Steel sheet pile cofferdam structure and construction control method

By using welding and groove reinforcement technology between double-layer steel sheet piles and reverse steel sheet piles in the steel sheet pile cofferdam structure, an annular support structure is formed, which solves the problem of stress concentration at the oblique braces, and improves the strength and construction safety of the cofferdam. and simplifies the manufacturing process of the support structure.

CN118958335APending Publication Date: 2024-11-15CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411064319.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When the existing steel sheet pile cofferdam structure withstands the impact force of water flow, the stress concentration at the oblique braces leads to structural damage, which poses a risk of overturning and collapse.

Method used

The double-layer steel sheet pile structure and reverse steel sheet pile welding to form an annular support. Through grooves and cutting block reinforcement, the embedding position of the surrounding purlin is increased, and the annular support structure is formed to disperse stress, and the manufacturing and welding of support beef legs are reduced, which improves the The strength and stiffness of the structure.

Benefits of technology

It significantly improves the strength and stiffness of the cofferdam structure, reduces the impact of local stress and deformation, enhances construction safety, simplifies the construction process, and reduces the manufacturing cost of the support structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958335A_ABST
    Figure CN118958335A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of cofferdam construction, and particularly relates to a steel sheet pile cofferdam structure and a construction control method. The steel sheet pile group comprises a single-layer wall body and a reinforcing section, the single-layer wall body is arranged around the edge of the cofferdam area in a sine wave shape, the reinforcing section is connected to the inner wall of the single-layer wall body in a sine wave shape, the reinforcing section and the single-layer wall body form an annular supporting structure, and the inclined strut is installed on the reinforcing section part of the annular supporting structure. The annular supporting structure is formed between the reinforcing sections and the single-layer wall body, the reinforcing sections are installed at the positions, corresponding to the inclined struts, of the single-layer wall body, the loads of the inclined struts on the single-layer wall body can be shared easily, and the supporting effect of the single-layer wall body is improved. The strength and the rigidity of the cofferdam structure can be improved; the cutting blocks serve as surrounding purlin supporting brackets, so that construction is convenient and faster.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel sheet pile cofferdams, and particularly relates to a steel sheet pile cofferdam structure and a construction control method. Background Art

[0002] A cofferdam is a temporary protective structure that prevents water and soil from entering the construction area. Since most cofferdams are constructed in water areas, in order to reduce the difficulty of construction and allow materials to be reused, most of them are constructed by inserting and driving steel sheet piles in parallel and then sealing them together.

[0003] The cofferdam after enclosure and drainage is subjected to the impact force of water flow or water pressure from outside to inside. If the inner side of the cofferdam is not sufficiently supported, there will be a risk of overturning and collapse. Therefore, it is necessary to add supporting structures such as diagonal braces inside the cofferdam to ensure the balance of the cofferdam.

[0004] Since the impact force or pressure on the outside of the cofferdam acts on the entire surface, while the supporting structures such as the diagonal braces on the inside of the cofferdam are local supports, the unequal force-bearing areas on both sides of the cofferdam will cause stress to be concentrated at the joints of the internal supporting structures such as the diagonal braces, resulting in structural damage. Summary of the invention

[0005] In order to solve the above problems existing in the prior art, the present invention provides a steel sheet pile cofferdam structure and a construction control method to solve the problem of stress concentration at the diagonal brace connection of the cofferdam structure.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A steel sheet pile cofferdam structure comprises a steel sheet pile wall group, a purlin and an inner support; the inner support is connected to the inner wall of the steel sheet pile wall group through the purlin, the steel sheet pile wall group comprises a single-layer steel sheet pile wall arranged around the edge of the cofferdam area and a reverse steel sheet pile arranged corresponding to the installation position of the inner support, the reverse steel sheet pile is welded back-to-back with the steel sheet pile monomer of the single-layer steel sheet pile wall to form a double-layer steel sheet pile, and the purlin is installed on the double-layer steel sheet pile.

[0008] Preferably, a groove and a cutting block are cut and formed on the pile body of the double-layer steel sheet pile corresponding to the installation position of the surrounding purlin, the surrounding purlin is half-embedded in the groove, and the cutting block is welded to the edge of the groove of the double-layer steel sheet pile.

[0009] Preferably, there are multiple surrounding purlins, and the multiple surrounding purlins are arranged layer by layer along the axial direction of the double-layer steel sheet piles.

[0010] Preferably, the reverse steel sheet piles and the steel sheet pile monomers constituting the single-layer steel sheet pile wall are all Larsen steel sheet piles.

