Ventilation air-conditioning device and ventilation method for subway station

By designing a separate ventilation and air conditioning system and dynamically adjusting the operating mode, the problems of low utilization, large land and high energy consumption of traditional subway station air conditioning systems are solved, and the energy-saving and efficient operation of the ventilation and air conditioning devices of subway stations are achieved.

CN118960125APending Publication Date: 2024-11-15CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411106118.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When the equipment area of ​​the traditional subway station air conditioning system uses a full-air primary return air conditioning system and a backup multi-connection air conditioning system, the utilization rate is not high, the floor area is large, and the energy consumption is high, and the combined air conditioning unit is not in operation at low load. Convenient for energy conservation.

Method used

A subway station ventilation and air conditioning device is designed, including ventilation devices in public areas, air conditioning devices in equipment areas and spare air conditioning devices in equipment areas. Through the separation design of fresh air duct and exhaust air duct, components such as electric air volume regulating valves and mufflers are used. Combined with season and fire scene judgment, the air conditioning operation mode is dynamically adjusted, the use of traditional combined air conditioning units is cancelled, and the spare air conditioning system in the equipment area is fully utilized.

Benefits of technology

Reduced the floor area of ​​the environmental control room, saved civil engineering and equipment investment, improved the utilization rate of equipment, and realized energy-saving management, solving the problem of high energy consumption, large area and low utilization rate of backup system equipment in traditional technical solutions. question.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118960125A_ABST
    Figure CN118960125A_ABST
Patent Text Reader

Abstract

The invention discloses a subway station ventilation air conditioning device and a ventilation method, the subway station ventilation air conditioning device comprises a public area ventilation device, an equipment area air conditioning device and an equipment area standby air conditioning device, the public area ventilation device comprises a public area fresh air duct for supplying air and a public area exhaust duct for exhausting air and smoke; the equipment area air conditioning device comprises an equipment area air conditioning air supply pipeline for supplying air and an equipment area air conditioning air exhaust pipeline for exhausting air and smoke, and the equipment area standby air conditioning device is arranged in the equipment area; the method comprises the following steps: performing season judgment; when summer is judged, a summer air conditioner operation mode is started; when the transition season is judged, a transition season ventilation operation mode is started; when it is judged that winter exists, a winter fresh air operation mode is started; performing fire scene judgment; when the station hall public area fires, a station hall public area fire operation mode is carried out; and when a fire occurs in the platform public area, a platform public area fire operation mode is performed. Meanwhile, energy-saving management is facilitated, and the occupied area is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of ventilation and air conditioning in urban rail transit, and in particular relates to a ventilation and air conditioning device and a ventilation method for a subway station. Background Art

[0002] The traditional station public area air conditioning system design is a full air return air conditioning system, which is mainly composed of a combined air conditioning unit, a fresh air fan, a return exhaust fan, and a smoke exhaust fan. The station equipment area air conditioning system design is a full air return air conditioning system, which is mainly composed of an air conditioning unit and a return exhaust fan. At the same time, the equipment area air conditioning system uses a multi-split air conditioning system, which is mainly composed of a multi-split air conditioning outdoor unit and an indoor unit. This design has the following problems: First, the equipment area simultaneously considers the full air single return air conditioning system and the backup multi-split air conditioning system. Under normal circumstances, the full air single return air conditioning system is turned on, and the backup multi-split air conditioning system is idle and the utilization rate is not high.

[0003] Secondly, the combined air-conditioning units serving the public areas occupy a large area, which is the main factor leading to the large area of ​​the environmental control room and is not conducive to saving investment.

[0004] Third, the combined air-conditioning units serving the public areas often operate at low load, which is not conducive to energy saving.

[0005] In view of the above problems, it is urgent to develop a feasible, reliable and economical ventilation and air-conditioning design scheme for urban rail transit, which has important value and significance for the construction and operation of urban rail transit. Summary of the invention

[0006] The present invention is proposed to solve the problems existing in the prior art, and its purpose is to provide a subway station ventilation and air-conditioning device and a ventilation method.

