Tamping and leveling integrated ship with riprapping, tamping and leveling functions and construction technology

By using two winch drives and cable system conversion in the rock-dumping flat ship, the tamping platform truck and the stone-dumping trolley move on the same track, optimize the winch configuration and increase the storage area of ​​the surrounding material cabin, solving the existing technology The problems of many medium winches, large space and complex loading improve construction efficiency and economy.

CN118958354APending Publication Date: 2024-11-15NO 3 ENG COMPANY LTD OF CCCC FIRST HARBOR ENG COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411260037.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the existing rock-throwing flat ship design, the winch is used in large quantities, the total installed power is large, the main deck takes up a lot of space, and the construction cost is high. The platform truck can only be fixed on the side of the ship, and lacks the safety protection function of screwing into the main deck surface. , the loading of the stone throwing device on the side of the extended side is complicated and affected by wind and waves, the effective operation time is short and the efficiency is low.

Method used

Design a tamping integrated boat with rock throwing, compacting and leveling functions, adopting two winch drives and cable system conversion to realize the movement of the tamping platform truck and the stone throwing tamping tamping on the same track, and only one winch is used to pull short The track and tampering platform trucks rotate in or out of the main deck, optimize the winch configuration, increase the storage area of ​​the surrounding material compartment, and adopt follow-up control technology.

Benefits of technology

Reduced the number of trolleys and the layout position, reduced the total power configuration of the ship, improved the construction distance and production efficiency, saved construction and maintenance costs, realized the completion of all the underwater foundation construction of a single ship, and reduced the crossing of multiple ships The wait-for-use cost of the operation increases economicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958354A_ABST
    Figure CN118958354A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ramming and leveling integrated ship construction, in particular to a ramming and leveling integrated ship with riprapping, ramming and leveling functions and a construction technology. Two C-shaped rails are arranged on one side of a main deck face of the ramming and flattening integrated ship in the length direction of the ship, a ramming platform car and a riprapping trolley are arranged on the C-shaped rails at the same time, and a material surrounding bin is arranged in the middle area of a main deck and used for storing stone; and the cable system is used for moving the tamping platform car and the riprap trolley on the track and rotating the tamping platform car towards the inner side of the main deck on the short track together. The safety of the tamping platform truck is improved, the construction cost is effectively saved, the material storage area of the material surrounding bin of the ship main deck is effectively increased, the production efficiency is greatly improved, and the construction and maintenance cost is remarkably saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tamping integrated boat construction, and in particular to a tamping integrated boat with riprap, tamping and leveling functions and a construction process. Background Art

[0002] At present, there is no ship that integrates riprap, tamping and leveling at home and abroad, and meets the construction standards of the upper caisson that is directly installed on the foundation. The existing riprap and tamping ship with similar functions is respectively provided with a first track and a second track on the left and right sides of the main deck, and the riprap trolley and the tamping platform trolley are arranged on the first track and the second track respectively, and the movement of the trolley is driven and pulled by the winches on both sides of the respective tracks. The above-mentioned prior art has the following shortcomings: the number of winches designed in the existing application technology is large, the total installed power is large, the main deck occupies a lot of space, the construction cost is high, and there is no space for the enclosure cabin arrangement; the tamping platform trolley and the riprap trolley are arranged on two tracks respectively, occupying a large space on the main deck of the ship; the tamping platform trolley can only be connected to the fixed anti-trap on the side of the ship, and there is no safety protection function of rotating into the main deck surface; at the same time, the riprap device of the ship extends out of the side, and the method of mooring the riprap ship on its outside to feed the riprap hopper is complicated, the safety risk is increased, and it is also greatly affected by wind and waves, the effective operation time is short, and the efficiency is low. Summary of the invention

