Method for disassembling and assembling liquid-gas spring of full-balance gear rack climbing type vertical ship lift
Through the fully balanced gear rack-and-pin climbing vertical hoist liquid-gas spring disassembly and assembly method, the problems of narrow maintenance space and limited tool arrangement are solved, and the rapid disassembly and efficient maintenance of the liquid-gas spring mechanism is realized, ensuring the lifting Safe and stable operation of the ship.
Patent Information
- Application Number
- CN202411104602.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-13
AI Technical Summary
The maintenance space of fully balanced rack and rack climb vertical hoisting machine is narrow and the layout of maintenance tools and equipment is limited, which affects the rapid maintenance efficiency of the liquid and gas spring mechanism.
Provide a fully balanced gear rack and rack climb vertical hoisting machine hydraulic gas spring disassembly and assembly method, including hydraulic cylinder pressure relief, ceiling segment cutting, displacement adaptation mechanism fixation, hydraulic cylinder lifting, measurement shaft disassembly and assembly and system debugging, etc. Steps simplify the disassembly and assembly process of liquid and gas springs.
It reduces the construction workload, saves manpower, improves the maintenance efficiency of the liquid-gas spring mechanism, reduces the safety risks of lifting operations, and ensures the operating reliability of the liquid-gas spring mechanism and the safe and stable operation of the ship lift.
Smart Images

Figure CN118951709A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vertical ship lifts, and in particular to a method for disassembling and assembling a hydraulic spring of a fully balanced rack and pinion climbing vertical ship lift. Background Art
[0002] The fully balanced rack and pinion climbing vertical ship lift has the safety function of locking the ship compartment in the event of an unbalanced accident. The driving mechanism hydraulic spring device is a key device that converts the support from the open rack and pinion transmission pair of the driving mechanism to the threaded contact pair of the rotating screw nut column of the safety mechanism during the lifting and lowering of the ship compartment, thereby realizing the overload locking of the ship compartment. The hydraulic spring mechanism includes a double-piston hydraulic cylinder, a support seat, a connecting rod, an accumulator, a hydraulic pipeline and valve components. The end of the piston rod at the upper part of the cylinder is connected to the upper flange through a thread, and the piston rod at the lower part of the cylinder is assembled with a clearance fit through a guide slider and the mounting hole of the lower flange; the upper flange and the lower flange are connected through a connecting rod. The bottom measuring shaft is assembled in the self-aligning rolling bearing in the shaft hole of the lower flange and the support hinge hole at the end of the bottom beam, and is axially positioned by the shaft end baffle and connecting screws installed at the end of the bottom beam. The hinge shaft in the middle of the cylinder is supported on the support seat through a self-lubricating bearing, and the support seat is connected to the ship compartment structure through bolts. According to the structural type of the pull rod and the piston rod head, when the load of the hydraulic spring is downward, the load is transmitted by the upper piston rod, and the lower piston rod is not subjected to force; when the load of the hydraulic spring is upward, the load is transmitted by the lower piston rod, and the upper piston rod is not subjected to force.
[0003] The Three Gorges Shiplift operates 24 hours a day all year round, and currently only about 35 days a year are reserved for equipment maintenance. Due to the layout characteristics of the equipment itself, the maintenance space of the shiplift is narrow and the layout of maintenance tools is limited, which affects the maintenance efficiency. How to achieve rapid maintenance of key equipment of the shiplift is the current difficulty. The hydraulic spring mechanism is an important part of the shiplift drive mechanism. Therefore, this application proposes a fully balanced rack and pinion climbing vertical shiplift hydraulic spring disassembly and assembly method for the inspection and maintenance of the shiplift hydraulic spring mechanism. Summary of the invention
[0004] In order to solve the current technical problems, the main purpose of the present invention is to provide a method for disassembling and assembling a hydraulic spring of a fully balanced rack and pinion climbing vertical ship lift, which is used for the inspection and maintenance of the hydraulic spring mechanism of the ship lift.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for disassembling and assembling a hydraulic spring of a fully balanced rack and pinion climbing vertical ship lift, comprising the following steps: S1. Remove the oil pipe of the hydraulic cylinder of the gas spring, mark the oil pipe, and remove the sensor and its circuit; before removing the oil pipe, make sure that the hydraulic cylinder is in a depressurized state; S2. Remove the connecting bolts between the top of the hydraulic cylinder and the adjustable bracket on the ceiling; S3. Lift the upper section of the ceiling using lifting equipment; S4, supporting and fixing the displacement adaptation mechanism and the lower flange of the hydraulic spring; S5. Remove the connecting rod of the hydraulic spring; S6. Lift out the hydraulic cylinder; S7. Remove and replace the measuring shaft, and reinstall the lower flange; S8. Reinstall the new hydraulic cylinder; S9, reinstall the connecting rod of the hydraulic and gas spring; S10. Connect the top of the hydraulic cylinder to the adjustable bracket, reinstall the sensor, reinstall the oil pipe, and debug the hydraulic system; S11. Reinstall the upper sections of the ceiling.