[0007] The technical solution of the present invention is: a subway station ventilation and air-conditioning device, including a public area ventilation device, an equipment area air-conditioning device, and an equipment area standby air-conditioning device, the public area ventilation device includes a public area fresh air duct for supplying air to the public area and a public area exhaust duct for exhausting air and smoke from the public area, the equipment area air-conditioning device includes an equipment area air-conditioning supply duct for supplying air to the equipment area and an equipment area air-conditioning exhaust duct for exhausting air and smoke from the equipment area, and the equipment area standby air-conditioning device is arranged in the equipment area.

[0008] Furthermore, the public area includes the station hall public area and the platform public area.

[0009] Furthermore, the public area fresh air duct includes a hall fresh air duct located in the hall public area and a platform fresh air duct located in the platform public area, and both the hall fresh air duct and the platform fresh air duct are provided with air supply outlets.

[0010] Furthermore, the station hall fresh air duct and the platform fresh air duct are connected in parallel to the first fresh air branch, the first fresh air branch passes through the environmental control room and the equipment area, and the first fresh air branch is provided with an air supply fan SF-A1, and the air supply fan SF-A1 is arranged in the environmental control room.

[0011] Furthermore, the public area exhaust duct includes a hall exhaust duct located in the hall public area and a platform exhaust duct located in the platform public area, and both the hall exhaust duct and the platform exhaust duct are provided with exhaust outlets.

[0012] Furthermore, the station hall exhaust duct and the platform exhaust duct are connected in parallel to the first exhaust branch, the first exhaust branch passes through the environmental control room and the equipment area, and the first exhaust branch is provided with an exhaust and smoke exhaust fan PF / PY-A1, and the exhaust and smoke exhaust fan PF / PY-A1 is arranged in the environmental control room.

[0013] Furthermore, the air-conditioning air supply duct of the equipment area is arranged in the environmental control room and the equipment area, and the air-conditioning air supply duct of the equipment area is connected in parallel with the first fresh air branch.

[0014] Furthermore, the air conditioning exhaust duct of the equipment area is arranged in the environmental control room and the equipment area, and the air conditioning exhaust duct of the equipment area is connected in parallel with the first exhaust branch.

[0015] Furthermore, an electric air volume regulating valve DT-A7 connecting the equipment area air conditioning air supply duct and the first fresh air branch is also provided between the two.

[0016] A ventilation method for a subway station ventilation and air conditioning device, comprising the following steps: A. Combine temperature, humidity and time to determine the season; B. When the judgment result is summer, start the summer air conditioning operation mode; C. When the judgment result is transition season, start the transition season ventilation operation mode; D. When the judgment result is winter, start the winter fresh air operation mode; E. Conduct fire scene assessment; F. When a fire occurs in the public area of ​​the station hall, the public area fire operation mode of the station hall shall be implemented; G. When a fire occurs in the platform public area, the platform public area fire operation mode will be implemented.

[0017] The beneficial effects of the present invention are as follows: The present invention eliminates the use of traditional combined air-conditioning units, greatly reduces the floor space of the environmental control room, saves civil engineering and equipment investment, and facilitates operation and management.

[0018] The present invention makes full use of the standby air conditioning system in the equipment area, thereby improving the utilization rate of the equipment.

[0019] The present invention is also beneficial to energy-saving management, and solves the drawbacks of traditional technical solutions such as energy consumption, large floor space occupation, and low utilization rate of standby system equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the structure of the present invention; in: 1 Fresh air shaft 2 Exhaust air shaft 3 Environmental control room 4 Equipment area 5. Hall public area 6. Platform public area 7 Entrance and Exit 8 Air Supply Outlet 9 Exhaust vent Supply fan SF-A1 Exhaust fan PF / PY-A1 Air conditioning unit KT-A1 Exhaust fan PF-A1 Muffler XSQ-A1~XSQ-A6 Electric air volume regulating valve DT-A1~A11 Multi-split outdoor unit DLW-A1 Multi-split indoor unit DLN-A1~ DLN-A3. DETAILED DESCRIPTION

[0021] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments: like Figure 1 As shown, a subway station ventilation and air-conditioning device includes a public area ventilation device, an equipment area air-conditioning device, and an equipment area standby air-conditioning device. The public area ventilation device includes a public area fresh air duct for supplying air to the public area and a public area exhaust duct for exhausting air and smoke from the public area. The equipment area air-conditioning device includes an equipment area air-conditioning supply duct for supplying air to the equipment area 4 and an equipment area air-conditioning exhaust duct for exhausting air and smoke from the equipment area 4. The equipment area standby air-conditioning device is arranged in the equipment area 4.