[0003] The object of the present invention is to provide a ramming integrated boat with riprap, compaction and leveling functions and a construction process to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above object, the present invention provides the following technical solutions: A construction process for a ramming integrated ship with riprap, tamping and leveling functions, characterized in that it comprises the following steps: S1: Stone Riprap S11: After the tamping integrated boat is loaded with stones, it is winched to the top of the riprap foundation and positioned on the underwater foundation to be constructed; S12: Start the automatic ballast system to automatically level the ship; S13: The riprap chute device is lowered into the water, fixed under the riprap hopper with a pin, and the telescopic sleeve is lowered to a specified depth; Control method for lowering the riprap chute device: Recover the steel wire rope of the second slide tube winch, lift the telescopic sleeve through the lifting frame, pull out the locking pin, rotate the anti-platform shelf to make it rotate with the shaft to the side of the ship, and insert the locking pin; release the steel wire rope of the second slide tube winch until the telescopic sleeve is in a natural drooping state; release the steel wire rope of the small winch fixed on the boom, fix the wire clamp connected to the hook head on the steel wire rope of the second slide tube winch and lock it, use the steel wire rope of the small winch to recover, pull the steel wire rope of the second slide tube winch out of the wheel groove of the single-cake pulley, lower the steel wire rope of the small winch until the steel wire rope of the second slide tube winch is in a tension-free state; remove the steel wire clamp and recover the steel wire rope of the small winch; tighten the steel wire rope of the first slide tube winch until the eye plate at the top of the telescopic sleeve is fully aligned, insert the pin shaft, and tighten the steel wire rope of the second slide tube winch; Control method for the expansion and contraction of the riprap chute device: Tighten the wire ropes of the first and second winches, switch to the linkage synchronous control program of the two winches, and automatically fine-tune the tension of the two winches; the inner sleeve of the telescopic sleeve is fixed to the unloading port through the eye plate, and the sleeve pins on both sides of the telescopic sleeve are pulled out, and the wire ropes of the first and second winches are linked to be lowered or recovered, and the outer sleeve of the telescopic sleeve is lowered or recovered accordingly; S14: Use an excavator in the material enclosure to dump rocks into the riprap hopper; S15: moving the riprap trolley structure through the cable system to complete riprap in the designated underwater area; When the riprap trolley moves on the C-shaped track, the tamping platform trolley rotates out from the inside to the outside together with the short track, the track is locked, and the winch wire rope is disassembled and retracted; the cable connection relationship for the movement of the riprap trolley is as follows: the No. 1 traction winch wire rope passes through the No. 1 single-plate pulley, the No. 2 single-plate pulley, and the No. 3 single-plate pulley, and then passes through the bottom of the tamping platform trolley and is directly connected to the No. 1 fixed eye plate of the riprap trolley; the wire rope of the No. 2 traction winch is directly connected to the No. 2 fixed eye plate of the riprap trolley; S2: Compacting process S21: Unlock the windproof zipper of the tamping platform vehicle, release the limit locking plate, rotate the short track to dock and lock it with the C-type track through the cable system, and move the tamping platform vehicle to the C-type track; When the tamping platform car is rotated outward from the inside, the cable connection relationship is: after the No. 1 traction winch wire rope passes through the No. 1 single-pan pulley, the No. 2 single-pan pulley, the No. 1 three-pan pulley group, and the No. 3 three-pan pulley group, the rope end is fixed on the base of the No. 1 three-pan pulley group; when it is rotated inward from the outside, the cable connection relationship is that after the No. 1 traction winch wire rope passes through the No. 1 single-pan pulley, the No. 2 single-pan pulley, the No. 2 three-pan pulley group, and the No. 3 three-pan pulley group, the rope end is fixed on the base of the No. 2 three-pan pulley group; S22: lower the tamping guide tube, let the tamping plate fall on the top surface of the riprap, start the vibrating hammer power unit of the tamping platform vehicle structure, and adjust the exciting force of the hydraulic vibrating hammer to perform tamping operations; S23: After the compaction of the first layer is completed, the riprap trolley is moved to carry out the second layer of riprap and compaction process on the foundation until the leveling elevation is reached; S3: Leveling process S31: Move the tamping platform car on the C-type track and use the follow-up control technology of the tamping system program to set the tamping winch preload; When the tamping platform vehicle moves on the C-shaped track, the cable connection relationship for the movement of the tamping platform vehicle is as follows: after the tamping platform vehicle is rotated out from the inside to the outside together with the short track, the track is locked, the No. 1 traction winch wire rope is disassembled and retrieved, the No. 1 traction winch wire rope passes through the No. 1 single-cup pulley, the No. 2 single-cup pulley, the No. 3 single-cup pulley and the No. 1 guide pulley of the tamping platform vehicle and is then fixed to the No. 1 fixed rope ear; the No. 2 traction winch wire rope directly passes through the No. 2 guide pulley of the tamping platform vehicle and is then fixed to the No. 2 fixed rope ear; S32: The vibration hammer is started with a small exciting force, and the two tamping winches are linked to release the wire rope synchronously. When the tamping conduit drops to the designed elevation, the tamping winches stop automatically, so that the tamping plate is fixed at a constant elevation position; S33: The constant elevation construction is carried out at all points through the overlapping of tamping plates, and the foundation is leveled, meeting the construction technical standards for directly installing the upper structure such as the caisson; S4: Retraction of the riprap chute and tamping platform vehicle S41: Control method for folding the riprap chute device: The first and second winches are symmetrically fixed on the bottom surface of the trolley of the riprap device. After the steel wire ropes of the two winches are wound around the first and second universal cable guides corresponding to the winches, the steel wire ropes are fixed on the bottom lifting ears of the telescopic sleeve respectively; the three fixed pins on the outer side of the eye plate at the top of the telescopic sleeve are removed, and the steel wire ropes of the first and second winches are released. The telescopic sleeve is in a natural drooping state connected by a pin; the steel wire rope of the small winch fixed on the boom is released, and the hook head of this steel wire rope is connected to the bottom lifting ears of the telescopic sleeve. Connect the wire clamp, fix the wire clamp on the wire rope of the second slide pipe winch and lock it, use the wire rope of the small winch to recycle, pull the wire rope of the second slide pipe winch and place it on the single-cup pulley fixed on the lifting frame; release the wire rope of the first slide pipe winch, recycle the wire rope of the second slide pipe winch, and lift the telescopic sleeve to the maximum height; pull out the two locking pins, rotate the two anti-typhoon racks outward from the ship's side until they are limited by the limit block; release the wire rope of the second slide pipe winch, place the telescopic sleeve on the anti-typhoon rack, insert the locking pin, and fix the pipe clamp; The cable connection relationship when the tamping platform is recovered from the outside to the inside is the same as when it is rotated from the inside to the outside. After the tamping platform is rotated from the outside to the inside together with the short track, the short track is locked, and the No. 1 traction winch wire rope is disassembled and retracted. At this time, the riprap trolley is moving on the C-type track, and its cable connection relationship is: the No. 1 traction winch wire rope passes through the No. 1 single-cake pulley and the No. 2 single-cake pulley, passes through the gap between the short track and the C-type track, and is directly connected to the No. 1 fixed eye plate of the riprap trolley after passing through the No. 4 single-cake pulley; the No. 2 traction winch wire rope is directly connected to the No. 2 fixed eye plate of the riprap trolley.

[0005] The No. 1 single-cup pulley is arranged perpendicular to the main deck surface along the direction of the wire rope and is more than 5m away from the No. 1 traction winch. Its function is not to be affected by the change in the wire rope outlet angle of the No. 1 traction winch drum, and to always limit and keep the passing wire rope in a parallel state; the No. 2 single-cup pulley is arranged horizontally, 3 meters away from the No. 1 single-cup pulley, and the line connecting the center line of the outer wheel groove of the No. 2 single-cup pulley and the center line of the upper wheel groove of the No. 1 single-cup pulley is horizontal to the main deck; the No. 2 three-cup pulley block and the No. 3 three-cup pulley block are both arranged horizontally, and the lower pulley of the pulley block and the No. 2 single-cup pulley are high from the main deck The height is consistent; the No. 1 guide pulley of the tamping platform car and the No. 2 guide pulley of the tamping platform car are both arranged at the bottom of the tamping platform car truss, and the line connecting the two coincides with the center line of the track; the No. 3 single-cake pulley is located 4m outside the short track, parallel to the No. 1 and No. 2 guide pulleys of the tamping platform car, and consistent with the height of the main deck; the No. 4 single-cake pulley is located on the center line between the tracks at the connection of the C-shaped track and the short track, and its height is lower than the No. 1 and No. 2 guide pulleys of the tamping platform car to prevent the tamping platform car from being restricted when moving; the angle between the No. 4 single-cake pulley and the No. 2 single-cake pulley and the horizontal direction is less than 6°.

[0006] The following method is specifically adopted for the follow-up control: The riprap trolley or tamping platform trolley moves on the C-type track using the follow-up technology. The two working conditions are front and back processes, and they do not move at the same time. The No. 1 traction winch and the No. 2 traction winch are both driven by variable frequency motors. In the follow-up mode, the brakes of the two winches are interlocked in the variable frequency control cabinets of the No. 1 traction winch and the No. 2 traction winch. The interlocking control is that when the variable frequency motor of the No. 1 traction winch is powered on, the brake of the No. 1 traction winch is powered off, and at the same time, the brake of the No. 2 traction winch is also interlocked and powered off; the No. 1 traction winch motor drives the winch to operate the traction trolley to move, and at the same time, the cable of the No. 2 traction winch is passively pulled and follows. ; The cable of the No. 2 traction winch is passively pulled and follows, and its variable frequency motor rotates due to the external force transmission of the drum and the gear box. The rotation of the No. 2 traction winch motor will generate regenerative electric energy, and energy-consuming braking is performed by adding a discharge resistor unit component on the DC side of the inverter; the energy-consuming braking includes two parts, a braking unit and a braking resistor. The braking resistance offsets the rotational inertia of the part of the No. 2 traction winch cable that is pulled, preventing the No. 1 traction winch drum from continuing to rotate and causing rope tangling when the No. 1 traction winch slows down or stops; the principle of the No. 2 traction winch driving the cable moving trolley and the No. 1 traction winch following is the same as above.

