Method for disassembling and assembling huge pulley unit of gear rack vertical ship lift
By using the coordinated operation of locking devices, support devices and tensioning devices in the vertical hoist, the complexity and safety risks in the pulley unit disassembly and assembly process are solved, and the efficient disassembly and assembly process is realized, reducing costs and construction periods. Ensure the safe operation of the ship lift.
Patent Information
- Application Number
- CN202411130195.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The disassembly and assembly process of the giant pulley unit of the vertical lift has problems such as complex construction, long construction period, high cost and great safety risks, and lacks mature experience cases.
A method of disassembly and assembled a giant pulley unit of a rack and rack vertical hoist, including a preset locking device and a support device. Through the coordinated operation of measurement recording, tensioning device and lifting equipment, the pulley unit is gradually removed and installed, and through Hydraulic cylinders and hydraulic pump stations realize rapid tensioning and disassembly of wire ropes.
It significantly reduces the difficulty of construction technology, saves manpower and resources, improves disassembly and assembly efficiency, reduces safety risks, and ensures the safe and stable operation of the ship lift.
Smart Images

Figure CN118958247A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vertical ship lift maintenance, and in particular to a method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift. Background Art
[0002] A ship lift is a navigation structure that uses the method of raising and lowering the ship support box to enable ships to overcome the water level difference on the channel. It is a type of lifting machinery. Figure 1 , where the ship-carrying compartment 5 is a box component for carrying ships, and the counterweight system belongs to the load balancing counterweight system in the lifting machinery, which is specially used to balance the load of the ship-carrying compartment, reduce the power of the motor, and stabilize the lifting and lowering operation state of the ship-carrying compartment. It is one of the core components in the overall structure of the ship lift. A certain ship lift counterweight system is installed with more than ten sets, which are symmetrically arranged on both sides of the cabin room. The counterweight system consists of equipment such as a pulley unit 1, a counterweight group 2, a wire rope 3, a counterweight chain 4 and a wire rope adjustment device. Each counterweight group is connected to the ship-carrying compartment 5 after a plurality of wire ropes pass through a plurality of pulley units 1. The pulley unit 1 is the upper bearing fulcrum for the mutually balanced operation of the ship-carrying compartment 5 and the counterweight group 2, and bears the ballast brought by the weight of the ship-carrying compartment 5 and the counterweight 2 during the operation of the ship lift.
[0003] The pulley unit 1 adopts a single-bearing double-rope groove structure, with a diameter of more than 5000mm, a thickness of 500mm, a single weight of 12t, and a self-lubricating central bearing. During the long-term operation of the ship lift, the pulley bearing is easily worn due to the ballast, affecting the working state of the pulley block and thus affecting the safe operation of the ship lift. The pulley unit 1 needs to be disassembled and replaced regularly. As the upper bearing fulcrum connecting the counterweight system and the ship compartment, the replacement of the pulley unit 1 is not simply a single pulley replacement, but involves a complete set of balancing system components from the balancing group, wire rope, and ship compartment. Its replacement has the outstanding characteristics of high technical requirements, complex construction, long construction period, high cost, and high safety risks. It is the first time in the industry and there is no mature experience to learn from. Summary of the invention
[0004] In order to solve the current technical problems, the main purpose of the present invention is to provide a method for disassembling and assembling the giant pulley unit of a rack and pinion vertical ship lift, which can overcome the various technical difficulties faced in the construction, and complete the disassembly, assembly and replacement of the giant pulley unit of the rack and pinion vertical ship lift with high quality and efficiency, providing the industry with mature experience cases for reference.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift, comprising the following steps: S1. Pre-set the locking device for limit balance reorganization on the operating platform in place; S2. The ship carriage and the balancing assembly are parked to the required construction state, and the initial quantities of relevant parameters are measured and recorded; S3. Arrange the locking device in place through the operating platform so that the locking device is located at the lower side of the balancing assembly to provide limited support for the balancing assembly; S4. Arrange the supporting device on both sides of the pulley unit that needs to be replaced in the machine room; S5, installing the tensioning device on the wire rope connecting plate on one side of the ship-carrying compartment and connecting and fixing it with the wire rope; separating the wire rope on one side of the ship-carrying compartment from the ship-carrying compartment through the tensioning device; S6. Lift the steel wire rope by the lifting equipment in the machine room to separate the steel wire rope from the pulley unit, and place the steel wire rope on the supporting device; S7, remove the pulley unit by lifting equipment, and then install a new pulley unit; S8. Re-install the wire rope and arrange it on the pulley unit; S9, restore the connection between the ship-carrying compartment and the wire rope through the tensioning device; S10, removing the locking device and the supporting device; S11. Complete the retest records of relevant parameters.
