Nuclear power plant pipeline plugging device and method

By designing a combination of double-layer sealing structure and connecting rods in the pipeline sealing device of the nuclear power plant, the problems of lax sealing and device dropping under high pressure are solved, and a more reliable sealing effect and safety are achieved.

CN118959766APending Publication Date: 2024-11-15CGNPC INSPECTION TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411314952.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Existing nuclear power plant pipeline sealing devices are prone to the risk of lax sealing, leakage of cleaning liquids and falling into the pipeline under high pressure environments.

Method used

A pipe sealing device including a first sealing structure and a second sealing structure is designed, and the two are connected into a whole through a connecting rod. The first sealing structure is in the pipe and the second sealing structure is at the open end, and the elastic seal is used. The parts and the limiting parts are closely attached to the inner wall of the pipe under the action of external forces, forming a double-layer sealing boundary, and jointly bear the pressure through the connecting rod.

Benefits of technology

It effectively reduces the risk of leakage caused by seal failure and the risk of device falling into the pipeline, ensuring the sealing of cleaning liquid in the pipeline and the stability of device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959766A_ABST
    Figure CN118959766A_ABST
Patent Text Reader

Abstract

The invention discloses a nuclear power plant pipeline plugging device and method. The nuclear power plant pipeline plugging device comprises a first sealing structure, a second sealing structure and at least four connecting rods. The first part of the first sealing piece and the first part of the second sealing piece serve as two layers of sealing boundaries of the pipeline, and the risk of sealing failure is effectively reduced. The first sealing structure is arranged in a to-be-blocked pipeline and comprises an elastic first sealing piece, and the first sealing piece is tightly attached to the inner wall face of the pipeline under the action of external force. The second sealing structure is arranged at the open end of the pipeline and comprises a second sealing piece, and the first part of the second sealing piece is located in the pipeline and tightly attached to the inner wall face of the pipeline under the action of external force. The second part of the second sealing piece is located outside the pipeline, the cross section size of the second part is larger than that of the pipeline when the second part is not affected by external force, the second part located outside the pipeline is just clamped to the open end of the pipeline, and the risk that the whole plugging device falls into the pipeline is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear power plant pipeline plugging, and in particular to a nuclear power plant pipeline plugging device and method. Background Art

[0002] The condenser of a nuclear power plant is one of the key equipment in the power generation process. Its function is to condense steam through a cooling medium (such as water) to recover heat energy and improve system efficiency. During operation, dirt, sediment and corrosion products will accumulate inside the condenser. These substances will seriously affect the heat transfer effect of the condenser, resulting in a decrease in power generation efficiency and may even cause damage to the equipment. Therefore, it is very necessary to clean the condenser regularly. For cleaning the condenser, the main focus is on overall chemical cleaning of the heat transfer tubes, heat transfer tube sheets and tube side water chambers. Since nuclear power plants have large single-unit power and low temperature, the required condenser equipment is large in size. When formulating equipment cleaning plans, it is necessary to focus on how to design a complete cleaning boundary. The integrity of the cleaning boundary is a necessary condition to ensure the smooth completion of equipment cleaning work.

[0003] In the related art, a pipe plugging device can be used to clean the boundary of an ordinary pipe structure, but the pipe plugging device in the related art has the following defects: (1) It usually has only a single-layer sealing boundary, and the amount of water in the inlet and outlet water chambers is large when the condenser is cleaned. The pipe plugging device will be subjected to a large fluid pressure during operation (the maximum pressure value can reach 20 atmospheres). When subjected to the huge pressure of the fluid in the pipeline, the core sealing structure of the pipe plugging device has the risk of poor sealing and leakage of the cleaning liquid in the pipeline. (2) In addition, the pipe plugging device in the related art sets the core sealing structure entirely inside the pipeline. Under the huge pressure difference in the pipeline, the pipe plugging device faces the risk of falling into the pipeline. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide an improved nuclear power plant pipeline plugging device and method.

