable energy. However, few studies model endogenous uncertainties (uncertainty realization is affected by decision factors) in planning problems and consider their specific impact in planning problems. Therefore, it is necessary to consider the impact of long-term and short-term uncertainties driven by exogenous and endogenous factors in multi-stage dynamic programming problems. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a low-carbon elastic driven source and storage multi-stage planning method considering mixed uncertainty in response to the deficiencies in the above-mentioned prior art, which is used to solve the technical problem of meeting the system elasticity requirements while ensuring the realization of emission reduction targets, give full play to the flexible organizational form of the distribution network, make up for the gap in the impact of long-term uncertainty on planning decision-making results that has been ignored by existing planning studies, and provide a more economical and technically efficient phased source and storage dynamic planning strategy for the low-carbon elastic evolution of the distribution network.
[0006] The present invention adopts the following technical solutions:
[0007] The multi-stage planning method of low-carbon elasticity-driven source and storage considering mixed uncertainty includes the following steps:
[0008] S1. Obtain distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage;
[0009] S2. Based on the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage obtained in step S1, a low-carbon elastic driven source storage multi-stage deterministic planning model adapting to multiple types of planning strategies is constructed to determine the objective function, investment and operation constraints, and planning strategy restrictions;
[0010] S3, further expanding the low-carbon elastic driven source and reservoir multi-stage deterministic planning model obtained in step S2 to construct a low-carbon elastic driven source and reservoir multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors;
[0011] S4. Solve the low-carbon elastic driven source-storage multi-stage stochastic programming model with multiple mixed uncertainties obtained in step S3 on the distribution network to obtain a low-carbon elastic driven source-storage multi-stage stochastic programming result considering multiple mixed uncertainties.
[0012] Preferably, in step S2, the objective function is specifically:
[0013]
[0014] Among them, C NPV is the total system cost during the planning period; is the investment cost of the new components in each stage s during the planning period; is the distribution network operation cost in each stage s during the planning period; R is the discount rate; Y is the number of years in the planning stage.
[0015] Preferably, the investment and operation constraints include:
[0016] Investment constraints:
[0017] The newly added capacity of the node of component k in stage s is subject to the following restrictions:
[0018]
[0019] in, represents the construction capacity of component k at node i in phase s; represents the upper limit of the newly built capacity of component k at node i; represents the construction capacity of the carbon capture device at node i in phase s; represents the upper limit of the newly invested capacity of the carbon capture device at node i; ESS represents energy storage elements; WT represents wind turbine elements; PV represents photovoltaic elements; GT represents gas turbine elements.
[0020] The total new capacity of component k in the distribution network is subject to the following restrictions:
[0021]
[0022] Among them, Λ k Represents the upper limit of the total newly added capacity of component k in each stage; Λ CCS Represents the upper limit of the total new capacity of carbon capture equipment to be built in each stage.
[0023] Various distributed source and storage operation constraints:
[0024] The relevant constraints for renewable energy are as follows:
[0025]
[0026] in, is the wind power / PV output power at node i in period t of phase s; is the availability coefficient of renewable energy at node i in period t of stage s. When an extreme event occurs in period t, the value will become relatively small to characterize the vulnerability of renewable energy to extreme events. is the upper limit of wind power / PV output power at node i in period t of phase s.
[0027] The relevant constraints for gas turbines equipped with carbon capture devices are as follows:
[0028]
[0029]
[0030] in, represents the active power output of the gas turbine at node i in the tth period of the sth stage; represents the installed capacity of the gas turbine at node i in stage s; represents the reactive power output of the gas turbine at node i during the tth period of the sth stage; θ i represents the power factor angle at node i; represents the carbon emissions of the gas turbine at node i in the tth period of the sth stage; ρ Emi,GT represents the carbon emission density of gas turbines; represents the carbon emissions that can be processed by the carbon capture device at node i in the tth period of the sth phase; represents the installed capacity of the carbon capture device at node i in stage s; represents the power consumption of the carbon capture device during the carbon capture process at node i in the tth period of the sth stage; β CCS represents the electricity consumption factor of the carbon capture device; represents the carbon emissions captured by the carbon capture device at node i in the tth period of the sth phase; η CCS Represents the capture efficiency of the carbon capture device.
[0031] The energy storage related constraints are as follows:
[0032]
[0033] in, They represent the charging / discharging power of the energy storage at node i in the tth period of the sth stage; represents the installed capacity of energy storage at node i in stage s; represents the stored energy stored at node i in the tth period of the sth stage; σ DOD Represents the maximum discharge depth of energy storage; τ ESS Represents the configuration duration of energy storage; η ESS.C Represents the charging efficiency of energy storage; η ESS.D Represents the discharge efficiency of energy storage.
[0034] The active and reactive power balance constraints of all nodes in the distribution network are expressed as:
[0035]
[0036] Among them, P ij,t,s represents the active power flow on line ij in period t of phase s; Q ij,t,s represents the reactive power flow on line ij in period t of phase s; represents the active load at node j at time t in phase s; Represents the reactive load at node j at time t in stage s; Ω F (j),Ω C (j) represents the set of child / parent nodes of node j.
[0037] The limits on voltage drop and node voltage amplitude on each distribution feeder are described as follows:
[0038]
[0039] Among them, V i,t,s represents the voltage amplitude at node i in the tth period of the sth stage; r ij represents the resistance of line ij; x ij represents the reactance of line ij; V0 represents the rated voltage of the distribution network; V i , Represent the lower and upper limits of the voltage amplitude at node i respectively.
[0040] The active / reactive power flow is limited according to the line capacity as follows:
[0041]
[0042] in, They represent the upper limits of active power and reactive power transmission of line ij respectively.
[0043] The extreme operating constraints of the distribution network are as follows:
[0044]
[0045] Among them, u ij,s represents the binary indicator corresponding to line ij at stage s; Represents the active power flow on line ij in the tth period of stage s under extreme operating conditions.
[0046] The constraints related to node load loss are as follows:
[0047]
[0048] in, They represent the active and reactive power relaxation at node j in the tth period of stage s under extreme operating conditions; Represents the engine output at node j in the tth period of stage s under extreme operating conditions; represents the wind turbine output at node j in the tth period of stage s under extreme operating conditions; represents the PV output at node j in period t in stage s under extreme operating conditions; Represents the energy storage discharge power at node j in the tth period of stage s under extreme operating conditions; Represents the energy storage charging power at node j in period t in stage s under extreme operating conditions; represents the active power flow on line ij in the tth period of stage s under extreme operating conditions; represents the load at node j in period t in stage s under extreme operating conditions; Represents the power of the carbon capture device at node j in the tth period of stage s under extreme operating conditions.
[0049] The voltage drop formula for the damaged line is relaxed, and the relevant constraints are as follows:
[0050]
[0051] in,
[0052] represents the voltage amplitude at node j in period t in stage s under extreme operating conditions; Represents the voltage drop on line ij in the tth period of stage s under extreme operating conditions.
[0053] Preferably, planning strategy constraints include:
[0054] Emission reduction strategies:
[0055]
[0056] Among them, E0 represents the current carbon emission level (i.e., carbon emissions in stage 0); represents the emission reduction target in stage s; represents the carbon quota purchased in the sth phase; D represents the number of typical days; ρ Emi,GT Indicates the carbon emission coefficient of the gas turbine; represents the active power output of the gas turbine at node i in the tth period of the sth stage; The carbon emissions captured by the carbon capture device at node i in the tth period of the sth phase; Δt represents the time scale, which is generally 1 hour; represents the carbon emission density of the power supply from the upper power grid in period t; P 01,t,s It represents the power supply of the upper power grid in the tth period of the sth stage;
[0057] Resilience Enhancement Strategies:
[0058]
[0059] Where L0 represents the current critical load loss level (i.e., load loss at stage 0); Characterizes the expected resilience improvement level of the system at stage s; σ i represents the load weight coefficient at node i; represents the active power relaxation at node i in the tth period of the sth stage, i.e., the load loss;
[0060] Carbon capture device access strategy:
[0061]
[0062] in, represents the integration target of the carbon capture device in the system at stage s; represents the installed capacity of the carbon capture device at node i in the sth stage; ρ Emi,GT It represents the carbon emission coefficient of gas turbine; represents the installed capacity of the gas turbine at node i in stage s;
[0063] Energy storage access strategy:
[0064]
[0065] in, Indicates the proportion of energy storage required to be met in stage s; represents the energy storage installed capacity at node i in stage s; represents the installed capacity of the wind turbine at node i in stage s; represents the photovoltaic installed capacity at node i in stage s.
[0066] Preferably, step S3 specifically includes:
[0067] The multi-stage stochastic programming problem is constructed as a Markov process; the optimization problem based on the Markov process is equivalently converted into a construction based on the scenario tree;
[0068] Through sampling, random scene sets are generated stage by stage to characterize the uncertainty of power demand and wind and solar resources, and the carbon emission intensity is discretized to characterize the carbon emission level of the distribution network. The randomness of the carbon quota price follows the Gaussian distribution, and the scene generation technology is used to generate a discrete carbon emission intensity level. The uncertainty of the realization is sampled, and then a random scene can be obtained Modeling of short-term uncertainty driven by endogenous and exogenous factors;
[0069] Model long-term uncertainty as decision-related uncertainty, use discrete probability distribution functions to describe random characteristics, and control probability distribution characteristics by adjusting the uncertainty realization value at each probability level to achieve long-term uncertainty modeling driven by endogenous and exogenous factors;
[0070] The problem is solved using a stochastic dynamic dual integer programming algorithm.