[0007] The follow-up control technology is brake interlocking control, and the control of the two traction winches includes individual local operation, remote single control and remote linkage control.

[0008] A ramming integrated boat with riprap, tamping and leveling functions, characterized in that: It includes a box-type deck cargo barge, a tamping platform car, a riprap trolley and a pair of C-type rails; the box-type deck cargo barge can be pressurized and carry water, and two C-type rails are arranged on one side of the main deck surface along the length direction of the ship, and the tamping platform car and the riprap trolley are arranged on the C-type rails at the same time, and a material compartment is arranged in the middle area of ​​the main deck to store stones; it also includes a cable system arranged on the deck, and the cable system is used for the movement of the tamping platform car and the riprap trolley on the rails, and the tamping platform car rotates together toward the inside of the main deck on the short rails; The box-type deck cargo barge is provided with ballast tanks for accommodating ballast water on the left and right sides. The box-type deck cargo barge is equipped with an automatic ballast adjustment system. The automatic ballast water system controls the draft of the deck cargo barge by controlling the amount of ballast water in the ballast tanks. The draft of the deck cargo barge is kept constant at the same waterline as the stone in the main deck coaming tank is consumed, meeting the ship stability requirements and operation accuracy requirements of the construction conditions; The tamping platform vehicle comprises: a steel structure frame, which is D-shaped and divided into three-layer platforms, and a pipe well structure is arranged in the vertical large end of the steel structure frame; and two C-shaped leg structures are symmetrically arranged at the bottom of the steel structure, which are fixed to the first layer platform of the steel structure frame by bolts and are used for the installation and disassembly of the trolley as a whole on the track; a vibration hammer power unit is arranged on the first layer of the steel structure frame; a tamping guide tube is vertically arranged in the pipe well structure of the steel structure frame; a hydraulic vibration hammer is installed at the bottom of the tamping guide tube and connected to the tamping guide tube with a flange; a tamping plate structure, the upper top surface of which is connected to the lower bottom surface of the hydraulic vibration hammer and is fixed by bolts; two tamping winches are symmetrically arranged on the second layer of the steel structure frame, which pass steel wire ropes through the pulley block of the steel structure frame and the pulley block of the hydraulic vibration hammer to drive the hydraulic vibration hammer, tamping plate and tamping guide tube to move up and down together; The riprap trolley comprises: a trolley base, with two C-shaped leg structures symmetrically arranged at the lower part of the bottom, and fixed by bolts, which are the same as the C-shaped leg structure under the first platform of the steel structure frame; a discharge hopper, whose discharge port is arranged on the outer side of the ship's side of the box-type deck cargo barge, and 4 eye plates are symmetrically arranged at the discharge port; two universal fairleads are symmetrically arranged on both sides of the discharge hopper along the length of the ship, and fixed on the trolley base; a group of slide pipes, which are in the form of inner and outer telescopic sleeves, with 4 eye plates arranged on the top of the inner pipe, which can be docked with the eye plates of the discharge port, and are connected in the form of pin shafts, and two lifting ears are symmetrically arranged at the bottom of the outer pipe for retracting the outer pipe, and the inner and outer pipes are fixed by pins; and two slide pipe winches, symmetrically arranged on the base of the riprap trolley, with their steel wire ropes strung around the universal fairleads and connected to the lifting ears of the outer pipe of the slide pipe to drive the outer sleeve of the slide pipe to rise and fall vertically; The C-shaped track includes two main tracks, which are welded in parallel on one side of the length direction of the box-type deck cargo barge; a rotating shaft, which is arranged at one end of the inner track of the two main tracks; and two short tracks, which are arranged in alignment with the two main tracks and whose lower parts are welded on a steel plate; The cable system includes a No. 1 traction winch, a No. 2 traction winch and a pulley mechanism, wherein the No. 1 traction winch is connected to the deck on one side of the short track, and the No. 2 traction winch is connected to the deck near the other end of the C-shaped track; the pulley mechanism includes a single-disc pulley mechanism, a three-disc pulley mechanism and a guide pulley mechanism; The guide pulley mechanism includes a first guide pulley of the tamping platform vehicle and a second guide pulley of the tamping platform vehicle, both of which are arranged at the bottom of the tamping platform vehicle truss, and the connecting line of the two coincides with the center line of the track; The single-cup pulley mechanism includes a single-cup pulley No. 1, a single-cup pulley No. 2, a single-cup pulley No. 3, and a single-cup pulley No. 4. The single-cup pulley No. 1 and the single-cup pulley No. 2 are sequentially connected to the downstream of the No. 1 traction winch. The single-cup pulley No. 3 is located outside the short track, parallel to the two guide pulleys of the tamping platform vehicle, and has the same height from the main deck. The single-cup pulley No. 4 is located on the center line between the tracks where the C-type track and the short track are connected, and its height is lower than the two guide pulleys of the tamping platform vehicle. The three-pan pulley mechanism includes a No. 1 three-pan pulley group, a No. 2 three-pan pulley group and a No. 3 three-pan pulley group. The No. 1 three-pan pulley group is located downstream of the No. 2 single-pan pulley. The No. 2 three-pan pulley group and the No. 3 three-pan pulley group are both arranged horizontally, and the lower pulley of the pulley group is at the same height as the No. 2 single-pan pulley from the main deck.

[0009] The rotating shaft includes a main shaft, which is welded and fixed on the deck surface of the box-type deck cargo barge; a lower rotating plate, which rotates around the main shaft and is welded and fixed to the lower edge of the short track; and an upper rotating plate, which rotates around the main shaft, is connected to the upper top surface of the short track and is fixed with bolts and can be detached and screwed out of the track.

[0010] The lower part of the C-shaped leg structure is provided with a wear-resistant sliding block for sliding on the C-shaped track.

[0011] The slide pipes also include a typhoon-proof shelf and a lifting frame arranged on the box-type deck; the typhoon-proof shelf is fixed to the side vertical plate of the ship's side at the front of the main track and above the waterline, and can be retracted or released with rotation; the lifting frame is used to rotate the group of slide pipes to one side of the typhoon-proof shelf and place them on the shelf, and to fix the group of slide pipes with steel belts.

[0012] The No. 1 single-cake pulley is arranged perpendicular to the main deck surface along the direction of the wire rope, and is more than 5 meters away from the No. 1 traction winch; the No. 2 single-cake pulley is arranged horizontally, 3 meters away from the No. 1 single-cake pulley, and the line connecting the center line of the outer wheel groove of the No. 2 single-cake pulley and the center line of the upper wheel groove of the No. 1 single-cake pulley is horizontal to the main deck; the No. 3 single-cake pulley is located 4m outside the short track; the angle between the line connecting the No. 4 single-cake pulley and the No. 2 single-cake pulley and the horizontal direction is less than 6°.