[0005] The technical solution adopted by the present invention to solve the technical problem is: to provide a nuclear power plant pipeline plugging device, which includes a first sealing structure, a second sealing structure and at least four connecting rods;

[0006] Each of the connecting rods is respectively connected to the first sealing structure and the second sealing structure;

[0007] The first sealing structure is arranged inside the pipeline to be blocked, and the first sealing structure comprises an elastic first sealing member, and the first sealing member is used to be closely attached to the inner wall surface of the pipeline under the action of an external force;

[0008] The second sealing structure is arranged at the open end of the pipeline, the second sealing structure comprises an elastic second sealing member, the second sealing member comprises a first part and a second part connected to each other, the first part is located inside the pipeline and is used to cling to the inner wall surface of the pipeline under the action of an external force, and the second part is located outside the pipeline;

[0009] The cross-sectional dimension of the first portion when no external force is applied is smaller than or equal to the cross-sectional dimension of the pipe, and the cross-sectional dimension of the second portion when no external force is applied is larger than the cross-sectional dimension of the pipe.

[0010] In some embodiments, a cross-sectional dimension of the second sealing member gradually increases in a direction away from the first sealing structure.

[0011] In some embodiments, the first sealing structure further includes a first limiter and a second limiter, the first sealing member is located between the first limiter and the second limiter, and each of the connecting rods passes through the first limiter, the first sealing member and the second limiter in sequence.

[0012] In some embodiments, each of the connecting rods is a screw rod, and the first sealing structure also includes at least four first nuts and at least four second nuts, each of the first nuts is located on a side of the first limit member away from the first seal and is threadedly connected to one of the screw rods, and each of the second nuts is located on a side of the second limit member away from the first seal and is threadedly connected to one of the screw rods.

[0013] In some embodiments, the first limiting member and / or the second limiting member is formed with a circle of steps extending along the circumferential direction, and the first sealing member is disposed on the steps.

[0014] In some embodiments, the second sealing structure further includes a third limiter and a fourth limiter, the second sealing member is located between the third limiter and the fourth limiter, and each of the connecting rods passes through the third limiter, the second sealing member and the fourth limiter in sequence.

[0015] In some embodiments, each of the connecting rods is a screw, and the second sealing structure also includes at least four third nuts and at least four fourth nuts, each of the third nuts is located on a side of the third limit member away from the second seal and is threadedly connected to one of the screws, and each of the fourth nuts is located on a side of the fourth limit member away from the second seal and is threadedly connected to one of the screws.

[0016] In some embodiments, the diameter of each of the connecting rods is greater than or equal to 100 mm;

[0017] And / or, the length of each connecting rod is greater than or equal to 1m;

[0018] And / or, the material of each connecting rod is 316L stainless steel.

[0019] In some embodiments, the material of the first sealing member includes at least one of polytetrafluoroethylene and silicone, and the material of the second sealing member includes at least one of polytetrafluoroethylene and silicone.

[0020] The present invention also provides a nuclear power plant pipeline plugging method, which comprises the following steps:

[0021] S1, sequentially inserting a first nut, a first stopper, a first seal, a second stopper and a second nut on the screw rod in the same direction to form a first installation base;

[0022] S2, moving the first mounting base from the open end of the pipe to be blocked to the inside of the pipe, and the second nut is closer to the open end than the first nut;

[0023] S3, moving the second stopper and the second nut relative to the screw in a direction close to the first stopper, so that the first sealing member is squeezed by the first stopper and the second stopper to expand radially, until the first sealing member is in close contact with the inner wall surface of the pipe;

[0024] S4, sequentially inserting a third nut, a third stopper, a second seal, a fourth stopper and a fourth nut on the screw rod along a direction from the open end to the second nut, and leaving a preset interval between the third nut and the second nut, the third nut, the third stopper and a first part of the second seal are located inside the pipe, and the second part of the second seal, the fourth stopper and the fourth nut are located outside the pipe, so that the second seal is clamped and fixed at the open end;

[0025] S5. Move the fourth limiter and the fourth nut relative to the screw in a direction close to the third limiter, so that the second seal is squeezed by the third limiter and the fourth limiter to expand radially until the first part of the second seal is in tight contact with the inner wall of the pipe.

