Quick release mold for connecting water pipeline and well chamber opening and construction method

Through the use of quick disassembly molds, including assembly section molds and connectors, the construction simplicity and quality control problems of the connection between water pipes and inspection wells is solved, and the rapid and efficient connection and sealing effect is achieved, and a variety of pipeline specifications are adapted to. Reduced resource consumption.

CN118958662APending Publication Date: 2024-11-15CHINA MCC17 GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411119250.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The prior art is difficult to achieve efficient, stable and rigid connection between water pipes and inspection wells, and there are problems such as simplicity of construction, quality control and high resource consumption during the construction process.

Method used

Quick disassembly molds, including assembly section molds and connectors, can be quickly connected and fixed through components such as connecting pieces, connecting bolts, well wall bolts and flare molds, and combine the closed structure of rubber rings and annular grooves to ensure sealing and stability.

Benefits of technology

It improves construction speed, quality control and low resource consumption, adapts to a variety of pipeline specifications, and ensures efficient connection and sealing quality between the well chamber opening and the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958662A_ABST
    Figure CN118958662A_ABST
Patent Text Reader

Abstract

The invention discloses a quick release mold for connecting a water pipeline and a well chamber opening and a construction method, and relates to the technical field of pipeline engineering construction. Comprising a first assembling section mold and a second assembling section mold, connecting openings are formed in the two ends of the first assembling section mold and the two ends of the second assembling section mold correspondingly, and connecting pieces are installed at the connecting openings and suitable for connecting the first assembling section mold and the second assembling section mold; the assembly section mold I and the assembly section mold II are respectively connected with a well chamber hole; the multiple sets of first assembly section molds are arranged in an arc shape, the first assembly section molds and the second assembly section molds are arranged in a surrounding mode, pipes are installed in the first assembly section molds and the second assembly section molds, and the pipes are installed in a well chamber hole. The sealing device solves the problems that in the prior art, the sealing performance of the joint of a well chamber opening and a pipeline is not high, and consequently well chamber leakage and foreign matter entering are caused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipeline engineering construction, and in particular relates to a quick-disassembly mold for connecting a water pipeline with a well chamber opening and a construction method. Background Art

[0002] Inspection wells are set up for the maintenance and installation of urban underground infrastructure such as power supply, water supply, drainage, sewage, communications, cable TV, gas pipes, and street light lines. In the inspection well chamber, a connection hole is set at the well chamber opening, a hole is opened at the connection between the well chamber and the pipeline, and the connection is sealed. In the current era, with the continuous progress of society and the significant improvement of construction technology, the connection technology between municipal rain and sewage pipes and inspection wells has also ushered in new challenges and opportunities. In order to ensure efficient and stable rigid connection between rain and sewage pipes and inspection wells, we need to start from multiple aspects such as material selection, construction technology and design optimization.

[0003] In terms of design optimization, the stress and deformation characteristics between the pipeline and the inspection well should be fully considered, and a reasonable connection method and sealing structure should be adopted. For example, prefabricated inspection wells can be used to achieve fast and efficient connection between the pipeline and the inspection well through factory production and standardized design. At the same time, a special sealing device is set at the connection point to effectively prevent leakage of the well chamber and the entry of foreign matter at the connection point between the pipeline and the inspection well.

[0004] Therefore, a quick-release mold and construction method for connecting a water pipe to a well chamber opening as mentioned in the present invention are needed. Summary of the invention

[0005] The purpose of the present invention is to provide a quick-release mold and construction method for connecting a water pipe to a well chamber opening to solve the problems raised in the above-mentioned background technology, and can effectively improve the characteristics of simple construction, good construction quality control, fast construction speed, low resource consumption and adaptability to various pipe specifications, thereby solving the problems in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A quick-release mold for connecting a water pipe to a well chamber opening, comprising an assembly section mold 1 and an assembly section mold 2, both ends of the assembly section mold 1 and the assembly section mold 2 are provided with connection ports, and a connecting piece is installed at the connection port, and the connecting piece is suitable for connecting the assembly section mold 1 and the assembly section mold 2;

[0008] The assembly section mold 1 and the assembly section mold 2 are respectively connected to the well chamber opening;

[0009] The assembly section mold 1 is provided with multiple groups and is arranged in an arc shape. The assembly section mold 1 and the assembly section mold 2 are arranged in a surrounding manner and have pipes installed inside. The pipes are installed in the well chamber opening.

