PLC construction method pile operation method for river and sea areas

By adopting horizontal stacking stacking and automated rotation detection systems in PLC pile steel pipes in the Hehai area, the problems of rainwater accumulation and large area of ​​steel pipes are solved, efficient and accurate detection and storage are achieved, and construction efficiency is improved and quality.

CN118958149APending Publication Date: 2024-11-15SHUOHUANG RAILWAY DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411118709.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In water-rich areas, the rainwater accumulation and large area of ​​steel pipes lead to low construction efficiency and lack of automated testing methods, which affects the construction quality.

Method used

A pre-store method of PLC pile steel pipes used in the river and sea areas is adopted. Through horizontal stacking and automatic rotation detection systems, the steel pipes are quickly and accurately detected, reducing the time of crane occupation, avoiding rainwater siltation, and saving space.

Benefits of technology

It improves the efficiency and accuracy of steel pipe inspection, saves floor space, reduces costs, and realizes automated inspection. It is suitable for temporary storage or centralized storage of beams and fields, and is simple to operate, safe and reliable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958149A_ABST
    Figure CN118958149A_ABST
Patent Text Reader

Abstract

The invention relates to a PLC (programmable logic controller) construction method pile operation method for river and sea areas. The method comprises the following steps: S1, pre-checking a steel pipe pile; and S2, transferring the steel pipe piles qualified in pre-inspection, and horizontally stacking the steel pipe piles in a beam field or a construction area. In the step S2, firstly, a storage assembly (3) is pre-adjusted, by driving the position of a movable inclined seat (18) relative to a fixed inclined seat (20), the inclination of a V-shaped bottom plate (17) is adjusted, the effect that the outer portion is high and the inner portion is low is achieved, and a herringbone middle frame (12) is placed to support the lower end; the device is reasonable in design, compact in structure and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a PLC construction pile operation method for river and sea areas, and is particularly suitable for extremely large cross-river and cross-sea projects. Background Art

[0002] The PLC method pile consists of two parts: steel pipe and Larsen steel sheet pile. The steel pipe is made of Q235 material ɸ820×12 steel pipe, and the length of the steel pipe is 24m. The steel sheet pile is Larsen SP-Ⅳ type, with a pile length of 24m and a width of 400mm. The steel pipe and steel sheet pile are not perforated, and the steel sheet pile can only be used after trimming and straightening. Crawler crane + vibrating hammer is used for steel sheet pile driving construction, and the vibrating hammer vibrates up and down to insert the steel sheet pile into the soil. Long-arm excavator is used for foundation pit excavation. After the steel pipe pile and steel sheet pile driving machinery enters the site, notify the project department's safety department to conduct the machinery entry acceptance, and it can only be used after passing the acceptance. In water-rich areas, the overall quality of steel pipes is an important means to ensure construction quality. Before construction, steel pipes need to be treated with anti-corrosion, anti-deformation and anti-collision treatments. Generally, this is done with the cooperation of cranes, which leads to a large number of cranes being occupied. Manual monitoring of steel pipe quality is inefficient, and steel pipes can only be placed in two layers, resulting in the steel pipes occupying a large area.

[0003] How to solve the problem of rainwater accumulation in steel pipes, achieve multi-layer centralized stacking, save floor space, improve detection quality and efficiency, realize automated detection, and improve work efficiency has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] The technical problem to be solved by the present invention is generally to provide a PLC construction pile operation method and a pre-storage system for river and sea areas. To solve the above problems, the technical solution adopted by the present invention is: In order to realize automated pre-inspection, a pre-storage method for PLC construction method pile steel pipes in river and sea areas is provided, and the pre-storage method comprises the following steps: S1, pre-inspect the steel pipe piles; S2, transfer the qualified steel pipe piles in advance and stack them horizontally in the beam yard or construction area. In order to realize construction operations and operations in water-rich areas, a PLC construction pile operation method for river and sea areas is provided, and the operation method includes the following steps: Step 1, pre-storing the steel pipe piles by means of the above-mentioned pre-storage method; Step 1A: When the steel sheet piles are inspected and accepted, firstly, the steel pipe piles are polished and inspected for appearance, including surface defects and rust; then, holes are cut and cross-section defects are reinforced; Step 1B, verticality check, deformation check of steel pipe piles; Step 1C, repairing and protecting the steel pipe piles; Step 1D: Qualified steel pipe piles are stored centrally at the construction site or beam yard; Step 1E, extend the steel pipe piles; the steel pipe piles are installed in sections and fully welded. The present invention saves space, reduces the occupancy time of the crane, avoids rainwater accumulation, and is particularly suitable for temporary storage or centralized storage in the beam yard. Through automatic rotation, the steel pipe can be detected quickly and accurately. Compared with traditional horizontal detection, it saves space and is more accurate, greatly improving efficiency. The present invention has a reasonable design, low cost, durability, safety and reliability, simple operation, time-saving and labor-saving, money-saving, compact structure and easy use. BRIEF DESCRIPTION OF THE DRAWINGS

[0005] Figure 1 It is a schematic diagram of the use structure of the PLC construction method pile of the present invention.

[0006] Figure 2 It is a schematic diagram of the overall structure of the present invention.

[0007] Figure 3 It is a schematic diagram of the storage component structure of the present invention.

