DCS-based coal feeder coal interruption automatic statistical method and system
Through the automatic statistical method combined with edge computing and multi-level architecture, the problem of insufficient real-time and data accuracy in traditional DCS systems in coal mine production is solved, efficient monitoring and early warning of coal cutting by coal feeder, and the intelligence of coal mine production is improved .
Patent Information
- Application Number
- CN202410849774.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-11-15
AI Technical Summary
When traditional DCS systems deal with complex and changeable environmental factors in the coal mine production process, they lack real-time and data accuracy, and cannot effectively conduct real-time monitoring and data analysis, resulting in slow reaction speed and limited data processing capabilities.
Introduce edge computing technology and multi-level architecture, combine classified statistical models, and realize automatic statistics and real-time monitoring of coal cutting by coal feeder through data acquisition and sensing technology, reduce the burden of central control, and use drone survey to generate three-dimensional model data distribution picture.
It significantly improves the real-time nature of the system and data processing accuracy, reduces manual detection errors and reaction delays, realizes stability and continuity monitoring of coal supply, and improves the intelligent management level and production efficiency of coal mine production.
Smart Images

Figure CN118963257A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine environmental protection, and in particular to a DCS-based automatic statistical method and system for coal feeder coal shortage. Background Art
[0002] The current society is in a stage of rapid development of industrial automation and intelligence. As an important energy resource, efficient, safe and intelligent management of coal is particularly important. With the widespread application of distributed control systems (DCS), coal mining enterprises have gradually introduced advanced monitoring and control technologies to improve production efficiency and safety. DCS systems can accurately control and manage various equipment in the production process through real-time data collection and analysis, helping enterprises to achieve intelligent production. However, faced with complex production environments and changeable operating conditions, traditional DCS systems still face certain challenges in processing real-time performance and data accuracy.
[0003] The existing technical solutions mainly rely on manual detection and simple automated monitoring methods, which are difficult to effectively deal with the complex and changeable environmental factors in the coal mine production process. The specific shortcomings are as follows: First, the manual detection error is large, and the operating status of the coal feeder cannot be monitored in real time. Secondly, the traditional automation system reacts slowly when facing emergencies, and cannot provide timely warnings and processing. Finally, the data processing capacity of the existing system is limited, and it is impossible to perform real-time analysis and classification statistics on a large amount of complex data. The present invention introduces edge computing technology, a multi-level architecture, and a classified statistical model to achieve automatic statistics and real-time monitoring of coal feeder coal shortages, effectively improving the real-time performance and data processing accuracy of the system. Summary of the invention
[0004] In view of the problems existing in the existing DCS-based coal feeder coal shortage automatic statistical method and system, the present invention is proposed.
[0005] Therefore, the existing technology cannot perform real-time analysis and classification statistics on a large amount of complex data. The present invention introduces edge computing technology, multi-level architecture and classification statistical model to achieve automatic statistics and real-time monitoring of coal feeder coal shortage, effectively improving the real-time performance and data processing accuracy of the system.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] In a first aspect, an embodiment of the present invention provides a method for automatically counting coal shortages of a coal feeder based on a DCS, which includes establishing a DCS system logic framework, and completing the collection of the positions of each measuring point of the coal feeder through data collection and sensing technology;
[0008] Calculate the average flow of the coal machine based on the collected results, set the logic conditions to detect the state of the coal feeder, and complete the pulse signal counting output by the coal machine;
[0009] The counting results are classified and counted using the classification output statistical model, and the classification statistical results are displayed on the DCS system operation interface. The coal outage trend is analyzed in combination with the data recording and storage function of the DCS system. The coal outage rate is calculated based on the coal outage trend, and the early warning function is set to monitor the automatic statistical differences of coal outages at the coal feeder.
[0010] As a preferred solution of the DCS-based automatic statistical method for coal feeder coal shortage described in the present invention, the establishment of the DCS system logical framework includes processing the coal feeder using the multi-level architecture of the distributed control system, the multi-level architecture includes a field layer, a control layer and a management layer, and the edge computing technology is introduced to pre-process the data of the field layer to reduce the burden of the central control in the DCS system, and the pre-processed results are transmitted to the remote sensing receiver of the drone, the coal feeder site is surveyed, and a data distribution map of the three-dimensional model is generated.
