BIM (Building Information Modeling) technology-based double-arc metal roof board mounting structure and construction method
By introducing components such as clamps, springs and sealing airbags into the roof panel installation structure, the problem of telescopic deformation caused by the roof panel is solved, the long life and sealing effect of the roof panel are achieved, and the overall performance of the roof panel is improved.
Patent Information
- Application Number
- CN202411199083.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-29
AI Technical Summary
During use, the roof panels are telescopic and deformation due to temperature influence, resulting in relative displacement of the sun panels and fixing screws, causing the plates to crack and reduce the service life of the roof panels.
Using a double arc metal roof panel installation structure based on BIM technology, the relative displacement and sealing function of the card block during the expansion and contraction process is realized by setting a card slot and mounting plate on the keel frame, and using components such as card blocks, springs and sealing airbags. Avoid cracking of the board and improve the service life of the roof panel.
It effectively avoids cracking of the roof panel during expansion and contraction, improves the service life of the roof panel, and prevents rainwater from seeping through sealing airbags, enhancing the sealing of the installation.
Smart Images

Figure CN118958597A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of roof panel installation, and in particular to a double-arc metal roof panel installation structure and a construction method based on BIM technology. Background Art
[0002] BIM technology is not just a simple integration of digital information, but the application of digital information. When installing roof panels, 3D real-time modeling technology can be used to guide the installation and construction in real time according to the construction plan, which can speed up the construction progress and avoid construction errors. In the selection of double-arc roof panels, polycarbonate panels are the preferred material due to their light transmittance, good bendability, and easy and quick installation. During installation, the polycarbonate panels are fixed to the keel frame with fixing screws to form a roof.
[0003] However, the sun panel is a polycarbonate endurance panel, which will be affected by temperature and cause expansion and contraction deformation during the use of the roof panel. During the expansion and contraction process, the sun panel and the fixing screws will have relative displacement, causing the panel to crack, thereby reducing the service life of the roof panel. Summary of the invention
[0004] The purpose of the present invention is to solve the following shortcomings in the prior art: the roof panel undergoes expansion and contraction deformation during use, and the polycarbonate sheet and the fixing screws undergo relative displacement during the expansion and contraction process, causing the sheet to crack, thereby reducing the service life of the roof panel, and a double-arc metal roof panel installation structure based on BIM technology is proposed.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A double-arc metal roof panel installation structure based on BIM technology, comprising a roof panel body and two keel frames, both sides of the two keel frames are provided with card slots, both ends of the roof panel body are fixedly installed with mounting plates, a plurality of card blocks are fixedly installed on the mounting plates, a plurality of card blocks are provided with strip holes, a plurality of card blocks are inserted into the card slots, a plurality of positioning holes are provided on the surface of the keel frame, the positioning holes are aligned with the strip holes, a fastening screw is provided in the positioning hole, one end of the fastening screw passes through the strip hole, and a fastening nut is threadedly sleeved;
[0007] A plurality of mounting grooves are provided inside the upper and lower sides of the card slot, and the plurality of mounting grooves are respectively located near the plurality of positioning holes. A first telescopic spring is fixedly installed in the mounting groove, and a cylindrical block is fixedly installed at one end of the first telescopic spring away from the mounting groove. A spherical groove is provided at one end of the cylindrical block, and a ball is roamingly embedded in the spherical groove. The plurality of balls are respectively in rolling contact with the upper and lower surfaces of the plurality of card blocks.
[0008] As a preferred solution, a rectangular hole connected to the strip hole is provided on the side of the card block, and a plurality of rectangular rods are horizontally fixedly installed in the card slot, and one end of the plurality of rectangular rods are respectively slidably inserted in the rectangular holes provided on the plurality of card blocks, and a movable disk is sleeved on the rectangular rod, and a second telescopic spring is sleeved on the movable rod, and the two ends of the second telescopic spring are respectively fixedly connected to the surface of the movable disk and the inner wall of the card slot, and a movable hole is provided on the rectangular rod, and a movable block is horizontally slidably installed in the movable hole through a sliding component, and limit components for limiting the card block are provided at the upper and lower ends of the movable block.