[0010] In a further technical solution, the connecting member includes a connecting piece and a connecting bolt, the connecting piece is fixedly installed in the connecting port, a positioning screw hole is opened on the connecting piece, and the connecting bolt is connected to the positioning screw hole;

[0011] Connecting pieces are fixedly installed in adjacent connecting ports.

[0012] In a further technical solution, the assembly section mold 1 and the assembly section mold 2 are both provided with well wall bolts, and the well wall bolts are suitable for fixing the assembly section mold 1 and the assembly section mold 2 in the well chamber opening.

[0013] In a further technical solution, the assembly section mold 2 is located at the top of the assembly section mold 1, and a bell-mouth mold is installed on the top of the assembly section mold 2. The bell-mouth mold is suitable for inserting into the inner wall of the corresponding well chamber, and the well wall bolts are suitable for penetrating the inner wall of the corresponding well chamber.

[0014] In a further technical solution, the second assembly section mold is provided with two groups and installed in pairs, and bell-mouth molds are provided inside and outside the well wall.

[0015] In a further technical solution, it also includes a closing piece, which is installed on the pipe and is located on both sides of the assembly section mold one and distributed on both sides of the well chamber opening.

[0016] In a further technical solution, the closure member includes a ring edge plate and a rubber ring, the rubber ring is provided with an extension ring portion, the outer sides of the assembly section mold 1 and the assembly section mold 2 are provided with an annular groove, and the extension ring portion is suitable for abutting in the annular groove;

[0017] The ring side plate is conical and has external threads on its surface; the external threads of the ring side plate are connected with a conical piece, and the conical piece is suitable for spirally advancing and movably abutting against the side of the rubber ring facing away from the annular groove.

[0018] In a further technical solution, the conical member comprises a split block, and arc-shaped clamping openings are respectively provided at both ends of the split block;

[0019] A ring 1 is installed at the end of the arc-shaped clamping opening relative to the assembly section mold 1, and the ring 1 is detachably connected to the arc-shaped clamping opening;

[0020] A second ring is installed at the end of the arc-shaped clamping opening away from the first assembly section mold, and the second ring is detachably connected to the corresponding arc-shaped clamping opening;

[0021] A bottom thread is arranged on one side of the split block opposite to the side ring plate, and the bottom thread is matched with the external thread of the side ring plate.

[0022] A construction method of a quick-release mold for connecting a water pipeline to a well chamber opening, comprising the following steps:

[0023] Step 1. Preparation before construction: Before using the quick-disassembly mold construction method, determine the location of the well chamber, and open a well chamber opening in the well chamber.

[0024] The well chamber opening should be roughened thoroughly to increase the bonding strength between the newly poured concrete and the original structure;

[0025] Afterwards, the surface of the base needs to be thoroughly cleaned to ensure that there is no debris and dust, laying a solid foundation for subsequent construction;

[0026] Step 2: Positioning of pipes: In the well chamber, the pipes need to be placed precisely at the designated locations;

[0027] Step 3, assembly of the quick-release mold: according to the current diameter of the construction pipe, determine the number of assembly section molds 1 of the quick-release mold required; the number of assembly section molds 2 is two sets and they are symmetrically installed on the top of the quick-release mold;

[0028] Then, in order, multiple groups of assembly segment molds are connected in sequence using connecting bolts at the connecting ports, and the bell-mouth segment mold is set with an upward opening to ensure a firm connection;

