Large-flow and large-span aqueduct suspended splicing steel arch
By using connecting ends, limit blocks and moving components in the aqueduct suspended steel arch frame, the rapid installation of arch ribs and piers is solved, and the problem of long construction cycle in the existing technology is improved, and construction efficiency and support effect are improved.
Patent Information
- Application Number
- CN202411372224.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-15
AI Technical Summary
During the construction of existing aqueducts, prefabricated racks can only be assembled after the reinforced concrete structure is cured and formed, resulting in a long construction period.
Using a large flow and large span aqueduct suspended steel arch frame, the connecting ends, limit blocks and moving components are set between the arch ribs and the piers, the rapid installation and fixation of the arch ribs and the piers is achieved, and the reinforced concrete is avoided to be formed. .
The construction cycle is shortened, the construction efficiency is improved, and the pressure bearing surface of the support pier is expanded through the clamping of the limit block and the limit groove to enhance the support effect.
Smart Images

Figure CN118958116A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of aqueduct construction, and in particular to a suspended steel arch frame for a large-flow and large-span aqueduct. Background Art
[0002] An aqueduct is an overhead water channel that transports channel water across rivers, valleys, depressions and roads. During the construction of prefabricated aqueducts, arches are usually required to support them.
[0003] In the related art, a Chinese patent document with publication number CN115748603A discloses an assembled arch aqueduct structure and a construction method thereof, wherein the assembled arch aqueduct structure includes a support structure and a trough body structure; the support structure includes a left pier, a right pier, a left arch rib, a right arch rib and a plurality of frame columns; the tops of the left pier and the right pier are respectively provided with a first support and a second support; the frame columns are arranged on the first support, the second support, the right arch rib and the left arch rib, and the trough body structure is arranged on a plurality of frame columns. During construction, the left pier and the right pier are first installed, and then the left arch rib and the right arch rib are hoisted and connected, and then the reinforced concrete structure is constructed at the connection position between the left arch rib and the first support, the connection position between the left arch rib and the right arch rib, and the connection position between the right arch rib and the second support. After the reinforced concrete structure is cured and formed, the assembly construction of the prefabricated frame columns is carried out.
[0004] With regard to the above-mentioned related technologies, after the reinforced concrete structure is constructed at the connection between the left arch rib and the first support, the connection between the left arch rib and the right arch rib, and the connection between the right arch rib and the second support, it is necessary to wait for a certain period of time before the assembly of the prefabricated frame can be carried out after the reinforced concrete structure is cured and formed, resulting in a long construction period. Summary of the invention
[0005] In order to help shorten the construction period, the present application provides a large-flow, large-span aqueduct suspended steel arch frame.
[0006] The application provides a large flow and large span aqueduct suspended steel arch frame adopts the following technical solution: A suspended steel arch frame for a large-flow and large-span aqueduct comprises two piers and two arch ribs arranged opposite to each other, wherein the two arch ribs are spliced between the two piers, a connecting end is arranged at one end of the arch rib close to the pier, a connecting groove for plugging and cooperating with the connecting end is provided on the pier, a limit block is slidably penetrated through the side wall of the connecting end, a limit groove for snap-fitting with the limit block is provided on the side wall of the connecting groove, a moving component is provided at the connecting end, and the moving component is used to adjust the limit block to slide in a direction close to or away from the connecting end, a splicing end is arranged at the end of the arch rib away from the pier, a fixing piece is provided between the splicing ends on the two arch ribs, and the fixing piece is used to relatively fix the splicing ends on the two arch ribs.
[0007] Preferably, the moving assembly includes a spring arranged in the connecting end, an adjusting block slidably arranged in the connecting end, an adjusting rope arranged on the limit block and an adjusting member arranged on the connecting end, the spring is used to pull the limit block to move in a direction away from the connecting end, one end of the adjusting rope away from the limit block is arranged on the adjusting block, the adjusting rope is used to pull the limit block to move in a direction close to the connecting end, and the adjusting member is used to drive the adjusting block to move in a direction close to or away from the limit block.
[0008] Preferably, the adjusting member comprises a screw rod rotatably inserted into the connecting end, the rotation axis of the screw rod is parallel to the sliding direction of the adjusting block, and the adjusting block is threadably sleeved on the screw rod.