[0009] As a preferred solution, the sliding assembly includes a sliding rail horizontally fixedly installed in the moving hole and a third telescopic spring sleeved on the sliding rail. The moving block is slidably sleeved on the sliding rail, and the two ends of the third telescopic spring are respectively fixedly connected to the inner wall of the moving hole and the surface of the moving block.
[0010] As a preferred solution, rectangular grooves are provided at both the upper and lower ends of the movable block, and the limiting assembly includes a fourth telescopic spring fixedly installed in the rectangular groove and a trapezoidal limiting block fixedly installed at one end of the fourth telescopic spring, and the trapezoidal limiting block is slidably installed in the rectangular groove, and the side surface of the trapezoidal limiting block contacts the inner wall of the strip hole.
[0011] As a preferred solution, the elastic coefficient of the second telescopic spring is the same as the elastic coefficient of the third telescopic spring, and the inclined surface of the trapezoidal limiting block faces away from the moving disk.
[0012] As a preferred solution, strip rods are fixedly installed on the upper and lower surfaces of the mounting plate, cavities are opened inside the two strip rods, and sealed air bags are fixedly installed on the strip rods. The inner wall of the cavity is opened with multiple inflation holes that are connected to the sealed air bags, and the surfaces of the sealed air bags are in contact with the surface of the keel frame and the surface of the mounting plate.
[0013] As a preferred solution, a plurality of air cavities are provided inside the mounting plate, and the inner walls of the plurality of air cavities are provided with two air inlet holes respectively connected with the cavities of the two strip rods, and a push plate is horizontally and sealingly slidably installed in the air cavity, and the two air inlet holes are both located on the side of the push plate close to the strip hole, and a transmission assembly for driving the push plate to move is provided on the mounting plate.
[0014] As a preferred solution, a sliding hole connected to the air cavity is opened on the side wall of the strip hole, and the transmission assembly includes a sliding rod slidably installed in the sliding hole and a transmission ring fixedly installed at one end of the sliding rod, and the end of the sliding rod away from the transmission ring is fixedly connected to the push plate, and the transmission ring is sleeved on the fastening screw.
[0015] As a preferred solution, there is a closed space between one end of the push plate away from the strip hole and the air cavity, and a conical block is fixedly mounted on the lower end of the fastening screw.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The installation of the roof panel is completed by inserting the mounting plate and multiple card blocks into the card slots, and then installing the card blocks on the keel frame through fastening screws and fastening nuts. When the roof panel is deformed due to temperature, the card blocks and fastening screws can be relatively displaced under the action of the strip holes to ensure that there is a certain displacement space for the card blocks during the expansion and contraction process, effectively avoiding the cracking of the roof panel and increasing the service life of the roof panel.
[0018] 2. When the card block is installed in the card slot, the card block can be clamped in the card slot under the cooperation of the first telescopic spring, the cylindrical block and the ball, and the friction between the card block and the card slot is reduced, so that the card block can move horizontally in the card slot and prevent the friction from affecting the telescopic deformation of the roof panel.
[0019] 3. When the influence of temperature on the roof panel decreases, the rectangular rod, the second telescopic spring, the moving plate, the sliding assembly, the moving block, and the limit assembly cooperate with each other to facilitate the restoration of the roof panel to its original state and return the card block to its initial position. When the roof panel is affected by temperature again, the roof panel can be deformed repeatedly, thereby further improving the service life of the roof panel.
[0020] 4. The sealing airbag is filled with gas and is in an expanded state. When the mounting plate and the card block are inserted into the card slot, the sealing airbag will contact the keel frame and the mounting plate, thereby blocking the gap between the mounting plate and the keel frame, preventing rainwater from seeping in and avoiding the risk of water leakage.