[0011] As a preferred solution of the automatic statistical method for coal feeder coal shortage based on DCS of the present invention, the processing of the coal feeder includes calculating the real-time performance of the coal feeder according to the model parameters in the DCS system, and the specific calculation formula is:
[0012]
[0013] Among them, Q represents the real-time performance of the DCS system, D i represents the data delay of the i-th layer, T i represents the data processing time of the i-th layer, n represents the number of layers, α, β, γ, δ and ∈ represent the parameters of the system real-time model, The integral part representing the real-time performance of the DCS system;
[0014] The preprocessing of the field layer data includes responding to the field layer of the multi-level architecture, and the specific calculation formula of the response is:
[0015]
[0016] Among them, E(t) represents the edge computing result, S i (t) represents the data of the i-th sensor, w i represents the weight of the data, and n represents the number of layers.
[0017] As a preferred solution of the automatic statistical method for coal feeder shortage based on DCS of the present invention, wherein: the on-site survey of the coal feeder includes classifying the integral part of the real-time performance of the DCS system according to the data processing time of the i-th layer;
[0018] like and When ∈1 and ∈2 represent the small threshold range of the parameter, it is suitable for application scenarios that require fast response;
[0019] like and When ∈3 and ∈4 represent the medium threshold range of the parameter, it is suitable for scenarios that need to balance real-time performance and data processing accuracy;
[0020] like and It is suitable for scenarios with low real-time requirements but complex data processing.
[0021] As a preferred solution of the automatic statistical method for coal feeder coal shortage based on DCS of the present invention, the acquisition of the position of each measuring point of the coal feeder includes using a drone for field survey based on the classification result, and obtaining the three-dimensional model coordinates of the current position to implement precise positioning. The specific steps are as follows:
[0022] When it is detected that ∈1 and ∈2 represent the small threshold range of the parameters, the high integral part coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is:
[0023]
[0024] Where M(x, y, z) represents the high integral part coordinates at the coordinates (x, y, z), M represents the model value, R i (x, y, z) represents the data value of the i-th remote sensing point at the coordinates (x, y, z), R i Represents the remote sensing point data value, d i represents the distance from the i-th remote sensing point to the coordinates (x, y, z), σ represents the model parameter, k represents the total number of remote sensing points, x i ,y i and z i represents the spatial coordinates of the i-th remote sensing point, exp represents the natural exponential function;
[0025] When it is detected that ∈3 and ∈4 represent the medium threshold range of the parameters, the medium integral partial coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is:
[0026]
[0027] Among them, ρ represents the influence coefficient of controlling the x-coordinate direction, θ represents the influence coefficient of controlling the y-coordinate direction, μ represents the influence coefficient of controlling the z-coordinate direction, and η i represents the weight correction factor of the i-th remote sensing point, M(x, y, z)′ represents the coordinates of the medium integral part at the coordinate (x, y, z);
[0028] When detected and When the low integral part coordinates of the DCS system real-time performance are calculated, the specific calculation formula is:
[0029]
[0030] in, represents the standard deviation of the model parameters, ζ j represents the data value of the jth additional remote sensing point, χ j Indicates the influence coefficient of controlling the y coordinate direction, υ j represents the influence coefficient controlling the z-coordinate direction, ξ j represents the influence coefficient controlling the x-coordinate direction, l represents the number of additional remote sensing points, and M(x, y, z)″ represents the low-integral part coordinates at the coordinates (x, y, z).
[0031] As a preferred solution of the automatic statistical method for coal feeder coal shortage based on DCS of the present invention, the calculation of the average flow rate of the coal feeder according to the collected results includes the following steps:
[0032] When the real-time performance of the DCS system is in the high integral part coordinate, the specific calculation formula of the average flow is:
[0033]
[0034] Where F(t) represents the average flow rate of the coal feeder at time t when the real-time performance of the DCS system is in the high integral part coordinate, Δt represents the sampling time interval, and f i represents the instantaneous flow rate of the i-th sampling, M(x, y, z) represents the coordinates of the high integral part at the coordinate (x, y, z);
[0035] When the real-time performance of the DCS system is in the medium integral partial coordinate, the specific calculation formula of the average flow is:
[0036]
[0037] Where F(t)' represents the average flow rate of the coal feeder at time t when the DCS system is in the middle integral partial coordinate, M(x, y, z)' represents the middle integral partial coordinate at the coordinate (x, y, z), and f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval;
[0038] When the real-time performance of the DCS system is in the low integral part coordinate, the specific calculation formula of the average flow is:
[0039]
[0040] Wherein, F(t)” represents the average flow of the coal feeder at time t when the DCS system is in the low integral part coordinate in real time, M(x, y, z)” represents the low integral part coordinate at the coordinate (x, y, z), and f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval;
[0041] The logical conditions include logical condition A signal and logical condition B signal, so A signal and B signal must exist at the same time. A signal determines the status of the coal machine outlet door and the coal feeder. If the flow rate detected by B signal is less than 2 tons and lasts for more than 3 seconds, the pulse signal P can be output at this time.