[0029] Step 4: Fixing and installing the mold: Apply an appropriate amount of mold release agent to the quick-release mold to facilitate the subsequent demoulding operation; then, install the assembled quick-release mold on the pipes on both sides of the well wall, and adjust the position of the mold to ensure that it fits tightly with the well wall;

[0030] Step 5: Fix the mold: Use well wall bolts to firmly fix the mold on the well wall;

[0031] Step 6. Check before pouring: Before pouring, check the fixation of the mold to ensure that everything is ready;

[0032] Step 7, pouring of fine stone concrete: the pouring work starts from the upper part of the trumpet section of the quick-disassembly mold, and the fine stone concrete flows into the mold under the action of gravity; during the pouring process, a vibrating rod should be used synchronously to vibrate along the corresponding position of the outer side of the mold to ensure that the concrete is dense and has no gaps;

[0033] Step 8: Concrete curing and demolding: After pouring, the newly poured concrete needs to be properly cured to ensure that it reaches the designed strength. After the concrete strength reaches the standard, demolding is carried out in the reverse order of installation.

[0034] Step 9: Quality inspection and repair: After demolding, the concrete surface should be carefully inspected; any defects found should be promptly repaired with a higher grade of micro-expansive fine stone concrete to ensure the construction quality of the prefabricated well.

[0035] Beneficial Effects

[0036] The present invention installs a quick-release mold at the connection between the well chamber opening and the pipeline, and pours concrete in the quick-release mold. The pouring position is reinforced by well wall bolts, which can effectively ensure the plugging quality, improve the plugging efficiency and speed, and reduce resource consumption. It has the characteristics of simple construction, good construction quality control, fast construction speed, low resource consumption, and adaptability to various pipeline specifications.

[0037] The present invention achieves closed connection with the annular groove by providing a rubber ring, and strengthens the closed connection by providing an installation cone. An internal thread is provided in the split block and rotates forward on the annular plate. Since the ring ring 2 is detachably connected to the split block, the split block and the ring ring can be quickly separated. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0039] Figure 1 A schematic cross-sectional view of a quick-release mold for connecting a water pipe to a well chamber opening of the present invention;

[0040] Figure 2 A side view of a quick-release mold for connecting a water pipe to a well chamber opening of the present invention;

[0041] Figure 3 A top view of a quick-release mold for connecting a water pipe to a well chamber opening of the present invention;

[0042] Figure 4 for Figure 2 A magnified view of part A;

[0043] Figure 5 A cross-sectional schematic diagram of a quick-release mold for connecting a water pipe to a well chamber opening according to Example 2 of the present invention;

[0044] Figure 6 for Figure 5 A magnified view of part B;

[0045] Figure 7 It is a structural diagram of the tapered member of the present invention.

[0046] In the figure: 1. Assembly section mold 1; 2. Assembly section mold 2; 3. Connection port; 4. Connection bolt; 5. Connection plate; 6. Well wall bolt; 7. Well wall; 8. Well chamber; 9. Pipe; 10. Well chamber opening; 11. Bell mouth mold; 12. Ring side plate; 13. Rubber ring; 14. Extension ring; 15. Annular groove; 16. Split block; 17. Arc clamp; 18. Ring 1; 19. Ring 2. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0048] The application principle of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0049] Example 1

[0050] See also Figure 1-4 As shown, an embodiment of the present invention is provided, which provides a quick-release mold for connecting a water pipe to a well chamber opening, including an assembly section mold 1 and an assembly section mold 2, both ends of the assembly section mold 1 and the assembly section mold 2 are provided with connection ports 3, and a connecting piece is installed at the connection port 3, and the connecting piece is suitable for connecting the assembly section mold 1 and the assembly section mold 2; the assembly section mold 1 and the assembly section mold 2 are respectively connected to the well chamber opening 10; the assembly section mold 1 is provided with multiple groups and is arranged in an arc shape, the assembly section mold 1 and the assembly section mold 2 are arranged around and have pipes 9 installed inside, and the pipes 9 are installed in the well chamber opening 10.

