Building muck recovery processing method and recovery processing system thereof
By using the magnetic adsorption of ferrite magnets, tin-boron magnets and electromagnets in the construction waste treatment system, combined with transmission and detection components, the problem of poor metal separation effect of building waste in the existing technology is solved, and the problem of poor metal separation of construction waste in the existing technology is achieved. Effective metal debris separation and recovery on continuous flow slag.
Patent Information
- Application Number
- CN202411011274.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing construction waste removal method cannot be effectively separated when the metal flows continuously, and the magnetic casing is easily washed off and mixed with the waste, resulting in poor separation effect.
Using a system including crushing boxes, separation boxes, screening boards and iron plates, metal debris is adsorbed through the magnetic force of ferrite magnets, ferrobor magnets and electromagnets, and cyclic transmission and detection are achieved through transmission components and detection components to ensure The metal debris are completely adsorbed and separated.
It realizes effective separation of metal debris on continuous flowing construction waste, avoids separation failure caused by magnetic material erosion, and ensures complete separation and recycling of waste and metal waste.
Smart Images

Figure CN118950183A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction waste treatment equipment, and in particular to a construction waste recycling method and a recycling system thereof. Background Art
[0002] Construction waste refers to the rubble, abandoned soil, abandoned materials, silt and other waste generated during the construction, laying, demolition and repair of various buildings, structures, pipelines, etc. by construction units or individuals. These metal wastes are sometimes tightly combined with concrete blocks, forming construction waste that is difficult to recycle.
[0003] When recycling construction waste, it is usually necessary to crush, filter and remove metal to ensure the effect of construction waste recycling. For example, the Chinese patent with publication number CN114522759A in the relevant technology proposes a construction waste recycling and reuse device, which is equipped with a pre-treatment mechanism and a metal recovery mechanism. The pre-treatment mechanism can effectively crush construction concrete waste, and after the large-volume metal waste is separated from the sand and gravel, the sand and gravel waste is effectively separated from the large-volume metal waste through the vibration of the leak plate. The metal debris in the sand and gravel is separated from the sand and gravel after being adsorbed by two magnetic sleeves, and finally collected in the box.
[0004] Regarding the above-mentioned related technologies: The method for demetallizing construction debris in the current existing technology is usually to use magnetic materials to adsorb metal waste in the construction debris. However, the method for demetallizing construction debris in this design is to wash the crushed and filtered construction debris on two rotatable magnetic sleeves, and adsorb the metal waste in the construction debris through the magnetic force of the magnetic sleeves. Although this method can achieve temporary separation of construction debris and metal waste, it cannot be used on continuously flowing construction debris, because when the construction debris washes the magnetic sleeves, the metal waste adsorbed by the magnetic sleeves will be quickly washed down due to the washing force of the construction debris and mixed with the construction debris again. In addition, the construction debris cannot be filtered and adsorbed in a cycle, and the metal waste in the construction debris cannot be completely adsorbed, and thus the effect of separating construction debris from metal waste cannot be effectively guaranteed. Summary of the invention
[0005] In order to solve the problem of washing crushed and filtered construction debris on two magnetic sleeves and adsorbing metal waste in the construction debris by the magnetic force of the magnetic sleeves, although this method can achieve temporary separation of construction debris and metal waste, it cannot be used on continuously flowing construction debris, because when the construction debris washes the magnetic sleeves, the metal waste adsorbed by the magnetic sleeves will be quickly washed down by the washing force of the construction debris and mixed with the construction debris again. The present application provides a construction debris recycling and processing method and a recycling and processing system.
[0006] The present application provides a construction waste recycling method and a recycling system thereof, which adopts the following technical solutions: A construction waste recycling and processing system, comprising a crushing box, a separation box fixed below the crushing box, a screening plate for filtering the construction waste, and an iron plate for adsorbing metal debris, the crushing box is provided with a processing mechanism for crushing, filtering and drying the construction waste, the processing mechanism comprises a crushing component, a filtering component and a drying component, the separation box is provided with a processing mechanism for circulating transmission of the construction waste, debris adsorption and debris detection, the processing mechanism comprises a transmission component, an adsorption component and a detection component, the separation box is also provided with a collection component for collecting metal debris; the adsorption component comprises a ferrite magnet fixed above the iron plate, a ferrite magnet fixed on the left side of the ferrite magnet, and a ferrite magnet fixed on the right side of the ferrite magnet. The transmission component comprises a transmission tube fixed on the separation box, a first auger and a second auger rotatably arranged on the inner side of the transmission tube, and a driving member for rotating the first auger and the second auger; the detection component comprises a partition plate fixed on the inner side of the separation box, a fixed block is arranged on the left side of the partition plate, an elastic rope is arranged on the bottom of the fixed block, a second electromagnet is arranged on the bottom of the elastic rope, and evenly distributed magnet holes are opened on the inner side of the partition plate, and the second electromagnet is located on the left side of the iron suction hole.
[0007] By adopting the above technical scheme, the construction waste that needs to be crushed can be crushed by the crushing component to prevent the construction waste from sticking together and affecting the subsequent screening and filtering as well as the separation from metal debris. The crushed construction waste can be filtered and screened by the filtering component to separate the larger stones in the construction waste and prevent the stones from being mixed in the construction waste and affecting the recycling effect. The construction waste can be dried and dehydrated by the drying component to prevent the construction waste from being affected by moisture during crushing and screening, thereby affecting the effect of crushing and screening of the construction waste and affecting the effect of subsequent separation of the construction waste from metal debris.
[0008] The filtered and dried construction debris can be circulated, transported, adsorbed and detected through the processing mechanism; the metal debris in the construction debris can be adsorbed through the adsorption component; the metal iron filings in the construction debris can be effectively adsorbed through the strong magnetic force of the ferrite magnet, the ferrite boron magnet, the first electromagnet and the iron plate; the adsorbed metal iron filings can be collected through the collecting component to prevent the metal iron filings from sticking to the iron plate and affecting the effect of the iron plate on the adsorption of the metal iron filings; the first electromagnet can be driven to move left and right on the iron plate through the sliding part to ensure the effect of the first electromagnet on moving and cleaning the metal debris on the iron plate; the transmitted construction debris can be detected and processed through the detection component to detect whether the construction debris contains metal iron filings; the construction debris can be circulated and transported through the transmission component, the metal iron filings in the construction debris can be circulated and adsorbed, and the construction debris can be circulated and detected at the same time.
[0009] Optionally, the crushing assembly includes a servo motor fixed on the left side of the crushing box, the output shaft of the servo motor is provided with a movable shaft, the outer side of the movable shaft is provided with a power gear, the outer side of the power gear is meshed with a transmission gear, the inner side of the transmission gear is provided with a connecting shaft, the outer sides of the movable shaft and the connecting shaft are provided with crushing rollers, and the outer sides of the two crushing rollers are provided with evenly distributed crushing blades.
[0010] By adopting the above technical scheme, the servo motor can sequentially drive the movable shaft, the power gear, the transmission gear, the connecting shaft, the two crushing rollers and the multiple crushing blades to rotate. The multiple crushing blades rotate on the inner side of the crushing box, so that the construction waste above the screening plate can be crushed to avoid the construction waste from sticking together, so as to ensure the effect of the construction waste recycling treatment.
[0011] Optionally, the filtering assembly includes a supporting shaft rotatably arranged on the inner side of a crushing box, a screening plate is arranged on the outer side of the supporting shaft, a fixed box is arranged on the right side wall of the crushing box, a buffer spring is arranged on the inner side of the fixed box, a buffer plate is arranged on the top of the buffer spring, the buffer plate is fixedly connected to the bottom of the screening plate, a driving wheel is arranged on the outer side of the movable shaft, a transmission belt is connected to the outer side of the driving wheel for transmission, a driven wheel is connected to the inner side of the transmission belt for transmission, a camshaft is arranged on the inner side of the driven wheel, a movable cam is arranged on the outer side of the camshaft, and the movable cam is movably fitted with the screening plate.
[0012] By adopting the above technical scheme, the crushed construction debris can be filtered through the screening plate, and the crushed construction debris will flow to the inner bottom wall of the crushing box, while the stones in the construction debris will remain above the screening plate. When the movable shaft rotates, it drives the driving wheel, the transmission belt, the driven wheel, the camshaft and the movable cam to rotate in sequence. When the movable cam rotates, the screening plate can be frequently squeezed. Therefore, through the cooperation between the support shaft, the fixed box, the buffer spring, the buffer plate, the arc groove and the two first rotating blocks, when the movable cam frequently squeezes the screening plate, the screening plate can have an angle swing effect, thereby enhancing the screening and filtering effect of the screening plate on the construction debris.
