Energy-saving ash conveying method of pilot-operated type ash conveying system

By combining ash transmission pipelines and intelligent management and control platforms, the operation of the air compressor is optimized, and the ash transmission between one and two electric fields is realized, which solves the problems of high investment, large energy consumption and pollution in traditional ash transmission processes, and improves the ash transmission efficiency and safety.

CN118954081APending Publication Date: 2024-11-15HUADIAN ZIBO THERMAL POWER

Patent Information

Application Number
CN202411298702.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the traditional positive pressure concentrated phase pneumatic ash transfer process, two independent ash transfer pipelines are used for ash transfer in one and two electric fields, resulting in high investment, high energy consumption, increased daily maintenance and maintenance work, and easy leakage and polluting the environment.

Method used

Combine the ash transmission pipelines of one and two electric fields of electrical dust removal into one pipeline, optimize the operation of the air compressor through the intelligent control platform, realize the ash transmission between the one and two electric fields, set up multiple sets of trigger signals for early warning and equipment adjustment, and optimize the ash transmission efficiency and energy consumption.

Benefits of technology

Reduced investment in steel ash warehouse construction, reduced daily maintenance workload, improved maintenance efficiency, reduced leakage points, reduced environmental pollution, optimized air compressor utilization, and reduced resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure QLYQS_1
    Figure QLYQS_1
  • Figure QLYQS_2
    Figure QLYQS_2
Patent Text Reader

Abstract

The invention discloses an energy-saving ash conveying method for a pilot-operated type ash conveying system, and relates to the technical field of energy conservation and environmental protection of thermal power generating units. S2, gas saving rate calculation and ash conveying curve drawing; s3, controlling and optimizing the air compressor; s4, setting an early warning trigger mechanism; and S5, the overall ash conveying step is completed, and the ash conveying efficiency is verified. In the invention, the ash conveying pipelines of the first and second electric fields of the electric precipitator are combined into one pipeline to be conveyed to the steel ash silo, and the first and second electric fields are controlled to convey ash at intervals through a program, so that the two electric fields share one ash conveying pipeline for long-distance ash conveying on the premise of ensuring the ash conveying safety of the first and second electric fields of the electric precipitator, and the construction investment of the steel ash silo is effectively reduced; and meanwhile, the daily overhaul and maintenance workload and energy consumption are reduced, the overhaul work efficiency is improved, leakage points can be effectively reduced when the pipeline is used, and pollution to the surrounding environment when the ash conveying system is used is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of energy conservation and environmental protection of thermal power units, and in particular to an energy-saving ash conveying method of a pilot ash conveying system. Background Art

[0002] The steel silos supporting large-scale coal-fired power generation units are generally arranged around the plant area, which is far away from the original concrete ash storage. Some are even several kilometers away. The ash transport volume of the first and second electric fields of the electrostatic precipitator is large (the first electric field accounts for 80% of the total ash transport volume, and the second electric field accounts for 16% of the total ash transport volume). Due to the low ash transport efficiency and insufficient long-distance ash transport capacity of the traditional positive pressure dense phase pneumatic ash transport process, usually the first and second electric fields are arranged with independent ash conveying pipelines to transport ash separately without affecting each other.

[0003] In the existing positive-pressure dense-phase pneumatic ash conveying process, independent ash conveying pipelines must be set up for the first and second electric fields. Otherwise, frequent pipe blockages will occur due to insufficient ash conveying capacity. However, when two ash conveying pipelines are used for ash conveying in the first and second electric fields respectively, the investment is large, the energy consumption is high, the workload of daily inspection and maintenance is increased, and the leakage points of the pipelines increase when in use, which is easy to pollute the surrounding environment. Summary of the invention

[0004] The purpose of the present invention is to provide an energy-saving ash conveying method for a pilot ash conveying system to solve the problem that when the two ash conveying pipelines proposed in the above background technology are used for conveying ash to one or two electric fields respectively, the investment is large, the energy consumption is high, the workload of daily inspection and maintenance is increased, and the leakage points of the pipelines increase when in use, which easily pollutes the surrounding environment.

