Prestressed reinforced concrete high-position pool structure and construction method

By adopting prestressed reinforced concrete high-level pool structure in underwater terrain monitoring, and using the tensioning and anchoring technology of prestressed steel bars, the problem of outliers in underwater terrain monitoring data is solved, and the accuracy of measurement and the seismic resistance of the structure are improved. Performance enhances the reliability of high-level pools.

CN118958755APending Publication Date: 2024-11-15NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410942842.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

There are outliers in the existing underwater terrain monitoring data, which affects the accuracy of the data. The existing anomaly detection methods rely on manual parameters and lack adaptability.

Method used

The structure of prestressed reinforced concrete high-level water tank is adopted, including ordinary reinforced concrete base plates, ordinary reinforced concrete pools and prestressed reinforced concrete pools. The structure's seismic performance and deformation are improved through the tensioning and anchoring of prestressed steel bars. ability to reduce the need for manual parameter setting.

Benefits of technology

It improves the accuracy of underwater terrain measurement work and the seismic resistance, safety performance and post-seismic repair performance of the structure, and enhances the reliability and stability of the high-level pool structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958755A_ABST
    Figure CN118958755A_ABST
Patent Text Reader

Abstract

The invention discloses a prestressed reinforced concrete high-position pool structure and a construction method. The structure comprises a common reinforced concrete bottom plate, a common reinforced concrete pool body, a prestressed reinforced concrete pool body and a top ring beam, and buttresses are arranged on the outer circle of the prestressed reinforced concrete pool body. The construction method comprises the following specific construction steps: (1) binding a lower constructional reinforcement cage; (2) lower structure reinforced concrete is poured; (3) binding an upper shear wall and a ring beam prestressed reinforcement net rack; (4) pouring an upper structure shear wall and ring beam concrete; (5) after the prestressed reinforcements are tensioned, binding an upper buttress reinforcement cage; and (6) pouring upper buttress concrete. The prestressed reinforced concrete shear wall is adopted, the deformation resisting capacity of the wall body structure can be effectively improved, the anti-seismic performance, the safety performance and the post-earthquake repairing performance of a building structure can be effectively improved, and the reliability of the high-position pool structure is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of civil engineering, and in particular relates to a prestressed reinforced concrete high-level water tank structure and a construction method. Background Art

[0002] The accurate acquisition of underwater topographic data is of great significance in the depiction of river morphology and early warning of water disasters. The cost of acquiring such data is high, and it often requires the use of high-precision measuring equipment, such as single-beam and multi-beam depth sounders. However, due to the errors of the measuring equipment and the complex on-site monitoring environment, outliers are inevitably present in the underwater topographic monitoring data, which affect the accuracy of the monitoring data. Existing anomaly detection methods often rely on manually set parameters and lack adaptability and accuracy. Therefore, the development of a prestressed reinforced concrete high-level water tank structure and construction method that does not require manual parameter setting is of great significance to improving the accuracy of underwater topographic measurement. Summary of the invention

[0003] In order to solve the deficiencies in the prior art, the present invention provides a prestressed reinforced concrete high-level water tank structure and a construction method. The use of prestressed reinforced concrete shear walls can effectively improve the ability of the wall structure to resist deformation, effectively improve the seismic performance, safety performance, and post-earthquake repair performance of the building structure, and enhance the reliability of the high-level water tank structure.

[0004] In order to solve the above technical problems, the present invention adopts the following technical scheme: a prestressed reinforced concrete high-level water tank structure, comprising an ordinary reinforced concrete bottom plate, an ordinary reinforced concrete tank body, a prestressed reinforced concrete tank body and a top ring beam connected in sequence from bottom to top; the ordinary reinforced concrete tank body comprises a reinforced concrete continuous wall, a primary lining and a secondary lining connected in sequence from outside to inside; four buttresses that are vertically arranged are evenly arranged along the circumferential direction on the outer circle of the prestressed reinforced concrete tank body; the part below the ground adopts an ordinary reinforced concrete structure, and the part above the ground adopts a prestressed reinforced concrete structure; the upper and lower parts of the ordinary reinforced concrete tank body are respectively provided with an inlet pipe and an outlet pipe.

