Heavy planetary roller screw assembly process and assembly tool

By setting inserts and fillers in the nuts and using arc-shaped notch and step hole structures, the precise positioning and fixing of heavy-duty planetary roller screws is solved, and the problem of harsh assembly position and low efficiency is improved. The assembly accuracy is improved and efficiency.

CN118959535APending Publication Date: 2024-11-15MECHANICS RES & DESIGN ACAD SICHUAN PROV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411369272.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The heavy-duty planetary roller screw requires additional components and complex appearance design during installation, resulting in strict assembly position requirements, increasing processing difficulty and use complexity, and reducing assembly efficiency and accuracy.

Method used

Using a lightweight assembly process and tooling, by setting multiple inserts and fillers in the nut, the positioning part and limiting part are formed using arc-shaped notch and step hole structures, combining the hexagonal hole and the V-shaped support plate. Accelerate precise positioning and fixing of rollers and lead screws.

Benefits of technology

It improves the assembly accuracy and efficiency of heavy-duty planetary roller screws, simplifies the assembly process, reduces spatial position requirements, and reduces assembly difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959535A_ABST
    Figure CN118959535A_ABST
Patent Text Reader

Abstract

The invention discloses a heavy planetary roller screw assembly process and assembly tool. The heavy planetary roller screw assembly process comprises the steps that S1, a plurality of rollers are sequentially installed into a nut; s2, after the two ends of the pin rollers are limited in the nut through second inserts, the phase positions of the pin rollers are adjusted through inner hexagonal holes in the ends of the pin rollers, and the tool nut is installed from the second end of the nut; s3, inner gear rings and retainers at the two ends of the nut are installed; s4, the roller is fixed in the nut through filler, then the tool lead screw is installed in the nut from the first end of the nut, and assembling of the roller nut is completed; and S5, the height of the lead screw is adjusted, one end of a roller nut of the lead screw is assembled, and meanwhile the tool lead screw is disassembled. According to the light-weight and unique assembly process and tool, the technical problem of assembly of the heavy planetary roller lead screw can be effectively solved, the assembly accuracy of the heavy planetary roller lead screw is guaranteed, and the assembly efficiency of the heavy planetary roller lead screw is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mechanical assembly, and in particular relates to an assembly process and an assembly tool for a heavy planetary roller screw. Background Art

[0002] The standard planetary roller screw, which consists of three major components, a screw rod, a roller and a nut, converts rotational motion into linear motion. During use, the nut often needs to be fixedly installed with an external structure. During the installation process, in order to fix the nut with the external structure, multiple additional parts need to be added to cooperate with it, or the external shape of the nut is set to be more complicated, which increases the difficulty of processing and the complexity of the use of the planetary roller screw, reducing its convenience.

[0003] That is, during the installation process, the spatial position requirements for the screw, roller and nut are extremely stringent, and over-positioning is very serious, especially for heavy-duty planetary roller screws. There are more than 1,000 assembly positions where over-positioning occurs, making assembly and debugging very difficult. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a heavy-duty planetary roller screw assembly process and assembly tooling, and to propose a set of lightweight and unique assembly processes and tooling, which can effectively solve the technical problems of assembling heavy-duty planetary roller screws, ensure the assembly accuracy of heavy-duty planetary roller screws and improve their assembly efficiency.

[0005] The object of the present invention is achieved through the following technical solutions:

[0006] A heavy-duty planetary roller screw assembly process comprises the following steps:

[0007] Step S1, sequentially install multiple rollers into nuts;

[0008] A plurality of first inserts are arranged in the nut along the circumference thereof, a positioning portion is formed between two adjacent first inserts, the rollers are arranged in sequence in the positioning portion, and the retainer at the first end of the nut is assembled with the rollers;

[0009] Step S2, after limiting the two ends of the roller in the nut by using the second insert, adjusting the phase of each roller through the hexagonal holes at the ends of the rollers, and installing the tooling nut from the second end of the nut;

[0010] Step S3, installing the inner gear ring and the retaining frame at both ends of the nut;

[0011] Step S4, after fixing the roller in the nut by using a filler, the tooling screw is installed from the first end of the nut to complete the assembly of the roller nut;

[0012] Step S5, adjust the height of the lead screw, assemble one end of its roller nut, and disassemble the tooling lead screw at the same time.

[0013] In one embodiment, in step S1, both ends of the first insert have arc-shaped notches, the arc-shaped notches between two adjacent first inserts are combined to form the circular positioning portion, and multiple first inserts are provided at both ends of the nut to limit the roller.

[0014] In one embodiment, in step S3, the second insert at the second end of the nut is first removed to complete the replacement of the inner gear ring at the second end of the nut, and then the second insert and the first insert at the first end of the nut are removed, and the inner gear ring and the retaining frame are reinstalled.