[0013] Optionally, the drying component includes a heating box fixed to the right side of the crushing box, a heating tube is provided on the inner side of the heating box, a first bevel gear is provided on the outer side of the connecting shaft, a second bevel gear is meshed with the outer side of the first bevel gear, a transmission shaft is provided on the inner side of the second bevel gear, a third bevel gear is provided on the outer side of the transmission shaft, a fourth bevel gear is meshed with the outer side of the third bevel gear, a fan blade shaft is provided on the inner side of the fourth bevel gear, and fan blades are provided on the outer side of the fan blade shaft, a connecting pipe is provided on the left side of the heating box, a filter plate is provided on the bottom end of the connecting pipe, a driving box is provided on the bottom of the heating box, the driving box is fixedly connected to the crushing box, and the filter plate is fixedly connected to the inner top wall of the crushing box.
[0014] By adopting the above technical solution, when the connecting shaft rotates, it will drive the first bevel gear, the second bevel gear, the transmission shaft, the third bevel gear, the fourth bevel gear, the fan shaft and the fan blades to rotate and generate wind force. The wind force in the heating box can be heated by the heating pipe to form hot air, and then the hot air will enter the inner side of the crushing box through the connecting pipe and the filter plate. Through the circulation and floating of the hot air inside the crushing box, the construction waste inside the crushing box can be dried and dehydrated to ensure the effect of construction waste recycling and processing, and avoid the construction waste from affecting the subsequent construction waste filtration and metal debris adsorption due to moisture.
[0015] Optionally, the transmission component includes a transmission pipe fixed on the separation box, a connecting box is provided on the inner side of the transmission pipe, a fifth bevel gear is provided on the outer side of the transmission shaft, a sixth bevel gear is meshed on the outer side of the fifth bevel gear, an auger shaft is provided on the inner side of the sixth bevel gear, the second auger is fixed on the outer side of the auger shaft, the first auger is fixed on the outer side of the transmission shaft, a feed frame is provided at the bottom of the right side of the crushing box, a first solenoid valve is fixedly installed on the outer side of the feed frame, a connecting pipe is provided at the bottom of the right side of the separation box, a second solenoid valve is fixedly installed on the outer side of the connecting pipe, and evenly distributed iron-absorbing holes are opened on the top of the transmission pipe.
[0016] By adopting the above technical scheme, the construction debris filtered inside the crushing box can be quantitatively put into the inner side of the transmission pipe through the feed frame through the first solenoid valve. When the transmission shaft rotates, it will also drive the fifth bevel gear, the first auger, the sixth bevel gear, the auger shaft and the second auger to rotate in sequence. When the second auger rotates, the construction debris inside the transmission pipe can be transmitted and stirred. By opening the connecting pipe at a timed time through the second solenoid valve, the construction debris inside the connecting pipe can be put into the inner side of the transmission pipe through the connecting pipe. Through the rotation of the first auger, the construction debris inside the transmission pipe can be driven to be transmitted upward, and the construction debris can be transmitted to the second auger again, and the construction debris can continue to be transmitted through the second auger.
[0017] Optionally, the sliding member includes a rotating shaft rotatably arranged on the inner side of the separation box, a seesaw is arranged on the left and right sides of the rotating shaft, an adjustment plate is movably connected to the top of the seesaw on the left side, a sliding plate is arranged on the left side of the adjustment plate, a detection block is arranged on the outer side of the sliding plate, a sliding square hole is opened on the left side of the separation box, the sliding plate is slidably connected to the sliding square hole, the seesaw on the right side is movably fitted with the second electromagnet, the total weight of the sliding plate, the detection block and the adjustment plate is equal to the weight of the second electromagnet, and evenly distributed magnet holes are opened on the inner side of the partition plate.
[0018] By adopting the above technical solution, when the construction waste being transmitted and absorbed still contains metal debris, the metal debris will be absorbed on the top of the second electromagnet through the magnet hole. Therefore, the second electromagnet will increase gravity due to the suction of the debris, causing the two seesaws to lose balance, driving the two seesaws to rotate around the rotation axis as the center. When the left seesaw rotates upward, it will drive the adjustment plate, the sliding plate and the detection block to move upward in turn. At the same time, when the second electromagnet is pressed down by gravity, it means that the metal iron chips in the current construction waste have not been completely absorbed. The movement of the detection block can also let the staff know the metal removal status of the construction waste.
[0019] Optionally, the sliding member also includes an adjusting box fixed on the inner side of the separation box, the inner side of the adjusting box is movably connected with an adjusting block, a telescopic spring is provided on the right side of the adjusting block, the telescopic spring is fixedly connected to the adjusting box, a movable push plate is provided on the right side of the adjusting block, the adjusting box is fixedly connected to the partition plate, the iron plate is fixedly connected to the adjusting box, and the adjusting plate fits with the inclined surface of the adjusting block.
[0020] By adopting the above technical solution, because the top of the adjustment plate fits with the inclined surface of the adjustment block, when the adjustment plate moves upward, the telescopic spring will be in a compressed state, and then the adjustment block, the movable push plate and the first electromagnet will be driven to move to the right in turn. When the first electromagnet moves to the right, the iron filings under the iron plate can also be driven to move to the right through the suction force of the first electromagnet, and the first electromagnet moves inside the iron plate, which can further enhance the magnetization effect of the iron plate and ensure the suction force of the iron plate on the iron filings.
[0021] Optionally, the collecting component includes a shielding frame fixed to the right side of the iron plate, a shielding plate is provided at the bottom of the shielding frame, a storage cavity is opened on the inner side of the iron plate and the shielding frame, the first electromagnet is located on the inner side of the storage cavity, a collecting frame is provided on the right side wall of the separation box, the transmission pipe is located between the shielding frame and the collecting frame, and the collecting frame is a rectangular block with a hollow interior and a missing top.
[0022] By adopting the above technical solution, when the first electromagnet moves to the inner side of the shielding frame, the shielding effect of the shielding frame and the shielding plate causes the iron plate and the first electromagnet to lose their suction force on the iron filings. At this time, the iron filings will fall into the inner side of the collecting frame due to gravity for collection, and the metal filings can be quickly cleaned up for recycling. The metal filings on the iron plate can be cleaned up while the construction waste is circulated, avoiding excessive amounts of metal filings on the iron plate, which affects the adsorption effect of the iron plate on the metal filings, so that the iron plate can continuously adsorb the metal filings.
[0023] Optionally, the movable part includes a connecting frame fixed to the bottom of the movable push plate, the connecting frame is fixedly connected to the iron block, the inner side of the iron block is movably connected with a sliding rod, the outer side of the sliding rod is hinged with a connecting rod, the outer side of the connecting rod is hinged with a pushing rod, a movable push block is provided on the outer side of the pushing rod, and two connecting springs are provided on the outer side of the movable push block, both of which are fixedly connected to the iron block, the movable push block is slidably connected to the iron block, an annular spring is provided on the outer side of the connecting rod, the annular spring is fixedly connected to the iron block, the sliding rod is movably fitted with the shielding plate, and the iron plate is movably fitted with the iron block.
[0024] By adopting the above technical scheme, the iron block is in contact with the iron plate and also has a magnetic absorption function. When the sliding part drives the first electromagnet to move, it can scrape and brush the bottom of the iron plate to prevent iron filings from remaining at the bottom of the iron plate. The iron block can absorb and catch the iron filings when scraping and brushing. When the iron block moves to the shielding plate, the shielding frame and the shielding plate will also make the iron block lose its magnetic force. The movement of the iron block will gradually make the moving part contact with the shielding plate, and the moving part can gradually drive the connecting iron block to scrape and brush, and completely scrape the iron filings on the iron block and drop them into the collection frame for collection.
