Safety rope tying toggle clip tool suitable for edge operation and construction method of safety rope tying toggle clip tool

By designing a safety rope tucking clamping tool suitable for edge operations, and adjusting the clamping space using screws and rotary screws, the problems of high construction efficiency and cost of edge operations are solved, achieving efficient and convenient construction and improving safety.

CN118949312APending Publication Date: 2024-11-15CHINA CONSTR EIGHTH ENG BUREAU (GANSU) CONSTR CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411284225.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In construction projects, the construction of side work requires the construction of a large number of scaffolding or other protective measures, resulting in the problems of long construction period and high construction costs.

Method used

A safety rope tying clamping tool suitable for edge operations is designed, including two snap brackets, two stress brackets, two sets of screws and buckles. The clamping space is adjusted through screw adjustment and rotary screw to adapt to Building structure size, improve construction efficiency and reduce costs.

Benefits of technology

The tool can quickly and safely clamp on the building structure, improve the construction efficiency and safety of edge operations, reduce construction costs, and facilitate operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118949312A_ABST
    Figure CN118949312A_ABST
Patent Text Reader

Abstract

The invention relates to a safety rope tying and hanging clamping and buckling tool suitable for edge operation, which can be clamped and buckled on a building structure and comprises two clamping and buckling brackets, a clamping and buckling device and a clamping and buckling device, the two stress supports are horizontally arranged, and the two stress supports are connected between the two buckle supports; the two sets of screw rods are arranged at the ends of the two buckle supports in a penetrating mode respectively, a buckle clamping space is formed between the two sets of screw rods, and the distance between the two sets of screw rods can be adjusted; the hanging buckle is connected between the two stress supports, and a safety rope can be tied and hung on the hanging buckle. The distance between the two buckle supports on the stress support is preliminarily adjusted through the screw, the clamping space is further finely adjusted by rotating the screw rod, the clamping device can adapt to the size of a building structure needing clamping, the construction efficiency during edge operation can be effectively improved, the construction cost can be effectively reduced, operation is efficient and convenient, and practicability is high. And the safety of edge operation in a project is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction engineering design, and in particular to a safety rope hanging clip buckle tool suitable for edge operations and a construction method thereof. Background Art

[0002] With the development of society, especially the continuous improvement of science and technology, people's living standards have been greatly improved and enhanced, and at the same time, higher requirements have been put forward for the quality of life. As a field that is inseparable from people's lives, the safety protection during construction operations has also attracted more and more attention.

[0003] During the construction process, it is often necessary to carry out various types of edge opening operations. When carrying out such construction work, the safety protection of construction workers is very important. Once negligence is caused, irreversible consequences will inevitably occur. Most edge operations do not involve large amounts of work. If a large number of scaffolding is erected at the construction location or other protective measures are adopted before construction, it will not only delay the construction period but also involve higher construction costs. In order to facilitate workers to protect themselves when carrying out edge opening operations, a safety rope hanging clip buckle tool suitable for edge operations was invented. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a safety rope hanging clip tool suitable for edge operations and a construction method thereof, so as to solve the problem that the existing edge operations require the erection of a large number of scaffolding or the adoption of other protective measures, resulting in long construction period and high construction cost.

[0005] The technical solution to achieve the above-mentioned purpose is: a safety rope hanging and clamping tool suitable for edge operations, which can be clamped on a building structure, comprising: two clamping brackets, the two clamping brackets are vertically arranged opposite to each other; two force-bearing brackets, the two force-bearing brackets are horizontally arranged, and the two force-bearing brackets are connected between the two clamping brackets; two groups of screws, the two groups of screws are respectively passed through the ends of the two clamping brackets, a clamping space is formed between the two groups of screws, and the spacing between the two groups of screws is adjustable; a hanging buckle, the hanging buckle is connected between the two force-bearing brackets, and the hanging buckle can be used to hang a safety rope.

