Cross-particle-size grading riprap anti-scour structure and construction method
By filling gravel on the subsea soil layer and pouring gel slurry into cemented gravel clusters, the problem of insufficient anti-erosion ability of gravel piles is solved, and the stability and protective performance of the structure are improved.
Patent Information
- Application Number
- CN202411218078.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-15
AI Technical Summary
The gravel piles formed by natural accumulation are relatively weak in their anti-shrinkage ability and are easily dispersed by water flow, affecting their protective performance.
Adopt a cross-particle size graded stone throwing anti-scrubbing structure. By filling a large amount of gravel on the subsea soil layer and pouring a small amount of gel slurry on its surface, the gravels bond to each other, forming a cluster of cemented gravels of super-large particle size , thereby improving the anti-smoking ability.
It effectively avoids long-term cyclic inclined deformation and vibration of the structure, enhances the stability and anti-shrinking ability of the anti-shrinking structure, and solves the technical problems of anti-shrinking structures.
Smart Images

Figure CN118958384A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underwater riprap, and in particular to a cross-particle size grading riprap anti-scour structure and a construction method. Background Art
[0002] The installation of pile foundations, bridge piers and other structures on the riverbed or seabed will change the distribution of the surrounding water flow field, causing local scouring of the soil around the structures and forming scouring pits. This may affect the long-term stability of these structures and the operational safety of the superstructure of the structures.
[0003] Riprap is the most commonly used and economical anti-scour measure in water conservancy projects, marine projects and port projects. However, the gravel accumulation formed by natural accumulation is relatively weak in anti-scour ability. Under the action of water flow, riprap materials are easily dispersed, thus affecting their protective performance. Summary of the invention
[0004] The embodiment of the present invention provides a cross-particle size grading riprap anti-scour structure and construction method to solve the problem that the crushed stone accumulation formed by natural accumulation is relatively weak in anti-scour ability and the riprap material is easily dispersed under the action of water flow, thereby affecting its protective performance.
[0005] The embodiment of the present invention discloses a cross-particle size gradation riprap anti-scour structure, the cross-particle size gradation riprap anti-scour structure comprises at least one layer of anti-scour structure; the cross-particle size gradation riprap anti-scour structure is arranged on a preset seabed soil layer; the anti-scour structure is constructed based on a preset large amount of crushed stones and a preset small amount of gel slurry; the large amount of crushed stones is dumped into the surface of the soil layer and / or any layer of the anti-scour structure through a preset riprap conduit, and a narrow particle size gradation crushed stone accumulation body is formed on the surface of the soil layer and / or any layer of the anti-scour structure;
[0006] The cementitious slurry is used to be poured into multiple local areas on the surface of the gravel pile through a preset pouring conduit; the cementitious slurry is used to diffuse on the surface of the gravel pile and flow downward along the gaps in the gravel pile, so that the gravel within the slurry flow range adheres to each other to form a cluster of cemented gravel with super-large particle size, thereby transforming the gravel pile with narrow particle size grading into an anti-scour structure.
[0007] Optionally, the gelled slurry is placed in a slurry bag; the slurry bag is used to be dropped into a plurality of local areas on the surface of the gravel pile through the pouring pipe and / or the crane.
[0008] Optionally, the slurry bags placed in multiple local areas on the surface of the gravel pile dissolve in water, causing the gelled slurry in the slurry bags to flow out, expand in local areas on the surface of the gravel pile, and flow downward along the gaps in the gravel pile.
[0009] Optionally, a barb-type bag breaker is provided at the outlet of the casting conduit; the barb-type bag breaker is used to destroy the slurry bag when the slurry bag passes through the lower outlet of the casting conduit, so that the gelled slurry in the slurry bag flows out and is deposited into a local area on the surface of the gravel pile.
[0010] Optionally, there is an inverted filter layer on the surface of the soil layer; the large amount of crushed stones is dumped onto the surface of the inverted filter layer above the soil layer;
[0011] The filter layer is composed of at least one of geotextile, sandbag, sand blanket and sand and gravel with a preset particle size; the preset particle size is smaller than the minimum particle size of the gravel particles of the gravel accumulation body.
[0012] Optionally, the thickness of the gravel accumulation body is a first preset multiple of the median particle size of gravel in the gravel accumulation body.
[0013] Optionally, the cross-particle size grading riprap anti-scour structure includes an upper structure, a middle structure and a bottom structure; in the process of constructing the upper structure, the middle structure and the bottom structure, the particle size ranges of the large amount of crushed stones used to construct the upper structure, the middle structure and the bottom structure are different.
[0014] Optionally, in the process of constructing the upper structure, the middle structure and the bottom structure, the slurry bags are staggeredly distributed at the placement positions on the surface of the gravel accumulation body corresponding to the upper structure, the middle structure and the bottom structure.
[0015] Optionally, the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are staggeredly distributed in the spatial structure of the cross-particle size gradation riprap anti-scour structure.
[0016] Optionally, the cementitious slurry includes at least one of cement-based materials, early-strength high-flow cement mortar, early-strength high-flow concrete and early-strength high-flow solidified soil.
[0017] Optionally, the equivalent diameter of the cemented gravel cluster is a second preset multiple of the gravel particle size forming the cemented gravel cluster.
[0018] Optionally, the porosity of the bonded gravel cluster is not lower than a preset porosity threshold, the uniaxial compression strength of the bonded gravel cluster is not greater than a first preset strength threshold, and the bonding strength between mutually bonded gravel in the bonded gravel cluster is not less than a second preset strength threshold.
