The invention discloses a pre-
assembly construction and turnover hoisting method for a
rudder horn block of a large ship. The pre-
assembly construction and turnover hoisting method comprises the following steps: step 1, a block division method and a construction method for the
rudder horn block: A1, a division method for the
rudder horn block; A2, a segmented construction method of the rudder hornblock; A3, a block construction method of the rudder horn block; step 2, an inverse pre-
assembly construction method; step 3, a pre-assembly turnover method: A1, the length direction of the pre-assembly is consistent with the length direction of a ship in a dock; A2, the ship length direction of the pre-assembly is perpendicular to the length direction of the ship in the dock. High-altitude operation of a lower
deck and a lower structure is flattened, high-altitude positioning, assembling,
welding and
coating difficulties are avoided through flat ground operation, the
safety risk is reduced,the total assembly operation efficiency is improved, a time period foundation is laid for rudder
system boring operation after block completion, and the method is universal for various ship types, particularly for simultaneously building various large ships in large docks.