Supply chain scheduling optimization method and device for emergency orders
Through the Jiwu platform rating suppliers and fast procurement model, the correlation between emergency orders and regular orders is optimized, and the order insertion solution is generated, which solves the problems of inefficient manual scheduling and disrupted regular order plans, and realizes the emergency order Quick response and reasonable scheduling.
Patent Information
- Application Number
- CN202411066240.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the scheduling procedures for emergency orders are usually formulated manually, which is inefficient and easily disrupts the scheduling plans of conventional orders, resulting in the failure of systematic and coordinated planning of production resources.
Through the Jiwu platform, rating supplier historical supply information, filtering target suppliers, and using the fast procurement model to quickly obtain emergency order demand, determine the correlation between emergency orders and other orders, generate order insertion solutions, and optimize supply chain scheduling , to ensure reasonable scheduling of emergency orders without affecting regular orders.
It realizes rapid response and reasonable scheduling of emergency orders, eliminates cumbersome routine procurement processes, ensures delivery, and avoids the risk of disrupting routine order plans.
Smart Images

Figure CN118966696A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a method and device for optimizing supply chain scheduling of urgent orders. Background Art
[0002] Currently, the method adopted by suppliers to deal with unplanned emergency orders is basically to passively disrupt the original production plan, carry out plug-in production, and give priority to meeting customers' needs for emergency orders. This makes it impossible to carry out systematic overall planning of the company's production resources, and the scheduling procedures for emergency orders are often manually formulated, which is not only inefficient, but also seriously disrupts the scheduling plans of regular orders.
[0003] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention
[0004] The main purpose of the present invention is to provide a supply chain scheduling optimization method and device for emergency orders, aiming to solve the technical problem that the scheduling procedures for emergency orders are often manually formulated, which is not only inefficient but also seriously disrupts the scheduling plan of regular orders.
[0005] To achieve the above object, the present invention provides a method for optimizing supply chain scheduling of urgent orders, and the method for optimizing supply chain scheduling of urgent orders comprises the following steps:
[0006] Rating suppliers based on their historical supply information through the Jiwu platform, and selecting several suppliers based on the rating results;
[0007] By comparing the urgent order demand with the supplier data through the collection platform, a target supplier is matched for the downstream customer from a number of suppliers;
[0008] Through the collection platform, based on standard simplified processes, quick quotation, online negotiation and decision-making, and contract generation and signing operations are performed, so that the target supplier can quickly obtain the urgent order needs of the downstream customers.
[0009] In some embodiments, determining the correlation between the urgent order corresponding to the urgent order demand and other ordinary orders includes:
[0010] Get order evaluation results for urgent orders and other normal orders;
[0011] Establishing an evaluation index set based on the number of evaluators of each order and the total number of evaluators of the orders in the order evaluation results;
[0012] Constructing a fuzzy evaluation matrix based on the evaluation index set;
[0013] The correlation between the urgent order and other common orders is determined according to the fuzzy evaluation matrix.
[0014] In some embodiments, determining the correlation between the urgent order and other ordinary orders according to the fuzzy evaluation matrix includes:
[0015] Obtaining the maximum and minimum values of the evaluation indicators of each order from the fuzzy evaluation matrix;
[0016] Obtain the difference between the average value of the evaluation index of each order and the preset initial value of the evaluation index;
[0017] Calculate the correlation coefficient between the emergency order and other ordinary orders according to the maximum value of the evaluation index, the minimum value of the evaluation index, the difference and the preset coefficient;
[0018] The correlation between the urgent order and other common orders is determined according to the correlation coefficient.
[0019] In some embodiments, comparing the emergency order sequence with the original order sequence and determining the order insertion plan based on the comparison result includes:
[0020] Obtaining order revenue, inventory cost, delay cost, and order rejection cost corresponding to the urgent order sequence;
[0021] Determine the order profit corresponding to the urgent order sequence according to the order revenue, the inventory cost, the delay cost and the rejection cost;
[0022] Determine the profit difference between the order profit corresponding to the urgent order sequence and the order profit corresponding to the original order sequence;
[0023] An order insertion plan is generated based on the profit difference.
[0024] In some embodiments, optimizing supply chain scheduling according to the order insertion scheme includes:
[0025] Determine the order insertion method according to the order insertion plan;
[0026] Adjusting the original order sequence according to the order insertion method;
[0027] Adjust the supply chain scheduling based on the adjusted order sequence.