[0071] Preferably, the optimization problem based on the Markov process is equivalently converted into a construction based on the scene tree as follows:
[0072]
[0073] in, Represents the uncertainty factor ξ in the long-term uncertainty scenario m s Implementation of and Respectively represent nodes The set of parent nodes and child nodes of ψ s (n s-1 ,ξ s ) represents the uncertainty ξ at stage s s The feasible domain of decision making under represents the investment decision variable under uncertainty scenario m in stage s; represents the operational decision variable under the uncertainty scenario m in the sth stage; m′ represents the long-term uncertainty scenario, which is used to distinguish it from m; |S| represents the total number of stages; n s represents the investment decision variable in stage s, h s represents the operational decision variable of the sth stage; Represents the corresponding coefficient matrix and vector of the sth stage.
[0074] Preferably, random scenes Specifically:
[0075]
[0076]
[0077] in, represents a binary indicator; represents the expected cost of purchasing carbon allowances; Represents the discrete carbon emission intensity level boundary in the lth interval of the sth stage; represents the carbon emission intensity in the sth phase; B represents the number of uncertain scenarios; represents the carbon quota price corresponding to the lth interval of the bth uncertain scenario in the sth phase; Represents the carbon quota purchased in the sth stage; s represents the stage scenario.
[0078] Preferably, the randomized dynamic dual integer programming algorithm is used to solve the problem:
[0079] The forward iteration process of all long-term uncertainty scenarios starts from the first stage and ends at the last stage. For each stage, given the current estimate of the expected cost function of that stage, the optimal solution set of the current iteration of that stage is obtained by solving the optimization problem, and then the optimal solution set is used to update the approximate expected cost function in the backward step. After completing the τth iteration of all long-term uncertainty scenarios in the scenario tree, a set of stage-by-stage feasible solutions is obtained. and the optimal target value corresponding to each long-term uncertainty scenario;
[0080] The backward iteration process for all long-term uncertainty scenarios starts from the last stage and ends at stage 2, based on the latest optimal decision obtained in the previous step. For the τth iteration stage S The dual variable in the approximate expected cost function of Update by relaxing the integer variables into continuous variables and solving their linear relaxation form to obtain the dual variable solution, generate a new lower bound estimate of the expected cost function based on the newly generated dual variable solution, and add it to the optimization problem, and obtain the effective lower bound LB of the original problem by solving the optimization problem of stage 1;
[0081] Iterate the forward and backward steps and converge to the optimal solution if UB equals LB.
[0082] Preferably, the multi-stage stochastic planning results of low-carbon elastic driving source and storage include:
[0083] Analysis of multi-stage planning results under different planning strategies; analysis of the impact of long-term uncertainty modeling on planning results; the impact of the same carbon quota price on distribution network investment decisions; verification on other distribution networks with different scenarios.
[0084] In a second aspect, an embodiment of the present invention provides a low-carbon elastic driving source storage multi-stage planning system considering hybrid uncertainty, including:
[0085] Parameter module, which obtains distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage;
[0086] The construction module builds a low-carbon elastic driven source-storage multi-stage deterministic planning model that adapts to multiple types of planning strategies based on the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage obtained by the parameter module, and determines the objective function, investment and operation constraints, and planning strategy restrictions;
[0087] The extension module further expands the low-carbon elastic driven source and storage multi-stage deterministic planning model obtained by the construction module to construct a low-carbon elastic driven source and storage multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors;
[0088] The planning module solves the multi-stage stochastic programming model of low-carbon elastic driven source and storage with multiple mixed uncertainties obtained by the extension module on the distribution network, and obtains the multi-stage stochastic programming results of low-carbon elastic driven source and storage considering multiple mixed uncertainties.
[0089] In a third aspect, a computer device comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the above-mentioned multi-stage planning method for low-carbon elastic driven source storage considering mixed uncertainty are implemented.
[0090] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned low-carbon elastic driven source storage multi-stage planning method considering hybrid uncertainty.
[0091] Compared with the prior art, the present invention has at least the following beneficial effects:
[0092] The low-carbon elastic driven source storage multi-stage planning method considering mixed uncertainty first obtains the data required for the problem to provide boundary conditions and parameter inputs for the subsequent model establishment; then, based on the collected parameters, a low-carbon elastic driven source storage multi-stage deterministic planning model that adapts to multiple types of planning strategies is constructed, so that the operation process of the low-carbon elastic distribution network can be represented by a mathematical programming model, which is convenient for subsequent expansion; then, the multi-stage deterministic model of the low-carbon elastic distribution network proposed in the previous step is integrated, and it is expanded to construct the low-carbon elastic driven source storage multi-stage stochastic programming model considering multiple mixed uncertainties of the present invention; finally, a fast solution algorithm suitable for multi-stage dynamic programming problems is proposed to accelerate the speed of calling commercial solvers to solve the model, and obtain the multi-stage stochastic planning planning results of the low-carbon elastic distribution network source storage. The present invention refines the model of the low-carbon elastic driven distribution network source storage multi-stage deterministic planning model, and further expands it into a stochastic programming model considering long-term and short-term uncertainties. The constructed planning model can complete the optimization calculation under the support of general commercial solvers and combined with the accelerated solution algorithm proposed by the present invention. The results calculated by this method can be directly used for the multi-stage planning of distribution network sources and storage, providing a more economical and technically feasible staged source and storage dynamic planning strategy for the low-carbon elastic evolution of distribution networks.
[0093] Furthermore, setting the relevant investment and operation constraints of the distribution network optimization planning model is a necessary step to execute the subsequent calculation process. The investment scale, normal and extreme operating conditions, and system flow conditions of various types of equipment are restricted in order to ensure that the planning and calculation results of the distribution network can meet the basic requirements of power system planning economy and operational safety, and that the model calculation results can better simulate the actual operation of the distribution network and ensure the accuracy of the planning results.
[0094] Furthermore, setting planning strategy constraints for the distribution network optimization planning model, including emission reduction, resilience enhancement, carbon capture device access, energy storage access, and other strategies, is a necessary step in executing the subsequent calculation process. The planning strategy reflects the investment tendency of investors during the planning period, which can ensure that the final planning results meet certain specific needs of investors while maintaining a stable planning flow to avoid potential negative effects caused by over / under investment.
[0095] Furthermore, the low-carbon elastic driven source storage multi-stage stochastic programming model considering multiple mixed uncertainties is extended and constructed. The purpose is to use a mathematical programming model to express the mixed uncertainty of the dynamic programming of the distribution network, to characterize the short-term and long-term uncertainties driven by exogenous and endogenous factors in the multi-stage dynamic programming process, and to study and analyze its impact on the long-term dynamic programming results on this basis. It is a necessary step to execute subsequent calculation processes and meet the innovation of the present invention. Considering that there will be a large number of uncertain factors in the planning decision-making process, including uncertain factors such as electricity demand, wind and solar output, and carbon quota prices, these uncertain factors often have a significant impact on the planning structure. Therefore, it is necessary to incorporate the long-term and short-term uncertainty impacts driven by exogenous and endogenous factors into the multi-stage dynamic programming problem.
[0096] Furthermore, the use of randomized dynamic dual integer programming algorithm to solve the problem is an important step to improve the efficiency of solving and execute the subsequent calculation process. In order to reduce the computational complexity, the present invention introduces a randomized dynamic dual integer programming method to decompose the original problem into multiple phased sub-problems, and coordinates the solution of different sub-problems through two-step alternating iterations, while using an enhanced cut generation method to improve the solution performance of the randomized dynamic dual integer programming algorithm.
[0097] It can be understood that the beneficial effects of the second aspect mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here.
[0098] In summary, the present invention can make full use of the flexible organizational form of the distribution network, effectively promote new system emission reduction and enhance system resilience, realize the low-carbon elastic transformation of the distribution network system, and improve the performance of the distribution network under extreme events while saving energy and reducing emissions.
[0099] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0100] Figure 1 A flowchart for executing multi-stage planning of source and reservoir driven by low-carbon resilience considering multiple hybrid uncertainties;
[0101] Figure 2 Schematic diagram of a multi-stage random decision-making process with mixed uncertainty;
[0102] Figure 3 This is a schematic diagram of the scene tree;
[0103] Figure 4 To improve the IEEE 33-node distribution network schematic;
[0104] Figure 5 This is a schematic diagram of the planning results of various components in the distribution network;
[0105] Figure 6 This is a schematic diagram of the results of the source and storage dynamic planning of the distribution network in each stage;
[0106] Figure 7 It is a schematic diagram of the cumulative investment capacity of renewable energy components;
[0107] Figure 8 This is a diagram showing the percentage of contribution to emission reduction;
[0108] Fig. 9 Schematic diagram of the cumulative capacity under different cost reduction rates of "gas turbine + carbon capture device".