[0008] Figure 4 It is a schematic diagram of the herringbone intermediate frame structure of the present invention. Figure 5 It is a schematic diagram of the use structure of the fixed inclined seat of the present invention.

[0009] Figure 6 It is a schematic diagram of the detection station structure of the present invention.

[0010] Figure 7 It is a schematic diagram of the receiving side opening structure of the present invention.

[0011] Figure 8 It is a schematic diagram of the structure of the measuring frame of the present invention. Fig. 9 It is a schematic diagram of the use structure of the output bracket of the present invention. Fig.10 It is a schematic diagram of the structure of the rotating disc seat of the present invention.

[0012] Among them: 1. Steel pipe pile; 2. Pretreatment component; 3. Storage component; 4. Storage station; 5. Mobile storage component; 6. Gantry crane body; 7. Push-pull component; 8. Cart track; 9. Trolley track; 10. Process horizontal support; 11. Mobile support leg; 12. Herringbone intermediate frame; 13. Side guardrail; 14. U-shaped side bracket; 15. Spacer; 16. Support base; 17. V-shaped bottom plate; 18. Movable inclined seat; 19. Side pulling part; 20. Fixed inclined seat; 21. Rotating frame assembly; 22. Loading station; 23. Grinding station; 24. Inspection station; 25. Discharging station; 26. Loading input part; 27. Loading inlet; 28. Loading transfer assembly; 29. ​​Swinging frame; 30. Vertical guide part; 31. Swinging drive part; 32. Lifting guide frame; 33. Upper baffle; 34. Driven lifting Frame; 35, driven guide part; 36, connecting support part; 37, connecting inclined surface; 38, axis stop fork; 39, receiving side opening; 40, grinding frame; 41, grinding rotating head; 42, rotating grinding head; 43, measuring frame; 44, direction changing head; 45, fixed oblique seat; 46, oblique rotating shaft; 47, rotating oblique seat; 48, rotating head; 49, hanging head; 50, counterweight; 51, plumb part; 52. Camera unit; 53. Output bracket; 54. Output lower baffle; 55. Output upper baffle; 56. Output stop fork; 57. Inlet; 58. Rotating disk seat; 59. End disk; 60. Radial cross groove; 61. Movable finger; 62. Center through hole; 63. Telescopic center cone head shaft; 64. Process notch; 65. End face spiral guide line; 66. Engaging tooth; 67. Probe tongue; 68. Vertical finger. DETAILED DESCRIPTION like Figure 1-10 As shown, the PLC construction method pile steel pipe pre-storage system for river and sea areas of this embodiment includes a storage component 3 for stacking steel pipe piles 1 horizontally, thereby realizing formatted storage; the storage component 3 has a storage station 4 and a mobile station, thereby realizing centralized storage and turnover at the mobile station; A trolley track 9 is provided between the storage station 4 and the moving station to realize transfer, which is generally a straight line.

[0013] A mobile storage assembly 5 is provided on the trolley track 9 to realize the storage of the steel pipe piles in the storage grid; A push-pull assembly 7 is provided at the mobile station and / or storage station 4, which has a hook head and can hook the mobile storage assembly 5 to move back and forth; The mobile storage assembly 5 includes a support base 16 as a chassis support; a mobile support leg 11 is arranged at the lower part of the support base 16; the mobile support leg 11 has rollers that run on the trolley track 9 and a jack leg that is set for lifting; when running, the roller contacts the track and moves forward, and when stopping, the jack leg is started to achieve support, so that the roller rises, thereby preventing the roller from being subjected to stress for a long time and causing damage to the bearing.

[0014] The mobile storage components 5 in the same row are arranged opposite to each other and a herringbone intermediate frame 12 is arranged at the opposite position, which uses an inclined surface to achieve oblique support to prevent sliding out due to oblique placement; wherein, the mobile storage components 5 in the same row can be only one or two opposite to each other, which can be adjusted according to actual conditions. If there is only one, it is only necessary to fix the herringbone intermediate frame 12 on the chassis.

[0015] In order to achieve spacing and avoid rocking back and forth and avoid stress on the tube body, side guardrails 13 are provided on both sides of the support base 16; T-shaped grooves are provided at both ends of the inner groove wall of the side guardrail 13, and the grooves are connected, so that a U-shaped side bracket 14 is provided in the T-shaped groove of the side guardrail 13, so that the bracket body and the tube body are stressed at the same time; In order to prevent water from accumulating and being unable to flow out, the support base 16 is provided with a movable inclined seat 18 when sliding, and one end of a V-shaped bottom plate 17 is hinged on the support base 16; a fixed inclined seat 20 adapted to the inclined surface of the movable inclined seat 18 is provided on the lower surface of the other end of the V-shaped bottom plate 17. It is in a horizontal state when hoisting, and is tilted in advance when stored. Compared with traditional simple stacking, the present invention connects the bases into one to form a large platform, and then, after it is filled, a large cart is used to achieve staggered stacking on the top, thereby greatly improving the storage efficiency. To this end, a large cart track 8 is provided in parallel with the trolley track 9; A gantry crane body 6 is running on the trolley track 8, and is used for hoisting the steel pipe pile 1 to be placed in or away from the mobile storage assembly 5; the gantry crane body 6 can be a gantry crane of a beam yard.

[0016] The V-shaped bottom plate 17 is inclined and perpendicular to the pressing surface of the herringbone intermediate frame 12, so as to achieve better contact and force.