[0025] The second aspect of the present application provides a construction waste recycling method using the following technical solution: The present application also discloses a method for recycling construction waste, which is based on the above-mentioned system for recycling construction waste, and includes the following steps: S1. Pour the construction waste to be recycled into the inner side of the crushing box, and the crushing assembly can be driven by the processing mechanism to crush the construction waste; S2. When the construction waste is crushed, the processing mechanism can drive the drying component to dry and dehydrate the construction waste, thus ensuring the effect of subsequent construction waste processing; S3. When the construction waste is dried and crushed, the processing mechanism can drive the filter assembly to filter the construction waste and separate the larger stones in the construction waste; S4. After the construction debris is screened, the construction debris can be quantitatively placed in the transmission assembly, and the transmission assembly can be driven by the processing mechanism, and the second auger can be driven by the transmission assembly to drive the construction debris to be transmitted. The iron plate can generate a strong magnetic force through the ferrite magnet, the ferrite-boron magnet and the first electromagnet to absorb the metal iron filings in the construction debris, and the adsorbed construction debris will be transmitted to the partition plate; S5. The second electromagnet can be used to detect construction debris. When the construction debris being transmitted and absorbed contains metal debris, it will be absorbed by the second electromagnet and increase gravity, causing the two seesaws to lose balance and generate power. The first electromagnet can be driven to move to the right through the cooperation of the adjustment plate, telescopic spring and movable push plate to move the iron filings under the iron plate to the shielding plate, so that the magnetic force loses its attraction to the iron filings and they fall into the collection frame through gravity for collection. The iron receiving block also has a magnetic attraction function when it contacts the iron plate. When the sliding part drives the first electromagnet to move, it will drive the iron receiving block to scrape and brush the bottom of the iron plate. The iron receiving block can also absorb the iron filings when scraping and brushing, and the fallen iron filings will be When the connecting iron block moves to the shielding plate, the shielding frame and the shielding plate will also make the connecting iron block lose its magnetic force, and the iron filings on the connecting iron block will fall into the collection frame for collection. At the same time, the movement of the connecting iron block will gradually make the moving part contact with the shielding plate, so that the moving part can gradually drive the connecting iron block scraper to completely scrape the iron filings off the connecting iron block and drop them into the collection frame for collection. At the same time, when the second electromagnet is pressed down by force, the second solenoid valve opens the connecting pipe, and the construction debris in the separation box can be put into the transmission pipe. The construction debris can be cyclically adsorbed and cleaned through the transmission of the first auger and the second auger until the metal debris in the construction debris is completely adsorbed and cleaned. S6. If it is detected that there are no metal fragments in the construction waste, the construction waste can be directly discharged from the separation box and can be recycled.
[0026] By adopting the above technical scheme, metal debris in construction debris can be effectively adsorbed. There is no need to wash the construction debris on the magnetic material. It can be used on continuously flowing construction debris. While avoiding the construction debris from washing the magnetic material, the metal waste adsorbed by the magnetic material will be washed down due to the washing force of the construction debris, avoiding the magnetic material from being mixed with the construction debris again, and effectively ensuring the effect of separating construction debris from metal waste.
[0027] In summary, the present application includes at least one of the following beneficial technical effects: 1. Pour the construction waste to be recycled into the crushing box through the feed funnel. The servo motor can drive the movable shaft, power gear, transmission gear, connecting shaft and two crushing rollers to rotate in turn, which can drive multiple crushing blades to rotate in the crushing box, and can crush the construction waste on the screening plate to prevent the construction waste from sticking together in groups, so as to ensure the effect of subsequent construction waste filtering and screening. When the connecting shaft rotates, it will drive the first bevel gear, the second bevel gear, the transmission shaft, the third bevel gear, the fourth bevel gear, the fan shaft and the fan blades to rotate to generate wind force. The wind force in the heating box can be heated by the heating pipe to form hot air. The hot air will enter the crushing box through the connecting pipe and the filter plate, and then pass through the The hot air circulates and floats in the crushing box, which can dry and dehydrate the construction waste in the crushing box to ensure the effect of construction waste recycling and processing, and avoid the construction waste affecting the subsequent construction waste filtering and metal debris adsorption due to moisture. The crushed construction waste can be filtered through the screening plate, and the crushed construction waste will flow to the inner bottom wall of the crushing box through the filter holes on the inner side of the screening plate, while the stones in the construction waste will remain above the screening plate. When the movable shaft rotates, it will drive the driving wheel, the transmission belt, the driven wheel, the camshaft and the movable cam to rotate. Frequent squeezing of the screening plate can make the screening plate have an angle swing effect, thereby enhancing the construction waste screening and filtering effect of the screening plate; 2. The filtered construction debris in the crushing box can be quantitatively put into the transmission pipe through the feed frame through the first solenoid valve. When the transmission shaft rotates, it will also drive the fifth bevel gear, the first auger, the fifth bevel gear, the sixth bevel gear, the auger shaft and the second auger to rotate in sequence, so as to transmit and stir the construction debris in the transmission pipe. The iron plate generates a strong magnetic force through the ferrite magnet, the ferrite-boron magnet and the first electromagnet. When the construction debris is transmitted, the iron filings in the construction debris are adsorbed out through the iron-absorbing holes outside the transmission pipe. The construction debris in the transmission pipe is transmitted to the partition plate through the transmission of the second auger. When the construction debris is transmitted from the transmission pipe, the effect of the iron plate on the adsorption and separation of iron filings in the construction debris can be further enhanced; 3. When the construction debris is washed on the partition plate, the second electromagnet can detect the construction debris. When the construction debris being transmitted and adsorbed also contains metal debris, the metal debris will be adsorbed on the top of the second electromagnet through the magnet hole. Therefore, the second electromagnet will increase the gravity due to the suction of the debris, causing the two seesaws to lose balance, and then drive the two seesaws to rotate with the rotation axis as the center. When the left seesaw rotates upward, it will drive the adjustment plate, sliding plate and detection block to move upward in turn, which will compress the telescopic spring, and then drive the adjustment block, movable push plate and the first electromagnet to move to the right in turn. Because the magnetism of the first electromagnet is higher than that of the first electromagnet, The ferrite magnet and the ferrite-boron magnet can also drive the iron filings under the iron plate to move to the right through the suction force of the first electromagnet. When the first electromagnet moves to the inner side of the shielding frame, the shielding effect of the shielding frame and the shielding plate causes the iron plate and the first electromagnet to lose their suction force on the iron filings. At this time, the iron filings will fall into the inner side of the collection frame for collection due to gravity. When the first electromagnet moves in the iron plate, the magnetization effect of the iron plate can be further enhanced to ensure the suction force of the iron plate on the iron filings. At the same time, when the second electromagnet is pressed down by gravity, it means that the metal iron filings in the current construction debris are not completely adsorbed. The movement of the detection block can let the staff know the situation of metal removal from the construction debris. 4. When the second electromagnet is pressed downward, the connecting pipe is opened through the second solenoid valve, and the construction debris in the separation box is placed in the transmission pipe. The rotation of the first auger can drive the construction debris in the transmission pipe to be transmitted upward, and the construction debris is transmitted to the second auger again. The construction debris can be continuously transmitted through the second auger, and the metal iron filings of the construction debris are adsorbed again through the strong magnetic force of the ferrite magnet, the ferrite-boron magnet, the first electromagnet and the iron plate. The effect of adsorbing the metal iron filings of the construction debris can be ensured by cyclically transmitting and adsorbing the construction debris. Until the gravity of the second electromagnet does not change and the detection block does not move, it means that the metal iron filings in the construction debris have been adsorbed cleanly, and then the connecting pipe is closed through the second solenoid valve, so that the construction debris remains in the separation box and can be released. After each round of transmission of the construction debris, the second electromagnet temporarily loses its suction because At this time, the two seesaws are in an inclined state, so the metal iron filings will flow directly to the inner bottom wall of the separation box for collection due to gravity, and the gravity of the second electromagnet will gradually become lighter. Through the elastic force of the elastic rope and the telescopic spring, the two seesaws can be balanced again, and the first electromagnet can be moved to the left wall of the iron plate to facilitate the adsorption and detection of the construction debris again, so as to achieve the effect of cyclic adsorption and detection of the construction debris. After the construction debris has no metal iron filings, the whole system can be shut down to keep the first electromagnet suction, and finally the detection block can be directly pushed upward to drive the adjustment plate upward, drive the adjustment block, the movable push plate and the first electromagnet to move to the right, and move the last metal iron filings on the iron plate to the shielding plate, and then fall to the inner side of the collection frame for collection, so as to achieve the purpose of effectively separating the construction debris from the metal waste, and the construction debris can be cyclically transmitted and adsorbed to completely adsorb the metal waste in the construction debris; 5. The iron block also has a magnetic attraction effect when it contacts the iron plate. When the first electromagnet moves, it will also drive the iron block to move. The iron block can move left and right at the bottom of the iron plate to scrape the bottom of the iron plate to prevent the iron filings from remaining at the bottom of the iron plate when the first electromagnet drives the iron filings to move. At the same time, the iron block can also adsorb the iron filings when scraping and brushing to prevent the iron filings from falling into the construction waste. When the iron block moves to the shielding plate, the shielding of the shielding frame and the shielding plate will also cause the iron block to lose its magnetic force, and then the iron filings on the iron block will also fall into the collection frame for collection. At the same time, when the iron block moves, the sliding rod will gradually contact and be pressed against the shielding plate. Through the connection and cooperation between the shielding plate, the sliding rod, the connecting rod, the pushing rod, the movable pushing block, the two connecting springs and the annular spring, the movable pushing block scrapes and brushes the iron filings on the iron block, and the iron filings are scraped and brushed off and fall into the collection frame for collection, thereby ensuring the effect of iron filings absorbing iron. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2 A cross-sectional view of the crushing box connection structure in the embodiment of the present application; Figure 3 Right view of the transmission pipe connection structure in the embodiment of the present application; Figure 4 Embodiments of the present application Figure 2 Enlarged view of point A in the middle; Figure 5 Left view of the crushing box connection structure in the embodiment of the present application; Figure 6 A top view of the crushing box connection structure in the embodiment of the present application; Figure 7 Left view of the separation box connection structure in the embodiment of the present application; Figure 8 Left view of the partition plate connection structure in the embodiment of the present application; Fig. 9 Embodiments of the present application Figure 2 Enlarged view of point B in the middle.
