Pipe fitting cutting, end flattening and chamfering integrated equipment
By designing the integrated cutting flat-head chamfering equipment during the processing of pipe fittings, the full process of automation from material preparation to material extraction is achieved, and the inefficiency problems caused by manual intervention in the existing technology are solved, and processing efficiency and finished product quality are improved.
Patent Information
- Application Number
- CN202411131269.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-17
AI Technical Summary
The cutting and grinding process of existing pipe fittings requires a lot of manual intervention, resulting in low degree of automation and reduced processing efficiency.
A pipe fitting cutting flat chamfer integrated equipment is designed, integrating cutting device, grinding device and automatic material transfer mechanism to realize the full automatic processing from material preparation to cutting, grinding and cutting, reducing manual operations and ensuring the continuous processing of the processing process. and efficient.
Through automated processing, the machining efficiency of pipe fittings is greatly reduced, the precise cutting size and smooth grinding surface are ensured, labor costs are reduced, and finished product quality is improved.
Smart Images

Figure CN118951744A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipe processing, and in particular to an integrated device for cutting, flattening and chamfering pipes. Background Art
[0002] Cutting and grinding of pipe fittings are common processes in pipe fitting processing. Excessively long pipe fittings are cut to the corresponding length. After the pipe fittings are cut, burrs will inevitably appear on the pipe mouth. Special tools are needed to process the end face, outer corners, and inner corners of the pipe mouth to improve the flatness of the pipe fitting end.
[0003] In the related art, the processing of pipe fittings is usually carried out by an operator who transports multiple pipe fittings of the same batch to a circular saw, loads the pipe fittings one by one, cuts them to a predetermined length, and unloads them. The cut pipe fittings of equal length are then uniformly transferred to a grinder, where they are loaded one by one, the end faces are grinded, and the unloading is then carried together to a downstream workstation for subsequent processing such as packaging.
[0004] Regarding the above-mentioned related technologies, before and after the cutting and grinding process of pipe fittings, in the process of loading, transferring and unloading, a lot of manual intervention is still required, and the degree of automation is low. On the one hand, there is a waste of personnel, and on the other hand, it also reduces the processing efficiency of pipe fittings. Therefore, it is necessary to provide a pipe fitting processing equipment that can realize the integrated loading, cutting, transferring, grinding and unloading of pipe fittings, reduce manual intervention, and improve the processing efficiency of pipe fittings. Summary of the invention
[0005] In order to improve the problem of manual transfer and loading and unloading during the processing of pipe fittings and improve the processing efficiency of pipe fittings, the present application provides an integrated equipment for cutting flat heads and chamfering pipe fittings.
[0006] The present application provides an integrated equipment for cutting flat heads and chamfering pipe fittings, which adopts the following technical solutions: An integrated equipment for cutting flat ends and chamfering pipe fittings, comprising a material preparation rack for placing pipe fittings to be cut, a cutting device for cutting pipe fittings, a grinding device for grinding ends of pipe fittings, a material storage rack arranged between the grinding device and the cutting device and used for temporarily storing pipe fittings to be grinded, and a material unloading rack arranged on a side of the grinding device away from the cutting device and used for storing the polished pipe fittings; The cutting device comprises a cutting frame having a cutting station for arranging the pipe fittings, the cutting frame being provided with a cutting assembly for cutting both ends of the pipe fittings and a cutting clamping assembly for clamping and positioning the pipe fittings at the cutting station; The grinding device comprises a mounting base, two sets of grinding frames symmetrically arranged at two ends of the mounting base, and a grinding assembly arranged on the grinding frame and used for grinding two ends of the pipe fitting, the grinding frame having a grinding station, and a grinding clamping assembly for clamping the pipe fitting at the grinding station; It also includes a first material moving mechanism for transferring the pipe fittings on the material preparation rack to the cutting station and the material storage rack in sequence, and a second material moving mechanism for transferring the pipe fittings on the material storage rack to the grinding station and the unloading rack in sequence. The first material moving mechanism and the second material moving mechanism are both perpendicular to the length direction of the material preparation rack.
[0007] By adopting the above technical solutions, the equipment integrates a cutting device, a grinding device and two automatic material transfer mechanisms, realizing the full automation of the process from material preparation to cutting, grinding and finally unloading, greatly reducing the need for manual operation and avoiding errors and safety issues that may be caused by human factors. The automated process reduces the time for manual loading, unloading and transfer, improves the processing speed of pipe fittings, and the various components of the equipment work together to ensure the continuity and efficiency of the processing process. Both the cutting device and the grinding device are equipped with precise clamping components and cutting / grinding components, which can ensure that the pipe fittings remain stable during the processing process, thereby obtaining precise cutting dimensions and smooth grinding surfaces, and improving the quality of the finished pipe fittings. The high degree of automation of the equipment reduces manual intervention during operation and reduces labor costs.
[0008] Furthermore, the first material moving mechanism includes a first material moving plate for transferring the pipe fittings on the material preparation rack to the cutting station, a second material moving plate for transferring the pipe fittings at the cutting station to the material storage rack, a first pushing mechanism for synchronously driving the first material moving plate and the second material moving plate, a first guide plate matched with the first material moving plate, and a second guide plate matched with the second material moving plate, and the upper sides of the first material moving plate, the second material moving plate, the first guide plate, and the second guide plate are all inclined downward from one side of the material preparation rack to the side away from the material preparation rack; The second material moving plate is fixedly connected to a side of the first material moving plate away from the material preparation rack, the top side of the second material moving plate is higher than the top side of the first material moving plate, and the first pushing mechanism is installed on the frame and located below the first material moving plate to drive the first material moving plate to reciprocate up and down; The first guide plate is installed on the cutting machine frame and is located above the first material moving plate. The edge of the first material moving plate close to the material preparation rack protrudes beyond the edge of the first guide plate. The second guide plate is installed on the cutting rack and a material moving gap is left between the second guide plate and the first guide plate for the pipe to fall into the cutting station. The material moving gap is exactly opposite to the position of the second material moving plate.
