Supporting structure for building small-clear-distance tunnel and using method of supporting structure

By setting up a support mechanism on the middle rock wall of the small clearance tunnel to transmit vibration to the inner wall of the pioneer tunnel, the problem of easy cracking of the middle rock wall during blasting is solved, and the protection and strength guarantee of the middle rock wall is achieved.

CN118959082AInactive Publication Date: 2024-11-15IANGSU COLLEGE OF ENG & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411393610.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of small clearance tunnels, cracks in the middle rock walls are likely to occur when the rear tunnel is blasted, affecting the safe use of the tunnel.

Method used

Design a support structure, including a first fixed groove and support mechanism arranged on the middle rock wall, to transmit vibration to the inner wall of the pioneer hole through a hydraulic cylinder, threaded rod and a vibration wall of high elastic modulus and low density material, to reduce middle rock The vibration of the wall is affected, and the support mechanism is gradually removed after blasting for grouting and reinforcement.

Benefits of technology

It effectively reduces the vibration impact of the middle rock wall during blasting, avoids cracks, and ensures the strength and safety of the middle rock wall during subsequent construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959082A_ABST
    Figure CN118959082A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel construction, and particularly discloses a supporting structure used for building a small-clear-distance tunnel and a using method thereof.The supporting structure comprises a middle rock wall, a plurality of first fixing grooves are formed in the middle rock wall, and supporting mechanisms used for supporting the middle rock wall are arranged in the first fixing grooves; the supporting mechanism comprises two sets of first supporting blocks, a first hydraulic cylinder is arranged between the two sets of first supporting blocks, first limiting blocks are arranged on the two sets of first supporting blocks, the two sets of first limiting blocks are clamped in the driving middle rock wall, vibration transmission walls are arranged on the two sides of the first hydraulic cylinder, and first threaded rods are arranged on the two sides of the two sets of first supporting blocks. The multiple sets of first threaded rods are installed in the two sets of vibration transmission walls in a penetrating mode correspondingly. Fastening mechanisms used for fixing the vibration transmission wall are arranged on the multiple sets of first threaded rods. The technical problem that when a posterior hole is blasted, a middle rock wall is prone to cracking, and therefore safe use of a tunnel is affected is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular discloses a supporting structure for constructing a small-clearance tunnel and a use method thereof. Background Art

[0002] When constructing tunnels in areas with small construction clearance or narrow terrain, the thickness of the rock wall between tunnels is less than the standard value due to terrain restrictions. At this time, small clearance tunnels are used; when constructing small clearance tunnels, since the thickness of the middle rock wall is less than the standard value, when the tunnel is excavated after blasting, the middle rock wall will be affected by the vibration caused by blasting, which may cause cracks in the middle rock wall due to its own insufficient strength, which may lead to landslides in the first tunnel.

[0003] For example, the invention with patent application number 2012103119598 discloses a method for reinforcing the middle rock in a small clear distance tunnel, comprising: a. constructing a large pipe shed before tunnel excavation, which is arranged in the rock mass outside the tunnel, and the arrangement range extends from the shoulder of the arch away from the side of the middle rock through the arch crown to the arch foot close to the side of the middle rock, and the large pipe sheds are arranged along the axial direction of the tunnel; b. carrying out partial excavation and support of the tunnel, and constructing a small guide tube for grouting and secondary reinforcement before excavating the soil close to the side of the middle rock, the small guide tube is located on the side of the tunnel close to the middle rock, and extends from the shoulder of the tunnel to the arch foot; the existing method for reinforcing the middle rock wall is to grout through the small guide tube in the middle rock wall, and to perform secondary reinforcement on the middle rock wall, but when blasting the rear tunnel, it is inevitable that an adverse effect will be produced on the middle rock wall, thereby causing cracks in the middle rock wall, etc., affecting the safe use of the tunnel. Summary of the invention

[0004] In view of this, the purpose of the present invention is to provide a support structure for constructing a small clearance tunnel and a method of using the same, so as to solve the technical problem that when blasting the rear tunnel, cracks are easily generated in the middle rock wall, thereby affecting the safe use of the tunnel.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a supporting structure for constructing a small-clearance tunnel, comprising a middle rock wall, a plurality of groups of first fixing grooves are opened on the middle rock wall, and a supporting mechanism for supporting the middle rock wall is arranged in each of the plurality of first fixing grooves; the supporting mechanism comprises two groups of first supporting blocks, a first hydraulic cylinder is arranged between the two groups of the first supporting blocks, a first limiting block is arranged on each of the two groups of the first supporting blocks, the two groups of the first limiting blocks are clamped in the middle rock wall, vibration walls are arranged on both sides of the first hydraulic cylinder, first threaded rods are arranged on both sides of the two groups of the first supporting blocks, and a plurality of groups of the first threaded rods are respectively installed in the two groups of the vibration-transmitting walls; a fastening mechanism for fixing the vibration-transmitting wall is arranged on each of the plurality of first threaded rods; a second fixing mechanism for transmitting vibration is arranged on each of the plurality of vibration-transmitting walls close to the pilot tunnel. The middle rock wall is supported by a supporting mechanism to strengthen the strength of the middle rock wall, and the vibration transmission wall is fixedly connected to the supporting mechanism by a fastening mechanism. The vibration transmission wall can transmit the vibration received by the middle rock wall to reduce the impact of the vibration on the middle rock wall.