[0019] Optionally, the calculation formula of the uniaxial compressive strength of the cemented gravel cluster is:
[0020]
[0021] Among them, σ peak is the uniaxial compressive strength, k is the first coefficient, σ pm is the bonding strength between the cementitious slurry in the cemented gravel cluster and the gravel surface, ρ m is the volume fraction of the cementitious slurry in the cemented gravel cluster, n is the average coordination number of the gravels in the gravel accumulation, and ρ b is the volume fraction of the gravel in the cemented gravel cluster, and a is the second coefficient.
[0022] Optionally, there are structures around the cross-size graded riprap anti-scour structure; the structures include at least one of pile foundations, bridge piers, river embankments, seawalls, breakwaters, and island embankments.
[0023] Optionally, the particle size of the gravel is in the range of 5-20 cm; the gravel in the gravel accumulation body is uniform and flat on the surface of the soil layer and / or the anti-scour structure.
[0024] The embodiment of the present invention also discloses a construction method of a cross-particle size grading riprap anti-scour structure, comprising:
[0025] A large amount of gravel is dumped on a preset soil layer on the seabed using a preset riprap pipe; the large amount of gravel is used to form a narrow-size graded gravel accumulation body on the soil layer;
[0026] A small amount of preset cementing slurry is poured on the surface of the gravel accumulation body by using a preset pouring conduit; the cementing slurry is used to spread on the surface of the gravel accumulation body and flow downward along the gaps of the gravel accumulation body, so that the gravels within the flow range of the slurry are bonded to each other to form cemented gravel clusters of super-large particle size, thereby transforming the gravel accumulation body with narrow particle size distribution into an anti-scour structure;
[0027] A large amount of crushed stones are dumped on the surface of the anti-scour structure by using the riprap conduit; the large amount of crushed stones on the surface of the anti-scour structure are used to form a narrow-size graded crushed stone accumulation body on the surface of the anti-scour structure;
[0028] Using the pouring conduit to pour the gel slurry on the surface of the gravel accumulation body on the surface of the anti-scour structure, to obtain the anti-scour structure on the surface of the anti-scour structure;
[0029] The step of repeatedly utilizing the riprap conduit to dump a large amount of gravel on the surface of the anti-scour structure, utilizing the pouring conduit to pour the cementitious slurry on the surface of the gravel accumulation on the surface of the anti-scour structure, and obtaining the anti-scour structure on the surface of the anti-scour structure, until the height of at least one layer of the anti-scour structure reaches a preset design height; the at least one layer of the anti-scour structure forms a cross-particle size grading riprap anti-scour structure.
[0030] Optionally, the step of dumping a large amount of gravel on a preset seabed soil layer using a preset riprap pipe comprises:
[0031] For any gravel, obtaining the target landing point position of the gravel;
[0032] The position of the riprap guide tube is moved so that the crushed stones are thrown to the target landing point.
[0033] Optionally, the step of pouring a small amount of preset gel slurry on the surface of the gravel accumulation body by using a preset pouring conduit comprises:
[0034] Acquire at least one target pouring position of the gel slurry;
[0035] The position of the pouring conduit is moved so that the cementitious slurry is poured at the target pouring position.
[0036] The embodiments of the present invention include the following advantages:
[0037] In an embodiment of the present invention, the cross-particle size gradation riprap anti-scour structure includes at least one layer of anti-scour structure; the cross-particle size gradation riprap anti-scour structure is arranged on a soil layer of a preset seabed; the anti-scour structure is constructed based on a preset large amount of crushed stones and a preset small amount of cementitious slurry; a large amount of crushed stones are thrown into the soil layer and / or the surface of any layer of the anti-scour structure through a preset riprap conduit, and a narrow particle size gradation crushed stone accumulation body is formed on the surface of the soil layer and / or any layer of the anti-scour structure; the cementitious slurry is used to be poured on the crushed stones through a preset pouring conduit. The cemented slurry is used to diffuse on the surface of the gravel accumulation body and flow downward along the gaps of the gravel accumulation body, so that the gravel within the flow range of the slurry adheres to each other to form a cemented gravel cluster of super-large particle size, thereby converting the gravel accumulation body with narrow particle size gradation into an anti-scour structure. The cross-particle size gradation riprap anti-scour structure in the embodiment of the present invention can avoid the long-term cyclic tilting deformation and vibration of the surrounding structures, induce structural instability of the anti-scour structure, and solve the technical problem of structure scour prevention and control.
[0038] In an embodiment of the present invention, a small amount of cementitious slurry is poured on the surface of the gravel pile, and the gravels within the slurry flow range in the gravel pile bond with each other to form an ultra-large particle size cemented gravel cluster. The equivalent diameter of the ultra-large particle size cemented gravel cluster is several times or even dozens of times the particle size of the gravel forming the cemented gravel cluster. Thus, the ultra-large particle size cemented gravel cluster and the surrounding gravel particles together constitute a cross-particle size grading riprap anti-scour structure.