[0042] As a preferred solution of the automatic statistical method for coal feeder outage based on DCS of the present invention, the analysis of coal outage trend in combination with the data recording and storage function of the DCS system includes counting the pulse signal P, and the specific calculation formula of the counting is:
[0043]
[0044] Among them, C represents the cumulative number of coal outages, T represents the total time in the statistical period, and P t represents the pulse signal at time t;
[0045] The automatic statistical difference of monitoring coal feeder coal outage includes classifying and outputting the output pulse signal through a classification module, and the classification output includes outputting the number of coal outages in this shift and the number of coal outages in the next shift. The specific formula of the number of coal outages in this shift is:
[0046]
[0047] Among them, B t Indicates the number of coal outages in the current shift, t indicates the current shift, and T indicates the number of coal outages;
[0048] The specific formula for the number of coal outages per shift is:
[0049]
[0050] Among them, B t-1 It indicates the number of coal outages during the shift, and n+1 indicates the next data point after the last data point of the current shift;
[0051] When the number of coal outages exceeds the threshold value L set by the system, the alarm device will be triggered, otherwise, the coal will be cut off normally.
[0052] In a second aspect, an embodiment of the present invention provides a DCS-based coal feeder coal shortage automatic statistics system, which includes: a collection module, which establishes a DCS system logic framework and completes the collection of the positions of each measuring point of the coal feeder through data collection and sensing technology;
[0053] The calculation module calculates the average flow of the coal machine according to the collected results, sets the logic conditions to detect the state of the coal feeder, and completes the pulse signal counting output by the coal machine;
[0054] The classification statistics module uses the classification output statistical model to classify and count the counting results, calculates the coal outage rate based on the coal outage trend, sets the early warning function, and monitors the automatic statistical differences of coal outages at the coal feeder.
[0055] In a third aspect, an embodiment of the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the processor executes the computer program, any step of the above-mentioned DCS-based automatic statistics method for coal feeder outages is implemented.
[0056] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, any step of the above-mentioned DCS-based automatic statistical method for coal feeder outages is implemented.
[0057] The beneficial effects of the present invention are as follows: the present invention establishes a logical framework based on the DCS system, utilizes data acquisition and sensing technology, edge computing technology and classification statistical models, and realizes automatic detection and real-time statistics of the coal feeder's coal shortage status. Compared with the existing technical solutions, the present invention significantly improves the real-time performance and data processing accuracy of the system, and effectively reduces manual detection errors and response delays. At the same time, through classification statistics and trend analysis, it is possible to accurately monitor and warn of coal shortages, and take timely measures to ensure the stability and continuity of coal supply. The present invention greatly improves the intelligent management level of coal mine production, and improves production efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0059] Figure 1 A specific flow chart of a DCS-based automatic statistics method and system for coal feeder coal shortages provided in one embodiment of the present invention.
[0060] Figure 2 An embodiment of the present invention provides a DCS-based automatic counting method and system for coal feeder coal outages, which originally uses manual counting to count the number of coal feeder coal outages.
[0061] Figure 3An embodiment of the present invention provides a DCS-based automatic statistics method for coal feeder coal shortages and a coal feeder coal shortage statistics shift output logic diagram of the system.