[0017] A side pulling portion 19 is provided on the supporting base 16 to assist other operations.

[0018] A process cross brace 10 is connected between the adjacent guardrails 13 on both sides, thereby integrating the base into one.

[0019] Spacers 15 are provided on the side of the support base 16 .

[0020] The herringbone intermediate frame 12 has a process groove to facilitate the entry of the hoisting device into the hook.

[0021] In order to replace the traditional manual work, avoid the resulting disability of personnel and improve efficiency, a pretreatment component 2 is provided at the mobile workstation for pretreatment of the incoming steel pipe piles 1; the present invention is improved based on the method pile, during which supplementary work can be performed manually.

[0022] As an improvement, the pretreatment component 2 includes a rotating frame component 21, which can rotate normally; the rotating frame component 21 corresponds to a loading station 22, a grinding station 23, a detection station 24 and a discharging station 25, etc., which are not limited to the six equal parts shown in the attached figure; in view of the particularity of the steel pipe piles, in order to reduce the bearing capacity, a top seat can be set at each station to achieve auxiliary support, thereby changing the problem of poor stress on the cantilever structure.

[0023] At the loading station 22, a loading transfer assembly 28 is provided, and its input end is connected to a truck or a train. The loading transfer assembly 28 is input to a loading inlet 27, and a loading input part 26 is provided at the loading inlet 27, which is used to roll the steel pipe piles 1 on the transport vehicle one by one and change them into a vertical state. Compared with the traditional horizontal detection, the vertical detection better simulates the actual working condition and avoids the deformation error caused by lying horizontally.

[0024] Compared with manual grinding, a grinding component is provided at the grinding station 23, which is used to grind away rust, burrs and dirt on the steel pipe pile 1; it realizes automatic monitoring by installing a camera in conjunction with the same. Of course, in order to better support the steel pipe pile and prevent it from sliding back and forth, a supporting manipulator can be provided at each station or on the cantilever end to assist in maintaining the upper part of the steel pipe pile. It is a simple conventional structure, so the description is omitted.

[0025] At the inspection station 24, an inspection component is provided, which uses the plumb line principle to inspect the shape and position tolerances of the inner and outer walls of the steel pipe pile 1; compared with the traditional horizontal type, the inspection efficiency is higher, and the inspection is more accurate and convenient.

[0026] At the discharging station 25, an output assembly is provided for outputting the steel pipe piles 1 one by one to a designated location, such as a moving station.

[0027] As a feeding improvement, it adopts the following simple structure to realize linkage control, thereby realizing blocking and releasing, and the design is ingenious and simple. The feeding transfer assembly 28 includes a swing frame 29 swingably arranged below the feeding station 22; a vertical guide portion 30 is arranged below the A end of the swing frame 29, and a lifting guide frame 32 is lifted and lowered on the vertical guide portion 30; the guide groove of the lifting guide frame 32 is on the hinge shaft at the A end; An upper baffle 33 is provided at the upper end of the lifting guide frame 32 for ascending and entering the feeding inlet 27; A driven guide portion 35 is provided below the B end of the swing frame 29, and the lower portion of the driven lifting frame 34 is provided in the driven guide portion 35; a guide groove is provided in the middle of the driven lifting frame 34 for being sleeved on the hinge shaft of the B end of the swing frame 29; A connecting supporting portion 36 is provided on the upper portion of the driven lifting frame 34; A swing driving unit 31 is provided on the swing frame 29; A connecting inclined surface 37 is provided on one side of the connecting supporting portion 36, and an axis stop fork 38 and a receiving side opening 39 are provided at the front and rear ends of the connecting supporting portion 36; Auxiliary lifting supports are provided at the loading station 22 and / or the discharging station 25 to assist in lifting the steel pipe pile 1 when it changes direction; it cleverly utilizes the existing structure to solve the problems of loading the steel pipe pile, avoiding obstruction, and achieving effective connection.

[0028] The auxiliary lifting support adopts a truck crane, a gantry crane, a fall chain assembly or a jack, which can be selected according to the current situation.

[0029] In order to realize automatic grinding, the grinding assembly includes a grinding frame 40; a grinding rotating head 41 is arranged on the grinding frame 40; a rotating grinding head 42 is arranged at the end of the grinding rotating head 41, and the self-rotation is realized by the grinding head, and the revolution is realized by the rotating head to realize position adjustment. The frame can adjust the matching telescopic length according to the length of the steel pipe pile. When grinding, the grinding of other positions is realized by the self-rotation of the steel pipe pile. Of course, inclination and other solutions can also be added.

[0030] As a sense of detection, the present invention uses a plumb line to detect the risk width. Of course, the plumb line can be colored. Whether it is in contact or not, whether it is deformed in the opposite direction, and whether it is deformed to the side of the plumb line by shaking it in contact with the plumb line, completely subverting the detection idea of ​​the prior art. It can be detected as long as it rotates one circle. Of course, by using the taper top and the clamping finger, the bottom can be avoided from blocking the counterweight. The detection component includes a measuring frame 43; a direction-changing head 44 is telescopically arranged on the measuring frame 43; the direction-changing head 44 includes a fixed oblique seat 45; an oblique rotating shaft 46 is vertically arranged on the lower end oblique surface of the fixed oblique seat 45, and a rotating oblique seat 47 is arranged at the end of the oblique rotating shaft 46; the inclined surface of the rotating oblique seat 47 is parallel to the inclined surface of the fixed oblique seat 45; through its clever setting, internal and external detection is realized without the need to use two sets of tools for detection separately. The problem of not being able to detect the inner cavity in the past has been solved.