[0021] 5. When the card block and the mounting plate move in the card slot, the expansion size of the sealing airbag can be changed through the cooperation of the transmission assembly, the push plate, the air cavity and the air inlet hole, so that it can just block the gap between the keel frame and the mounting plate, preventing the sealing airbag from being too large to affect the movement of the card block, and too small to affect the sealing. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a three-dimensional structural schematic diagram of the double-arc metal roof panel installation structure of the present invention;
[0023] Figure 2 It is a three-dimensional partial structural schematic diagram of the double-arc metal roof panel installation structure of the present invention;
[0024] Figure 3 It is a three-dimensional exploded structural diagram of the mounting plate, the clamping block, the keel frame and the fastening screws;
[0025] Figure 4 It is a schematic diagram of the planar structure of the mounting plate, the clamping block, the keel frame and the fastening screws;
[0026] Figure 5 It is a schematic diagram of a partial cross-sectional structure of a mounting plate, a clamping block, a keel frame and fastening screws;
[0027] Figure 6 for Figure 5 The enlarged structural diagram at A in the middle;
[0028] Figure 7 for Figure 5 The enlarged structural diagram at B in the middle;
[0029] Figure 8 for Figure 5 Enlarged structural diagram at point C in the middle.
[0030] In the figure:
[0031] 1 roof panel body, 2 keel frame, 3 slot, 4 mounting plate, 5 block, 6 strip hole, 7 positioning hole, 8 fastening screw, 9 fastening nut, 10 first telescopic spring, 11 cylindrical block, 12 ball, 13 rectangular rod, 14 moving plate, 15 second telescopic spring, 16 moving block, 17 slide rail, 18 third telescopic spring, 19 moving hole, 20 rectangular slot, 21 fourth telescopic spring, 22 trapezoidal limit block, 23 strip rod, 24 sealing airbag, 25 air cavity, 26 push plate, 27 slide rod, 28 transmission ring, 29 conical block. DETAILED DESCRIPTION
[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0033] Reference Figure 1-Figure 8 A double-arc metal roof panel installation structure based on BIM technology, comprising a roof panel body 1 and two keel frames 2, both sides of the two keel frames 2 are provided with card slots 3, both ends of the roof panel body 1 are fixedly installed with mounting plates 4, a plurality of card blocks 5 are fixedly installed on the mounting plates 4, a plurality of card blocks 5 are provided with strip holes 6, a plurality of card blocks 5 are inserted into the card slots 3, a plurality of positioning holes 7 are provided on the surface of the keel frame 2, the positioning holes 7 are aligned with the strip holes 6, a fastening screw 8 is provided in the positioning hole 7, one end of the fastening screw 8 passes through the strip hole 6, and a fastening nut 9 is threadedly sleeved;
[0034] When installing the roof panel on the keel frame 2, the mounting plate 4 and multiple clamping blocks 5 fixedly installed on the roof panel are inserted into the clamping slot 3. During the insertion process, the strip hole 6 on the clamping block 5 and the positioning hole 7 are on the same vertical plane until the strip hole 6 is aligned with the positioning hole 7, and then the fastening screw 8 is passed through the positioning hole 7 and the strip hole 6 in turn, and then the fastening nut 9 is threadedly sleeved on one end of the fastening screw 8, thereby completing the installation of the roof panel. After the roof panel is installed, the clamping block 5 can move in the clamping slot 3, and the fastening screw 8 is relatively displaced in the strip hole 6, ensuring that the clamping block 5 has a certain displacement space during the expansion and contraction deformation of the roof panel, effectively avoiding the roof panel from being torn, and improving the service life of the roof panel.
[0035] A plurality of mounting grooves are provided inside the upper and lower sides of the card slot 3, and the plurality of mounting grooves are respectively located near the plurality of positioning holes 7. A first telescopic spring 10 is fixedly installed in the mounting groove, and a cylindrical block 11 is fixedly installed at one end of the first telescopic spring 10 away from the mounting groove. A spherical groove is provided at one end of the cylindrical block 11, and a ball 12 is roamingly embedded in the spherical groove. The plurality of balls 12 are respectively in rolling contact with the upper and lower surfaces of the plurality of card blocks 5.
[0036] When the block 5 is inserted into the slot 3, the upper and lower surfaces of the block 5 will contact the multiple balls 12, and under the action of the arc surface of the balls 12, the cylindrical block 11 will move into the installation groove, and the first telescopic spring 10 will be compressed. When the block 5 moves in the slot 3, the balls 12 can reduce the friction between the block 5 and the slot 3.