[0006] Further, the first threaded rod at the bottom is sleeved with a first support sleeve, and the first threaded rod at the top is sleeved with a second support sleeve; the fastening mechanism includes a first connecting block, the first threaded rod is sleeved with a hexagonal bolt, the hexagonal bolt is threadedly connected to the first threaded rod, the hexagonal bolt is in contact with the first supporting sleeve / the second supporting sleeve, the hexagonal bolt is clamped with a first clamping block, the first clamping block is provided with a plum blossom block, the first threaded rod passes through the plum blossom block, and the first connecting block is clamped on the plum blossom block and the first clamping block; the first connecting block is provided with a first fixing plate, the first fixing plate is slidably clamped on the first connecting block, the first fixing plate is provided with a push block, the first fixing plate is provided with an arc groove, and the first threaded rod is clamped in the arc groove. When the vibration transmission wall is fixed by the hexagonal bolt, the plum blossom block can ensure that the first connecting block is in a suitable position, so that it is convenient for the staff to adjust the position of the first fixing mechanism and the auxiliary vibration transmission mechanism.

[0007] Furthermore, four groups of the first connection blocks near the rear tunnel are provided with a first fixing mechanism, the first fixing mechanism comprising a first matching block, one end of the first matching block is hinged on the first connection block, the first matching block is provided with a second matching block slidably connected thereto, the second matching block is hinged with an arc block, the arc block contacts the inner wall of the rear tunnel; a second hydraulic cylinder is provided between the first matching block and the second matching block. The first fixing mechanism is used to fix the vibration transmission wall near the rear tunnel.

[0008] Furthermore, several groups of vibration-transmitting walls near the pilot hole are provided with a second fixing mechanism, the second fixing mechanism includes a second support frame, one end of the second support frame is provided with a second limit block, the second limit block is clamped in the vibration-transmitting wall; the second support frame is in a "T" shape, and the other two ends of the second support frame are provided with third matching blocks, the two groups of the third matching blocks are perpendicular to each other, the two groups of the third matching blocks are in contact with the inner wall of the pilot hole, and a third hydraulic cylinder is provided between the second support frame and the two groups of the third matching blocks. The second fixing mechanism is used to fix the vibration-transmitting wall near the pilot hole, and can transmit the vibration received by the middle rock wall to the pilot hole.

[0009] Furthermore, a first support frame is provided between several groups of the first connection blocks on the same side, the first support frame is clamped in several groups of the first connection blocks, and second fixing plates are provided on the first connection blocks at four corners of the first support frame, and the second fixing plates are fixedly connected to the first connection blocks by bolts. The first support frame is used to support several groups of the first connection blocks, and can play an auxiliary supporting role in the center rock wall.

[0010] Furthermore, a second connection block is provided between every two groups of vibration-transmitting walls near the pilot hole, and clamping blocks are provided on both sides of the second connection block, and the two groups of clamping blocks are respectively clamped in the two groups of vibration-transmitting walls; a connection plate is clamped between every two adjacent groups of the second support frames, and the two ends of the connection plate are respectively clamped on the two groups of the second support frames, and one side of the connection plate is in contact with the second connection block. The second connection block is used to connect several groups of vibration-transmitting walls near the pilot hole, thereby improving the efficiency of vibration transmission.

[0011] Furthermore, the first connecting block close to the pilot hole and located below is provided with an auxiliary vibration transmission mechanism, the auxiliary vibration transmission mechanism includes a movable block, the movable block is hinged on the first connecting block, a third support frame is provided on the movable block, one end of the third support frame is in contact with the inner wall of the pilot hole; the first connecting block is provided with a fixed block, two groups of second threaded rods are installed on the fixed block, one end of the two groups of second threaded rods are hinged with a second support block, and the two groups of second support blocks are in contact with the movable frame. The auxiliary vibration transmission mechanism can transmit the vibration received by the middle rock wall, thereby reducing the vibration received by the middle rock wall and protecting the middle rock wall.

[0012] Furthermore, the vibration transmission wall, the second connection block, the second support frame and the third support frame are all made of materials with high elastic modulus and low density, and can efficiently transmit vibration. The materials with high elastic modulus and low density can improve the efficiency of vibration transmission, thereby transmitting the vibration received by the middle rock wall and reducing the vibration received by the middle rock wall, thereby achieving the purpose of protecting the middle rock wall.