[0013] The No. 1 traction winch and the No. 2 traction winch are both driven by variable frequency motors, and the control of the two traction winches includes individual local operation, remote single control and remote linkage control.

[0014] The present invention provides a ramming integrated ship and construction process with riprap, tamping and leveling functions, which breaks the design deficiencies of the prior art, innovatively utilizes the drive of two winches and the conversion of the cable system, realizes the movement of the ramming platform car and the riprap trolley on the same side track, and only uses one winch to pull the short track and the ramming platform car into or out of the main deck as a whole, thereby improving the safety of the ramming platform car; after optimizing multiple winches, the total power configuration of the ship is reduced, and the construction cost is effectively saved. The main thing is that by reducing the number and layout of the trolleys, the working length of the track is increased, the construction distance of the trolley on the underwater foundation working section is increased, and the storage area of ​​the surrounding material bin on the ship owner's deck is effectively increased, which greatly improves the production efficiency and saves construction and maintenance costs significantly. At the same time, the innovative application of the follow-up control technology solves the control technology problems of similar equipment in the industry and fills the gap; the present invention only uses one ship to continuously complete all the processes of underwater foundation construction, reducing the combined input production cost of the single process construction of 2-3 ships in the past, as well as the ship towing cost, and more importantly, saving the standby cost of multiple ships for cross-operation, effectively improving the production efficiency, and greatly improving the economic efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a front view of the tamping integrated boat of the present invention; Figure 2 It is a top view of the tamping integrated boat of the present invention; Figure 3 It is a schematic structural diagram of the tamping platform vehicle of the present invention; Figure 4 It is a schematic diagram of the structure of the hydraulic vibration hammer of the present invention; Figure 5 It is a schematic diagram of the structure of the riprap chute control system of the present invention (the chute device is folded up and lowered); Figure 6 for Figure 5 Side view; Figure 7 It is a schematic diagram of the structure of the platform-proof shelf of the present invention (the telescopic sleeve is stored); Figure 8 for Figure 7 Side view; Fig. 9 It is a schematic diagram of the cable arrangement of the tamping platform vehicle according to the present invention rotating along the short track; Fig.10 It is a schematic diagram of the cable arrangement for moving the tamping platform vehicle of the present invention; Fig.11 It is a schematic diagram of the cable arrangement for moving the riprap trolley in the short track retracted state of the present invention; Fig.12 It is a schematic diagram of the cable arrangement for moving the riprap trolley in the short track swung out state of the present invention; In the figure: 1. Hull; 2. Ramming platform car; 3. Stone dumping car; 4. C-type track; 5. Enclosure; 6. Ballast tank; 7. Steel structure frame; 8. C-type leg structure of ramming platform car; 9. Pipe well structure; 10. Ramming guide tube; 11. Vibrating hammer power unit; 12. Hydraulic vibrating hammer; 13. Ramming plate structure; 14. Ramming winch; 15. Truss pulley block; 16. Slide winch 1; 17. Vibrating hammer hammer body; 18. Slide winch 2; 19. Hammer top pulley block; 20. Hopper; 21. Feeding port; 22. Telescopic sleeve; 23. Lifting lug; 24. Universal cable guide 1; 25. Universal cable guide 2; 26. C-shaped leg structure of the tube slide trolley; 27. Anti-platform shelf; 28. Lifting frame; 29. ​​Casing pin; 30. Lifting frame; 31. Eye plate; 32. Single-pan pulley; 33. Hanging rod; 34. Small winch; 35. Wire clamp; 36. Shaft; 37 Limit block; 38. Locking pin; 39. Fixed pipe clamp; 40. Short track; 41. No. 1 traction winch; 42. No. 2 traction winch; 43. Rotating shaft; 44. No. 1 guide pulley of the tamping platform trolley; 4 5. Guide pulley No. 2 of tamping platform vehicle; 46. Fixed eye plate No. 1; 47. Fixed eye plate No. 2; 48. Three-disc pulley block No. 1; 49. Three-disc pulley block No. 2; 50. Three-disc pulley block No. 3; 51. Single-disc pulley No. 1; 52. Single-disc pulley No. 2; 53. Single-disc pulley No. 3; 54. Single-disc pulley No. 4; 55. Fixed rope ear No. 1; 56. Fixed rope ear No. 2; A. Initial position of tamping platform vehicle; B. Swivel-out position of the short track of tamping platform vehicle; C. Recovering position of the short track of tamping platform vehicle. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example 1