[0026] The present invention has at least the following beneficial effects: (1) The first seal and the first part of the second seal serve as two layers of sealing boundaries of the pipeline. Even if the seal of the first sealing structure fails, the sealing effect can be maintained by relying on the second sealing structure; and the first sealing structure and the second sealing structure are connected as a whole through a connecting rod. The first sealing structure, the second sealing structure and the connecting rod jointly bear the pressure brought by the fluid in the pipeline, thereby reducing the pressure borne by the first sealing structure and the second sealing structure alone. The above settings can effectively reduce the risk of leakage of cleaning liquid in the pipeline due to seal failure. (2) Since the second sealing structure is arranged at the open end of the pipeline, the second part of the second seal is located outside the pipeline. The cross-sectional size of the second part when not affected by external force is larger than the cross-sectional size of the pipeline. The second part located outside the pipeline is just clamped on the open end of the pipeline, thereby reducing the risk of the entire plugging device falling into the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solution of the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments, in which:

[0028] Figure 1 is a schematic diagram of the three-dimensional structure of a nuclear power plant pipeline plugging device in some embodiments of the present invention;

[0029] Figure 2 yes Figure 1 The longitudinal cross-sectional structure diagram of the pipeline plugging device of a nuclear power plant is shown;

[0030] Figure 3 yes Figure 2 The longitudinal section structure diagram of the pipeline plugging device of a nuclear power plant when it is installed on the pipeline is shown;

[0031] Figure 4 yes Figure 1 Schematic diagram of the exploded structure of the nuclear power plant pipeline plugging device is shown. DETAILED DESCRIPTION

[0032] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0033] See also Figures 1 to 3 The present invention shows a nuclear power plant pipeline plugging device (hereinafter referred to as the plugging device) of an embodiment, which includes a first sealing structure, a second sealing structure and four connecting rods 3. Each connecting rod 3 is connected to the first sealing structure and the second sealing structure respectively. The connecting rod 3 is mainly used to support the first sealing structure and the second sealing structure, and connect the first sealing structure and the second sealing structure into a whole, so as to ensure that the plugging device as a whole has a more reliable rigidity.

[0034] The first sealing structure is entirely arranged inside the pipe 4 to be blocked, serving as the first layer of sealing for the pipe 4. The first sealing structure includes a first sealing member 10, which is used to fit tightly against the inner wall of the pipe 4 under the action of an external force. Specifically, the first sealing member 10 is an elastic sealing member having the ability to deform elastically. Under the action of an external force, the first sealing member 10 will deform; after the external force is released, the first sealing member 10 can return to its original shape. Since the first sealing member 10 is an elastic sealing member, it can be moved to a designated position inside the pipe 4 for installation when no external force is applied to the first sealing member 10. After the first sealing member 10 is installed, an external force is applied to it to cause it to expand radially along the pipe 4, so that it fits tightly against the outer wall of the pipe 4, thereby forming a first sealing boundary inside the pipe 4.

[0035] Different from the first sealing structure, the second sealing structure is arranged at the open end of the pipe 4, serving as the second layer of sealing of the pipe 4. The open end of the pipe 4 is also the end of the pipe 4 in contact with the atmospheric environment. The second sealing structure includes a second sealing member 20, and the second sealing member 20 includes a first part 201 and a second part 202 connected to each other. The first part 201 is located inside the pipe 4 and is used to be close to the inner wall surface of the pipe 4 under the action of an external force. Specifically, the second sealing member 20 is similar to the first sealing member 10, and has the ability of elastic deformation. The first part 201 achieves the blocking of the pipe 4 by expanding radially along the pipe 4 under the action of an external force. The second part 202 is located outside the pipe 4 and does not directly contact the inner wall surface of the pipe 4.

