Balanced gas supply strategy determination method, system, equipment and medium
Through the determination method of balanced gas supply strategy based on uniform coefficients, the problem of supply in the natural gas market in the heating season is solved. Through the optimization of multi-dimensional gas supply strategy and steady-state calculation, the rational allocation of natural gas demand and efficient utilization of resources are achieved, reducing the Air supply error and economic loss.
Patent Information
- Application Number
- CN202410956563.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-15
AI Technical Summary
The problem of supply in the natural gas market in the heating season is mainly due to insufficient estimates of demand growth, limited gas storage facilities and weak pipeline connectivity, resulting in a severe peak-shaving and supply-saving situation.
The equilibrium gas supply strategy determination method based on different uniform coefficients is used to determine the relationship between the hourly, daily and monthly pipeline gas transmission volume and the gas recovery volume of the gas storage by preset linear relationship sets, and the gas supply strategy is allocated, and the steady-state calculation is used. and peak scheduling analysis model optimize gas supply strategy.
Determine the gas supply strategy through a multi-dimensional way, reduce gas supply errors, rationally allocate resources, reduce economic losses, and improve the applicability and efficiency of the gas supply strategy.
Smart Images

Figure CN118966622A_ABST
Abstract
Description
Background Art
[0002] In recent years, in order to promote the rapid growth of natural gas demand, the natural gas market has been in short supply during the winter heating season. Many gas companies have introduced emergency measures such as gas restrictions and gas cuts for some industrial users to ensure the use of gas for residents. The main reasons for this phenomenon are insufficient estimates of the growth of natural gas market demand, limited gas storage facilities, and weak connectivity of the pipeline network, which have led to a more severe peak-shaving and supply guarantee situation during the natural gas heating season. Summary of the invention
[0003] The technical problem to be solved by the present invention is to address the deficiencies of the prior art and specifically provide a method, system, device and medium for determining a balanced gas supply strategy, as follows:
[0004] 1) In the first aspect, the present invention provides a method for determining a balanced gas supply strategy based on different uniformity coefficients, and the specific technical solution is as follows:
[0005] Determine at least one of the hourly pipeline gas delivery, daily pipeline gas delivery, and monthly pipeline gas delivery of any pipeline to be allocated, and determine one of the hourly gas storage gas production, daily gas storage gas production, and monthly gas storage gas production corresponding to any pipeline based on a preset linear relationship set;
[0006] Based on the determination result, a gas supply strategy is allocated;
[0007] Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
[0008] The beneficial effects of a method for determining a balanced gas supply strategy based on different uniformity coefficients provided by the present invention are as follows:
[0009] Determining the gas supply strategy in a multi-dimensional (hourly, daily, and monthly) manner can improve the applicability of the strategy. That is, reasonable strategy allocation based on actual needs, such as the need to adjust the daily gas supply, can significantly reduce the gas supply error, while meeting the demand with the least resources and reducing economic losses.
[0010] Based on the above solution, the present invention can also be improved as follows.
[0011] Furthermore, the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage gas production volume is determined in the following manner:
[0012] The peak load scheduling analysis model under the hourly uneven coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume.
[0013] Furthermore, the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume is determined in the following manner:
[0014] The peak load scheduling analysis model under the daily non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume.
[0015] Furthermore, the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume is determined in the following manner:
[0016] The peak load scheduling analysis model under the monthly non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume.
[0017] Furthermore, the peak load scheduling analysis model is specifically:
[0018] Determine the corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline storage volume at the end of gas storage, and the pipeline storage volume at the beginning of gas storage;
[0019] Determine the corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well;
[0020] According to the correspondence between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage and the pipeline inventory at the beginning of gas storage, as well as the correspondence between the cumulative gas production volume of the gas storage and the gas production volume of a single well, the basic simulation model is corrected to obtain an initial simulation model, which is used as the peak-shaving scheduling analysis model.
[0021] Furthermore, it also includes:
[0022] The validity of the initial simulation model is verified to obtain a verified simulation model, and the verified simulation model is used as the peak-shaving scheduling analysis model.