[0022] The public area includes a station hall public area 5 and a platform public area 6.

[0023] The public area fresh air duct includes a station hall fresh air duct located in the station hall public area 5 and a platform fresh air duct located in the platform public area 6, and both the station hall fresh air duct and the platform fresh air duct are provided with air supply outlets 8.

[0024] The station hall fresh air duct and the platform fresh air duct are connected in parallel to the first fresh air branch, and the first fresh air branch passes through the environmental control room 3 and the equipment area 4. The first fresh air branch is provided with an air supply fan SF-A1, and the air supply fan SF-A1 is arranged in the environmental control room 3.

[0025] The public area exhaust duct includes a station hall exhaust duct located in the station hall public area 5 and a platform exhaust duct located in the platform public area 6. Exhaust outlets 9 are provided in both the station hall exhaust duct and the platform exhaust duct.

[0026] The station hall exhaust duct and the platform exhaust duct are connected in parallel to the first exhaust branch, and the first exhaust branch passes through the environmental control room 3 and the equipment area 4. The first exhaust branch is provided with an exhaust and smoke exhaust fan PF / PY-A1, and the exhaust and smoke exhaust fan PF / PY-A1 is arranged in the environmental control room 3.

[0027] The air-conditioning air supply duct of the equipment area is arranged in the environmental control room 3 and the equipment area 4, and the air-conditioning air supply duct of the equipment area is connected in parallel with the first fresh air branch.

[0028] The equipment area air conditioning exhaust duct is arranged in the environmental control room 3 and the equipment area 4, and the equipment area air conditioning exhaust duct is connected in parallel with the first exhaust branch.

[0029] An electric air volume regulating valve DT-A7 connecting the equipment area air conditioning air supply duct and the first fresh air branch is also provided between the two.

[0030] Specifically, an electric air volume regulating valve DT-A6 connecting the equipment area air conditioning exhaust duct and the first exhaust branch is also provided between the two.

[0031] Specifically, the air supply duct of the equipment area air conditioner and the first fresh air branch are connected in parallel to the fresh air shaft 1, and the fresh air shaft 1 is provided with a muffler XSQ-A2.

[0032] Specifically, the equipment area air conditioning exhaust duct and the first exhaust branch are connected in parallel to the exhaust shaft 2, and the exhaust shaft 2 is provided with a muffler XSQ-A1.

[0033] Specifically, the connection of the fresh air duct in the public area is explained. An electric air volume regulating valve DT-A2 and a muffler XSQ-A4 are also provided in the first fresh air branch. The electric air volume regulating valve DT-A2 and the muffler XSQ-A4 are located in the environmental control room 3. The electric air volume regulating valve DT-A2 and the muffler XSQ-A4 are located on both sides of the air supply fan SF-A1.

[0034] The connection description is given in conjunction with the air conditioning supply duct in the equipment area. The air conditioning supply duct in the equipment area is provided with an electric air volume regulating valve DT-A3, an air conditioning unit KT-A1, and a muffler XSQ-A5. The electric air volume regulating valve DT-A3, the air conditioning unit KT-A1, and the muffler XSQ-A5 are located in the environmental control room 3.

[0035] Specifically, a bypass duct is arranged between the first fresh air branch and the air supply duct of the equipment area air conditioner, and an electric air volume regulating valve DT-A7 is arranged in the bypass duct. The electric air volume regulating valve DT-A7 is connected to one end of the muffler XSQ-A4 and the muffler XSQ-A5.

[0036] Specifically, an electric air volume regulating valve DT-A9 is also provided in the air supply duct of the air conditioner in the equipment area, and the electric air volume regulating valve DT-A9 is located in the equipment area 4.