[0036] The cross-sectional dimension of the first part 201 when not subjected to external force is less than or equal to the cross-sectional dimension of the inner wall of the pipe 4. It should be noted that the lateral direction referred to by the cross-sectional dimension can be consistent with the radial direction of the pipe 4, and the radial direction of the pipe 4 is also the direction perpendicular to the axis of the pipe 4. Therefore, the first part 201 does not contact the inner wall surface of the pipe 4 when not subjected to external force, or a slight friction force is generated when in contact, which is conducive to the first part 201 moving along the circumference of the pipe 4 to the designated position to complete the installation; the first part 201 undergoes radial expansion deformation when subjected to external force, so that it can fit closely with the inner wall surface of the pipe 4. The cross-sectional dimension of the second part 202 when not subjected to external force is greater than the cross-sectional dimension of the inner wall of the pipe 4. Therefore, the second part 202 located outside the pipe 4 is just clamped on the open end of the pipe 4, reducing the risk of the plugging device falling into the pipe 4 as a whole. Figure 3 The dashed line in illustratively illustrates the boundary between the inside and the outside of the pipe 4 .

[0037] In summary, (1) the first seal 10 and the first part 201 of the second seal 20 serve as two layers of sealing boundaries of the pipeline 4. Even if the sealing of the first sealing structure fails, the sealing effect can be maintained by the second sealing structure; and the first sealing structure and the second sealing structure are connected as a whole through the connecting rod 3. The first sealing structure, the second sealing structure and the connecting rod 3 jointly bear the pressure brought by the fluid in the pipeline 4, reducing the pressure borne by the first sealing structure and the second sealing structure alone. The above settings can effectively reduce the risk of leakage of the cleaning liquid in the pipeline 4 due to sealing failure. (2) Since the second sealing structure is arranged at the open end of the pipeline 4, the second part 202 of the second seal 20 is located outside the pipeline 4. The cross-sectional size of the second part 202 when not subject to external force is larger than the cross-sectional size of the pipeline 4. The second part 202 located outside the pipeline 4 is just clamped on the open end of the pipeline 4, reducing the risk of the entire plugging device falling into the pipeline 4.

[0038] In the application scenario of nuclear power plant condenser cleaning, the inner diameter of the pipe 4 to be blocked is more than 1m. The first seal 10 can be a sealing ring. The thickness of the first seal 10 when not under the action of external force can be designed to be greater than or equal to 50mm. The axial length of the second seal 20 when not under the action of external force can be designed to be greater than or equal to 100mm. The difference between the minimum cross-sectional dimension of the first part 201 of the second seal 20 when not under the action of external force and the cross-sectional dimension of the inner wall of the pipe 4 can be about 5mm. The difference between the maximum cross-sectional dimension of the second part 202 of the second seal 20 when not under the action of external force and the cross-sectional dimension of the inner wall of the pipe 4 can be about 20mm.

[0039] It can be understood that in other embodiments, the number of connecting rods 3 can be more than four, such as five, six, seven, etc. As a supporting structure between the first sealing structure and the second sealing structure, the connecting rod 3 needs to withstand the pressure brought by the fluid in the pipeline 4. The more the number of connecting rods 3, the stronger the bearing capacity, and the better the reliability of the plugging device, thereby effectively preventing the plugging device from falling into the pipeline 4. In order to achieve reliable support strength, the number of connecting rods 3 is at least four.

[0040] See also Figure 2In some embodiments, the cross-sectional dimension of the second seal 20 gradually increases in the direction away from the first sealing structure (i.e., the direction away from the pipe orifice, the upward direction in the figure). That is, the longitudinal section of the second seal 20 is inverted cone shape, and the cross-sectional dimension of the first part 201 and the cross-sectional dimension of the second part 202 are smoothly transitioned. Alternatively, in some other embodiments, the cross-sectional dimension of the first part 201 and the cross-sectional dimension of the second part 202 may not be smoothly transitioned, and a step 110 is formed between the two. For the inverted cone-shaped second seal 20, it can be squeezed along the inside of the pipe 4 to gradually increase the clamping force between the second seal 20 and the open end of the pipe 4, so that the clamping force between the second seal 20 and the open end of the pipe 4 is preset to the maximum value during installation, so as to maximize the sealing effect and clamping effect of the second seal 20.