[0006] In S1, when the balancing assembly is located below the operating platform, the locking device is hoisted onto the operating platform.
[0007] In S2, the construction requirement status of the ship-carrying compartment and the balancing assembly is that the ship-carrying compartment is in the low-level maintenance position, the balancing assembly is in the high-level maintenance position, and the high-level maintenance position is above the operating platform; In this state, the measurement records including the initial quantities of the following relevant parameters are made: The elevation of the center axis of the pulley unit to be removed; The actual lengths of the two steel wire ropes corresponding to the pulley unit to be removed; The bottom elevation of the balanced reassembly mounted on the two steel wire ropes corresponding to the pulley unit to be removed; The two steel wire ropes corresponding to the pulley unit to be removed correspond to the elevation of the side deck of the ship compartment.
[0008] In S3, when not in maintenance mode, the locking device is parked on the operating platform on one side of the counterweight well; During the inspection and maintenance, the locking device stops at the state of crossing the counterweight well, and then the steel wedge pad is used to fill the space between the counterweight and the locking device tightly, so that the counterweight cannot go down to change the initial elevation posture.
[0009] In S4, two supporting devices are hoisted to both sides of the pulley unit to be dismantled; the top of the supporting device is at the same elevation as the central axis of the pulley unit, and the bottom is in close contact with the ground and is cushioned; by adjusting the distance between the locking device and the concrete pier, the supporting device is in close contact with the concrete pier on the other side.
[0010] In S5, the locking connecting beam of the tensioning device is hoisted onto the flower basket connecting bolts at the head of the wire rope and is tightened and fixed by tightening the bolts; Lift the hydraulic cylinder to the ship's steel wire rope connection plate, and connect the lower part of the hydraulic cylinder to the ear hole on the ship's steel wire rope connection plate using the connecting shaft; Hoist the connecting rod and connect it with the locking connecting beam through the shaft; The hydraulic pump station is hoisted onto the deck of the carrier, and the hydraulic pump station is connected to the hydraulic cylinder through a high-pressure hose; Start the hydraulic pump station, control the piston rod of the hydraulic cylinder to extend upward, and connect the piston rod end of the hydraulic cylinder with the connecting rod through the shaft; Control the piston rod of the hydraulic cylinder to retract downward, so that the hydraulic cylinders on both sides can carry load synchronously; Control the two hydraulic cylinders to pull downward synchronously to a set value, remove the connecting shaft between the basket connecting bolt and the ship compartment wire rope connecting plate, and release the connection between the wire rope and the ship compartment; The piston rod of the hydraulic cylinder is controlled to extend upward synchronously to a no-load state, at which time the wire rope returns to a free state; and the coupling between the hydraulic cylinder and the corresponding connecting rod is released.
[0011] In S6, the lifting device is moved above the pulley unit to be removed; The two hooks of the lifting equipment are respectively hooked with the lifting rope, and the lifting rope and the wire rope are installed and clamped by the rope clamp; The lifting equipment synchronously lifts the steel wire rope upwards to make the steel wire rope disengage from the pulley unit; The lifting equipment moves, causing the wire rope to move above the supporting device; The two lifting ropes are lowered synchronously so that the wire ropes fall into the notches on the supporting device; Manually place the locking beam next to the wire rope at the counterweight wellhead; Disconnect the lifting rope from the lifting equipment and connect the lifting rope to the locking lug of the locking beam using the shackle.