[0029] Figure numerals: 1, crushing box; 2, servo motor; 3, movable shaft; 4, power gear; 5, transmission gear; 6, connecting shaft; 7, crushing roller; 8, crushing blade; 9, supporting shaft; 10, screening plate; 11, fixed box; 12, buffer spring; 13, buffer plate; 14, driving wheel; 15, transmission belt; 16, driven wheel; 17, camshaft; 18, movable cam; 19, heating box; 20, heating tube; 21, first bevel gear; 22, second bevel gear ; 23, transmission shaft; 24, third bevel gear; 25, fourth bevel gear; 26, fan shaft; 27, fan blade; 28, connecting pipe; 29, filter plate; 30, drive box; 31, feed frame; 32, first solenoid valve; 33, separation box; 34, transmission pipe; 35, connection box; 36, first auger; 37, fifth bevel gear; 38, sixth bevel gear; 39, auger shaft; 40, second auger; 41, connecting pipe; 42, second solenoid valve; 43, iron plate; 44, ferrite magnet; 45, ferrite boron magnet; 46, first electromagnet; 47, collection frame; 48, discharge pipe; 49, fixed valve; 50, adjustment box; 51, partition plate; 52, fixed block; 53, elastic rope; 54, second electromagnet; 55, rotating shaft; 56, seesaw; 57, sliding plate; 58, detection block; 59, adjustment plate; 60, limit frame; 61, adjustment block; 62, telescopic spring; 63, movable push plate; 64, intelligent control control device; 65, the first discharging frame; 66, the first baffle plate; 67, the second discharging frame; 68, the second baffle plate; 69, the third discharging frame; 70, the third baffle plate; 71, the universal wheel; 72, the brake; 73, the feeding funnel; 74, the sealing door; 75, the shielding frame; 76, the shielding plate; 77, the connecting frame; 78, the connecting iron block; 79, the sliding rod; 80, the connecting rod; 81, the pushing rod; 82, the movable pushing block; 83, the connecting spring; 84, the annular spring. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-9 This application is described in further detail.
[0031] Embodiment 1:
[0032] The present application embodiment discloses a construction waste recycling and processing system, referring to Figure 1 and Figure 2, including a crushing box 1, a separation box 33 fixed below the crushing box 1, a screening plate 10 for filtering construction debris, and an iron plate 43 for adsorbing metal debris. The crushing box 1 is provided with a processing mechanism for crushing, filtering and drying the construction debris, and the processing mechanism includes a crushing component, a filtering component and a drying component. The separation box 33 is provided with a processing mechanism for circulating transmission, debris adsorption and debris detection of the construction debris, and the processing mechanism includes a transmission component, an adsorption component and a detection component. The separation box 33 is also provided with a collection component for collecting metal debris; the adsorption component includes a ferrite magnet 44 fixed above the iron plate 43, a ferrite boron magnet 45 fixed on the left side of the ferrite magnet 44, and a first electric A magnet 46, an iron block 78 arranged at the bottom of the iron plate 43, a moving part for driving the iron block 78 left and right, and a sliding part for slidingly driving the first electromagnet 46; the transmission component includes a transmission tube 34 fixed on the separation box 33, a first auger 36 and a second auger 40 rotatably arranged on the inner side of the transmission tube 34, and a driving part for rotating and driving the first auger 36 and the second auger 40; the detection component includes a partition plate 51 fixed on the inner side of the separation box 33, a fixed block 52 is fixedly connected to the left side of the partition plate 51, an elastic rope 53 is fixedly connected to the bottom of the fixed block 52, a second electromagnet 54 is fixedly connected to the bottom of the elastic rope 53, and evenly distributed magnet holes are opened on the inner side of the partition plate 51, and the second electromagnet 54 is located on the left side of the magnet hole.
[0033] The crushing assembly includes a servo motor 2 fixed on the left side of the crushing box 1, the output shaft of the servo motor 2 is fixedly connected to a movable shaft 3, the outer side of the movable shaft 3 is fixedly connected to a power gear 4, the outer side of the power gear 4 is meshed with a transmission gear 5, the inner side of the transmission gear 5 is fixedly connected to a connecting shaft 6, the outer sides of the movable shaft 3 and the connecting shaft 6 are fixedly connected to crushing rollers 7, and the outer sides of the two crushing rollers 7 are fixedly connected to evenly distributed crushing blades 8.
[0034] The filtering assembly includes a supporting shaft 9 rotatably arranged on the inner side of the crushing box 1, a screening plate 10 is fixedly connected to the outer side of the supporting shaft 9, a fixed box 11 is fixedly connected to the right side wall of the crushing box 1, a buffer spring 12 is fixedly connected to the inner side of the fixed box 11, a buffer plate 13 is fixedly connected to the top of the buffer spring 12, a connecting square hole is provided on the top of the fixed box 11, the buffer plate 13 is slidably connected to the connecting square hole, the buffer plate 13 is fixedly connected to the bottom of the screening plate 10, the inner side of the screening plate 10 is provided with evenly distributed filtering holes, an arc groove is provided on the right side wall of the crushing box 1, the screening plate 10 is slidably connected to the arc groove, one end of the front side and one end of the back side of the supporting shaft 9 are fixedly connected to the first rotating block, the two first rotating blocks are rotatably connected to the crushing box 1, one end of the front side of the supporting shaft 9 sequentially penetrates the crushing box 1 and the screening plate 10 and extends to the back side of the first rotating block, and the crushing blade 8 is located on the screening plate 10. Above the movable shaft 3, a driving wheel 14 is fixedly connected to the outside of the driving wheel 14, a transmission belt 15 is transmission-connected to the outside of the driving wheel 14, a driven wheel 16 is transmission-connected to the inside of the transmission belt 15, a camshaft 17 is fixedly connected to the inside of the driven wheel 16, a movable cam 18 is fixedly connected to the outside of the camshaft 17, the movable cam 18 is located above the screening plate 10, and the movable cam 18 is movably fitted with the screening plate 10, two first bearings are fixedly connected to the outside of the movable shaft 3, and the two first bearings are fixedly connected to the crushing box 1, the right end of the movable shaft 3 sequentially penetrates the crushing box 1, the first bearing, the crushing roller 7, the power gear 4 and the driving wheel 14 and extends to the inside of the driving wheel 14, a second bearing is fixedly connected to the outside of the camshaft 17, and the second bearing is fixedly connected to the crushing box 1, and the left end of the camshaft 17 sequentially penetrates the driven wheel 16, the second bearing and the crushing box 1 and extends to the outside of the movable cam 18.