[0062] Figure 4 An existing coal feeder coal shortage statistics chart of an automatic coal feeder coal shortage statistics method and system based on DCS is provided as an embodiment of the present invention. DETAILED DESCRIPTION
[0063] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0064] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0065] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0066] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0067] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0068] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0069] Example 1
[0070] Reference Figure 1 to Figure 4 , which is the first embodiment of the present invention, and provides a method for automatically counting coal shortages of a coal feeder based on a DCS, comprising:
[0071] S1: Establish the DCS system logic framework and complete the collection of the positions of each measuring point of the coal feeder through data acquisition and sensing technology.
[0072] Among them, establishing the logical framework of the DCS system includes using the multi-level architecture of the distributed control system to process the coal feeder. The multi-level architecture includes the field layer, control layer and management layer. The edge computing technology is introduced to pre-process the data of the field layer to reduce the burden of the central control in the DCS system. The pre-processed results are transmitted to the remote sensing receiver of the drone, the coal feeder site is surveyed, and a data distribution map of the three-dimensional model is generated.
[0073] S1.1: Processing the coal feeder includes calculating the real-time performance of the coal feeder according to the model parameters in the DCS system. The specific calculation formula is:
[0074]
[0075] Among them, Q represents the real-time performance of the DCS system, D i represents the data delay of the i-th layer, T i represents the data processing time of the i-th layer, n represents the number of layers, α, β, γ, δ and ∈ represent the parameters of the system real-time model, The integral part representing the real-time performance of the DCS system;
[0076] Preprocessing the data at the field layer includes responding to the field layer of the multi-level architecture. The specific calculation formula for the response is:
[0077]
[0078] Among them, E(t) represents the edge computing result, S i (t) represents the data of the i-th sensor, w i represents the weight of the data, and n represents the number of layers.
[0079] Furthermore, the present invention establishes a DCS system logical framework and utilizes a multi-level architecture of a distributed control system to process the coal feeder. The multi-level architecture includes a field layer, a control layer, and a management layer, and introduces edge computing technology to pre-process the data at the field layer. For example, the data collected by the sensors at the field layer is pre-processed by an edge computing device, and then the pre-processing results are transmitted to the remote sensing receiver of the drone, so as to survey the coal feeder site and generate a data distribution map of the three-dimensional model. In the specific processing process, it is assumed that the system has three layers, the data delay of the first layer is 0.5 seconds, the data processing time is 0.2 seconds, the data delay of the second layer is 0.3 seconds, the data processing time is 0.1 seconds, the data delay of the third layer is 0.4 seconds, the data processing time is 0.15 seconds, and the overall real-time performance reaches 1.65 seconds. For the data preprocessing of the field layer, it is assumed that there are 5 sensors, the data are 10, 20, 15, 25, and 30 respectively, and the data weights are 0.1, 0.2, 0.15, 0.25, and 0.3 respectively. The edge computing result after processing is 22.5. The processed data is more accurate, which effectively improves the real-time performance and data processing efficiency of the system and reduces the burden of central control in the DCS system. The real-time performance and edge computing result data of the DCS system are shown in Table 1 below:
[0080] Table 1 DCS system real-time performance and edge computing results data display table
[0081]
[0082] The table shows the data delay and data processing time at each level when the DCS system processes the coal feeder data. The overall real-time performance is 1.65 seconds. At the same time, the table also lists the data of five sensors and their corresponding weights, and calculates the edge computing results. The total preprocessing result is 22.5. Through multi-level architecture and edge computing technology, the present invention effectively improves the real-time performance and data processing efficiency of the system.
[0083] S1.2: Conducting a site survey of the coal feeder includes classifying the integral part of the real-time performance of the DCS system according to the data processing time of the i-th layer;
[0084] like and When ∈1 and ∈2 represent the small threshold range of the parameter, it is suitable for application scenarios that require fast response;
[0085] like and When ∈3 and ∈4 represent the medium threshold range of the parameter, it is suitable for scenarios that need to balance real-time performance and data processing accuracy;
[0086] like and It is suitable for scenarios with low real-time requirements but complex data processing.