[0012] In S7, the verticality and the installation position of the pulley unit to be removed are measured and recorded; Hang a new lifting rope on the hook of the lifting equipment, lower the lifting rope to connect it with the hole just above the pulley unit, lift the pulley unit away from the concrete pier to a high position, move downstream to the lifting hole, lower the pulley unit to the maintenance platform, and release the connection between the lifting rope and the pulley unit; Connect the new pulley unit to the lifting rope, lift the new pulley unit, and lift the new pulley unit onto the support of the concrete pier; Re-measure the verticality and installation position of the newly installed pulley unit to ensure that it is restored to the state before removal; Disconnect the lifting rope from the pulley unit.
[0013] In S8, two hooks of the lifting equipment are lowered above the locking beam respectively; Release the shackle connection between the lifting rope and the locking lug of the locking beam, and connect the lifting rope to the two hooks respectively; Move the locking beam away from the counterweight wellhead; The two hooks are lifted up synchronously, so that the wire rope is separated from the supporting device and the height of the wire rope exceeds the highest point of the pulley unit; The hook moves to the top of the pulley unit, and after the hook simultaneously lowers the wire rope to the pulley unit, release the rope clamp.
[0014] In S9, the hydraulic pump station is started to control the two hydraulic cylinders to extend upward synchronously to complete the through-shaft connection with the corresponding connecting rods; Control the two hydraulic cylinders to retract and load downward synchronously to stretch the wire rope; After the flower basket connection bolts and the ear holes between the ship's cabin wire rope connection plate are aligned, the through-shaft connection between the flower basket connection bolts and the ship's cabin wire rope connection plate is restored; Control the double hydraulic cylinders to extend upward synchronously to the unloaded state, at which time the wire rope is in the loaded working state; Release the connection between the hydraulic cylinder and the corresponding connecting rod; Disconnect the high-pressure hose between the hydraulic pump station and the hydraulic cylinder; Remove the locking connecting beam, connecting rod and hydraulic cylinder from top to bottom.
[0015] The present invention has the following beneficial effects: By using the method of the present invention, the problems of balanced reorganization rapid support and zero-settlement displacement locking are solved, and the problem of rapid bidirectional tensioning of wire ropes is solved, which can greatly reduce the difficulty of construction technology and save manpower. The designed tooling equipment can be reused, which greatly saves resource investment and reduces operational safety risks. In addition, the operation method is simple, which significantly improves the efficiency of maintenance and replacement of giant pulleys of the ship lift and ensures safe and stable operation of the ship lift. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0017] Figure 1 This is an overall schematic diagram of the interior of the ship lift counterweight shaft.
[0018] Figure 2 It is a schematic diagram of the main structure of placing the locking device of the present invention below the balancing reorganization.
[0019] Figure 3 It is a side view schematic diagram of the locking device of the present invention placed below the balancing reorganization.
[0020] Figure 4 It is a schematic diagram of the front view structure of the support devices installed on both sides of the pulley unit of the present invention.
[0021] Figure 5 It is a side view structural schematic diagram of the support devices installed on both sides of the pulley unit of the present invention.
[0022] Figure 6 It is a schematic structural diagram of the tensioning device of the present invention.
[0023] Figure 7 This is the state diagram before the wire rope detaches from the pulley unit.
[0024] Figure 8 This is the state diagram after the wire rope is separated from the pulley unit.
[0025] Fig. 9 This is the state diagram when preparing to lift out the pulley unit.
[0026] Fig.10 This is the state diagram when the pulley unit is hoisted out.