[0005] To achieve the above object, the present invention provides the following technical solution: an energy-saving ash conveying method for a pilot ash conveying system, comprising the following contents: S1. Pipeline laying and data acquisition: construct the basic ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add ash conveying pipelines and pneumatic valves from the second electric field to the first electric field, merge the ash conveying pipelines for the first and second electric fields into one pipeline to transport them to the steel ash storage, obtain the operating data of the unit boiler and coal mill, and predict the ash conveying volume based on the data; S2, calculation of gas-saving rate and drawing of ash conveying curve: according to the data obtained in S1, the equipment parameters are adjusted to obtain the actual ash conveying amount and gas consumption, the ash conveying curve is drawn according to the ash conveying amount, and the gas-saving rate is calculated according to the gas consumption; S3. Control and optimization of air compressors: Build an intelligent management and control platform, establish a connection between the platform and the air compressor, control the start and stop of the air compressor and adjust the operating pressure, ensure the daily operation and maintenance of the air compressor, and optimize the processing according to the use status of the air compressor; S4. Set up early warning trigger mechanism: set up multiple groups of trigger signals and define trigger thresholds. When the operation data of the equipment exceeds the threshold, the ash conveying system sends an early warning signal to the control terminal for rapid early warning. The control terminal adjusts the equipment in time according to the different information corresponding to the early warning. S5. Improve the overall ash conveying steps and verify the ash conveying efficiency: After S3 optimization, ensure the normal operation of the ash conveying system. Under the premise that no early warning is triggered, calculate the number of conveying times per hour in the first and second electric fields, and the single ash conveying time at the maximum ash volume.

[0006] Preferably, in step S1, when adding the first and second electric field ash conveying pipelines for the electrostatic precipitator, a pneumatic communication door for the first and second electric field ash conveying pipelines is added in the pneumatic ash conveying PLC control logic, and the alternating ash conveying of the first and second electric fields can be realized through interlocking control.

[0007] Preferably, in step S2, when calculating the energy saving rate, the relevant expression is as follows: ; Where L1 is the gas consumption before adjustment, and L2 is the gas consumption after adjustment.

[0008] Preferably, in step S2, when calculating the ash delivery amount, the relevant expression is as follows: ; In the formula, V is the volume of a single silo pump, m1 is the number of silo pumps, is the bulk density, is the filling coefficient of the silo pump, and m2 is the number of deliveries per unit time.

[0009] Preferably, in step S2, when optimizing the air compressor, the following contents are also included: S21. Data monitoring and analysis: Install a flow meter on the main air intake pipe to measure the gas consumption of the ash conveying system, obtain the ash conveying gas consumption within a specified time period, and analyze the conveying capacity of the system; S22, data adjustment and update: gradually reduce the interlocking pressure of electrostatic precipitator ash conveying, reduce the operating pressure of ash conveying compressed air main pipe, increase the ash-to-gas ratio, and synchronize the adjusted interlocking pressure and ash-to-gas ratio to the control terminal in time; S23, data comparison and backup: calculate the air compressor loading current before and after the data adjustment, obtain the power consumption data before and after the air compressor data adjustment, compare the obtained data, calculate the difference, and then back up the data to the local database.

[0010] Preferably, in step S22, the adjustment range of the ash conveying interlocking pressure is 0.56-0.49 MPa.

[0011] Preferably, in step S4, the multiple groups of trigger signals further include: S41, valve leakage: when the ash hopper height is higher than 2m, and the ash conveying time is greater than the specified time and is 3 cycles, the sensor detects an abnormality and generates a corresponding trigger signal to trigger a leakage warning of the ash conveying system. The control terminal reminds the operator to check whether there is leakage in the ash conveying valve; S42, excessive pressure: when the pressure of the gas storage tank is less than the lower threshold, the system automatically starts the standby air compressor. When the pressure of the gas storage tank is greater than the upper threshold and maintains for a certain period of time, the pressure warning of the ash conveying system is triggered. The system sends a signal to the control terminal and automatically stops the current air compressor. S43, material discharge temperature: When the material level of a single ash hopper is significantly higher than that of other ash hoppers, and the temperature of a single silo pump is lower than that of other silo pumps during material discharge, the temperature of the material discharge port fluctuates significantly during the transportation process, triggering the system's temperature warning. The control terminal reminds the operating personnel to check the ash hopper and silo pump in time.