[0037] A rectangular hole connected to the strip hole 6 is provided on the side of the card block 5, and a plurality of rectangular rods 13 are fixedly installed horizontally in the card slot 3, and one end of the plurality of rectangular rods 13 is respectively slidably inserted in the rectangular holes provided on the plurality of card blocks 5, and a moving disk 14 is sleeved on the rectangular rod 13, and a second telescopic spring 15 is sleeved on the rectangular rod 13, and the two ends of the second telescopic spring 15 are respectively fixedly connected to the surface of the moving disk 14 and the inner wall of the card slot 3, and a moving hole 19 is provided on the rectangular rod 13, and a moving block 16 is horizontally slidably installed in the moving hole 19 through a sliding assembly, and the upper and lower ends of the moving block 16 are provided with limit assemblies for limiting the card block 5, and the sliding assembly includes a slide rail 17 and a horizontal fixedly installed in the moving hole 19 A third telescopic spring 18 is sleeved on the slide rail 17, and the moving block 16 is slidably sleeved on the slide rail 17. The two ends of the third telescopic spring 18 are fixedly connected to the inner wall of the moving hole 19 and the surface of the moving block 16 respectively. A rectangular groove 20 is provided at the upper and lower ends of the moving block 16. The limiting assembly includes a fourth telescopic spring 21 fixedly installed in the rectangular groove 20 and a trapezoidal limiting block 22 fixedly installed at one end of the fourth telescopic spring 21. The trapezoidal limiting block 22 is slidably installed in the rectangular groove 20. The side surface of the trapezoidal limiting block 22 contacts the inner wall of the strip hole 6. The elastic coefficient of the second telescopic spring 15 is the same as the elastic coefficient of the third telescopic spring 18. The inclined surface of the trapezoidal limiting block 22 faces away from the moving disk 14.
[0038] The slide rail 17 supports the moving block 16. The moving block 16 can move horizontally in the moving hole 19 through the slide rail 17. Under the action of the elastic force of the third telescopic spring 18, the moving block 16 contacts one end of the moving hole 19 close to the moving plate 14.
[0039] The distance between the two trapezoidal limit blocks 22 and one end of the fourth telescopic spring 21 is greater than the width of the rectangular hole. When the block 5 is inserted into the slot 3, one end of the rectangular rod 13 will be inserted into the rectangular hole opened on the block 5, and one end will pass through the strip hole 6 opened on the block 5. The side surfaces of the two trapezoidal limit blocks 22 are in contact with the inner wall of the strip hole 6, and the movable plate 14 is in contact with the side surface of the block 5 under the elastic force of the second telescopic spring 15. When the block 5 moves horizontally in the slot 3, the rectangular rod 13 will move in the rectangular hole, thereby driving the second telescopic spring 15 or the third telescopic spring 18 to be compressed. When the block 5 moves in the direction away from the slot 3, the movable block 16 will be driven to move on the slide rail 17 through the two trapezoidal limit blocks 22, and the third telescopic spring 18 will be compressed. When the block 5 moves into the slot 3, the block 5 will drive the movable plate 14 to move together, and the second telescopic spring 15 is compressed at this time.
[0040] The upper and lower surfaces of the mounting plate 4 are fixedly mounted with strip rods 23, each of which has a cavity inside, and a sealing airbag 24 is fixedly mounted on the strip rod 23, and the inner wall of the cavity is provided with a plurality of inflation holes which are all connected to the sealing airbag 24, and the surface of the sealing airbag 24 is in contact with the surface of the keel frame 2 and the surface of the mounting plate 4;
[0041] The cavity of the strip rod 23 and the sealing airbag 24 are filled with gas, and the sealing airbag 24 is in an expanded state. When the mounting plate 4 and the card block 5 are installed in the card slot 3, the surface of the sealing airbag 24 is in contact with the surface of the keel frame 2 and the surface of the mounting plate 4, so that the sealing airbag 24 will block the gap between the keel frame 2 and the mounting plate 4 to prevent rainwater from seeping in and avoid the risk of water leakage.