[0027] In the figure: Pulley unit 1, balancing assembly 2, wire rope 3, balancing chain 4, ship support 5, operating platform 6, concrete pier 7, ship support wire rope connecting plate 8, basket connecting bolt 9; Locking device 10, steel wedge pad 11; Support device 20, adjustment locking device 21, notch 22; Tensioning device 30, locking connecting beam 31, fastening bolts 32, connecting rod 33, hydraulic cylinder 34, connecting shaft 35, hydraulic pump station 36, high-pressure hose 37; Lifting equipment 40; Hoisting rope 50, rope clamp 51; Locking beam 60, locking lifting eye 61. DETAILED DESCRIPTION
[0028] See also Figure 1-10 As shown, a method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift comprises the following steps: S1, pre-setting the locking device 10 for the limit balance reassembly 2 on the operating platform 6 in place; S2, the ship-carrying compartment 5 and the balancing assembly 2 are parked to the construction required state position, and the initial quantities of relevant parameters are measured and recorded; S3, placing the locking device 10 in place through the operating platform 6, so that the locking device 10 is located at the lower side of the balancing assembly 2, so as to provide limited support for the balancing assembly 2; S4, arranging the supporting device 20 on both sides of the pulley unit 1 that needs to be replaced in the machine room; S5, install the tensioning device 30 on the wire rope connecting plate 8 on one side of the ship-carrying compartment 5, and connect and fix it with the wire rope 3; separate the wire rope 3 on one side of the ship-carrying compartment 5 from the ship-carrying compartment 5 through the tensioning device 30; S6, lifting the steel wire rope 3 by the lifting equipment in the machine room, so that the steel wire rope 3 is separated from the pulley unit 1, and the steel wire rope 3 is placed on the supporting device 20; S7, removing the pulley unit 1 by lifting equipment, and then installing a new pulley unit 1; S8, re-install the wire rope and arrange it on the pulley unit 1; S9, restoring the connection between the ship-carrying compartment 5 and the steel wire rope 3 through the tensioning device 30; S10, removing the locking device 10 and the supporting device 20; S11. Complete the retest records of relevant parameters.
[0029] By using the method of the present invention, the problems of balanced reorganization rapid support and zero-settlement displacement locking are solved, and the problem of rapid bidirectional tensioning of wire ropes is solved, which can greatly reduce the difficulty of construction technology and save manpower. The designed tooling equipment can be reused, which greatly saves resource investment and reduces operational safety risks. In addition, the operation method is simple, which significantly improves the efficiency of maintenance and replacement of giant pulley units of ship lifts and ensures safe and stable operation of ship lifts.
[0030] like Figure 1 As shown, in S1 , when the balancing assembly 2 is located below the operating platform 6 , the locking device 10 is hoisted onto the operating platform 6 .
[0031] Since the ship lift tower is a fully enclosed structure, when the ship lift is shut down for maintenance, the ship holding compartment 5 is at an inspection position at an elevation of 62m, and the balancing assembly 2 is at an inspection position at an elevation of 176m. The locking device 10 is arranged on the 175m operating platform 6 during maintenance. It needs to be hoisted and transferred from the running route of the balancing assembly 2 to the operating platform 6. Therefore, it needs to be hoisted and transferred to the operating platform 6 for storage when the balancing assembly 2 is at an elevation below the operating platform 6.
[0032] like Figure 1As shown, in S2, the construction requirement status of the ship-carrying compartment 5 and the balancing assembly 2 is that the ship-carrying compartment 5 is in the low-level maintenance position, the balancing assembly 2 is in the high-level maintenance position, and the high-level maintenance position is above the operating platform 6, which is convenient for installing the locking device 10.
[0033] In this state, the measurement records including the initial quantities of the following relevant parameters are made: The elevation of the central axis of the pulley unit 1 to be removed; The actual lengths of the two steel ropes 3 corresponding to the pulley unit 1 to be removed; The bottom elevation of the balancing assembly 2 mounted by the two steel wire ropes 3 corresponding to the pulley unit 1 to be removed; The two steel wire ropes 3 corresponding to the pulley unit 1 to be removed correspond to the side deck elevation of the ship compartment 5 .
[0034] It is convenient to check the data after installation after replacing the pulley unit 1.
[0035] See also Figure 2 , 3 , in S3, when not in maintenance state, the locking device 10 is parked on the operating platform 6 on one side of the counterweight well; During the inspection, the locking device 10 stops in the state of crossing the counterweight well, and the steel wedge pad 11 is used to pad the space between the counterweight 2 and the locking device 10 tightly, so that the counterweight 2 cannot go down to change the initial elevation posture.
[0036] Specifically, in this embodiment, the locking device 10 is a steel beam structure.
[0037] See also Figure 4 , 5 In S4, the arrangement steps of the wire rope support device 20 are as follows: Two support devices 20 are hoisted to both sides of the pulley unit 1 to be removed. The top of the support device 20 is at the same elevation as the central axis of the pulley unit 1, and the bottom is in close contact with the ground and is padded; by adjusting the distance between the locking device 21 and the concrete pier 7, the support device 20 is in close contact with the concrete pier 7 on the other side. In this way, the installation and fixation of the support device 20 is achieved. In this embodiment, the adjustment locking device 21 is in the form of a screw and a nut sleeve, and the screw extends out of the nut sleeve, thereby abutting against the concrete pier 7 to fix the support device 20.