[0035] The drying assembly includes a heating box 19 fixed to the right side of the crushing box 1, a heating tube 20 is fixedly connected to the inner side of the heating box 19, a first bevel gear 21 is fixedly connected to the outer side of the connecting shaft 6, a second bevel gear 22 is meshed with the outer side of the first bevel gear 21, a transmission shaft 23 is fixedly connected to the inner side of the second bevel gear 22, a third bevel gear 24 is fixedly connected to the outer side of the transmission shaft 23, a fourth bevel gear 25 is meshed with the outer side of the third bevel gear 24, a fan blade shaft 26 is fixedly connected to the inner side of the fourth bevel gear 25, a fan blade 27 is fixedly connected to the outer side of the fan blade shaft 26, a connecting pipe 28 is fixedly connected to the left side of the heating box 19, and the bottom end of the connecting pipe 28 is fixedly connected to The filter plate 29 and the bottom of the heating box 19 are fixedly connected with a drive box 30, and the drive box 30 is fixedly connected to the crushing box 1. The inner side of the filter plate 29 is provided with evenly distributed air inlet holes, and the filter plate 29 is located on the inner side of the crushing box 1. The filter plate 29 is fixedly connected to the inner top wall of the crushing box 1. The crushing box 1 and the heating box 19 are both connected with the connecting pipe 28. The left side wall of the heating box 19 is an inclined surface, and the fan blade 27 is located on the right side of the heating tube 20. The right end of the fan blade shaft 26 is fixedly connected with the second rotating block, and the heating box 19 is rotatably connected to the second rotating block. The right end of the fan blade shaft 26 passes through the fourth bevel gear 25 and the heating box 19 in sequence and extends to the outside of the second rotating block.
[0036] The transmission assembly includes a transmission pipe 34 fixed on the separation box 33, a connecting box 35 is fixedly connected to the inner side of the transmission pipe 34, a fifth bevel gear 37 is fixedly connected to the outer side of the transmission shaft 23, a sixth bevel gear 38 is meshed with the outer side of the fifth bevel gear 37, an auger shaft 39 is fixedly connected to the inner side of the sixth bevel gear 38, a second auger 40 is fixed to the outer side of the auger shaft 39, a first auger 36 is fixed to the outer side of the transmission shaft 23, the first auger 36 and the second auger 40 are both located on the inner side of the transmission pipe 34, a feed frame 31 is fixedly connected to the bottom of the right side of the crushing box 1, a first solenoid valve 32 is fixedly installed on the outer side of the feed frame 31, the crushing box 1 and the transmission pipe 34 are both connected to the feed frame 31, a connecting pipe 41 is fixedly connected to the bottom of the right side of the separation box 33, and the connecting pipe 41 A second solenoid valve 42 is fixedly installed on the outside of the transmission shaft 23, the separation box 33 and the transmission pipe 34 are both connected to the connecting pipe 41, the outside of the transmission shaft 23 is fixedly connected to the third bearing, the bottom end of the transmission shaft 23 is fixedly connected to the third rotating block, the third bearing is fixedly connected to the connecting box 35, the transmission pipe 34 is rotatably connected to the third rotating block, the bottom end of the transmission shaft 23 passes through the third bevel gear 24, the heating box 19, the driving box 30, the second bevel gear 22, the third bearing, the transmission pipe 34, the connecting box 35 and the fifth bevel gear 37 in sequence and extends to the top of the third rotating block, the transmission pipe 34 is L-shaped, the left end of the transmission pipe 34 passes through the separation box 33 and extends to the inner side of the separation box 33, the top of the transmission pipe 34 is provided with evenly distributed iron-absorbing holes, and the left side of the transmission pipe 34 is provided with an opening.
[0037] The sliding member includes a rotating shaft 55 rotatably arranged on the inner side of the separation box 33, and a seesaw 56 is fixedly connected to the left and right sides of the rotating shaft 55. An adjusting plate 59 is movably connected to the top of the left seesaw 56, a sliding plate 57 is fixedly connected to the left side of the adjusting plate 59, and a detection block 58 is fixedly connected to the outer side of the sliding plate 57. A sliding square hole is opened on the left side of the separation box 33, and the sliding plate 57 is slidably connected to the sliding square hole. The right seesaw 56 is movably fitted with the second electromagnet 54, and the detection block 58 is movably fitted with the left side of the separation box 33. The total weight of the sliding plate 57, the detection block 58 and the adjusting plate 59 is equal to the weight of the second electromagnet 54. The suction force of the first electromagnet 46 is greater than the suction force of the ferrite magnet 45, and the suction force of the ferrite magnet 45 is greater than the suction force of the ferrite magnet 44. By adopting a small amount of ferrite magnet 45, cost expenditure can be saved.
[0038] The sliding part also includes an adjusting box 50 fixed on the inner side of the separation box 33, and an adjusting block 61 is movably connected to the inner side of the adjusting box 50, and a telescopic spring 62 is fixedly connected to the right side of the adjusting block 61, and the telescopic spring 62 is fixedly connected to the adjusting box 50, and a movable push plate 63 is fixedly connected to the right side of the adjusting block 61, and the iron plate 43 is fixedly connected to the adjusting box 50. The adjusting block 61 is a triangle, and sliding square holes are provided on the right side of the adjusting box 50 and the left side of the iron plate 43, and the two sliding square holes are slidably connected to the movable push plate 63, and a sliding block is fixedly connected to the top of the adjusting block 61, and a sliding long groove is provided on the inner top wall of the adjusting box 50, and the sliding block is slidably connected to the sliding long groove.
[0039] The collecting assembly includes a shielding frame 75 fixed to the right side of the iron plate 43, a shielding plate 76 is fixedly connected to the bottom of the shielding frame 75, the bottom of the shielding plate 76 is an inclined surface, a storage cavity is provided on the inner side of the iron plate 43 and the shielding frame 75, the two storage cavities are connected, the first electromagnet 46 is located on the inner side of the storage cavity, a collecting frame 47 is fixedly connected to the right side wall of the separation box 33, a discharge pipe 48 is fixedly connected to the bottom of the collecting frame 47, a fixed valve 49 is fixedly installed on the outer side of the discharge pipe 48, the collecting frame 47 is connected to the discharge pipe 48, the transmission pipe 34 is located between the shielding frame 75 and the collecting frame 47, the inner bottom wall of the collecting frame 47 is an inclined surface, and the collecting frame 47 is internally A rectangular solid that is empty and missing at the top, a sliding wheel is fixedly connected to the bottom of the first electromagnet 46, a sliding groove is provided on the inner bottom wall of the first electromagnet 46, and the two sliding grooves correspond to each other, the sliding wheel is slidably connected to the sliding groove, the bottom of the adjusting box 50 is fixedly connected to the limiting frame 60, the inner side of the limiting frame 60 and the bottom of the adjusting box 50 are provided with limiting square holes, and the two limiting square holes are connected, the two limiting square holes are slidably connected to the adjusting plate 59, the adjusting plate 59 is fitted with the inclined surface of the adjusting block 61, the material of the shielding frame 75 and the shielding plate 76 is preferably wood, and rubber, plastic and other materials can also be used under other working conditions, any material that can block magnetic force can be used.
[0040] The front of the separation box 33 is fixedly connected to an intelligent controller 64, and the servo motor 2, the heating tube 20, the first solenoid valve 32, the second solenoid valve 42, the first electromagnet 46 and the second electromagnet 54 are all electrically connected to the intelligent controller 64. The left side of the crushing box 1 is fixedly connected to a first discharge frame 65, and the inner side of the first discharge frame 65 is movably connected to a first baffle plate 66. The first discharge frame 65 is connected to the crushing box 1, and the first discharge frame 65 is located above the screening plate 10. The inner bottom wall of the crushing box 1 is an inclined surface. The bottom of the left side of the separation box 33 is fixedly connected to a second discharge frame 67, and the inner side of the second discharge frame 67 is movably connected to a second baffle plate 68. The second discharge frame 67 is connected with the separation box 33, the right side of the bottom of the separation box 33 is fixedly connected with the third discharge frame 69, the inner side of the third discharge frame 69 is movably connected with the third baffle plate 70, the third discharge frame 69 is connected with the separation box 33, the inner bottom wall of the separation box 33 is an inclined surface, the four corners of the bottom of the separation box 33 are fixedly connected with universal wheels 71, the outer sides of the four universal wheels 71 are fixedly connected with brakes 72, the top of the crushing box 1 is fixedly connected with a feed funnel 73, the top of the feed funnel 73 is movably connected with a movable cover, the feed funnel 73 is connected with the crushing box 1, the front of the separation box 33 is movably connected with a sealing door 74, and the sealing door 74 is located on the front of the collecting frame 47.