[0051] like Figure 4 As shown, the connecting piece includes a connecting piece 5 and a connecting bolt 4. The connecting piece 5 is fixedly installed in the connecting port 3. A positioning screw hole is opened on the connecting piece 5, and the connecting bolt 4 is connected to the positioning screw hole; connecting pieces 5 are fixedly installed in adjacent connecting ports 3.

[0052] like Figure 2 As shown, the assembly section mold 1 and the assembly section mold 2 2 are both provided with well wall bolts 6, and the well wall bolts 6 are suitable for fixing the assembly section mold 1 and the assembly section mold 2 2 in the well chamber opening 10.

[0053] The assembly section mold 2 2 is located at the top of the assembly section mold 1 1, and a bell-mouth mold 11 is installed on the top of the assembly section mold 2 2. The bell-mouth mold 11 is suitable for inserting into the inner wall of the corresponding well chamber 8, and the well wall bolt 6 is suitable for penetrating the inner wall of the corresponding well chamber 8. The assembly section mold 2 2 is provided with two groups and installed in pairs, and bell-mouth molds 11 are opened inside and outside the well wall.

[0054] A construction method of a quick-release mold for connecting a water pipeline to a well chamber opening, comprising the following steps:

[0055] Step 1, preparation before construction: before the quick-disassembly mold construction method is carried out, the position of the well chamber 8 is determined, and a well chamber opening 10 is opened in the well chamber 8. The well chamber opening 10 should be thoroughly roughened to increase the bonding strength between the newly poured concrete and the original structure;

[0056] Afterwards, the surface of the base needs to be thoroughly cleaned to ensure that there is no debris and dust, laying a solid foundation for subsequent construction;

[0057] Step 2: Positioning of the pipe 9: The pipe 9 needs to be accurately placed at a designated position in the well chamber 8;

[0058] Step 3, assembly of the quick-release mold: according to the diameter of the current construction pipe 9, determine the number of assembly section molds 1 of the quick-release mold required; the number of assembly section molds 2 2 is two groups and they are symmetrically installed on the top of the quick-release mold;

[0059] Then, in order, multiple groups of assembly segment molds 11 are connected in sequence using connecting bolts 4 at the connecting port 3, and the bell-mouth segment mold 11 is set to open upward to ensure a firm connection;

[0060] Step 4, fixation and installation of the mold: apply an appropriate amount of mold release agent in the quick-release mold to facilitate the subsequent demoulding operation; then, install the assembled quick-release mold on the pipes 9 on both sides of the well wall 7, and adjust the position of the mold to ensure that it fits tightly with the well wall 7;

[0061] Step 5: Fixing the mold: Use the well wall bolts 6 to firmly fix the mold on the well wall 7;

[0062] Step 6. Check before pouring: Before pouring, check the fixation of the mold to ensure that everything is ready;

[0063] Step 7, pouring of fine stone concrete: the pouring work starts from the upper part of the mold 5 of the trumpet section of the quick-disassembly mold, and the fine stone concrete flows into the mold under the action of gravity; during the pouring process, a vibrating rod should be used synchronously to vibrate along the corresponding position of the outer side of the mold to ensure that the concrete is dense and has no gaps;

[0064] Step 8: Concrete curing and demolding: After pouring, the newly poured concrete needs to be properly cured to ensure that it reaches the designed strength. After the concrete strength reaches the standard, demolding is carried out in the reverse order of installation.

[0065] Step 9: Quality inspection and repair: After demolding, the concrete surface should be carefully inspected; any defects found should be promptly repaired with a higher grade of micro-expansive fine stone concrete to ensure the construction quality of the prefabricated well.