[0031] A rotating head 48 is provided at the end of the rotating oblique seat 47; A suspension head 49 and a camera unit 52 are provided on the rotating head 48 to realize internal observation. This is a theoretical solution. A plumb part 51 is connected to the end of the suspension head 49, and a counterweight 50 is provided at the lower end of the plumb part 51. In order to achieve smooth output, the output assembly includes an output belt; an output bracket 53 is lifted and lowered outside the inlet 57 of the output belt; an output baffle is lifted and lowered at the inlet 57; the output baffle includes an output upper baffle 55 and an output lower baffle 54 arranged up and down; The output lower baffle 54 is at the same height as the output bracket 53; The output bracket 53 and the output baffle plate rise and fall synchronously; An output stop fork 56 is provided at the rear end of the output bracket 53. It is cleverly arranged to achieve a one-time change of direction fork, a second waiting for output, and at the same time, avoid blocking the workbench from rotating.

[0032] The modules of the present invention can be separately assembled and disassembled for transportation, so that the transportation can be adjusted in time according to the work progress.

[0033] In order to better position and clamp the steel pipe pile, the rotating frame assembly 21 of the present invention includes a rotating disc seat 58 having a central through hole 62, so as to realize the rotation of the steel pipe pile; an end disc 59 is provided at the rotating cantilever end of the rotating disc seat 58; A radial cross groove 60 is provided on the top of the rotating disk base 58 in three equal parts, and a movable finger 61 is radially movable in the radial cross groove 60; a telescopic center cone head shaft 63 passing through a center through hole 62 is provided at the center of the rotating disk base 58; the cone head of the telescopic center cone head shaft 63 has a process notch 64, thereby enabling each finger to move forward and backward synchronously and at the same speed at the same time, and self-lock to clamp or release the steel pipe pile, while avoiding damage.

[0034] The movable finger 61 has a vertical finger 68, thereby forming an L shape. The movable finger 61 has a probe tongue 67 extending from the lower part of the vertical finger 68; the two side walls of the vertical finger 68 have protrusions that contact the corresponding side walls of the steel pipe pile 1; thereby, both sides can be used without turning the fingers.

[0035] An end face spiral guide wire 65 is rotatably arranged on the rotating disc seat 58, preferably an Archimedean spiral wire; the bottom of the movable finger 61 has a meshing tooth 66 adapted to the end face spiral guide wire 65; and the process notch 64 corresponds to the movable finger 61, so as to realize radial drive.

[0036] The rotating frame assembly 21 is provided with a work station for repairing defects, cleaning and / or applying anti-rust paint.

[0037] The pre-storage method of the PLC construction method pile steel pipe for river and sea areas of the present embodiment comprises the following steps: S1, pre-inspect the steel pipe pile 1; S2, transferring the qualified steel pipe piles 1 in advance, and stacking them horizontally and in layers in a beam yard or a construction area.

[0038] In step S2, first, the storage assembly 3 is pre-adjusted by driving the movable inclined seat 18 relative to the fixed inclined seat 20 to adjust the inclination of the V-shaped bottom plate 17 so that the outside is high and the inside is low, and the herringbone intermediate frame 12 is placed to support the lower end; Then, the unloaded mobile storage assembly 5 is moved to the mobile station along the trolley track 9 by the push-pull assembly 7, the steel pipe pile 1 is placed in the storage assembly 5 by the crane, and the U-shaped side brackets 14 are placed at intervals to achieve the spacing of the upper and lower layers; secondly, the storage assembly 5 is pushed to the storage station 4, and the adjacent two-side guardrails 13 between the adjacent mobile storage assemblies 5 are connected and fixed by the process horizontal brace 10; thirdly, the jack legs are lowered to the ground; When the number of steel pipe piles 1 exceeds the storage quantity of all storage components 5, the crane lifts the steel pipe piles 1 to the top of the storage components 5 connected as a whole for staggered stacking, and separates the upper and lower layers of steel pipe piles 1 by V-shaped pads, and places spacing wooden blocks between the opposite steel pipe piles 1.

[0039] In step S1, after the pretreatment assembly 2 is transported and hoisted to the set position, it is assembled on site and pre-inspected with the help of the rotating frame assembly 21; S1.1, at the loading station 22, the steel pipe piles 1 on the transport vehicle are rolled in one by one and turned into a vertical state; S1.2, at the grinding station 23, the rust, burrs and dirt on the steel pipe pile 1 are ground; S1.3, at the inspection station 24, the form and position tolerances of the inner and outer walls of the steel pipe pile 1 are inspected using the plumb line principle; S1.4, at the discharging station 25, the steel pipe piles 1 are discharged one by one.