[0017] like Figure 1-Figure 2 As shown, a ramming ship with riprap, compaction and leveling functions, the hull 1 includes a box-type deck cargo barge, a ramming platform trolley 2, a riprap trolley 3 and a pair of C-type rails 4; the box-type deck cargo barge is provided with a ballast tank 6 that can be pressurized with water, and two C-type rails 4 are arranged on one side of the main deck surface along the length direction of the ship, and the ramming platform trolley 2 and the riprap trolley 3 are arranged on the C-type rails 4 at the same time, and a material compartment 5 is arranged in the middle area of ​​the main deck to store stones; it also includes a cable system arranged on the deck, and the cable system is used for the movement of the ramming platform trolley 2 and the riprap trolley 3 on the rails, and the ramming platform trolley 2 rotates together toward the inside of the main deck on the short rail 40; The box-type deck cargo barge is provided with ballast tanks 6 for accommodating ballast water on the left and right sides. The box-type deck cargo barge is equipped with an automatic ballast adjustment system. The automatic ballast adjustment system controls the draft of the deck cargo barge by controlling the amount of ballast water in the ballast tanks 6. The draft of the deck cargo barge is kept constant at the same waterline as the stone in the main deck coaming tank 5 is consumed, meeting the ship stability requirements and operation accuracy requirements of the construction working conditions; like Figure 3-Figure 4 As shown, the tamping platform vehicle 2 comprises: a steel structure frame, which is D-shaped and divided into three-layer platforms, and a pipe well structure 9 is arranged in the vertical large end of the steel structure frame 7; and two tamping platform vehicle C-shaped leg structures 8 are symmetrically arranged at the bottom of the steel structure frame 7, and are fixed to the first layer platform of the steel structure frame 7 by bolts, which are used for the installation and disassembly of the vehicle as a whole on the track; a vibration hammer power unit 11, which is arranged on the first layer of the steel structure frame 7; a tamping guide tube 10, which is vertically arranged in the pipe well structure 9 of the steel structure frame 7; a liquid A hydraulic vibration hammer 12 is installed at the bottom of the tamping tube 10 and connected to the tamping tube 10 with a flange; a tamping plate structure 13, the upper top surface of which is connected to the lower bottom surface of the hydraulic vibration hammer 12 and fixed with bolts; two tamping winches 14 are symmetrically arranged on the second floor of the steel structure frame 7, which pass steel wire ropes through the truss pulley block 15 of the steel structure frame 7 and the hammer top pulley block 19 of the hydraulic vibration hammer 12 to drive the vibration hammer body 17, the tamping plate structure 13 and the tamping tube 10 to move up and down together; like Figure 5-Figure 8 As shown, the riprap trolley 3 comprises: a trolley base, two C-shaped leg structures 26 of the chute trolley are symmetrically arranged at the lower part of the bottom, and are fixed by bolts, which are the same as the C-shaped leg structure under the first platform of the steel structure frame 7; a hopper 20, whose discharge port 21 is arranged on the outer side of the ship's side of the box-type deck cargo barge, and the discharge port 21 is symmetrically provided with four eye plates 31; two universal fairleads are symmetrically arranged on both sides of the discharge hopper 21 along the length of the ship, and are fixed on the trolley base; a group of telescopic sleeves 22, four eye plates 31 are arranged on the top of the inner tube, which can be docked with the eye plates 31 of the discharge port 21, and are connected in the form of pin shafts, and two lifting ears 23 are symmetrically arranged at the bottom of the outer tube for telescoping the outer tube, and the inner and outer tubes are fixed by pins; and two chute winches are symmetrically arranged on the riprap trolley base, and their steel wire ropes are connected to the lifting ears 23 of the outer tube of the chute after being wound around the universal fairlead, so as to drive the outer sleeve of the chute to rise and fall vertically; The C-shaped track 4 includes two main tracks, which are welded in parallel on one side of the longitudinal direction of the box-type deck cargo barge; a rotating shaft 43, which is arranged at one end of the inner track of the two main tracks; two short tracks 40, which are arranged in alignment with the two main tracks, and the lower part of which is welded on a steel plate; The cable system includes a No. 1 traction winch 41, a No. 2 traction winch 42 and a pulley mechanism. The No. 1 traction winch 41 is connected to the deck on one side of the short track 40, and the No. 2 traction winch 42 is connected to the deck near the other end of the C-shaped track 4; the pulley mechanism includes a single-plate pulley mechanism, a three-plate pulley mechanism and a guide pulley mechanism; The guide pulley mechanism includes a first guide pulley 44 of the tamping platform vehicle and a second guide pulley 45 of the tamping platform vehicle, both of which are arranged at the bottom of the truss of the tamping platform vehicle 2, and the connecting line of the two coincides with the center line of the track; The single-cup pulley mechanism includes a single-cup pulley 51, a single-cup pulley 52, a single-cup pulley 53, and a single-cup pulley 54. The single-cup pulley 51 and the single-cup pulley 52 are sequentially connected to the downstream of the first traction winch 41. The single-cup pulley 53 is located outside the short track 40, parallel to the two guide pulleys of the tamping platform vehicle 2, and has the same height from the main deck. The single-cup pulley 54 is located on the center line between the tracks at the connection between the C-type track 4 and the short track 40, and its height is lower than the two guide pulleys of the tamping platform vehicle 2. The three-plate pulley mechanism includes a first three-plate pulley block 48, a second three-plate pulley block 49 and a third three-plate pulley block 50. The first three-plate pulley block 48 is located downstream of the second single-plate pulley 52. ​​The second three-plate pulley block 49 and the third three-plate pulley block 50 are both arranged horizontally, and the lower pulley of the pulley block is at the same height from the main deck as the second single-plate pulley 52.

[0018] The rotating shaft 43 includes a main shaft, which is welded and fixed on the deck surface of the box-type deck cargo barge; a lower rotating plate, which rotates around the main shaft and is welded and fixed to the lower edge of the short track 40; and an upper rotating plate, which rotates around the main shaft, is connected to the upper top surface of the short track 40 and is fixed with bolts, and can be removed and screwed out of the track.

[0019] The lower part of the C-shaped leg structure is provided with a wear-resistant sliding block for sliding on the C-shaped track 4.

[0020] The slide pipes also include a typhoon-proof shelf 27 and a lifting frame 28 arranged on the box-type deck; the typhoon-proof shelf 27 is fixed on the side vertical plate of the ship's side at the front of the main track and above the waterline, and can be retracted or released with rotation; the lifting frame 28 is used to rotate the group of slide pipes to one side of the typhoon-proof shelf 27 and place them on the shelf, and to fix the group of slide pipes with steel belts.

[0021] The No. 1 single-cup pulley 51 is arranged perpendicular to the main deck surface along the direction of the wire rope, and is more than 5 meters away from the No. 1 traction winch 41; the No. 2 single-cup pulley 52 is arranged horizontally, 3 meters away from the No. 1 single-cup pulley 51, and the line connecting the center line of the outer wheel groove of the No. 2 single-cup pulley 52 and the center line of the upper wheel groove of the No. 1 single-cup pulley 51 is horizontal to the main deck; the No. 3 single-cup pulley 53 is located 4 meters outside the short track 40; the angle between the line connecting the No. 4 single-cup pulley 54 and the No. 2 single-cup pulley 52 and the horizontal direction is less than 6°.

[0022] The No. 1 traction winch 41 and the No. 2 traction winch 42 are both driven by variable frequency motors, and the control of the two traction winches includes individual local operation, remote single control and remote linkage control. Example 2