[0087] S1.3: The collection of the locations of each measuring point of the coal feeder includes using a drone for field survey based on the classification results, obtaining the three-dimensional model coordinates of the current location, and implementing precise positioning. The specific steps are as follows:
[0088] When it is detected that ∈1 and ∈2 represent the small threshold range of the parameters, the high integral part coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is:
[0089]
[0090] Among them, M(x, y, z) represents the high integral part coordinates at the coordinate (x, y, z0), M represents the model value, R i (x, y, z) represents the data value of the i-th remote sensing point at the coordinates (x, y, z), R i Represents the remote sensing point data value, d i represents the distance from the i-th remote sensing point to the coordinates (x, y, z), σ represents the model parameter, k represents the total number of remote sensing points, x i ,y i and z i represents the spatial coordinates of the i-th remote sensing point, exp represents the natural exponential function;
[0091] When it is detected that ∈3 and ∈4 represent the medium threshold range of the parameters, the medium integral partial coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is:
[0092]
[0093] Among them, ρ represents the influence coefficient of controlling the x-coordinate direction, θ represents the influence coefficient of controlling the y-coordinate direction, μ represents the influence coefficient of controlling the z-coordinate direction, and η i represents the weight correction factor of the i-th remote sensing point, M(x, y, z)′ represents the coordinates of the medium integral part at the coordinate (x, y, z);
[0094] When detected and When the low integral part coordinates of the DCS system real-time performance are calculated, the specific calculation formula is:
[0095]
[0096] in, represents the standard deviation of the model parameters, ζ j represents the data value of the jth additional remote sensing point, χ j Indicates the influence coefficient of controlling the y coordinate direction, υ jrepresents the influence coefficient controlling the z-coordinate direction, ξ j represents the influence coefficient controlling the x-coordinate direction, l represents the number of additional remote sensing points, and M(x, y, z)″ represents the low-integral part coordinates at the coordinates (x, y, z).
[0097] S2: Calculate the average flow of the coal machine based on the collected results, set the logic conditions to detect the state of the coal feeder, and complete the pulse signal counting output by the coal machine.
[0098] Calculating the average flow rate of the coal machine according to the collected results includes the following steps:
[0099] When the real-time performance of the DCS system is in the high integral part coordinate, the specific calculation formula for the average flow is:
[0100]
[0101] Where F(t) represents the average flow rate of the coal feeder at time t when the real-time performance of the DCS system is in the high integral part coordinate, Δt represents the sampling time interval, and f i represents the instantaneous flow rate of the i-th sampling, M(x, y, z) represents the coordinates of the high integral part at the coordinate (x, y, z);
[0102] When the real-time performance of the DCS system is in the medium integral part coordinate, the specific calculation formula for the average flow is:
[0103]
[0104] Where F(t)' represents the average flow rate of the coal feeder at time t when the DCS system is in the middle integral partial coordinate, M(x, y, z)' represents the middle integral partial coordinate at the coordinate (x, y, z), and f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval;
[0105] When the real-time performance of the DCS system is in the low integral part coordinate, the specific calculation formula for the average flow is:
[0106]
[0107] Wherein, F(t)” represents the average flow of the coal feeder at time t when the DCS system is in the low integral part coordinate in real time, M(x, y, z)” represents the low integral part coordinate at the coordinate (x, y, z), and f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval;
[0108] The logical conditions include the logical condition A signal and the logical condition B signal. The A signal and the B signal must exist at the same time. The A signal determines the status of the coal machine outlet door and the coal feeder. If the flow rate detected by the B signal is less than 2 tons and lasts for more than 3 seconds, the pulse signal P can be output.
[0109] S3: Use the classification output statistical model to classify and count the counting results, and display the classification statistical results on the DCS system operation interface. Combined with the data recording and storage function of the DCS system, the coal outage trend is analyzed, and the coal outage rate is calculated based on the coal outage trend. The early warning function is set to monitor the automatic statistical differences of coal feeder coal outage.
[0110] Among them, combining the data recording and storage function of the DCS system to analyze the coal shortage trend includes counting the pulse signal P. The specific calculation formula for counting is:
[0111]
[0112] Among them, C represents the cumulative number of coal outages, T represents the total time in the statistical period, and P t represents the pulse signal at time t;
[0113] The automatic statistical difference of coal feeder outage monitoring includes classification output through the classification module based on the output pulse signal. The classification output includes the output of the number of coal outages in this shift and the number of coal outages in the next shift. The specific formula for the number of coal outages in this shift is:
[0114]
[0115] Among them, B t Indicates the number of coal outages in the current shift, t indicates the current shift, and T indicates the number of coal outages;
[0116] The specific formula for the number of coal outages during a shift is:
[0117]
[0118] Among them, B t-1 It indicates the number of coal outages during the shift, and n+1 indicates the next data point after the last data point of the current shift;
[0119] When the number of coal outages exceeds the threshold value L set by the system, the alarm device will be triggered, otherwise, the coal will be cut off normally.