[0012] Preferably, in step S41, when the material level of the ash hopper reaches 2m, the ash conveying system automatically starts, and when the material level of the ash hopper is lower than 0.7m, the ash conveying system sends an early warning signal to the control terminal, and the ash conveying system stops conveying ash.

[0013] Preferably, in step S42, the pressure threshold range of the gas storage tank is 0.46-0.5 MPa.

[0014] Compared with the prior art, the present invention has the following beneficial effects: In the present invention, the ash conveying pipelines of the first and second electric fields of the electrostatic precipitator are combined into one pipeline to be conveyed to the steel ash silo, and the interval ash conveying of the first and second electric fields is controlled by a program. Under the premise of ensuring the safety of ash conveying of the first and second electric fields of the electrostatic precipitator, the two electric fields share one ash conveying pipeline for long-distance ash conveying, which effectively reduces the investment in the construction of the steel ash silo, reduces the workload and energy consumption of daily inspection and maintenance, improves the efficiency of inspection and maintenance work, and can effectively reduce the leakage points when the pipeline is used, and reduces the pollution of the surrounding environment when the ash conveying system is used; The calculation of air-saving rate and ash conveying volume can provide a data basis for the parameter adjustment of the air compressor, thereby assisting the intelligent management and control platform to effectively adjust the air compressor, optimize the utilization rate of the air compressor, realize precise control of compressed air, improve the ash-to-gas ratio, reduce the excess of compressed air, reduce resource waste, and also adjust the number of air compressors actually used in real time to reduce energy consumption; multiple groups of trigger signals can be set by valve leakage, excessive pressure and blanking temperature. When the operating data exceeds the threshold, the ash conveying system can alarm the control terminal, and adjust the working status of the equipment in time through the control terminal, thereby ensuring the safe use of the entire ash conveying system. DETAILED DESCRIPTION

[0015] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0016] Embodiment 1: This embodiment provides an energy-saving ash conveying method for a pilot ash conveying system, including the following contents: Step 1: Pipeline laying and data acquisition: Construct the basic ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add ash conveying pipelines and pneumatic valves from the second electric field to the first electric field, merge the ash conveying pipelines for the first and second electric fields into one pipeline and transport them to the steel ash storage, obtain the operating data of the unit boiler and coal mill, predict the ash conveying volume based on the data, and when adding ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add pneumatic communication gates for the ash conveying pipelines for the first and second electric fields in the pneumatic ash conveying PLC control logic, and through interlocking control, alternating ash conveying between the first and second electric fields can be achieved.

[0017] Step 2: Calculate the air-saving rate and draw the ash delivery curve: According to the data obtained in S1, adjust the equipment parameters, obtain the actual ash delivery amount and gas consumption, draw the ash delivery curve according to the ash delivery amount, and calculate the air-saving rate according to the gas consumption; When calculating the solar term rate, the relevant expression is as follows: ; In the formula, L1 is the gas consumption before adjustment, and L2 is the gas consumption after adjustment; When calculating the ash delivery amount, the relevant expression is as follows: ; In the formula, V is the volume of a single silo pump, m1 is the number of silo pumps, is the bulk density, is the filling coefficient of the silo pump, m2 is the number of deliveries per unit time; When optimizing the air compressor, the following contents are also included: 21. Data monitoring and analysis: Install a flow meter on the main air intake pipe to measure the gas consumption of the ash conveying system, obtain the ash conveying gas consumption within a specified time period, and analyze the conveying capacity of the system; 22. Data adjustment and update: gradually reduce the interlocking pressure of electrostatic precipitator ash conveying, reduce the operating pressure of ash conveying compressed air main pipe, increase the ash-gas ratio, and synchronize the adjusted interlocking pressure and ash-gas ratio to the control terminal in time. The ash conveying interlocking pressure is 0.52MPa; 23. Data comparison and backup: Calculate the air compressor loading current before and after data adjustment, obtain the power consumption data before and after the air compressor data adjustment, compare the obtained data, calculate the difference, and then back up the data to the local database.