[0023] Furthermore, the process of allocating the gas supply strategy based on the determination result is specifically as follows:
[0024] According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
[0025] 2) In the second aspect, the present invention also provides a system for determining a balanced gas supply strategy based on different uniformity coefficients, and the specific technical solution is as follows:
[0026] The confirmation module is used to: determine at least one of the hourly pipeline gas transmission volume, the daily pipeline gas transmission volume, and the monthly pipeline gas transmission volume of any pipeline to be allocated, and determine one of the hourly gas storage gas production volume, the daily gas storage gas production volume, and the monthly gas storage gas production volume corresponding to any pipeline based on a preset linear relationship set;
[0027] The allocation module is used to: allocate a gas supply strategy based on the determination result;
[0028] Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
[0029] Based on the above solution, the present invention can also be improved as follows.
[0030] Furthermore, the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage gas production volume is determined in the following manner:
[0031] The peak load scheduling analysis model under the hourly uneven coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume.
[0032] Furthermore, the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume is determined in the following manner:
[0033] The peak load scheduling analysis model under the daily non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume.
[0034] Furthermore, the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume is determined in the following manner:
[0035] The peak load scheduling analysis model under the monthly non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume.
[0036] Furthermore, the peak load scheduling analysis model is specifically:
[0037] Determine the corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline storage volume at the end of gas storage, and the pipeline storage volume at the beginning of gas storage;
[0038] Determine the corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well;
[0039] According to the correspondence between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage and the pipeline inventory at the beginning of gas storage, as well as the correspondence between the cumulative gas production volume of the gas storage and the gas production volume of a single well, the basic simulation model is corrected to obtain an initial simulation model, which is used as the peak-shaving scheduling analysis model.
[0040] Furthermore, it also includes:
[0041] The verification module is used to verify the validity of the initial simulation model to obtain a verified simulation model, and use the verified simulation model as the peak-shaving scheduling analysis model.
[0042] Furthermore, the process of allocating the gas supply strategy based on the determination result is specifically as follows:
[0043] According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
[0044] 3) In a third aspect, the present invention further provides an electronic device, comprising a processor, wherein the processor is coupled to a memory, wherein the memory stores at least one computer program, and wherein the at least one computer program is loaded and executed by the processor so that the electronic device implements any of the above methods.
[0045] 4) In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein at least one computer program is stored in the computer-readable storage medium, and the at least one computer program is loaded and executed by a processor so that a computer implements any of the above methods.
[0046] It should be noted that the beneficial effects achieved by the technical solutions of the second to fourth aspects of the present invention and the corresponding possible implementation methods can be found in the above-mentioned technical effects of the first aspect and its corresponding possible implementation methods, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0048] Figure 1 A flow chart of a method for determining a balanced gas supply strategy based on different uniformity coefficients according to an embodiment of the present invention;
[0049] Figure 2 A schematic diagram of a curve showing the relationship between pipeline gas transmission capacity and gas storage gas production capacity of a method for determining a balanced gas supply strategy based on different uniformity coefficients according to an embodiment of the present invention;
[0050] Figure 3 A schematic diagram of changes in pipe storage over time within a single day of a method for determining a balanced gas supply strategy based on different uniformity coefficients according to an embodiment of the present invention;
[0051] Figure 4 A schematic diagram of the change of pipeline pressure over time within a single day in a method for determining a balanced gas supply strategy based on different uniformity coefficients according to an embodiment of the present invention;
[0052] Figure 5 The present invention is a structural framework diagram of an electronic device. DETAILED DESCRIPTION
[0053] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0054] like Figure 1 As shown, a method for determining a balanced gas supply strategy based on different uniformity coefficients according to an embodiment of the present invention includes the following steps:
[0055] S1, determining at least one of the hourly pipeline gas transmission volume, the daily pipeline gas transmission volume, and the monthly pipeline gas transmission volume of any pipeline to be allocated, and determining one of the hourly gas storage gas production volume, the daily gas storage gas production volume, and the monthly gas storage gas production volume corresponding to any pipeline based on a preset linear relationship set;
[0056] S2, allocating a gas supply strategy based on the determination result;
[0057] Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
[0058] The beneficial effects of a method for determining a balanced gas supply strategy based on different uniformity coefficients provided by the present invention are as follows:
[0059] Determining the gas supply strategy in a multi-dimensional (hourly, daily, and monthly) manner can improve the applicability of the strategy. That is, reasonable strategy allocation based on actual needs, such as the need to adjust the daily gas supply, can significantly reduce the gas supply error, while meeting the demand with the least resources and reducing economic losses.