[0011] A construction control method for a steel sheet pile cofferdam structure comprises the following steps:

[0012] Step 1: Mark the position and number of internal supports required in the cofferdam structure, prefabricate double-layer steel sheet piles according to the number of required internal supports, and drive the double-layer steel sheet piles into the marked position;

[0013] Step 2: Drive single-layer steel sheet piles along the edge of the cofferdam area so that the single-layer steel sheet piles and double-layer steel sheet piles are connected to enclose the cofferdam area;

[0014] Step 3: Excavate the inside of the cofferdam area to the predetermined installation position of the purlin, cut the double-layer steel sheet piles to form an incision, and retain the cut pieces;

[0015] Step 4: Weld the steel plate at the cut of the double-layer steel sheet pile so that the steel plate is vertically fixed to the inner wall of the double-layer steel sheet pile to form a semi-closed groove, and weld the cutting block between the steel plate and the pile body of the double-layer steel sheet pile for reinforcement;

[0016] Step 5: Align the embedded grooves formed on the double-layer steel sheet piles in the cofferdam area horizontally to embed the purlins into the embedded grooves;

[0017] Step 6: Install the internal support and carry out the subsequent construction of the cofferdam structure and the pedestal structure.

[0018] Preferably, when prefabricating double-layer steel sheet piles, Larsen steel sheet piles are welded back to back to form a double-layer steel sheet pile structure with a hexagonal cross-section, and intermittent welding is used during the axial welding of the two steel sheet piles, with each section welded 10 cm long and a 20 cm interval between adjacent sections.

[0019] Preferably, during the welding of the two steel sheet piles, no welding is performed at the position corresponding to the installation of the surrounding purlin.

[0020] Preferably, the cutting blocks are welded back to back and then welded between the inner wall of the double-layer steel sheet pile and the bottom surface of the surrounding purlin for reinforcement.

[0021] Preferably, steps three to five are cycled to install multiple layers of perimeter purlins layer by layer, and internal supports are installed on each layer of perimeter purlins.

[0022] Preferably, step five includes welding stiffening plates between each layer of purlin steel sections.

[0023] The beneficial effects of the present invention are:

[0024] On the one hand, the present invention forms an annular supporting structure between the reinforcement section and the corresponding single-layer steel sheet pile wall by arranging the reinforcement section, and a plurality of embedding grooves are formed on the reinforcement section according to the installation area of ​​the perimeter purlin, and the multi-layer perimeter purlin is semi-embedded and installed in the corresponding embedding grooves. Compared with the traditional steel sheet pile cofferdam structure, the strength and rigidity of the cofferdam structure can be greatly increased, the influence caused by large local stress and deformation can be eliminated, and the safety of subsequent construction can be improved; on the other hand, the cutting block of the present invention replaces the function of the perimeter purlin supporting corbel, and compared with the traditional steel sheet pile cofferdam structure, the manufacturing and welding of the supporting corbel are reduced, so that the construction is convenient and quick; therefore, the present invention is suitable for promotion and application in this field, and its market prospect is broad. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0026] Figure 1 It is a schematic elevation diagram of the steel sheet pile cofferdam structure of the present invention;

[0027] Figure 2 It is a partial schematic diagram of the diagonal brace of the present invention;

[0028] Figure 3 This is a schematic cross-sectional view of a hexagonal steel sheet pile according to the present invention;

[0029] Figure 4 It is a schematic cross-sectional view of the back-to-back welded steel sheet piles of the present invention.

[0030] Main component symbols

[0031] In the figure: 1. Single-layer wall; 2. Peripheral purlin; 3. Diagonal brace support; 4. Diagonal brace; 5. Cutting block; 6. Reinforcement section; 7. Steel plate; 8. Stiffening plate; 9. Wooden pad; 10. Base structure. DETAILED DESCRIPTION

[0032] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments:

[0033] See also Figure 1 - Figure 4 The present invention discloses a steel sheet pile cofferdam structure and a construction control method, and the specific implementation methods are as follows:

[0034] In one embodiment, a steel sheet pile cofferdam structure includes a steel sheet pile group and a diagonal brace 4, wherein the steel sheet pile group includes a single-layer wall 1 and a reinforcement section 6. The single-layer wall 1 is a sine wave continuous row structure formed by splicing a plurality of U-shaped steel sheet piles one by one in a positive and negative direction, and is used as a single-layer main wall of the cofferdam. The reinforcement section 6 is also a sine wave continuous row structure formed by splicing a plurality of U-shaped steel sheet piles one by one in a positive and negative direction, such as Figure 2 As shown, the reinforcement section 6 has only one complete trough and two incomplete peaks, and the steel sheet piles used are Larsen steel sheet piles.