[0006] In S1, the method of depressurizing the hydraulic cylinder is as follows: In the inspection mode, the hydraulic cylinder is pressurized to extend the piston rods at both ends of the hydraulic cylinder, and the oil in the rod chamber is discharged to the high-level oil tank; Open the drain ball valve at the bottom of the high-position oil tank, use a clean container to collect the oil, drain all the hydraulic oil in the high-position oil tank, and then remove the air filter on the top of the high-position oil tank; Adjust the system relief valve in the hydraulic system pressure regulating valve block to the fully loose state, then cut off the power to the two proportional pump motors, and close the oil supply high-pressure ball valve in the main pressure oil pipe; The accumulator and the hydraulic cylinder are depressurized; the cylinder pressure relief solenoid valve is energized to start depressurizing the rodless chamber of the hydraulic cylinder, and after observing that the pressure gauge pointer is zero, all the relief valve adjusting screws in the safety shut-off valve block of each accumulator are loosened, and the manual pressure relief valve is opened. After observing that the pressure gauge pointer is zero, all the adjusting screws of the two relief valves in the hydraulic cylinder side block are also loosened, and then the pressure is measured at the pressure measuring point between the hydraulic cylinder and the cylinder side block. The oil pipes connected to the hydraulic cylinder and the cylinder side block can be removed only after the pressure gauge displays zero.
[0007] In S3, the steps of ceiling reconstruction are also included: Use asbestos cloth inside the ceiling to protect the oil cylinder and its accessories; Draw a circular cutting line on the side wall of the ceiling; Use a lifting device to lift the top of the ceiling, cut the ceiling along the cutting line to form the lower ceiling section and the upper ceiling section, lift the lower ceiling section, and grind the cutting positions of the lower ceiling section and the upper ceiling section to make them smooth; Use bolts to connect and fix the first flange and the second flange into a whole; Lift the flange to the top of the lower section of the ceiling for positioning, then lift the upper section of the ceiling to the upper end of the flange for positioning, weld the weld between the first flange and the lower section of the ceiling; weld the weld between the second flange and the upper section of the ceiling; After welding, remove the connecting bolts of the first flange and the second flange, and lift the sections on the ceiling.
[0008] In S4, a rigid pier and a jack are arranged below the tube bearing of the displacement adaptation mechanism, the jack is placed on the rigid pier, the displacement adaptation mechanism is connected and fixed to the ground by a support, and the lower flange of the hydro-pneumatic spring is fixed and supported by a tooling support.
[0009] In S6, the steps to lift out the hydraulic cylinder are as follows: Tie the sling to the hydraulic cylinder and hang the other end of the sling on the main hook of the bridge crane; Remove the connecting bolts between the support seat and the support plates on both sides of the cylinder; The main hook of the bridge crane is lifted. After the supporting plates on both sides of the hydraulic cylinder are separated from the supporting seats, the supporting plates on both sides are fixed to the hydraulic cylinder with wires; Then lift the main hook and lift the hydraulic cylinder out of the machine room; Use lifting equipment in conjunction with a bridge crane to adjust the hydraulic cylinder to a horizontal position and place it on the cylinder support fixture.
[0010] In S7, the steps to measure the axis removal are as follows: Hang a hoist on the main hook of the lifting equipment, connect the hoist to the lower flange, tighten the hoist to make it effective, and remove the support that supports the lower flange; Use tinplate to protect the measuring shaft on the inner side of the support seat, use a cutting tool to make a hole on the web of the support seat, and grind the inner wall of the hole to make it smooth; Remove the shaft end baffle that fixes the measuring shaft, use a jack to push the measuring shaft out of the shaft hole from the side, and then lift out the lower flange.
[0011] Install the reinforcement ring at the opening position, weld the weld between the reinforcement ring and the web, grind the weld to make it smooth after welding, and repair the paint; Replace the slider inside the support seat and lift the lower flange back to its original position; Reinstall the new measuring axis; Fix and support the lower flange and unload the hoist.
[0012] In S8, the steps to reinstall the new hydraulic cylinder are as follows: Use lifting equipment and bridge crane to lift the new hydraulic cylinder horizontally from the bracket, and then adjust the hydraulic cylinder to a vertical position; The lifting equipment cooperates to install the supporting plates on both sides, and fixes the supporting plates and the hydraulic cylinder with wires; Use the bridge crane to lift the hydraulic cylinder into the machine room, stop it when it is lifted to a certain distance above the support seat, and adjust the spacing between the support plates on both sides to ensure that the spacing between the support plates on both sides matches the spacing between the clamping plates at the upper end of the support seat; Slowly lower the main hook of the bridge crane to allow the guide slider at the lower end of the hydraulic cylinder to enter the groove of the lower flange, then slowly lower the main hook and adjust the position so that the support plate enters the clamping plate of the support seat. After the bolt holes of the support plate and the support seat are aligned, connect the support plate and the support seat with bolts to tighten them.