[0005] The wall thickness of the prestressed reinforced concrete pool body is smaller than that of the ordinary reinforced concrete pool body, and there is a cross-sectional mutation between the prestressed reinforced concrete pool body and the ordinary reinforced concrete pool body; the steel strands used inside the prestressed reinforced concrete pool body are slow-bonding prestressed steel strands, each of which is arranged along the circumferential direction of the prestressed reinforced concrete pool body to form a circular ring, and several steel strands are evenly arranged vertically inside the prestressed reinforced concrete pool body. All the steel strands are tensioned and anchored through four vertically arranged buttresses on the outer surface of the prestressed reinforced concrete pool body, and the four buttresses are respectively located at 0°, 90°, 180° and 270° of the outer circle of the prestressed reinforced concrete pool body.

[0006] The thickness of the reinforced concrete continuous wall is 1000mm, the thickness of the primary lining is 1250mm, the thickness of the secondary lining is 2000mm, the inner radius of the secondary lining is 12000mm, the top elevation of the prestressed reinforced concrete pool is 48.5m, and the upper surface elevation of the ordinary reinforced concrete bottom plate is -34.9m.

[0007] A construction method of a prestressed reinforced concrete high-level water tank structure comprises the following steps: (1) Tie up the ordinary reinforced concrete tank body below the ground and the lower tank body steel cage embedded inside the ordinary reinforced concrete bottom plate; (2) According to the conventional formwork method, the formwork is set outside the steel cage of the lower tank body tied below the ground, and then the concrete is poured; (3) Tie the prestressed reinforced concrete tank body above the ground and the prestressed steel grid embedded inside the top ring beam; (4) Use conventional formwork methods to support the formwork outside the prestressed steel grid tied above the ground, and then pour concrete; (5) Tension and anchor the prestressed steel bars inside the prestressed steel grid, and then evenly arrange four buttress column steel cages along the circumferential direction outside the prestressed reinforced concrete pool; (6) Use conventional formwork methods to support the formwork outside the buttress column reinforcement cage, cast the upper buttress column concrete on site, and cast the anchor ends of the prestressed steel bars in the buttress column concrete.

[0008] In step (1), the lower tank body steel cage is reserved with two outlet pipes and four inlet pipes, the diameters of the outlet pipes and the inlet pipes are both 4.8 m, wherein the two outlet pipes are arranged at an elevation of -31.8 m, and the four inlet pipes are arranged at an elevation of -14.5 m; the lower tank body steel cage includes a plurality of longitudinal bars and stirrups, each longitudinal bar is arranged in a ring shape, each stirrup is arranged horizontally and is vertically hooped on the longitudinal bar and is tied and fixedly connected with each longitudinal bar.

[0009] Step (2) specifically includes: firstly cast the ordinary reinforced concrete bottom plate, roughen the joint between the ordinary reinforced concrete bottom plate and the ordinary reinforced concrete pool body, and lay cement mortar, and then cast the reinforced concrete continuous wall, primary lining and secondary lining in sequence; the reinforced concrete continuous wall is cast with C30 concrete, the primary lining is cast with C35 concrete, and the ordinary reinforced concrete bottom plate and secondary lining are both cast with C40 concrete.

[0010] In step (3), the inner diameter and outer diameter of the prestressed reinforced concrete pool are 26m and 28m respectively. The prestressed steel bars in the prestressed reinforced concrete pool are arranged along the shaft ring and fixed at 0.1m away from the outer wall of the prestressed reinforced concrete pool. The laying position of the prestressed steel bars is at the ground elevation of 18m to 47.8m. High-strength, low-relaxation, slow-bonding steel strands are used, with a nominal diameter of 15.2mm. The prestressed steel bars are arranged in four sections with different spacings along the vertical direction of the structure, of which the 18m-23m elevation is arranged Sixteen prestressed steel bundles, each consisting of five strands of steel wire, with a spacing of 300mm between the upper and lower adjacent strands; 48 prestressed steel bundles are arranged at an elevation of 23m-35m, each consisting of five strands of steel wire, with a spacing of 250mm between the upper and lower adjacent strands; 21 prestressed steel bundles are arranged at an elevation of 35m-43m, each consisting of five strands of steel wire, with a spacing of 400mm between the upper and lower adjacent strands; 11 prestressed steel bundles are arranged at an elevation of 43m-48m, each consisting of three strands of steel wire, with a spacing of 400mm between the upper and lower adjacent strands; In step (3), the prestressed steel bars are arranged alternately in layers, with adjacent elevations rotating in a 90° circular manner; specifically, the two tensioning ends of the first ring of prestressed steel bars are anchored in the buttress columns at 0° and 180°, and the two tensioning ends of the second ring of prestressed steel bars are anchored in the buttress columns at 90° and 270°, and so on; the prestressed steel bars are supported by external buttress concrete, that is, four strip concrete support buttress columns are arranged at intervals of 90° in the circumferential direction outside the prestressed steel concrete pool body, and the prestressed steel bars are tensioned and anchored on the outer surface of the prestressed steel concrete pool body.