[0018] Step 3: Control and optimization of air compressors: Build an intelligent management and control platform, establish a connection between the platform and the air compressor, control the start and stop of the air compressor and adjust the operating pressure, ensure the daily operation and maintenance of the air compressor, and optimize the processing according to the use status of the air compressor; Step 4: Set up the early warning trigger mechanism: set up multiple groups of trigger signals and define the trigger threshold. When the operating data of the equipment exceeds the threshold, the ash conveying system sends an early warning signal to the control terminal for rapid early warning. The control terminal adjusts the equipment in time according to the different information corresponding to the early warning. Multiple groups of trigger signals also include: 41. Valve leakage: When the height of the ash hopper is higher than 2m, and the ash conveying time is greater than the specified time and is 3 cycles, the sensor detects an abnormality and generates a corresponding trigger signal to trigger a leakage warning of the ash conveying system. The control terminal reminds the operator to check whether there is a leakage in the ash conveying valve. When the material level of the ash hopper reaches 2m, the ash conveying system automatically starts. When the material level of the ash hopper is lower than 0.7m, the ash conveying system sends a warning signal to the control terminal and stops conveying ash. 42. Excessive pressure: When the pressure of the gas tank is less than the threshold, the system automatically starts the standby air compressor. When the pressure of the gas tank is greater than the threshold and maintains for a certain period of time, the pressure warning of the ash conveying system is triggered. The system sends a signal to the control terminal and automatically stops the current air compressor. The pressure threshold of the gas tank is 0.5MPa. 43. Material discharge temperature: When the material level of a single ash hopper is significantly higher than that of other ash hoppers, and the temperature of a single silo pump is lower than that of other silo pumps during material discharge, the temperature of the material discharge port will fluctuate significantly during the transportation process, triggering the system's temperature warning. The control terminal will remind the operating personnel to check the ash hopper and silo pump in time.

[0019] Step 5. Improve the overall ash conveying steps and verify the ash conveying efficiency: After optimization in step 3, ensure the normal operation of the ash conveying system. Under the premise that no early warning is triggered, calculate the number of conveying times per hour in the first and second electric fields, and the single ash conveying time at the maximum ash volume.

[0020] In this example, the ash conveying interlocking pressure is adjusted to 0.52MPa. The designed coal consumption of the 330MW coal-fired unit is 155t / h, the coal ash content is 31.52%, and the ash-slag ratio is 9:1. Under the BMCR working condition, the unit produces about 44t / h of ash. The first electric field processes 80% of the capacity, about 35.2t / h, and the second electric field processes 16% of the capacity, about 7t / h. By using the pilot ash conveying method, full-silo pump ash conveying can be achieved. Four silo pumps are arranged in the first and second electric fields respectively, and the effective volume of each silo pump is 2.5m³. Therefore, the single ash conveying capacity of the first and second electric fields is 6t. Therefore, the first electric field can meet the requirements by conveying 6 times per hour, and the second electric field can meet the ash conveying requirements by conveying 2 times. After the pneumatic ash removal is switched to the steel ash storage, the conveying distance increases, and the single ash conveying time is about 5min. Therefore, under the condition of the maximum designed ash discharge capacity, the ash conveying time per hour for the first and second electric fields is only 40min.