[0013] In S10, the steps for hydraulic system commissioning are as follows: After the two proportional pump motors are powered on, the control pump is started first, and then one of the proportional pumps is started. The system relief valve in the pressure regulating valve block is adjusted to be energized. After the system pressure is adjusted to 20MPa, the system relief valve is energized and de-energized for three times. When the system relief valve is energized, the system pressure is displayed as 20MPa each time, and when the system relief valve is de-energized, the system pressure is displayed as zero each time. Close the manual pressure relief valve and oil inlet valve in the safety shut-off valve block of each accumulator, close the plate-type high-pressure ball valve in the valve block beside the hydraulic cylinder, and tighten the regulating screw of the relief valve into place and return it one and a half to two turns; Start the control pump. After starting a proportional pump, open the oil supply high-pressure ball valve in the main pressure oil pipe, and then the system overflow valve is energized. After the ball electromagnetic reversing valve is energized, observe that the pressure on the pressure gauge shows 20MPa, and then start to open the accumulator inlet valves one by one to charge the oil. After adjusting the overflow valve in the accumulator safety shut-off valve block to the actual value tested, close the accumulator inlet valve to debug the next accumulator. Repeat the above steps to complete the adjustment of the overflow valves in the safety shut-off valve blocks of the four accumulators. Open the oil supply ball valve of the hydraulic cylinder rod chamber high-position oil tank, and inject the hydraulic oil into the hydraulic cylinder rod chamber; After all the oil inlet valves in the accumulator safety shut-off valve block are in the closed state, start to adjust the relief valve in the hydraulic cylinder valve block to loosen it to the actual value tested before opening the plate-type high-pressure ball valve in the valve block next to the cylinder to start pressurizing the rodless chamber of the hydraulic cylinder. When the pressure displayed on the pressure gauge is the same as the adjusted value of the relief valve, the ball-type solenoid reversing valve loses power and the cylinder pressure relief solenoid valve gains power to start pressure relief of the rodless chamber of the hydraulic cylinder. After the pressure gauge pointer is zero, the ball-type solenoid reversing valve gains power and the cylinder pressure relief solenoid valve loses power and runs repeatedly for several times to exhaust the cylinder body. After the hydraulic cylinder body is exhausted, start to adjust the relief valve. First, tighten the relief valve adjusting screw in place and return it one and a half to two turns, then pressurize the hydraulic cylinder. After the ball electromagnetic reversing valve is energized, observe that the pressure gauge shows 20MPa, then the cylinder pressure relief solenoid valve is energized to start the rodless chamber pressure relief of the hydraulic cylinder, and observe the pressure gauge pointer display. If it is higher than 2MPa, adjust the relief valve in the hydraulic cylinder side block to 2MPa, connect the pressure gauge to the pressure measuring point between the hydraulic cylinder and the cylinder side block, and slowly loosen the relief valve again to adjust the pressure to the actual value tested, and repeatedly energize the ball electromagnetic reversing valve and de-energize the cylinder pressure relief solenoid valve to verify whether the relief valve pressure is consistent with the actual value tested; After all the oil inlet valves in the accumulator safety shut-off valve block are in the open state, the on-site station linkage test is carried out. The first five on-site station linkage tests need to be further tested to verify whether the overflow valve pressure is consistent with the actual value tested; The on-site station linkage hydraulic cylinder operates normally, the pressure is maintained normally, the accumulator pressure replenishment is normal, there is no jamming, and there is no oil leakage.
[0014] When reinstalling the hydraulic cylinder, mark the direction of the arrow on the oil window cover of the hydraulic cylinder high-level oil tank, remove the oil window cover and clean the remaining oil inside, and use the dough to stick the inner wall of the high-level oil tank. After the inner wall of the high-level oil tank is clean and free of impurities, reinstall the oil window cover and air filter, and close the drain ball valve at the bottom of the high-level oil tank and the oil supply ball valve in the rod chamber of the hydraulic cylinder; After the hydraulic cylinder is reinstalled, tighten the cylinder interface according to the mark on the oil pipe when it was removed; make sure the combination gasket and the sealing ring are intact during reinstallation, and evenly apply butter on the sealing ring; After filtering the new hydraulic oil, use a refueling cart to add the hydraulic oil into the high-level oil tank. When filling, pay close attention to whether there is oil leakage at the oil window cover seal.
[0015] The present invention has the following beneficial effects: Due to the layout characteristics of the ship lift itself, the maintenance space of the ship lift gas spring mechanism is narrow, and the layout of maintenance tools and tooling is limited, which affects the maintenance efficiency of the ship lift. How to achieve rapid maintenance of key equipment of the ship lift is the current difficulty. By using the ship lift liquid gas spring disassembly and assembly method of the present invention, the construction workload can be reduced to a great extent, saving manpower. By opening a hole on the support seat, the disassembly and assembly efficiency of the measuring shaft can be effectively improved, and the safety risk of the lifting operation can be reduced. In addition, the operation method is simple, which not only improves the efficiency of the maintenance of the ship lift liquid gas spring mechanism, but also provides convenience for the subsequent daily maintenance of the liquid gas spring mechanism measuring shaft, ensuring the reliability of the operation of the liquid gas spring mechanism, thereby ensuring the safe and stable operation of the ship lift. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0017] Figure 1 It is an overall schematic diagram of the hydraulic and pneumatic spring device of the ship lift.
[0018] Figure 2 Schematic diagram of the lifting equipment layout.
[0019] Figure 3 Schematic diagram of the displacement adaptation mechanism support.
[0020] Figure 4 This is a schematic diagram of the site when the hydraulic cylinder is lifted out.
[0021] Figure 5 This is the status diagram of the hydraulic cylinder when it is lifted out.
[0022] Figure 6 It is a schematic diagram of the existing structure of the support seat.
[0023] Figure 7 This is a schematic diagram of the structure after the support seat is opened.
[0024] Figure 8 This is the on-site schematic diagram when the lower flange is lifted out.
[0025] Fig. 9 This is the status diagram of the hydraulic cylinder during installation.
[0026] Fig.10 Draw a schematic diagram of the cutting lines on the ceiling.
[0027] Fig.11 A schematic diagram for dividing the ceiling into lower ceiling sections and upper ceiling sections.