[0060] Any pipeline to be distributed refers to any pipe section that needs to be called in the overall gas transportation process.
[0061] The hourly pipeline gas supply volume, daily pipeline gas supply volume and monthly pipeline gas supply volume are obtained through hourly statistics, daily statistics and monthly statistics, that is, the gas supply volume of any pipeline section is counted in units of one hour, and the daily pipeline gas supply volume is counted in units of one day, and can also be counted by the hourly pipeline gas supply volume. Similarly, the monthly pipeline gas supply volume is counted in units of months, and can also be counted by the daily pipeline gas supply volume or the hourly pipeline gas supply volume.
[0062] The specific relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume is:
[0063]
[0064] Where: y is the gas volume of the gas storage, m 3 / d; x1 is the pipeline gas volume; m 3 / d, x1 is determined by multiplying the monthly non-uniformity coefficient K1 by the monthly pipeline gas transmission volume. The monthly non-uniformity coefficient is mainly affected by climatic conditions. The gas consumption peak generally occurs in winter, while the gas consumption valley occurs in summer. The monthly non-uniformity coefficient K1 is determined as follows:
[0065]
[0066] Where: K1 is the monthly non-uniformity coefficient; is the historical average daily gas consumption for that month; is the average daily gas consumption in historical years.
[0067] The specific relationship between daily pipeline gas transmission volume and daily gas storage gas production volume is:
[0068]
[0069] Where: y is the gas volume of the gas storage, m 3 / d; x2 is the pipeline gas volume; m 3 / d, x2 is determined by multiplying the daily unevenness coefficient K2 by the daily pipeline gas volume. The daily unevenness coefficient is related to the living habits of residents, the resting patterns of industrial enterprises and the changes in outdoor temperature. Through the analysis of historical gas data of users, it is found that during weekends and holidays, the peak load is significantly reduced due to the vacation of gas users. The daily unevenness coefficient K2 is determined as follows:
[0070]
[0071] Where: K2 is the daily non-uniformity coefficient; It is the average daily gas consumption in a certain month in history; Q1 is the gas consumption on a certain day in the month.
[0072] The specific correspondence between hourly pipeline gas transmission volume and hourly gas storage gas production volume is:
[0073]
[0074] Where: y is the gas volume of the gas storage, m 3 / d; x3 is the pipeline gas volume; m 3 / d, x3 is determined by multiplying the hourly uneven coefficient K3 by the hourly pipeline gas volume. The hourly unevenness of different types of residents is the greatest, and the degree of unevenness is related to factors such as the number of gas users, living habits, types and quantity of gas appliances, and user occupations. Generally, there are three peaks of gas consumption in the morning, afternoon, and evening. The hourly uneven coefficient K3 is determined as follows:
[0075]
[0076] Where: K3 is the hourly non-uniformity coefficient; Q SThe gas consumption in a certain hour of the day.
[0077] S2, based on the determination result, the specific process of allocating the gas supply strategy is as follows:
[0078] According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
[0079] The preset database contains target gas supply strategies corresponding to different ranges.
[0080] The range corresponding to the result is searched in the preset database, and the corresponding target gas supply strategy is determined according to the range.
[0081] Furthermore, the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage gas production volume is determined in the following manner:
[0082] The peak load scheduling analysis model under the hourly uneven coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume.
[0083] Furthermore, the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume is determined in the following manner:
[0084] The peak load scheduling analysis model under the daily non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume.
[0085] Furthermore, the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume is determined in the following manner:
[0086] The peak load scheduling analysis model under the monthly non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume.
[0087] The process of steady-state calculation is:
[0088] Create a dynamic script table to define transient scenarios, import and export conditions. Set the constraints of the upstream gas supply in detail to ensure that it is accurately constrained during the simulation, plan the required trend reports, ensure that all key parameters are included, run dynamic calculations, simulate the dynamic changes of the pipeline system over time, and ensure that all necessary time-dependent parameters are included in the model. Check the calculation results and check whether there are any error messages in the dynamic report. Pay attention to the changes in MODE in the dynamic trend report to determine whether the results are consistent with reality. If you are not satisfied with the calculation results, you can modify the pipeline network parameters or constraints and then re-calculate the dynamic calculation. If the results are basically satisfactory, use the last result of the last calculation as the initial value and start the dynamic calculation. Repeat this process until a dynamic result with stable periodic changes is obtained.