[0040] In step S1.1, first, the steel pipe pile 1 is transported from the feeding input part 26 to the feeding inlet 27 by a crane, and the front end of the steel pipe pile 1 enters the feeding inlet 27 and rolls along the connecting inclined surface 37 to the connecting supporting part 36, and the rear stop is provided by the axis stop fork 38, and the front end of the steel pipe pile 1 is assisted to be lifted by the auxiliary lifting support; then, the movable finger 61 is rotated and entered through the receiving side opening 39, and the end face spiral guide line 65 is driven to rotate and drive the meshing teeth 66, so that the movable finger 61 moves along the radial cross groove 60 to clamp the corresponding side wall of the steel pipe pile 1. When the inner side wall of the steel pipe pile 1 is clamped, the lower end face of the steel pipe pile 1 is supported by the probe tongue 67; When the lower end surface of the steel pipe pile 1 needs to be inspected, the central cone head shaft 63 is extended into the steel pipe pile 1 to achieve internal support, and at the same time, the outer wall of the steel pipe pile 1 is clamped by the movable fingers 61; Secondly, with the assistance of the auxiliary lifting support, the cantilever end of the rotating frame assembly 21 rotates 90 degrees and faces upward, so that the steel pipe pile 1 becomes a vertical state; Again, the swing frame 29 swings, and blocks the subsequent steel pipe pile 1 by raising the upper baffle plate 33. At the same time, the connecting supporting part 36 descends to avoid the rotating forward passage of the cantilever end; wherein, the guide groove of the driven lifting frame 34 is driven at the hinge shaft, and the driven guide part 35 guides the driven lifting frame 34 to rise and fall. At the same time, the vertical guide part 30 guides the lifting and lowering of the lifting guide frame 32, so that the upper baffle plate 33 and the connecting supporting part 36 are raised and lowered one by one.

[0041] S1.2, at the grinding station 23, when the outer wall of the steel pipe pile 1 needs to be ground, the grinding frame 40 is raised and lowered and the grinding rotary head 41 is rotated, and the steel pipe pile 1 is rotated by the rotating disc seat 58; when the inner wall needs to be cleaned, the grinding rotary head 41 descends into the inner cavity of the steel pipe pile 1, and drives the rotating grinding head 42 to rotate and grind the inner wall.

[0042] S1.3, at the inspection station 24, the outer wall of the steel pipe pile 1 is inspected; if the outer wall fails the inspection, it is determined to be an unqualified product; by rotating the rotating head 48, the plumb part 51 wound on the rotating head 48 is lowered and fits with the outer wall of the steel pipe pile 1, and the gap width at the fitting place is observed manually and by a camera to see whether it is greater than a set threshold, thereby determining whether the verticality of the steel pipe pile 1 is qualified; When the outer wall is qualified, the inner wall is inspected and checked; when inspecting the inner wall of the steel pipe pile 1, the steel pipe pile 1 is lifted by a crane, the movable fingers 61 clamp the outer wall of the steel pipe pile 1, and the telescopic center cone head shaft 63 is downwardly withdrawn from the steel pipe pile 1; when inspecting the inner cavity, the oblique rotating shaft 46 is used as the axis, and the oblique seat 47 is rotated from a horizontal state to a vertical state, so that under the action of gravity, the plumb part 51 droops to one side of the camera part 52 and is vertically parallel; then, the plumb part 51 is attached to the inner wall of the steel pipe pile 1, the rotating disk seat 58 rotates, and the camera part 52 records or takes pictures to detect the verticality of the inner wall.

[0043] The pre-storage method of PLC construction method pile steel pipes for river and sea areas, S1.4, at the discharging station 25, with the cooperation of the auxiliary lifting support, the cantilever end rotates 90 degrees and falls onto the rising output bracket 53, the movable finger 61 separates from the steel pipe pile 1, and the steel pipe pile 1 rolls to the inlet 57 of the output belt and is blocked by the output lower baffle 54; then, the output bracket 53 descends and leaves the discharging station 25, and at the same time, the output lower baffle 54 descends synchronously, and the output upper baffle 55 continues to block until the output upper baffle 55 leaves the inlet 57 of the output belt and the steel pipe pile 1 rolls out.

[0044] Between steps S1.3 and S1.4, several work stations are arranged; the work stations include a welding station, an anti-rust paint application station and / or a labeling station, for performing corresponding operations.

[0045] The PLC pile operation method for river and sea areas of the present embodiment comprises the following steps: Step 1, pre-storing the steel pipe pile 1 by means of the above-mentioned pre-storage method; Step 1A, when the steel sheet piles are inspected at the site, first, the steel pipe piles 1 are polished and inspected for appearance, including surface defects and rust; then, holes are cut and cross-section defects are reinforced; Step 1B, verticality inspection, deformation inspection of the steel pipe pile 1; Step 1C, repairing and protecting the steel pipe pile 1; Step 1D, the qualified steel pipe piles 1 are stored centrally at the construction site or beam yard; Step 1E, extending the steel pipe pile 1; the steel pipe pile 1 is installed in sections and fully welded.