[0039] In an embodiment of the present invention, the cementitious slurry is placed in a slurry bag, and the slurry bag is used to be placed in multiple local areas on the surface of the gravel accumulation body through a casting conduit and / or a crane. The two processes of gravel dumping and slurry bag placement are constructed alternately or synchronously layer by layer, and the super-large particle size cemented gravel clusters cemented and solidified in different layers of the gravel accumulation body are staggered in the spatial structure, thereby forming a cross-particle size grading riprap anti-scour structure, which improves the comprehensive performance of the cross-particle size grading riprap anti-scour structure. Moreover, the same set of construction equipment can be used for dumping gravel and placing slurry bags, and the construction process is simple and efficient. Both riprap and slurry bags can be constructed using conduits to achieve uniform and smooth riprap and accurate placement of slurry bags.
[0040] In addition, in the embodiment of the present invention, there are structures around the cross-particle size gradation riprap anti-scour structure. Since the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are super-large-size cemented gravel clusters, the size and weight of the cemented gravel clusters are several times or even dozens of times the crushed gravel in the cross-particle size gradation riprap anti-scour structure, so the cross-particle size gradation riprap anti-scour structure has a strong anti-scour ability. At the same time, the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are staggered in the spatial structure of the cross-particle size gradation riprap anti-scour structure, which limits the large movement of the crushed gravel around the cemented gravel clusters and adapts to the settlement of the soil layer. In addition, when the force exerted on the external pile foundation of the structure is transmitted to the cross-particle size grading riprap anti-scour structure, the super-large particle size cemented gravel cluster can serve as the core unit of the bearing capacity chain of the cross-particle size grading riprap anti-scour structure, transmitting the force to the rock and soil around the cross-particle size grading riprap anti-scour structure, avoiding the structural instability of the cross-particle size grading riprap anti-scour structure induced by long-term cyclic tilt deformation and vibration of the structure, and solving the technical difficulties of scour prevention and control of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 Schematic diagram of a cross-particle size grading riprap anti-scour structure provided in an embodiment of the present invention;
[0042] Figure 2 It is a schematic diagram of a structure existing around a cross-particle size grading riprap anti-scour structure provided in an embodiment of the present invention;
[0043] Figure 3 It is a flowchart of the steps of a construction method of a cross-particle size grading riprap anti-scour structure provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0044] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0045] To facilitate understanding of the technical solutions and technical effects of the embodiments of the present invention, the prior art of the present invention is briefly described below.
[0046] The installation of pile foundations, bridge piers and other structures on the riverbed or seabed will change the distribution of the surrounding water flow field, causing local scouring of the soil around the structures and forming scouring pits. This may affect the long-term stability of these structures and the operational safety of the superstructure of the structures.
[0047] Riprap is the most commonly used and economical anti-scour measure in water conservancy projects, marine projects and port projects. At present, there are two processes for riprap construction protection: one is to riprap directly from the water surface, and the other is to riprap through a conduit on a construction ship. The landing point of riprap directly from the water surface is not accurate enough. The conduit can make the landing point of riprap more accurate to a certain extent, but during the riprap process, due to the presence of stones in the conduit, it is usually only possible to complete the riprap at one point and then move to the next point, and it is impossible to form a uniform and flat gravel accumulation. At the same time, the water flow will change the landing point of the riprap, making it uncontrollable.
[0048] In addition, the gravel accumulation formed by natural accumulation is relatively weak in anti-scouring ability. Under the continuous impact of water flow, the riprap material is easily dispersed, thus affecting its protective performance. In order to improve its protective performance, a certain amount of underwater cementing material can be poured at the predetermined pouring point on the gravel accumulation to complete single-point pouring. In offshore construction operations, since the ship cannot move and adjust the position of the grouting pipe in real time, only the fixed-point pouring method can be used. However, when the riprap range is large, it is difficult to form an ideal cemented rockfill body in the riprap protective layer by relying solely on the fixed-point pouring method.
[0049] Reference Figure 1 , showing a schematic diagram of a cross-particle size gradation riprap anti-scour structure provided in an embodiment of the present invention, the cross-particle size gradation riprap anti-scour structure comprises at least one layer of anti-scour structure; the cross-particle size gradation riprap anti-scour structure is arranged on a preset seabed soil layer; the anti-scour structure is constructed based on a preset large amount of crushed stones and a preset small amount of gelled slurry; the large amount of crushed stones is dumped into the surface of the soil layer and / or any layer of the anti-scour structure through a preset riprap conduit, and a narrow particle size gradation crushed stone accumulation body is formed on the surface of the soil layer and / or any layer of the anti-scour structure;
[0050] The cementitious slurry is used to be poured into multiple local areas on the surface of the gravel pile through a preset pouring conduit; the cementitious slurry is used to diffuse on the surface of the gravel pile and flow downward along the gaps in the gravel pile, so that the gravel within the slurry flow range adheres to each other to form a cluster of cemented gravel with super-large particle size, thereby transforming the gravel pile with narrow particle size grading into an anti-scour structure.
[0051] In an embodiment of the present invention, a cross-particle size grading riprap anti-scour structure includes at least one layer of anti-scour structure. The construction process of the cross-particle size grading riprap anti-scour structure is as follows: First, a large amount of gravel is dumped on the soil layer of the preset seabed through a preset riprap pipe, and a large amount of gravel can form a narrow particle size grading gravel accumulation body on the soil layer. Among them, the gravel accumulation body is a uniform and flat gravel accumulation body. When the gravel is dumped through the riprap pipe, a large amount of gravel can be formed into a uniform and flat gravel accumulation body by moving the pipe. The particle size range of a large amount of gravel is 5-20cm (centimeter). Then, a small amount of cementitious slurry is poured on the surface of the gravel accumulation body through a preset pouring pipe. The cementitious slurry can diffuse on the surface of the gravel accumulation body, flow downward along the gaps of the gravel accumulation body, flow into the gravel accumulation body, so that the gravel in the slurry flow range in the gravel accumulation body is bonded to each other, forming at least one cemented gravel cluster, and the gravel accumulation body is transformed into an anti-scour structure. It should be noted that, during the flow process, the gelled slurry can adhere to the contact points of adjacent gravels on the flow path and fill the gaps between the adjacent gravels.