[0015] In one embodiment, in step S5, the assembled roller nut is hoisted and the height of the lead screw is adjusted using a V-shaped support plate.

[0016] The present invention also provides a heavy-duty planetary roller screw assembly tool, comprising a plurality of first inserts arranged at both ends of a nut, the first inserts being arranged sequentially along the circumference of the nut, both ends of the first inserts being provided with arc-shaped notches, the arc-shaped notches between two adjacent first inserts being combined to form a circular positioning portion matching the size of the roller, and second inserts being provided at both ends of the nut, the second insert having a stepped hole structure, the outer end of which matches the inner diameter of the nut, the inner end being located above the roller, and a plurality of through holes being provided to fix the roller and expose the hexagonal hole at the end of the roller.

[0017] In one embodiment, it also includes a tooling screw that matches the size of the screw to be installed so as to fix the roller in the nut together with the filler.

[0018] In one embodiment, an adjusting tool is further included, on which an adjusting slot is formed, and the adjusting slot has two opposite inclined surfaces for adjusting the height of the lead screw to be installed.

[0019] In one embodiment, an adjusting pad is further provided on the inclined surface.

[0020] The beneficial effects of the present invention are:

[0021] A set of lightweight and unique assembly processes and tooling is proposed, which can effectively solve the technical difficulties in assembling heavy planetary roller screws, ensure the assembly accuracy of heavy planetary roller screws and improve their assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings, wherein:

[0023] Figure 1 A schematic structural diagram of a first insert of the present invention is shown;

[0024] Figure 2 A schematic structural diagram of a second insert of the present invention is shown;

[0025] Figure 3 A schematic diagram showing the structure of the tooling screw of the present invention is shown;

[0026] Figure 4 A schematic diagram showing the structure of the adjustment tool of the present invention is shown;

[0027] Figure 5 A schematic diagram showing the roller screw of the present invention after assembly;

[0028] In the drawings, like reference numerals are used for like parts. The drawings are not necessarily to scale.

[0029] Reference numerals:

[0030] 1-first insert, 2-second insert, 3-tooling screw, 4-adjusting tool, 5-filler, 6-hexagonal hole, 101-arc notch, 102-arc end face, 103-hollow part, 401-inclined surface. DETAILED DESCRIPTION

[0031] The present invention will be further described below in conjunction with the accompanying drawings.

[0032] Since heavy-duty planetary roller screws have many assembly positions where they are over-positioned, assembly and debugging are very difficult. Conventional assembly processes and tooling are difficult to meet the assembly requirements of heavy-duty planetary roller screws. Not only is the assembly efficiency extremely low, but it is also difficult to ensure its assembly accuracy.

[0033] The present invention provides a heavy-duty planetary roller screw assembly process, comprising the following steps:

[0034] Step S1, sequentially install multiple rollers into nuts;

[0035] A plurality of first inserts 1 are arranged in the nut along its circumference, a positioning portion is formed between two adjacent first inserts 1, rollers are arranged in sequence in the positioning portion, and the retainer at the first end of the nut is assembled with the rollers;

[0036] Specifically, both ends of the first insert 1 have an arc-shaped notch 101, and the arc-shaped notches 101 between two adjacent first inserts 1 are combined to form a circular positioning portion. Both ends of the nut are provided with a plurality of first inserts 1 to limit the roller.

[0037] Step S2, after the two ends of the roller are limited in the nut by using the second insert 2, the phases of each roller are adjusted through the hexagonal holes 6 at the ends of the rollers, and the tooling nut is installed from the second end of the nut;

[0038] Step S3, installing the inner gear ring and the retaining frame at both ends of the nut;

[0039] Specifically, first remove the second insert 2 at the second end of the nut to complete the replacement of the inner gear ring at the second end of the nut, then remove the second insert 2 and the first insert 1 at the first end of the nut, and reinstall the inner gear ring and the retainer;

[0040] Step S4, after fixing the roller in the nut by using the filler 5, the tooling screw 3 is installed from the first end of the nut to complete the assembly of the roller nut;

[0041] Step S5, adjusting the height of the lead screw, and assembling one end of the roller nut thereof, while disassembling the tooling lead screw 3, that is, hoisting the assembled roller nut, and adjusting the height of the lead screw by using a V-shaped support plate;

[0042] It should be noted that, in the present embodiment, circular positioning portions are formed by using arc-shaped notches 101 of multiple first inserts 1, which are arranged at both ends of the nut along the circumference of the inner hole of the nut. In this process, multiple rollers are sequentially arranged in the nut, that is, multiple rollers are positioned and limited by the first insert 1, and then the two ends of the rollers are covered by the second insert 2 for further fixing. The hexagonal hole 6 at the end of the roller is exposed by the through hole of the second insert 2. The hexagonal hole 6 of the roller is screwed by a tool to adjust the phases of the multiple rollers. The inner gear ring and the retainer at both ends of the nut are installed by gradually replacing the second insert 2 and the first insert 1, and then the roller nut is assembled by the filler 5 and the tooling screw 3. Finally, the nut is lifted, and the height of the screw is adjusted by adjusting the V-shaped support structure of the tooling 4. The screw is assembled from one end of the roller nut, and the tooling screw 3 is disassembled simultaneously to complete the assembly.