[0009] Preferably, an operating rod is coaxially connected to one side of the screw rod outside the connecting end, and the cross-section of the operating rod is polygonal.
[0010] Preferably, when the limiting block is engaged with the limiting groove, one end of the limiting block away from the limiting groove abuts against the side wall of the adjusting block.
[0011] Preferably, a plurality of the limit blocks are arranged at intervals along the circumferential direction of the connection end, the limit grooves correspond to the limit blocks one-to-one, the springs correspond to the limit blocks one-to-one, and the adjustment block is located between the plurality of limit blocks.
[0012] Preferably, the limiting block is provided with a containing bag along its circumference, the containing bag is filled with stirred concrete slurry, and the inner wall of the limiting groove is provided with an opening piece for opening the containing bag.
[0013] Preferably, the opening member comprises a plurality of pins arranged on the inner wall of the limiting groove, and the pins are used to abut against the outer wall of the limiting block.
[0014] Preferably, the fixing member comprises a plurality of tightening screws, wherein the tightening screws are passed through two splicing ends, and both ends of the tightening screws are threadedly connected with locking nuts, and the locking nuts are used to abut against the splicing end on the corresponding side.
[0015] Preferably, the arch ribs are all steel arch ribs.
[0016] In summary, this application includes the following beneficial technical effects: After installing the two piers to the required positions, the two arch ribs are hoisted by using external equipment, and then the connecting ends of the two arch ribs are moved into the connecting grooves of the corresponding side piers in turn, so that the limit blocks are aligned with the corresponding limit grooves, and then the limit blocks are adjusted by moving the components to slide in the direction away from the connecting ends until the limit blocks are engaged with the corresponding limit grooves, thereby completing the installation of the arch ribs and the piers; then the splicing ends of the two arch ribs are abutted, and the splicing ends on the two arch ribs are relatively fixed by fixing parts, so that the two arch ribs are assembled and fixed; then the construction frame columns can be assembled on the piers and arch ribs, without spending a long time waiting for the reinforced concrete structure to be cured and formed, which helps to shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0018] Figure 2 It is a schematic diagram of the overall structure of the connection part of two arch ribs in the embodiment of the present application.
[0019] Figure 3 It is a cross-sectional view of the overall structure of the connecting end in the embodiment of the present application.
[0020] Figure 4 It is a cross-sectional view of the overall structure of the pier in the embodiment of the present application.
[0021] Explanation of the reference numerals in the accompanying drawings: 1. Pier; 2. Arch rib; 3. Connecting end; 4. Connecting groove; 5. Limit block; 6. Limit groove; 7. Splicing end; 9. Spring; 10. Adjusting block; 11. Adjusting rope; 12. Screw; 13. Receiving bag; 14. Poking needle; 15. Operating lever; 16. Tension screw; 17. Locking nut; 18. Slide; 19. Support block; 20. Support groove; 21. Adjusting groove. DETAILED DESCRIPTION
[0022] The following is combined with Figure 1-4 This application is described in further detail.
[0023] The embodiment of the present application discloses a large flow and large span aqueduct cantilever steel arch frame. Figure 1 The suspended steel arch frame of the large-flow and large-span aqueduct includes a buttress 1 and an arch rib 2. The buttress 1 and the arch rib 2 are arranged oppositely. The two arch ribs 2 are spliced between the two buttresses 1. The ends of the two arch ribs 2 that are far away from each other are used to connect with the adjacent buttress 1 to support the aqueduct structure. The arch frame has good strength and pressure-bearing performance and can be applied to the aqueduct structure with large flow and large span. Specifically, the arch ribs 2 are all steel arch ribs 2, which are made of steel and are light in weight and easy to hoist.
[0024] Reference Figure 1 and Figure 2The end of the arch rib 2 away from the pier 1 is integrally formed with a splicing end 7. When the two arch ribs 2 are spliced, the two splicing ends 7 are abutted up and down; a fixing piece is provided between the splicing ends 7 of the two arch ribs 2, and the fixing piece is used to relatively fix the splicing ends 7 of the two arch ribs 2.