[0013] A method for using a support structure for constructing a small clearance tunnel comprises the following steps: S1: When pouring the middle rock wall, the staff needs to ensure that there are several groups of first fixed grooves distributed on the middle rock wall, and then the staff installs the first hydraulic cylinder and two groups of first support blocks in the corresponding fixed grooves, and then installs several groups of vibration walls in the first fixed grooves, ensuring that vibration walls are installed on both sides of each group of first hydraulic cylinders to strengthen the structural strength of the middle rock wall; S2: The staff installs the first support sleeve / the second support sleeve and the hexagonal bolts into the first threaded rod, and fixes the vibration transmission wall to the two sets of first support blocks through the hexagonal bolts. Then the staff fixes the first clamping block and the plum blossom block on the hexagonal bolts. Then the staff fixes the first connecting block to the first clamping block and the plum blossom block. Then the staff fixes the first fixing plate to the first connecting block until the arc groove on the first fixing plate is clamped on the first threaded rod, so that the first connecting block is fixed to the first threaded rod; S3: Then the staff clamps the second connection block between the two groups of vibration transmission walls, and then clamps the first support frame between several groups of first connection blocks on the same side, so that the first support frame is clamped in the first clamping groove, and then the staff fixes the first support frame through the second fixing plate and bolts; S4: The staff rotates the first matching block, and then starts the four groups of second hydraulic cylinders. The telescopic ends of the second hydraulic cylinders drive the second matching blocks and the corresponding arc blocks to move until the arc blocks contact the inner wall of the guide hole, thereby supporting the first connection block. The staff then mounts the second support frame on the first connection block, and then starts the two groups of third hydraulic cylinders to move the third matching blocks to contact the inner wall of the guide hole, thereby supporting the first connection block. The connecting plates are then mounted on the two adjacent groups of second support frames, and the second connection blocks are fixed between the two groups of vibration transmission walls through the connecting plates. S5: After the staff completes the installation of the first connecting block equipped with the auxiliary vibration transmission mechanism, the third support frame drives the movable block to rotate around the first connecting block through gravity, so that one end of the third support frame contacts the inner wall of the pilot hole. Then the staff drives the second support block to move by rotating the two sets of second threaded rods until one side of the second support block fits with the movable block. At this time, the third support frame is fixed, and the third support frame always keeps in contact with the inner wall of the pilot hole.

[0014] S6: The construction workers then blast the rear tunnel, and the vibration received by the middle rock wall is transmitted to the inner wall of the leading tunnel, reducing the damage caused by the vibration to the middle rock wall. The workers then remove the first fixing mechanism, the second fixing mechanism, the fastening mechanism, the auxiliary vibration transmission mechanism, the first support frame and the second connecting block, leaving only the support mechanism in the first fixing groove. After that, each time the workers remove a group of support mechanisms, they perform grouting in the corresponding first fixing groove, and the workers only remove one group of support mechanisms at a time, and remove another group of support mechanisms after the concrete solidifies, until all the groups of support mechanisms are removed.

[0015] The working principle and beneficial effects of this solution are: When in use, the middle rock wall is supported by the supporting mechanism. When the rear tunnel is blasted, part of the vibration in the middle rock wall is directly transmitted to the vibration transmitting wall. The vibration transmitting wall can quickly transmit the shock wave to the inner wall of the leading tunnel through the second supporting frame, the third matching block and the auxiliary vibration transmitting mechanism, and transmit the vibration in the middle rock wall to the inner wall of the leading tunnel, thereby reducing the vibration intensity directly borne by the middle rock wall, reducing the impact of the vibration during blasting on the middle rock wall, protecting the middle rock wall, and avoiding the vibration caused by the blasting to damage the middle rock wall, causing cracks in the middle rock wall, and other situations that affect the subsequent safe use.

[0016] When the blasting of the rear tunnel is completed, the first fixing mechanism, the second fixing mechanism, the fastening mechanism, the auxiliary vibration transmission mechanism, the first support frame, the second connecting block and the vibration transmission wall are removed, leaving only the first hydraulic cylinder and the two groups of first support blocks. Then, each time the staff removes the first group of first hydraulic cylinders and the two groups of first support blocks, they will grout the corresponding first fixing grooves, and cast several groups of first fixing grooves in turn, so that the middle rock wall becomes a whole. The subsequently cast middle rock wall is not affected by the blasting, and the strength of the middle rock wall can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of an embodiment; Figure 2 is a side view of an embodiment; Figure 3 A schematic diagram of the support of the rock wall in the embodiment; Figure 4 is a cross-sectional view of a rock wall in the embodiment; Figure 5 It is a structural schematic diagram of the cooperation between the supporting mechanism and the fastening mechanism in the embodiment; Figure 6 An exploded view of the supporting mechanism, the fastening mechanism, the first fixing mechanism and the second fixing mechanism in the embodiment; Figure 7 This is an enlarged schematic diagram of region A in the embodiment; Figure 8Schematic diagram of the structure of the auxiliary vibration transmission mechanism in the embodiment.