[0023] A construction process for a ramming integrated ship with riprap, tamping and leveling functions, comprising the following steps: S1: Stone Riprap S11: After the tamping integrated boat is loaded with stones, it is winched to the top of the riprap foundation and positioned on the underwater foundation to be constructed; S12: Start the automatic ballast system to automatically level the ship; S13: The riprap chute device is lowered into the water, fixed under the riprap hopper 20 with a pin, and the telescopic sleeve 22 is lowered to a specified depth; Control method for lowering the riprap chute device: Recover the steel wire rope of the slide winch 18, lift the telescopic sleeve 22 through the lifting frame 28, pull out the locking pin 38, rotate the anti-platform shelf 27 to make it rotate to the side of the ship along with the shaft 36, and insert the locking pin 38; release the steel wire rope of the slide winch 18 until the telescopic sleeve 22 is in a naturally drooping state; release the steel wire rope of the small winch 34 fixed on the suspension rod 33, fix the wire clamp 35 connected to the hook head on the steel wire rope of the slide winch 18 and lock it. Use the wire rope of the small winch 34 to recover the wire rope of the slide pipe winch 18 out of the wheel groove of the single-cup pulley 32, and lower the wire rope of the small winch 34 until the wire rope of the slide pipe winch 18 is in a tension-free state; remove the wire clamp 35 and recover the wire rope of the small winch 34; tighten the wire rope of the slide pipe winch 16 until the eye plate 31 at the top of the telescopic sleeve 22 is fully aligned, insert the pin shaft, and tighten the wire rope of the slide pipe winch 18; Control method for the expansion and contraction of the riprap chute device: Tighten the steel wire ropes of the first and second winches 16 and 18, switch to the linkage synchronous control program of the two winches, and automatically fine-tune the tension of the two winches; the inner sleeve of the telescopic sleeve 22 is fixed to the discharge port 21 through the eye plate 31, and the sleeve latches 29 on both sides of the telescopic sleeve 22 are pulled out, and the steel wire ropes of the first and second winches 16 and 18 are linked to be lowered or recovered, and the outer sleeve of the telescopic sleeve 22 is lowered or recovered accordingly; S14: using an excavator in the enclosed material chamber 5 to throw stones into the riprap hopper 20; S15: moving the riprap trolley 3 through the cable system to complete riprap in the designated underwater area; When the riprap trolley 3 moves on the C-shaped track 4, the tamping platform trolley 2 is rotated out from the inside to the outside together with the short track 40, the track is locked, and the winch wire rope is disassembled and retracted; Fig.12 As shown, the cable connection relationship for moving the riprap trolley 3 is as follows: the wire rope of the No. 1 traction winch 41 passes through the No. 1 single-cup pulley 51, the No. 2 single-cup pulley 52, and the No. 3 single-cup pulley 53, and then passes through the bottom of the tamping platform trolley 2 and is directly connected to the No. 1 fixed eye plate 46 of the riprap trolley 3; the wire rope of the No. 2 traction winch 42 is directly connected to the No. 2 fixed eye plate 47 of the riprap trolley 3; S2: Compacting process S21: Unlock the windproof zipper of the tamping platform vehicle 2, release the limit locking plate, rotate the short track 40 to dock and lock it with the C-shaped track 4 through the cable system, and move the tamping platform vehicle 2 to the C-shaped track 4; like Fig. 9 As shown, when the tamping platform vehicle 2 is rotated outward from the inside, the cable connection relationship is: after the steel wire rope of the No. 1 traction winch 41 passes through the No. 1 single-cup pulley 51, the No. 2 single-cup pulley 52, the No. 1 three-cup pulley group 48, and the No. 3 three-cup pulley group 50, the rope end is fixed on the base of the No. 1 three-cup pulley group 48; when it is rotated inward from the outside, the cable connection relationship is: after the steel wire rope of the No. 1 traction winch 41 passes through the No. 1 single-cup pulley 51, the No. 2 single-cup pulley 52, the No. 2 three-cup pulley group 49, and the No. 3 three-cup pulley group 50, the rope end is fixed on the base of the No. 2 three-cup pulley group 49; S22: lowering the tamping guide tube 10, allowing the tamping plate structure 13 to fall on the top surface of the riprap, turning on the vibrating hammer power unit 11 of the tamping platform vehicle 2, and adjusting the exciting force of the hydraulic vibrating hammer 12 to perform tamping operations; S23: After the compaction operation of the first layer is completed, the riprap trolley 3 is moved to perform the second layer of riprap and compaction process on the foundation until the leveling elevation is reached; S3: Leveling process S31: moving the tamping platform vehicle 2 on the C-shaped track 4, and setting the tamping winch preload force by using the follow-up control technology of the tamping system program; like Fig.10As shown, when the tamping platform vehicle 2 moves on the C-shaped track 4, the cable connection relationship of the tamping platform vehicle 2 is as follows: after the tamping platform vehicle 2 is rotated out from the inside to the outside together with the short track 40, the track is locked, and the wire rope of the No. 1 traction winch 41 is disassembled and retrieved. The wire rope of the No. 1 traction winch 41 passes through the No. 1 single-cup pulley 51, the No. 2 single-cup pulley 52, the No. 3 single-cup pulley 53 and the No. 1 guide pulley 44 of the tamping platform vehicle and is then fixed to the No. 1 fixed cable ear 55; the wire rope of the No. 2 traction winch 42 directly passes through the No. 2 guide pulley 45 of the tamping platform vehicle and is then fixed to the No. 2 fixed cable ear 56; S32: The vibration hammer is started with a small exciting force, and the two tamping winches 14 are linked to release the wire rope synchronously. When the tamping conduit 10 is lowered to the designed elevation, the tamping winches 14 automatically stop, so that the tamping plate structure 13 is fixed at a constant elevation position; S33: The constant elevation construction is performed at all points by overlapping the tamping plate structure 13, and the foundation is leveled, meeting the construction technical standards for directly installing the upper structure such as the caisson; S4: Retraction of the riprap chute and tamping platform vehicle S41: Control method for folding the riprap chute device: The pipe winch 16 and the pipe winch 2 18 are fixed symmetrically on the bottom surface of the trolley of the stone-throwing pipe device. After the steel wire ropes of the two winches are wound around the universal cable guide 1 24 and the universal cable guide 2 25 corresponding to the winches, the steel wire ropes are respectively fixed on the bottom lifting ears 23 of the telescopic sleeve 22; the three fixed pins on the outer side of the eye plate 31 at the top of the telescopic sleeve 22 are removed, and the steel wire ropes of the pipe winch 16 and the pipe winch 2 18 are released, and the telescopic sleeve 22 is in a natural drooping state connected by a pin; the steel wire rope of the small winch 34 fixed on the suspension rod 33 is released, and the hook head of this steel wire rope is connected to the wire clamp 35, fix the wire clamp 35 on the wire rope of the slide pipe winch 18 and lock it, use the wire rope of the small winch 34 to recycle, and pull the wire rope of the slide pipe winch 18 to the single-plate pulley 32 fixed on the lifting frame 28; release the wire rope of the slide pipe winch 16, recycle the wire rope of the slide pipe winch 18, and lift the telescopic sleeve 22 to the maximum height; pull out the two locking pins 38, rotate the two anti-typhoon racks 27 outward from the ship's side until they are limited by the limit block 37; release the wire rope of the slide pipe winch 18, place the telescopic sleeve 22 on the anti-typhoon rack 27, insert the locking pin 38, and fix the pipe clamp 39; The cable connection relationship when the ramming platform 2 is recovered from the outside to the inside is the same as when it is rotated out from the inside to the outside. After the ramming platform 2 is rotated inward from the outside together with the short track 40, the short track 40 is locked, and the wire rope of the No. 1 traction winch 41 is disassembled and recovered. At this time, the riprap trolley 3 is in the moving working condition on the C-shaped track 4, such as Fig.11As shown, the cable connection relationship is as follows: the steel wire rope of the No. 1 traction winch 41 passes through the No. 1 single-disc pulley 51 and the No. 2 single-disc pulley 52, passes through the gap between the short track 40 and the C-type track 4, passes through the No. 4 single-disc pulley 54 and is directly connected to the No. 1 fixed eye plate 46 of the riprap trolley 3; the steel wire rope of the No. 2 traction winch 42 is directly connected to the No. 2 fixed eye plate 47 of the riprap trolley 3.