[0006] The invention discloses a safety rope hanging clip tool suitable for edge operations. The distance between two clip brackets on a load-bearing bracket is preliminarily adjusted by a screw, and the clip space is further finely adjusted by rotating the screw rod. The tool can adapt to the size of the building structure to be clipped, effectively improve the construction efficiency during edge operations, reduce construction costs, and is efficient and convenient to operate, thereby greatly improving the safety of edge operations in engineering projects.

[0007] A further improvement of the safety rope hanging clip buckle tool suitable for edge operations of the present invention is that both ends of the clip bracket are provided with through holes for the screw rod to pass through; the screw rod is screwed to the through holes.

[0008] A further improvement of the safety rope hanging clip buckle tool suitable for edge operations of the present invention is that the ends of the two groups of screw rods close to each other are both provided with gaskets, and the gaskets are in contact with the building structure.

[0009] A further improvement of the safety rope hanging clip tool suitable for edge operations of the present invention is that a handle is provided on the outer end of the screw rod, and the handle is rotated to drive the screw rod to move, so as to control the distance between the two groups of the screw rods.

[0010] A further improvement of the safety rope hanging clip buckle tool suitable for edge operations of the present invention lies in that the force-bearing bracket and the clip bracket are screw-connected.

[0011] A further improvement of the safety rope hanging clip buckle tool suitable for edge operations of the present invention is that a plurality of groups of screw holes are arranged on the force-bearing bracket; and the spacing between adjacent screw holes in each group is equal.

[0012] A further improvement of the safety rope hanging clip buckle tool suitable for edge operations of the present invention is that each of the clip brackets is provided with two groups of openings for the screws to pass through.

[0013] A construction method for working along an edge by hanging a clamping tool with a safety rope, comprising the following steps: hanging the tool near a target building structure; adjusting the distance between two clamping brackets according to the building structure, and connecting and fixing the adjusted clamping brackets to a force-bearing bracket with screws; clamping a gasket on the side wall of the building structure by rotating corresponding screws through handles on both sides; hanging the safety rope on the hook to perform working along the edge. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is an elevation view of the safety rope hanging clip buckle tool of the present invention.

[0015] Figure 2 It is a side view of the safety rope hanging clip buckle tool of the present invention.

[0016] Figure 3 The present invention is a flow chart of a construction method for edge operation using a safety rope to hang a clamp tool.

[0017] In the figure: 10, snap bracket; 11, load-bearing bracket; 12, screw; 13, hook; 14, gasket; 15, handle; 16, screw; 17, screw hole. DETAILED DESCRIPTION

[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0019] See also Figure 1 and Figure 2 , Figure 1 The elevation view of the safety rope hanging clip buckle tool of the present invention is shown, Figure 2 The side view of the safety rope hanging and clamping tool of the present invention is shown. The present invention provides a safety rope hanging and clamping tool suitable for edge operations, which can be clamped on a building structure and comprises: two clamping brackets 10, which are vertically arranged opposite to each other.

[0020] The clip bracket 10 is arranged in a V shape, with the V-shaped opening facing one side of the building structure.

[0021] Two force-bearing brackets 11 are horizontally arranged, and the two force-bearing brackets 11 are connected between the two buckle brackets 10 .

[0022] Among them, the force-bearing bracket 11 is horizontally arranged on the V-shaped inner wall of the snap bracket 10, and the two force-bearing brackets 11 are attached to the inner wall of the snap bracket 10. The distance between the two force-bearing brackets 11 is set according to specific implementation requirements and is not specifically limited here.

[0023] Two groups of screw rods 12 are respectively passed through the ends of the two buckle brackets 10 , a buckle space is formed between the two groups of screw rods 12 , and the distance between the two groups of screw rods 12 is adjustable.

[0024] The screw rod 12 is movably connected to the end of the buckle bracket 10, and the screw rod 12 can be rotated horizontally to adjust the position.

[0025] The hook 13 is connected between the two force-bearing brackets 11 , and the hook 13 can be used to hang a safety rope.

[0026] Among them, the number of the hanging buckle 13 can be one or more, and there is no specific limitation here.