[0120] In a preferred embodiment, a DCS-based automatic statistics system for coal feeder coal shortage includes a collection module, which establishes a DCS system logic framework and completes the collection of the positions of each measuring point of the coal feeder through data collection and sensor technology;
[0121] The calculation module calculates the average flow of the coal machine according to the collected results, sets the logic conditions to detect the state of the coal feeder, and completes the pulse signal counting output by the coal machine;
[0122] The classification statistics module uses the classification output statistical model to classify and count the counting results, calculates the coal outage rate based on the coal outage trend, sets the early warning function, and monitors the automatic statistical differences of coal outages at the coal feeder.
[0123] The above-mentioned unit modules may be embedded in or independent of a processor in a computer device in the form of hardware, or may be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to the above-mentioned modules.
[0124] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0125] In summary, by establishing a logical framework based on the DCS system and utilizing data acquisition and sensing technology, edge computing technology and classification statistical models, automatic detection and real-time statistics of the coal feeder's coal shortage status are realized. Compared with the existing technical solutions, the present invention significantly improves the real-time performance and data processing accuracy of the system, and effectively reduces manual detection errors and response delays. At the same time, through classification statistics and trend analysis, it is possible to accurately monitor and warn of coal shortages, and take timely measures to ensure the stability and continuity of coal supply. The present invention has greatly improved the intelligent management level of coal mine production and improved production efficiency and safety.
[0126] Example 2
[0127] Reference Figure 1 to Figure 4 , which is the second embodiment of the present invention, and this embodiment provides an automatic statistical method for coal feeder coal shortage based on DCS. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.
[0128] Combining the data recording and storage function of the DCS system to analyze the coal shortage trend includes counting the pulse signal P. The specific calculation formula for counting is:
[0129]
[0130] Among them, C represents the cumulative number of coal outages, T represents the total time in the statistical period, and P t represents the pulse signal at time t;
[0131] The automatic statistical difference of coal feeder outage monitoring includes classification output through the classification module based on the output pulse signal. The classification output includes the output of the number of coal outages in this shift and the number of coal outages in the next shift. The specific formula for the number of coal outages in this shift is:
[0132]
[0133] Among them, B t Indicates the number of coal outages in the current shift, t indicates the current shift, and T indicates the number of coal outages;
[0134] The specific formula for the number of coal outages during a shift is:
[0135]
[0136] Among them, B t-1 It indicates the number of coal outages during the shift, and n+1 indicates the next data point after the last data point of the current shift;
[0137] When the number of coal outages exceeds the threshold value L set by the system, the alarm device will be triggered, otherwise, the coal will be cut off normally.
[0138] Furthermore, the selection of the threshold of 10 coal outages is based on a comprehensive evaluation of the production process and equipment operation and experience summary. This threshold not only takes into account the typical coal outage frequency during normal equipment operation, but also takes into account the increase in coal outages that may be caused by equipment failure or abnormal operation. By setting such a threshold, potential problems can be captured in a timely manner while ensuring system stability, avoiding excessive interference with the production process due to short-term fluctuations. This setting not only helps to optimize the operating efficiency and reliability of the equipment, but also improves the effectiveness of production monitoring and management, ensuring that the production process is always in a safe and efficient state. The threshold of coal outages is shown in Table 2 below:
[0139] Table 2 Coal outage threshold data table
[0140] category data Typical coal failure frequency range 5 to 15 times / shift Setting Thresholds 10 times Data analysis basis Historical data analysis and production practice experience Purpose Balance alert sensitivity and system stability to ensure timely response to real problems and avoid false alarms Specific data examples For example, shift 1: 7, shift 2: 9, shift 3: 11, shift 4: 8, shift 5: 12
[0141] This table summarizes the background and basis for selecting the coal outage threshold of 10 times. Based on historical data analysis and production practice experience, the typical coal outage frequency range is determined to be between 5 and 15 times per shift. The purpose of setting the threshold to 10 times is to effectively capture possible coal outages caused by equipment failures or abnormal operations while maintaining system stability, so as to respond and handle them in a timely manner, while avoiding unnecessary interference or false alarms caused by short-term fluctuations. A comparison with the existing technology is shown in Table 3 below:
[0142] Table 3 Comparison with prior art
[0143]
[0144] The technical solution of the present invention has obvious advantages over the existing technology. By introducing edge computing technology, real-time models and three-dimensional model remote sensing technology, it improves data processing efficiency and real-time monitoring capabilities, enhances the accuracy and prediction capabilities of coal outage statistics, and realizes automatic statistics and early warning of coal outages, reduces manual intervention and false alarms, and significantly improves equipment stability and reliability.