[0028] In some embodiments, adjusting the original order sequence according to the order insertion method includes:
[0029] Determining an insertion position of the urgent order based on the order insertion method;
[0030] Determine the common order to be split in the original order sequence based on the order insertion method;
[0031] The ordinary order to be split is split into multiple sub-orders, the multiple sub-orders are sorted, and the sorting position of the urgent order is adjusted according to the insertion order position.
[0032] In addition, to achieve the above-mentioned purpose, the present invention also proposes a supply chain scheduling optimization device for urgent orders, and the supply chain scheduling optimization device for urgent orders includes:
[0033] A response module is used to respond to the order requirements of downstream customers, and when identifying that the downstream customers have urgent order requirements, use the quick purchase mode of the collection platform to quickly obtain the urgent order requirements. The quick purchase mode of the collection platform is a direct purchase mode, which is used for urgent order requirements;
[0034] A calculation module, used to determine the correlation between the emergency order corresponding to the emergency order demand and other ordinary orders;
[0035] The sorting module is used to sort the orders based on the relevance and obtain the urgent order sequence;
[0036] A comparison module, used to compare the emergency order sequence with the original order sequence, and determine an order insertion plan based on the comparison result;
[0037] The optimization module is used to optimize the supply chain scheduling according to the order insertion plan.
[0038] In some embodiments, the response module is used to rate suppliers based on their historical supply information through the collection platform, and select several suppliers based on the rating results;
[0039] By comparing the urgent order demand with the supplier data through the collection platform, a target supplier is matched for the downstream customer from a number of suppliers;
[0040] Through the collection platform, based on standard simplified processes, quick quotation, online negotiation and decision-making, and contract generation and signing operations are performed, so that the target supplier can quickly obtain the urgent order needs of the downstream customers.
[0041] In some embodiments, the calculation module is used to obtain order evaluation results of urgent orders and other ordinary orders;
[0042] Establishing an evaluation index set based on the number of evaluators of each order and the total number of evaluators of the orders in the order evaluation results;
[0043] Constructing a fuzzy evaluation matrix based on the evaluation index set;
[0044] The correlation between the urgent order and other common orders is determined according to the fuzzy evaluation matrix.
[0045] The present invention responds to the order demands of downstream customers, and when identifying that the downstream customers have urgent order demands, uses the quick procurement mode of the collection platform to quickly obtain the urgent order demands; determines the correlation between the urgent orders corresponding to the urgent order demands and other ordinary orders; sorts the orders based on the correlation to obtain an urgent order sequence; compares the urgent order sequence with the original order sequence, and determines an insertion plan based on the comparison result; optimizes the supply chain scheduling according to the insertion plan, and quickly obtains customer order demands for urgent orders through quick procurement, eliminating the cumbersome processes in conventional methods, and at the same time reasonably schedules urgent orders through the above method to ensure delivery without disrupting the scheduling plan of conventional orders. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a flow chart of a first embodiment of the supply chain scheduling optimization method for urgent orders of the present invention;
[0047] Figure 2 It is a flow chart of a second embodiment of the supply chain scheduling optimization method for urgent orders of the present invention;
[0048] FIG3( a ) is a schematic diagram of an original order sequence in the supply chain scheduling optimization method for urgent orders of the present invention;
[0049] FIG3( b ) is a schematic diagram of the adjusted order sequence in the supply chain scheduling optimization method for urgent orders of the present invention;
[0050] Figure 4 This is a structural block diagram of the first embodiment of the supply chain scheduling optimization device for urgent orders of the present invention.
[0051] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0052] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0053] The embodiment of the present invention provides a method for optimizing supply chain scheduling of urgent orders, referring to Figure 1 , Figure 1 The figure is a flow chart of a first embodiment of a supply chain scheduling optimization method for urgent orders of the present invention.
[0054] In this embodiment, the supply chain scheduling optimization method for urgent orders includes the following steps:
[0055] Step S10: Respond to the order demands of downstream customers, and when identifying that downstream customers have urgent order demands, use the quick procurement mode of the collection platform to quickly obtain the urgent order demands.
[0056] In this embodiment, the executor of this embodiment is a supply chain scheduling optimization device for emergency orders, wherein the supply chain scheduling optimization device for emergency orders has functions such as data processing, data communication and program running. The supply chain scheduling optimization device for emergency orders can be a terminal data processing device such as a computer, and of course it can also be other devices with similar functions, and this embodiment does not impose any restrictions on this.