[0025] Reference Figure 1 and Figure 3 The end of the arch rib 2 close to the corresponding side pier 1 is integrally formed with a connecting end 3, the connecting end 3 is concave, and the opening of the connecting end 3 is arranged toward the arch rib 2, and a connecting groove 4 for plugging and cooperating with the connecting end 3 is provided on the pier 1, and the cross-section of the connecting end 3 away from the arch rib 2 is square, and a limit block 5 is slidably penetrated through the side wall of the connecting end 3, the cross-section of the limit block 5 is square, and the sliding direction of the limit block 5 is perpendicular to the extension direction of the connecting end 3, and a slideway 18 for sliding cooperation with the limit block 5 is provided on the connecting end 3, and a plurality of limit blocks 5 are arranged at intervals along the circumference of the connecting end 3, which helps to improve the connection effect and strength between the arch rib 2 and the pier 1; in the embodiment of the present application, four limit blocks 5 are provided, and the four limit blocks 5 are located on the four sides of the connecting end 3.
[0026] Reference Figure 3 and Figure 4 The side wall of the connecting groove 4 is provided with a limiting groove 6 for engaging with the limiting block 5, and the limiting groove 6 corresponds to the limiting block 5 one by one. A moving component is arranged in the connecting end 3, and the moving component is used to adjust the limiting block 5 to slide toward or away from the connecting end 3.
[0027] When assembly is required, the two piers 1 are installed to the required positions, and then the two arch ribs 2 are hoisted separately by using an external crane, and the arch rib 2 with the splicing end 7 at the bottom is first moved toward the corresponding pier 1, so that the connecting end 3 of the corresponding arch rib 2 is moved into the connecting groove 4 close to one side pier 1, and the limit block 5 is aligned with the corresponding limit groove 6, and then the limit block 5 is adjusted by the moving component to slide in the direction away from the connecting end 3 until the limit block 5 is engaged with the corresponding limit groove 6; then the arch rib 2 with the splicing end 7 at the top is moved toward the corresponding pier 1, so that the connecting end 3 of the corresponding arch rib 2 is moved into the connecting groove 4 close to one side pier In the connecting groove 4 of the pier 1, similarly, the installation of the arch rib 2 and the pier 1 is completed; since the splicing ends 7 of the two arch ribs 2 are distributed up and down, after the installation of the arch rib 2 and the pier 1 is completed, the splicing ends 7 of the two arch ribs 2 will be together, and then the two splicing ends 7 are relatively fixed by fixing parts to achieve the assembly and fixation of the two arch ribs 2, and then the prefabricated frame columns can be installed on the pier 1 and the arch rib 2, without spending a long time waiting for the reinforced concrete structure to be cured and formed, which helps to shorten the construction period, and the clamping cooperation between the limit block 5 and the limit groove 6 helps to expand the pressure bearing surface of the pier 1 and improve the supporting effect.
[0028] Reference Figure 1 and Figure 2In order to facilitate the relative fixation of the two splicing ends 7, the fixing parts include a plurality of tensioning screws 16, and the plurality of tensioning screws 16 are all vertically penetrated on the two splicing ends 7, and the two ends of the tensioning screws 16 are threadedly connected with locking nuts 17, and the locking nuts 17 are used to abut against the corresponding splicing ends 7. After the splicing ends 7 of the two arch ribs 2 abut against each other, the plurality of tensioning screws 16 are sequentially penetrated on the two splicing ends 7, and then the locking nuts 17 at the two ends of the tensioning screws 16 are tightened so that the locking nuts 17 abut against the splicing ends 7 on the corresponding side, thereby realizing the fixed assembly of the two arch ribs 2, which is simple to operate and does not require a long time to wait for the concrete structure to be cured, thereby helping to shorten the construction period. In order to facilitate the assembly of the two arch ribs 2, the two splicing ends 7 are only partially overlapped when spliced.
[0029] Reference Figure 3 In order to facilitate the adjustment of the limit block 5 to slide in the direction close to or away from the connecting end 3, the moving assembly includes a spring 9, an adjusting block 10, an adjusting rope 11 and an adjusting member. The spring 9 corresponds to the limit block 5 one by one, and the extending direction of the spring 9 is parallel to the sliding direction of the corresponding limit block 5. A support block 19 is fixed on the side of the limit block 5 close to the center line of the connecting end 3. A support groove 20 that slides with the support block 19 is opened on the inner wall of the slideway 18. The spring 9 is located in the support groove 20. One end of the spring 9 is fixed on the side of the support block 19 away from the center line of the connecting end 3, and the other end is fixed on the inner wall of the support groove 20 away from the center line of the connecting end 3. The spring 9 is used to pull the corresponding support block 19 and the limit block 5 to move in the direction away from the connecting end 3, so as to achieve the snap-fitting of the limit block 5 and the limit groove 6.