[0037] Specifically, the connection instruction is provided for the exhaust duct in the public area. The exhaust duct in the public area is provided with an electric air volume regulating valve DT-A1 and a muffler XSQ-A3. The electric air volume regulating valve DT-A1 and the muffler XSQ-A3 are located on both sides of the exhaust and smoke exhaust fan PF / PY-A1, and the electric air volume regulating valve DT-A1 and the muffler XSQ-A3 are located in the environmental control room 3.

[0038] The connection description is given in conjunction with the air conditioning exhaust duct in the equipment area. The air conditioning exhaust duct in the equipment area is provided with an electric air volume regulating valve DT-A5, an exhaust fan PF-A1, a muffler XSQ-A6, and an electric air volume regulating valve DT-A8. The electric air volume regulating valve DT-A5, the exhaust fan PF-A1, and the muffler XSQ-A6 are located in the environmental control room 3, and the electric air volume regulating valve DT-A8 is located in the equipment area 4.

[0039] Specifically, a bypass duct is arranged between the air conditioning exhaust duct of the equipment area and the first exhaust branch, and an electric air volume regulating valve DT-A6 is arranged in the bypass duct. The electric air volume regulating valve DT-A6 is connected to the muffler XSQ-A3 and one end of the muffler XSQ-A6.

[0040] Specifically, a bypass duct is provided between the air supply duct of the equipment area air conditioner and the air exhaust duct of the equipment area air conditioner, and an electric air volume regulating valve DT-A4 is provided in the bypass duct.

[0041] Specifically, an entrance and exit 7 is provided in the public area 5 of the station hall.

[0042] Specifically, the electric air volume regulating valve includes an electric air volume regulating valve for regulating the air duct and an interlocking electric air volume regulating valve for interlocking control.

[0043] Specifically, the interlocking electric air volume regulating valve includes an electric air volume regulating valve DT-A1 and an electric air volume regulating valve DT-A2.

[0044] Specifically, the regulating electric air volume regulating valve includes electric air volume regulating valve DT-A3, electric air volume regulating valve DT-A4, electric air volume regulating valve DT-A5, electric air volume regulating valve DT-A6, electric air volume regulating valve DT-A7, electric air volume regulating valve DT-A8, electric air volume regulating valve DT-A9, electric air volume regulating valve DT-A10, and electric air volume regulating valve DT-A11.

[0045] Specifically, the electric air volume regulating valve DT-A1 is interlocked with the exhaust and smoke exhaust fan PF / PY-A1, and the electric air volume regulating valve DT-A2 is interlocked with the supply fan SF-A1, that is, when starting, the fan is turned on after the electric air volume regulating valve is opened to the right position, and when closing, the electric air volume regulating valve and the fan are closed at the same time.

[0046] Specifically, the ventilation device in the public area and the air conditioning device in the equipment area are also provided with a muffler. The muffler includes mufflers XSQ-A1~XSQ-A6. Mufflers XSQ-A1~XSQ-A6 are used to silence vibration equipment such as fans and air conditioning units to meet the requirements of regulations and environmental assessments on noise.

[0047] More specifically, the muffler XSQ-A1 is arranged at a position of the exhaust air duct close to the exhaust shaft 2, and the muffler XSQ-A2 is arranged at a position of the fresh air duct close to the fresh air shaft 1.

[0048] More specifically, the environmental control room 3 is provided with a silencer XSQ-A3, a silencer XSQ-A4, a silencer XSQ-A5 and a silencer XSQ-A6. The silencer XSQ-A3 is connected to the exhaust and smoke exhaust fan PF / PY-A1, the silencer XSQ-A4 is connected to the supply fan SF-A1, the silencer XSQ-A5 is connected to the air-conditioning unit KT-A1, and the silencer XSQ-A6 is connected to the exhaust fan PF-A1.

[0049] Specifically, the equipment area standby air conditioning device is composed of multi-split air conditioning indoor units DLN-A1~DLN-A3 and outdoor unit DLW-A1. The multi-split indoor units DLN-A1~DLN-A3 are arranged according to the room conditions, and the outdoor unit DLW-A1 is arranged in an open and ventilated place outdoors. When the air conditioning unit KT-A1 system cannot be activated, the equipment area standby air conditioning device is turned on.