[0109] Fig.10 A schematic diagram of a computer device provided by an embodiment of the present invention.
[0110] Fig.11 The block diagram of a chip provided according to an embodiment of the present invention. DETAILED DESCRIPTION
[0111] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0112] In the description of the present invention, it should be understood that the terms “include” and “comprises” indicate the presence of described features, wholes, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof.
[0113] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0114] It should be further understood that the term "and / or" used in the present specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects are in an "or" relationship.
[0115] It should be understood that, although the terms first, second, third, etc. may be used to describe preset ranges, etc. in the embodiments of the present invention, these preset ranges should not be limited to these terms. These terms are only used to distinguish preset ranges from each other. For example, without departing from the scope of the embodiments of the present invention, the first preset range may also be referred to as the second preset range, and similarly, the second preset range may also be referred to as the first preset range.
[0116] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0117] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0118] The present invention provides a low-carbon elasticity driven source and storage multi-stage planning method considering mixed uncertainty, which balances the planning requirements of each stage through the source and storage dynamic planning framework to achieve dynamic evolution to a low-carbon elastic system; at the same time, by incorporating systematic mixed multiple uncertainty modeling into the model, the impact of mixed uncertainty on multi-stage planning can be fully quantified; it can give full play to the flexible organizational form of the distribution network, solve the difficulty of meeting the system elasticity requirements while ensuring the realization of emission reduction targets, and improve the distribution network's ability to absorb new energy. At the same time, the impact of mixed uncertainty on multi-stage planning is quantified, which to a certain extent fills the gap in the impact of long-term uncertainty on planning decision-making results that has been ignored by existing planning research, and comprehensively considers the impact of endogenous and exogenous uncertainty factors on planning results, providing a more economic-technical staged source and storage dynamic planning strategy for the low-carbon elastic evolution of the distribution network.
[0119] See also Figure 1 The present invention provides a multi-stage planning method for low-carbon elastic driving source and storage considering mixed uncertainty, comprising the following steps:
[0120] S1. Obtain relevant data from relevant departments, including: distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage;
[0121] When applying the model proposed in the present invention, it is necessary to obtain distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage and carbon capture devices from relevant departments.
[0122] Distribution network system parameters: network topology of the distribution network system, the status of existing components in the distribution network, impedance data of each branch of the distribution network system, and active and reactive load data of each node in the distribution network system.
[0123] Multi-stage planning parameters: planning period, planning stage time, annual load growth rate, carbon emission reduction target and probability during the planning period.
[0124] Technical and economic parameters of generators: access location of new energy distributed generator sets in the distribution network, unit investment cost, unit carbon emissions, and unit operating costs.
[0125] Technical and economic parameters of energy storage and carbon capture devices: access location of energy storage and carbon capture devices in the distribution network, energy storage efficiency, energy storage duration, energy storage investment cost, unit operating cost, carbon capture device power consumption coefficient, and carbon capture device capture efficiency.
[0126] S2. Construct a low-carbon elastic driving source storage multi-stage deterministic planning model that adapts to multiple types of planning strategies, give the assumptions and simplifications involved in the present invention, and determine the objective function, investment and operation constraints, and planning strategy restrictions of the multi-stage planning;
[0127] 1) Conditions and Simplifications of the Invention
[0128] A. It is well known that the joint optimization planning of energy components and grid structure can achieve better economic benefits. However, the present invention focuses on studying the dynamic evolution of energy component configuration in the process of low-carbon elastic transformation of energy systems. Therefore, investment decisions only consider distributed energy and energy storage, without considering network strengthening (such as grid expansion and line strengthening). In addition, distributed energy and energy storage within the jurisdiction of the distribution network are vertically invested and operated by a single investor, that is, centralized planning.
[0129] B. Other alternative flexibility enhancement technologies, such as demand response and electric vehicle grid connection technologies, are not covered in this invention. However, the related models can be easily expanded and integrated into the model proposed in this invention.
[0130] 2) Objective Function
[0131] The goal of multi-stage planning is to minimize investment and operating costs during the planning period. The total system cost of each stage s is equal to the sum of the investment cost of the new components and the distribution network operating cost, which is expressed as:
[0132]
[0133] Among them, C NPV is the total system cost during the planning period; is the investment cost of the new components in each stage s during the planning period; is the distribution network operation cost in each stage s during the planning period; R is the discount rate; Y is the number of years in the planning stage.
[0134] The total capital cost of all components constructed at each stage s includes investment cost and fixed operation and maintenance cost, which is expressed as:
[0135]
[0136] Among them, γ k represents the capital recovery factor of component k; η OM,k Represents the fixed operation and maintenance cost ratio coefficient of component k.
[0137] In addition, the variable operating cost of the system at each stage s, including energy transaction costs, variable operating costs of flexible components and transaction costs of purchasing carbon quotas, is expressed as:
[0138]
[0139] in, represents the energy transaction cost coefficient; represents the variable operating cost factor of the gas turbine; represents the variable operating cost coefficient of energy storage; Represents the carbon quota transaction cost coefficient.
[0140] 3) Investment and operation constraints
[0141] A. Investment constraints
[0142] The newly added capacity of the node of component k in stage s is subject to the following restrictions:
[0143]
[0144]
[0145] in, is the construction capacity of component k at node i in stage s; represents the upper limit of the construction capacity of component k at node i in stage s; is the capacity of the carbon capture device at node i in stage s; Represents the upper limit of the construction capacity of the carbon capture device at node i in stage s.
[0146] The total new capacity of component k in the distribution network is subject to the following restrictions:
[0147]
[0148] Among them, Λ k is the upper limit of the total newly added capacity of component k in each stage; CCS Sets an upper limit on the total new capacity that can be invested in carbon capture equipment in each stage.
[0149] B. Operational constraints of various distributed sources and storage
[0150] Renewable energy: Wind power and photovoltaic power are generally regarded as low-carbon or even zero-carbon resources, and their maximum power generation is limited by resource availability. It reflects the availability of renewable energy in period t. When an extreme event occurs in period t, the value will become relatively small to characterize the vulnerability of renewable energy to extreme events. The relevant constraints are as follows:
[0151]
[0152] in, is the wind power / PV output power at node i in period t of stage s; is the availability coefficient of renewable energy at node i in phase s and period t; is the wind power / PV output power limit at node i in period t of stage s.
[0153] Gas turbines with carbon capture devices: Gas turbines are considered as flexible elements that can enhance system resilience in extreme situations. Gas turbine power generation emits polluting gases, which contain a large amount of carbon dioxide. Carbon capture devices can capture it through the adsorption capture process, with the following constraints:
[0154]
[0155] in, It represents the active power of the gas turbine; represents the reactive power of the gas turbine; represents the definition of carbon emissions; represents the amount of carbon emissions that can be processed by the carbon capture device; represents the installed capacity of carbon capture devices; represents the carbon emissions produced by gas turbines; represents the electricity consumption of the carbon capture device during the carbon capture process; Represents the carbon emissions captured by the carbon capture device; θ i represents the power factor angle at node i; ρ Emi,GT Represents the gas turbine carbon emission conversion factor; β CCS represents the electricity consumption coefficient of the carbon capture device; η CCS Represents the capture coefficient of the carbon capture device.
[0156] Energy storage: The charging / discharging power of energy storage is limited by its installed power capacity, while its storage energy is limited by its installed energy capacity. At the same time, it is necessary to model the transfer of energy storage storage, and its stored energy can be obtained based on the time-series charging / discharging power. In addition, it is necessary to limit the energy stored in the energy storage to remain the same from beginning to end in order to facilitate sustainable operation, but this limitation only needs to be considered under normal circumstances. It will be removed in extreme cases to enhance the emergency response capability of energy storage. The relevant constraints are as follows:
[0157]
[0158]
[0159] in, Respectively represent the charging / discharging power of energy storage; Represents the storage energy of energy storage; η ESS.C Represents the charging efficiency of energy storage; η ESS.D Represents the discharge efficiency of energy storage.
[0160] C. Constraints on normal operation of distribution network
[0161] Typically, the distribution network operates in a radial manner and can be viewed as a connected graph with a tree-like topology. Under normal circumstances, the distribution network allows bidirectional power flow to facilitate wind power / photovoltaic power consumption. Linearized distribution network power flow models are usually used to model the power flow and node voltage distribution in the distribution network.
[0162] The active and reactive power balance constraints of all nodes in the distribution network are expressed as:
[0163]
[0164] Among them, P ij,t,s represents the active power flowing on line ij at time period t in stage s; Q ij,t,s Represents the reactive power flowing on line ij during period t in stage s.
[0165] The limits on voltage drop and node voltage amplitude on each distribution feeder are described as follows:
[0166]
[0167] Among them, V i,t,s represents the voltage amplitude of node i at time period t in stage s; r ij represents the resistance of line ij; x ij represents the reactance of line ij; V i , Represent the lower and upper limits of the voltage amplitude at node i respectively.
[0168] Limit active / reactive power flow according to line capacity:
[0169]
[0170] in, They represent the upper limits of active power and reactive power transmission of line ij respectively.