[0038] See also Figure 6 In S5, the arrangement steps of the wire rope tensioning device 30 are as follows: Use the lifting equipment 40 to hoist the locking connecting beam 31 of the tensioning device 30 to the basket connecting bolt 9 at the head of the wire rope 3, and tighten it with the fastening bolt 32; The hydraulic cylinder 34 is hoisted onto the ship's cabin wire rope connecting plate 8 by using the lifting equipment 40, and the lower part of the hydraulic cylinder 34 is connected to the ear hole on the ship's cabin wire rope connecting plate 8 by using the connecting shaft 35; Use the lifting equipment 40 to hoist the connecting rod 33 and connect it to the locking connecting beam 31 through the shaft; The hydraulic pump station 36 is hoisted onto the deck of the ship carrier 5 by means of a lifting device 40, and the hydraulic pump station 36 is connected to the hydraulic cylinder 34 via a high-pressure hose 37; Start the hydraulic pump station 36 to control the piston rod of the hydraulic cylinder 34 to extend upward, and connect the piston rod end of the hydraulic cylinder 34 to the connecting rod 33 through the shaft; Control the piston rod of the hydraulic cylinder 34 to retract downward, so that the hydraulic cylinders 34 on both sides can carry a load of 10KN synchronously; The two hydraulic cylinders 34 are controlled to pull downward synchronously until the load reaches the set value of 80t and then stop loading, remove the connecting shaft 35 between the flower basket connecting bolt 9 and the ship compartment wire rope connecting plate 8, and release the connection between the wire rope 3 and the ship compartment 5; The piston rod of the hydraulic cylinder 34 is controlled to extend upward synchronously to a no-load state, at which time the steel wire rope 3 returns to a free state; The coupling between the hydraulic cylinder 34 and the corresponding connecting rod 33 is released by using the lifting equipment 40 .
[0039] Through the above method, the connection between the steel wire rope 3 and the ship-carrying box 5 is released, so that the steel wire rope 3 is in a free state.
[0040] See also Figure 5 , 7 8. In S6, the steps of disengaging the steel wire rope 3 from the pulley unit 1 are as follows: The bridge crane in the machine room is moved to the top of the pulley unit 1 to be removed; The two hooks of the bridge crane are respectively hooked with the lifting rope 50, and the lifting rope 50 and the wire rope 3 are installed and clamped by the rope clamp 51; The lifting equipment synchronously lifts the steel wire rope 3 upwards to make the steel wire rope 3 detach from the pulley unit 1; The lifting equipment moves, so that the wire rope 3 moves to above the supporting device 20; The two hoisting ropes 50 are lowered synchronously, so that the wire rope 3 falls into the notch 22 on the supporting device 20; Manually place the locking beam 60 next to the wire rope 3 at the counterweight wellhead; The connection between the hoisting rope 50 and the lifting equipment is released, and the hoisting rope 50 is connected to the locking lug 61 of the locking beam 60 by means of a shackle.
[0041] Through the above method, the steel wire rope 3 on the pulley unit 1 is transferred to the supporting device 20 .
[0042] See also Fig. 9 , 10 In S7, the steps to remove the pulley unit and install a new pulley unit are as follows: Measure and record the verticality and installation position of the pulley unit 1 to be removed; A new lifting rope 50 is hooked on the hook of the lifting equipment, and the lifting rope 50 is lowered from the hook to connect with the hole just above the pulley unit 1, and the pulley unit 1 is lifted to a high position away from the concrete pier 7, and then moved downstream to the lifting hole, and the pulley unit 1 is lowered to the maintenance platform, and the connection between the lifting rope 50 and the pulley unit 1 is released; Connect the new pulley unit 1 to the hoisting rope 50, hoist the new pulley unit 1, and hoist the new pulley unit 1 onto the support of the concrete pier 7; Re-measure the verticality and installation position of the newly installed pulley unit 1 to ensure that it is restored to the state before removal; The connection between the hoisting rope 50 and the pulley unit 1 is released.