[0046] Step 2: PLC method pile construction; Step 2A, compacting the soil within the foundation pit construction range in the island construction area; Step 2B, performing PLC method pile hoisting; Step 2C, the end of the steel pipe pile 1 is reinforced to prevent the end of the steel pipe pile from being damaged during the insertion process, and the steel pipe pile is welded to the lock buckle. When welding the lock buckle, the steel pipe should be connected and stabilized on site first, and then the ink line should be stretched throughout the length; the lock buckle strip welding should adopt the jump welding process to prevent deformation; Step 3: inserting and driving PLC method piles; Step 3A, measurement and setting out, according to the design drawings, lay out the edge line of the main pier cap, then take the main pier cap as the reference, extend 1.53m and 1.61m outward, lay out the construction method pile driving center axis, sprinkle gray lines on the ground in the island area to indicate; mark in the steel platform area; Step 3B, setting a guide frame, inserting and driving a first set of method piles at the center of the upstream of the steel cofferdam, and using the method piles as guide piles for subsequent insertion, and welding double-jointed steel sections on both sides of the guide piles as a guide frame; Step 4: driving PLC method piles; Before the construction pile cofferdam is sunk, the debris dropped during construction at the base should be cleared away. The locks of the pile groups and single piles should be coated with butter mixture to reduce the friction resistance during insertion and ensure the anti-seepage performance. When encountering sand layers that are difficult to drive into, high-pressure water jetting is used as an auxiliary measure to ensure that the driving depth of steel pipe piles and steel sheet piles meets the design requirements; Before driving the steel pipe pile 1, the lock buckle is caulked with water-stop material; the verticality of the first steel pipe pile 1 should be controlled within 0.5% of the pile length; the verticality of other steel pipe piles 1 should be controlled within 1% of the pile length; during driving, the position and verticality of the steel pipe pile 1 should be checked; In step 3B, it is crucial to determine the construction sequence of the steel sheet piles. The order of driving the steel sheet piles is to start from the upstream of the cofferdam, drive them symmetrically on both sides, and close them at the center of the downstream of the cofferdam. The order of driving the steel sheet piles is as follows: S3B1, the first set of method piles are driven as positioning piles; The driving of the first steel sheet pile plays a key role in positioning. The driving starts from the upstream of the steel cofferdam. The steel sheet pile is fixed in a vertical position before being driven. During the driving process, measurement and tracking are required, and corrections are made at any time. When the correction is impossible, the steel sheet pile is pulled out and driven again until it is qualified. After the first group of piles are driven, a guide frame is welded along the cofferdam with the front of the steel sheet pile in the direction of the designed edge line to guide the subsequent driving.

[0047] Subsequent construction method: pile driving in groups; For the other construction methods, three piles are driven in a group vertically to disperse the deviation. If there is any deviation, the piles are driven symmetrically on both sides of the first group of piles. The driving direction is from upstream to the closure mouth, and the piles are vibrated step by step to the designed elevation. Vibration hammer is used to drive the construction method piles. Steel plates are welded at the pile heads to protect the steel plate pile heads. After the cofferdam is closed, the stability of the cofferdam is observed to ensure the safety of the cofferdam construction and the progress of the project. S3B3, closure of construction piles; closure of construction piles is the most critical, and when the last five groups of construction piles are driven, closure is ready; before closure, measure the length required for closure in advance, and check whether the last five groups of construction piles meet the closure requirements; if the deviation is large, increase steel pipe piles or reduce steel sheet piles as needed to adjust the length to ensure that the cofferdam fits tightly as a whole without leaks; Step 5: Verticality control; S5A, check the verticality, make sure the first group of construction method piles are qualified, then use the first group of construction method piles as the reference, and then symmetrically drive each steel sheet pile to the designed position on both sides. During the whole construction process, use the hammer ball to always control the verticality of each pile and adjust it in time. Use the total station to track and measure the whole process, check the deviation of the steel sheet pile at any time, and use the fall chain to correct the deviation when the steel sheet pile is deflected. When the deviation is too large to be adjusted by the pulling and extrusion method, it should be pulled up and re-inserted.

[0048] Elevation: The elevation control of the construction method piles is to use a level to control the elevation of the pile top of the first pile, that is, the design elevation. The subsequent construction method piles refer to the elevation of the previous piles and are verified with a level to ensure that the top of the pile is straight and reaches the design elevation, so that the driven piles are neat and evenly stressed.

[0049] Subsequently, the construction of precipitation wells will be carried out. The present invention is fully described for a clearer disclosure, and the prior art is not listed one by one.

[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some of the technical features therein with equivalents; it is obvious for those skilled in the art to combine multiple technical solutions of the present invention. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention. The technical contents not described in detail in the present invention are all known technologies.

Claims

1. A method for pre-storing steel pipes for PLC construction method piles in river and sea areas, characterized by: The pre-storage method comprises the following steps: S1, pre-inspecting the steel pipe pile (1); S2, transferring the pre-inspected qualified steel pipe piles (1) and stacking them horizontally and in layers in a beam yard or construction area.

2. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 1, characterized in that: In step S2, first, the storage assembly (3) is pre-adjusted by driving the movable inclined seat (18) relative to the fixed inclined seat (20) to adjust the inclination of the V-shaped bottom plate (17) so that the outside is high and the inside is low, and a herringbone intermediate frame (12) is placed to support the lower end; Then, the unloaded mobile storage assembly (5) is moved along the trolley track (9) to the mobile station by means of the push-pull assembly (7), the steel pipe pile (1) is placed in the storage assembly (5) by means of a crane, and U-shaped side brackets (14) are placed at intervals to achieve the spacing between the upper and lower layers; secondly, the storage assembly (5) is pushed to the storage station (4), and the adjacent two-side guardrails (13) are connected and fixed between adjacent mobile storage assemblies (5) by means of process cross braces (10); thirdly, the jack legs are lowered to the ground; When the number of steel pipe piles (1) exceeds the storage quantity of all storage components (5), the crane lifts the steel pipe piles (1) to the top of the storage components (5) connected as a whole for staggered stacking, and uses V-shaped pads to space the upper and lower layers of steel pipe piles (1), and places spacing wooden blocks between the opposite steel pipe piles (1).