[0171] D. Extreme operating constraints of distribution networks
[0172] Extreme events may damage some distribution lines, resulting in the distribution network being divided into several areas that are disconnected from the upper grid. In this case, each area should try to achieve self-power supply to minimize the loss of critical loads by using its local resources.
[0173] In extreme cases, the distribution network allows power flow in both directions in the undamaged lines. When the feeder ij is damaged, the binary indicator u ij,s is 0. The constraint is expressed as:
[0174]
[0175] Among them, u ij,s Represents the binary indicator corresponding to line ij at stage s.
[0176] By using variables and The node power balance in extreme cases is relaxed to characterize the node load loss, and the relevant constraints are as follows:
[0177]
[0178]
[0179] in, They represent the active and reactive power relaxation of node j at time period t in stage s respectively.
[0180] By modeling the voltage drop along the distribution feeder and using the variable To ensure that the voltage drop formula of the damaged line is relaxed, the relevant constraints are as follows:
[0181]
[0182] 4) Planning strategy restrictions
[0183] The planning strategy reflects the investment tendency of investors during the planning period, which can ensure that the final planning results meet certain specific needs of investors while maintaining a stable planning flow to avoid potential negative impacts caused by over / under investment. When planning a low-carbon resilient energy system, the following constraints reflect the planning needs of planners at different stages.
[0184] A. Emission reduction strategies
[0185] To promote low-carbon transformation, emission reduction targets can be set in the target year (such as the final stage of a multi-stage plan) to obtain a low-carbon system configuration; however, policymakers may expect to seek phased carbon emission controls.
[0186] Therefore, add the following constraints:
[0187]
[0188] Among them, E0 represents the current carbon emission level (i.e., carbon emissions in stage 0); represents the emission reduction target for phase s, which can be a preset value that depends on policy-related uncertainties or a variable that can be optimized within a certain range according to investor preferences; Represents the purchased carbon quota, which can improve the investment flexibility of distribution network source and storage planning by allowing the distribution network to make up for the carbon emission limit exceeded due to insufficient investment.
[0189] B. Resilience Enhancement Strategies
[0190] Resilience refers to the ability of a distribution network to resist and recover from extreme events. Since both wind power and photovoltaic power are susceptible to extreme events, when their penetration rates are high, it is urgent to enhance system resilience. The present invention uses the minimum critical load loss under the worst extreme scenario to quantify the resilience performance of the distribution network. This metric calculates the weighted load loss during extreme events based on the typical resilience curves in the relevant literature. The present invention regards line damage and insufficient renewable energy as the main threats to energy supply under extreme conditions. To this end, the worst extreme scenario can be set as a situation where the distribution network is disconnected from the upper power grid and is divided into several self-powered areas due to damage to the vulnerable feeder. To this end, the line fault state u under the corresponding extreme scenario can be used. ij,s and renewable energy availability factor The weighted load loss of the system under the extreme operation constraints of the distribution network is evaluated, and the phased elasticity enhancement constraint is incorporated into the planning problem to ensure that the weighted load loss of the distribution network under extreme conditions is lower than a certain level. The phased elasticity enhancement constraint is expressed as:
[0191]
[0192] Where L0 represents the current critical load loss level (i.e., load loss at stage 0); Characterizes the expected level of resilience improvement of the system at stage s. Unlike the emission reduction target, it is usually a preset parameter for the consideration of resilience performance requirements.
[0193] C. Carbon capture device access strategy
[0194] Carbon capture is a relatively mature technology. Carbon capture devices have negative carbon emission intensity and can be configured on gas turbines to reduce their carbon emissions. However, the relatively high investment cost of carbon capture devices has reduced their investment economics in low-carbon planning to a certain extent. This formula reflects the willingness of investors to promote the integration of carbon capture devices into the system:
[0195]
[0196] in, Represents the integration target of the carbon capture device in the system at stage s.
[0197] D. Energy storage access strategy
[0198] Energy storage is essential to promote the utilization of wind power / photovoltaic energy. In some countries, such as China, a certain amount of energy storage must be configured when investing in wind power / photovoltaic. This constraint ensures that the proportion of energy storage capacity is higher than a given limit:
[0199]
[0200] in, Indicates the proportion of energy storage required to be met in stage s.
[0201] Finally, the above deterministic multi-stage planning problem is reduced to the following closed set form:
[0202]
[0203] Among them, n s represents the investment decision variable, h s represents the operational decision variable; E s n s-1 +F s n s ≤g s Characterizes the coupling constraints between investment decision variables in any two adjacent stages; s +Bh s ≤ b covers all other investment and operating constraints, c s ,d s ,E s ,F s ,g s ,A s ,Bs and b s are the corresponding coefficient matrices and vectors.
[0204] S3. Based on the multi-stage deterministic programming model obtained in step S2, further expand it to construct a low-carbon elastic driven source storage multi-stage stochastic programming model considering multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors; at the same time, a fast solution algorithm adapted to the multi-stage dynamic programming problem proposed by the present invention is given;
[0205] S301. Modeling of multi-stage stochastic programming problem of source and reservoir based on Markov process
[0206] Before uncertainty modeling, the present invention first constructs the multi-stage stochastic programming problem as a Markov process:
[0207]
[0208] ψ s (n s-1 ,ξ s )={(n s ,h s )|E s n s-1 +F s n s ≤g s ,A s n s +B s h s ≤ b s (ξ s )}
[0209] Among them, ψ s (n s-1 ,ξ s ) represents the decision feasible domain of ξs under the uncertainty of stage s.
[0210] This nested formula describes that the decision variables can be adapted to each specific uncertainty realization, that is, after the uncertainty is realized in a certain stage, investors make stage-by-stage decisions based on the expected future costs of all remaining stages.
[0211] The scenario tree method is used to describe the phased realization of long-term uncertainty, where all nodes refer to a specific realization of long-term uncertainty, such as Figure 3 It should be noted that the short-term uncertainty corresponding to all nodes in the same stage is consistent. The present invention makes the unique path from the root node to the leaf node m is the mth long-term uncertainty scenario, and the scenario tree contains a total of M long-term uncertainty scenarios. Therefore, the above Markov process-based optimization problem can be equivalently converted into the following formula based on the construction of the scenario tree:
[0212]
[0213] in, Represents the uncertainty factor ξ in the long-term uncertainty scenario m s , which is associated with the sth node on the corresponding path; and Respectively represent nodes A collection of parent nodes and child nodes.
[0214] S302. Modeling short-term uncertainty driven by endogenous and exogenous factors
[0215] A. Uncertainty in electricity demand (exogenous)
[0216] Since the energy consumption behavior of users is random, the power demand is highly uncertain, and it is usually exogenous uncertainty that is not affected by the planning / operation decision of the distribution network (i.e., decision-independent uncertainty). This paper assumes that the hourly power demand is a random variable, and its probability distribution function can be estimated by the normal distribution of the point prediction results and their prediction errors. Therefore, random scenario sets can be generated stage by stage by sampling to characterize the uncertainty of power demand.
[0217] B. Wind power / PV uncertainty (exogenous)
[0218] Compared with conventional power sources, the output of renewable energy sources such as wind power / photovoltaic power has obvious characteristics such as randomness, volatility and intermittency. For wind power / photovoltaic power, the uncertainty of its available wind / light resources is exogenous because it is mainly affected by the volatility of wind speed / solar radiation. Therefore, the wind power / photovoltaic availability coefficient The probability distribution function of is modeled as follows:
[0219]
[0220] in, represents Gaussian distribution; μ i,t and σ i,t are the predicted values and variances of wind and solar resources, respectively. Furthermore, similar to the treatment of uncertainty in power demand, random scene sets can be generated stage by stage through sampling and other methods to characterize the uncertainty of wind and solar resources.
[0221] C. Carbon quota price uncertainty (endogenous)
[0222] In essence, the price of carbon quotas is directly determined by the supply and demand relationship in the carbon trading market. Since the total amount of carbon quotas is limited, high regional carbon emissions mean high carbon quota demand, which will increase the price of carbon quotas to a certain extent. The present invention discretizes the carbon emission intensity and uses it to characterize the carbon emission level of the distribution network. Therefore, the probability distribution of the uncertainty of carbon quota prices can be approximately linked to the level of carbon emission intensity. Without loss of generality, the present invention assumes that the randomness of carbon quota prices follows a Gaussian distribution:
[0223]
[0224] in,
[0225]
[0226] in, and represents the mean and variance of the probability distribution function of carbon quota price; Represents carbon emission intensity.
[0227] From the above formula, it can be seen that each discrete carbon emission intensity level Corresponding to a specific carbon quota price probability distribution function Therefore, by using scenario generation techniques, each discrete carbon emission intensity level can be The uncertainty realization is sampled to obtain a random scene As shown below:
[0228]
[0229] in, represents a binary indicator; Represents the expected cost of purchasing carbon allowances.