[0035] Since stress concentration at the connection between the diagonal brace 4 and the single-layer wall 1 can easily cause a decrease in the structural strength, stability and compressive resistance of the single-layer wall 1, in order to reduce the impact of stress concentration, in this embodiment, the reinforcement section 6 is selected to be set at the connection between the diagonal brace 4 and the single-layer wall 1, and the diagonal brace 4 is installed on the reinforcement section 6 through the diagonal brace support 3. The reinforcement section 6 then applies the supporting force provided by the diagonal brace 4 to the single-layer wall 1, thereby increasing the area of ​​action and reducing the stress value per unit area, thereby achieving the purpose of improving the stress concentration problem.

[0036] The specific connection method between the reinforcement section 6 and the single-layer wall 1 is as follows: a predetermined position for installing the diagonal brace 4 is selected on the single-layer wall 1, and the peak section of the single-layer wall 1 and the trough section of the reinforcement section 6 are selected here for mirror alignment, and then the trough of the single-layer wall 1 and the two incomplete peaks of the reinforcement section 6 are welded together to form a ring-shaped support structure, and the diagonal brace 4 is installed at the trough of the reinforcement section 6.

[0037] It is worth mentioning that the connection structure between the single-layer wall 1 and the reinforcement section 6 can be constructed using prefabricated parts. Before inserting the steel sheet piles, a section of the single-layer wall 1 and a section of the reinforcement section 6 are prefabricated and welded, and then the prefabricated parts are inserted into the predetermined position as a whole.

[0038] When Larsen steel sheet piles are used as U-shaped steel sheet piles, thanks to the fact that the cross-sectional shape of the Larsen steel sheet piles is an isosceles trapezoid, the cross-sectional shape of the annular support structure formed by the single-layer wall 1 and the reinforcement section 6 is an equihexagonal shape. This shape has the same force-bearing principle as the honeycomb structure and has extremely strong multi-directional impact and compression resistance, so that the single-layer wall 1 constituting the main body of the cofferdam can use each annular support structure as a fulcrum to further improve stability.

[0039] In general, in order to ensure the stability of the connection of each steel sheet pile of the single-layer wall 1, it is also necessary to set a purlin 2 around the inner wall of the single-layer wall 1 to achieve the purpose of support and reinforcement connection. And according to the height of the cofferdam and the on-site survey results of the construction area, multiple purlins 2 are adaptively set to reinforce different height sections of the steel sheet piles respectively. However, when the annular support structure of the above embodiment is used to reduce the influence of stress, the inwardly protruding reinforcement section 6 will interfere with the purlin 2. To overcome this problem, in one embodiment, a cut is made on the reinforcement section 6 at a position where it interferes with the purlin 2, and then the cut is reinforced to form an embedded groove, so that the purlin 2 can be embedded in the embedded groove, so that the purlin 2 can continuously contact the inner wall of the single-layer wall 1. At the same time, the embedded groove structure can also provide a more stable limit and support effect for the purlin 2, which is better than the traditional connection method of the purlin 2 and the steel sheet pile.

[0040] After solving the interference problem between the purlin 2 and the reinforcement section 6, the single-layer wall 1 equipped with the purlin 2 and the reinforcement section 6 has a horizontally and vertically staggered quasi-support keel. At this time, the best point of application of the diagonal brace 4 should be at the junction of the purlin 2 and the reinforcement section 6. Therefore, as a further limitation on the connection between the diagonal brace 4 and the reinforcement section 6, in one embodiment, the diagonal brace 4 is connected to the purlin 2 section embedded in the groove. The purlin 2 serves as a connecting medium between the diagonal brace 4 and the reinforcement section 6 to disperse the supporting force of the diagonal brace 4 on the single-layer wall 1 in a larger range, and can also disperse the supporting force of the diagonal brace 4 on the single-layer wall 1 in a larger range by itself. Thereby, the effective area of ​​the supporting force is further increased and the influence of local stress is reduced.