[0042] A plurality of air cavities 25 are provided inside the mounting plate 4, and two air inlet holes are provided on the inner walls of the plurality of air cavities 25, which are respectively connected to the cavities of the two strip rods 23. A push plate 26 is horizontally and slidably installed in the air cavity 25 in a sealed manner, and the two air inlet holes are both located on the side of the push plate 26 close to the strip hole 6. A transmission assembly for driving the push plate 26 to move is provided on the mounting plate 4, and a sliding hole connected to the air cavity 25 is provided on the side wall of the strip hole 6. The transmission assembly includes a sliding rod 27 slidably installed in the sliding hole and a transmission ring 28 fixedly installed at one end of the sliding rod 27. The end of the sliding rod 27 away from the transmission ring 28 is fixedly connected to the push plate 26, and the transmission ring 28 is sleeved on the fastening screw 8;
[0043] The side of the push plate 26 is in sealed contact with the inner wall of the air cavity 25. When the push plate 26 moves toward the air inlet hole, the air on the side of the push plate 26 close to the air inlet hole will pass through the air inlet hole into the cavity opened by the strip rod 23, and enter the sealed airbag 24 through the inflation hole, causing the sealed airbag 24 to expand and become larger. When the push plate 26 moves away from the air inlet hole, the gas in the cavity and the sealed airbag 24 will be sucked into the air cavity 25, so that the sealed airbag 24 will shrink.
[0044] There is a closed space between the end of the push plate 26 away from the strip hole 6 and the air cavity 25, and a conical block 29 is fixedly installed on the lower end of the fastening screw 8. When the fastening screw 8 passes through the strip hole 6, the conical block 29 can facilitate the transmission ring 28 to be sleeved on the fastening screw 8.
[0045] Construction method, when installing the roof panel, first insert the mounting plate 4 and the card block 5 installed on the roof panel into the card slot 3. During the insertion of the card block 5, the rectangular hole opened on the card block 5 faces the rectangular rod 13, so that the rectangular rod 13 is inserted into the rectangular hole. During the insertion of the rectangular rod 13, the two sides of the rectangular hole opened by the card block 5 will contact the inclined surfaces of the two trapezoidal limit blocks 22. Under the action of the inclined surfaces, the trapezoidal limit blocks 22 are squeezed to move into the rectangular groove 20, and the fourth telescopic spring 21 is compressed. When the trapezoidal limit block 22 passes through the rectangular hole, under the elastic force of the fourth telescopic spring 21, the trapezoidal limit block 22 will move out of the rectangular groove 20 and contact the inner wall of the strip hole 6. At the same time, the side of the card block 5 will contact the moving disk 14. At this time, the strip hole 6 is just aligned with the positioning hole 7. Then, the fastening screw 8 is passed through the positioning hole 7 and the strip hole 6 in turn. Finally, the fastening nut 9 is threadedly sleeved on one end of the fastening screw 8 to complete the installation of the roof panel.
[0046] When the roof panel is affected by temperature and undergoes expansion and contraction deformation, the roof panel will drive the block 5 to move in the slot 3 through the mounting plate 4. During the movement, the ball 12 can reduce the friction between the block 5 and the slot 3, thereby facilitating the horizontal movement of the block 5 in the slot 3 and preventing the friction from affecting the expansion and contraction deformation of the roof panel. At the same time, relative to the block 5, the fastening screw 8 is relatively displaced in the strip hole 6 to ensure that the block 5 has a certain displacement space during the expansion and contraction deformation of the roof panel, thereby effectively avoiding the roof panel from being torn and increasing the service life of the roof panel.