[0089] Furthermore, the peak load scheduling analysis model is specifically:
[0090] Determine the corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline storage volume at the end of gas storage, and the pipeline storage volume at the beginning of gas storage;
[0091] Determine the corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well;
[0092] According to the correspondence between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage and the pipeline inventory at the beginning of gas storage, as well as the correspondence between the cumulative gas production volume of the gas storage and the gas production volume of a single well, the basic simulation model is corrected to obtain an initial simulation model, which is used as the peak-shaving scheduling analysis model.
[0093] The process of determining the corresponding relationship between the gas storage volume at the end of the pipeline, the pipe storage volume at the end of gas storage, and the pipe storage volume at the beginning of gas storage is as follows:
[0094] When the user's gas volume is small, the end-of-pipeline gas storage method is often used for peak load regulation. The gas storage volume at the end of the pipeline is analyzed:
[0095]
[0096] Where: V C is the gas storage capacity at the end of the pipeline, m 3 ; V min is the pipe inventory at the end of gas storage, m 3 ; V max is the pipe inventory at the beginning of gas storage, m 3 ;p pjmax is the average pressure of the pipeline at the end of gas storage, Pa; p pjmin is the average pressure of the pipeline at the beginning of gas storage, Pa; D is the inner diameter of the terminal pipeline, m; L is the length of the terminal pipeline, m; Z is the natural gas compression factor; T is the average temperature of the transported gas, K; p0 is the pressure under standard conditions, Pa; T0 is the temperature under standard conditions, K.
[0097]
[0098] Where: p pj is the average pressure of the calculated section of pipeline, MPa; p1 is the starting pressure at the beginning of gas storage, MPa; p2 is the end pressure at the end of gas storage, MPa.
[0099] The corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well is determined as follows:
[0100] When the gas volume of users is large, gas storage is often used for peak load regulation. The gas storage volume of gas storage is analyzed:
[0101]
[0102] Where: Q is the cumulative gas production of the gas storage, m 3 / d; i is the grid number of the gas well; m is the number of gas wells; j is the time grid number; n is the time step, days; q is the gas production of a single well, m 3 / d.
[0103] The process of correcting the basic simulation model and obtaining the initial simulation model is as follows:
[0104] The corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage, and the pipeline inventory at the beginning of gas storage, as well as the corresponding relationship between the cumulative gas production volume of the gas storage and the gas production volume of a single well, was used as the constraint conditions. The simulation model of the natural gas pipeline network in the region (basic simulation model) was established using Pipeline Studio software, and the simulation accuracy of the model was analyzed and corrected to ensure the accuracy and applicability of the model. The impact of gas load and gas consumption patterns on pipeline network operation was analyzed, and the gas transmission capacity, gas transmission bottleneck, and peak-shaving capacity of the natural gas pipeline network in a certain region were analyzed.
[0105] Furthermore, it also includes:
[0106] The validity of the initial simulation model is verified to obtain a verified simulation model, and the verified simulation model is used as the peak-shaving scheduling analysis model.
[0107] That is, the effectiveness of the integrated peak-shaving scheduling analysis model is verified based on the actual peak-shaving parameters of pipeline production and operation.
[0108] Furthermore, the process of allocating the gas supply strategy based on the determination result is specifically as follows:
[0109] According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
[0110] Example 1, taking section A of a certain province as an example, the natural gas composition table is shown in Table 1. The pipeline is a straight seam submerged arc welded steel pipe φ1016×21, 37.2km long, with a pipeline volume of 27050m3, a design pressure of 9.2MPa, and a supporting gas storage. The pipeline gas source supply is 17.29×108m3 / a, the gas supply temperature is 25-60℃, and the maximum gas supply pressure is 8.0MPa. The minimum inlet pressure of the terminal user is 4MPa.