[0041] See also Figures 1 to 4 In some embodiments, the first sealing structure further includes a first stopper 11 and a second stopper 12, the first sealing member 10 is located between the first stopper 11 and the second stopper 12, and each connecting rod 3 passes through the first stopper 11, the first sealing member 10 and the second stopper 12 in sequence. Specifically, the first stopper 11 is further away from the second sealing structure than the second stopper 12. Figures 1 to 4 With reference to the orientation in FIG, the first stopper 11 is located at the lower side of the second stopper 12. During installation, the first stopper 11 or the second stopper 12 is moved to reduce the distance between the first stopper 11 and the second stopper 12, so that the first seal 10 is subjected to the extrusion force of the first stopper 11 and the second stopper 12 and expands radially, thereby making the first seal 10 in close contact with the inner wall surface of the pipe 4. Therefore, the first stopper 11 and the second stopper 12 are mainly used to limit the position of the first seal 10 and to apply extrusion force (external force) to the first seal 10 so that it deforms and fits closely to the inner wall surface of the pipe 4.

[0042] See also Figures 1 to 4In some embodiments, each connecting rod 3 is a screw. The first sealing structure also includes four first nuts 13 and four second nuts 14. Each first nut 13 is located on a side of the first limiter 11 away from the first seal 10 (i.e., the lower side in the figure) and is threadedly connected to one of the screws. Each second nut 14 is located on a side of the second limiter 12 away from the first seal 10 (i.e., the upper side in the figure) and is threadedly connected to one of the screws. Specifically, each first nut 13 is connected to each screw one-to-one, and each second nut 14 is also connected to each screw one-to-one. Thus, the first limiter 11, the first seal 10 and the second limiter 12 are restricted between the first nut 13 and the second nut 14, preventing the first limiter 11, the first seal 10 and the second limiter 12 from moving along the axial direction of the screw after installation. That is, the first nut 13 , the second nut 14 and the screw are mainly used to limit the axial position of the first limiter 11 , the first seal 10 and the second limiter 12 , and prevent these parts from detaching from the connecting rod 3 and falling into the interior of the pipe 4 .

[0043] It can be understood that the number of the first nut 13 and the second nut 14 is consistent with the number of the screw rods. The number of the first nut 13 and the second nut 14 is not limited to four, and can also be more than four, such as five, six, seven, etc.

[0044] See also Figure 4 In some embodiments, the first stopper 11 is formed with a circle of steps 110 extending in the circumferential direction. Specifically, the first stopper 11 includes two parts with different cross-sectional dimensions, and a circle of steps 110 is formed between the two parts due to the size difference. Since the first sealing structure is entirely arranged inside the pipeline 4, the first seal 10 is subjected to a greater impact force from the fluid in the pipeline 4. The first seal 10 is arranged on the step 110, so that the contact area and friction between the first seal 10 and the first stopper 11 can be increased, so that the position of the first seal 10 is stabilized. The second stopper 12 can also be formed with a circle of steps 110 extending in the circumferential direction, and its function is the same as that of the step 110 on the first stopper 11.

[0045] See also Figures 1 to 4 In some embodiments, the second sealing structure further includes a third stopper 21 and a fourth stopper 22, the second sealing member 20 is located between the third stopper 21 and the fourth stopper 22, and each connecting rod 3 passes through the third stopper 21, the second sealing member 20 and the fourth stopper 22 in sequence. Specifically, the third stopper 21 is closer to the second sealing structure than the fourth stopper 22. Figures 1 to 4With reference to the orientation in FIG. 4 , the third stopper 21 is located at the lower side of the fourth stopper 22. During installation, the third stopper 21 or the fourth stopper 22 is moved to reduce the distance between the third stopper 21 and the fourth stopper 22, so that the second seal 20 is subjected to the extrusion force of the third stopper 21 and the fourth stopper 22 and expands radially, so that the first part 201 of the second seal 20 is in close contact with the inner wall surface of the pipe 4, and the second part 202 of the second seal 20 is blocked outside the opening end of the pipe 4. Therefore, the third stopper 21 and the fourth stopper 22 are mainly used to limit the position of the second seal 20, and to apply extrusion force (external force) to the second seal 20 to deform it and close to the inner wall surface of the pipe 4.