[0050] A ventilation method for a subway station ventilation and air conditioning device, comprising the following steps: A. Combine temperature, humidity and time to determine the season; B. When the judgment result is summer, start the summer air conditioning operation mode; C. When the judgment result is transition season, start the transition season ventilation operation mode; D. When the judgment result is winter, start the winter fresh air operation mode; E. Conduct fire scene assessment; F. When there is a fire in the public area 5 of the station hall, the fire operation mode of the public area 5 of the station hall shall be implemented; G. When a fire occurs in the platform public area 6, the platform public area 6 fire operation mode will be implemented.

[0051] Specifically, when the result of step B is summer, the summer air conditioning operation mode is started, and the specific process is as follows: First, turn on the air conditioning unit KT-A1 and exhaust fan PF-A1 in the equipment area; Then, open the electric air volume regulating valve DT-A3, the electric air volume regulating valve DT-A4, the electric air volume regulating valve DT-A6, the electric air volume regulating valve DT-A7, the electric air volume regulating valve DT-A10, and the electric air volume regulating valve DT-A11; Then, turn off the supply fan SF-A1 and the exhaust fan PF / PY-A1; Then, close the electric air volume regulating valve DT-A1, the electric air volume regulating valve DT-A2, the electric air volume regulating valve DT-A5, the electric air volume regulating valve DT-A8, and the electric air volume regulating valve DT-A9 to provide air conditioning services for the public area; Finally, turn on the backup air conditioning system in the equipment area, that is, turn on the multi-split air-conditioning outdoor unit DLW-A1 and indoor units DLN-A1~DLN-A3 to provide air conditioning services for the equipment area and improve the utilization rate of the backup air conditioning system.

[0052] Specifically, when the result of step C is the transition season, the transition season ventilation operation mode is started, and the specific process is as follows: First, turn on the supply fan SF-A1 and the exhaust fan PF / PY-A1; Then, open the electric air volume regulating valve DT-A1, the electric air volume regulating valve DT-A2, the electric air volume regulating valve DT-A10, and the electric air volume regulating valve DT-A11; Then, close the electric air volume regulating valve DT-A6 and the electric air volume regulating valve DT-A7 to provide ventilation services for the public area; Finally, turn on the air-conditioning unit KT-A1 and the exhaust fan PF-A1, open the electric air volume regulating valves DT-A3, DT-A5, DT-A8 and DT-A9, and close the electric air volume regulating valve DT-A4 to provide ventilation services for the equipment area. At this time, the air-conditioning unit KT-A1 only realizes the air supply function.

[0053] Specifically, when the result of step D is winter, the winter fresh air operation mode is started, and the specific process is as follows: First, turn on the blower SF-A1 and the electric air volume regulating valve DT-A2; Then, turn off the exhaust and smoke exhaust fan PF / PY-A1, close the electric air volume regulating valve DT-A1, electric air volume regulating valve DT-A6, electric air volume regulating valve DT-A7, electric air volume regulating valve DT-A10, and electric air volume regulating valve DT-A11 to provide fresh air service for the public area. At this time, the supply fan SF-A1 operates with variable frequency to meet the fresh air needs of the public area personnel; Finally, turn on the air-conditioning unit KT-A1 and the exhaust fan PF-A1, open the electric air volume regulating valves DT-A3, DT-A5, DT-A8 and DT-A9, and close the electric air volume regulating valve DT-A4 to provide ventilation services for the equipment area. At this time, the air-conditioning unit KT-A1 only realizes the air supply function.

[0054] Specifically, in step F, when there is a fire in the public area 5 of the station hall, the fire operation mode of the public area 5 of the station hall is carried out, and the specific process is as follows: Turn on the exhaust and smoke exhaust fan PF / PY-A1, open the electric air volume control valves DT-A1 and DT-A11, and close other equipment and electric air volume control valves to provide smoke exhaust services for the public area of ​​the station hall, and provide air supply at the entrance and exit 7 of the station.