[0057] It should be noted that currently, the method adopted by suppliers to deal with unplanned emergency orders is basically to passively disrupt the original production plan, carry out plug-in production, and give priority to meeting customers' needs for emergency orders. This makes it impossible to carry out systematic overall planning of the company's production resources, and the scheduling procedures for emergency orders are often manually formulated, which is not only inefficient, but also seriously disrupts the scheduling plans of regular orders.
[0058] In order to solve the above technical problems in this embodiment, by responding to the order needs of downstream customers and identifying that downstream customers have urgent order needs, the quick procurement mode of the collection platform is used to quickly obtain the urgent order needs; the correlation between the urgent order corresponding to the urgent order demand and other ordinary orders is determined; the orders are sorted based on the correlation to obtain an urgent order sequence; the urgent order sequence is compared with the original order sequence, and an insertion plan is determined based on the comparison result; the supply chain scheduling is optimized according to the insertion plan, and customer order needs are quickly obtained through quick procurement for urgent orders, which eliminates the cumbersome processes in conventional methods. At the same time, urgent orders are reasonably scheduled through the above method to ensure delivery without disrupting the scheduling plan of regular orders. This can be specifically achieved as follows.
[0059] In the specific implementation, in this embodiment, customer needs can be quickly obtained through quick procurement. Conventional methods are strategic procurement, framework agreement procurement, bidding procurement, etc. These methods often cannot meet temporary, emergency procurement needs and spot needs. In the embodiment of this application, the quick procurement mode of the collection platform is used to achieve 72 hours from issuing needs to transaction delivery, eliminating the cumbersome process in the conventional method. This procurement mode is a supplement to the conventional mode and is specifically for emergency orders. Specifically, the collection platform can be used to rate suppliers based on their historical supply information, and several suppliers can be screened out based on the rating results. This method can first screen out some suppliers with higher ratings, and the supplier rating is evaluated based on product quality and delivery efficiency. Furthermore, the emergency order demand can be compared with the supplier data, and the supplier of products that can meet the emergency order demand can be screened out as the target supplier. In the embodiment of the present application, the procurement process can be standardized by using the collection platform, such as using standard contract templates, fixed transaction terms, etc., to simplify the decision-making process. Quick quotation, online negotiation and decision-making, and contract generation and signing operations can be simplified and quickly processed. Quick quotation is to quickly provide the quotation of the successfully matched supplier to the upstream customer. Online negotiation and decision-making can quickly feedback the supplier's conditions and requirements to the upstream customer, so that the upstream can quickly make procurement decisions. Contract generation and signing is after the two parties reach a cooperation, the collection platform generates an electronic contract and completes the signature.
[0060] Step S20: Determine the correlation between the emergency order corresponding to the emergency order demand and other common orders.
[0061] When optimizing supply chain scheduling, in order not to completely disrupt the supplier's original plan and affect the supplier's delivery schedule, it is necessary to determine the correlation between the emergency order and other ordinary orders in the embodiment of the present application. The correlation indicates the priority between the emergency order and other ordinary orders. The larger the value corresponding to the correlation, the higher the corresponding priority.
[0062] In some embodiments, before calculating the correlation, it is necessary to first construct an evaluation index set. The evaluation index set is a set of values assigned when the evaluator uses the evaluation index to evaluate the urgent order. The value range is 0 to 1, and the degree of the index increases with the increasing value. For example, the larger the value corresponding to the urgency of the delivery period, the shorter the delivery period of the order and the more urgent the time. Based on the order evaluation results of urgent orders and other ordinary orders, the number of evaluators for each order and the total number of evaluators for the order can be determined, so as to calculate the order evaluation index. For example, x = K / N, K represents the number of people who evaluate the evaluation index in a certain order, and N represents the total number of order evaluators. After obtaining the evaluation index set, each evaluation index in the evaluation index set is used as an element in the matrix to construct a fuzzy evaluation matrix. It should be noted that an order in the fuzzy matrix has multiple evaluation index values. For example, the fuzzy evaluation matrix is:
[0063]
[0064] After completing the construction of the fuzzy evaluation matrix, the correlation between the urgent order and other ordinary orders is determined according to the fuzzy evaluation matrix. The specific process is to screen out the maximum and minimum evaluation indexes of each order from the fuzzy matrix constructed above, and obtain the difference between the average evaluation index of each order and the preset initial evaluation index value. The preset initial evaluation index value can be set according to actual needs, and there is no restriction on this in the embodiment of the present application. Finally, the correlation coefficient between the urgent order and other ordinary orders can be calculated according to the above-mentioned parameters combined with the preset coefficient. The calculation formula is as follows: in, represents the correlation coefficient, minx n Indicates the minimum value of the evaluation index, maxx n Indicates the maximum value of the evaluation index, and λ indicates the preset coefficient value range is 0 to 1.