[0052] Next, a large amount of crushed stone is thrown onto the surface of the anti-scour structure through the riprap conduit, and a large amount of crushed stone can form a narrow particle size graded crushed stone accumulation body on the surface of the anti-scour structure. A small amount of cementitious slurry is poured onto the surface of the crushed stone accumulation body through the pouring conduit, so that the crushed stone accumulation body is converted into a layer of anti-scour structure. Repeat the steps of throwing a large amount of crushed stone onto the surface of the anti-scour structure through the riprap conduit, pouring a small amount of cementitious slurry onto the surface of the crushed stone accumulation body through the pouring conduit, so that the crushed stone accumulation body is converted into a layer of anti-scour structure, until the height of the multi-layer anti-scour structure reaches the designed height of the cross-particle size graded riprap anti-scour structure. The multi-layer anti-scour structure forms a cross-particle size graded riprap anti-scour structure.
[0053] Therefore, the cross-particle size grading riprap anti-scour structure includes at least one layer of anti-scour structure, which is arranged on a preset seabed soil layer, and is constructed based on a preset large amount of crushed stone and a preset small amount of gelled slurry.
[0054] In an embodiment of the present invention, the cross-particle size gradation riprap anti-scour structure includes at least one layer of anti-scour structure; the cross-particle size gradation riprap anti-scour structure is arranged on a soil layer of a preset seabed; the anti-scour structure is constructed based on a preset large amount of crushed stones and a preset small amount of cementitious slurry; a large amount of crushed stones are thrown into the soil layer and / or the surface of any layer of the anti-scour structure through a preset riprap conduit, and a narrow particle size gradation crushed stone accumulation body is formed on the surface of the soil layer and / or any layer of the anti-scour structure; the cementitious slurry is used to be poured on the crushed stones through a preset pouring conduit. The cemented slurry is used to diffuse on the surface of the gravel accumulation body and flow downward along the gaps of the gravel accumulation body, so that the gravel within the flow range of the slurry adheres to each other to form a cemented gravel cluster of super-large particle size, thereby converting the gravel accumulation body with narrow particle size gradation into an anti-scour structure. The cross-particle size gradation riprap anti-scour structure in the embodiment of the present invention can avoid the long-term cyclic tilting deformation and vibration of the surrounding structures, induce structural instability of the anti-scour structure, and solve the technical problem of structure scour prevention and control.
[0055] Furthermore, in any of the above embodiments, the gelled slurry is placed in a slurry bag; the slurry bag is used to be dropped into a plurality of local areas on the surface of the gravel accumulation body through the pouring conduit and / or the crane.
[0056] Furthermore, in any of the above embodiments, the slurry bags placed in multiple local areas on the surface of the gravel pile dissolve in water, causing the gelled slurry in the slurry bags to flow out, expand in local areas on the surface of the gravel pile, and flow downward along the gaps in the gravel pile.
[0057] Furthermore, in any of the above embodiments, a barb-type bag breaker is provided at the outlet of the casting conduit; the barb-type bag breaker is used to destroy the slurry bag when the slurry bag passes through the lower outlet of the casting conduit, so that the gelled slurry in the slurry bag flows out and is deposited into a local area on the surface of the gravel pile.
[0058] In the embodiment of the present invention, the gelled slurry can also be placed in a slurry bag. The slurry bag can reach the surface of the gravel pile through a casting conduit or a crane, and then the slurry bag is self-dissolved in water or physically destroyed, and the gelled slurry flows from the slurry bag to the surface of the gravel pile. Physical destruction can refer to the slurry bag being washed by water flow and gradually worn out.
[0059] In an embodiment of the present invention, if the gelled slurry is contained in a slurry bag, a barb-type bag breaker can be provided at the outlet of the casting conduit. When the slurry bag passes through the outlet of the casting conduit, the slurry bag is physically broken by the barb-type bag breaker, and the gelled slurry flows out and is cast on the surface of the gravel accumulation body.
[0060] Furthermore, in any of the above embodiments, there is a filter layer on the surface of the soil layer; the large amount of crushed stones is dumped onto the surface of the filter layer above the soil layer;
[0061] The filter layer is composed of at least one of geotextile, sandbag, sand blanket and sand and gravel with a preset particle size; the preset particle size is smaller than the minimum particle size of the gravel particles of the gravel accumulation body.
[0062] In the embodiment of the present invention, a filter layer is placed below the cross-particle size grading riprap anti-scour structure, that is, on the surface of the soil layer on the seabed surface, and the filter layer includes but is not limited to geotextiles, sand bags, sand blankets, and sand and gravel with a preset particle size. The preset particle size is smaller than the particle size of the gravel in the gravel accumulation body, and the preset particle size is 1-5 cm.
[0063] In the embodiment of the present invention, the filter layer can prevent fine particles in the soil layer from entering the anti-scour structure with the water flow, thereby avoiding the pores of the anti-scour structure from being blocked by fine particles, thereby ensuring the drainage performance and stability of the anti-scour structure.