[0055] Specifically, in step G, when there is a fire in the platform public area 6, the platform public area 6 fire operation mode is performed, and the specific process is as follows: Turn on the exhaust and smoke exhaust fan PF / PY-A1, turn on the electric air volume regulating valves DT-A1 and DT-A10, and close other equipment and electric air volume regulating valves to provide smoke exhaust services for the platform public area. At the same time, turn on the station tunnel fan for auxiliary smoke exhaust, and provide air supply at the station's entrance and exit 7.

[0056] The present invention eliminates the use of traditional combined air-conditioning units, greatly reduces the floor space of the environmental control room, saves civil engineering and equipment investment, and facilitates operation and management.

[0057] The present invention makes full use of the standby air conditioning system in the equipment area, thereby improving the utilization rate of the equipment.

[0058] The present invention is also beneficial to energy-saving management, and solves the drawbacks of traditional technical solutions such as energy consumption, large floor space occupation, and low utilization rate of standby system equipment.

Claims

1. A subway station ventilation and air conditioning device, comprising a public area ventilation device, an equipment area air conditioning device, and an equipment area standby air conditioning device, characterized in that: The public area ventilation device comprises a public area fresh air duct for supplying air to the public area and a public area exhaust duct for exhausting air and smoke from the public area. The equipment area air conditioning device comprises an equipment area air conditioning supply duct for supplying air to the equipment area (4) and an equipment area air conditioning exhaust duct for exhausting air and smoke from the equipment area (4). The equipment area standby air conditioning device is arranged in the equipment area (4).

2. A subway station ventilation and air conditioning device according to claim 1, characterized in that: The public area includes a station hall public area (5) and a platform public area (6).

3. A subway station ventilation and air conditioning device according to claim 2, characterized in that: The public area fresh air duct comprises a station hall fresh air duct located in the station hall public area (5) and a platform fresh air duct located in the platform public area (6), and both the station hall fresh air duct and the platform fresh air duct are provided with air supply outlets (8).

4. A subway station ventilation and air conditioning device according to claim 3, characterized in that: The station hall fresh air duct and the platform fresh air duct are connected in parallel to a first fresh air branch, the first fresh air branch passes through an environmental control room (3) and an equipment area (4), and an air supply fan SF-A1 is provided in the first fresh air branch, and the air supply fan SF-A1 is provided in the environmental control room (3).

5. A subway station ventilation and air conditioning device according to claim 4, characterized in that: The public area exhaust duct comprises a station hall exhaust duct located in the station hall public area (5) and a platform exhaust duct located in the platform public area (6), and both the station hall exhaust duct and the platform exhaust duct are provided with exhaust outlets (9).

6. A subway station ventilation and air conditioning device according to claim 5, characterized in that: The station hall exhaust duct and the platform exhaust duct are connected in parallel to a first exhaust branch, the first exhaust branch passes through an environmental control room (3) and an equipment area (4), an exhaust and smoke exhaust fan PF / PY-A1 is provided in the first exhaust branch, and the exhaust and smoke exhaust fan PF / PY-A1 is provided in the environmental control room (3).

7. A subway station ventilation and air conditioning device according to claim 6, characterized in that: The equipment area air conditioning air supply duct is arranged in the environmental control room (3) and the equipment area (4), and the equipment area air conditioning air supply duct is connected in parallel with the first fresh air branch.

8. A subway station ventilation and air conditioning device according to claim 7, characterized in that: The equipment area air conditioning exhaust duct is arranged in the environmental control room (3) and the equipment area (4), and the equipment area air conditioning exhaust duct is connected in parallel with the first exhaust branch.

9. A subway station ventilation and air conditioning device according to claim 8, characterized in that: An electric air volume regulating valve DT-A7 connecting the equipment area air conditioning air supply duct and the first fresh air branch is also provided between the two.

10. A ventilation method for a subway station ventilation and air conditioning device, characterized in that: The following steps are involved: A. Determine the season based on temperature, humidity and time; B. When the judgment result is summer, start the summer air conditioning operation mode; C. When the judgment result is transition season, start the transition season ventilation operation mode; D. When the judgment result is winter, start the winter fresh air operation mode; E. Conduct fire scene judgment; F. In case of fire in the public area (5) of the station hall, the fire operation mode of the public area (5) of the station hall shall be implemented; G. In case of fire in the platform common area (6), the platform common area (6) fire operation mode shall be implemented.