[0024] The No. 1 single-cup pulley 51 is arranged perpendicular to the main deck surface along the direction of the wire rope, and is more than 5m away from the No. 1 traction winch 41. Its function is not affected by the change in the wire rope outlet angle of the drum of the No. 1 traction winch 41, and always limits and keeps the passing wire rope in a parallel state; the No. 2 single-cup pulley 52 is arranged horizontally, 3 meters away from the No. 1 single-cup pulley 51, and the center line of the outer wheel groove of the No. 2 single-cup pulley 52 and the center line of the upper wheel groove of the No. 1 single-cup pulley 51 are connected to the main deck in a horizontal direction; the No. 2 three-cup pulley block 49 and the No. 3 three-cup pulley block 50 are both arranged horizontally, and the lower pulley of the pulley block and the No. 2 single-cup pulley 52 are 3 meters away from the main deck. The height is consistent; the No. 1 guide pulley 44 of the tamping platform car and the No. 2 guide pulley 45 of the tamping platform car are both arranged at the bottom of the truss of the tamping platform car 2, and the line connecting the two coincides with the center line of the track; the No. 3 single-cake pulley 53 is located 4m outside the short track 40, parallel to the No. 1 and No. 2 guide pulleys of the tamping platform car, and at the same height from the main deck; the No. 4 single-cake pulley 54 is located on the center line between the tracks at the connection between the C-type track 4 and the short track 40, and its height is lower than the No. 1 and No. 2 guide pulleys of the tamping platform car to prevent the tamping platform car 2 from being restricted when moving; the angle between the No. 4 single-cake pulley 54 and the No. 2 single-cake pulley 52 and the horizontal direction is less than 6°.

[0025] The following method is specifically adopted for the follow-up control: The riprap trolley 3 or the tamping platform trolley 2 is moved on the C-type track 4 using the follow-up technology. The two working conditions are front and back processes and do not move at the same time. The No. 1 traction winch 41 and the No. 2 traction winch 42 are both driven by variable frequency motors. In the follow-up mode, in the variable frequency control cabinets of the No. 1 traction winch 41 and the No. 2 traction winch 42, the brakes of the two winches are interlocked. The interlocking control is that when the variable frequency motor of the No. 1 traction winch 41 is powered on, the brake of the No. 1 traction winch 41 is powered off, and at the same time, the brake of the No. 2 traction winch 42 is simultaneously powered off. The No. 1 traction winch 41 motor drives the winch to operate the traction trolley to move, and at the same time, the cable of the No. 2 traction winch 42 is passively controlled. Traction follower; the cable of the No. 2 traction winch 42 is passively followed by traction, and its variable frequency motor rotates due to the external force transmission of the drum and the gear box. The follow-up rotation of the motor of the No. 2 traction winch 42 will generate regenerative electric energy, and energy-consuming braking is performed by adding a discharge resistor unit component on the DC side of the inverter; the energy-consuming braking includes two parts, a braking unit and a braking resistor, and the braking resistance offsets the rotational inertia of the part of the cable of the No. 2 traction winch 42 that is pulled, to prevent the drum of the No. 2 traction winch 42 from continuing to rotate when the No. 1 traction winch 41 slows down or stops, resulting in tangled ropes; the principle of the No. 2 traction winch 42 driving the cable moving trolley and the No. 1 traction winch 41 to follow is the same as above.

[0026] The follow-up control technology is brake interlocking control, and the control of the two traction winches includes individual local operation, remote single control and remote linkage control.

[0027] Contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field. Although the embodiments of the present invention have been shown and described, it is understood by those of ordinary skill in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. A construction process for a ramming ship with riprap, compaction and leveling functions, characterized by: The following steps are involved: S1: Stone throwing process S11: After the ramming vessel is loaded with stones, it is winched to the top of the riprap foundation and positioned on the underwater foundation to be constructed; S12: Start the automatic ballast system to automatically level the ship; S13: The riprap chute device is lowered into the water, fixed to the bottom of the riprap hopper with a pin, and the telescopic sleeve is lowered to the specified depth; Control method for lowering the riprap chute device: Recover the wire rope of the second slide tube winch, lift the telescopic sleeve through the lifting frame, pull out the locking pin, rotate the anti-slip shelf so that it rotates with the shaft to the side of the ship, and insert the locking pin; release the wire rope of the second slide tube winch until the telescopic sleeve is in a natural drooping state; release the wire rope of the small winch fixed on the boom, fix the wire clamp connected to the hook head to the wire rope of the second slide tube winch and lock it; use the wire rope of the small winch to recycle, pull the wire rope of the second slide tube winch out of the wheel groove of the single-plate pulley, and lower the wire rope of the small winch until the wire rope of the second slide tube winch is in a tension-free state; Remove the wire clamp and recycle the wire rope of the small winch; tighten the wire rope of the slide winch 1 until the eye plate at the top of the telescopic sleeve is fully aligned, insert the pin shaft, and tighten the wire rope of the slide winch 2; Control method for expansion and contraction of riprap chute device: Tighten the wire ropes of the first and second winches, switch to the linkage and synchronization control program of the two winches, and automatically fine-tune the tension of the two winches; the inner sleeve of the telescopic sleeve is fixed to the discharge port through the eye plate, and the sleeve pins on both sides of the telescopic sleeve are pulled out, and the wire ropes of the first and second winches are linked to be lowered or retracted, and the outer sleeve of the telescopic sleeve is lowered or retracted accordingly; S14: Use an excavator in the material compartment to throw stones into the riprap hopper; S15: moving the riprap trolley structure through the cable system to complete riprap in the designated underwater area; When the riprap trolley moves on the C-shaped track, the tamping platform trolley rotates out from the inside to the outside together with the short track, the track is locked, and the winch wire rope is disassembled and retracted; the cable connection relationship for the movement of the riprap trolley is as follows: the wire rope of the No. 1 traction winch passes through the No. 1 single-plate pulley, the No. 2 single-plate pulley, and the No. 3 single-plate pulley, and then passes through the bottom of the tamping platform trolley and is directly connected to the No. 1 fixed eye plate of the riprap trolley; the wire rope of the No. 2 traction winch is directly connected to the No. 2 fixed eye plate of the riprap trolley; S2: Compacting process S21: Unlock the windproof zipper of the tamping platform, release the limit lock plate, rotate the short track to connect and lock it with the C-type track through the cable system, and move the tamping platform to the C-type track; When the tamping platform car is rotated outward from the inside, the cable connection relationship is: after the No. 1 traction winch wire rope passes through the No. 1 single-panel pulley, No. 2 single-panel pulley, No. 1 three-panel pulley group, and No. 3 three-panel pulley group, the rope end is fixed on the base of the No. 1 three-panel pulley group; when it is rotated inward from the outside, the cable connection relationship is: after the No. 1 traction winch wire rope passes through the No. 1 single-panel pulley, No. 2 single-panel pulley, No. 2 three-panel pulley group, and No. 3 three-panel pulley group, the rope end is fixed on the base of the No. 2 three-panel pulley group; S22: Lower the tamping guide tube to allow the tamping plate to land on the top surface of the riprap, start the vibrating hammer power unit of the tamping platform structure, and adjust the exciting force of the hydraulic vibrating hammer to perform the tamping operation; S23: After the compaction work of the first layer is completed, the riprap trolley is moved to carry out the second layer of riprap and compaction process on the foundation until the leveling elevation is reached; S3: Leveling process S31: Move the tamping platform car on the C-type track and use the follow-up control technology of the tamping system program to set the tamping winch preload; When the tamping platform car moves on the C-shaped track, the cable connection relationship for the movement of the tamping platform car is as follows: after the tamping platform car is rotated out from the inside to the outside together with the short track, the track is locked, the No. 1 traction winch wire rope is disassembled and retracted, the No. 1 traction winch wire rope passes through the No. 1 single-plate pulley, the No. 2 single-plate pulley, the No. 3 single-plate pulley and the No. 1 guide pulley of the tamping platform car and is then fixed to the No. 1 fixed cable ear; the No. 2 traction winch wire rope directly passes through the No. 2 guide pulley of the tamping platform car and is then fixed to the No. 2 fixed cable ear; S32: The vibrating hammer is started with a small exciting force, and the two tamping winches are linked and synchronously release the wire ropes. When the tamping conduit descends to the designed elevation, the tamping winches automatically stop, so that the tamping plate is fixed at a constant elevation. S33: By overlapping the tamping plates, the construction was carried out at a constant elevation at all points, completing the foundation leveling and meeting the construction technical standards for directly installing the caisson and other superstructures; S4: Retraction of the riprap chute and tamping platform vehicle S41: Control method for folding the riprap chute device: The first and second pipe winches are fixed symmetrically on the bottom surface of the trolley of the stone-throwing pipe device. After the steel wire ropes of the two winches are wound around the first and second universal fairleads corresponding to the winches, the steel wire ropes are fixed on the bottom lifting ears of the telescopic sleeve respectively; the three fixed pins on the outer side of the eye plate at the top of the telescopic sleeve are removed, and the steel wire ropes of the first and second pipe winches are released. The telescopic sleeve is in a natural drooping state connected by a pin; the steel wire rope of the small winch fixed on the boom is released, and the hook head of this steel wire rope is connected to the bottom lifting ear of the telescopic sleeve. Connect the wire clamp and secure it to the wire rope of the second slide pipe winch, locking it tightly. Using the wire rope of the small winch to retract, pull the wire rope of the second slide pipe winch onto the single-cup pulley fixed on the lifting frame. Release the wire rope of the first slide pipe winch, retract the wire rope of the second slide pipe winch, and lift the telescopic sleeve to the maximum height. Pull out the two locking pins and rotate the two anti-typhoon shelves outward from the ship's side until they are in the position of the limit blocks. Release the wire rope of the second slide pipe winch, place the telescopic sleeve on the anti-typhoon shelf, insert the locking pin, and secure the pipe clamp. The cable connection relationship when the tamping platform is retracted from the outside to the inside is the same as when it is rotated out from the inside to the outside. After the tamping platform is rotated inward from the outside together with the short track, the short track is locked, and the No. 1 traction winch wire rope is disassembled and retracted. At this time, the riprap trolley is moving on the C-type track, and its cable connection relationship is: the No. 1 traction winch wire rope passes through the No. 1 single-plate pulley and the No. 2 single-plate pulley, passes through the gap between the short track and the C-type track, and passes through the No. 4 single-plate pulley and is directly connected to the No. 1 fixed eye plate of the riprap trolley; the No. 2 traction winch wire rope is directly connected to the No. 2 fixed eye plate of the riprap trolley.