[0009] By adopting the above technical solution, the first material moving plate lifts the pipe fittings from the material preparation rack and transfers them to the cutting station, the second material moving plate transfers the cut pipe fittings from the cutting station to the storage rack, the second material moving plate is fixedly connected to the side of the first material moving plate away from the material preparation rack, and the first pushing mechanism is installed on the frame and located below the first material moving plate as a power source to realize the transfer of the pipe fittings, and is used to drive the first material moving plate to reciprocate up and down. The first pushing mechanism pushes the first material moving plate to move up and down, lifts the pipe fittings on the material preparation rack and transfers them to the upper side of the first guide plate, and the pipe fittings slide along the first guide to the cutting station, and the pipe fittings are clamped by the cutting clamping assembly and cut to a predetermined length by the cutting assembly; after the pipe fittings are cut, the first pushing mechanism drives the second material moving plate to move up and down, lifts the pipe fittings at the cutting station and transfers them to the upper side of the second guide plate, and the pipe fittings slide along the second guide plate to the storage rack. The first material moving mechanism realizes the automatic, smooth and efficient transfer of pipes from the material preparation rack to the cutting station and then to the material storage rack through the coordinated operation of the first material moving plate, the second material moving plate, the first pushing mechanism, the first guide plate and the second guide plate, thereby improving processing efficiency, reducing the need for manual intervention and improving the degree of equipment automation.
[0010] Furthermore, a movable base is provided above the mounting base along the length direction, and the mounting base is provided with a second pushing mechanism for driving the movable base to move up and down and forward and backward; The second material moving mechanism is located between the two grinding machine frames and is perpendicular to the length direction of the mounting base, and the second material moving mechanism includes a third material moving plate fixedly connected to the movable base, a stinger fixedly connected to the mounting base and used to support the pipe fitting at the grinding station, a third guide plate provided on the mounting base and located on a side of the stinger close to the cutting device, and a fourth guide plate provided on the mounting base and located on a side of the stinger close to the unloading rack; The stinger is located between the material storage plate and the third guide plate. The upper sides of the material storage plate and the third guide plate are both arranged to be inclined downward from the cutting device side to the unloading rack side. The upper sides of the material storage plate and the third guide plate are both provided with a limiting protrusion for limiting the position of the pipe fittings on a side close to the stinger. The upper side of the third material moving plate is respectively provided with a first material moving groove for cooperating with the third guide plate and a second material moving groove for cooperating with the fourth guide plate.
[0011] By adopting the above technical solution, the second material moving mechanism is located between the two grinding machine racks and is perpendicular to the length direction of the mounting base, ensuring that the pipe fittings can be smoothly transferred from the material storage rack to the grinding station and continue to be transferred to the lower material rack. The movable base is driven by the second pushing mechanism to move up and down and forward and backward. The third guide plate cooperates with the material storage rack to support the pipe fittings together. The third guide plate and the material storage rack both prevent the pipe fittings from slipping through the limiting protrusions. The pipe rack is fixedly connected to the mounting base to support the pipe fittings to the same height as the grinding station. The third material moving plate is fixedly connected to the movable base. Driven by the movable base, the third material moving plate lifts the pipe fittings supported on the material storage rack and the third guide plate through the first material moving groove and places them on the pipe rack. Both ends of the pipe fittings are clamped by the grinding clamping assembly and polished by the grinding assembly. The third guide plate lifts the pipe from the stinger and the grinding station through the second material transfer trough and transfers it to the fourth guide plate. The polished pipe slides along the upper side of the fourth guide plate to the unloading rack. The second material transfer mechanism and the movable base realize the automatic, smooth and efficient transfer of pipes from the storage rack to the grinding station and then to the unloading rack through precise movement control and guiding structure, which improves processing efficiency and also enhances the automation and flexibility of the equipment.
[0012] Furthermore, the second pushing mechanism includes a lifting pushing member for pushing the movable base to move up and down and a longitudinal pushing member for pushing the movable base to move forward and backward. The lifting pushing member is arranged on the side wall of the mounting base and is located below the movable base. The longitudinal pushing member is arranged along the width direction of the mounting base.
[0013] By adopting the above technical solution, the lifting and pushing member is arranged on the side wall of the mounting base and below the movable base, ensuring that the lifting and pushing member can directly act on the bottom of the movable base and stably push the movable base to move in the vertical direction. The longitudinal pushing member is arranged along the width direction of the mounting base, so that the longitudinal pushing member can push the movable base to move forward and backward in the horizontal direction.
[0014] Furthermore, the cutting assembly is arranged in the cutting frame, and the cutting assembly includes a cutter disc, a cutter seat for rotationally connecting the cutter disc, a driving motor for driving the cutter disc to rotate, and a cutter seat pushing member for driving the cutter seat to rise and fall; The cutting machine frame is provided with a knife feed slot at the cutting station for the knife disc to extend out.
[0015] By adopting the above technical solution, the cutting frame is the supporting structure of the cutting assembly, the cutter disc is the main tool for cutting pipe fittings, the cutter seat is the supporting and connecting component of the cutter disc, which is responsible for fixing the cutter disc on the cutting frame and ensuring that it can rotate stably, the drive motor is the power source of the cutting assembly, providing rotational power for the cutter disc, and the cutter seat pusher can control the rise and fall of the cutter seat. The cutting frame is provided with a feed slot for the cutter disc to extend at the cutting station, ensuring that the cutter disc can smoothly enter and exit and accurately cut the pipe fittings. The cutting assembly achieves precise cutting of pipe fittings through the coordinated work of the cutter disc, the cutter seat, the drive motor and the cutter seat pusher, thereby improving the cutting accuracy and efficiency.
[0016] Furthermore, the cutting clamping assembly includes a first fixed clamping block and a first movable clamping block arranged on the upper side of the cutting frame, the first fixed clamping block is installed on the side of the cutting frame close to the material preparation rack, and the upper side of the cutting frame is provided with a first clamping block driving component for driving the first movable clamping block close to the first fixed clamping block on the side close to the grinding device.