[0018] The markings in the attached figure are as follows: soil 101, rear tunnel 102, advance tunnel 103, pilot tunnel 104, middle rock wall 105; Vibration transmission wall 201, first fixing groove 202, first support block 203, first hydraulic cylinder 204, first threaded rod 205, first limiting block 206, second limiting groove 207, first support sleeve 208, second support sleeve 209, hexagonal bolt 210, first clamping block 211, plum blossom block 212, first connecting block 213, plum blossom groove 214, second fixing groove 215, first fixing plate 216, sliding groove 217, push block 218, arc groove 219, third fixing groove 220; A second connecting block 301, a second clamping block 302, a first supporting frame 303, a first clamping slot 304, and a second fixing plate 305; A first matching block 401, a second hydraulic cylinder 402, a second matching block 403, and an arc block 404; A second support frame 501, a third hydraulic cylinder 502, a third matching block 503, a second limiting block 504, a second limiting groove 505, a connecting plate 506, and a second clamping groove 507; Movable block 601 , third support frame 602 , fixed block 603 , second threaded rod 604 , second support block 605 . DETAILED DESCRIPTION

[0019] The following is further described in detail through specific implementation methods: Example like Figures 1 to 8 As shown, a supporting structure for constructing a small clearance tunnel is disclosed, including a soil body 101, a pilot tunnel 104 is opened in the soil body 101, a leading tunnel 103 and a rear tunnel 102 are respectively arranged on both sides of the pilot tunnel 104, a wall between the leading tunnel 103 and the rear tunnel 102 is a middle rock wall 105, the middle rock wall 105 is completely located in the pilot tunnel 104, a plurality of groups of first fixing grooves 202 are opened on the middle rock wall 105, and the plurality of groups of first fixing grooves 202 are evenly distributed on the middle rock wall 105 along the horizontal direction.

[0020] A supporting mechanism is provided in each of the plurality of first fixed grooves 202, and the supporting mechanism includes a first hydraulic cylinder 204, both ends of the first hydraulic cylinder 204 are fixedly connected to a first supporting block 203, and first limiting blocks 206 are provided on the two groups of first supporting blocks 203, and first limiting grooves are provided at the top and bottom ends of the first fixed grooves 202, and the two groups of first limiting blocks 206 are respectively clamped in the two groups of first limiting grooves, and first threaded rods 205 are provided on both sides of the two groups of first supporting blocks 203, and two groups of vibration transmission walls 201 are clamped in the first fixed grooves 202. The two groups of vibration walls 201 are respectively located on both sides of the first hydraulic cylinder 204. The vibration walls 201 are in a right-angle trapezoid shape. The hypotenuses of the two groups of vibration walls 201 face the leading hole 103 and the trailing hole 102 respectively. The four groups of first threaded rods 205 are respectively installed in the two groups of vibration walls 201. The vibration walls 201 are composed of materials with high elastic modulus and low density, which ensures that the vibration transmission effect of the vibration walls 201 is better than that of the middle rock wall 105. The vibration walls 201 can efficiently transmit vibration, thereby reducing the impact of vibration on the middle rock wall 105; Figure 4 and Figure 6 shown.

[0021] A third fixing groove 220 is provided on the vibration transmission wall 201, and a second support sleeve 209 is sleeved on the first threaded rod 205 located at the top, and a first support sleeve 208 is sleeved on the first threaded rod 205 located at the bottom. The first support sleeve 208 and the second support sleeve 209 have different sizes. One end of the first support sleeve 208 and the second support sleeve 209 are respectively clamped in the corresponding third fixing groove 220, and a fastening mechanism is provided between several groups of first threaded rods 205 and the vibration transmission wall 201. The fastening mechanism includes a first connecting block 213, and a hexagonal bolt 210 is sleeved on the first threaded rod 205. One side of the hexagonal bolt 210 is fitted with one side of the first support sleeve 208 / the second support sleeve 209. The hexagonal bolt 210 is connected to the first threaded rod 205 by threads, and several groups of hexagonal bolts 210 located on the same side are Located in the same vertical plane, a first clamping block 211 is clamped on the hexagonal bolt 210, a plum blossom block 212 is fixedly connected to the first clamping block 211, the plum blossom block 212 and the first clamping block 211 are both sleeved on the first threaded rod 205, a plum blossom groove 214 and a second fixed groove 215 are provided on the first connecting block 213, the plum blossom block 212 is clamped in the plum blossom groove 214, the first clamping block 211 is clamped in the second fixed groove 215, two groups of sliding grooves 217 are provided on the first connecting block 213, a first fixing plate 216 is slidably clamped in the two groups of sliding grooves 217, a push block 218 is provided on the first fixing plate 216, an arc groove 219 is provided on the first fixing plate 216, the arc groove 219 is clamped on the first threaded rod 205, and the first fixing plate 216 contacts the first clamping block 211 and the hexagonal bolt 210; Figure 6 and Figure 7 shown.