[0043] Through the above method, the disassembly of the old pulley unit 1 and the installation of the new pulley unit 1 are achieved.
[0044] See also Figure 7 , 6 In S8, the steps of re-installing the steel wire rope 3 on the pulley unit 1 are as follows: The two hooks of the lifting equipment are lowered to above the locking beam 60 respectively; Release the shackle connection between the lifting rope 50 and the locking lug 61 of the locking beam 60, and connect the lifting rope 50 to the two hooks respectively; Move the locking beam 60 away from the counterweight wellhead; The two hooks are lifted up synchronously, so that the wire rope 3 is separated from the supporting device 20, and the height of the wire rope 3 exceeds the highest point of the pulley unit 1; The hook moves to the top of the pulley unit 1 , and after the hook simultaneously lowers the wire rope 3 onto the pulley unit 1 , the rope clamp 51 is released.
[0045] In the above manner, the steel wire rope 3 is reinstalled onto the new pulley unit 1 .
[0046] See also Figure 6 In S9, the steps of restoring the connection between the ship-bearing compartment 5 and the steel wire rope 3 by the tensioning device 30 are as follows: Start the hydraulic pump station 36 to control the hydraulic cylinders 34 to extend upward synchronously to complete the through-shaft connection with the corresponding connecting rods 33; Control the hydraulic cylinder 34 to retract and load downward synchronously to stretch the wire rope 3; After the ear holes between the flower basket connecting bolt 9 and the ship cabin wire rope connecting plate 8 are aligned, the through-shaft connection between the flower basket connecting bolt 9 and the ship cabin wire rope connecting plate 8 is restored; Control the hydraulic cylinder 34 to extend the cylinders synchronously upward to the unloaded state, at which time the wire rope 3 is in the mounted working state; Release the connection between the hydraulic cylinder 34 and the corresponding connecting rod 33; Release the connection between the high-pressure hose 37 between the hydraulic pump station 36 and the hydraulic cylinder 34; The locking connecting beam 31 , the connecting rod 33 and the hydraulic cylinder 34 are removed in sequence from top to bottom.
[0047] Through the above method, the connection between the ship-bearing box 5 and the steel wire rope 3 is restored, and the tensioning device 30 is removed.
[0048] In S10, Figure 3 As shown, the steps for removing the locking device 10 and the supporting device 20 are as follows: Remove the steel wedge plate 11 between the balancing assembly 2 and the locking device 10; The locking device 10 is moved onto the operating platform 6 .
[0049] The bolts of the adjusting locking device 21 are screwed back to loosen the supporting device 20 from the concrete pier 7, and the supporting device 20 is hoisted to the storage area.
[0050] In S1, the following key parameters were retested: Elevation of the center axis of the newly installed pulley unit 1; The actual lengths of the two steel ropes 3 corresponding to the newly installed pulley unit 1; The bottom elevation of the balancing assembly 2 mounted by the two steel wire ropes 3 corresponding to the newly installed pulley unit 1; The deck elevation of the side of the ship-bearing compartment 5 corresponding to the two steel wire ropes 3 corresponding to the newly installed pulley unit 1; The parameters shall be compared with the parameters before construction and recorded, and the parameter deviation shall not exceed the design value.
[0051] At this time, the ship-bearing compartment 5 and the counterweight return to normal working condition.
[0052] By using the method of the present invention, the problems of balanced reorganization rapid support and zero-settlement displacement locking are solved, and the problem of rapid bidirectional tensioning of wire ropes is solved, which can greatly reduce the difficulty of construction technology and save manpower. The designed tooling equipment can be reused, which greatly saves resource investment and reduces operational safety risks. In addition, the operation method is simple, which significantly improves the efficiency of maintenance and replacement of giant pulleys of the ship lift and ensures safe and stable operation of the ship lift.