[0017] By adopting the above technical solution, the first fixed clamp block is installed on the side of the cutting frame close to the material preparation rack as a fixed clamping point for cutting, and the first movable clamp block can clamp and release the pipe by approaching or moving away from the first fixed clamp block. The upper side of the cutting frame is provided with a first clamp block driving member close to the grinding device, which is responsible for driving the first movable clamp block to approach or move away from the first fixed clamp block. The pipe falls between the first fixed clamp block and the first movable clamp block, and the first clamp block driving member drives the first movable clamp block to move toward the first fixed clamp block to clamp the pipe at the cutting station. The cutter disc extends through the feed groove and cuts the pipe. After the cutting is completed, the first clamp block driving member drives the first movable clamp block away from the first fixed clamp block to release the pipe. The cutting clamping assembly can prevent the pipe from moving during the cutting process and improve the cutting accuracy. The movable setting of the first movable clamp block enables the cutting clamping assembly to adapt to pipes of different sizes and shapes, thereby improving the flexibility and adaptability of the equipment.
[0018] Furthermore, the cutting device also includes an adjustment mechanism for adjusting the distance between the two cutting frames; The adjustment mechanism includes a sliding track, an adjusting screw and two connecting blocks arranged below the cutting device for the two cutting frames to slide. The two connecting blocks are arranged on the adjusting screw at intervals and are both threadedly connected to the adjusting screw. The two connecting blocks are correspondingly fixedly connected to the outer wall of the two cutting frames close to the material preparation rack.
[0019] By adopting the above technical solution, the sliding track provides a sliding track for the two cutting racks, and the two connecting blocks are arranged on the adjusting screw at intervals and are both threadedly connected to the adjusting screw. Each connecting block is fixedly connected to the outer wall of a cutting rack close to the material preparation rack, and the relative position between the two connecting blocks is controlled by rotating the adjusting screw, thereby adjusting the spacing of the cutting racks. The design of the adjustment mechanism allows the spacing of the cutting devices to be adjusted according to the length requirements of the pipe cutting, thereby improving the flexibility and applicability of the equipment.
[0020] Furthermore, the grinding assembly includes a grinding tool holder rotatably connected to the grinding machine frame and an end face grinding head, an outer angle grinding head and an inner angle grinding head fixedly connected to the grinding tool holder. The grinding machine frame is provided with a grinding pusher for driving the grinding assembly close to the end of the pipe.
[0021] By adopting the above technical solution, the grinding knife seat is rotatably connected to the grinding machine frame to provide an installation platform for the grinding head. The end face grinding head is used to grind the end face of the pipe fitting, the outer angle grinding head is used to grind the outer angle of the pipe fitting, and the inner angle grinding head is used to grind the inner angle of the pipe fitting. A grinding pusher that drives the grinding machine frame to feed / exit is provided on the mounting base. The grinding machine frame is driven by the grinding pusher to make the grinding knife seat close to / away from the end of the pipe fitting. The grinding assembly is an important part of the integrated equipment for cutting flat heads and chamfering pipe fittings. By integrating multiple grinding tools and optimizing the design, it can achieve comprehensive grinding of pipe fittings and improve the processing accuracy and efficiency of the equipment.
[0022] Furthermore, the grinding machine frame is provided with a second fixed clamping block and a second movable clamping block at the grinding station, the second fixed clamping block and the second movable clamping block are respectively located at the upper and lower sides of the grinding station, the second fixed clamping block is fixedly connected to the mounting base, and the grinding machine frame is provided with a second clamping block driving component for driving the second movable clamping block to approach the second fixed clamping block.
[0023] By adopting the above technical solution, the second fixed clamp block is installed on the mounting base and is located below the grinding station to provide a support surface for the pipe fitting. The second movable clamp block is located on the opposite side of the second fixed clamp block and clamps the pipe fitting together with the second fixed clamp block. A second clamp block driving member is provided on the grinding machine frame to drive the second movable clamp block to approach or move away from the second fixed clamp block, thereby clamping and releasing the pipe fitting. The pipe fitting is transferred from the material storage rack and the third guide plate to the grinding station between the second fixed clamp block and the second movable clamp block through the third material transfer plate. The second clamp block driving member drives the second movable clamp block to move toward the second fixed clamp block and clamp the pipe fitting. The grinding machine frame is driven by the grinding push member to drive the grinding knife seat to approach the end of the pipe fitting, thereby grinding the end face, outer angle and inner angle of the pipe fitting. After the pipe fitting is polished, the second clamp block driving member drives the second movable clamp block to move away from the second fixed clamp block and release the pipe fitting. The third material transfer plate takes out the pipe fitting from the grinding station and transfers it to the fourth guide plate.
[0024] Furthermore, the unloading rack includes a support base for supporting on the ground and an arc-surface supporting plate arranged on the support base and used to receive the pipe fittings. The support base is provided with a soft receiving belt for buffering above the arc-surface supporting plate.
[0025] By adopting the above technical solution, the support seat is the foundation of the unloading rack, which is used to stably support the ground. The curved support plate is arranged on the support seat, which is used to receive the polished pipe fittings. The support seat is provided with a soft receiving belt above the curved support plate. The soft receiving belt can buffer the impact force of the pipe fittings when they slide down, reduce the hard contact between the pipe fittings and the support plate, and protect the surface of the pipe fittings.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through the integration of cutting device, grinding device and two automatic material transfer mechanisms, the whole process from material preparation, cutting, transfer, grinding and unloading is automated, reducing the time of manual loading and unloading and transfer. The various components work together to ensure the continuity and efficiency of the processing process, improve the processing speed of pipe fittings, greatly reduce manual intervention, and avoid errors and safety problems that may be caused by human factors; 2. Both the cutting device and the grinding device are equipped with a clamping assembly and a cutting / grinding assembly, so that the pipe fittings remain stable during processing, ensuring accurate cutting size and smooth grinding surface. The movable setting of the first movable clamping block and the second movable clamping block enables the cutting clamping assembly and the grinding clamping assembly to adapt to pipe fittings of different sizes and shapes, thereby improving the flexibility and adaptability of the equipment, thereby improving the processing accuracy and quality of the finished product; 3. The high degree of automation of the equipment can reduce manual intervention and labor costs. The precise movement control of the adjustment mechanism of the cutting device and the second material moving mechanism enables the equipment to adjust the cutting length according to the pipe cutting requirements, thereby enhancing the flexibility and applicability of the equipment; 4. The soft support belt can reduce the impact force of the pipe during the sliding process, protect the surface of the pipe, and improve the protection of the equipment and the quality of the finished product. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of an integrated device for cutting flat heads and chamfering pipes according to an embodiment of the present application.