[0022] A first support frame 303 is arranged between several groups of first connecting blocks 213 located on the same side, and a first card slot 304 is opened on several groups of first connecting blocks 213. The first support frame 303 is clamped on several groups of first card slots 304, wherein second fixing plates 305 are arranged on the first connecting blocks 213 located at the four corners of the first supporting frame 303, and the second fixing plates 305 are fixedly connected to the first connecting blocks 213 by bolts, and one side of the second fixing plates 305 is in contact with the first connecting blocks 213 and the first support frame 303; a second connecting block 301 is arranged between several groups of vibration transmission walls 201 close to one side of the pilot hole 103, and second card blocks 302 are arranged on both sides of the second connecting block 301, and two groups of second card blocks 302 are clamped on two adjacent groups of vibration transmission walls 201 respectively, and the material of the second connecting block 301 is the same as that of the vibration transmission wall 201; Figure 5 shown.

[0023] The four groups of first connecting blocks 213 close to the rear tunnel 102 are all provided with a first fixing mechanism, the first fixing mechanism includes a first matching block 401, the first matching block 401 is hinged on the first connecting block 213, a second hydraulic cylinder 402 is provided on the first matching block 401, the fixed end of the second hydraulic cylinder 402 is fixedly connected to the first matching block 401 by bolts, and the telescopic end is fixedly connected to the second matching block 403, one section of the second matching block 403 is installed in the first matching block 401, and the other end of the second matching block 403 is hinged with an arc block 404, and the arc block 404 contacts the inner wall of the guide tunnel 104; Figure 6 and Figure 7 shown.

[0024] A second fixing mechanism is provided on several groups of vibration transmission walls 201 close to one side of the pilot hole 103, and the second fixing mechanism includes a second support frame 501, and the second support frame 501 is in a "T" shape, and a second limit block 504 is provided at one end of the second support frame 501, and a second limit groove 207 is provided on the vibration transmission wall 201, and the second limit block 504 is clamped in the second limit groove 207, and the other two ends of the second support frame 501 are fixedly connected with a third hydraulic cylinder 502 by bolts, and the other ends of the two groups of third hydraulic cylinders 502 are provided with a third matching block 503, and the two groups of third matching blocks 503 are in contact with the inner wall of the pilot hole 103; Figure 6 shown.

[0025] A connecting plate 506 is provided between each two adjacent groups of second support frames 501, and two groups of second slots 507 are provided on the second support frames 501. Both ends of the connecting plate 506 are clamped in the two groups of second slots 507 on the two adjacent groups of second support frames 501. One side of the connecting plate 506 is in contact with the second connecting block 301 and the two groups of vibration-transmitting walls 201, and the connecting plate 506 fixes the second connecting block 301 at the same time; the materials of the second support frames 501 and the connecting plate 506 are the same as the materials of the vibration-transmitting walls 201; Figure 5 shown.

[0026] Several groups of first connecting blocks 213 located near one side of the pilot hole 103 and below are all provided with auxiliary vibration transmission mechanisms, the auxiliary vibration transmission mechanisms comprising a movable block 601, the movable block 601 is hinged on the first connecting block 213, a third support frame 602 is provided on the movable block 601, one end of the third support frame 602 is in contact with the inner wall of the pilot hole 103, a fixed block 603 is fixedly connected to the first connecting block 213, two groups of second threaded rods 604 are installed on the fixed block 603, one end of the second threaded rod 604 is hinged to a second support block 605, one side of the second support block 605 is in contact with one side of the movable frame; Figure 8 shown.

[0027] A support structure for constructing a small clearance tunnel and a method of using the same, comprising the following steps: S1: When the staff is casting the middle rock wall 105, it is necessary to cast the middle rock wall 105 into a specified shape so that a plurality of groups of first fixed grooves 202 are distributed on the middle rock wall 105. Then the staff moves the first hydraulic cylinder 204 and the two groups of first support blocks 203 into one of the groups of fixed grooves, and clamps the first limit block 206 located below into the corresponding first limit groove. Then the staff starts the first hydraulic cylinder 204, and the telescopic end of the first hydraulic cylinder 204 extends, driving the first support block 203 to move upward until the corresponding first limit block 206 is clamped into the corresponding first limit groove. At this time, the two groups of first support blocks 203 cooperate with the first hydraulic cylinder 204 to support the middle rock wall 105. In this reciprocating manner, several groups of first hydraulic cylinders 204 and the corresponding two groups of first support blocks 203 are fixed in several groups of first limiting grooves to improve the strength of the middle rock wall 105; then the staff clamps several groups of vibration walls 201 in the first fixed grooves 202, and each group of first hydraulic cylinders 204 has vibration walls 201 on both sides, and each group of vibration walls 201 has first threaded rods 205 passed through the upper and lower ends, and the vibration walls 201 play an auxiliary supporting role for the middle rock wall 105.