[0111] Table 1
[0112] Components <![CDATA[CH4]]> <![CDATA[C2H6]]> C3 iC4 C5 C6 <![CDATA[CO2]]> Mole fraction / % 96.66 1.74 0.58 0.28 0.03 0.09 0.62
[0113] Gas reservoir A is an emergency gas reservoir for area B and provides strong support for the natural gas supply in area B. The upper limit and lower wellhead injection of the gas storage reservoir are designed to have a limit pressure of 17.0MPa and 6.0MPa respectively. The single unit design gas injection capacity is 7.29×108m3 / d, the storage capacity is 3.80×108m3, the effective working gas volume is 2.95×108m3 / d, and the cushion gas volume is 2.93×108m3 / d.
[0114] According to the actual production and operation data, the monthly unevenness coefficient of the gas pipeline in 2023 is calculated using the formula. As shown in Table 2, the highest gas consumption of the pipeline is in January and the lowest is in June. The actual operation data of the gas pipeline in February 2023 is selected to calculate the daily unevenness coefficient as shown in Table 3. The analysis shows that the gas sales volume is higher during the Spring Festival period from February 9 to February 17. Then, the gas transmission volume of a branch pipeline in the highest gas consumption month and the highest day of the month is selected, and the hourly unevenness coefficient is calculated using the formula as shown in Table 4. The daily gas consumption has an obvious hourly peak-to-valley difference.
[0115] Table 2
[0116] month 1 2 3 4 5 6 Unevenness coefficient 1.2 1.3 1.1 1.0 0.9 0.8 month 7 8 9 10 11 12 Unevenness coefficient 0.7 0.7 0.9 1.0 1.1 1.3
[0117] Table 3
[0118] date 2-1 2-3 2-5 2-7 2-9 2-11 2-13 Unevenness coefficient 0.7 0.7 0.8 0.8 0.9 1.0 1.1 date 2-15 2-17 2-19 2-21 2-23 2-25 2-27 Unevenness coefficient 1.2 1.3 1.3 1.2 1.1 1.0 0.9
[0119] Table 4
[0120] time 00:00 02:00 04:00 06:00 08:00 10:00 Unevenness coefficient 0.6 0.6 0.6 0.8 1.0 1.2 time 12:00 14:00 16:00 18:00 20:00 22:00 Unevenness coefficient 1.4 1.4 1.3 1.2 1.1 0.8
[0121] In actual production operations, gas storage needs to operate in coordination with the trunk pipeline network. However, due to the safe operation of the pipeline, the distribution of gas volume along the line and the need for downstream pressure, its peak-shaving capacity will also be subject to many constraints. In order to determine the most reasonable operation plan to maximize economic benefits, it is necessary to comprehensively consider the needs of multiple parties and reasonably calculate variables such as the gas transmission volume and operating pressure of the pipeline and gas storage. According to the designed pipeline conditions, the PIPELINE software was used to construct a natural gas pipeline network-gas storage integrated peak-shaving model, and a numerical simulation was performed on it. The calculation results show the relationship between the pipeline transmission volume and the gas storage volume of the gas storage. Figure 2 shown.
[0122] By analyzing the uneven coefficient of the pipeline network and the peak-shaving capacity of the pipeline network, the best peak-shaving control point is obtained to determine the optimal peak-shaving measures. The specific process is as follows: ① Based on the gas transmission capacity and peak-shaving coefficient, the pipeline peak-shaving capacity, the injection and production capacity of the gas storage reservoir and the downstream peak-shaving demand are comprehensively considered to formulate a user configuration plan. ② When the peak-shaving capacity of the pipeline is within a certain range, the peak-shaving method of gas storage at the end of the pipeline should be given priority, and a specific optimization plan is proposed. When the gas consumption is insufficient, the peak-shaving capacity of the gas storage reservoir should be considered. ③ In both cases, when the peak-shaving capacity of the gas storage reservoir and the pipeline can meet the needs, the optimal joint peak-shaving plan is proposed. If the requirements cannot be met, the transportation task or transportation plan needs to be adjusted.
[0123] The average daily gas production of the gas source of Section A of a certain province in the winter of 2023 is about 528×104m 3 / d, the maximum safe gas transmission capacity of the pipeline is about 473×104m 3 / d; the continuous gas injection capacity of the gas storage is 60×104m 3 / d、120×104m 3 / d and 180×104m 3 / d, the peak load regulation capacity is 177×104~479×104m 3 / d; the daily peak load coefficient in winter is predicted to be 0.8 to 1.2. According to the optimization process, the peak load demand of the pipeline is calculated and the peak load plan is determined.