[0021] Embodiment 2: This embodiment provides an energy-saving ash conveying method for a pilot ash conveying system, including the following contents: Step 1: Pipeline laying and data acquisition: Construct the basic ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add ash conveying pipelines and pneumatic valves from the second electric field to the first electric field, merge the ash conveying pipelines for the first and second electric fields into one pipeline and transport them to the steel ash storage, obtain the operating data of the unit boiler and coal mill, predict the ash conveying volume based on the data, and when adding ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add pneumatic communication gates for the ash conveying pipelines for the first and second electric fields in the pneumatic ash conveying PLC control logic, and through interlocking control, alternating ash conveying between the first and second electric fields can be achieved.

[0022] Step 2: Calculate the air-saving rate and draw the ash delivery curve: According to the data obtained in S1, adjust the equipment parameters, obtain the actual ash delivery amount and gas consumption, draw the ash delivery curve according to the ash delivery amount, and calculate the air-saving rate according to the gas consumption; When calculating the solar term rate, the relevant expression is as follows: ; In the formula, L1 is the gas consumption before adjustment, and L2 is the gas consumption after adjustment; When calculating the ash delivery amount, the relevant expression is as follows: ; In the formula, V is the volume of a single silo pump, m1 is the number of silo pumps, is the bulk density, is the filling coefficient of the silo pump, m2 is the number of deliveries per unit time; When optimizing the air compressor, the following contents are also included: 21. Data monitoring and analysis: Install a flow meter on the main air intake pipe to measure the gas consumption of the ash conveying system, obtain the ash conveying gas consumption within a specified time period, and analyze the conveying capacity of the system; 22. Data adjustment and update: gradually reduce the interlocking pressure of electrostatic precipitator ash conveying, reduce the operating pressure of ash conveying compressed air main pipe, increase the ash-gas ratio, and synchronize the adjusted interlocking pressure and ash-gas ratio to the control terminal in time. The ash conveying interlocking pressure is 0.50MPa; 23. Data comparison and backup: Calculate the air compressor loading current before and after data adjustment, obtain the power consumption data before and after the air compressor data adjustment, compare the obtained data, calculate the difference, and then back up the data to the local database.

[0023] Step 3: Control and optimization of air compressors: Build an intelligent management and control platform, establish a connection between the platform and the air compressor, control the start and stop of the air compressor and adjust the operating pressure, ensure the daily operation and maintenance of the air compressor, and optimize the processing according to the use status of the air compressor; Step 4: Set up the early warning trigger mechanism: set up multiple groups of trigger signals and define the trigger threshold. When the operating data of the equipment exceeds the threshold, the ash conveying system sends an early warning signal to the control terminal for rapid early warning. The control terminal adjusts the equipment in time according to the different information corresponding to the early warning. Multiple groups of trigger signals also include: 41. Valve leakage: When the height of the ash hopper is higher than 2m, and the ash conveying time is greater than the specified time and is 3 cycles, the sensor detects an abnormality and generates a corresponding trigger signal to trigger a leakage warning of the ash conveying system. The control terminal reminds the operator to check whether there is a leakage in the ash conveying valve. When the material level of the ash hopper reaches 2m, the ash conveying system automatically starts. When the material level of the ash hopper is lower than 0.7m, the ash conveying system sends a warning signal to the control terminal and stops conveying ash. 42. Excessive pressure: When the pressure of the gas tank is less than the threshold, the system automatically starts the standby air compressor. When the pressure of the gas tank is greater than the threshold and maintains for a certain period of time, the pressure warning of the ash conveying system is triggered. The system sends a signal to the control terminal and automatically stops the current air compressor. The pressure threshold range of the gas tank is 0.46MPa. 43. Material discharge temperature: When the material level of a single ash hopper is significantly higher than that of other ash hoppers, and the temperature of a single silo pump is lower than that of other silo pumps during material discharge, the temperature of the material discharge port will fluctuate significantly during the transportation process, triggering the system's temperature warning. The control terminal will remind the operating personnel to check the ash hopper and silo pump in time.

[0024] Step 5. Improve the overall ash conveying steps and verify the ash conveying efficiency: After optimization in step 3, ensure the normal operation of the ash conveying system. Under the premise that no early warning is triggered, calculate the number of conveying times per hour in the first and second electric fields, and the single ash conveying time at the maximum ash volume.