[0041] Since the annular support structure is a hollow structure, after the reinforcement section 6 is cut to form an incision, if the purlin 2 is directly embedded, it will cause excessive load at the edge of the incision of the reinforcement section 6. For this reason, in one embodiment, it is proposed to lay a steel plate 7 structure at the incision so that the edge of the steel plate 7 is welded to the inner wall of the annular support structure, which not only shares the force of the incision section of the reinforcement section 6, but also increases the overall structural strength of the annular support structure, further increasing the stability of the cofferdam structure.

[0042] Following the previous embodiment, the cutting block 5 is cut from the reinforcement section 6. Based on the principle of not wasting construction materials and making the best use of them, the cutting block 5 is welded between the bottom surface of the purlin 2 and the side wall of the reinforcement section 6 to support the purlin 2. The setting of multiple cutting blocks 5 is equivalent to the supporting function of the purlin 2 supporting corbels in traditional construction. In the traditional cofferdam structure, the purlin 2 supporting corbels are used to connect the lower surface of the purlin 2 and the inner wall surface of the single-layer wall 1. The cutting block 5 of this solution replaces the traditional connecting cofferdam body to support the purlin 2 supporting corbels, reducing the manufacturing cost and working hours of the supporting corbels. The characteristic that the cutting block 5 and the reinforcement section 6 are originally integrated also makes it easier to align and match during matching welding, and more convenient in installation.

[0043] During construction, many factors may affect the stability of the steel sheet pile cofferdam structure. For example, if the bearing capacity of the soil foundation around the steel sheet piles is insufficient, the steel sheet piles may sink or tilt, or the cofferdam structure may become unstable due to natural disasters. In order to further improve the stability of the steel sheet pile cofferdam structure when facing a large water flow impact force or other large impacts, when it is determined that there is a risk of insufficient strength in a local area of ​​the single-layer wall 1, a reinforcement section 6 may be reinforced at that location to form an annular support structure for the purpose of strengthening the overall structure, thereby meeting the requirements of on-site construction in different construction scenarios.

[0044] In one embodiment, a construction control method for a steel sheet pile cofferdam structure is disclosed, which specifically includes the following steps:

[0045] Step 1: pre-weld a section of single-layer wall 1 and a section of reinforcement section 6, so that the single-layer wall 1 and the reinforcement section 6 are welded to form an annular support structure, and then the prefabricated annular support structure is inserted into the pre-marked installation position of the diagonal brace 4 at the edge of the cofferdam area;

[0046] Step 2: insert the remaining single-layer wall 1 along the edge of the cofferdam area and weld them one by one to connect the prefabricated annular support structures of each section, so that the cofferdam area is closed;

[0047] Step 3: When the cofferdam area is excavated to the predetermined installation depth of the purlin 2, that is, after excavating to 0.5m below the installation position of each layer of purlin 2, the reinforcement section 6 is cut to form an incision, and the cut block 5 is retained; the steel plate 7 is welded at the upper and lower sections of the incision, so that the steel plate 7 is vertically fixed to the inner wall surface of the annular support structure to form a semi-closed groove. This step first requires the completion of pumping water from the inside of the cofferdam body so that the steel sheet piles to be cut are in a dry environment, and then they are cut to ensure construction safety;

[0048] Step 4: Align the embedded grooves on each annular support structure horizontally, and embed the purlin 2 into each embedded groove synchronously, then weld the cutting block 5 between the bottom surface of the purlin 2 and the side wall of the reinforcement section 6 as a corbel support structure, and put the wooden pad 9 into the groove of the steel sheet pile between the purlin 2 and the cofferdam structure. Any wooden pad 9 consists of two wedge-shaped blocks to fill the gap between the purlin 2 and the cofferdam body. The cooperation between the two wedge-shaped blocks can adjust the size of the wooden pad 9, which can be adjusted according to the gap between the steel sheet pile of the cofferdam body and the purlin 2. Finally, install two diagonal braces 4 at the four corners of the purlin 2 respectively.

[0049] Repeat steps 3 and 4 to install the multi-layer purlin 2 and the diagonal brace 4;

[0050] Step 5: Execute the subsequent construction steps of the cofferdam structure and the cap structure 10.

[0051] S501: After excavating below the bottom of the cap, cut off the excess steel casing;

[0052] S502: pour cushion concrete and chisel away pile heads;

[0053] S503: Cast the cap. After the cap concrete reaches the designed strength, fill the surrounding area with sand and cast a concrete cover layer on the sand layer.

[0054] S503: Construct the pier body and dismantle the purlin 2 according to the installation sequence of the purlin 2.