[0028] S2: The staff installs the first support sleeve 208 / the second support sleeve 209 in the first threaded rod 205 until one end of the first support sleeve 208 / the second support sleeve 209 is clamped in the third fixing groove 220. Then the staff installs the hexagonal bolt 210 on the first threaded rod 205, and fixes the first support sleeve 208 / the second support sleeve 209 and the corresponding vibration transmission wall 201 to the two sets of first support blocks 203. Then the staff installs the first clamping block 211 and the plum blossom block 212 on the first threaded rod 205. The hexagonal bolt 210 is clamped in the first clamping block 211, and then the staff puts the first connecting block 213 on the first clamping block 211 and the plum blossom block 212. At this time, the first clamping block 211 is clamped in the second fixing groove 215, and the plum blossom block 212 is clamped in the plum blossom groove 214. The plum blossom block 212 cooperates with the plum blossom groove 214 to ensure that the first connecting block 213 can be fixed at a specified inclination angle. In this reciprocating manner, several groups of first connecting blocks 213 are fixedly connected to the corresponding groups of first threaded rods 205.

[0029] S3: Then the staff aligns the two ends of the first fixed plate 216 with the two groups of sliding grooves 217, and then moves the first fixed plate 216, and uses the push block 218 to make the two ends of the first fixed plate 216 slide in the two groups of sliding grooves 217 until the arc groove 219 on the first fixed plate 216 is clamped on the first threaded rod 205. At this time, the first fixed plate 216 clamps the hexagonal bolt 210 and the first clamping block 211 on the first connecting block 213, so that the first connecting block 213 is fixedly connected to the first threaded rod 205.

[0030] S4: Then the staff clamps the first support frame 303 between several groups of first connecting blocks 213 on the same side, so that the first support frame 303 is clamped in the first clamping groove 304, and then the staff fixes the second fixing plate 305 to the first connecting block 213 at the four corners of the first support frame 303 through bolts, and fixes the first support frame 303 through four groups of second fixing plates 305. The first support frame 303 plays the role of auxiliary support to improve the strength of the middle rock wall 105. Then the staff clamps the second connecting block 301 between the two groups of vibration transmission walls 201 through the second clamping block 302.

[0031] S5: The staff rotates the first matching block 401 to make a suitable angle between the first matching block 401 and the first connecting block 213, and then starts the four groups of second hydraulic cylinders 402. The telescopic ends of the second hydraulic cylinders 402 drive the second matching block 403 and the corresponding arc block 404 to extend until the arc block 404 contacts the inner wall of the guide hole 104, thereby supporting the first connecting block 213.

[0032] S6: The staff aligns the second limit block 504 with the second limit groove 207, and then clamps the second limit block 504 in the second limit groove 207. At this time, the second support frame 501 is fixedly connected to the corresponding vibration transmission wall 201, and then the staff starts two groups of third hydraulic cylinders 502. The telescopic ends of the two groups of third hydraulic cylinders 502 extend to drive the corresponding third matching blocks 503 to move until the third matching blocks 503 contact the inner wall of the pilot hole 103, thereby supporting the first connecting block 213, until several groups of second support frames 501 are fixed on the corresponding vibration transmission wall 201, and at the same time, the third matching blocks 503 are all in contact with the inner wall of the pilot hole 103.

[0033] S7: Then the connecting plate 506 is clamped on two adjacent sets of second support frames 501, so that the two sides of the connecting plate 506 are respectively clamped in the two corresponding second slots 507, and the second connecting block 301 is fixedly connected between the two sets of vibration-transmitting walls 201 through the connecting plate 506.

[0034] S8: After the staff completes the installation of the first connecting block 213 provided with the auxiliary vibration transmission mechanism, the third support frame 602 drives the movable block 601 to rotate around the first connecting block 213 through gravity, so that one end of the third support frame 602 contacts the inner wall of the pilot hole 103, and then the staff drives the second support block 605 to move by rotating the two sets of second threaded rods 604 until one side of the second support block 605 is in contact with the movable block 601. At this time, the third support frame 602 is fixed, and the third support frame 602 always keeps in contact with the inner wall of the pilot hole 103.

[0035] S9: The construction workers blast the rear tunnel 102. The vibration exerted on the middle rock wall 105 is transmitted to the inner wall of the leading tunnel 103 through the vibration transmission wall 201 in cooperation with the second fixing mechanism and the auxiliary vibration transmission mechanism, thereby reducing the damage of the vibration to the middle rock wall 105. Then the workers remove the first fixing mechanism, the second fixing mechanism, the fastening mechanism, the auxiliary vibration transmission mechanism, the first support frame 303 and the second connecting block 301, leaving only the support mechanism in the first fixing groove 202. Then, each time the workers remove a group of support mechanisms, they inject grout into the corresponding first fixing groove 202. The workers only remove one group of support mechanisms at a time, and remove another group of support mechanisms after the concrete solidifies, until all the groups of support mechanisms are removed.

[0036] When implementing: The staff fixed the first connection block 213 with four sets of first fixing mechanisms on the side close to the rear tunnel 102, and the four sets of first fixing mechanisms were respectively close to the four corners of the middle rock wall 105; the first connection block 213 with the auxiliary vibration transmission mechanism was fixedly connected to the side close to the front tunnel 103 and on the first threaded rod 205 located below. Thus, the first fixing mechanism and the auxiliary vibration transmission mechanism can be used normally.