[0025] In this example, the loading and unloading pressure ranges of the ash handling air compressor are adjusted, and the ash conveying compressed air pressure is adjusted to 0.50 MPa. After the ash conveying interlocking pressure value is reduced, the average operating pressure of the ash conveying compressed air mother pipe is reduced to 0.50 MPa, which is 0.10 MPa lower than the average operating pressure of 0.60 MPa before the pressure reduction. The operating current of the ash handling air compressor is reduced by 1.2 A, and the dust removal and ash conveying power consumption rate is reduced from 0.08% before the adjustment to 0.062.

[0026] In the present invention, the ash conveying pipelines of the first and second electric fields of the electrostatic precipitator are merged into one pipeline and conveyed to the steel ash warehouse, and the interval ash conveying of the first and second electric fields is controlled by a program. Under the premise of ensuring the safety of ash conveying of the first and second electric fields of the electrostatic precipitator, the two electric fields share one ash conveying pipeline for long-distance ash conveying, which effectively reduces the investment in the construction of the steel ash warehouse, and at the same time reduces the workload of daily inspection and maintenance, and improves the efficiency of inspection and maintenance work; the calculation of the air saving rate and the ash conveying amount can provide a data basis for the parameter adjustment of the air compressor, thereby assisting the intelligent management and control platform to effectively adjust the air compressor, optimize the utilization rate of the air compressor, realize the precise control of compressed air, improve the ash-to-gas ratio, reduce the excess of compressed air, reduce resource waste, and also can adjust the number of air compressors actually used in real time to reduce energy consumption; multiple groups of trigger signals are set by valve leakage, excessive pressure and blanking temperature. When the operating data exceeds the threshold, the trigger signal can alarm the control terminal through the ash conveying system, and the working state of the equipment is adjusted in time through the control terminal, thereby ensuring the safety of the entire ash conveying system.

[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An energy-saving ash conveying method for a pilot ash conveying system, characterized in that: Includes the following: S1. Pipeline laying and data acquisition: construct the basic ash conveying pipelines for the first and second electric fields of the electrostatic precipitator, add ash conveying pipelines and pneumatic valves from the second electric field to the first electric field, merge the ash conveying pipelines for the first and second electric fields into one pipeline to transport them to the steel ash storage, obtain the operating data of the unit boiler and coal mill, and predict the ash conveying volume based on the data; S2, calculation of gas-saving rate and drawing of ash conveying curve: according to the data obtained in S1, the equipment parameters are adjusted to obtain the actual ash conveying amount and gas consumption, the ash conveying curve is drawn according to the ash conveying amount, and the gas-saving rate is calculated according to the gas consumption; S3. Control and optimization of air compressors: Build an intelligent management and control platform, establish a connection between the platform and the air compressor, control the start and stop of the air compressor and adjust the operating pressure, ensure the daily operation and maintenance of the air compressor, and optimize the processing according to the use status of the air compressor; S4. Set up early warning trigger mechanism: set up multiple groups of trigger signals and define trigger thresholds. When the operation data of the equipment exceeds the threshold, the ash conveying system sends an early warning signal to the control terminal for rapid early warning. The control terminal adjusts the equipment in time according to the different information corresponding to the early warning. S5. Improve the overall ash conveying steps and verify the ash conveying efficiency: After S3 optimization, ensure the normal operation of the ash conveying system. Under the premise that no early warning is triggered, calculate the number of conveying times per hour in the first and second electric fields, and the single ash conveying time at the maximum ash volume.

2. The energy-saving ash conveying method of the pilot ash conveying system according to claim 1 is characterized in that: In step S1, when adding the first and second electric field ash conveying pipelines for the electrostatic precipitator, a pneumatic communication door for the first and second electric field ash conveying pipelines is added in the pneumatic ash conveying PLC control logic, and the alternating ash conveying of the first and second electric fields can be realized through interlocking control.