[0055] The intermittent welding method is used in the welding process of the prefabricated annular support structure. Every time the welding length reaches 10cm, it will be interrupted by 20cm before welding the next one; and no welding is performed at the position corresponding to the installation of the purlin 2

[0056] In one embodiment, step four includes welding stiffening plates 8 between each layer of purlin 2 steel sections. Steel purlin 2 is a retaining structure made of steel, usually composed of upper and lower bearing beams, support rods, etc. Its function is to support the surrounding soil during underground construction to prevent its collapse or slippage and ensure the safety of workers. Moreover, purlin 2 is usually welded from steel sheet piles of the same type, and the force between the steel sheet piles will be unbalanced. Therefore, in order to improve the structural stability of purlin 2 itself, a number of stiffening plates 8 are arranged between the purlin 2 steel sections when assembling purlin 2. A number of stiffening plates 8 are connected to both sides of purlin 2 to reinforce purlin 2 as a whole. In order to further increase the connection stability between the cofferdam body and purlin 2 in subsequent construction. The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A steel sheet pile cofferdam structure, characterized in that: It includes a steel sheet pile group and a diagonal brace; the steel sheet pile group includes a single-layer wall and a reinforcement section, the single-layer wall is arranged around the edge of the cofferdam area in a sinusoidal wave shape, the reinforcement section is also connected to the inner wall of the single-layer wall in a sinusoidal wave shape, and the two form an annular support structure, and the diagonal brace is installed on the reinforcement section part of the annular support structure.

2. A steel sheet pile cofferdam structure according to claim 1, characterized in that: It also includes a surrounding purlin. The reinforcement section of the annular support structure is provided with a plurality of embedding grooves. The surrounding purlin is half-embedded in the reinforcement section of the annular support structure, and the diagonal brace is connected to the surrounding purlin.

3. A steel sheet pile cofferdam structure according to claim 2, characterized in that: The embedding groove is composed of a cut formed on the reinforcement section and a steel plate arranged inside the annular support structure, and the steel plate is vertically welded to the inner wall of the annular support structure.

4. A steel sheet pile cofferdam structure according to claim 1, characterized in that: The cut-off portion of the reinforcement section is a cutting block, and the cutting block is welded between the bottom surface of the surrounding purlin and the side wall of the reinforcement section to support the surrounding purlin.

5. The steel sheet pile cofferdam structure according to claim 2, characterized in that: There are multiple surrounding purlins, and the multiple surrounding purlins are arranged layer by layer along the axial direction of the annular support structure.

6. The steel sheet pile cofferdam structure according to claim 1, characterized in that: The single-layer wall and the reinforcement section are both formed by Larsen steel sheet piles connected in a positive and negative manner in a circular manner.

7. A construction control method for a steel sheet pile cofferdam structure, implementing a steel sheet pile cofferdam structure according to any one of claims 2 to 4, characterized in that: The following steps are involved: Step 1: pre-weld a section of single-layer wall and a section of reinforcement section, so that the single-layer wall and the reinforcement section are welded to form an annular support structure, and then the prefabricated annular support structure is inserted into the pre-marked diagonal brace installation position at the edge of the cofferdam area; Step 2: Insert the remaining single-layer wall along the edge of the cofferdam area and weld them one by one to connect the prefabricated annular support structures of each section to close the cofferdam area; Step 3: When the cofferdam area is excavated to the predetermined installation depth of the purlin, the reinforcement section is cut to form an incision, and the cut block is retained; steel plates are welded at the upper and lower sections of the incision, so that the steel plates are vertically fixed to the inner wall surface of the annular support structure to form a semi-closed embedding groove; Step 4: Align the embedded grooves on each annular support structure horizontally, and embed the surrounding purlins into each embedded groove synchronously, then weld the cutting block between the bottom surface of the surrounding purlin and the side wall of the reinforcement section as a corbel support structure, and finally install the diagonal brace; Step 5: Execute the subsequent construction steps of the cofferdam structure and the foundation structure.

8. The construction control method of a steel sheet pile cofferdam structure according to claim 7, characterized in that: The intermittent welding method is adopted during the welding process of the prefabricated annular support structure. Every time the welding length reaches 10cm, it is interrupted by 20cm and then welded to the next point; and no welding is performed at the position corresponding to the installation of the purlin.

9. The construction control method of a steel sheet pile cofferdam structure according to claim 7, characterized in that: Repeat steps three and four to install multi-layer purlins and diagonal braces.

10. The construction control method of a steel sheet pile cofferdam structure according to claim 7, characterized in that: Each layer of purlins is reinforced with welded stiffening plates.