[0064] Further, in any of the above embodiments, the thickness of the gravel accumulation body is a first preset multiple of the median particle size of the gravel in the gravel accumulation body.
[0065] Furthermore, in any of the above embodiments, the cross-particle size grading riprap anti-scour structure includes an upper structure, a middle structure and a bottom structure; in the process of constructing the upper structure, the middle structure and the bottom structure, the particle size ranges of the large amount of crushed stones used to construct the upper structure, the middle structure and the bottom structure are different.
[0066] Furthermore, in any of the above embodiments, during the process of constructing the upper structure, the middle structure and the bottom structure, the slurry bags are staggeredly distributed at the placement positions on the surface of the gravel accumulation body corresponding to the upper structure, the middle structure and the bottom structure.
[0067] Further, in any of the above embodiments, the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are staggeredly distributed in the spatial structure of the cross-particle size gradation riprap anti-scour structure.
[0068] In the embodiment of the present invention, the thickness of the gravel accumulation body is a first preset multiple of the median particle size of the gravel in the gravel accumulation body. The first preset multiple may be 3-5 times.
[0069] In the embodiment of the present invention, according to the design height of the cross-particle size grading riprap anti-scour structure, the cross-particle size grading riprap anti-scour structure can be divided into three-layer structures of different heights, namely, an upper structure, a middle structure and a bottom structure, and each layer structure can include at least one layer of anti-scour structure. In the process of constructing the upper structure, the middle structure and the bottom structure, the particle size ranges of the large amount of crushed stones used to construct the upper structure, the middle structure and the bottom structure are different. The particle size range of the large amount of crushed stones corresponding to the upper structure is 5-10cm, the particle size range of the large amount of crushed stones corresponding to the middle structure is 10-15cm, and the particle size range of the large amount of crushed stones corresponding to the bottom structure is 10-20cm.
[0070] As an example of the present invention, Figure 1 The structure includes three layers, each of which includes at least one anti-scour structure. The construction process of the anti-scour structure is as follows: first, a large amount of gravel 1 is dumped at the location to be constructed of the anti-scour structure through a preset riprap pipe, and a large amount of gravel 1 can form a gravel pile at the location to be constructed. Then, a slurry bag 2 filled with cementitious slurry is made to reach the surface of the gravel pile through a casting pipe or a crane. The slurry bag 2 self-dissolves or is physically destroyed in the water, and the cementitious slurry flows from the slurry bag 2 to the surface of the gravel pile. The cementitious slurry diffuses on the surface of the gravel pile, and flows downward along the gaps in the gravel pile, and flows into the gravel pile, so that the gravel 1 within the slurry flow range in the gravel pile adheres to each other, forming at least one cemented gravel cluster 3, and the gravel pile is transformed into an anti-scour structure.
[0071] In the embodiment of the present invention, during the construction of the upper structure, the middle structure and the bottom structure, the slurry bags are placed at positions staggered on the surface of the gravel accumulation body corresponding to the upper structure, the middle structure and the bottom structure. It should be noted that the placement positions of the slurry bags can be determined by GPS (Global Positioning System).
[0072] In the embodiment of the present invention, since the placement positions of the slurry bags on the surfaces of the gravel accumulation bodies corresponding to the upper structure, the middle structure and the bottom structure are staggered, the cemented gravel clusters in the cross-particle size grading riprap anti-scour structure are staggered in the spatial structure of the cross-particle size grading riprap anti-scour structure.
[0073] In an embodiment of the present invention, the cementitious slurry is placed in a slurry bag, and the slurry bag is used to be placed in multiple local areas on the surface of the gravel accumulation body through a casting conduit and / or a crane. The two processes of gravel dumping and slurry bag placement are constructed alternately or synchronously layer by layer, and the super-large particle size cemented gravel clusters cemented and solidified in different layers of the gravel accumulation body are staggered in the spatial structure, thereby forming a cross-particle size grading riprap anti-scour structure, which improves the comprehensive performance of the cross-particle size grading riprap anti-scour structure. Moreover, the same set of construction equipment can be used for dumping gravel and placing slurry bags, and the construction process is simple and efficient. Both riprap and slurry bags can be constructed using conduits to achieve uniform and smooth riprap and accurate placement of slurry bags.
[0074] Furthermore, in any of the above embodiments, the cementitious slurry includes at least one of cement-based materials, early-strength high-flow cement mortar, early-strength high-flow concrete, and early-strength high-flow solidified soil.
[0075] In an embodiment of the present invention, the cementitious slurry includes at least one of cement-based materials, early-strength high-flow cement mortar, early-strength high-flow concrete, and early-strength high-flow solidified soil. The early-strength high-flow concrete includes 1-3 parts of early-strength cement, 4-7 parts of ordinary cement, 2-4 parts of stone powder, 20-30 parts of sand and gravel, 3-5 parts of water, and 0.1-0.2 parts of admixtures, and the ratio of the maximum particle size of the sand and gravel in the 20-30 parts of sand and gravel to the median particle size of the gravel in the gravel pile is 0.1-0.2.
[0076] It should be noted that "part" is a relative unit used to indicate the proportion or mix ratio of different components, and refers to the proportion range of each component when making early strength high flow concrete. These proportions are usually based on the mass ratio or volume ratio of the total amount.
[0077] Further, in any of the above embodiments, the equivalent diameter of the cemented gravel cluster is a second preset multiple of the gravel particle size forming the cemented gravel cluster.