[0041] The movable member includes a connecting frame 77 fixed to the bottom of the movable push plate 63, the connecting frame 77 is fixedly connected to the iron block 78, the inner side of the iron block 78 is movably connected with a sliding rod 79, the outer side of the sliding rod 79 is hinged with a connecting rod 80, the outer side of the connecting rod 80 is hinged with a pushing rod 81, the outer side of the pushing rod 81 is fixedly connected with a movable push block 82, the outer side of the movable push block 82 is fixedly connected with two connecting springs 83, the two connecting springs 83 are both fixedly connected to the iron block 78, the iron block 78 is L-shaped, and two receiving grooves are provided on the inner side of the iron block 78, the two connecting springs 83 are respectively located on the inner sides of the two receiving grooves, and the movable The movable push block 82 is slidably connected to the iron block 78, the outer side of the connecting rod 80 is fixedly connected with an annular spring 84, the annular spring 84 is fixedly connected to the iron block 78, the sliding rod 79 is movably fitted with the shielding plate 76, the iron plate 43 is movably fitted with the iron block 78, a long sliding hole is provided at the bottom of the adjusting box 50, the connecting frame 77 is slidably connected to the long sliding hole, the connecting frame 77 is L-shaped, a connecting hole with the same diameter as the push rod 81 is provided on the inner side of the iron block 78, the push rod 81 is slidably connected to the connecting hole, a sliding hole with the same diameter as the sliding rod 79 is provided on the inner side of the iron block 78, and the sliding rod 79 is slidably connected to the sliding hole.
[0042] The implementation principle of a construction waste recycling and processing system in the embodiment of the present application is as follows: (1) By opening the movable cover, the construction waste to be recycled can be poured into the crushing box 1 through the feeding funnel 73. The servo motor 2 can drive the movable shaft 3 and the power gear 4 to rotate in turn. Because the power gear 4 is meshed with the transmission gear 5, the power gear 4 will drive the transmission gear 5 and the connecting shaft 6 to rotate in turn when it rotates. When the movable shaft 3 and the connecting shaft 6 rotate, they will respectively drive the two crushing rollers 7 to rotate, and then drive the multiple crushing blades 8 to rotate on the inner side of the crushing box 1. Through the rotation of the multiple crushing blades 8, the construction waste above the screening plate 10 can be crushed to prevent the construction waste from sticking together, so as to ensure the effect of subsequent construction waste filtering and screening; (2) When the connecting shaft 6 rotates, it will drive the first bevel gear 21 to rotate. Because the first bevel gear 21 is meshed with the second bevel gear 22, the first bevel gear 21 will drive the second bevel gear 22, the transmission shaft 23 and the third bevel gear 24 to rotate in sequence. Because the third bevel gear 24 is meshed with the fourth bevel gear 25, the third bevel gear 24 will drive the fourth bevel gear 25, the fan blade shaft 26 and the fan blade 27 to rotate in sequence. When the fan blade 27 rotates, it will generate wind force, which can heat the wind force inside the heating box 19 through the heating pipe 20 to form hot air. Then, the hot air will enter the inner side of the crushing box 1 through the connecting pipe 28 and the air inlet hole inside the filter plate 29. Through the circulation of the hot air inside the crushing box 1, the construction waste inside the crushing box 1 can be dried and dehydrated to ensure the effect of construction waste recycling and avoid the construction waste being affected by moisture. The effect of subsequent construction waste filtration and metal debris adsorption; (3) The crushed construction waste can be filtered through the screening plate 10. The crushed construction waste will flow to the bottom wall of the crushing box 1 through the filter holes of the screening plate 10, while the stones in the construction waste will remain on the screening plate 10, thereby achieving the purpose of filtering and screening the construction waste. When the movable shaft 3 rotates, it will drive the driving wheel 14 to rotate. Because the driving wheel 14 and the driven wheel 16 are both connected to the transmission belt 15, when the driving wheel 14 rotates, it will drive the transmission belt 15, the driven wheel 16, the cam shaft 17 and the movable cam 18 to rotate in turn. When the movable cam 18 rotates, The screening plate 10 is frequently squeezed, because the left side of the screening plate 10 is rotatably connected to the crushing box 1 through the support shaft 9, and the right side of the screening plate 10 is connected to the crushing box 1 through the fixed box 11, the buffer spring 12 and the buffer plate 13. Therefore, through the cooperation between the support shaft 9, the fixed box 11, the buffer spring 12, the buffer plate 13, the arc groove and the two first rotating blocks, when the active cam 18 frequently squeezes the screening plate 10, the screening plate 10 can have an angular swing effect, thereby enhancing the construction waste screening and filtering effect of the screening plate 10; (4) The filtered construction debris in the crushing box 1 can be quantitatively put into the transmission pipe 34 through the feed frame 31 through the first solenoid valve 32. When the transmission shaft 23 rotates, it will also drive the fifth bevel gear 37 and the first auger 36 to rotate in sequence. Because the fifth bevel gear 37 is meshed with the sixth bevel gear 38, when the fifth bevel gear 37 rotates, it will drive the sixth bevel gear 38, the auger shaft 39 and the second auger 40 to rotate in sequence. When the second auger 40 rotates, it can transport and stir the construction debris inside the transmission pipe 34; (5) The iron plate 43 can generate a strong magnetic force through the ferrite magnet 44, the ferrite-boron magnet 45 and the first electromagnet 46. When the construction debris is being transported, the metal iron filings in the construction debris can be adsorbed out through the iron-absorbing holes on the outside of the transmission pipe 34. The construction debris in the transmission pipe 34 is transported to the partition plate 51 through the transmission of the second auger 40. When the construction debris is transported out of the transmission pipe 34, the effect of the iron plate 43 on adsorbing and separating the metal iron filings in the construction debris can be further enhanced. (6) When the construction debris is washed on the partition plate 51, the second electromagnet 54 can detect the construction debris, because the inner side of the partition plate 51 is provided with evenly distributed magnet holes. When the construction debris being transmitted and adsorbed also contains metal debris, the metal debris will be adsorbed on the top of the second electromagnet 54 through the magnet holes. Therefore, the second electromagnet 54 will increase the gravity due to the suction of the debris, causing the two seesaws 56 to lose balance, and then the two seesaws 56 can be driven to rotate with the rotating shaft 55 as the center. When the left seesaw 56 rotates upward, it will drive the adjustment plate 59, the sliding plate 57 and the detection block 58 to move upward in turn. Because the top of the adjustment plate 59 is in contact with the inclined surface of the adjustment block 61, when the adjustment plate 59 moves upward, the telescopic spring 62 will be in a compressed state, which will then drive the adjustment block 61, the movable push plate 63 and the first electromagnet in turn. 46 moves to the right, because the magnetism of the first electromagnet 46 is higher than that of the ferrite magnet 44 and the ferrite boron magnet 45, when the first electromagnet 46 moves to the right, the suction force of the first electromagnet 46 can also drive the iron filings under the iron plate 43 to move to the right, and when the first electromagnet 46 moves to the inner side of the shielding frame 75, due to the shielding effect of the shielding frame 75 and the shielding plate 76, the iron plate 43 and the first electromagnet 46 lose the suction force on the iron filings, and the iron filings will fall into the inner side of the collecting frame 47 for collection due to gravity, and the first electromagnet 46 can further strengthen the magnetization effect of the iron plate 43 while moving in the iron plate 43, so as to ensure the suction force of the iron plate 43 on the iron filings, and at the same time, when the second electromagnet 54 is pressed down by gravity, it means that the metal iron filings in the current construction debris are not completely adsorbed, and the movement of the detection block 58 can also let the staff know the metal removal situation of the construction debris; (7) By contacting the iron block 78 with the iron plate 43, the iron block 78 can also have a magnetic attraction effect. When the movable push plate 63 drives the first electromagnet 46 to move left and right, it will also drive the connecting frame 77 and the iron block 78 to move left and right in turn. By moving the iron block 78 left and right at the bottom of the iron plate 43, the bottom of the iron plate 43 can be scraped to avoid iron filings remaining at the bottom of the iron plate 43 when the first electromagnet 46 drives the iron filings to move. At the same time, the iron block 78 can also absorb the iron filings when scraping because of its magnetic force to prevent the iron filings from falling into the treated construction waste soil, and can catch the fallen iron filings. When the iron block 78 moves to the shielding plate 76, the shielding frame 75 and the shielding plate The shielding of 76 will also make the iron block 78 lose its magnetic force, and then the iron filings on the iron block 78 will also fall to the inside of the collection frame 47 for collection. At the same time, when the iron block 78 moves, the sliding rod 79 will gradually contact and be compressed with the shielding plate 76, so that the annular spring 84 is in a compressed state and the two connecting springs 83 are in a stretched state. Then, through the connection and cooperation between the shielding plate 76, the sliding rod 79, the connecting rod 80, the pushing rod 81, the