[0028] Figure 2 It is a schematic diagram of the overall structure of the material preparation rack in the embodiment of the present application.
[0029] Figure 3 It is a schematic diagram of the overall structure of the cutting device and the first material moving mechanism in the embodiment of the present application.
[0030] Figure 4 yes Figure 3 A schematic diagram of the enlarged structure of the cutting and clamping assembly in part A.
[0031] Figure 5 It is an enlarged schematic diagram of the structure of the cutting assembly and the first material moving mechanism in the embodiment of the present application.
[0032] Figure 6 It is a schematic diagram of the overall structure of the grinding device and the second material moving mechanism in the embodiment of the present application.
[0033] Figure 7 It is an enlarged schematic diagram of the structure of the material storage rack, the grinding machine frame, the grinding assembly and the grinding clamping assembly in the embodiment of the present application.
[0034] Figure 8 It is an enlarged schematic diagram of the structure of the grinding assembly in the embodiment of the present application.
[0035] Fig. 9 yes Figure 6 Part B is an enlarged schematic diagram of the structure of the second material moving mechanism and the second pushing mechanism.
[0036] Fig.10 It is a schematic diagram of the overall structure of the unloading rack in the embodiment of the present application.
[0037] Description of reference numerals: 1, material preparation rack; 11, support frame; 12, guide rod; 2, cutting device; 21, cutting frame; 211, cutting station; 212, feed slot; 213, door panel; 214, receiving slot; 215, inclined guide plate; 22, cutting assembly; 221, knife disc; 222, knife seat; 223, driving motor; 224, knife seat pusher; 23, cutting clamping assembly; 231, first fixed clamping block; 232, first movable clamping block; 23 3. First adjustable fixed seat; 234. First clamping block driving member; 24. Adjusting mechanism; 241. Sliding track; 242. Adjusting screw; 243. Connecting block; 25. Sliding mounting frame; 26. Laser sensor; 3. Grinding device; 31. Grinding frame; 311. Grinding station; 312. Bottom plate; 313. Grinding body; 32. Grinding assembly; 321. Grinding tool holder; 322. End face grinding head; 323. External angle grinding head; 324. Internal angle Grinding head; 33, grinding clamping assembly; 331, second fixed clamping block; 332, second movable clamping block; 333, second adjustable fixed seat; 334, second clamping block driving member; 335, connecting arm; 336, grinding push member; 34, mounting base; 341, strip track; 35, movable base; 36, second push mechanism; 361, lifting push member; 362, longitudinal push member; 4, material storage rack; 5, material unloading rack; 51, support seat; 52, arc surface bearing Support plate; 53, flexible receiving belt; 6, first material moving mechanism; 61, first material moving plate; 62, second material moving plate; 63, first pushing mechanism; 631, first pushing cylinder; 632, supporting block; 64, first guide plate; 65, second guide plate; 7, second material moving mechanism; 71, third material moving plate; 711, first material moving trough; 712, second material moving trough; 72, hosting rack; 73, third guide plate; 731, limiting protrusion; 74, fourth guide plate. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-10 And embodiments, the present application is further described in detail.
[0039] The embodiment of the present application discloses an integrated pipe cutting flat head chamfering device. The words such as "upper" and "lower" used to express the positional relationship in the embodiment are determined with reference to the placement and installation position of the integrated pipe cutting flat head chamfering device when it is in normal use.
[0040] Reference Figure 1 The integrated equipment for cutting flat head and chamfering of pipe fittings comprises a material preparation rack 1, a cutting device 2, a grinding device 3, a material storage rack 4, a material unloading rack 5, a first material moving mechanism 6 and a second material moving mechanism 7.
[0041] The material preparation rack 1 is arranged on one side of the cutting device 2 for placing the pipes to be cut. The cutting device 2 is used to cut the two ends of the pipes so that the pipes reach a predetermined length. The grinding device 3 is used to grind the two ends of the pipes to remove burrs. The material storage rack 4 is arranged between the cutting device 2 and the grinding device 3 for temporarily storing the pipes to be grinded after cutting. The material unloading rack 5 is arranged on the side of the grinding device 3 away from the cutting device 2 for receiving the pipes that have been grinded.
[0042] The first material transfer mechanism 6 can transfer the pipe fittings from the material preparation rack 1 to the cutting device 2 for cutting, and then transfer the cut pipe fittings to the material storage rack 4. The second material transfer mechanism 7 can transfer the pipe fittings on the material storage rack 4 to the grinding device 3, and then transfer the ground pipe fittings to the material unloading rack 5. The operator only needs to place several pipe fittings of the same batch on the material preparation rack 1. After the equipment processing is completed, the cut and ground pipe fittings can be collected from the material unloading rack 5, and then transferred to the downstream station for packaging and other subsequent operations.
[0043] Reference Figure 1 and Figure 2 The material preparation rack 1 of this embodiment includes a support frame 11 and a guide rod 12. The support frame 11 is used to be supported on the ground. The guide rod 12 is fixedly connected to the top of the support frame 11. The guide rod 12 is arranged downwardly from the side away from the cutting device 2 to the side close to the cutting device 2, so as to guide the pipe to slide naturally to the position of the first material moving mechanism 6. The length direction of the support frame 11 is parallel to the length direction of the cutting device 2, and the length direction of the guide rod 12 is perpendicular to the length direction of the support frame 11. In this embodiment, the number of guide rods 12 is several and they are arranged at intervals along the length direction of the support frame 11.
[0044] Reference Figure 1 and Figure 3 The cutting device 2 includes a cutting frame 21, a cutting assembly 22 and a cutting clamping assembly 23. The cutting frame 21 has a cutting station 211 for arranging pipe fittings. When the pipe fittings are located at the cutting station 211, the cutting assembly 22 cuts both ends of the pipe fittings so that the pipe fittings reach a predetermined length. The cutting clamping assembly 23 clamps the pipe fittings when the pipe fittings are cut to position the pipe fittings at the cutting station 211 to prevent the pipe fittings from being offset.