[0028] In the figure: Hydraulic cylinder 100, connecting rod 101, guide slider 102, lower flange 103; Ceiling 200, adjustable bracket 201, cutting line 202, ceiling lower section 203, ceiling upper section 204, first flange 205, second flange 206; Support seat 300, support plate 301, measuring shaft 302, web 303, reinforcement ring 304, slider 305, Lifting equipment 400, Displacement adaptation mechanism 600 , rigid pier 601 , jack 602 , support 603 , tooling support 604 . DETAILED DESCRIPTION
[0029] See also Figure 1-11 As shown, a method for disassembling and assembling a hydraulic spring of a fully balanced rack and pinion climbing vertical ship lift comprises the following steps: S1. Remove the oil pipe of the hydraulic cylinder 100 of the gas spring, mark the oil pipe, and remove the sensor and its circuit; before removing the oil pipe, make sure that the hydraulic cylinder 100 is in a depressurized state; S2, remove the connecting bolts between the top of the hydraulic cylinder 100 and the adjustable bracket 201 on the ceiling 200; S3, lifting the upper ceiling section 204 of the ceiling 200 by means of the lifting equipment 400; S4, supporting and fixing the displacement adaptation mechanism 600 and the lower flange 103 of the hydraulic spring; S5, removing the connecting rod 101 of the hydraulic spring; S6, lifting the hydraulic cylinder 100; S7, the measuring shaft 302 is removed and replaced, and the lower flange 103 is reinstalled; S8, reinstalling a new hydraulic cylinder 100; S9, reinstall the connecting rod 101 of the hydraulic and gas spring; S10, connect the top of the hydraulic cylinder 100 to the adjustable bracket 201, reinstall the sensor, reinstall the oil pipe, and debug the hydraulic system; S11. Reinstall the upper ceiling section 204.
[0030] Through the above structure, the replacement of the hydraulic cylinder of the hydraulic-gas spring mechanism of the elevator and the replacement of the measuring shaft can be realized, and the inspection and maintenance of the hydraulic-gas spring mechanism of the elevator can be realized.
[0031] It should be noted that, during this process, the self-lubricating bearings of the hinged parts can also be replaced, such as the self-lubricating bearings at the hinges between the support plate 301 and the hydraulic cylinder 100 , and the self-lubricating bearings at the hinges between the hydraulic cylinder 100 and the measuring shaft 302 .
[0032] In S1, the method for relieving the pressure of the hydraulic cylinder 100 is as follows: In the maintenance mode, the hydraulic cylinder 100 is pressurized so that the piston rods at both ends of the hydraulic cylinder 100 extend and the oil in the rod chamber is discharged to the high-level oil tank; Open the drain ball valve at the bottom of the high-position oil tank, use a clean container to collect the oil, drain all the hydraulic oil in the high-position oil tank, and then remove the air filter on the top of the high-position oil tank; Adjust the system relief valve in the hydraulic system pressure regulating valve block to the fully loose state, then cut off the power to the two proportional pump motors, and close the oil supply high-pressure ball valve in the main pressure oil pipe; The accumulator and the hydraulic cylinder 100 are depressurized; the cylinder pressure relief solenoid valve is energized to start depressurizing the rodless chamber of the hydraulic cylinder 100, and after observing that the pressure gauge pointer is zero, all the relief valve adjusting screws in the safety shut-off valve block of each accumulator are loosened, and the manual pressure relief valve is opened. After observing that the pressure gauge pointer is zero, all the adjusting screws of the two relief valves in the cylinder side block of the hydraulic cylinder 100 are also loosened, and then the pressure is measured at the pressure measuring point between the hydraulic cylinder 100 and the cylinder side block. The oil pipe connected to the hydraulic cylinder 100 and the cylinder side block can be removed only after the pressure gauge displays zero.
[0033] In S1, mark the oil pipes and corresponding interfaces at the inlet and outlet of the oil cylinder, and use indestructible labels to mark the hydraulic hoses and corresponding interfaces on each oil cylinder for easy reinstallation. Remove the connection between the connecting hose and the oil cylinder. After the removal is completed, wrap the hose joints and the joints on the oil cylinder with plastic bags to prevent foreign matter from entering the joints.
[0034] Through the above steps, the pressure of the hydraulic cylinder 100 is relieved, the safe disassembly of the oil pipe of the hydraulic cylinder 100 is ensured, and the oil pipe is easily reinstalled.
[0035] In S2, see Figure 1 , remove the connecting bolts between the top of the hydraulic cylinder 100 and the adjustable bracket 201 on the ceiling 200 to separate the hydraulic cylinder 100 from the ceiling 200.
[0036] In S3, see Fig.10 , 11 , also includes the steps of ceiling renovation: Use asbestos cloth to protect the oil cylinder and its accessories inside the ceiling 200; A circular cutting line 202 is drawn on the side wall of the ceiling 200; See also Figure 2 The lifting device 400 is stopped at a designated position and deployed. Preferably, the lifting device 400 is a truck crane. The top of the ceiling 200 is lifted by the lifting device 400, and the ceiling is cut along the cutting line 202 to form a lower ceiling section 203 and an upper ceiling section 204. The lower ceiling section 203 is lifted open, and the cutting positions of the lower ceiling section 203 and the upper ceiling section 204 are polished and smoothed. Use bolts to connect and fix the first flange 205 and the second flange 206 into a whole; Lift the flange to the top of the lower ceiling section 203 for positioning, then lift the upper ceiling section 204 to the upper end of the flange for positioning, weld the weld between the first flange 205 and the lower ceiling section 203; weld the weld between the second flange 206 and the upper ceiling section 204; After welding, the connecting bolts of the first flange 205 and the second flange 206 are removed, and the upper section 204 of the ceiling is lifted.