3. The energy-saving ash conveying method of a pilot ash conveying system according to claim 1 is characterized in that: In step S2, when calculating the energy saving rate, the relevant expression is as follows: ; Where L1 is the gas consumption before adjustment, and L2 is the gas consumption after adjustment.

4. The energy-saving ash conveying method of a pilot ash conveying system according to claim 1 is characterized in that: In step S2, when calculating the ash delivery amount, the relevant expression is as follows: ; In the formula, V is the volume of a single silo pump, m1 is the number of silo pumps, is the bulk density, is the filling coefficient of the silo pump, and m2 is the number of deliveries per unit time.

5. The energy-saving ash conveying method of a pilot ash conveying system according to claim 1 is characterized in that: In step S2, when optimizing the air compressor, the following contents are also included: S21. Data monitoring and analysis: Install a flow meter on the main air intake pipe to measure the gas consumption of the ash conveying system, obtain the ash conveying gas consumption within a specified time period, and analyze the conveying capacity of the system; S22, data adjustment and update: gradually reduce the interlocking pressure of electrostatic precipitator ash conveying, reduce the operating pressure of ash conveying compressed air main pipe, increase the ash-to-gas ratio, and synchronize the adjusted interlocking pressure and ash-to-gas ratio to the control terminal in time; S23, data comparison and backup: calculate the air compressor loading current before and after the data adjustment, obtain the power consumption data before and after the air compressor data adjustment, compare the obtained data, calculate the difference, and then back up the data to the local database.

6. The energy-saving ash conveying method of the pilot ash conveying system according to claim 5 is characterized in that: In step S22, the adjustment range of the ash conveying interlocking pressure is 0.56-0.49 MPa.

7. The energy-saving ash conveying method of a pilot ash conveying system according to claim 1 is characterized in that: In step S4, the multiple groups of trigger signals also include: S41, valve leakage: when the ash hopper height is higher than 2m, and the ash conveying time is greater than the specified time and is 3 cycles, the sensor detects an abnormality and generates a corresponding trigger signal to trigger a leakage warning of the ash conveying system. The control terminal reminds the operator to check whether there is leakage in the ash conveying valve; S42, excessive pressure: when the pressure of the gas storage tank is less than the lower threshold, the system automatically starts the standby air compressor. When the pressure of the gas storage tank is greater than the upper threshold and maintains for a certain period of time, the pressure warning of the ash conveying system is triggered. The system sends a signal to the control terminal and automatically stops the current air compressor. S43, material discharge temperature: When the material level of a single ash hopper is significantly higher than that of other ash hoppers, and the temperature of a single silo pump is lower than that of other silo pumps during material discharge, the temperature of the material discharge port fluctuates significantly during the transportation process, triggering the system's temperature warning. The control terminal reminds the operating personnel to check the ash hopper and silo pump in time.

8. The energy-saving ash conveying method of a pilot ash conveying system according to claim 7, characterized in that: In step S41, when the material level of the ash hopper reaches 2m, the ash conveying system automatically starts, and when the material level of the ash hopper is lower than 0.7m, the ash conveying system sends an early warning signal to the control terminal, and the ash conveying system stops conveying ash.

9. The energy-saving ash conveying method of a pilot ash conveying system according to claim 7, characterized in that: In step S42, the pressure threshold range of the gas storage tank is 0.46-0.5 MPa.

Citation Information

Patent Citations

  • Boiler dry ash handling system ash conveying programmed control system

    CN110104441A

  • Pneumatic ash removal and blockage removal method

    CN113060556A

  • Thermal power generating unit ash conveying energy-saving optimization method and system

    CN114647190A

  • PLC (Programmable Logic Controller) monitoring system for gas-making pneumatic ash conveying production line

    CN118289493A

  • Ash-conveying capacity expansion device adapting to coal-fired power plant mass ash

    CN202481759U

Cited By

  • Power plant ash conveying control optimization system

    CN120143700A

  • Intelligent decision-making method, system and device for pneumatic conveying system

    CN120406345A