[0045] In this embodiment, the number of cutting racks 21 is preferably two, and the two cutting racks 21 are symmetrically arranged for cutting both ends of the pipe fitting. The cutting device 2 also includes an adjustment mechanism 24 for adjusting the distance between the two cutting racks 21. The adjustment mechanism 24 includes a sliding track 241 arranged on the ground, an adjustment screw 242 and two connecting blocks 243. The two cutting racks 21 are slidably installed on the sliding track 241 and are respectively arranged at both ends of the sliding track 241. Two groups of threads with opposite spiral directions are arranged on the outer wall of the screw, and the two connecting blocks 243 are correspondingly installed at the two groups of opposite thread positions on the adjustment screw 242 and threadedly matched with the adjustment screw 242. The outer walls of the two connecting blocks 243 are correspondingly fixedly connected to the outer walls of the two cutting racks 21 close to the side of the material preparation rack 1. The operator can adjust the distance between the two connecting blocks 243 by rotating the adjustment screw 242, thereby adjusting the distance between the two cutting racks 21. The adjustment mechanism 24 in this embodiment can control the distance between the two cutting machine frames 21 to be 3m-6m, thereby meeting the cutting requirements of corresponding pipe lengths.
[0046] Reference Figure 4 and Figure 5 The cutting assembly 22 is installed inside the cutting frame 21, and the cutting assembly 22 includes a cutter disc 221, a cutter seat 222, a driving motor 223 and a cutter seat pusher 224. The cutter disc 221 is arranged perpendicular to the horizontal plane and is rotatably connected to one side of the cutter seat 222. The driving motor 223 is used to drive the cutter disc 221 to rotate, and the cutter seat pusher 224 is used to drive the cutter seat 222 to rise and fall. The cutting frame 21 is provided with a cutter feed slot 212 at the cutting position for the cutter disc 221 to extend. The cutter seat pusher 224 in this embodiment is preferably a cylinder with a faster response speed. The cutter seat pusher 224 pushes the cutter seat 222 to rise and fall vertically, thereby driving the cutter disc 221 to extend / retract into the cutter feed slot 212. In combination with Figure 1 A door panel 213 is hingedly connected to the cutting frame 21 to cover the cutter disc 221 and prevent the cutter disc 221 from being exposed. A receiving groove 214 for receiving waste (pipe material head) is provided on the outer side walls of the two cutting frames 21. The cutting frames 21 are also provided with an inclined guide plate 215 above the receiving groove 214 to guide the waste and cutting debris to fall.
[0047] Reference Figure 3 and Figure 4, there are two groups of cutting and clamping assemblies 23, and the two groups of cutting and clamping assemblies 23 are correspondingly installed on the top sides of the two cutting machine frames 21. The cutting and clamping assembly 23 includes a first fixed clamping block 231, a first movable clamping block 232, a first adjustable fixing seat 233 for fixing the first fixed clamping block 231, and a first clamping block driving member 234 for driving the first movable clamping block 232. The first fixed clamping block 231 is arranged opposite to the first movable clamping block 232, the first adjustable fixing seat 233 is fixedly connected to the cutting machine frame 21, the first fixed clamping block 231 is fixedly connected to one end of the first adjustable fixing seat 233 away from the material preparation rack 1, and the first adjustable fixing seat 233 in this embodiment adjusts the position of the first fixed clamping block 231 through the screw adjustment mechanism 24, so that pipes of different diameters are clamped in the cutting station 211. The first clamping block driving member 234 is preferably a cylinder with a faster response force. The first clamping block driving member 234 is fixedly connected to the top surface of the cutting frame 21 and away from the side of the preparation rack 1. The first movable clamping block 232 is fixedly connected to the piston rod of the first clamping block driving member 234. The first clamping block driving member 234 drives the first movable clamping block 232 to approach / move away from the first fixed clamping block 231, thereby achieving clamping / releasing of the pipe.
[0048] In this embodiment, a sliding mounting frame 25 is slidably installed on the sliding rail 241 at the middle position between the two cutting machine frames 21. In this embodiment, the number of first material moving mechanisms 6 is preferably three groups, one group of first material moving mechanisms 6 is installed on the sliding mounting frame 25, and the remaining two groups of first material moving mechanisms 6 are respectively installed on the opposite side surfaces of the two cutting machine frames 21.
[0049] A laser sensor 26 for sensing the position of the pipe is installed on the sliding mounting frame 25. When the laser sensor 26 detects that the first material moving mechanism 6 transfers the pipe to be cut on the preparation rack 1 to the cutting station 211, the first clamping block driving member 234 drives the first movable clamping block 232 to approach the first fixed clamping block 231, thereby clamping the pipe at the cutting station 211, and the knife seat pushing member 224 drives the knife seat 222 to descend and drives the knife disc 221 to extend out of the knife feed slot 212, thereby cutting the pipe to a predetermined length.
[0050] Reference Figure 3 and Figure 5The first material moving mechanism 6 includes a first material moving plate 61, a second material moving plate 62, a first pushing mechanism 63, a first guide plate 64 and a second guide plate 65. The second material moving plate 62 is integrally connected to the side of the first material moving plate 61 away from the material preparation rack 1, and the first pushing mechanism 63 can synchronously drive the lifting of the first material moving plate 61 and the second material moving plate 62. The first pushing mechanism 63 includes a first pushing cylinder 631 and a top support block 632 fixedly connected to the upper end of the piston rod of the first pushing cylinder 631 and the lower side of the first material moving plate 61. The upper sides of the first material moving plate 61, the second material moving plate 62, the first guide plate 64 and the second guide plate 65 are all arranged to be inclined downward from the side of the material preparation rack 1 to the side away from the material preparation rack 1.
[0051] In this embodiment, for the two groups of first material moving mechanisms 6 installed on the two groups of cutting frames 21: the first guide plate 64 is fixedly connected to the cutting frame 21 and is located at the edge of the cutting frame 21, the upper side of the first guide plate 64 is higher than the upper side of the first material moving plate 61, and the edge of the first material moving plate 61 close to the material preparation rack 1 protrudes from the edge of the first guide plate 64, so that the upper side of the first material moving plate 61 and the side of the first guide plate 64 close to the material preparation rack 1 form a step shape, which is used to remove the pipe fittings from the material preparation rack 1.