[0124] The day with the largest monthly uniformity coefficient in the middle of January was used as the research basis, and the relevant research data was brought into the built pipeline-gas storage integrated model for simulation analysis. Figure 3 As shown, its maximum value is 3.43MSm 3 , the minimum value is 2.96MSm 3 .
[0125] Since the gas consumption is low from night to early morning, if the gas storage at the end of the pipeline is used as the peak-shaving method, the natural gas pipeline inventory will continue to accumulate and overload. The pipeline inventory reaches the maximum value at around 8 o'clock. At this time, the maximum pressure at the end of the pipeline is 9.86MPa. The results are as follows Figure 4 As shown, it has obviously exceeded the design pressure of the pipeline, so this section needs to rely on the gas storage at the end of the pipeline and the gas storage reservoir to coordinate peak regulation.
[0126] The peak-shaving measures for pipeline gas sales exceeding gas intake in winter 2023 are calculated from Table 5: By 2023, the total gas sales volume of the gas pipeline in Section A of a certain province will exceed the total gas supply volume. Under this condition, the maximum peak-shaving capacity of the gas pipeline is 147×104m 3 / d, while the actual peak gas demand of the gas pipeline is 135×104m 3 / d, indicating that the gas pipeline can fully meet the peak-shaving needs; but the peak-shaving capacity of the pipeline is only one day. If the time limit is exceeded, consideration should be given to reducing the gas consumption of downstream users or solving the problem through a second gas source.
[0127] Table 5
[0128]
[0129] The peak-shaving measures for pipeline gas intake greater than gas sales in winter 2023 are calculated from Table 6. In 2023, the total gas supply of section A of a certain province will also be greater than the total gas sales. Based on this situation, the maximum peak-shaving capacity of the gas pipeline is 227×104m 3 / d, while the actual peak-shaving gas demand of the pipeline is 112×104m 3 / d, indicating that the gas pipeline meets certain peak-shaving capacity. In actual operation, the peak-shaving capacity of gas storage and pipeline storage should be fully utilized to minimize the start-up and shutdown frequency of gas storage. At the same time, the peak-shaving mode of pipeline storage plus gas storage can be adopted, with one in use and two in reserve, or with pipeline storage plus gas storage and one in reserve.
[0130] Table 6
[0131]
[0132] The present invention takes the supply and demand of section A gas pipeline in a certain province in winter 2023 as an example to carry out peak shaving simulation analysis, considers the uneven gas demand of users under the background of increased natural gas demand in the region, combines the short-term peak-shaving method of terminal gas storage and the long-term peak-shaving gas storage reservoir peak-shaving method, and uses simulation software to establish a "pipeline-gas storage integrated peak-shaving" analysis model, reveals the optimal gas transmission demand analysis of pipelines and gas storage reservoirs under the combination of multiple peak-shaving methods, and divides the peak shaving into two cases: "gas sales are greater than gas intake" and "gas intake is greater than gas sales". By comparing the software simulation calculation results with the actual peak-shaving operation of the natural gas pipeline, it can be seen that the error is less than 0.2% by comparing the model data with the actual peak-shaving data, and the model has high accuracy. The model method can be used to evaluate the peak-shaving capacity of the pipeline, which has practical guiding significance for determining the most reasonable peak-shaving operation plan and maximizing economic benefits.
[0133] Considering the uneven gas demand of users under the background of increasing natural gas demand, combined with the short-term peak-shaving mode of terminal gas storage and the long-term peak-shaving gas storage peak-shaving mode, the "pipeline-gas storage integrated peak-shaving" analysis model is established using simulation software to reveal the optimal gas transmission demand analysis of pipelines and gas storage under the combination of multiple peak-shaving modes, which has practical guiding significance for determining the most reasonable operation plan for the actual peak-shaving conditions of "Section A of a certain province" and maximizing economic benefits. At the same time, by changing the model parameters, the model can also provide experience for natural gas peak-shaving in other regions under similar circumstances, and has broad application prospects.