[0011] Step (4) specifically includes: firstly, roughening the joint at the top of the ordinary reinforced concrete pool body and laying cement mortar, then pouring the prestressed reinforced concrete pool body part, then roughening the joint at the top of the prestressed reinforced concrete pool body and laying cement mortar, and then pouring the top ring beam concrete. Both the prestressed reinforced concrete pool body and the top ring beam are cast with C50 high-strength concrete.

[0012] In step (5), the prestressed steel bar tensioning construction work is carried out seven days after the main body of the prestressed steel bar concrete pool is poured; the prestressed steel bars are arranged horizontally along the structural elevation direction and tensioned in a top-down manner, and the prestressed steel bar tension is tensioned from 0% to 103%. All prestressed steel bars are tensioned and anchored in sequence from the 48m elevation to the 18m elevation. Due to the special prestressed steel bar arrangement and anchoring method, it is necessary to arrange four buttress columns on the outer wall of the prestressed steel bar concrete pool body and each is adjacent to the other in a 90° direction. The buttress column steel bar cage includes a number of horizontal distribution bars and vertical distribution bars tied together, and the steel bars in each direction are arranged in a rectangular array; the tensioning and anchoring end of each prestressed steel bar is located in the buttress column, and the prestressed steel bar and the steel bars in the buttress column are fixed in sequence by stirrups.

[0013] Step (6) specifically includes: pouring the buttress column concrete on site according to the conventional formwork method, so that each anchor end of the prestressed steel bar and the buttress column steel cage are poured into the concrete buttress column, and then the prestressed steel bar concrete pool body is fixedly connected with the top ring beam and the buttress column; when pouring concrete, roughening and laying cement mortar at the joint between the buttress column and the prestressed steel bar concrete pool body; the buttress column is also cast with C50 high-strength concrete.

[0014] By adopting the above technical solution, the present invention has outstanding substantive features and significant progress compared with the prior art. Specifically, the present invention has the following advantages: (I) The present invention adopts a special structure of upper prestressed reinforced concrete structure and lower ordinary reinforced concrete structure to cast the high-level water tank, which has strong earthquake resistance and deformation capacity. Because the above-ground part of the building structure is more vulnerable to damage than the underground part wrapped by the soil during an earthquake, and the prestressed reinforced concrete structure has good earthquake toughness compared to the traditional reinforced concrete structure, and the earthquake resistance is greatly enhanced. The prestressed reinforced concrete structure can effectively resist the energy generated when an earthquake occurs, greatly reduce the damage and adverse effects of the earthquake on the structural wall, and improve the structural stability.

[0015] (ii) The prestressed steel bar arrangement of the present invention is based on the different bearing capacities of structures at different elevations, and prestressed steel bars with different spacings and different numbers of strands are arranged in four elevation sections, which can effectively improve the reliability of the structure. Prestressed steel bars have advantages such as high strength, ductility, adhesion, and durability, and can quickly return to their original position when an earthquake occurs, which is in line with the earthquake-resistant design concept.

[0016] (III) The design structure of the present invention adopts partial prestressed steel bars to reduce the structural reinforcement ratio, thereby reducing the consumption of steel bars and concrete, while reducing the bonding slip between steel bars and concrete, and improving the performance of the structure. Since the steel strand has a large diameter and is relatively soft, it is easy to construct and reduces additional costs such as processing, transportation, and construction, and has good economic efficiency.

[0017] (IV) The structural type designed by the present invention is suitable for industrial buildings, civil buildings, high-rise buildings, etc. in earthquake-resistant areas. It has a wide range of applications, high cost performance, and can effectively improve the earthquake resistance of the structure.