[0037] Through the above steps, the ceiling 200 is divided into a lower ceiling section 203 and an upper ceiling section 204 which are easy to disassemble and assemble, thereby facilitating the lifting of the hydraulic cylinder 100.
[0038] In S4, see Figure 3 A rigid support pier 601 and a jack 602 are arranged below the pipe bearing of the displacement adaptation mechanism 600. The 50T jack 602 is placed on the rigid support pier 601 to support the displacement adaptation mechanism. The displacement adaptation mechanism 600 is connected and fixed to the ground with a support 603, and the lower flange 103 of the gas spring is fixed and supported by a tooling support 604.
[0039] Through the above steps, the displacement adaptation mechanism 600 is supported and fixed to prevent the displacement adaptation mechanism 600 from shaking.
[0040] In S6, see Figure 4 , 5 , the steps for lifting the hydraulic cylinder 100 are as follows: Tie the sling to the hydraulic cylinder 100, and hang the other end of the sling on the main hook of the bridge crane; Remove the connecting bolts between the support seat 300 and the support plates 301 on both sides of the oil cylinder; The main hook of the bridge crane is lifted, and after the support plates 301 on both sides of the hydraulic cylinder 100 are separated from the support seat 300, the support plates 301 on both sides are fixed together with the hydraulic cylinder 100 with wires; Then lift the main hook and lift the hydraulic cylinder 100 out of the machine room; Use the lifting equipment 400 in conjunction with the bridge crane to adjust the hydraulic cylinder 100 to a horizontal posture and place it on the cylinder supporting tooling.
[0041] Through the above steps, the hydraulic cylinder 100 is lifted out smoothly. Figure 5 shown.
[0042] In S7, see Figure 6 , 7 8. The steps for removing the measuring shaft 302 are as follows: Hang a hoist on the main hook of the lifting device 400, the hoist is connected to the lower flange 103, tighten the hoist to make it effective, and remove the support supporting the lower flange 103; The measuring shaft 302 is protected with tinplate on the inner side of the support seat 300, a hole is opened on the web 303 of the support seat 300 with a cutting tool, and the inner wall of the hole is polished and smoothed; Remove the shaft end baffle that fixes the measuring shaft 302, use a jack to push the measuring shaft 302 out of the shaft hole from the side, and then lift out the lower flange 103.
[0043] Install the reinforcing ring 304 at the opening position, weld the weld between the reinforcing ring 304 and the web 303, grind the weld to make it smooth after welding, and repair the paint; Replace the slider 305 inside the support seat and lift the lower flange 103 back to its original position; Reinstall the new measuring shaft 302; The lower flange 103 is fixed and supported, and the hoist is unloaded.
[0044] Through the above steps, the measuring shaft 302 can be disassembled and replaced with the slider 305 inside the support seat. After the hole is opened on the web 303, it is also convenient to disassemble the measuring shaft 302 in the later stage. After the measuring shaft 302 is disassembled, the bearing at the hinge between the measuring shaft 302 and the lower flange 103 can be replaced.
[0045] In S8, see Fig. 9 , the steps for reinstalling the new hydraulic cylinder 100 are as follows: Use the lifting equipment 400 in conjunction with the bridge crane to horizontally lift the new hydraulic cylinder 100 from the bracket, and then adjust the hydraulic cylinder 100 to a vertical posture; The lifting equipment 400 cooperates with the support plates 301 on both sides to install, and the support plates 301 and the hydraulic cylinder 100 are fixed with wires; The hydraulic cylinder 100 is hoisted into the machine room by the bridge crane, and stopped when the hydraulic cylinder 100 is hoisted to 800 mm above the support seat 300, and the spacing between the support plates 301 on both sides is adjusted to ensure that the spacing between the support plates 301 on both sides matches the spacing between the clamping plates at the upper end of the support seat 300; Slowly lower the main hook of the bridge crane so that the guide slider 102 at the lower end of the hydraulic cylinder 100 enters the groove of the lower flange 103, then slowly lower the main hook and adjust the position so that the support plate 301 enters the clamping plate of the support seat 300. After the bolt holes of the support plate 301 and the support seat 300 are aligned, fasten the support plate 301 and the support seat 300 with bolts.
[0046] Through the above steps, the hydraulic cylinder 100 is reinstalled.