[0027] In this embodiment, two hooks 13 are provided, and the two hooks 13 are provided at the middle position between the two force-bearing brackets 11, so that after the safety rope is hung, the force of the force-bearing bracket 11 is located in the middle, preventing left and right shaking from affecting the stability of the buckle bracket 10.

[0028] The present invention provides a safety rope hanging clip buckle tool suitable for edge operations. Both ends of a clip bracket 10 are provided with through holes for a screw rod 12 to pass through.

[0029] The through hole transversely penetrates the end of the V-shaped clip bracket 10 , and the positions of the through holes at the upper and lower ends of the clip bracket 10 correspond.

[0030] The screw rod 12 is screwed into the through hole.

[0031] The inner wall of the through hole is provided with an internal thread which is screwed with the screw rod 12 . The screw rod 12 can be rotated in the through hole to adjust the length of the screw rod 12 at the outer end. The distance between two oppositely arranged screw rods 12 can be relatively adjusted.

[0032] See also Figure 1 , showing a vertical view of the safety rope hanging clip buckle tool of the present invention. The present invention provides a safety rope hanging clip buckle tool suitable for edge operations, and the ends of the two sets of screw rods 12 close to each other are both provided with gaskets 14, and the gaskets 14 are attached to the building structure.

[0033] Among them, the gasket 14 is larger than the size of the end of the screw 12. The gasket 14 enlarges the contact surface between the end of the screw 12 and the building structure, and the friction between the gasket 14 and the building structure is relatively large. The gasket 14 can be a rubber pad, a silicone pad, or other materials that can provide greater friction and prevent the gasket 14 from sliding, which is not limited here.

[0034] See also Figure 1 , showing a vertical view of the safety rope hanging clip buckle tool of the present invention. The present invention provides a safety rope hanging clip buckle tool suitable for edge operations, wherein a handle 15 is provided on the outer end of the screw rod 12, and the handle 15 is rotated to drive the screw rod 12 to move, so as to control the distance between the two groups of screw rods 12.

[0035] The handle 15 is fixedly connected to the other end of the screw rod 12 . The handle 15 can be in a straight line shape, a circle shape, or a cross shape. There is no limitation on the shape of the handle 15 .

[0036] See also Figure 1 , showing a vertical view of the safety rope hanging clip buckle tool of the present invention. The present invention provides a safety rope hanging clip buckle tool suitable for edge operations, wherein the force support 11 and the clip bracket 10 are connected by screws 16.

[0037] The position between the force-bearing bracket 11 and the buckle bracket 10 can be adjusted, and after adjustment, they are connected and fixed with screws 16 .

[0038] See also Figure 1 , showing a vertical view of the safety rope hanging clip buckle tool of the present invention. The present invention provides a safety rope hanging clip buckle tool suitable for edge operations, and a plurality of sets of screw holes 17 are provided on the force-bearing bracket 11.

[0039] There are two screw holes 17 in each group, and the screw holes 17 are arranged in a row on the force-bearing bracket 11, so that the snap bracket 10 can be easily moved left and right to replace the connection point.

[0040] The spacing between each group of adjacent screw holes 17 is equal.

[0041] The screw holes of the two force-bearing brackets 11 are also arranged correspondingly up and down.

[0042] In this embodiment, the lateral width of the building structure corresponding to the clip is smaller than the spacing between the outermost screw holes 17 on both sides of the load-bearing bracket 11. This embodiment selects a building structure within 0.1 meters to 1.5 meters for clipping, which is more stable.

[0043] The present invention provides a safety rope hanging clip buckle tool suitable for edge operations, and each clip bracket 10 is provided with two groups of openings for screws 16 to pass through.

[0044] The size of the opening corresponds to the size of the screw hole 17 of the force-bearing bracket 11, and the opening can correspond to each set of screw holes 17. The positions of the two sets of openings correspond to the connection positions of the two force-bearing brackets 11, and the positions of the two sets of openings on the buckle bracket 10 are symmetrically arranged up and down.

[0045] See also Figure 3 , showing a flow chart of a construction method for working on an edge using a safety rope and a clamp tool. The present invention provides a construction method for working on an edge using a safety rope and a clamp tool, comprising the following steps:

[0046] Execute step S210: place the tool near the target hanging building structure.