[0047] When the roof panel is telescopically deformed, the block 5 is driven to move. When the block 5 moves away from the slot 3, the block 5 drives the moving block 16 to slide on the slide rail 17 through the two trapezoidal limit blocks 22, and the third telescopic spring 18 is compressed. Therefore, when the temperature effect on the roof panel is reduced, the block 5 is facilitated to move back under the action of the elastic force of the third telescopic spring 18;
[0048] When the card block 5 moves into the card slot 3, it will drive the movable plate 14 to slide on the rectangular rod 13, and the second telescopic spring 15 will be compressed. When the influence of temperature on the roof panel is reduced, the card block 5 will move back under the action of the elastic force of the second telescopic spring 18, ensuring that the card block 5 returns to the initial position, so that when it is affected by temperature again, the roof panel can be deformed repeatedly, further improving the service life of the roof panel.
[0049] When the mounting plate 4 and the clamping block 5 are mounted on the keel frame 2, the sealing airbag 24 mounted on the mounting plate 4 will contact the keel frame 2 and the mounting plate 4, thereby blocking the gap between the keel frame 2 and the mounting plate 4 to prevent rainwater from penetrating and avoid the hidden danger of water leakage;
[0050] At the same time, when the fastening screw 8 passes through the strip hole 6, the transmission ring 28 will be sleeved on the fastening screw 8, and when the block 5 moves in the slot 3 in the direction away from the slot 3, the distance between the strip rod 23 and the keel frame 2 becomes farther, and the sealing airbag 24 cannot effectively block the gap between the keel frame 2 and the mounting plate 4. At the same time, due to the relative displacement between the block 5 and the fastening screw 8, the sliding rod 27 will be driven to move in the sliding hole through the transmission ring 28, and the push plate 26 in the air cavity 25 will be driven to move toward the air inlet hole, and the gas in the air cavity 25 will be filled into the cavity and the sealing airbag 24, so that the sealing airbag 24 expands and becomes larger, so that the distance between the strip rod 23 and the keel frame 2 becomes farther, and the sealing airbag 24 can still contact with the gap between the mounting plate 4 and the keel frame 2, thereby ensuring the sealing of the sealing airbag 24;
[0051] When the block 5 moves into the slot 3, the distance between the strip rod 23 and the keel frame 2 becomes smaller. At this time, the sealing airbag 24 has a greater force on the gap between the keel frame 2 and the mounting plate 4, which will affect the movement of the block 5. At the same time, the transmission ring 28 will drive the push plate 26 to move away from the air inlet through the sliding rod 27. At this time, the sealing airbag 24 and the air in the cavity will be sucked into the air cavity 25, and the sealing airbag 24 will become smaller, thereby reducing the force of the sealing airbag 24 on the gap between the keel frame 2 and the mounting plate 4, so that the sealing airbag 24 can just block the gap between the keel frame 2 and the mounting plate 4, preventing the sealing airbag 24 from being too large to affect the movement of the block 5, and too small to affect the sealing.
[0052] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A double-arc metal roof panel installation structure based on BIM technology, comprising a roof panel body (1) and two keel frames (2), characterized in that: Both sides of the two keel frames (2) are provided with card slots (3); both ends of the roof panel body (1) are fixedly mounted with mounting plates (4); a plurality of card blocks (5) are fixedly mounted on the mounting plates (4); a plurality of card blocks (5) are provided with strip holes (6); the plurality of card blocks (5) are inserted into the card slots (3); a plurality of positioning holes (7) are provided on the surface of the keel frame (2) and penetrate the keel frame (2); the positioning holes (7) are aligned with the strip holes (6); a fastening screw (8) is provided in the positioning hole (7); one end of the fastening screw (8) passes through the strip hole (6) and is threadedly sleeved with a fastening nut (9); A plurality of mounting grooves are provided inside the upper and lower sides of the clamping slot (3), and the plurality of mounting grooves are respectively located near the plurality of positioning holes (7). A first telescopic spring (10) is fixedly installed in the mounting groove, and a cylindrical block (11) is fixedly installed at one end of the first telescopic spring (10) away from the mounting groove. A spherical groove is provided at one end of the cylindrical block (11), and a ball (12) is rounably embedded in the spherical groove. The plurality of balls (12) are respectively in rolling contact with the upper and lower surfaces of the plurality of clamping blocks (5).