[0230] The above formula shows that if the carbon emission intensity falls within the lth interval, the binary indicator =1, and only one indicator can be 1 at the same time; the expected cost of purchasing carbon quotas is measured by a set of different carbon quota price uncertainty realizations, and its activation state is determined by the operational decision variable related to carbon emission intensity. Therefore, the probability distribution of the actual carbon quota price faced at each stage will be controlled by the carbon emission intensity decision variable.
[0231] S303. Modeling of long-term uncertainty driven by endogenous and exogenous factors
[0232] Typically, long-term uncertainty is achieved stage by stage and has a great impact on planning results. In existing studies, policy-related restrictions such as stage-by-stage carbon emission reduction targets are usually regarded as fixed values. However, in practice, policymakers may continuously adjust them according to actual needs, so they have a high degree of uncertainty. In addition, the goal setting for future stages will be greatly affected by the historical performance of the system. For example, if the distribution network fails to achieve its given carbon emission target in the current stage, it may be subject to stricter carbon emission restrictions in the future. Therefore, the present invention models long-term uncertainty as decision-related uncertainty. At the same time, in order to integrate it into the scenario tree construction for long-term uncertainty, the present invention uses a discrete probability distribution function to describe its random characteristics, and controls its probability distribution characteristics by adjusting the uncertain realization value at each probability level.
[0233] Specifically, the node The long-term uncertain realization of is its parent node Completion of phased carbon reduction targets Function:
[0234]
[0235] Therefore, the node The carbon reduction targets are set as follows:
[0236]
[0237] in, It is the uncertainty realization of carbon emission reduction targets under the ideal state (the carbon emission reduction targets in the previous stage are fully achieved).
[0238] S304. A fast solution algorithm suitable for multi-stage dynamic programming problems.
[0239] The multi-stage mixed integer programming problem has a nested structure. If for any stage s, the expected cost of the remaining stages If the analytical form of is known accurately, it can be decomposed into a series of single-stage optimization problems. However, the expected cost function is usually a high-dimensional nonlinear function, and its exact form is difficult to obtain. Therefore, the present invention adopts a randomized dynamic dual integer programming algorithm to use a series of linear constraints to approximate the expected cost function of the remaining stages, thereby solving the problem.
[0240] The present invention assumes that the scene tree is stage-independent, that is, for all nodes in the same stage, their child nodes have the same independent probability distribution, so Equivalent to Therefore, the single-stage optimization problem can be formulated as follows, where the expected cost function for the remaining stages is approximated by a set of linear Benders cuts. Introduced as its parent node decision The above linear Benders cut quantifies the expected cost function value as the current decision The sensitivity of the corresponding dual variable Characterization:
[0241]
[0242] It is worth noting that the construction of the above Benders cut relies on stage-by-stage decision making. Therefore, two main steps need to be designed in the stochastic dynamic dual integer programming algorithm to achieve problem solving through alternating iterations:
[0243] A. Forward Step
[0244] The forward iteration process for all long-term uncertainty scenarios starts from the first stage and ends at the last stage. For each stage, given the current estimate of the expected cost function in that stage, the optimal solution set for the current iteration of that stage is obtained by solving the optimization problem, and then the optimal solution set is used to update the approximate expected cost function in the backward step. After completing the τth iteration of all long-term uncertainty scenarios in the scenario tree, a set of stage-by-stage feasible solutions is obtained. And the optimal target value corresponding to each long-term uncertainty scenario:
[0245]
[0246] Based on this, the upper bound (UB) is obtained by calculating the weighted average of the target values of each scenario:
[0247]
[0248] B. Backward Step
[0249] The backward iteration process for all long-term uncertainty scenarios starts from the last stage and ends at stage 2. Based on the latest optimal decision obtained in the previous step Its dual variable in the approximate expected cost function of S at the τth iteration stage is Updated. It is worth noting that since the dual variables cannot be obtained by directly solving the mixed integer programming problem, the dual variable solutions can be obtained by relaxing the integer variables into continuous variables and solving their linear relaxation forms. Based on these newly generated dual variable solutions, new lower bound estimates of the expected cost function can be generated and added to the optimization problem, thereby gradually tightening the approximation. Once the backward step is completed, the effective lower bound (LB) of the original problem can be obtained by solving the optimization problem of stage 1:
[0250]
[0251] C. Convergence Criteria and Convergence Analysis
[0252] Iterate the forward and backward steps. If UB equals LB, then the algorithm converges to the optimal solution. However, due to the state variable n s As well as the mixed integer form of the single-stage problem, this may lead to the existence of computational residuals, making the overall convergence of the randomized dynamic dual integer programming algorithm slow. In actual algorithm applications, as long as UB-LB is less than the predefined threshold or LB tends to be stable in multiple iterations, the algorithm will be terminated and the current solution will be output.
[0253] In fact, the Benders cut is only one of the multiple effective cuts that are feasible in integer linear programming problems, and it may not be the tightest cut in some cases. For this reason, it is possible to consider constructing an enhanced cut to improve the convergence performance of the randomized dynamic dual integer programming algorithm.
[0254] The single-stage optimization problem is solved by coupling the constraints Dualize it and penalize its limit violation through Lagrangian multipliers, thus converting it into Lagrangian relaxation form:
[0255]
[0256] S4. Solve the multi-stage stochastic programming model of low-carbon elastic driven source and storage considering multiple mixed uncertainties formed in step S3 on the distribution network to obtain the multi-stage stochastic programming result of low-carbon elastic driven source and storage considering multiple mixed uncertainties.
[0257] The results of multi-stage stochastic programming of low-carbon elastic driving source and reservoir include:
[0258] 1. Analysis of multi-stage planning results under different planning strategies;
[0259] 2. Analysis of the impact of long-term uncertainty modeling on planning results;
[0260] 3. Sensitivity analysis, i.e. the impact of different carbon quota prices on distribution network investment decisions;
[0261] 4. Scalability analysis, that is, the proposed model and algorithm are further verified on other distribution networks with different scenarios to illustrate its scalability.
[0262] In another embodiment of the present invention, a low-carbon elastic driven source storage multi-stage planning system considering hybrid uncertainty is provided. The system can be used to implement the above-mentioned low-carbon elastic driven source storage multi-stage planning method considering hybrid uncertainty. Specifically, the low-carbon elastic driven source storage multi-stage planning system considering hybrid uncertainty includes a parameter module, a construction module, an extension module and a planning module.
[0263] Among them, the parameter module obtains the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage;
[0264] The construction module builds a low-carbon elastic driven source-storage multi-stage deterministic planning model that adapts to multiple types of planning strategies based on the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage obtained by the parameter module, and determines the objective function, investment and operation constraints, and planning strategy restrictions;
[0265] The extension module further expands the low-carbon elastic driven source and storage multi-stage deterministic planning model obtained by the construction module to construct a low-carbon elastic driven source and storage multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors;
[0266] The planning module solves the multi-stage stochastic programming model of low-carbon elastic driven source and storage with multiple mixed uncertainties obtained by the extension module on the distribution network, and obtains the multi-stage stochastic programming results of low-carbon elastic driven source and storage considering multiple mixed uncertainties.
[0267] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of a low-carbon elastic drive source storage multi-stage planning method considering mixed uncertainty, including:
[0268] Obtain distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage; construct a low-carbon elastic driven source storage multi-stage deterministic planning model that adapts to multiple types of planning strategies based on distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage, and determine the objective function, investment and operation constraints, and planning strategy restrictions; further expand the low-carbon elastic driven source storage multi-stage deterministic planning model to construct a low-carbon elastic driven source storage multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors; solve the low-carbon elastic driven source storage multi-stage stochastic planning model with multiple mixed uncertainties on the distribution network, and obtain the low-carbon elastic driven source storage multi-stage stochastic planning results considering multiple mixed uncertainties.
[0269] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It can be understood that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory, or a non-volatile memory (Non-Volatile Memory), such as at least one disk memory.
[0270] One or more instructions stored in a computer-readable storage medium may be loaded and executed by a processor to implement the corresponding steps of the multi-stage planning method for low-carbon elastic driving source storage considering hybrid uncertainty in the above embodiment; one or more instructions in the computer-readable storage medium are loaded and executed by the processor as follows:
[0271] Obtain distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage; construct a low-carbon elastic driven source storage multi-stage deterministic planning model that adapts to multiple types of planning strategies based on distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage, and determine the objective function, investment and operation constraints, and planning strategy restrictions; further expand the low-carbon elastic driven source storage multi-stage deterministic planning model to construct a low-carbon elastic driven source storage multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors; solve the low-carbon elastic driven source storage multi-stage stochastic planning model with multiple mixed uncertainties on the distribution network, and obtain the low-carbon elastic driven source storage multi-stage stochastic planning results considering multiple mixed uncertainties.
[0272] See also Fig.10 , the terminal device is a computer device, and the computer device 60 of this embodiment includes: a processor 61, a memory 62, and a computer program 63 stored in the memory 62 and executable on the processor 61. When the computer program 63 is executed by the processor 61, the method for calculating the composition of fluid in the reservoir transformation wellbore in the embodiment is realized. To avoid repetition, it is not described one by one here. Alternatively, when the computer program 63 is executed by the processor 61, the functions of each model / unit in the calculation system for the composition of fluid in the reservoir transformation wellbore in the embodiment are realized. To avoid repetition, it is not described one by one here.