2. The construction process of a ramming-integrated ship with riprap, compaction and leveling functions according to claim 1, characterized in that: The No. 1 single-cup pulley is arranged perpendicular to the main deck surface along the direction of the wire rope and is more than 5m away from the No. 1 traction winch. Its function is not to be affected by the change in the wire rope output angle of the No. 1 traction winch drum, and to always limit and keep the passing wire rope in a parallel state; the No. 2 single-cup pulley is arranged horizontally, 3 meters away from the No. 1 single-cup pulley, and the line connecting the center line of the outer wheel groove of the No. 2 single-cup pulley and the center line of the upper wheel groove of the No. 1 single-cup pulley is horizontal to the main deck; the No. 2 three-cup pulley group and the No. 3 three-cup pulley group are both arranged horizontally, and the lower pulley of the pulley group and the No. 2 single-cup pulley are high from the main deck. The degree of consistency; the No. 1 guide pulley of the ramming platform car and the No. 2 guide pulley of the ramming platform car are both arranged at the bottom of the ramming platform car truss, and the line connecting the two coincides with the center line of the track; the No. 3 single-cake pulley is located 4m outside the short track, parallel to the No. 1 and No. 2 guide pulleys of the ramming platform car, and the height is consistent with the main deck; the No. 4 single-cake pulley is located on the center line between the tracks at the connection of the C-shaped track and the short track, and its height is lower than the No. 1 and No. 2 guide pulleys of the ramming platform car to prevent the ramming platform car from being restricted when moving; the angle between the No. 4 single-cake pulley and the No. 2 single-cake pulley and the horizontal direction is less than 6°.

3. The construction process of a ramming-integrated ship with riprap, compaction and leveling functions according to claim 1, characterized in that: The following method is specifically adopted for the follow-up control: The riprap trolley or tamping platform trolley moves on the C-type track using the follow-up technology. The two working conditions are front and back processes and do not move at the same time. The No. 1 traction winch and the No. 2 traction winch are both driven by variable frequency motors. In the follow-up mode, the brakes of the two winches are interlocked in the variable frequency control cabinets of the No. 1 traction winch and the No. 2 traction winch. The interlocking control is that when the variable frequency motor of the No. 1 traction winch is powered on, the brake of the No. 1 traction winch is powered off and the brake of the No. 2 traction winch is also interlocked and powered off. The No. 1 traction winch motor drives the winch to operate and the traction trolley moves, while the cable of the No. 2 traction winch is passively pulled and follows. ; The cable of the No. 2 traction winch is passively pulled and follows, and its variable frequency motor rotates due to the external force transmission of the drum and gear box. The rotation of the No. 2 traction winch motor will generate regenerative electrical energy, and energy-consuming braking is performed by adding a discharge resistor unit component on the DC side of the inverter; the energy-consuming braking includes two parts, a braking unit and a braking resistor. The braking resistance offsets the rotational inertia of the part of the No. 2 traction winch cable that is pulled, preventing the No. 1 traction winch drum from continuing to rotate and causing rope tangling when the No. 1 traction winch slows down or stops; the principle of the No. 2 traction winch driving the cable moving trolley and the No. 1 traction winch following is the same as above.

4. The construction process of a ramming-integrated ship with riprap, compaction and leveling functions according to claim 3, characterized in that: The follow-up control technology is brake interlocking control, and the control of the two traction winches includes individual local operation, remote single control and remote linkage control.