2. According to the BIM technology-based double-arc metal roof panel installation structure of claim 1, it is characterized in that: A rectangular hole connected to the strip hole (6) is provided on the side of the clamping block (5); a plurality of rectangular rods (13) are fixedly installed horizontally in the clamping slot (3); one end of the plurality of rectangular rods (13) is respectively slidably inserted in the rectangular holes provided on the plurality of clamping blocks (5); a moving disk (14) is sleeved on the rectangular rod (13); a second telescopic spring (15) is sleeved on the rectangular rod (13); two ends of the second telescopic spring (15) are respectively fixedly connected to the surface of the moving disk (14) and the inner wall of the clamping slot (3); a moving hole (19) is provided on the rectangular rod (13); a moving block (16) is horizontally slidably installed in the moving hole (19) via a sliding assembly; upper and lower ends of the moving block (16) are provided with limit assemblies for limiting the clamping block (5).
3. The double-arc metal roof panel installation structure based on BIM technology according to claim 2 is characterized in that: The sliding assembly comprises a sliding rail (17) horizontally fixedly installed in a moving hole (19) and a third telescopic spring (18) sleeved on the sliding rail (17); the moving block (16) is slidably sleeved on the sliding rail (17); and two ends of the third telescopic spring (18) are respectively fixedly connected to the inner wall of the moving hole (19) and the surface of the moving block (16).
4. The double-arc metal roof panel installation structure based on BIM technology according to claim 3 is characterized in that: The upper and lower ends of the moving block (16) are both provided with rectangular grooves (20), and the limiting assembly comprises a fourth telescopic spring (21) fixedly installed in the rectangular groove (20) and a trapezoidal limiting block (22) fixedly installed at one end of the fourth telescopic spring (21), and the trapezoidal limiting block (22) is slidably installed in the rectangular groove (20), and the side surface of the trapezoidal limiting block (22) contacts the inner wall of the strip hole (6).
5. The double-arc metal roof panel installation structure based on BIM technology according to claim 4 is characterized in that: The elastic coefficient of the second telescopic spring (15) is the same as the elastic coefficient of the third telescopic spring (18), and the inclined surface of the trapezoidal limiting block (22) faces away from the movable plate (14).
6. The double-arc metal roof panel installation structure based on BIM technology according to claim 1 is characterized in that: The upper and lower surfaces of the mounting plate (4) are both fixedly mounted with strip rods (23), each of the two strip rods (23) having a cavity formed therein, a sealing airbag (24) being fixedly mounted on the strip rods (23), the inner wall of the cavity being provided with a plurality of inflation holes which are all in communication with the sealing airbag (24), and the surface of the sealing airbag (24) is in contact with the surface of the keel frame (2) and the surface of the mounting plate (4).
7. The double-arc metal roof panel installation structure based on BIM technology according to claim 6 is characterized in that: The mounting plate (4) is provided with a plurality of air cavities (25) inside, and the inner walls of the plurality of air cavities (25) are provided with two air inlet holes respectively connected to the cavities of the two strip-shaped rods (23). A push plate (26) is horizontally and sealingly slidably installed in the air cavity (25), and the two air inlet holes are both located on a side of the push plate (26) close to the strip-shaped hole (6). The mounting plate (4) is provided with a transmission component for driving the push plate (26) to move.
8. The double-arc metal roof panel installation structure based on BIM technology according to claim 7 is characterized in that: The side wall of the strip hole (6) is provided with a sliding hole connected to the air cavity (25); the transmission assembly comprises a sliding rod (27) slidably mounted in the sliding hole and a transmission ring (28) fixedly mounted on one end of the sliding rod (27); the end of the sliding rod (27) away from the transmission ring (28) is fixedly connected to the push plate (26).
9. The double-arc metal roof panel installation structure based on BIM technology according to claim 8 is characterized in that: There is a closed space between the end of the push plate (26) away from the strip hole (6) and the air cavity (25), and a conical block (29) is fixedly mounted on the lower end of the fastening screw (8).