[0043] The present invention also provides a heavy-duty planetary roller screw assembly tool, such as Figures 1 to 5 As shown, it includes a plurality of first inserts 1 arranged at both ends of the nut, the first inserts 1 are arranged in sequence along the circumference of the nut, both ends of the first inserts 1 are provided with arc-shaped notches 101, the arc-shaped notches 101 between two adjacent first inserts 1 are combined to form a circular positioning portion matching the size of the roller, and both ends of the nut are further provided with second inserts 2, the second inserts 2 are in a stepped hole structure, the outer end of which matches the inner diameter of the nut, the inner end is located above the roller, and a plurality of through holes are provided to fix the roller and expose the inner hexagonal hole 6 at the end of the roller;

[0044] Specifically, Figure 3 As shown, it also includes a tooling screw 3, which matches the size of the screw to be installed, so as to fix the roller in the nut with the filler 5;

[0045] In one embodiment, an adjusting tool 4 is further included, on which an adjusting slot is provided, and the adjusting slot has two opposite inclined surfaces 401 to adjust the height of the screw to be installed, and an adjusting pad is also provided on the inclined surface 401 to protect the roller screw and avoid scratching the screw;

[0046] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "bottom", "top", "front", "back", "inside", "outside", "left", "right", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0047] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the various dependent claims and features described herein may be combined in a manner different from that described in the original claims. It should also be understood that features described in conjunction with individual embodiments may be used in other described embodiments.

Claims

1. A heavy-duty planetary roller screw assembly process, characterized in that: The following steps are involved: Step S1, sequentially install multiple rollers into nuts; A plurality of first inserts are arranged in the nut along the circumference thereof, a positioning portion is formed between two adjacent first inserts, the rollers are arranged in sequence in the positioning portion, and the retainer at the first end of the nut is assembled with the rollers; Step S2, after limiting the two ends of the roller in the nut by using the second insert, adjusting the phase of each roller through the hexagonal holes at the ends of the rollers, and installing the tooling nut from the second end of the nut; Step S3, installing the inner gear ring and the retaining frame at both ends of the nut; Step S4, after fixing the roller in the nut by using a filler, the tooling screw is installed from the first end of the nut to complete the assembly of the roller nut; Step S5, adjust the height of the lead screw, assemble one end of its roller nut, and disassemble the tooling lead screw at the same time.

2. A heavy-duty planetary roller screw assembly process according to claim 1, characterized in that: In step S1, both ends of the first insert have arc-shaped notches, and the arc-shaped notches between two adjacent first inserts are combined to form the circular positioning portion. Both ends of the nut are provided with a plurality of first inserts to limit the roller.

3. A heavy-duty planetary roller screw assembly process according to claim 2, characterized in that: In step S3, the second insert at the second end of the nut is first removed to complete the replacement of the inner gear ring at the second end of the nut, and then the second insert and the first insert at the first end of the nut are removed, and the inner gear ring and the retainer are reinstalled.

4. A heavy-duty planetary roller screw assembly process according to claim 3, characterized in that: In step S5, the assembled roller nut is hoisted and the height of the lead screw is adjusted using a V-shaped support plate.

5. A heavy-duty planetary roller screw assembly tool, characterized in that: It includes a plurality of first inserts arranged at both ends of the nut, the first inserts are arranged in sequence along the circumference of the nut, both ends of the first inserts are provided with arc-shaped notches, the arc-shaped notches between two adjacent first inserts are combined to form a circular positioning portion matching the size of the roller, and second inserts are also provided at both ends of the nut, the second insert has a stepped hole structure, the outer end of the second insert matches the inner diameter of the nut, the inner end is located above the roller, and a plurality of through holes are provided to fix the roller and expose the hexagonal hole at the end of the roller.

6. A heavy-duty planetary roller screw assembly tool according to claim 5, characterized in that: Also included is a tooling screw that matches the size of the screw to be installed so as to fix the roller in the nut together with the filler.

7. A heavy-duty planetary roller screw assembly tool according to claim 6, characterized in that: It also includes an adjusting tool, on which an adjusting slot is provided. The adjusting slot has two opposite inclined surfaces for adjusting the height of the lead screw to be installed.

8. A heavy-duty planetary roller screw assembly tool according to claim 7, characterized in that: An adjusting pad is also arranged on the inclined surface.