[0030] Reference Figure 3 The adjusting block 10 is slidably arranged in the connecting end 3, and an adjusting groove 21 for slidingly cooperating with the adjusting block 10 is provided in the connecting end 3. The sliding direction of the adjusting block 10 is parallel to the extending direction of the connecting end 3, and the slideway 18 is connected with the adjusting groove 21; the adjusting block 10 is located on the center line of the connecting end 3, and the adjusting block 10 is located between a plurality of limit blocks 5, and the cross section of the adjusting block 10 is square. The adjusting rope 11 corresponds to the limit blocks 5 one by one, and one end of the adjusting rope 11 is fixed on the side of the corresponding limit block 5 close to the center line of the connecting end 3, and the other end is fixed on the side of the adjusting block 10 close to the arch rib 2. A channel for the adjusting rope 11 to move is provided on the inner wall of the adjusting groove 21, so that the adjusting rope 11 is not easily stuck; the adjusting rope 11 is inelastic, and the adjusting rope 11 is used to pull the limit block 5 to move in the direction close to the connecting end 3, and the side length of the adjusting block 10 is greater than the side length of the limit block 5; in the initial state, the adjusting block 10 is located on the side of the limit block 5 close to the arch rib 2, and the adjusting rope 11 is in a tensioned state.
[0031] Reference Figure 3The adjusting member is arranged on the connecting end 3, and the adjusting member is used to drive the adjusting block 10 to move toward or away from the limiting block 5; in order to facilitate driving the adjusting block 10 to move toward or away from the limiting block 5, the adjusting member includes a screw 12, and the screw 12 is rotatably penetrated on the side of the connecting end 3 close to the arch rib 2, and the screw 12 is penetrated in the concave opening of the connecting end 3, and the rotation axis of the screw 12 is parallel to the sliding direction of the adjusting block 10, and the adjusting block 10 is threadedly sleeved on the screw 12.
[0032] In the initial state, the adjustment block 10 is located on the side of the limit block 5 close to the arch rib 2. The threaded connection between the adjustment block 10 and the screw rod 12 can limit the position of the adjustment block 10. At this time, the adjustment rope 11 is in a tensioned state. The adjustment rope 11 pulls the corresponding limit block 5 so that the limit block 5 is located in the corresponding slideway 18, so that the spring 9 is in a stretched state. After the connection end 3 extends into the connection groove 4, the screw rod 12 is screwed with an external tool. Since the adjustment groove 21 guides the adjustment block 10 so that it does not rotate, the screw rod 12 drives the adjustment block 10 to slide in the direction close to the limit block 5. The tension of the adjustment rope 11 on the limit block 5 is reduced. Then the stretched spring 9 pulls the corresponding limit block 5 to move in the direction away from the connection end 3, which helps to achieve the clamping fit between the limit block 5 and the corresponding limit groove 6, thereby completing the installation and fixation of the arch rib 2 and the buttress 1.
[0033] Reference Figure 3 An operating rod 15 is coaxially connected to one side of the screw rod 12 outside the connection end 3. The cross section of the operating rod 15 is polygonal. Specifically, the cross section of the operating rod 15 is hexagonal, which is convenient for using an external tool to twist the operating rod 15 to drive the screw rod 12 to rotate.
[0034] Reference Figure 3 When the limit block 5 is engaged with the limit groove 6, the end face of the limit block 5 away from the limit groove 6 abuts against the side wall of the adjustment block 10, so that the adjustment block 10 limits the position of the limit block 5. Even when shaking or vibrating occurs, the limit block 5 will not be separated from or loosened from the limit groove 6.
[0035] Reference Figure 3 and Figure 4 The limiting block 5 is bonded with a sealed containing bag 13 along its circumference. The containing bag 13 is a plastic bag. The containing bag 13 contains stirred unsolidified concrete slurry. The inner wall of the limiting groove 6 is provided with an opening piece for opening the containing bag 13.