[0273] The computer device 60 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The computer device 60 may include, but is not limited to, a processor 61 and a memory 62. Those skilled in the art will appreciate that Fig.10 This is only an example of the computer device 60 and does not constitute a limitation of the computer device 60. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the computer device may also include input and output devices, network access devices, buses, etc.
[0274] The processor 61 may be a central processing unit (CPU), or other general-purpose processors, central processing units, graphics processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, data processing logic based on quantum computing, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.
[0275] The memory 62 may be an internal storage unit of the computer device 60, such as a hard disk or memory of the computer device 60. The memory 62 may also be an external storage device of the computer device 60, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc., equipped on the computer device 60.
[0276] Furthermore, the memory 62 may include both an internal storage unit of the computer device 60 and an external storage device. The memory 62 is used to store computer programs and other programs and data required by the computer device. The memory 62 may also be used to temporarily store data that has been output or is to be output.
[0277] Any reference to memory, database or other media used in the embodiments provided in the present application may include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM), etc.
[0278] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0279] See also Fig.11 , the terminal device is a chip, and the chip 600 of this embodiment includes a processor 622, which may be one or more, and a memory 632 for storing a computer program executable by the processor 622. The computer program stored in the memory 632 may include one or more modules, each corresponding to a set of instructions. In addition, the processor 622 may be configured to execute the computer program to execute the above-mentioned generalizable monocular absolute depth map estimation method.
[0280] In addition, the chip 600 may further include a power supply component 626 and a communication component 650, wherein the power supply component 626 may be configured to perform power management of the chip 600, and the communication component 650 may be configured to implement communication, for example, wired or wireless communication, of the chip 600. In addition, the chip 600 may further include an input / output interface 658. The chip 600 may operate based on an operating system stored in the memory 632.
[0281] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can usually be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0282] The present invention verifies the proposed multi-stage stochastic programming method for clean resources and energy storage on an improved IEEE 33-node distribution network. Figure 4 As shown in Figure 1, the 8-year planning period is divided into 4 phases, each covering 2 years. The annual load growth rate is set to 3%. At the beginning of the planning period, the distribution network has been equipped with 1.2MW wind turbines, 1MW photovoltaic units, and 1.65MW gas turbine units. The candidate locations for the components are shown in Figure 1. Figure 4 Its economic and technical parameters are shown in Table 1.
[0283] Table 1 Parameters of the components to be selected
[0284]
[0285] In this example, a scenario tree is constructed to characterize the long-term uncertainty of the carbon reduction target. The possible scenarios and the related probabilities of each stage are listed in Table 2.
[0286] Table 2 Basic long-term uncertainty scenarios at each stage
[0287]
[0288] In addition, twelve typical scenarios were selected for annual operation simulation. The resilience assessment of the distribution network considered the most extreme case, that is, the distribution network was disconnected from the upper power grid and divided into several self-powered areas due to the damage of the vulnerable feeder. At the same time, the available amount of renewable energy in the extreme case was reduced to 10% of its original value.
[0289] 1) Analysis of multi-stage planning results under different planning strategies
[0290] The proposed planning model can be applied to determine the optimal configuration of components under different planning strategies. This section studies and analyzes the differences between different planning schemes by designing four schemes, that is, four different planning options:
[0291] Option 1 (lowest cost option): system planning with only emission reduction and flexibility requirements.
[0292] Option 2 (Carbon capture device access option): Based on Option 1, set up a phased Requirements for access to carbon capture devices.
[0293] Solution 3 (energy storage access option): Based on Solution 1, set up phase-by-phase Energy storage access requirements.
[0294] Option 4 (Carbon capture device and energy storage access option): Based on Option 1, set up a phased and Carbon capture devices and energy storage access requirements.
[0295] Table 3 summarizes the weighted installed capacity and cost of each type of component at the final stage over the entire planning period:
[0296] Table 3 Source and reservoir planning results under different planning strategies
[0297]
[0298] Option 1: Driven by the need to reduce emissions, the system will invest in a total of 9.01MW of renewable energy components to increase the proportion of zero-carbon energy in the energy supply. It should be noted that Option 1 has the lowest operating cost of all four options because it has the highest wind power / photovoltaic penetration rate. Therefore, although the investment cost of Option 1 is relatively high, only 3.40% lower than the highest investment cost (Option 2), its total cost for the entire planning period is still the lowest. This shows that when pursuing a low-carbon transition, investing in renewable energy is still the most cost-effective option compared to other technical options. Despite this, 1.28MW gas turbines still need to be deployed in the distribution network to meet resilience requirements. This shows that it is not feasible to rely solely on uncontrollable renewable energy in the transition to a low-carbon resilient system.
[0299] Scheme 2: Under the planning scheme that takes into account the need for carbon capture device access, the system invests in a total of 0.41Ton / h of carbon capture devices to reduce the carbon emission intensity of gas turbines. Therefore, gas turbines equipped with carbon capture devices can not only be used to enhance the system's resilience to extreme events, but also to reduce dependence on high-carbon emission intensity energy from the upper power grid, thereby reducing system carbon emissions. In particular, the installed capacity of wind power / photovoltaic power used to meet emission reduction requirements in Scheme 2 is reduced by 13.6% compared with Scheme 1. This shows that carbon capture devices have certain advantages in reducing carbon emissions. However, the total cost in Scheme 2 is still relatively high, mainly due to the relatively high investment and operating costs of gas turbines and carbon capture devices. Nevertheless, it is foreseeable that with the advancement of technology, gas turbines equipped with carbon capture devices will become key components in the distribution network to meet system resilience needs while achieving carbon emission reductions.
[0300] Scheme 3: Considering the preference of investors for energy storage access, 1.11MW of energy storage was invested and built in Scheme 3. Compared with Schemes 1 and 2, the installed capacity of gas turbines in Scheme 3 was reduced by 15.4%. This shows that energy storage can partially replace the role of gas turbines in enhancing the emergency response capability of the distribution network. In addition, compared with Scheme 1, the installed capacity of wind power / photovoltaic in Scheme 3 also decreased slightly by 0.71%. It is worth noting that in Scheme 3, the ability of energy storage to reduce carbon emissions is relatively limited, mainly because the penetration rate of wind power / photovoltaic in the distribution network is relatively low, so the distribution network can achieve efficient use of clean energy without a large amount of energy storage. In addition, the carbon emission intensity of energy from the upper power grid is relatively high in all time periods. For this reason, the ability of energy storage to utilize low carbon emission intensity energy from the upper power grid through energy transfer is also limited. Nevertheless, the total cost of Option 3 is only 1.19% higher than that of Option 1, indicating that "wind power / photovoltaic + energy storage" and "wind power / photovoltaic + gas turbine" have comparable investment economics, and when the wind power / photovoltaic penetration rate is high, the former will ultimately outperform the latter.
[0301] Option 4: In this option, the system makes a trade-off between different configurations such as "wind power / photovoltaic + energy storage" and "gas turbine + carbon capture device". On the one hand, connecting energy storage to wind power / photovoltaic can improve system flexibility. Therefore, compared with Option 2, the amount of gas turbine + carbon capture device in Option 4 is reduced by 0.17MW+0.02Ton / h. On the other hand, equipping gas turbines with carbon capture devices can also reduce carbon emissions. Therefore, compared with Option 3, the investment capacity of low-carbon driven wind power / photovoltaic + energy storage in Option 4 is also reduced by 1.07+0.11MW. Although the total cost of Option 4 is 0.96% and 2.9% higher than that of Option 2 and Option 3, respectively, its planning results are relatively reasonable due to the relatively balanced proportion of its various types of components.
[0302] Figure 5 and Figure 6 The installed capacity of different components in each stage is compared. It can be seen that all planning schemes have invested in a large number of photovoltaic units in the first two stages. This is mainly because the investment cost of photovoltaics is lower than that of wind power, so it has a relatively high investment economics in reducing carbon emissions. However, as the installed capacity of photovoltaics increases, its marginal benefit of emission reduction gradually decreases, so the cost-effectiveness of wind power investment and construction gradually increases and begins to be gradually deployed in the third stage. It is worth noting that the investment and construction of energy storage can enhance the consumption of photovoltaics, thereby increasing the marginal benefit of photovoltaic investment. Therefore, although the cumulative installed capacity of photovoltaics in the first two stages is almost the same, compared with Scheme 1, Schemes 3 and 4 invested in more photovoltaics in the third stage. As for carbon capture devices and energy storage, since they do not have strong investment economics, they are only put into operation step by step according to the minimum threshold.
[0303] 2) Analysis of the impact of long-term uncertainty modeling on planning results
[0304] In order to evaluate the value of introducing system uncertainty modeling for multi-stage stochastic programming problems, this method studies and analyzes two extensions of Scheme 1 under the conditions of ignoring exogenous or endogenous long-term uncertainty. The specific settings and comparisons are as follows:
[0305] A. Analysis of the impact of long-term exogenous uncertainty
[0306] Based on Scheme 1, this example designs three schemes to solve the deterministic model with different phased carbon reduction targets and evaluates their planning results in an uncertain environment:
[0307] Option 1.1: Deterministic planning is carried out at each stage based on the minimum uncertainty in achieving emission reduction targets;
[0308] Option 1.2: Deterministic planning is carried out at each stage based on the maximum uncertainty of emission reduction targets;
[0309] Option 1.3: Carry out deterministic planning based on the average uncertainty of emission reduction targets at each stage.