[0052] The second guide plate 65 is fixedly connected to the cutting frame and is spaced apart from the first guide plate 64 along the edge of the cutting frame 21. A material shifting gap is left between the second guide plate 65 and the first guide plate 64 for the pipe to fall into the cutting station 211. When the first push cylinder 631 is in a retracted state, the material shifting gap is located directly above the second material shifting plate 62.
[0053] With respect to a set of first material moving mechanisms 6 installed on the sliding mounting frame 25 , the first guide plate 64 and the second guide plate 65 are both fixedly connected to the sliding mounting frame 25 and arranged at intervals along the length direction of the sliding mounting frame 25 .
[0054] Reference Figure 1 and Figure 6 The grinding device 3 includes two symmetrically arranged grinding frames 31, a grinding assembly 32 and a grinding clamping assembly 33 arranged on the grinding frames 31, and a mounting base 34 for mounting the grinding frames 31. A strip track 341 for slidingly mounting the grinding frames 31 is fixedly connected to the top surface of the mounting base 34 along the length direction. The grinding frame 31 has a grinding station 311. The grinding clamping assembly 33 is used to clamp the pipe fitting at the grinding station 311, and the grinding assembly 32 is used to grind both ends of the pipe fitting.
[0055] Reference Figure 7 and Figure 8The grinding machine frame 31 includes a base plate 312 for slidingly mounting on a bar track 341 and a grinding machine body 313 slidably mounted on the base plate 312. The grinding assembly 32 includes a grinding tool holder 321, an end face grinding head 322, an outer angle grinding head 323 and an inner angle grinding head 324. There are two grinding assemblies 32, and the two grinding tool holders 321 are rotatably connected to the opposite two sides of the two grinding machine bodies 313. The end face grinding head 322, the outer angle grinding head 323 and the inner angle grinding head 324 are equidistantly arranged in a dial shape and are fixedly connected to the grinding tool holder 321 in sequence.
[0056] The two sets of grinding fixture assemblies are respectively located at adjacent positions on the two opposite sides of the two grinding machine frames 31. The grinding clamping assembly 33 includes a second fixed clamping block 331, a second movable clamping block 332, a second adjustable fixing seat 333 for fixing the second fixed clamping block 331, and a second clamping block driving member 334 for driving the second movable clamping block 332. The second adjustable fixing seat 333 is slidably mounted on the bottom plate 312, and the second fixed clamping block 331 is fixedly connected to the upper side of the second adjustable fixing seat 333. The storage rack 4 is fixedly connected to a side of the second adjustable fixing seat 333 close to the cutting device 2, and the upper side of the storage rack 4 is tilted downward from the side close to the cutting device 2 to the side connected to the second adjustable fixing seat 333.
[0057] The grinding body 313 is fixedly connected to a connecting arm 335 for installing a second clamping block driving member 334 on one side close to the second adjustable fixed seat 333. The second clamping block driving member 334 is preferably a cylinder with a faster response force. The second movable clamping block 332 is fixedly connected to the end of the piston rod of the second clamping block driving member 334 and is directly above the second fixed clamping block 331. The second clamping block driving member 334 drives the second movable clamping block 332 to approach / move away from the second fixed clamping block 331 so as to clamp / release the pipe to be ground at the grinding station 311.
[0058] A grinding pusher 336 for driving the grinding machine body 313 to approach the grinding clamping assembly 33 is fixedly connected to the bottom plate 312 at one side away from the second adjustable fixing seat 333 . The grinding pusher 336 in this embodiment is preferably a cylinder with a faster response force.
[0059] Reference Figure 6 and Fig. 9A movable base 35 is provided on the mounting base 34 between the two grinding machine frames 31 along the length direction, and the mounting base 34 is provided with a second pushing mechanism 36 for driving the movable base 35 to move up and down and forward and backward. The second pushing mechanism 36 includes a lifting and pushing member 361 for pushing the movable base 35 to move up and down and a longitudinal pushing member 362 for pushing the movable base 35 to move forward and backward. The lifting and pushing member 361 and the longitudinal pushing member 362 in this embodiment are preferably cylinders with a certain supporting capacity. The lifting and pushing member 361 is installed on the side wall of the mounting base 34 and is located below the movable base 35. The longitudinal pushing member 362 is arranged along the width direction of the mounting base 34. The lifting and pushing member 361 pushes the movable base 35 to move in the vertical direction, and the longitudinal pushing member 362 pushes the movable base 35 to move forward and backward in the horizontal direction.
[0060] In this embodiment, the number of the second material moving mechanisms 7 is two and they are arranged at intervals between the two grinding machine frames 31, and the length direction of the second material moving mechanism 7 is perpendicular to the length direction of the mounting base 34. The second material moving mechanism 7 includes a third material moving plate 71 fixedly connected to the movable base 35, a stinger frame 72 fixedly connected to the mounting base 34, a third guide plate 73 fixedly connected to the mounting base 34 and located on the side of the stinger frame 72 close to the cutting device 2, and a fourth guide plate 74 fixedly connected to the mounting base 34 and located on the side of the stinger frame 72 close to the unloading rack 5.
[0061] The stinger 72 is located between the third guide plate 73 and the fourth guide plate 74, and the top side of the stinger 72 can support the pipe to the same height of the grinding station 311. The upper sides of the third guide plate 73 and the fourth guide plate 74 are both inclined downward from the side of the cutting device 2 to the side of the unloading rack 5. The third guide plate 73 and the storage rack 4 have the same inclination angle for jointly supporting the pipe to be polished. The upper side of the third guide plate 73 is fixedly connected to a limiting protrusion 731 for limiting the position of the pipe on the side close to the stinger 72.
[0062] The upper side of the third material moving plate 71 is provided with a first material moving groove 711 and a second material moving groove 712 at intervals. The first material moving groove 711 is used to cooperate with the third guide plate 73. The third material moving plate 71 is driven by the second pushing mechanism 36. The pipe fittings limited on the upper side of the storage rack 4 and the third guide plate 73 are transferred to the stinger rack 72 through the first material moving groove 711, and are clamped on the grinding station 311 by the second fixed clamp block 331 and the second movable clamp block 332. The second material moving groove 712 is used to cooperate with the fourth guide plate 74. The pipe fittings on the upper side of the stinger rack 72 are transferred to the fourth guide plate 74 through the second material moving groove 712, and slide from the fourth guide plate 74 to the unloading rack 5.