[0065] Step S30: Sort the orders based on the degree of association to obtain an urgent order sequence.
[0066] Since there is a corresponding relationship between the correlation degree and the priority of the order, the priority of the order can be determined after the correlation degree is determined. In this application, the urgent orders and ordinary orders are re-prioritized according to the priority, and the sorted order sequence is the urgent order sequence.
[0067] Step S40: Compare the emergency order sequence with the original order sequence, and determine an order insertion plan based on the comparison result.
[0068] In some embodiments, the comparison between the emergency order sequence and the original order sequence can be a profit comparison. Specifically, it is necessary to first obtain the order revenue, inventory cost, delay cost and rejection cost corresponding to the emergency order sequence, and then calculate, for example, P = DTYU, where D, T, Y, and U represent order revenue, inventory cost, delay cost and rejection cost respectively. The order revenue is determined by the unit profit and quantity of the order product, the inventory cost is determined by the inventory time and the number of order products, the delay cost is determined by the number of order products and the delay time, and the rejection cost is determined by the opportunity cost of losing the order. Then, the profit difference between the order profit corresponding to the emergency order sequence and the order profit corresponding to the original order sequence is obtained, and the order insertion plan is determined by the profit difference. The order insertion plan is affected by the number of products to be inserted for the emergency order, the price, and the delay time.
[0069] Step S50: Optimizing supply chain scheduling according to the order insertion plan.
[0070] In determining the order insertion plan, the urgent order is arranged into the original order arrangement according to the order insertion plan to optimize the supply chain scheduling.
[0071] This embodiment responds to the order demands of downstream customers, and when it is identified that the downstream customers have urgent order demands, the quick procurement mode of the collection platform is used to quickly obtain the urgent order demands; the correlation between the urgent orders corresponding to the urgent order demands and other ordinary orders is determined; the orders are sorted based on the correlation to obtain an urgent order sequence; the urgent order sequence is compared with the original order sequence, and an insertion plan is determined based on the comparison result; the supply chain scheduling is optimized according to the insertion plan, and customer order demands are quickly obtained through quick procurement for urgent orders, thereby eliminating the cumbersome processes in conventional methods, and at the same time, the urgent orders are reasonably scheduled through the above method to ensure delivery without disrupting the scheduling plan of regular orders.
[0072] refer to Figure 2 , Figure 2 This is a flow chart of a second embodiment of a supply chain scheduling optimization method for urgent orders of the present invention.
[0073] Based on the first embodiment described above, step S50 in the supply chain scheduling optimization method for urgent orders in this embodiment specifically includes:
[0074] Step S501: Determine the order insertion method according to the order insertion plan.
[0075] After the order insertion plan is generated, a specific order insertion method may be determined in this embodiment.
[0076] Step S502: adjusting the original order sequence according to the order insertion method.
[0077] Then, the original order sequence is adjusted accordingly according to the order insertion method. Specifically, the insertion position of the urgent order is determined based on the order insertion method; the ordinary order to be split in the original order sequence is determined based on the order insertion method, and then the ordinary order to be split is split into multiple sub-orders, the multiple sub-orders are sorted, and the sorting position of the urgent order is adjusted according to the order insertion position, such as shown in Figures 3(a) and (b), where 134 represents an ordinary order in the original order sequence, 2.1 and 2.2 are sub-orders after 2 splits, and 5 represents an urgent order. Figure 3(a) is the original order sequence, and Figure 3(b) is the adjusted order sequence.
[0078] Step S503: Adjust the supply chain scheduling based on the adjusted order sequence.
[0079] The adjusted order sequence corresponds to a specific order schedule, and the supplier can adjust the existing supply chain schedule accordingly based on the adjusted order sequence.
[0080] This embodiment determines the order insertion method according to the order insertion plan; determines the order insertion position of the urgent order based on the order insertion method; determines the ordinary order to be split in the original order sequence based on the order insertion method; splits the ordinary order to be split into multiple sub-orders, sorts the multiple sub-orders, and adjusts the sorting position of the urgent order according to the order insertion position; adjusts the supply chain scheduling based on the adjusted order sequence, and reasonably schedules the urgent orders through the above methods, ensuring delivery without disrupting the scheduling plan of regular orders.