[0036] Reference Figure 3 and Figure 4In order to facilitate opening the containing bag 13 so that the concrete slurry can fill the gap between the limiting block 5 and the limiting groove 6, the opening member includes a poking pin 14, which is a steel pin. There are multiple poking pins 14 pre-buried along the circumference of the inner wall of the limiting groove 6. When the limiting block 5 abuts against the bottom wall of the limiting groove 6, the poking pin 14 abuts against the outer wall of the limiting block 5.
[0037] Before the connecting end 3 is extended into the connecting groove 4, the screw 12 is rotated to make the adjusting block 10 approach the limiting block 5, and the limiting block 5 is adjusted to move out of the slide 18, and then the containing bag 13 filled with the freshly mixed concrete slurry is bonded to the outer wall of the limiting block 5 along the circumference of the limiting block 5, and then the screw 12 is rotated to make the adjusting block 10 away from the limiting block 5, and the limiting block 5 is moved into the slide 18; then the connecting end 3 is extended into the connecting groove 4, and then the limiting block 5 is adjusted to move into the corresponding limiting groove 6. During the movement of the limiting block 5, the poking needle 14 is hooked and rubbed with the containing bag 13, so that the containing bag 13 is broken, and then the concrete slurry in the containing bag 13 fills the gap between the corresponding limiting block 5 and the limiting groove 6, so as to realize the combination of concrete and mechanical connection and enhance the connection stability of the arch rib 2 and the pier 1; since there is less concrete slurry between the limiting block 5 and the limiting groove 6, there is no need to wait for a long time, thereby shortening the construction period to a certain extent.
[0038] The implementation principle of the embodiment of the present application is as follows: when assembly is required, the two piers 1 are installed to the required positions, and then an external crane is used to hoist the two arch ribs 2 respectively, and then an external tool is used to twist the operating rod 15, and the operating rod 15 drives the screw 12 to rotate synchronously, so that the adjustment block 10 moves toward the direction close to the limit block 5, the tension of the adjustment rope 11 on the limit block 5 is reduced, and the stretched spring 9 pulls the limit block 5 out of the slide 18, and then the containing bag 13 filled with the freshly mixed concrete slurry is bonded to the outer wall of the limit block 5 along the circumference of the limit block 5; then an external tool is used to reversely twist the operating rod 15 to move the adjustment block 10 in the direction away from the limit block 5, and the limit block 5 moves into the slide 18 under the pulling of the adjustment rope 11.
[0039] Then, the arch rib 2 with the splicing end 7 at the bottom is moved toward the corresponding pier 1, so that the connecting end 3 of the corresponding arch rib 2 is moved into the connecting groove 4 close to the side pier 1, and the limit block 5 is aligned with the corresponding limit groove 6. Then, an external tool is used to twist the operating rod 15, and the operating rod 15 drives the screw 12 to rotate synchronously. The screw 12 drives the adjustment block 10 to slide in the direction close to the limit block 5, and the tension of the adjustment rope 11 on the limit block 5 is reduced. The stretched spring 9 pulls the corresponding limit block 5 to move in the direction away from the connecting end 3, so that the limit block 5 gradually engages with the corresponding limit groove 6. At this time, the poking needle 14 will hook and rub with the receiving bag 13, so that the receiving bag 13 is broken, and then the concrete slurry in the receiving bag 13 fills the gap between the corresponding limit block 5 and the limit groove 6, thereby completing the installation of the arch rib 2 and the pier 1 on one side.
[0040] Then move the arch rib 2 with the splicing end 7 at the top toward the corresponding pier 1, so that the connection end 3 of the corresponding arch rib 2 moves into the connection groove 4 close to the pier 1 on one side, and then use an external tool to twist the operating rod 15, so that the screw 12 drives the adjustment block 10 to slide in the direction close to the limit block 5. Similarly, the installation of the arch rib 2 and the pier 1 on the other side is completed; because the splicing ends 7 of the two arch ribs 2 are distributed up and down, after the arch rib 2 and the pier 1 are installed, the splicing ends 7 of the two arch ribs 2 will be abutted together up and down, and then a plurality of tensioning screws 16 are inserted into the two splicing ends 7, and then tighten the locking nuts 17 at both ends of the tensioning screws 16, so that the locking nuts 17 are pressed against the splicing end 7 on the side, so as to achieve the fixed assembly of the two arch ribs 2. Then the prefabricated frame columns can be installed on the pier 1 and the arch rib 2, without spending a long time waiting for the reinforced concrete structure to be cured and formed, which helps to shorten the construction period.