[0018] To sum up, the present invention has a scientific principle, a compact structure, and is easy to construct. It can effectively improve the wall structure's ability to resist deformation, and can effectively improve the seismic resistance, safety, and post-earthquake repair performance of the building structure, thereby improving the reliability and stability of the high-level water tank structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic plan view of the prestressed reinforced concrete high-level water tank structure of the present invention; Figure 2 It is a three-dimensional view of the prestressed reinforced concrete high-level water tank structure of the present invention; Figure 3 It is a schematic diagram of the arrangement of prestressed steel bars for shear walls of the present invention; Figure 4 It is an axial view of the prestressed steel bar of the present invention. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0021] like Figure 1-Figure 4 As shown, a prestressed reinforced concrete high-level water tank structure comprises an ordinary reinforced concrete bottom plate 6, an ordinary reinforced concrete tank body 11, a prestressed reinforced concrete tank body 1 and a top ring beam 3 which are sequentially connected from bottom to top; the ordinary reinforced concrete tank body 11 comprises a reinforced concrete continuous wall 9, a primary lining 8 and a secondary lining 7 which are sequentially connected from outside to inside; four buttress columns 2 which are vertically arranged are evenly arranged along the circumferential direction on the outer circle of the prestressed reinforced concrete tank body 1; the part below the ground adopts an ordinary reinforced concrete structure, and the part above the ground adopts a prestressed reinforced concrete structure; the upper and lower parts of the ordinary reinforced concrete tank body 11 are respectively provided with an inlet pipe 4 and an outlet pipe 5.

[0022] The wall thickness of the prestressed reinforced concrete pool body 1 is smaller than that of the ordinary reinforced concrete pool body 11, and there is a cross-sectional mutation between the prestressed reinforced concrete pool body 1 and the ordinary reinforced concrete pool body 11; the steel strands used inside the prestressed reinforced concrete pool body 1 are slow-bonding prestressed steel strands, each of which is arranged along the circumferential direction of the prestressed reinforced concrete pool body 1 to form a circular ring, and a number of steel strands are evenly arranged vertically inside the prestressed reinforced concrete pool body 1, and all the steel strands are tensioned and anchored by four vertically arranged buttresses 2 arranged on the outer surface of the prestressed reinforced concrete pool body 1, and the four buttresses 2 are respectively located at 0°, 90°, 180° and 270° of the outer circle of the prestressed reinforced concrete pool body 1.

[0023] The thickness of the reinforced concrete continuous wall 9 is 1000mm, the thickness of the primary lining 8 is 1250mm, the thickness of the secondary lining 7 is 2000mm, the inner radius of the secondary lining 7 is 12000mm, the top elevation of the prestressed reinforced concrete pool body 1 is 48.5m, and the upper surface elevation of the ordinary reinforced concrete bottom plate 6 is -34.9m.

[0024] A construction method of a prestressed reinforced concrete high-level water tank structure comprises the following steps: (1) Tie up the ordinary reinforced concrete tank body 11 below the ground and the lower tank body steel cage embedded inside the ordinary reinforced concrete bottom plate 6; (2) According to the conventional formwork method, the formwork is set outside the steel cage of the lower tank body tied below the ground, and then the concrete is poured; (3) Tie the prestressed reinforced concrete tank body 1 above the ground and the prestressed steel grid embedded inside the top ring beam 3; (4) Use conventional formwork methods to support the formwork outside the prestressed steel grid tied above the ground, and then pour concrete; (5) tensioning and anchoring the prestressed steel bars 10 inside the prestressed steel bar grid, and then evenly arranging four buttress column steel bar cages along the circumferential direction on the outer circle of the concrete pool 1 of the prestressed steel bar 10; (6) According to the conventional formwork method, a formwork is set up outside the buttress column reinforcement cage, and the upper buttress column concrete is poured on site. The anchor ends of the prestressed steel bars 10 are poured into the buttress column concrete.

[0025] In step (1), the lower tank body steel cage reserves two water outlet pipes 5 and four water inlet pipes 4, the diameters of the water outlet pipes 5 and the water inlet pipes 4 are both 4.8 m, wherein the two water outlet pipes 5 are arranged at an elevation of -31.8 m, and the four water inlet pipes 4 are at an elevation of -14.5 m; the lower tank body steel cage includes a plurality of longitudinal bars and stirrups, each longitudinal bar is arranged in a ring shape, each stirrup is arranged horizontally and is vertically hooped on the longitudinal bar and is tied and fixedly connected with each longitudinal bar.