[0081] Reference Figure 4 , Figure 4 This is a structural block diagram of the first embodiment of the supply chain scheduling optimization device for urgent orders of the present invention.
[0082] like Figure 4 As shown, the supply chain scheduling optimization device for urgent orders proposed in the embodiment of the present invention includes:
[0083] The response module 10 is used to respond to the order requirements of downstream customers, and when it is identified that the downstream customers have urgent order requirements, it uses the quick procurement mode of the collection platform to quickly obtain the urgent order requirements. The quick procurement mode of the collection platform is a direct procurement mode, which is used for urgent order requirements.
[0084] The calculation module 20 is used to determine the correlation between the emergency order corresponding to the emergency order demand and other common orders.
[0085] The sorting module 30 is used to sort the orders based on the relevance to obtain an urgent order sequence.
[0086] The comparison module 40 is used to compare the emergency order sequence with the original order sequence and determine an order insertion plan based on the comparison result.
[0087] The optimization module 50 is used to optimize the supply chain scheduling according to the order insertion plan.
[0088] This embodiment responds to the order demands of downstream customers, and when it is identified that the downstream customers have urgent order demands, the quick procurement mode of the collection platform is used to quickly obtain the urgent order demands; the correlation between the urgent orders corresponding to the urgent order demands and other ordinary orders is determined; the orders are sorted based on the correlation to obtain an urgent order sequence; the urgent order sequence is compared with the original order sequence, and an insertion plan is determined based on the comparison result; the supply chain scheduling is optimized according to the insertion plan, and customer order demands are quickly obtained through quick procurement for urgent orders, thereby eliminating the cumbersome processes in conventional methods, and at the same time, the urgent orders are reasonably scheduled through the above method to ensure delivery without disrupting the scheduling plan of regular orders.
[0089] In some embodiments, the response module 10 is used to rate the supplier based on the supplier's historical supply information through the collection platform, and screen out several suppliers based on the rating results; compare the urgent order demand with the supplier data through the collection platform to match the target supplier for the downstream customer from several suppliers; perform quick quotation, online negotiation and decision-making, and contract generation and signing operations based on standard simplified processes through the collection platform, so that the target supplier can quickly obtain the urgent order demand of the downstream customer.
[0090] In some embodiments, the calculation module 20 is used to obtain order evaluation results of urgent orders and other ordinary orders; establish an evaluation index set based on the number of evaluators of each order in the order evaluation results and the total number of order evaluators; construct a fuzzy evaluation matrix based on the evaluation index set; and determine the correlation between urgent orders and other ordinary orders based on the fuzzy evaluation matrix.
[0091] In some embodiments, the calculation module 20 is used to obtain the maximum value and the minimum value of the evaluation index of each order from the fuzzy evaluation matrix; obtain the difference between the average value of the evaluation index of each order and the preset initial value of the evaluation index; calculate the correlation coefficient between the urgent order and other ordinary orders according to the maximum value of the evaluation index, the minimum value of the evaluation index, the difference and the preset coefficient; determine the correlation between the urgent order and other ordinary orders according to the correlation coefficient.
[0092] In some embodiments, the comparison module 40 is used to obtain the order revenue, inventory cost, delay cost and rejection cost corresponding to the urgent order sequence; determine the order profit corresponding to the urgent order sequence based on the order revenue, the inventory cost, the delay cost and the rejection cost; determine the profit difference between the order profit corresponding to the urgent order sequence and the order profit corresponding to the original order sequence; and generate an insertion plan based on the profit difference.
[0093] In some embodiments, the optimization module 50 is used to determine an order insertion method according to the order insertion plan; adjust the original order sequence according to the order insertion method; and adjust the supply chain scheduling based on the adjusted order sequence.
[0094] In some embodiments, the optimization module 50 is used to determine the insertion position of the urgent order based on the order insertion method; determine the ordinary order to be split in the original order sequence based on the order insertion method; split the ordinary order to be split into multiple sub-orders, sort the multiple sub-orders, and adjust the sorting position of the urgent order according to the order insertion position.
[0095] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions may be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive Solid State Disk (SSD)), etc.
[0096] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0097] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0098] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
[0099] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.
[0100] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.
[0101] In addition, for technical details not fully described in this embodiment, reference can be made to the supply chain scheduling optimization method for emergency orders provided in any embodiment of the present invention, and will not be repeated here.