[0047] If the overall weight of the tool is heavy, it needs to be suspended by a crane. If the overall weight of the tool is light, it can be adjusted by the construction workers by hand. Then, step S220 is executed.

[0048] Execute step S220: adjust the distance between the two clip brackets 10 according to the building structure, and connect and fix the adjusted clip bracket 10 to the load-bearing bracket 11 with screws 16.

[0049] The tool is generally clamped on concrete beams, slabs, and column components of the building structure within 0.1 meters to 1.5 meters, and the clamping distance is preliminarily adjusted using the clip bracket 10, and then step S230 is executed.

[0050] Execute step S230: rotate the corresponding screw rods 12 through the handles 15 on both sides to clamp the gasket 14 on the side wall of the building structure.

[0051] The handle 15 is manually rotated to drive the screw 12 to rotate to accurately adjust the position of the gasket 14 until the relatively arranged gaskets 14 are clamped on the side wall of the building structure and the tool is clamped on the building structure as a whole. Then, step S240 is executed.

[0052] Execute step S240: hang the safety rope on the hook 13 and perform edge work.

[0053] The safety rope is hung in the middle of the force-bearing bracket 11 , and the force-bearing bracket 11 and the buckle bracket 10 are balanced, so it is easy to maintain stability.

[0054] The present invention is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various changes to the present invention according to the above description. Therefore, certain details in the embodiments should not be construed as limiting the present invention, and the scope of protection of the present invention shall be the scope defined by the attached claims.

Claims

1. A safety rope hanging and clipping tool suitable for edge operations, which can be clipped on a building structure, characterized in that: include: Two snap-on brackets, the two snap-on brackets are vertically arranged opposite to each other; Two force-bearing brackets, the two force-bearing brackets are arranged horizontally, and the two force-bearing brackets are connected between the two buckle brackets; Two groups of screw rods, the two groups of screw rods are respectively passed through the ends of the two buckle brackets, a buckle space is formed between the two groups of screw rods, and the distance between the two groups of screw rods is adjustable; A hook is connected between the two force-bearing brackets, and the hook can be used to hang a safety rope.

2. A safety rope hanging clip buckle tool suitable for edge work according to claim 1, characterized in that: Both ends of the buckle bracket are provided with through holes for the screw to pass through; The screw rod is screwed to the through hole.

3. A safety rope hanging clip buckle tool suitable for edge work according to claim 1, characterized in that: The ends of the two groups of screw rods close to each other are both provided with gaskets, and the gaskets are in contact with the building structure.

4. A safety rope hanging clip buckle tool suitable for edge work according to claim 1, characterized in that: A handle is provided on the outer end of the screw rod, and the screw rod is driven to move by rotating the handle, so as to control the distance between the two groups of screw rods.

5. The safety rope hanging clip buckle tool suitable for edge work according to claim 1, characterized in that: The force-bearing bracket is connected to the buckle bracket by screws.

6. A safety rope hanging clip buckle tool suitable for edge work according to claim 5, characterized in that: The force-bearing bracket is provided with a plurality of sets of screw holes; The spacing between each set of adjacent screw holes is equal.

7. A safety rope hanging clip buckle tool suitable for edge work according to claim 5, characterized in that: Each of the buckle brackets is provided with two groups of openings for the screws to pass through.

8. A construction method for working on the edge by using a safety rope to hang a clamp tool, characterized in that: The steps include: Place the tool near the building structure where the target is mounted; Adjust the distance between the two clip brackets according to the building structure, and connect and fix the adjusted clip brackets to the load-bearing brackets with screws; The gasket is clamped on the side wall of the building structure by rotating the corresponding screw rods through the handles on both sides; Hang the safety rope on the hook and carry out edge work.

Citation Information

Patent Citations

  • Safety rope anchor

    CN205339899U

  • Safety rope hanging and buckling device for steel structure

    CN219517611U

  • Adjustable safety belt fixing clamp

    CN221373000U