movable pushing block 82, the two connecting springs 83 and the annular spring 84, the movable pushing block 82 can be scraped on the iron block 78, and the iron filings on the iron block 78 can be completely scraped off and fall to the inside of the collection frame 47 for collection, which can ensure the iron filings The effect of absorbing iron; (8) When the second electromagnet 54 is pressed downward, the second electromagnetic valve 42 is first used to open the connecting pipe 41, so that the construction debris inside the separation box 33 can be placed into the inner side of the transmission pipe 34 through the connecting pipe 41, and then the first auger 36 is rotated to drive the construction debris inside the transmission pipe 34 to be transmitted upward, and then the construction debris can be transmitted to the second auger 40 again. The construction debris can be continuously transmitted through the second auger 40, so that the strong magnetic force of the ferrite magnet 44, the ferrite-boron magnet 45, the first electromagnet 46 and the iron plate 43 can be used to adsorb the metal filings of the construction debris again. By cyclically transmitting and adsorbing the construction debris, the effect of adsorbing the metal filings of the construction debris can be ensured, until the gravity of the second electromagnet 54 does not change and the detection block 58 does not move. This indicates that the metal iron filings in the construction debris have been absorbed cleanly. At this time, the connecting pipe 41 is closed through the second electromagnetic valve 42, so that the construction debris remains in the separation box 33 and the construction debris can be released to prevent it from being further transmitted. After each round of transmission of the construction debris, the second electromagnet 54 temporarily loses its suction force. Because the two seesaws 56 are in an inclined state at this time, the metal iron filings will flow directly to the inner bottom wall of the separation box 33 due to gravity for collection. At this time, the gravity of the second electromagnet 54 gradually becomes lighter. Through the elastic force of the elastic rope 53 and the telescopic spring 62, the two seesaws 56 can be balanced again, the second electromagnet 54 and the adjustment plate 59 can be balanced, and the first electromagnet 46 can be moved to the left wall of the iron plate 43, so as to re-adsorb and detect the construction debris, so as to achieve the effect of cyclic adsorption and detection of construction debris. (9) After the construction waste soil is free of metal filings, the entire system can be shut down, so that the first electromagnet 46 maintains suction, and finally the detection block 58 can be directly pushed upward, thereby driving the adjustment plate 59 to move upward, thereby driving the adjustment block 61, the movable push plate 63 and the first electromagnet 46 to move rightward, and the last metal filings on the iron plate 43 can be moved to the shielding plate 76, and then fall to the inner side of the collection frame 47 for collection; (10) The first baffle plate 66 is pulled out from the inner side of the first discharge frame 65, so that the gravel above the screening plate 10 can be discharged through the first discharge frame 65. The second baffle plate 68 is pulled out from the inner side of the second discharge frame 67, so that the metal iron filings inside the separation box 33 can be discharged through the second discharge frame 67. The third baffle plate 70 is pulled out from the inner side of the third discharge frame 69, so that the construction waste inside the separation box 33 can be discharged through the third discharge frame 69. By opening the sealing door 74 and then adjusting the fixed valve 49, the metal iron filings inside the collection frame 47 can be discharged through the discharge pipe 48.
[0043] Embodiment 2:
[0044] The present application also discloses a method for recycling construction waste, which is based on the construction waste recycling system of the first embodiment and includes the following steps: S1. Pour the construction waste to be recycled into the inner side of the crushing box 1, and the crushing assembly can be driven by the processing mechanism to crush the construction waste; S2. When the construction waste is crushed, the processing mechanism can drive the drying component to dry and dehydrate the construction waste, thus ensuring the effect of subsequent construction waste processing; S3. When the construction waste is dried and crushed, the processing mechanism can drive the filter assembly to filter the construction waste and separate the larger stones in the construction waste; S4. After the construction debris is screened, the construction debris can be quantitatively placed in the transmission assembly, and the transmission assembly can be driven by the processing mechanism, and the second auger 40 can be driven by the transmission assembly to rotate and drive the construction debris to be transmitted. The iron plate 43 can generate a strong magnetic force through the ferrite magnet 44, the ferrite-boron magnet 45 and the first electromagnet 46 to absorb the metal iron filings in the construction debris, and the adsorbed construction debris will be transmitted to the partition plate 51; S5. The construction debris can be detected by the second electromagnet 54. When the construction debris being transmitted and absorbed contains metal debris, it will be absorbed by the second electromagnet 54 and increase the gravity, so that the two seesaws 56 lose balance and generate power. The first electromagnet 46 can be driven to move rightward through the cooperation of the adjustment plate 59, the telescopic spring 62 and the movable push plate 63 to move the iron filings under the iron plate 43 to the shielding plate 76, so that the magnetic force loses the attraction of the iron filings and falls into the collection frame 47 through gravity for collection. The iron receiving block 78 contacts the iron plate 43 and also has a magnetic attraction function. When the sliding part drives the first electromagnet 46 to move, it will drive the iron receiving block 78 to scrape the bottom of the iron plate 43. The iron receiving block 78 can also absorb the iron filings when scraping and catch the fallen iron filings. When the connecting iron block 78 moves onto the shielding plate 76, the shielding frame 75 and the shielding plate 76 will also make the connecting iron block 78 lose its magnetic force, and the iron filings on the connecting iron block 78 will fall into the collecting frame 47 for collection. At the same time, the movement of the connecting iron block 78 will gradually make the moving part contact with the shielding plate 76, so that the moving part can gradually drive the connecting iron block 78 to scrape and brush the iron filings on the connecting iron block 78 completely, and the iron filings will fall into the collecting frame 47 for collection. At the same time, when the second electromagnet 54 is pressed downward, the second solenoid valve 42 opens the connecting pipe 41, and the construction debris in the separation box 33 can be put into the transmission pipe 34. The construction debris can be cyclically adsorbed and cleaned through the transmission of the first auger 36 and the second auger 40 until the metal debris in the construction debris is completely adsorbed and cleaned. S6. If it is detected that there are no metal debris in the construction waste, the construction waste can be directly discharged from the separation box 33 and the construction waste can be recycled.
[0045] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction waste recycling and processing system, characterized in that: The invention comprises a crushing box (1), a separation box (33) fixed below the crushing box (1), a screening plate (10) for filtering construction debris, and an iron plate (43) for adsorbing metal debris. The crushing box (1) is provided with a processing mechanism for crushing, filtering and drying the construction debris, the processing mechanism comprising a crushing component, a filtering component and a drying component. The separation box (33) is provided with a processing mechanism for circulating and transmitting the construction debris, adsorbing debris and detecting debris, the processing mechanism comprising a transmission component, an adsorption component and a detection component. The separation box (33) is also provided with a collection component for collecting metal debris. The adsorption assembly comprises a ferrite magnet (44) fixed above the iron plate (43), a ferrite boron magnet (45) fixed on the left side of the ferrite magnet (44), a first electromagnet (46) arranged on the inner side of the iron plate (43), an iron connecting block (78) arranged at the bottom of the iron plate (43), a moving part for driving the connecting iron block (78) left and right, and a sliding part for slidingly driving the first electromagnet (46); The transmission assembly comprises a transmission pipe (34) fixed on the separation box (33), a first auger (36) and a second auger (40) rotatably arranged inside the transmission pipe (34), and a driving member for driving the first auger (36) and the second auger (40) to rotate; The detection component comprises a partition plate (51) fixed on the inner side of the separation box (33); a fixed block (52) is arranged on the left side of the partition plate (51); an elastic rope (53) is arranged at the bottom of the fixed block (52); a second electromagnet (54) is arranged at the bottom of the elastic rope (53); evenly distributed magnet holes are opened on the inner side of the partition plate (51); and the second electromagnet (54) is located on the left side of the magnet hole.
2. A construction waste recycling system according to claim 1, characterized in that: The pulverizing assembly comprises a servo motor (2) fixed to the left side of the pulverizing box (1); the output shaft of the servo motor (2) is provided with a movable shaft (3); a power gear (4) is provided on the outer side of the movable shaft (3); a transmission gear (5) is meshed on the outer side of the power gear (4); a connecting shaft (6) is provided on the inner side of the transmission gear (5); pulverizing rollers (7) are provided on the outer sides of the movable shaft (3) and the connecting shaft (6); and evenly distributed pulverizing blades (8) are provided on the outer sides of the two pulverizing rollers (7).