[0041] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A steel arch frame for a large flow and large span aqueduct, comprising two piers (1) and two arch ribs (2) arranged opposite to each other, wherein the two arch ribs (2) are spliced between the two piers (1), characterized in that: The arch rib (2) is provided with a connecting end (3) at one end close to the pier (1); the pier (1) is provided with a connecting groove (4) for plugging and matching with the connecting end (3); a limit block (5) is slidably penetrated through the side wall of the connecting end (3); the side wall of the connecting groove (4) is provided with a limit groove (6) for snap-fitting with the limit block (5); the connecting end (3) is provided with a moving component, and the moving component is used to adjust the limit block (5) to slide in a direction close to or away from the connecting end (3); the arch rib (2) is provided with a splicing end (7) at one end away from the pier (1); a fixing piece is provided between the splicing ends (7) on the two arch ribs (2); the fixing piece is used to relatively fix the splicing ends (7) on the two arch ribs (2).
2. The large flow and large span aqueduct cantilever steel arch frame according to claim 1 is characterized by: The moving assembly comprises a spring (9) arranged in the connection end (3), an adjusting block (10) slidably arranged in the connection end (3), an adjusting rope (11) arranged on the limit block (5), and an adjusting member arranged on the connection end (3); the spring (9) is used for pulling the limit block (5) to move in a direction away from the connection end (3); one end of the adjusting rope (11) away from the limit block (5) is arranged on the adjusting block (10); the adjusting rope (11) is used for pulling the limit block (5) to move in a direction close to the connection end (3); and the adjusting member is used for driving the adjusting block (10) to move in a direction close to or away from the limit block (5).
3. The large flow and large span aqueduct cantilever steel arch frame according to claim 2 is characterized by: The adjusting member comprises a screw rod (12) rotatably inserted into the connecting end (3), the rotation axis of the screw rod (12) being parallel to the sliding direction of the adjusting block (10), and the adjusting block (10) being threadedly sleeved on the screw rod (12).
4. The large flow and large span aqueduct cantilever steel arch frame according to claim 3 is characterized by: An operating rod (15) is coaxially connected to one side of the screw rod (12) outside the connection end (3), and the cross section of the operating rod (15) is polygonal.
5. The large flow and large span aqueduct cantilever steel arch frame according to claim 2 is characterized by: When the limiting block (5) is engaged with the limiting groove (6), one end of the limiting block (5) away from the limiting groove (6) abuts against the side wall of the adjusting block (10).
6. The large flow and large span aqueduct cantilever steel arch frame according to claim 5 is characterized by: A plurality of the limit blocks (5) are arranged at intervals along the circumference of the connection end (3); the limit grooves (6) correspond one-to-one to the limit blocks (5); the springs (9) correspond one-to-one to the limit blocks (5); and the adjustment blocks (10) are located between the plurality of limit blocks (5).
7. The large flow and large span aqueduct cantilever steel arch frame according to claim 1 is characterized by: The limiting block (5) is provided with a containing bag (13) along its circumference, the containing bag (13) is filled with stirred concrete slurry, and the inner wall of the limiting groove (6) is provided with an opening piece for opening the containing bag (13).
8. The large flow and large span aqueduct cantilever steel arch frame according to claim 7 is characterized by: The opening member comprises a plurality of poking pins (14) arranged on the inner wall of the limiting groove (6), and the poking pins (14) are used to abut against the outer wall of the limiting block (5).
9. The large flow and large span aqueduct cantilever steel arch frame according to claim 1, characterized in that: The fixing member comprises a plurality of tightening screws (16), wherein the tightening screws (16) are passed through two splicing ends (7), and both ends of the tightening screws (16) are threadedly connected with locking nuts (17), and the locking nuts (17) are used to abut against the splicing end (7) on the corresponding side.
10. A suspended steel arch frame for a large flow and large span aqueduct according to any one of claims 1 to 9, characterized in that: The arch ribs (2) are all steel arch ribs (2).