[0134] When the pipeline network is peak-shaving, the peak-shaving mode should be reasonably determined based on the results of the peak-shaving load evaluation. In actual operation, daily peak-shaving generally adopts the method of gas storage at the end of the pipeline for peak-shaving, followed by the use of gas storage for peak-shaving, and finally considers reducing the gas consumption of upstream and downstream users or coordinating with a third gas source for peak-shaving. This patent uses different uneven coefficients of month, day, and hour as reference variables for analysis, combines the gas storage peak-shaving problem under different demands, and selects an appropriate peak-shaving method in combination with model analysis. For example: For seasonal peak-shaving problems, gas storage should be used for peak-shaving as much as possible, supplemented by pipeline network regulation in a small range at the end of the pipeline to prevent large-scale investment in pipeline networks from causing unstable pipeline operation status.
[0135] The present invention also provides a system for determining a balanced gas supply strategy based on different uniformity coefficients, and the specific technical solution is as follows:
[0136] The confirmation module is used to: determine at least one of the hourly pipeline gas transmission volume, the daily pipeline gas transmission volume, and the monthly pipeline gas transmission volume of any pipeline to be allocated, and determine one of the hourly gas storage gas production volume, the daily gas storage gas production volume, and the monthly gas storage gas production volume corresponding to any pipeline based on a preset linear relationship set;
[0137] The allocation module is used to: allocate a gas supply strategy based on the determination result;
[0138] Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
[0139] Based on the above solution, the present invention can also be improved as follows.
[0140] Furthermore, the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage gas production volume is determined in the following manner:
[0141] The peak load scheduling analysis model under the hourly uneven coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume.
[0142] Furthermore, the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume is determined in the following manner:
[0143] The peak load scheduling analysis model under the daily non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume.
[0144] Furthermore, the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume is determined in the following manner:
[0145] The peak load scheduling analysis model under the monthly non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume.
[0146] Furthermore, the peak load scheduling analysis model is specifically:
[0147] Determine the corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline storage volume at the end of gas storage, and the pipeline storage volume at the beginning of gas storage;
[0148] Determine the corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well;
[0149] According to the correspondence between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage and the pipeline inventory at the beginning of gas storage, as well as the correspondence between the cumulative gas production volume of the gas storage and the gas production volume of a single well, the basic simulation model is corrected to obtain an initial simulation model, which is used as the peak-shaving scheduling analysis model.
[0150] Furthermore, it also includes:
[0151] The verification module is used to verify the validity of the initial simulation model to obtain a verified simulation model, and use the verified simulation model as the peak-shaving scheduling analysis model.
[0152] Furthermore, the process of allocating the gas supply strategy based on the determination result is specifically as follows:
[0153] According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
[0154] In the above embodiments, although the steps are numbered S1, S2, etc., these are only specific embodiments given by the present invention. Those skilled in the art may adjust the execution order of S1, S2, etc. according to actual conditions, which is also within the protection scope of the present invention. It can be understood that in some embodiments, some or all of the above embodiments may be included.
[0155] It should be noted that the beneficial effects of the system for determining a balanced gas supply strategy based on different uniformity coefficients provided in the above embodiment are the same as the beneficial effects of the method for determining a balanced gas supply strategy based on different uniformity coefficients, which will not be described in detail here. In addition, when the system provided in the above embodiment realizes its functions, it only uses the division of the above functional modules as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the system can be divided into different functional modules according to actual conditions to complete all or part of the functions described above. In addition, the system and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be described in detail here.
[0156] like Figure 5 As shown, an electronic device 300 according to an embodiment of the present invention includes a processor 320, the processor 320 is coupled to a memory 310, and the memory 310 stores at least one computer program 330, and the at least one computer program 330 is loaded and executed by the processor 320, so that the electronic device 300 implements any of the above methods, specifically:
[0157] The electronic device 300 may have relatively large differences due to different configurations or performances, and may include one or more processors 320 (Central Processing Units, CPU) and one or more memories 310, wherein the one or more memories 310 store at least one computer program 330, and the at least one computer program 330 is loaded and executed by the one or more processors 320, so that the electronic device 300 implements a method for determining a balanced gas supply strategy based on different uniformity coefficients provided in the above embodiment. Of course, the electronic device 300 may also have components such as a wired or wireless network interface, a keyboard, and an input and output interface for input and output, and the electronic device 300 may also include other components for realizing device functions, which will not be repeated here.
[0158] A computer-readable storage medium according to an embodiment of the present invention stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that a computer implements any one of the above methods.