3. The pre-storage method of PLC construction method pile steel pipe for river and sea areas according to claim 1, characterized in that: In step S1, after the pretreatment assembly (2) is transported and hoisted to a set location, it is assembled on site and pre-inspected with the aid of a rotating frame assembly (21); S1.1, at the loading station (22), the steel pipe piles (1) on the transport vehicle are rolled in one by one and turned into a vertical state; S1.2, grinding away rust, burrs and dirt on the steel pipe pile (1) at the grinding station (23); S1.3, at the inspection station (24), using the plumb line principle, inspect the shape and position tolerances of the inner and outer walls of the steel pipe pile (1); S1.4, at the discharging station (25), the steel pipe piles (1) are discharged one by one.

4. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 3, characterized in that: In step S1.1, first, the steel pipe pile (1) is transported from the feeding input part (26) to the feeding inlet (27) by a crane, and the front end of the steel pipe pile (1) enters the feeding inlet (27) and rolls along the connecting inclined surface (37) to the connecting support part (36), and the axis stop fork (38) provides a back stop, and the front end of the steel pipe pile (1) is assisted to be lifted by the auxiliary lifting support; then, the movable finger (61) is rotated and entered through the receiving side opening (39), and the end face spiral guide line (65) is driven to rotate and drive the meshing teeth (66), so that the movable finger (61) moves along the radial cross groove (60) to clamp the corresponding side wall of the steel pipe pile (1), and when the inner side wall of the steel pipe pile (1) is clamped, the lower end face of the steel pipe pile (1) is supported by the probe tongue (67); When the lower end surface of the steel pipe pile (1) needs to be inspected, the central cone head shaft (63) is extended into the steel pipe pile (1) to achieve internal support, and at the same time, the outer wall of the steel pipe pile (1) is clamped by the movable fingers (61); Secondly, with the assistance of the auxiliary lifting support, the cantilever end of the rotating frame assembly (21) is rotated 90 degrees and faces upward, so that the steel pipe pile (1) becomes a vertical state; Next, the swing frame (29) swings, and blocks the subsequent steel pipe pile (1) by raising the upper baffle plate (33), and at the same time, the connecting support portion (36) descends to avoid the rotation forward passage of the cantilever end; wherein the guide groove of the driven lifting frame (34) is driven on the hinge shaft, and the driven guide portion (35) guides the driven lifting frame (34) to rise and fall, and at the same time, the vertical guide portion (30) guides the lifting and lowering of the lifting guide frame (32), so that the upper baffle plate (33) and the connecting support portion (36) are raised and lowered one by one.

5. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 3, characterized in that: S1.2, at the grinding station (23), when it is necessary to grind the outer wall of the steel pipe pile (1), the grinding frame (40) is raised and lowered and the grinding rotary head (41) is rotated, and the steel pipe pile (1) is rotated through the rotating disc seat (58); when it is necessary to clean the inner wall, the grinding rotary head (41) is lowered into the inner cavity of the steel pipe pile (1), and the rotating grinding head (42) is driven to rotate and grind the inner wall.

6. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 3, characterized in that: S1.3, at the inspection station (24), the outer wall of the steel pipe pile (1) is inspected; if the outer wall fails the inspection, it is determined to be an unqualified product; by rotating the rotating head (48), the plumb part (51) wound on the rotating head (48) is lowered and fits with the outer wall of the steel pipe pile (1), and the gap width at the fitting place is observed manually and by a camera to determine whether it is greater than a set threshold value, thereby determining whether the verticality of the steel pipe pile (1) is qualified; When the outer wall is qualified, the inner wall is inspected and checked. When inspecting the inner wall of the steel pipe pile (1), the steel pipe pile (1) is lifted by a crane, the movable fingers (61) clamp the outer wall of the steel pipe pile (1), and the telescopic center cone head shaft (63) is withdrawn downward from the steel pipe pile (1). When inspecting the inner cavity, the oblique rotating shaft (46) is used as the axis to rotate the oblique seat (47) from a horizontal state to a vertical state, so that under the action of gravity, the plumb part (51) hangs down to one side of the camera part (52) and is vertically parallel. Then, the plumb part (51) is attached to the inner wall of the steel pipe pile (1), the rotating disc seat (58) rotates, and the camera part (52) records or takes pictures to detect the verticality of the inner wall.

7. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 3, characterized in that: S1.4, at the discharge station (25), with the cooperation of the auxiliary lifting support, the cantilever end rotates 90 degrees and falls onto the rising output support (53), the movable finger (61) separates from the steel pipe pile (1), and the steel pipe pile (1) rolls to the entrance (57) of the output belt and is blocked by the output lower baffle (54); then, the output support (53) descends and leaves the discharge station (25), and at the same time, the output lower baffle (54) descends synchronously, and the output upper baffle (55) continues to block until the output upper baffle (55) leaves the entrance (57) of the output belt and the steel pipe pile (1) rolls out.

8. The method for pre-storing steel pipes for PLC construction piles in river and sea areas according to claim 3, characterized in that: Between steps S1.3 and S1.4, several work stations are arranged; the work stations include a welding station, an anti-rust paint application station and / or a labeling station, for performing corresponding operations.