[0078] In the embodiment of the present invention, the equivalent diameter of the cemented gravel cluster is a second preset multiple of the gravel particle size forming the cemented gravel cluster. The second preset multiple is an exponential multiple or tens of multiples.
[0079] In the embodiment of the present invention, the particle sizes of the cemented gravel clusters and the gravel surrounding the cemented gravel clusters in the anti-scour structure to which the cemented gravel clusters belong present cross-particle size grading characteristics.
[0080] In an embodiment of the present invention, a small amount of cementitious slurry is poured on the surface of the gravel pile, and the gravels within the slurry flow range in the gravel pile bond with each other to form an ultra-large particle size cemented gravel cluster. The equivalent diameter of the ultra-large particle size cemented gravel cluster is several times or even dozens of times the particle size of the gravel forming the cemented gravel cluster. Thus, the ultra-large particle size cemented gravel cluster and the surrounding gravel particles together constitute a cross-particle size grading riprap anti-scour structure.
[0081] Furthermore, in any of the above embodiments, the porosity of the bonded gravel cluster is not lower than a preset porosity threshold, the uniaxial compression strength of the bonded gravel cluster is not greater than a first preset strength threshold, and the bonding strength between the mutually bonded gravel in the bonded gravel cluster is not lower than a second preset strength threshold.
[0082] Further, in any of the above embodiments, the calculation formula of the uniaxial compressive strength of the cemented gravel cluster is:
[0083]
[0084] Among them, σ peak is the uniaxial compressive strength, k is the first coefficient, σ pm is the bonding strength between the cementitious slurry in the cemented gravel cluster and the gravel surface, ρ m is the volume fraction of the cementitious slurry in the cemented gravel cluster, n is the average coordination number of the gravels in the gravel accumulation, and ρ b is the volume fraction of the gravel in the cemented gravel cluster, and a is the second coefficient.
[0085] In an embodiment of the present invention, the porosity of the cemented gravel cluster is not less than a preset porosity threshold. The preset porosity threshold may be 20%. The uniaxial compression strength of the cemented gravel cluster is not greater than a first preset strength threshold. The first preset strength threshold may be 10 MPa (megapascals). The bonding strength between the mutually bonded gravels in the cemented gravel cluster is not less than a second preset strength threshold. The second preset strength threshold may be 2 KN (kilonewtons).
[0086] The calculation formula of the uniaxial compressive strength of cemented gravel cluster is:
[0087]
[0088] Among them, σ peak is the uniaxial compressive strength, k is the first coefficient, σ pm is the bonding strength between the cement paste in the cemented gravel cluster and the gravel surface, ρ m is the volume fraction of cement paste in the cemented gravel cluster, n is the average coordination number of gravel in the gravel accumulation, ρ bis the volume fraction of gravel in the cemented gravel cluster, and a is the second coefficient. Wherein, k is an empirical coefficient, which is related to the stacking structure, shape and coordination number of the gravel. a is also an empirical coefficient and can be determined by experiment.
[0089] Furthermore, in any of the above embodiments, there are structures around the cross-size graded riprap anti-scour structure; the structures include at least one of pile foundations, bridge piers, river embankments, seawalls, breakwaters, and island embankments.
[0090] In an embodiment of the present invention, there are structures around the cross-particle size gradation riprap anti-scour structure, and the structures include at least one of a pile foundation, a bridge pier, a river bank, a seawall, a wave breakwater, and an island bank. Specifically, the structure can be constructed in the cross-particle size gradation riprap anti-scour structure or along the inner edge of the cross-particle size gradation riprap anti-scour structure, and the cross-particle size gradation riprap anti-scour structure can also be constructed along the periphery of the structure.
[0091] In the embodiment of the present invention, there are structures around the cross-particle size gradation riprap anti-scour structure. Since the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are super-large-size cemented gravel clusters, the size and weight of the cemented gravel clusters are several times or even dozens of times the crushed gravel in the cross-particle size gradation riprap anti-scour structure, so the cross-particle size gradation riprap anti-scour structure has a strong anti-scour ability. At the same time, the cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are staggered in the spatial structure of the cross-particle size gradation riprap anti-scour structure, which limits the large movement of the crushed gravel around the cemented gravel clusters and adapts to the settlement of the soil layer. In addition, when the force exerted on the external pile foundation of the structure is transmitted to the cross-particle size grading riprap anti-scour structure, the super-large particle size cemented gravel cluster can serve as the core unit of the bearing capacity chain of the cross-particle size grading riprap anti-scour structure, transmitting the force to the rock and soil around the cross-particle size grading riprap anti-scour structure, avoiding the structural instability of the cross-particle size grading riprap anti-scour structure induced by long-term cyclic tilt deformation and vibration of the structure, and solving the technical difficulties of scour prevention and control of the structure.
[0092] Reference Figure 2 , showing a schematic diagram of structures existing around a cross-particle size grading riprap anti-scour structure provided in an embodiment of the present invention. Figure 2 The number 1 in the figure refers to the gravel, the number 3 refers to the cemented gravel cluster, the number 4 refers to the first structure, and the number 5 refers to the second structure. The first structure is located in the cross-size graded riprap anti-scour structure. The cross-size graded riprap anti-scour structure exists outside the second structure.
[0093] Furthermore, in any of the above embodiments, the particle size of the gravel is in the range of 5-20 cm; the gravel in the gravel accumulation body is uniform and flat on the surface of the soil layer and / or the anti-scour structure.