[0037] When the construction workers blast the rear tunnel 102, the vibration generated by the blasting will be transmitted to the middle rock wall 105. At this time, part of the vibration in the middle rock wall 105 is directly transmitted to the vibration transmission wall 201. The efficiency of vibration transmission by the vibration transmission wall 201 is higher than that of the middle rock wall 105. The vibration transmission wall 201 can quickly transmit the shock wave to the inner wall of the leading tunnel 103 through the second support frame 501 and the third matching block 503. At the same time, the vibration is also transmitted to the inner wall of the leading tunnel 103 by the auxiliary vibration transmission mechanism. By transmitting the vibration borne by the middle rock wall 105 to the inner wall of the leading tunnel 103, the vibration directly borne by the middle rock wall 105 is reduced, thereby protecting the middle rock wall 105. While the vibration is transmitted in the middle rock wall 105, part of the vibration will also be transmitted from the middle rock wall 105 to the vibration transmission wall 201, so as to avoid the vibration generated by the blasting from damaging the middle rock wall 105 and preventing cracks in the middle rock wall 105.

[0038] When the blasting of the rear tunnel 102 is completed, the staff first removes several groups of second fixing mechanisms and corresponding groups of second support plates, and then removes several groups of fastening mechanisms and corresponding first fixing mechanisms and auxiliary vibration transmission mechanisms. At this time, only the supporting mechanisms remain in the middle rock wall 105. The staff then removes one group of the supporting mechanisms, and the other supporting mechanisms remain stationary. Then the staff grouts the first fixing groove 202 of the removed supporting mechanisms, waits for the first fixing groove 202 to solidify and have supporting capacity, then removes one group of the supporting mechanisms, and grouts the corresponding first fixing groove 202. This process is repeated until all the supporting mechanisms in the middle rock wall 105 are removed, so that the cast middle rock wall 105 becomes a whole, and at the same time reduces the impact of the blasting of the rear tunnel 102 on the middle rock wall 105, thereby ensuring that the structural strength of the middle rock wall 105 meets the standards when in use.

[0039] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the present invention.

Claims

1. A support structure for constructing a small clearance tunnel. Features: It comprises a middle rock wall, wherein a plurality of groups of first fixing grooves are formed on the middle rock wall, and a supporting mechanism for supporting the middle rock wall is provided in each of the plurality of groups of first fixing grooves; The support mechanism comprises two groups of first support blocks, a first hydraulic cylinder is arranged between the two groups of the first support blocks, a first limit block is arranged on each of the two groups of the first support blocks, the two groups of the first limit blocks are clamped in the driving rock wall, vibration walls are arranged on both sides of the first hydraulic cylinder, first threaded rods are arranged on both sides of the two groups of the first support blocks, and a plurality of groups of the first threaded rods are respectively installed in the two groups of the vibration walls; A fastening mechanism for fixing the vibration transmission wall is disposed on each of the plurality of groups of the first threaded rods; A second fixing mechanism for transmitting vibration is arranged on the plurality of groups of vibration transmission walls close to the pilot hole.

2. A support structure for constructing a small clearance tunnel according to claim 1, Features: A first support sleeve is sleeved on the first threaded rod at the bottom, and a second support sleeve is sleeved on the first threaded rod at the top; The fastening mechanism comprises a first connecting block, a hexagonal bolt is sleeved on the first threaded rod, the hexagonal bolt is threadedly connected to the first threaded rod, the hexagonal bolt contacts the first support sleeve / the second support sleeve, a first clamping block is clamped on the hexagonal bolt, a plum blossom block is arranged on the first clamping block, the first threaded rod passes through the plum blossom block, and the first connecting block is clamped on the plum blossom block and the first clamping block; The first connecting block is provided with a first fixing plate, the first fixing plate is slidably mounted on the first connecting block, a push block is provided on the first fixing plate, an arc groove is formed on the first fixing plate, and the first threaded rod is mounted in the arc groove.

3. A support structure for constructing a small clearance tunnel according to claim 2, Features: A first fixing mechanism is provided on four groups of the first connecting blocks near the rear passage hole, the first fixing mechanism comprises a first matching block, one end of the first matching block is hinged on the first connecting block, the first matching block is provided with a second matching block slidably connected thereto, the second matching block is hinged with an arc block, and the arc block contacts the inner wall of the rear passage hole; A second hydraulic cylinder is arranged between the first matching block and the second matching block.

4. A support structure for constructing a small clearance tunnel according to claim 3, Features: A second fixing mechanism is provided on a plurality of groups of vibration transmission walls near the pilot tunnel, wherein the second fixing mechanism comprises a second support frame, a second limit block is provided at one end of the second support frame, and the second limit block is clamped in the vibration transmission wall; The second support frame is in a "T" shape, and third matching blocks are provided at both ends of the second support frame. The two groups of the third matching blocks are perpendicular to each other, and the two groups of the third matching blocks are in contact with the inner wall of the pilot hole. A third hydraulic cylinder is provided between the second support frame and the two groups of the third matching blocks.