[0310] Table 4. Source and reservoir planning results under different long-term exogenous uncertainty realizations
[0311]
[0312] Table 4 shows the planning results under different uncertainties in the realization of carbon emission reduction targets. It can be seen that among all the options, Option 1 has the lowest total cost, which shows that incorporating long-term exogenous uncertainty into the planning problem will make the planning results more investment-economical. Options 1.1-1.3 use carbon emission reduction targets as pre-set parameters for optimization planning, and thus make overly radical or conservative decisions. Specifically, Option 1.1 assumes that the carbon emission reduction targets for each stage are low. Therefore, it delays the construction of wind power / photovoltaic power and achieves the lowest investment cost, such as Figure 7 However, in practice, this configuration is difficult to adapt to the emission reduction target, resulting in actual carbon emissions higher than the carbon emission limit. To this end, carbon quotas need to be purchased to fill this gap, which makes its operating cost the highest among all the options. In contrast, options 1.2 and 1.3 promote the construction of wind power / photovoltaic power to avoid penalties for violating carbon emission limits. However, even with relatively low operating costs, the high investment costs caused by overly conservative investment decisions in options 1.2-1.3 still make their total costs higher than option 1.
[0313] B. Analysis of the impact of long-term endogenous uncertainty
[0314] When the carbon quota price is relatively low, the distribution network may be willing to violate the preset carbon emission targets to gain more investment flexibility. However, considering the degree of violation, this behavior may lead to stricter emission reduction targets in the future. In order to analyze the impact of this endogenous uncertainty, this paper designs the following two schemes for verification and sets a lower carbon quota price of 35$ / Ton compared to Scheme 1:
[0315] Option 5.1: does not take into account long-term endogenous uncertainty;
[0316] Option 5.2: Consider long-term endogenous uncertainty.
[0317] Table 5 Source and reservoir planning results under different endogenous uncertainties
[0318]
[0319] As shown in Table 5, without considering long-term endogenous uncertainty, the distribution network overestimates its investment flexibility, and the installed capacity of renewable energy invested is 0.69MW less than that of Scheme 5.2. For this reason, in actual operation, the distribution network needs to purchase carbon quotas to meet the carbon emission target limit. Compared with Scheme 5.2, its operating cost has increased by 1.89%. Therefore, while the total cost increases by 0.05%, the planning results of Scheme 5.1 will lead to an additional increase of 3334Ton carbon emissions, which is suboptimal from a technical and economic perspective. This shows that incorporating endogenous uncertainty is conducive to the distribution network making more effective long-term investment decisions while maintaining a certain investment flexibility.
[0320] 3) Sensitivity analysis
[0321] In order to study and analyze the impact of different carbon quota prices on distribution network investment decisions, the present invention compares the actual emission reduction contributions of distribution networks when fulfilling their emission reduction obligations in Scheme 1. Figure 8 The proportion of carbon emission reductions promoted / achieved by various technologies or carbon quotas in the total carbon emission reduction is shown. It can be seen that when the carbon quota price is higher than 40$ / Ton, the distribution network tends to invest in wind power / photovoltaic to achieve its phased emission reduction targets. However, when the carbon price becomes lower, the distribution network will be more inclined to violate the emission reduction target and fill the gap by purchasing carbon quotas. In particular, when the carbon price is 20$ / Ton, the actual carbon emission reduction target achieved is less than 60%. This is because it is economical to reduce emissions through investment only when the marginal cost is higher than the carbon quota price. This also shows that adjusting the carbon quota price can be used as a means to regulate the investment flexibility of the distribution network to avoid unnecessary over-investment.
[0322] The high investment and operating costs of gas turbine + carbon capture devices limit their application in distribution networks. Fig. 9 The planning results of the distribution network under different cost reduction rates of gas turbine + carbon capture device in Scheme 1 are shown. It can be seen that when the cost reduction rate is low (such as 2%), emission reduction by investing in wind power / photovoltaic is still the most economical way. However, when the cost reduction rate is higher than 4%, emission reduction by investing in carbon capture device will be more investment-economical, so its access rate will increase rapidly to more than 30%. At the same time, when the cost reduction rate reaches 4%, 6% and 8% respectively, nearly 32%, 56% and 63% of wind power / photovoltaic in Scheme 1 are replaced by gas turbine + carbon capture device. This shows that with the cost reduction brought about by technological breakthroughs, gas turbine + carbon capture device may eventually outperform wind power / photovoltaic + gas turbine in ensuring a safe and clean energy supply.
[0323] 4) Scalability Analysis
[0324] The proposed model and algorithm are further verified on an improved IEEE123 node distribution network with different scenarios to illustrate its scalability. The solution time of the commercial solver GUROBI to achieve 0.1% optimal gap is used as a benchmark.
[0325] Table 6 Results of multi-stage distribution network planning
[0326]
[0327] As shown in Table 6, the size of the optimization problem, i.e., the number of variables and constraints, increases in proportion to the system size and the total number of scenarios. It is worth noting that the total number of scenarios here is the product of the number of random scenarios representing short-term uncertainty and the number of scenario tree nodes representing long-term uncertainty. Compared with the proposed randomized dynamic dual integer programming algorithm, when the problem is solved using the GUROBI solver, the growth trend of the solution time is more significant as the problem size increases.
[0328] Furthermore, the GUROBI solver cannot solve large examples due to out of memory (OM), while the randomized dynamic dual integer programming algorithm can always ensure the solvability of the problem, and its solution time increases almost linearly with the problem size. This shows that the proposed randomized dynamic dual integer programming algorithm has strong scalability in multi-stage stochastic optimization of large-scale planning problems.
[0329] In summary, the present invention provides a low-carbon elastic driven source and storage multi-stage planning method considering mixed uncertainty, which can optimize the system configuration stage by stage under the guidance of different planning strategies. At the same time, its investment flexibility can be controlled by adjusting the carbon quota price to avoid over-investment. In addition, the method can effectively coordinate mixed uncertainty and avoid potential risks, so that the planning scheme has better economic and technical performance.
[0330] The above contents are only for explaining the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A multi-stage planning method for low-carbon elastically driven source and storage considering mixed uncertainty, characterized in that: The following steps are involved: S1. Obtain distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage; S2. Based on the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage obtained in step S1, a low-carbon elastic driven source storage multi-stage deterministic planning model adapting to multiple types of planning strategies is constructed to determine the objective function, investment and operation constraints, and planning strategy restrictions; S3, further expanding the low-carbon elastic driven source and reservoir multi-stage deterministic planning model obtained in step S2 to construct a low-carbon elastic driven source and reservoir multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors; S4. Solve the low-carbon elastic driven source-storage multi-stage stochastic programming model with multiple mixed uncertainties obtained in step S3 on the distribution network to obtain a low-carbon elastic driven source-storage multi-stage stochastic programming result considering multiple mixed uncertainties.
2. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 1 is characterized in that: In step S2, the objective function is specifically: Among them, C NPV is the total system cost during the planning period; is the investment cost of the new components in each stage s during the planning period; is the distribution network operation cost in each stage s during the planning period; R is the discount rate; Y is the number of years in the planning stage.
3. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 2 is characterized in that: Investment and operational constraints include: Investment constraints: The newly added capacity of the node of component k in stage s is subject to the following restrictions: in, represents the construction capacity of component k at node i in phase s; represents the upper limit of the newly built capacity of component k at node i; represents the construction capacity of the carbon capture device at node i in phase s; represents the upper limit of the newly invested capacity of the carbon capture device at node i; ESS represents energy storage components; WT represents wind turbine components; PV represents photovoltaic components; GT represents gas turbine components; The total new capacity of component k in the distribution network is subject to the following restrictions: Among them, Λ k Represents the upper limit of the total newly added capacity of component k in each stage; Λ CCS Represents the upper limit of the total new capacity of carbon capture equipment to be built in each stage; Various distributed source and storage operation constraints: The relevant constraints for renewable energy are as follows: in, is the wind power / PV output power at node i in period t of phase s; is the availability coefficient of renewable energy at node i in period t of stage s. When an extreme event occurs in period t, the value will become relatively small to characterize the vulnerability of renewable energy to extreme events. is the upper limit of wind power / PV output power at node i in period t of phase s; The relevant constraints for gas turbines equipped with carbon capture devices are as follows: in, represents the active power output of the gas turbine at node i in the tth period of the sth stage; represents the installed capacity of the gas turbine at node i in stage s; represents the reactive power output of the gas turbine at node i during the tth period of the sth stage; θ i represents the power factor angle at node i; represents the carbon emissions of the gas turbine at node i in the tth period of the sth stage; ρ Emi,GT represents the carbon emission density of gas turbines; represents the carbon emissions that can be processed by the carbon capture device at node i in the tth period of the sth phase; represents the installed capacity of the carbon capture device at node i in stage s; represents the power consumption of the carbon capture device during the carbon capture process at node i in the tth period of the sth stage; β CCS represents the electricity consumption factor of the carbon capture device; represents the carbon emissions captured by the carbon capture device at node i in the tth period of the sth phase; η CCS represents the capture efficiency of the carbon capture device; The energy storage related constraints are as follows: in, They represent the charging / discharging power of the energy storage at node i in the tth period of the sth stage; represents the installed capacity of energy storage at node i in stage s; represents the stored energy stored at node i in the tth period of the sth stage; σ DOD Represents the maximum discharge depth of energy storage; τ ESS Represents the configuration duration of energy storage; η ESS.C Represents the charging efficiency of energy storage; η ESS.D Represents the discharge efficiency of energy storage; The active and reactive power balance constraints of all nodes in the distribution network are expressed as: Among them, P ij,t,s represents the active power flow on line ij in period t of phase s; Q ij,t,s represents the reactive power flow on line ij in period t of phase s; represents the active load at node j at time t in phase s; Represents the reactive load at node j at time t in stage s; Ω F (j),Ω C (j) represents the set of child / parent nodes of node j; The limits on voltage drop and node voltage amplitude on each distribution feeder are described as follows: Among them, V i,t,s represents the voltage amplitude at node i in the tth period of the sth stage; r ij represents the resistance of line ij; x ij represents the reactance of line ij; V0 represents the rated voltage of the distribution network; Represent the lower and upper limits of the voltage amplitude at node i respectively; The active / reactive power flow is limited according to the line capacity as follows: in, They represent the upper limits of active power and reactive power transmission of line ij respectively; The extreme operation constraints of the distribution network are as follows: Among them, u ij,s represents the binary indicator corresponding to line ij at stage s; represents the active power flow on line ij in period t of stage s under extreme operating conditions; The constraints related to node load loss are as follows: in, They represent the active and reactive power relaxation at node j in the tth period of stage s under extreme operating conditions; Represents the engine output at node j in the tth period of stage s under extreme operating conditions; represents the wind turbine output at node j in the tth period of stage s under extreme operating conditions; represents the PV output at node j in period t in stage s under extreme operating conditions; Represents the energy storage discharge power at node j in the tth period of stage s under extreme operating conditions; Represents the energy storage charging power at node j in period t in stage s under extreme operating conditions; represents the active power flow on line ij in the tth period of stage s under extreme operating conditions; represents the load at node j in period t in stage s under extreme operating conditions; Represents the power of the carbon capture device at node j in period t in stage s under extreme operating conditions; The voltage drop formula for the damaged line is relaxed, and the relevant constraints are as follows: in, represents the voltage amplitude at node j in period t in stage s under extreme operating conditions; Represents the voltage drop on line ij in the tth period of stage s under extreme operating conditions.
4. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 2 is characterized in that: Planning policy restrictions include: Emission reduction strategies: Among them, E0 represents the current carbon emission level (i.e., carbon emissions in stage 0); represents the emission reduction target in stage s; represents the carbon quota purchased in the sth phase; D represents the number of typical days; ρ Emi,GT It represents the carbon emission coefficient of gas turbine; represents the active power output of the gas turbine at node i in the tth period of the sth stage; The carbon emissions captured by the carbon capture device at node i in the tth period of the sth phase; Δt represents the time scale, which is generally 1 hour; represents the carbon emission density of the power supply from the upper power grid in period t; P 01,t,s It represents the power supply of the upper power grid in the tth period of the sth stage; Resilience Enhancement Strategies: Where L0 represents the current critical load loss level (i.e., load loss at stage 0); Characterizes the expected resilience improvement level of the system at stage s; σ i represents the load weight coefficient at node i; represents the active power relaxation at node i in the tth period of the sth stage, i.e., the load loss; Carbon capture device access strategy: in, represents the integration target of the carbon capture device in the system at stage s; represents the installed capacity of the carbon capture device at node i in the sth stage; ρ Emi,GT It represents the carbon emission coefficient of gas turbine; represents the installed capacity of the gas turbine at node i in stage s; Energy storage access strategy: in, Indicates the proportion of energy storage required to be met in stage s; represents the energy storage installed capacity at node i in stage s; represents the installed capacity of the wind turbine at node i in stage s; represents the photovoltaic installed capacity at node i in stage s.
5. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 1 is characterized in that: Step S3 is specifically as follows: The multi-stage stochastic programming problem is constructed as a Markov process; the optimization problem based on the Markov process is equivalently converted into a construction based on the scenario tree; Through sampling, random scene sets are generated stage by stage to characterize the uncertainty of power demand and wind and solar resources, and the carbon emission intensity is discretized to characterize the carbon emission level of the distribution network. The randomness of the carbon quota price follows the Gaussian distribution, and the scene generation technology is used to generate a discrete carbon emission intensity level. The uncertainty of the realization is sampled, and then a random scene can be obtained Enables modeling of short-term uncertainty driven by endogenous and exogenous factors; Model long-term uncertainty as decision-related uncertainty, use discrete probability distribution functions to describe random characteristics, and control probability distribution characteristics by adjusting the uncertainty realization value at each probability level to achieve long-term uncertainty modeling driven by endogenous and exogenous factors; The problem is solved using a stochastic dynamic dual integer programming algorithm.
6. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 5 is characterized in that: The optimization problem based on Markov process is equivalently converted to the construction based on scene tree as follows: in, Represents the uncertainty factor ξ in the long-term uncertainty scenario m s Implementation of and Respectively represent nodes The set of parent nodes and child nodes of ; ψs(ns-1,ξs) represents the uncertainty ξ at stage s s The feasible domain of decision making under represents the investment decision variable under uncertainty scenario m in stage s; represents the operational decision variable under the uncertainty scenario m in the sth stage; m′ represents the long-term uncertainty scenario, which is used to distinguish it from m; |S| represents the total number of stages; n s represents the investment decision variable in stage s, h s represents the operational decision variable of the sth stage; Represents the corresponding coefficient matrix and vector of the sth stage.
7. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 5 is characterized in that: Random Scenes Specifically: in, represents a binary indicator; represents the expected cost of purchasing carbon allowances; Represents the discrete carbon emission intensity level boundary in the lth interval of the sth stage; represents the carbon emission intensity in the sth phase; B represents the number of uncertain scenarios; represents the carbon quota price corresponding to the lth interval of the bth uncertain scenario in the sth phase; Represents the carbon quota purchased in the sth stage; s represents the stage scenario.
8. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 5 is characterized in that: The randomized dynamic dual integer programming algorithm is used to solve the problem: The forward iteration process of all long-term uncertainty scenarios starts from the first stage and ends at the last stage. For each stage, given the current estimate of the expected cost function of that stage, the optimal solution set of the current iteration of that stage is obtained by solving the optimization problem, and then the optimal solution set is used to update the approximate expected cost function in the backward step. After completing the τth iteration of all long-term uncertainty scenarios in the scenario tree, a set of stage-by-stage feasible solutions is obtained. and the optimal target value corresponding to each long-term uncertainty scenario; The backward iteration process for all long-term uncertainty scenarios starts from the last stage and ends at stage 2, based on the latest optimal decision obtained in the previous step. The dual variable in the approximate expected cost function S for the τth iteration stage Update by relaxing the integer variables into continuous variables and solving their linear relaxation form to obtain the dual variable solution, generate a new lower bound estimate of the expected cost function based on the newly generated dual variable solution, and add it to the optimization problem, and obtain the effective lower bound LB of the original problem by solving the optimization problem of stage 1; Iterate the forward and backward steps and converge to the optimal solution if UB equals LB.
9. The low-carbon elastic driving source and storage multi-stage planning method considering mixed uncertainty according to claim 1 is characterized in that: The results of multi-stage stochastic programming of low-carbon elastic driving source and reservoir include: Analysis of multi-stage planning results under different planning strategies; analysis of the impact of long-term uncertainty modeling on planning results; the impact of the same carbon quota price on distribution network investment decisions; verification on other distribution networks with different scenarios.
10. A low-carbon elastic driving source and storage multi-stage planning system considering mixed uncertainty, characterized in that: include: Parameter module, which obtains distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage; The construction module builds a low-carbon elastic driven source-storage multi-stage deterministic planning model that adapts to multiple types of planning strategies based on the distribution network system parameters, multi-stage planning parameters, technical and economic parameters of generators, and technical and economic parameters of energy storage obtained by the parameter module, and determines the objective function, investment and operation constraints, and planning strategy restrictions; The extension module further expands the low-carbon elastic driven source and storage multi-stage deterministic planning model obtained by the construction module to construct a low-carbon elastic driven source and storage multi-stage stochastic planning model that considers multiple mixed uncertainties, including short-term and long-term uncertainties driven by exogenous and endogenous factors; The planning module solves the multi-stage stochastic programming model of low-carbon elastic driven source and storage with multiple mixed uncertainties obtained by the extension module on the distribution network, and obtains the multi-stage stochastic programming results of low-carbon elastic driven source and storage considering multiple mixed uncertainties.