[0094] Reference Figure 3 , shows a flowchart of the steps of a construction method of a cross-particle size grading riprap anti-scour structure provided in an embodiment of the present invention, which may specifically include the following steps:
[0095] Step 301, using a preset riprap pipe to dump a large amount of gravel on a preset seabed soil layer; the large amount of gravel is used to form a narrow-size graded gravel accumulation body on the soil layer;
[0096] Step 302, using a preset pouring conduit to pour a preset small amount of cementitious slurry on the surface of the gravel accumulation body; the cementitious slurry is used to spread on the surface of the gravel accumulation body and flow downward along the gaps of the gravel accumulation body, so that the gravels within the slurry flow range are bonded to each other to form a cemented gravel cluster with an ultra-large particle size, thereby transforming the gravel accumulation body with a narrow particle size distribution into an anti-scour structure;
[0097] Step 303, using the riprap pipe to dump a large amount of crushed stones on the surface of the anti-scour structure; the large amount of crushed stones on the surface of the anti-scour structure are used to form a narrow-size graded crushed stone accumulation body on the surface of the anti-scour structure;
[0098] Step 304, using the casting conduit to cast the gel slurry on the surface of the gravel accumulation body on the surface of the anti-scour structure, to obtain the anti-scour structure on the surface of the anti-scour structure;
[0099] Step 305, repeatedly using the riprap conduit to dump a large amount of gravel on the surface of the anti-scour structure, using the pouring conduit to pour the cementitious slurry on the surface of the gravel accumulation on the surface of the anti-scour structure, to obtain the anti-scour structure on the surface of the anti-scour structure, until the height of at least one layer of the anti-scour structure reaches a preset design height; the at least one layer of the anti-scour structure forms a cross-particle size grading riprap anti-scour structure.
[0100] In the embodiment of the present invention, a large amount of gravel is dumped on the soil layer of the preset seabed using a preset riprap conduit, and the large amount of gravel is used to form a gravel accumulation body with narrow particle size distribution on the soil layer. A small amount of preset cementitious slurry is poured on the surface of the gravel accumulation body using a preset casting conduit, and the cementitious slurry is used to diffuse on the surface of the gravel accumulation body and flow downward along the gaps of the gravel accumulation body, so that the gravel within the flow range of the slurry adheres to each other to form a cemented gravel cluster with super large particle size, thereby converting the gravel accumulation body with narrow particle size distribution into an anti-scour structure. A large amount of gravel is dumped on the surface of the anti-scour structure using a riprap conduit, and the large amount of gravel on the surface of the anti-scour structure is used to form a gravel accumulation body with narrow particle size distribution on the surface of the anti-scour structure. A small amount of cementitious slurry is poured on multiple local areas of the surface of the gravel accumulation body on the surface of the anti-scour structure using a casting conduit to obtain an anti-scour structure on the surface of the anti-scour structure. The steps of repeatedly using a riprap pipe to dump a large amount of gravel on the surface of the anti-scour structure, and using a pouring pipe to pour a small amount of gelled slurry on the surface of the gravel accumulation on the surface of the anti-scour structure to obtain the anti-scour structure on the surface of the anti-scour structure, until the height of at least one layer of the anti-scour structure reaches a preset design height, and at least one layer of the anti-scour structure forms a cross-particle size grading riprap anti-scour structure. The cross-particle size grading riprap anti-scour structure in the embodiment of the present invention can avoid the long-term cyclic tilt deformation and vibration of the surrounding structures, induce the structural instability of the anti-scour structure, and solve the technical problem of structure scour prevention and control.
[0101] Further, in any of the above embodiments, step 301 includes:
[0102] Sub-step S11, for any gravel, obtaining the target landing point position of the gravel;
[0103] Sub-step S12, moving the position of the riprap pipe so that the crushed stones are thrown to the target landing point.
[0104] In the embodiment of the present invention, for any crushed stone, the target landing point of the crushed stone is obtained, and the position of the stone riprap guide tube is moved so that the crushed stone is thrown to the target landing point.
[0105] Further, in any of the above embodiments, step 302 includes:
[0106] Sub-step S21, obtaining at least one target pouring position of the gel slurry;
[0107] Sub-step S22, moving the position of the pouring conduit so that the cementitious slurry is poured at the target pouring position.
[0108] In an embodiment of the present invention, at least one target pouring position of the cementitious slurry is acquired, and the position of the pouring conduit is moved so that the cementitious slurry is poured at the target pouring position.
[0109] In the embodiment of the present invention, the same set of construction equipment can be used for pouring crushed stone and cementitious slurry, the construction process is simple and efficient, the crushed stone and cementitious slurry are constructed by using a conduit, the stone throwing is uniform and flat, and the cementitious slurry is accurately placed.
[0110] It should be noted that, for the sake of simplicity, the method embodiments are described as a series of action combinations, but those skilled in the art should be aware that the embodiments of the present invention are not limited by the order of the actions described, because according to the embodiments of the present invention, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions involved are not necessarily required by the embodiments of the present invention.
[0111] As for the method embodiment, since it is basically similar to the structural embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the structural embodiment.
[0112] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state hard disk Solid State Disk (SSD)), etc.