10. The construction method of the double-arc metal roof panel installation structure based on BIM technology according to claim 9 is characterized in that: Here are the steps: When the roof panel needs to be installed, the mounting plate (4) and the clamping block (5) mounted on the roof panel body (1) are inserted into the clamping slot (3). During the insertion of the clamping block (5), the rectangular hole provided on the clamping block (5) is inserted toward the rectangular rod (13). The two sides of the rectangular hole provided on the clamping block (5) will contact the inclined surfaces of the two trapezoidal limiting blocks (22). Under the action of the inclined surfaces, the trapezoidal limiting blocks (22) are squeezed to move into the rectangular slot (20), and the fourth telescopic spring (21) is compressed. When the trapezoidal stopper (22) passes through the rectangular hole, under the elastic force of the fourth telescopic spring (21), the trapezoidal stopper (22) moves out of the rectangular groove (20) and contacts the inner wall of the strip hole (6), and at the same time, the side surface of the clamping block (5) contacts the moving plate (14), and at this time, the strip hole (6) is just aligned with the positioning hole (7); Then, the fastening screw (8) is passed through the positioning hole (7), the strip hole (6), and the transmission ring (28) in sequence, and finally the fastening nut (9) is threadedly installed on one end of the fastening screw (8). At this time, the sealing airbag (24) seals the gap between the installation plate (4) and the keel frame (2), and the installation of the roof panel is completed; When the roof panel body (1) is affected by temperature and undergoes expansion and contraction deformation, the roof panel body (1) drives the clamping block (5) to move in the clamping groove (3) through the mounting plate (4). During the movement, the ball (12) reduces the friction between the clamping block (5) and the clamping groove (3); When the roof panel body (1) is affected by temperature and the clamping block (5) moves away from the clamping slot (3), the clamping block (5) drives the moving block (16) to slide on the slide rail (17) through the two trapezoidal limit blocks (22), and the third telescopic spring (18) is compressed. When the temperature effect on the roof panel decreases, the clamping block (5) moves back under the action of the elastic force of the third telescopic spring (18). During this period, the distance between the strip rod (23) and the keel frame (2) becomes farther, and the sealing airbag ( 24) cannot effectively block the gap between the keel frame (2) and the mounting plate (4). Due to the relative displacement between the block (5) and the fastening screw (8), the transmission ring (28) drives the slide rod (27) to move in the slide hole, and drives the push plate (26) in the air cavity (25) to move toward the air inlet, so that the gas in the air cavity (25) is filled into the cavity and the sealing airbag (24), so that the sealing airbag (24) expands and becomes larger, thereby sealing the gap between the mounting plate (4) and the keel frame (2); When the roof panel body (1) is affected by temperature and the clamping block (5) moves into the clamping slot (3), it drives the moving plate (14) to slide on the rectangular rod (13), and the second telescopic spring (15) is compressed. When the temperature influence on the roof panel decreases, the clamping block (5) moves back under the action of the elastic force of the second telescopic spring (18), ensuring that the clamping block (5) returns to the initial position. During this period, the distance between the strip rod (23) and the keel frame (2) becomes smaller, and the sealing airbag (24) exerts a greater force on the gap between the keel frame (2) and the mounting plate (4), thereby The movement of the card block (5) will be affected. At the same time, the transmission ring (28) will drive the push plate (26) to move away from the air inlet through the slide rod (27). The air in the sealing airbag (24) and the cavity is sucked into the air cavity (25). The sealing airbag (24) becomes smaller, thereby reducing the force of the sealing airbag (24) on the gap between the keel frame (2) and the mounting plate (4). The sealing airbag (24) can just block the gap between the keel frame (2) and the mounting plate (4), preventing the sealing airbag (24) from being too large to affect the movement of the card block (5) and too small to affect the sealing performance.
Citation Information
Patent Citations
Metal roof system
CN110258980A
Roof panel heat preservation connecting structure and construction technology
CN115030411A
Improve waterproof performance's double -deck room panel system
CN206128458U
Installation part of aluminum supporting plate at installation seam of steel skeleton roof plate
CN212001941U
Building composite assembly type roof panel
CN216380190U
Cited By
Special stoma bag restraint bellyband for neonates
CN120267463A