[0026] Step (2) specifically includes: firstly casting the ordinary reinforced concrete bottom plate 6, roughening the joint between the ordinary reinforced concrete bottom plate 6 and the ordinary reinforced concrete pool body 11, and laying cement mortar, and then casting the reinforced concrete continuous wall 9, the primary lining 8 and the secondary lining 7 in sequence; the reinforced concrete continuous wall 9 is cast by C30 concrete, the primary lining 8 is cast by C35 concrete, and the ordinary reinforced concrete bottom plate 6 and the secondary lining 7 are both cast by C40 concrete.

[0027] In step (3), the inner diameter and outer diameter of the prestressed reinforced concrete tank body 1 are 26m and 28m respectively. The prestressed steel bars 10 in the prestressed reinforced concrete tank body 1 are arranged along the shaft ring and fixed at a distance of 0.1m from the outer wall of the prestressed reinforced concrete tank body 1; the laying position of the prestressed steel bars 10 is at a ground elevation of 18m to 47.8m, and high-strength, low-relaxation, slow-bonding steel strands are used, with a nominal diameter of 15.2mm; the prestressed steel bars 10 are arranged in four sections with different spacings along the vertical direction of the structure, of which the 18m-23m elevation is arranged at the 18m-23m elevation. Sixteen prestressed steel bars 10 are arranged, each consisting of five strands of steel strands, with a spacing of 300 mm between the upper and lower adjacent strands; forty-eight prestressed steel bars 10 are arranged at an elevation of 23m-35m, each consisting of five strands of steel strands, with a spacing of 250 mm between the upper and lower adjacent strands; twenty-one prestressed steel bars 10 are arranged at an elevation of 35m-43m, each consisting of five strands of steel strands, with a spacing of 400 mm between the upper and lower adjacent strands; eleven prestressed steel bars 10 are arranged at an elevation of 43m-48m, each consisting of three strands of steel strands, with a spacing of 400 mm between the upper and lower adjacent strands; In step (3), the prestressed steel bars 10 are arranged alternately in layers, and are rotated in a 90° ring between adjacent elevations; specifically, the two tensioning ends of the first ring of prestressed steel bars 10 are anchored in the buttress columns 2 at 0° and 180°, and the two tensioning ends of the second ring of prestressed steel bars 10 are anchored in the buttress columns 2 at 90° and 270°, and so on; the prestressed steel bars 10 are supported by external buttress concrete, that is, four strip concrete support buttress columns 2 are arranged at intervals of 90° in the outer circumferential direction of the prestressed steel concrete pool body 1, and the prestressed steel bars 10 are tensioned and anchored on the outer surface of the prestressed steel concrete pool body 1.

[0028] Step (4) specifically includes: firstly, roughening the joint at the top of the ordinary reinforced concrete tank body 11 and laying cement mortar, then pouring the prestressed reinforced concrete tank body 1 part, then roughening the joint at the top of the prestressed reinforced concrete tank body 1 and laying cement mortar, and then pouring the top ring beam 3 part of concrete. Both the prestressed reinforced concrete tank body 1 and the top ring beam 3 are cast with C50 high-strength concrete.

[0029] In step (5), the prestressed steel bar tensioning construction work is carried out seven days after the main body of the prestressed reinforced concrete pool 1 is poured. The prestressed steel bars are arranged horizontally along the structural elevation direction and tensioned in a top-down manner. The prestressed steel bar tension is tensioned from 0% to 103%. All prestressed steel bars are tensioned and anchored in sequence from the 48m elevation to the 18m elevation. Due to the special prestressed steel bar arrangement and anchoring method, it is necessary to arrange four buttress columns 2 on the outer wall of the prestressed reinforced concrete pool 1 and each is adjacent to the other in a 90° direction. The buttress column steel bar cage includes a plurality of horizontal distribution bars and vertical distribution bars tied together, and the steel bars in each direction are arranged in a rectangular array. The tensioning and anchoring end of each prestressed steel bar is located in the buttress column 2, and the prestressed steel bar and the steel bars in the buttress column 2 are fixed in sequence by stirrups.