[0046] See also Figures 1 to 4 In some embodiments, the second sealing structure further includes four third nuts 23 and four fourth nuts 24. Each third nut 23 is located on a side of the third limiter 21 away from the second seal 20 (i.e., the lower side in the figure) and is threadedly connected to one of the screws. Each fourth nut 24 is located on a side of the fourth limiter 22 away from the first seal 10 (i.e., the upper side in the figure) and is threadedly connected to one of the screws. Specifically, each third nut 23 is connected to each screw one-to-one, and each fourth nut 24 is also connected to each screw one-to-one. Thus, the third limiter 21, the second seal 20 and the fourth limiter 22 are restricted between the third nut 23 and the fourth nut 24, preventing the third limiter 21, the second seal 20 and the fourth limiter 22 from moving along the axial direction of the screw after installation is completed. That is, the third nut 23 , the fourth nut 24 and the screw are mainly used to limit the axial position of the third limiter 21 , the second seal 20 and the fourth limiter 22 , and prevent these parts from detaching from the connecting rod 3 and falling into the interior of the pipe 4 .

[0047] It can be understood that the number of the third nut 23 and the fourth nut 24 is consistent with the number of the screw rods. The number of the third nut 23 and the fourth nut 24 is not limited to four, and can also be more than four, such as five, six, seven, etc.

[0048] Since the amount of water in the inlet and outlet water chambers is large when the condenser is cleaned, the fluid pressure on the sealing device as a whole is also large. In order to ensure that the connecting rod 3 has sufficient load-bearing capacity to prevent the sealing device from being separated from the inner wall of the pipe 4 and falling into the pipe 4 when subjected to a large pressure, in some embodiments, the diameter of each connecting rod 3 can be designed to be greater than or equal to 100 mm (for example, a screw with a specification of M100 is used), and the length of each connecting rod 3 is designed to be greater than or equal to 1 m (for example, a screw with a length greater than or equal to 1 m is used), so that the connecting rod 3 has sufficient rigidity and load-bearing capacity.

[0049] The material of each connecting rod 3 can be selected from 316L stainless steel (for example, a screw rod made of 316L stainless steel). 316L stainless steel is an austenitic stainless steel, one of the 300 series stainless steels. It contains molybdenum (Mo), which makes it more resistant to pitting and stress corrosion than 304 stainless steel. "L" indicates that this material contains a lower carbon content, which helps to reduce carbide precipitation during welding, thereby improving the corrosion resistance of the welded joint. Due to the excellent corrosion resistance of 316L stainless steel, the connecting rod 3 can be prevented from being corroded and damaged by a chemical reaction after contacting the chemical cleaning liquid in the pipeline 4.

[0050] Further, in order to make the first seal 10 and the second seal 20 also have good corrosion resistance, the material of the first seal 10 can include at least one of polytetrafluoroethylene and silicone, and the material of the second seal 20 can also include at least one of polytetrafluoroethylene and silicone. That is, the material of the first seal 10 can include polytetrafluoroethylene or silicone, or can include polytetrafluoroethylene and silicone at the same time (polytetrafluoroethylene and silicone can be combined together through a specific process, for example, silicone can be covered on polytetrafluoroethylene to form a material structure with dual advantages). Polytetrafluoroethylene material has extremely high chemical stability and can withstand almost all chemicals, including strong acids, strong alkalis and organic solvents, which enables the first seal 10 and / or the second seal 20 to maintain its sealing performance in the chemical cleaning environment in the pipeline 4 when the nuclear power plant condenser is cleaned. In addition, the polytetrafluoroethylene material can maintain its physical properties in a wide temperature range (-200°C to 260°C) and will not deform or degrade due to high temperature. This makes it suitable for the high temperature environment of chemical cleaning when cleaning the condenser of a nuclear power plant.

[0051] Furthermore, the cross-sectional shapes of the first stopper 11 , the first sealing member 10 , the second stopper 12 , the third stopper 21 , the second sealing member 20 , and the fourth stopper 22 may be circular to match the pipe 4 having a circular cross-sectional shape.