5. A support structure for constructing a small clearance tunnel according to claim 4, Features: A first support frame is arranged between several groups of the first connecting blocks located on the same side, the first support frame is clamped in several groups of the first connecting blocks, and second fixing plates are arranged on the first connecting blocks located at the four corners of the first support frame, and the second fixing plates are fixedly connected to the first connecting blocks by bolts.

6. A support structure for constructing a small clearance tunnel according to claim 5, Features: A second connection block is provided between each two sets of vibration transmission walls on the side close to the pilot tunnel, and clamping blocks are provided on both sides of the second connection block. The two sets of clamping blocks are respectively clamped in the two sets of vibration transmission walls; A connecting plate is clamped between every two adjacent groups of the second supporting frames, two ends of the connecting plate are respectively clamped on the two groups of the second supporting frames, and one side of the connecting plate is in contact with the second connecting block.

7. A support structure for constructing a small clearance tunnel according to claim 6, Features: The first connecting block located near the pilot hole and below is provided with an auxiliary vibration transmission mechanism, the auxiliary vibration transmission mechanism includes a movable block, the movable block is hinged on the first connecting block, a third support frame is provided on the movable block, and one end of the third support frame is in contact with the inner wall of the pilot hole; A fixing block is arranged on the first connecting block, and two groups of second threaded rods are installed on the fixing block. One end of the two groups of second threaded rods is hinged with a second supporting block, and the two groups of second supporting blocks are in contact with the movable frame.

8. A support structure for constructing a small clearance tunnel according to claim 7, Features: The vibration transmission wall, the second connecting block, the second supporting frame and the third supporting frame are all made of materials with high elastic modulus and low density, and can transmit vibrations efficiently.

9. A method for using a support structure for constructing a small clearance tunnel, It is characterized in that The following steps are involved: S1: When pouring the middle rock wall, the staff needs to ensure that there are several groups of first fixed grooves distributed on the middle rock wall, and then the staff installs the first hydraulic cylinder and two groups of first support blocks in the corresponding fixed grooves, and then installs several groups of vibration walls in the first fixed grooves, ensuring that vibration walls are installed on both sides of each group of first hydraulic cylinders to strengthen the structural strength of the middle rock wall; S2: The staff installs the first support sleeve / the second support sleeve and the hexagonal bolts into the first threaded rod, and fixes the vibration transmission wall to the two sets of first support blocks through the hexagonal bolts. Then the staff fixes the first clamping block and the plum blossom block on the hexagonal bolts. Then the staff fixes the first connecting block to the first clamping block and the plum blossom block. Then the staff fixes the first fixing plate to the first connecting block until the arc groove on the first fixing plate is clamped on the first threaded rod, so that the first connecting block is fixed to the first threaded rod; S3: Then the staff clamps the second connection block between the two groups of vibration transmission walls, and then clamps the first support frame between several groups of first connection blocks on the same side, so that the first support frame is clamped in the first clamping groove, and then the staff fixes the first support frame through the second fixing plate and bolts; S4: The staff rotates the first matching block, and then starts the four groups of second hydraulic cylinders. The telescopic ends of the second hydraulic cylinders drive the second matching blocks and the corresponding arc blocks to move until the arc blocks contact the inner wall of the guide hole, thereby supporting the first connection block. The staff then mounts the second support frame on the first connection block, and then starts the two groups of third hydraulic cylinders to move the third matching blocks to contact the inner wall of the guide hole, thereby supporting the first connection block. The connecting plates are then mounted on the two adjacent groups of second support frames, and the second connection blocks are fixed between the two groups of vibration transmission walls through the connecting plates. S5: After the staff installs the first connection block provided with the auxiliary vibration transmission mechanism, the third support frame drives the movable block to rotate around the first connection block by gravity, so that one end of the third support frame contacts the inner wall of the pilot hole, and then the staff drives the second support block to move by rotating the two sets of second threaded rods until one side of the second support block fits with the movable block. At this time, the third support frame is fixed, and the third support frame always keeps in contact with the inner wall of the pilot hole; S6: The construction workers then blast the rear tunnel, and the vibration received by the middle rock wall is transmitted to the inner wall of the leading tunnel, reducing the damage caused by the vibration to the middle rock wall. The workers then remove the first fixing mechanism, the second fixing mechanism, the fastening mechanism, the auxiliary vibration transmission mechanism, the first support frame and the second connecting block, leaving only the support mechanism in the first fixing groove. After that, each time the workers remove a group of support mechanisms, they perform grouting in the corresponding first fixing groove, and the workers only remove one group of support mechanisms at a time, and remove another group of support mechanisms after the concrete solidifies, until all the groups of support mechanisms are removed.