Claims
1. A method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift, characterized in that: The following steps are involved: S1. Pre-setting the locking device (10) for the limit balance reassembly (2) in place on the operating platform (6); S2, the ship-carrying compartment (5) and the balancing assembly (2) are parked to the construction required state position, and the initial quantities of relevant parameters are measured and recorded; S3, placing the locking device (10) in place through the operating platform (6), so that the locking device (10) is located at the lower side of the balancing assembly (2), so as to provide limited support for the balancing assembly (2); S4, arranging the supporting device (20) on both sides of the pulley unit (1) to be replaced in the machine room; S5, installing the tensioning device (30) on the steel wire rope connecting plate (8) on one side of the ship-carrying compartment (5), and connecting and fixing the tensioning device (3) to the steel wire rope (3); separating the steel wire rope (3) on one side of the ship-carrying compartment (5) from the ship-carrying compartment (5) by using the tensioning device (30); S6. Lifting the steel wire rope (3) by means of a lifting device in the machine room, so that the steel wire rope (3) is separated from the pulley unit (1), and placing the steel wire rope (3) on the supporting device (20); S7, removing the pulley unit (1) by lifting equipment, and then installing a new pulley unit (1); S8, re-installing the wire rope and arranging it on the pulley unit (1); S9, restoring the connection between the ship-carrying compartment (5) and the steel wire rope (3) through the tensioning device (30); S10, removing the locking device (10) and the supporting device (20); S11. Complete the retest records of relevant parameters.
2. A method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S1, when the balancing assembly (2) is located below the operating platform (6), the locking device (10) is hoisted onto the operating platform (6).
3. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S2, the construction requirement status of the ship-carrying compartment (5) and the balancing assembly (2) is that the ship-carrying compartment (5) is in a low-level maintenance position, the balancing assembly (2) is in a high-level maintenance position, and the high-level maintenance position is above the operating platform (6); In this state, the measurement records including the initial quantities of the following relevant parameters are made: The elevation of the center axis of the pulley unit (1) to be removed; The actual lengths of the two steel wire ropes (3) corresponding to the pulley unit (1) to be removed; The bottom elevation of the two steel wire ropes (3) mounted on the pulley unit (1) to be removed and the balancing assembly (2); The two steel wire ropes (3) corresponding to the pulley unit (1) to be removed correspond to the side deck elevation of the ship-bearing compartment (5).
4. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S3, in a non-maintenance state, the locking device (10) is parked on an operating platform (6) on one side of the counterweight well; When in the maintenance state, the locking device (10) is stopped in a state of crossing the counterweight well, and then a steel wedge pad (11) is used to pad the space between the counterweight assembly (2) and the locking device (10) tightly, so that the counterweight assembly (2) cannot go down to change its initial elevation posture.
5. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S4, two support devices (20) are hoisted to both sides of the pulley unit (1) to be removed; the top of the support device (20) is at the same elevation as the central axis of the pulley unit (1), and the bottom is in close contact with the ground and is cushioned; by adjusting the distance between the locking device (21) and the concrete pier (7), the support device (20) is in close contact with the concrete pier (7) on the other side.
6. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S5, the locking connecting beam (31) of the tensioning device (30) is hoisted onto the flower basket connecting bolt (9) at the head of the steel wire rope (3), and is tightened and fixed by means of the fastening bolt (32); The hydraulic cylinder (34) is hoisted onto the ship's steel wire rope connection plate (8), and the lower part of the hydraulic cylinder (34) is connected to the ear hole on the ship's steel wire rope connection plate (8) by using the connection shaft (35); The connecting rod (33) is hoisted and connected to the locking connecting beam (31) through the shaft; The hydraulic pump station (36) is hoisted onto the deck of the ship carrier (5), and the hydraulic pump station (36) is connected to the hydraulic cylinder (34) via a high-pressure hose (37); The hydraulic pump station (36) is started to control the piston rod of the hydraulic cylinder (34) to extend upward, and the piston rod end of the hydraulic cylinder (34) is connected to the connecting rod (33) through the shaft; Controlling the piston rod of the hydraulic cylinder (34) to retract downward, so that the hydraulic cylinders (34) on both sides are loaded synchronously; Controlling the two hydraulic cylinders (34) to tension and load downward synchronously to a set value, removing the connecting shaft (35) between the basket connecting bolt (9) and the ship compartment wire rope connecting plate (8), and releasing the connection between the wire rope (3) and the ship compartment (5); The piston rod of the hydraulic cylinder (34) is controlled to extend upward synchronously to a no-load state, at which time the steel wire rope (3) returns to a free state; and the coupling between the hydraulic cylinder (34) and the corresponding connecting rod (33) is released.
7. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S6, the lifting device is moved above the pulley unit (1) to be removed; The two lifting hooks of the lifting equipment are respectively hooked with a lifting rope (50), and the lifting rope (50) and the steel wire rope (3) are installed and clamped by using a rope clamp (51); The lifting equipment synchronously lifts the steel wire rope (3) upwards to separate the steel wire rope (3) from the pulley unit (1); The lifting device moves, so that the steel wire rope (3) moves to above the supporting device (20); The two lifting ropes (50) are lowered synchronously so that the steel wire rope (3) falls into the notch (22) on the supporting device (20); Manually placing the locking beam (60) adjacent to the steel wire rope (3) at the counterweight wellhead; The connection between the lifting rope (50) and the lifting equipment is released, and the lifting rope (50) is connected to the locking lug (61) of the locking beam (60) via a shackle.
8. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S7, the verticality and installation position of the pulley unit (1) to be removed are measured and recorded; A new lifting rope (50) is hooked on the lifting hook of the lifting equipment, and the lifting rope (50) is lowered from the hook to be connected to the hole directly above the pulley unit (1), and the pulley unit (1) is lifted to be separated from the concrete pier (7) to a high position, and moved downstream to the lifting hole, and the pulley unit (1) is lowered to the maintenance platform, and the connection between the lifting rope (50) and the pulley unit (1) is released; Connecting the new pulley unit (1) to the lifting rope (50), lifting the new pulley unit (1), and lifting the new pulley unit (1) onto the support of the concrete pier (7); Re-measure the verticality and installation position of the newly installed pulley unit (1) to ensure that it is restored to the state before removal; The connection between the lifting rope (50) and the pulley unit (1) is released.
9. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S8, two hooks of the lifting equipment are lowered to above the locking beam (60) respectively; Release the shackle connection between the lifting rope (50) and the locking lug (61) of the locking beam (60), and connect the lifting rope (50) to the two hooks respectively; Move the locking beam (60) away from the counterweight wellhead; The two hooks are lifted upward synchronously, so that the steel wire rope (3) is separated from the supporting device (20), and the height of the steel wire rope (3) exceeds the highest point of the pulley unit (1); The hook moves to the top of the pulley unit (1), and after the hook simultaneously lowers the wire rope (3) onto the pulley unit (1), the rope clamp (51) is released.
10. The method for disassembling and assembling a giant pulley unit of a rack and pinion vertical ship lift according to claim 1, characterized in that: In S9, the hydraulic pump station (36) is started to control the hydraulic cylinders (34) to extend the cylinders upward synchronously to complete the through-shaft connection with the corresponding connecting rods (33); Control the hydraulic cylinder (34) to retract and load the two cylinders downward synchronously, thereby stretching the steel wire rope (3); After the ear holes between the flower basket connecting bolt (9) and the ship cabin wire rope connecting plate (8) are aligned, the through-shaft connection between the flower basket connecting bolt (9) and the ship cabin wire rope connecting plate (8) is restored; Controlling the two hydraulic cylinders (34) to extend upward synchronously to a no-load state, at which time the steel wire rope (3) is in a mounted working state; Release the connection between the two hydraulic cylinders (34) and the corresponding connecting rods (33); Disconnecting the high-pressure hose (37) between the hydraulic pump station (36) and the hydraulic cylinder (34); The locking connecting beam (31), the connecting rod (33) and the hydraulic cylinder (34) are removed in sequence from top to bottom.
Citation Information
Patent Citations
Full flat type balance vertical ship lift adaptive to ship reception chamber outlet-inlet water
CN102535424A
Elevator lifted by adopting ship lock water delivery theory and operation control method thereof
CN104709802A
Construction method for lifting system of hydraulic ship lift and method for controlling installation precision
CN106988294A
Hydraulic ship lift and ship reception chamber safety unlocking method thereof
CN112609660A
Stretching adjusting device of steel wire rope for connecting vertical ship lifter balance weight