[0066] Example 2

[0067] like Figure 5 As shown, it is another embodiment of the present invention, based on Example 1. It also includes a closure member, which is installed on the pipe and located on both sides of the assembly section mold 1, distributed on both sides of the well chamber opening 10. The closure member includes an annular plate 12 and a rubber ring 13, on which an extension ring portion 14 is provided, and an annular groove 15 is provided on the outer side of the assembly section mold 1 and the assembly section mold 2, and the extension ring portion 14 is suitable for abutting in the annular groove 15; the annular plate 12 is set in a conical shape, and an external thread is provided on the surface; the annular plate 12 is externally threaded with a conical member, and the conical member is suitable for spirally advancing and abutting on the side of the rubber ring 13 that is not facing the annular groove 15.

[0068] Example 3

[0069] like Figure 7 As shown, it is another embodiment of the present invention. On the basis of Example 2, the conical member includes a split block 16, and arc-shaped clamping openings 17 are respectively provided at both ends of the split block 16;

[0070] A ring 18 is installed at the end of the arc-shaped clamping opening 17 of the relative assembly section mold 1, and the ring 18 is detachably connected to the arc-shaped clamping opening 17; the surface and interior of the split block 16 should be provided with threads, Figure 7 The end of the arc-shaped clamping opening 17 away from the assembly section mold 1 is provided with a second ring 19, and the second ring 19 is detachably connected to the corresponding arc-shaped clamping opening 17;

[0071] A bottom thread is provided on one side of the split block opposite to the side ring plate 12 , and the bottom thread is matched with the external thread of the side ring plate 12 .

[0072] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.

[0073] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A quick-release mold for connecting a water pipe to a well chamber opening, characterized in that: It comprises an assembly section mold 1 (1) and an assembly section mold 2 (2), both ends of the assembly section mold 1 (1) and the assembly section mold 2 (2) are provided with connection ports (3), and a connection piece is installed at the connection port (3), and the connection piece is suitable for connecting the assembly section mold 1 (1) and the assembly section mold 2 (2); The assembly section mold 1 (1) and the assembly section mold 2 (2) are respectively connected to the well chamber opening (10); The assembly section mold one (1) is provided with multiple groups and is arranged in an arc shape. The assembly section mold one (1) and the assembly section mold two (2) are arranged in a surrounding manner and have pipes (9) installed inside. The pipes (9) are installed in the well chamber opening (10).

2. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 1, characterized in that: The connecting piece comprises a connecting piece (5) and a connecting bolt (4); the connecting piece (5) is fixedly installed in the connecting port (3); a positioning screw hole is provided on the connecting piece (5); and the connecting bolt (4) is connected to the positioning screw hole; Connecting pieces (5) are fixedly installed in adjacent connecting ports (3).

3. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 2, characterized in that: The assembly section mold 1 (1) and the assembly section mold 2 (2) are both provided with well wall bolts (6), and the well wall bolts (6) are suitable for fixing the assembly section mold 1 (1) and the assembly section mold 2 (2) in the well chamber opening (10).

4. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 3, characterized in that: The second assembly section mold (2) is located at the top of the first assembly section mold (1), and a bell-mouth mold (11) is installed on the top of the second assembly section mold (2). The bell-mouth mold (11) is suitable for being inserted into the inner wall of the corresponding well chamber (8), and the well wall bolt (6) is suitable for penetrating the inner wall of the corresponding well chamber (8).

5. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 4, characterized in that: The second assembly section mold (2) is provided with two groups and installed in pairs, and bell-mouth molds (11) are provided inside and outside the well wall.

6. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 4, characterized in that: It also includes a closing piece, which is installed on the pipe and is located on both sides of the assembly section mold (1) and distributed on both sides of the well chamber opening (10).

7. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 6, characterized in that: The sealing member comprises a ring edge plate (12) and a rubber ring (13), an extension ring portion (14) is provided on the rubber ring (13), an annular groove (15) is provided on the outer sides of the assembly section mold 1 (1) and the assembly section mold 2 (2), and the extension ring portion (14) is suitable for abutting against the annular groove (15); The annular edge plate (12) is conical and has an external thread on its surface; the external thread of the annular edge plate (12) is connected to a conical member, and the conical member is suitable for spirally advancing and movably contacting the side of the rubber ring (13) facing away from the annular groove (15).

8. A quick-release mold for connecting a water pipe to a well chamber opening according to claim 7, characterized in that: The conical member comprises a split block (16), and arc-shaped clamping openings (17) are respectively provided at two ends of the split block (16); A ring ring (18) is installed at the end of the arc-shaped clamping opening (17) of the assembly section mold (1), and the ring ring (18) is detachably connected to the arc-shaped clamping opening (17); A second ring (19) is installed at the end of the arc-shaped clamping opening (17) away from the first assembly section mold (1), and the second ring (19) is detachably connected to the corresponding arc-shaped clamping opening (17); A bottom thread is arranged on one side of the split block relative to the ring edge plate (12), and the bottom thread is matched with the external thread of the ring edge plate (12).

9. A construction method for a quick-release mold for connecting a water pipe to a well chamber opening, characterized in that: The quick-release mold according to claim 6 further comprises the following steps: Step 1, preparation before construction: Before the quick-disassembly mold construction method is carried out, the position of the well chamber (8) is determined, and a well chamber opening (10) is opened in the well chamber (8). The well chamber opening (10) must be roughened thoroughly to increase the bonding strength between the newly poured concrete and the original structure; Afterwards, the surface of the base needs to be thoroughly cleaned to ensure that there is no debris and dust, laying a solid foundation for subsequent construction; Step 2: Positioning of the pipe (9): The pipe (9) needs to be accurately placed at a designated position in the well chamber (8); Step 3, assembling the quick-release mold: according to the diameter of the current construction pipe (9), determine the number of assembly section molds 1 (1) of the quick-release mold required; the number of assembly section molds 2 (2) is two sets and they are symmetrically installed on the top of the quick-release mold; Then, in order, multiple groups of assembly segment molds (11) are connected in sequence using connecting bolts (4) at the connecting port (3), and the bell-mouth segment mold (11) is opened upward to ensure a firm connection; Step 4, fixation and installation of the mold: apply an appropriate amount of mold release agent inside the quick-release mold to facilitate the subsequent demoulding operation; then, install the assembled quick-release mold on the pipes (9) on both sides of the well wall (7), and adjust the position of the mold to ensure that it fits tightly with the well wall (7); Step 5: Fixing the mold: Use well wall bolts (6) to firmly fix the mold on the well wall (7); Step 6. Check before pouring: Before pouring, check the fixation of the mold to ensure that everything is ready; Step 7, pouring of fine stone concrete: the pouring work starts from the upper part of the quick-disassembly mold bell-mouth section mold (5), and the fine stone concrete flows into the mold under the action of gravity; during the pouring process, a vibrating rod should be used synchronously to vibrate along the corresponding position of the outer side of the mold to ensure that the concrete is dense and has no gaps; Step 8: Concrete curing and demolding: After pouring, the newly poured concrete needs to be properly cured to ensure that it reaches the designed strength. After the concrete strength reaches the standard, demolding is carried out in the reverse order of installation. Step 9: Quality inspection and repair: After demolding, the concrete surface should be carefully inspected; any defects found should be promptly repaired with a higher grade of micro-expansive fine stone concrete to ensure the construction quality of the prefabricated well.

Citation Information

Patent Citations

  • Through-wall pipeline waterproof structure

    CN211574427U

  • Concrete pouring template for encapsulating pipeline and circular inspection well

    CN214575660U

  • Quick-release mold for pipe hole fabrication

    CN215212363U

  • Pipeline hole plugging mold

    CN217762430U

  • Plugging device for gap between inspection well and pipeline

    CN221255671U