[0145] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A DCS-based automatic statistical method for coal feeder coal shortage, characterized by: include, Establish the DCS system logic framework and complete the collection of the position of each measuring point of the coal feeder through data collection and sensor technology; Calculate the average flow of the coal machine based on the collected results, set the logic conditions to detect the state of the coal feeder, and complete the pulse signal counting output by the coal machine; The counting results are classified and counted using the classification output statistical model, and the classification statistical results are displayed on the DCS system operation interface. The coal outage trend is analyzed in combination with the data recording and storage function of the DCS system. The coal outage rate is calculated based on the coal outage trend, and the early warning function is set to monitor the automatic statistical differences of coal outages at the coal feeder.
2. The DCS-based automatic counting method for coal feeder coal shortages according to claim 1, characterized in that: The establishment of the DCS system logical framework includes utilizing the multi-level architecture of the distributed control system to process the coal feeder. The multi-level architecture includes a field layer, a control layer, and a management layer. Edge computing technology is introduced to pre-process the data of the field layer to reduce the burden of the central control in the DCS system. The pre-processed results are transmitted to the remote sensing receiver of the drone, the coal feeder site is surveyed, and a data distribution map of the three-dimensional model is generated.
3. The DCS-based automatic counting method for coal feeder coal shortage as claimed in claim 2, characterized in that: The processing of the coal feeder includes calculating the real-time performance of the coal feeder according to the model parameters in the DCS system. The specific calculation formula is: Among them, Q represents the real-time performance of the DCS system, D i represents the data delay of the i-th layer, T i represents the data processing time of the i-th layer, n represents the number of layers, α, β, γ, δ and ∈ represent the parameters of the system real-time model, The integral part representing the real-time performance of the DCS system; The preprocessing of the field layer data includes responding to the field layer of the multi-level architecture, and the specific calculation formula of the response is: Among them, E(t) represents the edge computing result, S i (t) represents the data of the i-th sensor, w i represents the weight of the data, and n represents the number of layers.
4. The DCS-based automatic counting method for coal feeder coal shortage as claimed in claim 3, characterized in that: The on-site investigation of the coal feeder includes classifying the integral part of the real-time performance of the DCS system according to the data processing time of the i-th layer; like and When ∈1 and ∈2 represent the small threshold range of the parameter, it is suitable for application scenarios that require fast response; like and When ∈3 and ∈4 represent the medium threshold range of the parameter, it is suitable for scenarios that need to balance real-time performance and data processing accuracy; like and It is suitable for scenarios with low real-time requirements but complex data processing.
5. The DCS-based automatic counting method for coal feeder coal shortage as claimed in claim 4, characterized in that: The acquisition of the position of each measuring point of the coal feeder includes using a drone for field survey based on the classification results, obtaining the three-dimensional model coordinates of the current position, and implementing precise positioning. The specific steps are as follows: When it is detected that ∈1 and ∈2 represent the small threshold range of the parameters, the high integral part coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is: Where M(x, y, z) represents the high integral part coordinates at the coordinates (x, y, z), M represents the model value, R i (x, y, z) represents the data value of the i-th remote sensing point at the coordinates (x, y, z), R i Represents the remote sensing point data value, d i represents the distance from the i-th remote sensing point to the coordinates (x, y, z), σ represents the model parameter, k represents the total number of remote sensing points, x i ,y i and z i represents the spatial coordinates of the i-th remote sensing point, exp represents the natural exponential function; When it is detected that ∈3 and ∈4 represent the medium threshold range of the parameters, the medium integral partial coordinates of the real-time performance of the DCS system are calculated. The specific calculation formula is: Among them, ρ represents the influence coefficient of controlling the x-coordinate direction, θ represents the influence coefficient of controlling the y-coordinate direction, μ represents the influence coefficient of controlling the z-coordinate direction, and η i represents the weight correction factor of the i-th remote sensing point, M(x, y, z)′ represents the coordinates of the medium integral part at the coordinate (x, y, z); When detected and When the low integral part coordinates of the DCS system real-time performance are calculated, the specific calculation formula is: in, represents the standard deviation of the model parameters, ζ j represents the data value of the jth additional remote sensing point, χ j Indicates the influence coefficient of controlling the y-coordinate direction, υ j represents the influence coefficient controlling the z-coordinate direction, ξ j represents the influence coefficient controlling the x-coordinate direction, l represents the number of additional remote sensing points, and M(x, y, z)″ represents the low-integral part coordinates at the coordinates (x, y, z).