[0113] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0114] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0115] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A cross-particle size grading riprap anti-scour structure, characterized in that: The cross-particle size gradation riprap anti-scour structure comprises at least one layer of anti-scour structure; the cross-particle size gradation riprap anti-scour structure is arranged on a preset seabed soil layer; the anti-scour structure is constructed based on a preset large amount of crushed stones and a preset small amount of gel slurry; The large amount of crushed stones is dumped onto the surface of the soil layer and / or any layer of the anti-scour structure through a preset dumping conduit, forming a narrow-size graded crushed stone accumulation body on the surface of the soil layer and / or any layer of the anti-scour structure; The cementitious slurry is used to be poured into multiple local areas on the surface of the gravel pile through a preset pouring conduit; the cementitious slurry is used to diffuse on the surface of the gravel pile and flow downward along the gaps in the gravel pile, so that the gravel within the slurry flow range adheres to each other to form a cluster of cemented gravel with super-large particle size, thereby transforming the gravel pile with narrow particle size grading into an anti-scour structure.
2. The cross-size graded riprap anti-scour structure according to claim 1 is characterized in that: The gelling slurry is placed in a slurry bag; the slurry bag is used to be dropped into a plurality of local areas on the surface of the gravel accumulation body through the pouring pipe and / or the crane.
3. The cross-particle size grading riprap anti-scour structure according to claim 2 is characterized in that: The slurry bags placed in multiple local areas on the surface of the gravel pile are dissolved in water, so that the gelled slurry in the slurry bags flows out, spreads in the local areas on the surface of the gravel pile and flows downward along the gaps in the gravel pile.
4. The cross-particle size grading riprap anti-scour structure according to claim 2, characterized in that: A barbed bag breaker is provided at the outlet of the casting conduit; the barbed bag breaker is used to destroy the slurry bag when the slurry bag passes through the lower outlet of the casting conduit, so that the gelled slurry in the slurry bag flows out and is placed on a local area on the surface of the gravel accumulation body.
5. The cross-particle size grading riprap anti-scour structure according to claim 1, characterized in that: There is an inverted filter layer on the surface of the soil layer; the large amount of crushed stones are dumped onto the surface of the inverted filter layer above the soil layer; The filter layer is composed of at least one of geotextile, sandbag, sand blanket and sand and gravel with a preset particle size; the preset particle size is smaller than the minimum particle size of the gravel particles of the gravel accumulation body.
6. The cross-size graded riprap anti-scour structure according to claim 1, characterized in that: The thickness of the gravel accumulation body is a first preset multiple of the median particle size of the gravel in the gravel accumulation body.
7. The cross-size graded riprap anti-scour structure according to claim 2, characterized in that: The cross-particle size grading riprap anti-scour structure includes an upper structure, a middle structure and a bottom structure; in the process of constructing the upper structure, the middle structure and the bottom structure, the particle size ranges of the large amount of crushed stones used to construct the upper structure, the middle structure and the bottom structure are different.
8. The cross-size graded riprap anti-scour structure according to claim 7, characterized in that: During the process of constructing the upper structure, the middle structure and the bottom structure, the slurry bags are staggeredly distributed at the placement positions on the surface of the gravel accumulation body corresponding to the upper structure, the middle structure and the bottom structure.
9. The cross-particle size grading riprap anti-scour structure according to claim 8, characterized in that: The cemented gravel clusters in the cross-particle size gradation riprap anti-scour structure are staggeredly distributed on the spatial structure of the cross-particle size gradation riprap anti-scour structure.
10. The cross-size graded riprap anti-scour structure according to claim 1, characterized in that: The cementitious slurry comprises at least one of cement-based materials, early-strength high-fluidity cement mortar, early-strength high-fluidity concrete and early-strength high-fluidity solidified soil.
11. The cross-particle size grading riprap anti-scour structure according to claim 1, characterized in that: The equivalent diameter of the cemented gravel cluster is a second preset multiple of the gravel particle size forming the cemented gravel cluster.
12. The cross-particle size grading riprap anti-scour structure according to claim 1, characterized in that: The porosity of the bonded gravel cluster is not lower than a preset porosity threshold, the uniaxial compression strength of the bonded gravel cluster is not greater than a first preset strength threshold, and the bonding strength between the mutually bonded gravels in the bonded gravel cluster is not lower than a second preset strength threshold.
13. The cross-particle size grading riprap anti-scour structure according to claim 12, characterized in that: The calculation formula of the uniaxial compressive strength of the cemented gravel cluster is: Among them, σ peak is the uniaxial compressive strength, k is the first coefficient, σ pm is the bonding strength between the cementitious slurry in the cemented gravel cluster and the gravel surface, ρ m is the volume fraction of the cementitious slurry in the cemented gravel cluster, n is the average coordination number of the gravels in the gravel accumulation, and ρ b is the volume fraction of the gravel in the cemented gravel cluster, and a is the second coefficient.
14. The cross-size graded riprap anti-scour structure according to claim 1, characterized in that: There are structures around the cross-size graded riprap anti-scour structure; the structures include at least one of pile foundations, bridge piers, river embankments, seawalls, wave breakwaters, and island embankments.
15. The cross-size graded riprap anti-scour structure according to claim 1, characterized in that: The particle size of the crushed stones ranges from 5 to 20 cm; the crushed stones in the crushed stone accumulation body are uniform and flat on the surface of the soil layer and / or the anti-scour structure.
Citation Information
Patent Citations
Gridding cemented riprap anti-scouring structure
CN114457857A
Self-cementation granular mixture anti-scouring composite structure
CN116180794A
Underwater pouring device and pouring construction method of underwater cementing material
CN117684573A
Rubble mound, its construction method and high specific- gravity rubber granular material used for it
JP2003306921A