[0063] The movable base 35 is also fixedly connected with two third material moving plates 71 for assisting in lifting the pipe fittings. The two third material moving plates 71 are respectively disposed on the back and front sides of the two groups of second material moving mechanisms 7 and are both located between the two grinding machine frames 31 .
[0064] Reference Figure 1 and Fig.10 The unloading rack 5 includes a support seat 51 and a plurality of curved support plates 52. The support seat 51 is used to support the unloading rack 5 as a whole on the ground. The curved support plates 52 are arranged at intervals along the length direction of the support seat 51 and are fixedly connected to the support seat 51. A soft receiving belt 53 for buffering is provided on the top of each curved support plate 52. When the third material transfer plate 71 transfers the pipe fittings on the upper side of the tube rack 72 to the fourth guide plate 74 through the second material transfer groove 712, the pipe fittings slide from the fourth guide plate 74 to the soft receiving belt 53 of the unloading rack 5 and fall into the curved support plate 52.
[0065] The material preparation rack 1 in this embodiment can store 10-20 pipes to be cut. When the first material moving plate 61 and the second material moving plate 62 are driven to reciprocate by the first pushing mechanism 63, the first material moving plate 61 can take the material from the material preparation rack 1 and the second material moving plate 62 can transfer the material from the cutting station 211 simultaneously, thereby improving the continuity of the equipment's processing of pipes. The material storage rack 4 can temporarily store 10-20 pipes to be polished. When the third material moving plate 71 is driven to reciprocate by the second pushing mechanism 36, the third material moving plate 71 can simultaneously complete the transfer of the pipes to be polished and the unloading of the polished pipes through the first material moving groove 711 and the second material moving groove 712, further improving the continuity of the equipment's processing of pipes.
[0066] The implementation principle of the integrated equipment for cutting flat head and chamfering of pipe fittings in the embodiment of the present application is as follows: the guide rod 12 of the material preparation rack 1 is arranged to be inclined to guide the pipe fitting to slide naturally down to the upper side of the first material moving plate 61 of the first material moving mechanism 6. The first material moving mechanism 6 transfers the pipe fitting from the material preparation rack 1 to the cutting station 211 of the cutting device 2 through the synchronous lifting and lowering movement of the first material moving plate 61 and the second material moving plate 62, and the guiding effect of the first guide plate 64 and the second guide plate 65.
[0067] The cutting device 2 includes two symmetrically arranged cutting frames 21, and the spacing is adjusted by an adjustment mechanism 24 to adapt to pipes of different lengths. The cutting assembly 22 uses a cutter disc 221, a cutter seat 222, a drive motor 223 and a cutter seat pusher 224 to achieve accurate cutting of the pipe. The cutting clamping assembly 23 clamps the pipe during the cutting process through a first fixed clamping block 231, a first movable clamping block 232 and a first clamping block driving member 234 to prevent deviation.
[0068] The storage rack 4 is used to temporarily store the pipes to be polished after cutting. The second material moving mechanism 7 transfers the pipes on the storage rack 4 to the polishing station 311 of the polishing device 3 through the cooperation of the third material moving plate 71, the tube rack 72, the third guide plate 73 and the fourth guide plate 74, and the drive of the second pushing mechanism 36.
[0069] The grinding device 3 includes two symmetrically arranged grinding frames 31, each of which is provided with a grinding tool holder 321 and is equipped with an end face grinding head 322, an outer angle grinding head 323 and an inner angle grinding head 324. The grinding clamping assembly 33 clamps the pipe fitting at the grinding station 311 through a second fixed clamping block 331, a second movable clamping block 332 and a second clamping block driving member 334. The grinding pusher 336 drives the grinding body 313 to approach the end of the pipe fitting for grinding.
[0070] The unloading rack 5 is provided with a support seat 51 and a curved support plate 52. The curved support plate 52 is provided with a soft receiving belt 53 for buffering and collecting the polished pipes. After the polishing of the pipes is completed, the second material transfer mechanism 7 transfers the pipes from the tube rack 72 to the fourth guide plate 74 through the second material transfer trough 712, and finally slides into the curved support plate 52 of the unloading rack 5.
[0071] The whole equipment realizes unmanned operation from material preparation to unloading through coordinated operation and automated control among various mechanisms, greatly improving the efficiency and accuracy of pipe processing.
[0072] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An integrated equipment for cutting flat heads and chamfering pipe fittings. Features: It comprises a material preparation rack (1) for placing pipes to be cut, a cutting device (2) for cutting the pipes, a grinding device (3) for grinding the ends of the pipes, a material storage rack (4) arranged between the grinding device (3) and the cutting device (2) and used to temporarily store the pipes to be grinded, and a material unloading rack (5) arranged on a side of the grinding device (3) away from the cutting device (2) and used to store the grinded pipes; The cutting device (2) comprises a cutting frame (21), the cutting frame (21) having a cutting station (211) for arranging pipes, the cutting frame (21) being provided with a cutting assembly (22) for cutting both ends of the pipes and a cutting clamping assembly (23) for clamping and positioning the pipes at the cutting station (211); The grinding device (3) comprises a mounting base (34), two sets of grinding frames (31) symmetrically arranged at two ends of the mounting base (34), and a grinding assembly (32) arranged on the grinding frame (31) and used for grinding two ends of the pipe fitting, the grinding frame (31) having a grinding station (311), and a grinding clamping assembly (33) for clamping the pipe fitting at the grinding station (311); It also includes a first material moving mechanism (6) for transferring the pipe fittings on the material preparation rack (1) to the cutting station (211) and the material storage rack (4) in sequence, and a second material moving mechanism (7) for transferring the pipe fittings on the material storage rack (4) to the grinding station (311) and the material unloading rack (5) in sequence. The first material moving mechanism (6) and the second material moving mechanism (7) are both perpendicular to the length direction of the material preparation rack (1).
2. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 1, Features: The first material moving mechanism (6) comprises a first material moving plate (61) for transferring the pipe fittings on the material preparation rack (1) to the cutting station (211), a second material moving plate (62) for transferring the pipe fittings on the cutting station (211) to the material storage rack (4), a first pushing mechanism (63) for synchronously driving the first material moving plate (61) and the second material moving plate (62), a first guide plate (64) matched with the first material moving plate (61) and a second guide plate (65) matched with the second material moving plate (62), and the upper sides of the first material moving plate (61), the second material moving plate (62), the first guide plate (64) and the second guide plate (65) are all inclined downward from one side of the material preparation rack (1) to a side away from the material preparation rack (1); The second material moving plate (62) is fixedly connected to a side of the first material moving plate (61) away from the material preparation rack (1), the top side of the second material moving plate (62) is higher than the top side of the first material moving plate (61), and the first pushing mechanism (63) is installed on the frame and located below the first material moving plate (61) to drive the first material moving plate (61) to reciprocate up and down; The first guide plate (64) is installed on the cutting frame (21) and is located above the first material moving plate (61). The edge of the first material moving plate (61) close to the material preparation frame (1) protrudes beyond the edge of the first guide plate (64). The second guide plate (65) is installed on the cutting frame and a material moving gap is left between the second guide plate (65) and the first guide plate (64) for the pipe to fall into the cutting station (211). The material moving gap is located opposite to the position of the second material moving plate (62).
3. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 2, Features: A movable base (35) is provided above the mounting base (34) along the length direction, and the mounting base (34) is provided with a second pushing mechanism (36) for driving the movable base (35) to move up and down and forward and backward; The second material moving mechanism (7) is located between the two grinding machine frames (31) and is perpendicular to the length direction of the mounting base (34). The second material moving mechanism (7) comprises a third material moving plate (71) fixedly connected to the movable base (35), a stinger (72) fixedly connected to the mounting base (34) and used to support the pipe fitting at the grinding station (311), a third guide plate (73) provided on the mounting base (34) and located on the side of the stinger (72) close to the cutting device (2), and a fourth guide plate (74) provided on the mounting base (34) and located on the side of the stinger (72) close to the unloading rack (5); The stinger (72) is located between the material storage plate and the third guide plate (73), and the upper sides of the material storage plate and the third guide plate (73) are arranged obliquely downward from the side of the cutting device (2) to the side of the unloading rack (5), and the upper sides of the material storage plate and the third guide plate (73) are provided with a limiting protrusion (731) for limiting the position of the pipe fittings on the side close to the stinger (72); The upper side of the third material moving plate (71) is respectively provided with a first material moving groove (711) for cooperating with the third guide plate (73) and a second material moving groove (712) for cooperating with the fourth guide plate (74).
4. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 3, Features: The second pushing mechanism (36) comprises a lifting pushing member (361) for pushing the movable base (35) to move up and down, and a longitudinal pushing member (362) for pushing the movable base (35) to move forward and backward. The lifting pushing member (361) is arranged on the side wall of the mounting base (34) and is located below the movable base (35). The longitudinal pushing member (362) is arranged along the width direction of the mounting base (34).
5. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 1, Features: The cutting assembly (22) is arranged in the cutting frame (21), and comprises a knife disc (221), a knife seat (222) rotatably connected to the knife disc (221), a driving motor (223) for driving the knife disc (221) to rotate, and a knife seat pushing member (224) for driving the knife seat (222) to rise and fall; The cutting frame (21) is provided with a knife feed slot (212) at the cutting station for the knife disc (221) to extend out.
6. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 5, Features: The cutting clamping assembly (23) comprises a first fixed clamping block (231) and a first movable clamping block (232) which are arranged on the upper side of the cutting frame (21); the first fixed clamping block (231) is installed on a side of the cutting frame (21) close to the material preparation rack (1); and a first clamping block driving member (234) for driving the first movable clamping block (232) close to the first fixed clamping block (231) is provided on the upper side of the cutting frame (21) close to the grinding device (3).
7. The integrated equipment for cutting, flattening and chamfering pipe fittings according to claim 1, Features: The cutting device (2) further comprises an adjusting mechanism (24) for adjusting the distance between the two cutting frames (21); The adjustment mechanism (24) comprises a sliding track (241) provided below the cutting device (2) for the two cutting frames (21) to slide, an adjustment screw (242) and two connecting blocks (243); the two connecting blocks (243) are arranged on the adjustment screw (242) at intervals and are both threadedly connected to the adjustment screw (242); the two connecting blocks (243) are correspondingly fixedly connected to the outer wall of the two cutting frames (21) on one side close to the material preparation rack (1).
8. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 1, Features: The grinding assembly (32) comprises a grinding tool seat (321) rotatably connected to the grinding machine frame (31), and an end face grinding head (322), an outer angle grinding head (323) and an inner angle grinding head (324) fixedly connected to the grinding tool seat (321); the grinding machine frame (31) is provided with a grinding pusher (336) for driving the grinding assembly (32) to approach the end of the pipe fitting.
9. The integrated equipment for cutting flat head and chamfering pipe fittings according to claim 8, Features: The grinding machine frame (31) is provided with a second fixed clamping block (331) and a second movable clamping block (332) at the grinding station (311); the second fixed clamping block (331) and the second movable clamping block (332) are respectively located at the upper and lower sides of the grinding station (311); the second fixed clamping block (331) is fixedly connected to the mounting base (34); and the grinding machine frame (31) is provided with a second clamping block driving component (334) for driving the second movable clamping block (332) to approach the second fixed clamping block (331).
10. The integrated equipment for cutting, flattening and chamfering pipe fittings according to claim 1, Features: The unloading rack (5) comprises a support seat (51) for supporting on the ground and an arc-surface supporting plate (52) arranged on the support seat (51) and used for receiving the pipe fittings. The support seat (51) is provided with a soft receiving belt (53) for buffering above the arc-surface supporting plate (52).
Citation Information
Patent Citations
Automatic blanking and chamfering integrated equipment for gas spring outer sleeve
CN112008413A
Automatic steel pipe machining production line
CN115255943A
Multifunctional pipe machining device
CN116652616A
Feeding equipment of metal bar peeling machine
CN209078354U
Glasses frame polishing equipment
CN214926726U
Cited By
Part cutting device for new energy automobile shell manufacturing
CN121223262A