[0030] Step (6) specifically includes: pouring the buttress column concrete on site according to the conventional formwork method, so that the anchor ends of the prestressed steel bars and the buttress column steel cage are poured into the concrete buttress column, and then the prestressed reinforced concrete pool body 1 is fixedly connected with the top ring beam 3 and the buttress column 2; when pouring concrete, the outer circumference of the buttress column 2 and the prestressed reinforced concrete pool body 1 is roughened and cement mortar is spread; the buttress column 2 is also cast with C50 high-strength concrete.

[0031] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features therein may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A prestressed reinforced concrete high-level water tank structure, characterized in that: It includes an ordinary reinforced concrete bottom plate, an ordinary reinforced concrete pool body, a prestressed reinforced concrete pool body and a top ring beam which are connected in sequence from bottom to top; the ordinary reinforced concrete pool body includes a reinforced concrete continuous wall, a primary lining and a secondary lining which are connected in sequence from outside to inside; the outer circle of the prestressed reinforced concrete pool body is evenly provided with four vertical buttresses along the circumferential direction; the part below the ground adopts an ordinary reinforced concrete structure, and the part above the ground adopts a prestressed reinforced concrete structure; the upper and lower parts of the ordinary reinforced concrete pool body are respectively provided with a water inlet pipe and a water outlet pipe.

2. A prestressed reinforced concrete high-level water tank structure according to claim 1, characterized in that: The wall thickness of the prestressed reinforced concrete pool body is smaller than that of the ordinary reinforced concrete pool body, and there is a cross-sectional mutation between the prestressed reinforced concrete pool body and the ordinary reinforced concrete pool body; the steel strands used inside the prestressed reinforced concrete pool body are slow-bonding prestressed steel strands, each of which is arranged along the circumferential direction of the prestressed reinforced concrete pool body to form a circular ring, and several steel strands are evenly arranged vertically inside the prestressed reinforced concrete pool body. All the steel strands are tensioned and anchored through four vertically arranged buttresses on the outer surface of the prestressed reinforced concrete pool body, and the four buttresses are respectively located at 0°, 90°, 180° and 270° of the outer circle of the prestressed reinforced concrete pool body.

3. The prestressed reinforced concrete high-level water tank structure according to claim 1 is characterized by: The thickness of the reinforced concrete continuous wall is 1000mm, the thickness of the primary lining is 1250mm, the thickness of the secondary lining is 2000mm, the inner radius of the secondary lining is 12000mm, the top elevation of the prestressed reinforced concrete pool is 48.5m, and the upper surface elevation of the ordinary reinforced concrete bottom plate is -34.9m.

4. A construction method for a prestressed reinforced concrete high-level water tank structure as described in any one of claims 1 to 3, characterized in that: The following steps are involved: (1) Tie up the ordinary reinforced concrete tank body below the ground and the lower tank body steel cage embedded inside the ordinary reinforced concrete bottom plate; (2) According to the conventional formwork method, the formwork is set outside the steel cage of the lower tank body tied below the ground, and then the concrete is poured; (3) Tie the prestressed reinforced concrete pool body above the ground and the prestressed steel grid embedded inside the top ring beam; (4) Use conventional formwork methods to support the formwork outside the prestressed steel grid tied above the ground, and then pour concrete; (5) Tension and anchor the prestressed steel bars inside the prestressed steel grid, and then evenly arrange four buttress column steel cages along the circumferential direction outside the prestressed reinforced concrete pool; (6) Use conventional formwork methods to support the formwork outside the buttress column reinforcement cage, cast the upper buttress column concrete on site, and cast the anchor ends of the prestressed steel bars in the buttress column concrete.

5. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4 is characterized by: In step (1), the lower tank body steel cage is reserved with two outlet pipes and four inlet pipes, the diameters of the outlet pipes and the inlet pipes are both 4.8 m, wherein the two outlet pipes are arranged at an elevation of -31.8 m, and the four inlet pipes are arranged at an elevation of -14.5 m; the lower tank body steel cage includes a plurality of longitudinal bars and stirrups, each longitudinal bar is arranged in a ring shape, each stirrup is arranged horizontally and is vertically hooped on the longitudinal bar and is tied and fixedly connected with each longitudinal bar.

6. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4 is characterized by: Step (2) specifically includes: firstly cast the ordinary reinforced concrete bottom plate, roughen the joint between the ordinary reinforced concrete bottom plate and the ordinary reinforced concrete pool body, and lay cement mortar, and then cast the reinforced concrete continuous wall, primary lining and secondary lining in sequence; the reinforced concrete continuous wall is cast with C30 concrete, the primary lining is cast with C35 concrete, and the ordinary reinforced concrete bottom plate and secondary lining are both cast with C40 concrete.

7. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4 is characterized by: In step (3), the inner diameter and outer diameter of the prestressed reinforced concrete pool are 26m and 28m respectively. The prestressed steel bars in the prestressed reinforced concrete pool are arranged along the shaft ring and fixed at 0.1m away from the outer wall of the prestressed reinforced concrete pool. The laying position of the prestressed steel bars is at the ground elevation of 18m to 47.8m. High-strength, low-relaxation, slow-bonding steel strands are used, with a nominal diameter of 15.2mm. The prestressed steel bars are arranged in four sections with different spacings along the vertical direction of the structure, of which the 18m-23m elevation is arranged Sixteen prestressed steel bundles, each consisting of five strands of steel wire, with a spacing of 300mm between the upper and lower adjacent strands; 48 prestressed steel bundles are arranged at an elevation of 23m-35m, each consisting of five strands of steel wire, with a spacing of 250mm between the upper and lower adjacent strands; 21 prestressed steel bundles are arranged at an elevation of 35m-43m, each consisting of five strands of steel wire, with a spacing of 400mm between the upper and lower adjacent strands; 11 prestressed steel bundles are arranged at an elevation of 43m-48m, each consisting of three strands of steel wire, with a spacing of 400mm between the upper and lower adjacent strands; In step (3), the prestressed steel bars are arranged alternately in layers, with adjacent elevations rotating in a 90° circular manner; specifically, the two tensioning ends of the first ring of prestressed steel bars are anchored in the buttress columns at 0° and 180°, and the two tensioning ends of the second ring of prestressed steel bars are anchored in the buttress columns at 90° and 270°, and so on; the prestressed steel bars are supported by external buttress concrete, that is, four strip concrete support buttress columns are arranged at intervals of 90° in the circumferential direction outside the prestressed steel concrete pool body, and the prestressed steel bars are tensioned and anchored on the outer surface of the prestressed steel concrete pool body.

8. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4 is characterized by: Step (4) specifically includes: firstly, roughening the joint at the top of the ordinary reinforced concrete pool body and laying cement mortar, then pouring the prestressed reinforced concrete pool body part, then roughening the joint at the top of the prestressed reinforced concrete pool body and laying cement mortar, and then pouring the top ring beam concrete. Both the prestressed reinforced concrete pool body and the top ring beam are cast with C50 high-strength concrete.

9. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4, characterized in that: In step (5), the prestressed steel bar tensioning construction work is carried out seven days after the main body of the prestressed steel bar concrete pool is poured; the prestressed steel bars are arranged horizontally along the structural elevation direction and tensioned in a top-down manner, and the prestressed steel bar tension is tensioned from 0% to 103%. All prestressed steel bars are tensioned and anchored in sequence from the 48m elevation to the 18m elevation. Due to the special prestressed steel bar arrangement and anchoring method, it is necessary to arrange four buttress columns on the outer wall of the prestressed steel bar concrete pool body and each is adjacent to the other in a 90° direction. The buttress column steel bar cage includes a number of horizontal distribution bars and vertical distribution bars tied together, and the steel bars in each direction are arranged in a rectangular array; the tensioning and anchoring end of each prestressed steel bar is located in the buttress column, and the prestressed steel bar and the steel bars in the buttress column are fixed in sequence by stirrups.

10. The construction method of a prestressed reinforced concrete high-level water tank structure according to claim 4, characterized in that: Step (6) specifically includes: pouring the buttress column concrete on site according to the conventional formwork method, so that each anchor end of the prestressed steel bar and the buttress column steel cage are poured into the concrete buttress column, and then the prestressed steel bar concrete pool body is fixedly connected with the top ring beam and the buttress column; when pouring concrete, roughening and laying cement mortar at the joint between the buttress column and the prestressed steel bar concrete pool body; the buttress column is also cast with C50 high-strength concrete.