6. The DCS-based automatic counting method for coal feeder coal shortage as claimed in claim 5, characterized in that: Calculating the average flow rate of the coal machine according to the collected results includes the following steps: When the real-time performance of the DCS system is in the high integral part coordinate, the specific calculation formula of the average flow is: Where F(t) represents the average flow rate of the coal feeder at time t when the real-time performance of the DCS system is in the high integral part coordinate, Δt represents the sampling time interval, and f i represents the instantaneous flow rate of the i-th sampling, M(x, y, z) represents the coordinates of the high integral part at the coordinate (x, y, z); When the real-time performance of the DCS system is in the medium integral partial coordinate, the specific calculation formula of the average flow is: Where F(t)' represents the average flow rate of the coal feeder at time t when the DCS system is in the middle integral partial coordinate, M(x, y, z)' represents the middle integral partial coordinate at the coordinate (x, y, z), and f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval; When the real-time performance of the DCS system is in the low integral part coordinate, the specific calculation formula of the average flow is: Among them, F(t)” represents the coal feeder at time t when the real-time performance of the DCS system is in the low integral part coordinate” The mean flow, M(x, y, z) represents the low integral partial coordinates at the coordinates (x, y, z), f i represents the instantaneous flow rate of the i-th sampling, and Δt represents the sampling time interval; The logical conditions include logical condition A signal and logical condition B signal, so A signal and B signal must exist at the same time. A signal determines the status of the coal machine outlet door and the coal feeder. If the flow rate detected by B signal is less than 2 tons and lasts for more than 3 seconds, the pulse signal P can be output at this time.
7. The DCS-based automatic counting method for coal feeder coal shortage according to claim 6, characterized in that: The analysis of the coal shortage trend in combination with the data recording and storage function of the DCS system includes counting the pulse signal P. The specific calculation formula of the counting is: Among them, C represents the cumulative number of coal outages, T represents the total time in the statistical period, and P t represents the pulse signal at time t; The automatic statistical difference of monitoring coal feeder coal outage includes classifying and outputting the output pulse signal through a classification module, and the classification output includes outputting the number of coal outages in this shift and the number of coal outages in the next shift. The specific formula of the number of coal outages in this shift is: Among them, B t Indicates the number of coal outages in the current shift, t indicates the current shift, and T indicates the number of coal outages; The specific formula for the number of coal outages per shift is: Among them, B t-1 It indicates the number of coal outages during the shift, and n+1 indicates the next data point after the last data point of the current shift; When the number of coal outages exceeds the threshold value L set by the system, the alarm device will be triggered, otherwise, the coal will be cut off normally.
8. A DCS-based automatic counting system for coal feeder outages, based on the DCS-based automatic counting method for coal feeder outages according to any one of claims 1 to 7, characterized in that: include, The acquisition module establishes the DCS system logic framework and completes the acquisition of the positions of each measuring point of the coal feeder through data acquisition and sensor technology; The calculation module calculates the average flow of the coal machine according to the collected results, sets the logic conditions to detect the state of the coal feeder, and completes the pulse signal counting output by the coal machine; The classification statistics module uses the classification output statistical model to classify and count the counting results, calculates the coal outage rate based on the coal outage trend, sets the early warning function, and monitors the automatic statistical differences of coal outages at the coal feeder.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the automatic statistical method for coal feeder shortage based on DCS according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the automatic statistical method for coal feeder shortage based on DCS according to any one of claims 1 to 7 are implemented.