[0052] The present invention also provides a nuclear power plant pipeline plugging method, which comprises the following steps:

[0053] S1. The first nut 13, the first stopper 11, the first seal 10, the second stopper 12 and the second nut 14 are sequentially inserted on the screw rod in the same direction to form a first mounting base. That is, the first nut 13, the first stopper 11, the first seal 10, the second stopper 12 and the second nut 14 are sequentially inserted on the screw rod in the same direction, so that the first nut 13, the first stopper 11, the first seal 10, the second stopper 12 and the second nut 14 are sequentially arranged on the screw rod. Specifically, the first stopper 11 and the second stopper 12 are respectively provided with through holes 50 for the screw rod to pass through. The number of through holes 50 is consistent with the number of screw rods.

[0054] S2. Move the first mounting base from the open end of the pipe 4 to be blocked to the inside of the pipe 4, and the second nut 14 is closer to the open end than the first nut 13. Specifically, in some embodiments, the first mounting base can be moved from the open end of the pipe 4 to be blocked to the inside of the pipe 4 by using a lifting tool.

[0055] S3, the second stopper 12 and the second nut 14 are moved relative to the screw in a direction close to the first stopper 11, so that the first sealing member 10 is squeezed by the first stopper 11 and the second stopper 12 to expand radially, until the first sealing member 10 is tightly fitted with the inner wall surface of the pipe 4. Thus, a first sealing boundary is constructed in the pipe 4.

[0056] S4, the third nut 23, the third stopper 21, the second seal 20, the fourth stopper 22 and the fourth nut 24 are sequentially arranged on the screw along the direction from the open end to the second nut 14, so that the first nut 13, the first stopper 11, the first seal 10, the second stopper 12 and the second nut 14 are arranged in order on the screw. Specifically, the third stopper 21, the second seal 20 and the fourth stopper 22 are respectively provided with through holes 50 for the screw to pass through. The number of through holes 50 is consistent with the number of screws. And a preset interval is left between the third nut 23 and the second nut 14, and the preset interval can be adjusted according to actual conditions. The third nut 23, the third stopper 21 and the first part 201 of the second seal 20 are located inside the pipe 4, and the second part 202 of the second seal 20, the fourth stopper 22 and the fourth nut 24 are located inside the pipe 4, so that the second seal 20 is clamped and fixed at the open end.

[0057] S5, the fourth stopper 22 and the fourth nut 24 are moved relative to the screw in a direction close to the third stopper 21, so that the second sealing member 20 is squeezed by the third stopper 21 and the fourth stopper 22 and expands radially, until the first portion 201 of the second sealing member 20 is in close contact with the inner wall surface of the pipe 4. Thus, a second sealing boundary is constructed at the open end of the pipe 4.

[0058] It can be understood that the above embodiments only express the preferred implementation modes of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the patent scope of the present invention. It should be pointed out that, for ordinary technicians in this field, without departing from the concept of the present invention, the above technical features can be freely combined, and several deformations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, all equivalent changes and modifications made to the scope of the claims of the present invention should belong to the scope covered by the claims of the present invention.

Claims

1. A nuclear power plant pipeline plugging device, characterized in that: It comprises a first sealing structure, a second sealing structure and at least four connecting rods (3); Each of the connecting rods (3) is respectively connected to the first sealing structure and the second sealing structure; The first sealing structure is arranged inside the pipe (4) to be blocked, and comprises an elastic first sealing member (10), wherein the first sealing member (10) is used to closely adhere to the inner wall surface of the pipe (4) under the action of an external force; The second sealing structure is arranged at the open end of the pipe (4), the second sealing structure comprises an elastic second sealing member (20), the second sealing member (20) comprises a first portion (201) and a second portion (202) connected to each other, the first portion (201) is located inside the pipe (4) and is used to closely adhere to the inner wall surface of the pipe (4) under the action of an external force, and the second portion (202) is located outside the pipe (4); The cross-sectional dimension of the first portion (201) when not subject to external force is smaller than or equal to the cross-sectional dimension of the pipe (4), and the cross-sectional dimension of the second portion (202) when not subject to external force is larger than the cross-sectional dimension of the pipe (4).

2. The nuclear power plant pipeline plugging device according to claim 1, characterized in that: The cross-sectional dimension of the second sealing member (20) gradually increases in a direction away from the first sealing structure.