[0047] In S10, the steps for hydraulic system commissioning are as follows: After the two proportional pump motors are powered on, the control pump is started first, and then one of the proportional pumps is started. The system relief valve in the pressure regulating valve block is adjusted to be energized. After the system pressure is adjusted to 20MPa, the system relief valve is energized and de-energized for three times. When the system relief valve is energized, the system pressure is displayed as 20MPa each time, and when the system relief valve is de-energized, the system pressure is displayed as zero each time. Close the manual pressure relief valve and oil inlet valve in the safety cut-off valve block of each accumulator, close the plate-type high-pressure ball valve in the valve block beside the hydraulic cylinder 100, and tighten the regulating screw of the relief valve into place and return it one and a half to two turns; Start the control pump. After starting a proportional pump, open the oil supply high-pressure ball valve in the main pressure oil pipe, and then the system overflow valve is energized. After the ball electromagnetic reversing valve is energized, observe that the pressure on the pressure gauge shows 20MPa, and then start to open the accumulator inlet valves one by one to charge the oil. After adjusting the overflow valve in the accumulator safety shut-off valve block to the actual value tested, close the accumulator inlet valve to debug the next accumulator. Repeat the above steps to complete the adjustment of the overflow valves in the safety shut-off valve blocks of the four accumulators. Open the oil supply ball valve of the high-position oil tank of the rod chamber of the hydraulic cylinder 100, and inject the hydraulic oil into the rod chamber of the hydraulic cylinder 100; After all the oil inlet valves in the accumulator safety shut-off valve block are in the closed state, start to adjust the relief valve in the valve block beside the hydraulic cylinder 100 to loosen it to the actual value tested before opening the plate-type high-pressure ball valve in the valve block beside the cylinder to start pressurizing the rodless chamber of the hydraulic cylinder 100. When the pressure displayed on the pressure gauge is the same as the adjusted value of the relief valve, the ball-type electromagnetic reversing valve loses power and the cylinder pressure relief solenoid valve gains power to start pressure relief of the rodless chamber of the hydraulic cylinder 100. After the pressure gauge pointer is zero, the ball-type electromagnetic reversing valve gains power and the cylinder pressure relief solenoid valve loses power and runs repeatedly for several times to exhaust the cylinder body. After the exhaust of the cylinder body of the hydraulic oil cylinder 100 is completed, the overflow valve is adjusted. First, the overflow valve adjusting screw is tightened in place and then returned one and a half to two turns. Then, the hydraulic oil cylinder 100 is pressurized. After the ball electromagnetic reversing valve is energized, the pressure gauge pressure is observed to be 20MPa. The cylinder pressure relief solenoid valve is energized to start the rodless chamber pressure relief of the hydraulic oil cylinder 100, and the pressure gauge pointer is observed. If it is higher than 2MPa, the overflow valve in the cylinder side block of the hydraulic oil cylinder 100 is adjusted to 2MPa. After the pressure gauge is connected to the pressure measuring point between the hydraulic oil cylinder 100 and the cylinder side block, the overflow valve is slowly loosened again to adjust the pressure to the actual value tested. After repeatedly energizing the ball electromagnetic reversing valve and de-energizing the cylinder pressure relief solenoid valve, verify whether the overflow valve pressure is consistent with the actual value tested. After all the oil inlet valves in the accumulator safety shut-off valve block are in the open state, the on-site station linkage test is carried out. The first five on-site station linkage tests need to be further tested to verify whether the overflow valve pressure is consistent with the actual value tested; The on-site station linkage hydraulic cylinder 100 operates normally, the pressure is maintained normally, the accumulator pressure replenishment is normal, there is no jamming, and there is no oil leakage.
[0048] During the reinstallation process of the hydraulic cylinder 100, mark the direction of the arrow on the oil window cover of the high-level oil tank of the hydraulic cylinder 100, remove the oil window cover and clean the remaining oil inside, and then use the kneaded dough to stick the inner wall of the high-level oil tank. After the inner wall of the high-level oil tank is clean and free of impurities, reinstall the oil window cover and the air filter, and close the drain ball valve at the bottom of the high-level oil tank and the oil supply ball valve of the rod chamber of the hydraulic cylinder 100; After the hydraulic cylinder 100 is reinstalled, tighten the corresponding cylinder interface according to the mark when the oil pipe was removed; when reinstalling and connecting, make sure that the combined gasket and the sealing ring are intact, and evenly apply butter on the sealing ring; After filtering the new hydraulic oil to NAS8 cleanliness level, use a refueling cart to add the hydraulic oil to the high-level oil tank. When filling, pay close attention to whether there is oil leakage at the oil window cover seal.
[0049] Through the above steps, the hydraulic system is debugged to ensure the normal operation of the hydraulic system.
Claims
1. Disassembly and assembly method of the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift, It is characterized in that The following steps are involved: S1. Remove the oil pipe of the hydraulic cylinder (100) of the gas spring, mark the oil pipe, and remove the sensor and its circuit; before removing the oil pipe, confirm that the hydraulic cylinder (100) is in a depressurized state; S2, removing the connecting bolts between the top of the hydraulic cylinder (100) and the adjustable bracket (201) on the ceiling (200); S3, lifting the upper section (204) of the ceiling by means of a lifting device (400); S4, supporting and fixing the displacement adaptation mechanism (600) and the lower flange (103) of the hydraulic spring; S5. Remove the connecting rod (101) of the hydraulic spring; S6. Lift out the hydraulic cylinder (100); S7, remove and replace the measuring shaft (302), and reinstall the lower flange (103); S8, reinstall the new hydraulic cylinder (100); S9, reinstall the connecting rod (101) of the hydraulic and gas spring; S10, connecting the top of the hydraulic cylinder (100) to the adjustable bracket (201), reinstalling the sensor, reinstalling the oil pipe, and debugging the hydraulic system; S11, reinstall the upper ceiling section (204).
2. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S1, the method of relieving the pressure of the hydraulic cylinder (100) is as follows: In the inspection mode, the hydraulic cylinder (100) is pressurized so that the piston rods at both ends of the hydraulic cylinder (100) extend, and the oil in the rod chamber is discharged to the high-level oil tank; Open the drain ball valve at the bottom of the high-position oil tank, use a clean container to collect the oil, drain all the hydraulic oil in the high-position oil tank, and then remove the air filter on the top of the high-position oil tank; Adjust the system relief valve in the hydraulic system pressure regulating valve block to the fully loose state, then cut off the power to the two proportional pump motors, and close the oil supply high-pressure ball valve in the main pressure oil pipe; The accumulator and the hydraulic cylinder (100) are depressurized; the cylinder pressure relief solenoid valve is energized to start depressurizing the rodless chamber of the hydraulic cylinder (100), and after observing that the pressure gauge pointer is zero, all the relief valve adjustment screws in the safety cut-off valve block of each accumulator are loosened, and the manual pressure relief valve is opened. After observing that the pressure gauge pointer is zero, all the adjustment screws of the two relief valves in the cylinder side block of the hydraulic cylinder (100) are also loosened, and the pressure is measured at the pressure measuring point between the hydraulic cylinder (100) and the cylinder side block. Only after the pressure gauge displays zero can the oil pipe connected to the hydraulic cylinder (100) and the cylinder side block be removed.
3. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S3, the steps of ceiling reconstruction are also included: Use asbestos cloth to protect the oil cylinder and its accessories inside the ceiling (200); A circular cutting line (202) is drawn on the side wall of the ceiling (200); The top of the ceiling (200) is suspended by a lifting device (400), and the ceiling is cut along a cutting line (202) to form a lower ceiling section (203) and an upper ceiling section (204), the lower ceiling section (203) is lifted, and the cutting positions of the lower ceiling section (203) and the upper ceiling section (204) are polished and smoothed; The first flange (205) and the second flange (206) are connected and fixed into a whole by bolts; The flange is hoisted to the top of the lower ceiling section (203) for positioning, and the upper ceiling section (204) is hoisted to the upper end of the flange for positioning, and the weld between the first flange (205) and the lower ceiling section (203) is welded; and the weld between the second flange (206) and the upper ceiling section (204) is welded; After welding, the connecting bolts of the first flange (205) and the second flange (206) are removed, and the upper section (204) of the ceiling is lifted.
4. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S4, a rigid support pier (601) and a jack (602) are arranged below the tube bearing of the displacement adaptation mechanism (600), the jack (602) is placed on the rigid support pier (601), the displacement adaptation mechanism (600) is connected and fixed to the ground by a support (603), and the lower flange (103) of the gas spring is fixed and supported by a tooling support (604).
5. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S6, the steps for lifting out the hydraulic cylinder (100) are as follows: Tie the sling to the hydraulic cylinder (100) and hang the other end of the sling on the main hook of the bridge crane; Remove the connecting bolts between the support seat (300) and the support plates (301) on both sides of the oil cylinder; The main hook of the bridge crane is lifted, and after the support plates (301) on both sides of the hydraulic cylinder (100) are separated from the support seat (300), the support plates (301) on both sides and the hydraulic cylinder (100) are fixed together with iron wires; Then lift the main hook and lift the hydraulic cylinder (100) out of the machine room; The hydraulic cylinder (100) is adjusted to a horizontal posture by using a lifting device (400) in cooperation with a bridge crane, and is placed on a cylinder support fixture.
6. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S7, the steps to remove the measuring shaft (302) are as follows: Hang a hoist on the main hook of the lifting device (400), connect the hoist to the lower flange (103), tighten the hoist to make it strong, and remove the support supporting the lower flange (103); A measuring shaft (302) is protected with tinplate on the inner side of the support seat (300), a hole is opened on the web (303) of the support seat (300) with a cutting tool, and the inner wall of the hole is polished and smoothed; Remove the shaft end baffle that fixes the measuring shaft (302), use a jack to push the measuring shaft (302) out of the shaft hole from the side, and then lift out the lower flange (103).
7. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 6, It is characterized in that Install a reinforcing ring (304) at the opening position, weld the weld between the reinforcing ring (304) and the web (303), grind the weld to make it smooth after welding, and repair the paint; Replace the slider (305) inside the support seat and lift the lower flange (103) back to its original position; Reinstall the new measuring shaft (302); Fix and support the lower flange (103) and unload the hoist.
8. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S8, the steps for reinstalling the new hydraulic cylinder (100) are as follows: Use the lifting equipment (400) in conjunction with the bridge crane to horizontally lift the new hydraulic cylinder (100) from the bracket, and then adjust the hydraulic cylinder (100) to a vertical position; The lifting device (400) cooperates with the support plates (301) on both sides to be installed, and the support plates (301) and the hydraulic cylinder (100) are fixed with iron wires; The hydraulic cylinder (100) is hoisted into the machine room by means of a bridge crane, and when the hydraulic cylinder (100) is hoisted to a certain distance above the support seat (300), it is stopped, and the spacing between the support plates (301) on both sides is adjusted to ensure that the spacing between the support plates (301) on both sides matches the spacing between the clamping plates at the upper end of the support seat (300); The main hook of the bridge crane is slowly lowered so that the guide slider (102) at the lower end of the hydraulic cylinder (100) enters the groove of the lower flange (103), and then the main hook is slowly lowered and the position is adjusted so that the support plate (301) enters the clamping plate of the support seat (300). After the bolt holes of the support plate (301) and the support seat (300) are aligned, the support plate (301) and the support seat (300) are fastened by bolts.
9. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 1, It is characterized in that In S10, the steps for hydraulic system commissioning are as follows: After the two proportional pump motors are powered on, the control pump is started first, and then one of the proportional pumps is started. The system relief valve in the pressure regulating valve block is adjusted to be energized. After the system pressure is adjusted to 20MPa, the system relief valve is energized and de-energized for three times. When the system relief valve is energized, the system pressure is displayed as 20MPa each time, and when the system relief valve is de-energized, the system pressure is displayed as zero each time. Close the manual pressure relief valve and oil inlet valve in the safety shut-off valve block of each accumulator, close the plate-type high-pressure ball valve in the valve block beside the hydraulic cylinder (100), and tighten the regulating screw of the relief valve to the right position and then return it one and a half to two turns; Start the control pump. After starting a proportional pump, open the oil supply high-pressure ball valve in the main pressure oil pipe, and then the system overflow valve is energized. After the ball electromagnetic reversing valve is energized, observe that the pressure on the pressure gauge shows 20MPa, and then start to open the accumulator inlet valves one by one to charge the oil. After adjusting the overflow valve in the accumulator safety shut-off valve block to the actual value tested, close the accumulator inlet valve to debug the next accumulator. Repeat the above steps to complete the adjustment of the overflow valves in the safety shut-off valve blocks of the four accumulators. Open the oil supply ball valve of the high-position oil tank of the rod chamber of the hydraulic cylinder (100) and inject the hydraulic oil into the rod chamber of the hydraulic cylinder (100); After all the oil inlet valves in the accumulator safety shut-off valve block are in the closed state, the relief valve in the valve block beside the hydraulic cylinder (100) is adjusted to loosen to the actual value tested before the plate-type high-pressure ball valve in the valve block beside the cylinder is opened to start pressurizing the rodless chamber of the hydraulic cylinder (100). When the pressure displayed on the pressure gauge is the same as the adjusted value of the relief valve, the ball-type electromagnetic reversing valve is powered off and the cylinder pressure relief electromagnetic valve is powered on to start pressure relief of the rodless chamber of the hydraulic cylinder (100). After the pressure gauge pointer is observed to be zero, the ball-type electromagnetic reversing valve is powered on and the cylinder pressure relief electromagnetic valve is powered off repeatedly to exhaust the cylinder body; After the exhaust of the hydraulic cylinder (100) is completed, the relief valve is adjusted. First, the relief valve adjusting screw is tightened and then returned one and a half to two turns. Then, the hydraulic cylinder (100) is pressurized. After the ball electromagnetic reversing valve is energized, the pressure on the pressure gauge is observed to be 20 MPa. Then, the cylinder pressure relief solenoid valve is energized to start the rodless chamber pressure relief of the hydraulic cylinder (100). The pressure gauge pointer is observed. If it is higher than 2 MPa, the relief valve in the cylinder side block of the hydraulic cylinder (100) is adjusted to 2 MPa. After the pressure gauge is connected to the pressure measuring point between the hydraulic cylinder (100) and the cylinder side block, the relief valve is slowly loosened again to adjust the pressure to the actual value tested. After the ball electromagnetic reversing valve is energized and the cylinder pressure relief solenoid valve is de-energized several times, it is verified whether the relief valve pressure is consistent with the actual value tested. After all the oil inlet valves in the accumulator safety shut-off valve block are in the open state, the on-site station linkage test is carried out. The first five on-site station linkage tests need to be further tested to verify whether the overflow valve pressure is consistent with the actual value tested; The on-site station linkage hydraulic cylinder (100) operates normally, the pressure is maintained normally, the accumulator pressure replenishment is normal, there is no jamming, and there is no oil leakage.
10. The method for disassembling and assembling the hydraulic spring of the fully balanced rack and pinion climbing vertical ship lift according to claim 9, It is characterized in that During the reinstallation of the hydraulic cylinder (100), mark the direction of the arrow on the oil window cover of the high-position oil tank of the hydraulic cylinder (100), remove the oil window cover and clean the remaining oil inside, and then use the kneaded dough to stick the inner wall of the high-position oil tank. After the inner wall of the high-position oil tank is clean and free of impurities, reinstall the oil window cover and the air filter, and close the drain ball valve at the bottom of the high-position oil tank and the oil supply ball valve of the rod chamber of the hydraulic cylinder (100); After the hydraulic cylinder (100) is reassembled, tighten and connect the corresponding cylinder interface according to the mark when the oil pipe was removed; when reassembling and connecting, make sure that the combined gasket and the sealing ring are intact, and evenly apply butter on the sealing ring; After filtering the new hydraulic oil, use a refueling cart to add the hydraulic oil into the high-level oil tank. When filling, pay close attention to whether there is oil leakage at the oil window cover seal.
Citation Information
Patent Citations
Upright post cylinder disassembling machine
CN103567757A
Rapid replacement device of oil cylinder in narrow space and replacement method
CN109519437A
Marine hydraulic jacking device maintenance method
CN109604997A
Integral hoisting method for hydraulic cylinder in limited space
CN110316648A
Powerful sleeve spring disjointing external use hydraulic ram
KR200439773Y1
Cited By
Helium compressor installation and maintenance system and working method
CN119501531A
Helium compressor installation and maintenance system and working method
CN119501531B