[0159] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, and the like.
[0160] In an exemplary embodiment, a computer program product or a computer program is also provided, the computer program product or the computer program comprising computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the electronic device performs any of the above methods.
[0161] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects and represent the definition of a specific order or sequence. The order of use of similar objects can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than the order shown or described.
[0162] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present disclosure can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), or it can be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.
[0163] Any combination of one or more computer-readable media may be used. A computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device, or device.
[0164] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for determining a balanced gas supply strategy based on different uniformity coefficients, characterized in that: include: Determine at least one of the hourly pipeline gas delivery, daily pipeline gas delivery, and monthly pipeline gas delivery of any pipeline to be allocated, and determine one of the hourly gas storage gas production, daily gas storage gas production, and monthly gas storage gas production corresponding to any pipeline based on a preset linear relationship set; Based on the determination result, a gas supply strategy is allocated; Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
2. A method for determining a balanced gas supply strategy based on different uniformity coefficients according to claim 1, characterized in that: The method for determining the correspondence between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume is specifically as follows: The peak load scheduling analysis model under the hourly uneven coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the hourly pipeline gas transmission volume and the hourly gas storage reservoir gas production volume.
3. The method for determining a balanced gas supply strategy based on different uniformity coefficients according to claim 1, characterized in that: The method for determining the correspondence between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume is specifically as follows: The peak load scheduling analysis model under the daily non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the daily pipeline gas transmission volume and the daily gas storage reservoir gas production volume.
4. The method for determining a balanced gas supply strategy based on different uniformity coefficients according to claim 1, characterized in that: The method for determining the correspondence between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume is specifically as follows: The peak load scheduling analysis model under the monthly non-uniform coefficient constraint condition is subjected to steady-state calculation to obtain the corresponding relationship between the monthly pipeline gas transmission volume and the monthly gas storage reservoir gas production volume.
5. A method for determining a balanced gas supply strategy based on different uniformity coefficients according to any one of claims 2 to 4, characterized in that: The peak load scheduling analysis model is specifically: Determine the corresponding relationship between the gas storage volume at the end of the pipeline, the pipeline storage volume at the end of gas storage, and the pipeline storage volume at the beginning of gas storage; Determine the corresponding relationship between the cumulative gas production of the gas storage and the gas production of a single well; According to the correspondence between the gas storage volume at the end of the pipeline, the pipeline inventory at the end of gas storage and the pipeline inventory at the beginning of gas storage, as well as the correspondence between the cumulative gas production volume of the gas storage and the gas production volume of a single well, the basic simulation model is corrected to obtain an initial simulation model, which is used as the peak-shaving scheduling analysis model.
6. A method for determining a balanced gas supply strategy based on different uniformity coefficients according to claim 5, characterized in that: Also includes: The validity of the initial simulation model is verified to obtain a verified simulation model, and the verified simulation model is used as the peak-shaving scheduling analysis model.
7. The method for determining a balanced gas supply strategy based on different uniformity coefficients according to claim 1, characterized in that: The process of allocating the gas supply strategy based on the determination result is specifically as follows: According to the determination result, a target gas supply strategy corresponding to the determination result is searched in a preset database, and the target gas supply strategy is used as the gas supply strategy.
8. A system for determining a balanced gas supply strategy based on different uniformity coefficients, characterized in that: include: The confirmation module is used to: determine at least one of the hourly pipeline gas transmission volume, the daily pipeline gas transmission volume, and the monthly pipeline gas transmission volume of any pipeline to be allocated, and determine one of the hourly gas storage gas production volume, the daily gas storage gas production volume, and the monthly gas storage gas production volume corresponding to any pipeline based on a preset linear relationship set; The allocation module is used to: allocate a gas supply strategy based on the determination result; Among them, the preset linear relationship set includes the corresponding relationship between hourly pipeline gas transmission volume and hourly gas storage gas production volume, the corresponding relationship between daily pipeline gas transmission volume and daily gas storage gas production volume, and the corresponding relationship between monthly pipeline gas transmission volume and monthly gas storage gas production volume.
9. An electronic device, characterized in that: The electronic device comprises a processor, the processor is coupled to a memory, at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor so that the electronic device implements the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that a computer implements the method according to any one of claims 1 to 7.