3. The nuclear power plant pipeline plugging device according to claim 1, characterized in that: The first sealing structure further comprises a first limiting member (11) and a second limiting member (12); the first sealing member (10) is located between the first limiting member (11) and the second limiting member (12); and each of the connecting rods (3) passes through the first limiting member (11), the first sealing member (10) and the second limiting member (12) in sequence.

4. The nuclear power plant pipeline plugging device according to claim 3, characterized in that: Each of the connecting rods (3) is a screw rod, and the first sealing structure further comprises at least four first nuts (13) and at least four second nuts (14), each of the first nuts (13) being located on a side of the first limiting member (11) away from the first sealing member (10) and being threadedly connected to one of the screw rods, and each of the second nuts (14) being located on a side of the second limiting member (12) away from the first sealing member (10) and being threadedly connected to one of the screw rods.

5. The nuclear power plant pipeline plugging device according to claim 3, characterized in that: The first limiting member (11) and / or the second limiting member (12) is formed with a circle of steps (110) extending in the circumferential direction, and the first sealing member (10) is arranged on the steps (110).

6. The nuclear power plant pipeline plugging device according to claim 1, characterized in that: The second sealing structure further comprises a third limiting member (21) and a fourth limiting member (22), the second sealing member (20) being located between the third limiting member (21) and the fourth limiting member (22), and each of the connecting rods (3) passing through the third limiting member (21), the second sealing member (20) and the fourth limiting member (22) in sequence.

7. The nuclear power plant pipeline plugging device according to claim 6, characterized in that: Each of the connecting rods (3) is a screw rod, and the second sealing structure further comprises at least four third nuts (23) and at least four fourth nuts (24), each of the third nuts (23) being located on a side of the third limiting member (21) away from the second sealing member (20) and being threadedly connected to one of the screw rods, and each of the fourth nuts (24) being located on a side of the fourth limiting member (22) away from the second sealing member (20) and being threadedly connected to one of the screw rods.

8. The nuclear power plant pipeline plugging device according to any one of claims 1 to 7, characterized in that: The diameter of each connecting rod (3) is greater than or equal to 100 mm; and / or, the length of each connecting rod (3) is greater than or equal to 1 m; And / or, the material of each connecting rod (3) is 316L stainless steel.

9. The nuclear power plant pipeline plugging device according to any one of claims 1 to 7, characterized in that: The material of the first sealing member (10) includes at least one of polytetrafluoroethylene and silicone, and the material of the second sealing member (20) includes at least one of polytetrafluoroethylene and silicone.

10. A method for plugging pipelines in a nuclear power plant, characterized in that: The following steps are involved: S1, sequentially inserting a first nut (13), a first stopper (11), a first seal (10), a second stopper (12) and a second nut (14) on a screw rod in the same direction to form a first installation base; S2, moving the first mounting base from the open end of the pipe (4) to be blocked to the inside of the pipe (4), and the second nut (14) is closer to the open end than the first nut (13); S3, moving the second stopper (12) and the second nut (14) relative to the screw in a direction close to the first stopper (11), so that the first sealing member (10) is squeezed by the first stopper (11) and the second stopper (12) to expand radially until the first sealing member (10) is in tight contact with the inner wall surface of the pipe (4); S4, the third nut (23), the third stopper (21), the second sealing member (20), the fourth stopper (22) and the fourth nut (24) are sequentially inserted into the screw rod along the direction from the open end to the second nut (14), and a preset interval is left between the third nut (23) and the second nut (14), the third nut (23), the third stopper (21) and the first part (201) of the second sealing member (20) are located inside the pipe (4), and the second part (202) of the second sealing member (20), the fourth stopper (22) and the fourth nut (24) are located outside the pipe (4), so that the second sealing member (20) is clamped and fixed on the open end; S5. Move the fourth limiting member (22) and the fourth nut (24) relative to the screw in a direction close to the third limiting member (21), so that the second sealing member (20) is squeezed by the third limiting member (21) and the fourth limiting member (22) to expand radially until the first portion (201) of the second sealing member (20) is in tight contact with the inner wall surface of the pipe (4).