9. A PLC pile operation method for river and sea areas, characterized by: The operation method includes the following steps; Step 1, pre-storing the steel pipe pile (1) by means of the pre-storage method according to any one of claims 1 to 8; Step 1A, when the steel sheet piles are inspected at the site, first, the steel pipe piles (1) are polished and inspected for appearance, including surface defects and rust; then, holes are cut and cross-section defects are reinforced; Step 1B, verticality inspection, deformation inspection of the steel pipe pile (1); Step 1C, repairing and protecting the steel pipe pile (1); Step 1D: qualified steel pipe piles (1) are stored in a centralized manner at the construction site or beam yard; Step 1E, extending the steel pipe pile (1); the steel pipe pile (1) is installed in sections and fully butted and welded.

10. The PLC pile operation method for river and sea areas according to claim 9, characterized in that: Step 2: PLC method pile construction; Step 2A, compacting the soil within the foundation pit construction range in the island construction area; Step 2B, performing PLC method pile hoisting; Step 2C, the end of the steel pipe pile (1) is reinforced to prevent damage to the end of the steel pipe pile during the insertion process, and the steel pipe pile and the lock are welded. When welding the lock, the steel pipes must be connected and stabilized on site, and then the ink line is stretched throughout the length; the lock strip must be welded using a skip welding process to prevent deformation; Step 3: inserting and driving PLC method piles; Step 3A, measurement and setting out, according to the design drawings, lay out the edge line of the main pier cap, then take the main pier cap as the reference, extend 1.53m and 1.61m outward, lay out the construction method pile driving center axis, sprinkle gray lines on the ground in the island area to indicate; mark in the steel platform area; Step 3B, setting a guide frame, inserting and driving a first set of method piles at the center of the upstream of the steel cofferdam, and using the method piles as guide piles for subsequent insertion, and welding double-jointed steel sections on both sides of the guide piles as a guide frame; Step 4: driving PLC method piles; Before the construction pile cofferdam is sunk, the debris dropped during construction at the base should be cleared away. The locks of the pile groups and single piles should be coated with butter mixture to reduce the friction resistance during insertion and ensure the anti-seepage performance. When encountering sand layers that are difficult to drive into, high-pressure water jetting is used as an auxiliary measure to ensure that the driving depth of steel pipe piles and steel sheet piles meets the design requirements; Before driving the steel pipe pile (1), the lock buckle is caulked with water-stop material; the verticality of the pile body of the first steel pipe pile (1) should be controlled within 0.5% of the pile length; the verticality of other steel pipe piles (1) should be controlled within 1% of the pile length; during driving, the position and verticality of the steel pipe pile (1) are checked; In step 3B, it is crucial to determine the construction sequence of the steel sheet piles. The order of driving the steel sheet piles is to start from the upstream of the cofferdam, drive them symmetrically on both sides, and close them at the center of the downstream of the cofferdam. The order of driving the steel sheet piles is as follows: S3B1, the first set of method piles are driven as positioning piles; The driving of the first steel sheet pile plays a key role in positioning. The driving starts from the upstream of the steel cofferdam. The steel sheet pile is fixed in a vertical position before being driven. During the driving process, measurement and tracking are required, and corrections are made at any time. When the correction is impossible, the steel sheet pile is pulled out and driven again until it is qualified. After the first group of piles are driven, a guide frame is welded along the cofferdam with the front of the steel sheet pile in the direction of the designed edge line to guide the subsequent driving. S3B2, subsequent construction method, pile driving in groups; For the other construction methods, three piles are driven in a group vertically to disperse the deviation. If there is any deviation, the piles are driven symmetrically on both sides of the first group of piles. The driving direction is from upstream to the closure mouth, and the piles are vibrated step by step to the designed elevation. Vibration hammer is used to drive the construction method piles. Steel plates are welded at the pile heads to protect the steel plate pile heads. After the cofferdam is closed, the stability of the cofferdam is observed to ensure the safety of the cofferdam construction and the progress of the project. S3B3, closure of construction piles; closure of construction piles is the most critical, and when the last five groups of construction piles are driven, closure is ready; before closure, measure the length required for closure in advance, and check whether the last five groups of construction piles meet the closure requirements; if the deviation is large, increase steel pipe piles or reduce steel sheet piles as needed to adjust the length to ensure that the cofferdam fits tightly as a whole without leaks; Step 5: Verticality control; S5A, check the verticality, make sure the first group of construction method piles are qualified, then use the first group of construction method piles as the reference, and then symmetrically drive each steel sheet pile to the designed position on both sides. During the whole construction process, use the hammer ball to control the verticality of each pile and adjust it in time. Use the total station to track and measure the whole process, check the deviation of the steel sheet pile at any time. When the steel sheet pile deflects, use the fall chain to correct it. When the deflection is too large to be adjusted by the pulling and extrusion method, it should be pulled up and re-inserted. S5B, elevation; the elevation control of the construction method pile is that the elevation of the pile top is controlled by a level for the first pile, that is, the design elevation. The elevation of the subsequent construction method piles is referenced to the elevation of the previous piles and verified with a level to ensure that the top of the pile is straight and reaches the design elevation, so that the driven piles are neat and evenly stressed. Step six, subsequently carry out the dewatering well construction work.