3. A construction waste recycling system according to claim 2, characterized in that: The filtering assembly comprises a support shaft (9) rotatably arranged inside a crushing box (1), a screening plate (10) being arranged outside the support shaft (9), a fixed box (11) being arranged on the right side wall of the crushing box (1), a buffer spring (12) being arranged inside the fixed box (11), a buffer plate (13) being arranged on the top of the buffer spring (12), the buffer plate (13) being fixedly connected to the bottom of the screening plate (10), a driving wheel (14) being arranged outside the movable shaft (3), a transmission belt (15) being transmission-connected to the outside of the driving wheel (14), a driven wheel (16) being transmission-connected to the inside of the transmission belt (15), a cam shaft (17) being arranged inside the driven wheel (16), a movable cam (18) being arranged outside the cam shaft (17), the movable cam (18) being movably fitted to the screening plate (10).
4. A construction waste recycling system according to claim 2, characterized in that: The drying assembly comprises a heating box (19) fixed to the right side of the crushing box (1), a heating tube (20) being arranged on the inner side of the heating box (19), a first bevel gear (21) being arranged on the outer side of the connecting shaft (6), a second bevel gear (22) being meshed with the outer side of the first bevel gear (21), a transmission shaft (23) being arranged on the inner side of the second bevel gear (22), a third bevel gear (24) being arranged on the outer side of the transmission shaft (23), and a fourth bevel gear (24) being meshed with the outer side of the third bevel gear (24). bevel gear (25), a fan blade shaft (26) is arranged on the inner side of the fourth bevel gear (25), a fan blade (27) is arranged on the outer side of the fan blade shaft (26), a connecting pipe (28) is arranged on the left side of the heating box (19), a filter plate (29) is arranged at the bottom end of the connecting pipe (28), a driving box (30) is arranged at the bottom of the heating box (19), the driving box (30) is fixedly connected to the crushing box (1), and the filter plate (29) is fixedly connected to the inner top wall of the crushing box (1).
5. A construction waste recycling system according to claim 4, characterized in that: The transmission assembly comprises a transmission pipe (34) fixed on the separation box (33); a connection box (35) is arranged on the inner side of the transmission pipe (34); a fifth bevel gear (37) is arranged on the outer side of the transmission shaft (23); a sixth bevel gear (38) is meshed on the outer side of the fifth bevel gear (37); an auger shaft (39) is arranged on the inner side of the sixth bevel gear (38); the second auger (40) is fixed on the outer side of the auger shaft (39); the first auger (36) is fixed on the outer side of the transmission shaft (23); a feed frame (31) is arranged at the bottom of the right side of the crushing box (1); a first solenoid valve (32) is fixedly installed on the outer side of the feed frame (31); a connection pipe (41) is arranged at the bottom of the right side of the separation box (33); a second solenoid valve (42) is fixedly installed on the outer side of the connection pipe (41); and evenly distributed iron-absorbing holes are opened on the top of the transmission pipe (34).
6. A construction waste recycling system according to claim 1, characterized in that: The sliding member comprises a rotating shaft (55) rotatably arranged inside the separation box (33), a seesaw (56) is arranged on both the left and right sides of the rotating shaft (55), the top of the seesaw (56) on the left side is movably connected to an adjustment plate (59), a sliding plate (57) is arranged on the left side of the adjustment plate (59), and a detection block (58) is arranged on the outer side of the sliding plate (57), a sliding square hole is opened on the left side of the separation box (33), the sliding plate (57) is slidably connected to the sliding square hole, the seesaw (56) on the right side is movably fitted with a second electromagnet (54), the total weight of the sliding plate (57), the detection block (58) and the adjustment plate (59) is equal to the weight of the second electromagnet (54), and the inner side of the partition plate (51) is opened with uniformly distributed magnet holes.
7. A construction waste recycling system according to claim 6, characterized in that: The sliding member further comprises an adjusting box (50) fixed to the inner side of the separation box (33); an adjusting block (61) is movably connected to the inner side of the adjusting box (50); a telescopic spring (62) is arranged on the right side of the adjusting block (61); the telescopic spring (62) is fixedly connected to the adjusting box (50); a movable push plate (63) is arranged on the right side of the adjusting block (61); the adjusting box (50) is fixedly connected to the partition plate (51); the iron plate (43) is fixedly connected to the adjusting box (50); and the adjusting plate (59) is in contact with the inclined surface of the adjusting block (61).
8. The construction waste recycling system according to claim 5, characterized in that: The collecting assembly comprises a shielding frame (75) fixed to the right side of the iron plate (43); a shielding plate (76) is arranged at the bottom of the shielding frame (75); a storage cavity is provided on the inner sides of the iron plate (43) and the shielding frame (75); the first electromagnet (46) is located on the inner side of the storage cavity; a collecting frame (47) is provided on the right side wall of the separation box (33); the transmission tube (34) is located between the shielding frame (75) and the collecting frame (47); and the collecting frame (47) is a rectangular parallelepiped with a hollow interior and a missing top.
9. A construction waste recycling system according to claim 7, characterized in that: The movable member comprises a connecting frame (77) fixed to the bottom of the movable push plate (63), the connecting frame (77) being fixedly connected to the iron block (78), a sliding rod (79) being movably connected to the inner side of the iron block (78), a connecting rod (80) being hingedly connected to the outer side of the sliding rod (79), a pushing rod (81) being hingedly connected to the outer side of the connecting rod (80), a movable push block (82) being arranged on the outer side of the pushing rod (81), two connecting springs (83) being arranged on the outer side of the movable push block (82), both of the two connecting springs (83) being fixedly connected to the iron block (78), the movable push block (82) being slidably connected to the iron block (78), an annular spring (84) being arranged on the outer side of the connecting rod (80), the annular spring (84) being fixedly connected to the iron block (78), the sliding rod (79) being movably fitted with the shielding plate (76), and the iron plate (43) being movably fitted with the iron block (78).
10. A construction waste recycling method, based on a construction waste recycling system as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Pour the construction waste to be recycled into the inner side of the crushing box (1), and the crushing assembly can be driven by the processing mechanism to crush the construction waste; S2. When the construction waste is crushed, the processing mechanism can drive the drying component to dry and dehydrate the construction waste, thus ensuring the effect of subsequent construction waste processing; S3. When the construction waste is dried and crushed, the processing mechanism can drive the filter assembly to filter the construction waste and separate the larger stones in the construction waste; S4. After the construction waste is screened, the construction waste can be quantitatively placed in the transmission assembly, and the transmission assembly can be driven by the processing mechanism, and the second auger (40) can be driven by the transmission assembly to rotate and drive the construction waste to be transmitted. The iron plate (43) can generate a strong magnetic force through the ferrite magnet (44), the ferrite-boron magnet (45) and the first electromagnet (46) to absorb the metal iron filings in the construction waste, and the adsorbed construction waste will be transmitted to the partition plate (51); S5. The construction waste can be detected by the second electromagnet (54). When the construction waste to be transmitted and adsorbed also contains metal debris, it will be adsorbed on the second electromagnet (54) and increase the gravity, so that the two seesaws (56) lose balance and generate power. The first electromagnet (46) can be driven to move rightward through the cooperation of the adjustment plate (59), the telescopic spring (62) and the movable push plate (63) to move the iron chips under the iron plate (43) to the shielding plate (76), so that the magnetic force loses the attraction of the iron chips and falls into the collection frame (47) through gravity for collection. The iron receiving block (78) contacts the iron plate (43) and also has a magnetic attraction function. When the sliding member drives the first electromagnet (46) to move, it will drive the iron receiving block (78) to scrape the bottom of the iron plate (43). When scraping, the iron receiving block (78) can also adsorb the iron chips and catch the fallen iron chips. When (78) moves onto the shielding plate (76), the shielding frame (75) and the shielding plate (76) will also cause the connecting iron block (78) to lose its magnetic force, and the iron filings on the connecting iron block (78) will fall into the collecting frame (47) for collection. At the same time, the movement of the connecting iron block (78) will gradually contact the shielding plate (76), so that the moving part can gradually drive the connecting iron block (78) to scrape and brush, and the iron filings on the connecting iron block (78) will be completely scraped and brushed off and fall into the collecting frame (47) for collection. At the same time, when the second electromagnet (54) is pressed downward by force, the second electromagnetic valve (42) opens the connecting pipe (41), and the construction debris in the separation box (33) can be placed in the transmission pipe (34). The construction debris can be cyclically adsorbed and cleaned through the transmission of the first auger (36) and the second auger (40) until the metal debris in the construction debris is completely adsorbed and cleaned; S6. If it is detected that there are no metal debris in the construction waste, the construction waste can be directly discharged from the separation box (33) and the construction waste can be recycled.