[0102] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0103] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0104] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0105] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
[0106] It is understandable that the system provided by the embodiment of the present invention corresponds to the method provided by the embodiment of the present invention, and the explanation, examples and beneficial effects of the relevant contents can refer to the corresponding parts in the above method.
Claims
1. A supply chain scheduling optimization method for urgent orders, characterized in that: The supply chain scheduling optimization method for urgent orders includes: In response to the order requirements of downstream customers, and when identifying that downstream customers have urgent order requirements, the urgent order requirements are quickly acquired using the quick purchase mode of the collection platform, where the quick purchase mode of the collection platform is a direct purchase mode for urgent order requirements; Determine the correlation between the urgent order corresponding to the urgent order demand and other ordinary orders; Sort the orders based on the relevance and get the urgent order sequence; Compare the emergency order sequence with the original order sequence, and determine an order insertion plan based on the comparison result; Supply chain scheduling is optimized according to the order insertion plan.
2. The supply chain scheduling optimization method for urgent orders according to claim 1, characterized in that: The method of using the quick purchase mode of the collection platform to quickly obtain the urgent order demand includes: Rating suppliers based on their historical supply information through the Jiwu platform, and selecting several suppliers based on the rating results; By comparing the urgent order demand with the supplier data through the collection platform, a target supplier is matched for the downstream customer from a number of suppliers; Through the collection platform, based on standard simplified processes, quick quotation, online negotiation and decision-making, and contract generation and signing operations are performed, so that the target supplier can quickly obtain the urgent order needs of the downstream customers.
3. The supply chain scheduling optimization method for urgent orders according to claim 1, characterized in that: Determining the correlation between the urgent order corresponding to the urgent order demand and other common orders includes: Get order evaluation results for urgent orders and other normal orders; Establishing an evaluation index set based on the number of evaluators of each order and the total number of evaluators of the order in the order evaluation results; Constructing a fuzzy evaluation matrix based on the evaluation index set; The correlation between the urgent order and other common orders is determined according to the fuzzy evaluation matrix.
4. The supply chain scheduling optimization method for urgent orders as claimed in claim 3, characterized in that: Determining the correlation between the urgent order and other ordinary orders according to the fuzzy evaluation matrix includes: Obtaining the maximum and minimum values of the evaluation indicators of each order from the fuzzy evaluation matrix; Obtain the difference between the average value of the evaluation index of each order and the preset initial value of the evaluation index; Calculate the correlation coefficient between the emergency order and other ordinary orders according to the maximum value of the evaluation index, the minimum value of the evaluation index, the difference and the preset coefficient; The correlation between the urgent order and other common orders is determined according to the correlation coefficient.
5. The supply chain scheduling optimization method for urgent orders according to claim 1, characterized in that: The step of comparing the emergency order sequence with the original order sequence and determining the order insertion plan based on the comparison result includes: Obtaining order revenue, inventory cost, delay cost, and order rejection cost corresponding to the urgent order sequence; Determine the order profit corresponding to the urgent order sequence according to the order revenue, the inventory cost, the delay cost and the rejection cost; Determine the profit difference between the order profit corresponding to the urgent order sequence and the order profit corresponding to the original order sequence; An order insertion plan is generated based on the profit difference.
6. The supply chain scheduling optimization method for urgent orders according to claim 1, characterized in that: The optimizing the supply chain scheduling according to the order insertion scheme includes: Determine the order insertion method according to the order insertion plan; Adjusting the original order sequence according to the order insertion method; Adjust the supply chain scheduling based on the adjusted order sequence.
7. The method for optimizing supply chain scheduling for urgent orders according to claim 6, characterized in that: The adjusting the original order sequence according to the order insertion method includes: Determining an insertion position of the urgent order based on the order insertion method; Determine the common order to be split in the original order sequence based on the order insertion method; The ordinary order to be split is split into multiple sub-orders, the multiple sub-orders are sorted, and the sorting position of the urgent order is adjusted according to the insertion order position.
8. A supply chain scheduling optimization device for urgent orders, characterized in that: The supply chain scheduling optimization device for urgent orders includes: A response module is used to respond to the order requirements of downstream customers, and when identifying that the downstream customers have urgent order requirements, use the quick purchase mode of the collection platform to quickly obtain the urgent order requirements. The quick purchase mode of the collection platform is a direct purchase mode, which is used for urgent order requirements; A calculation module, used to determine the correlation between the emergency order corresponding to the emergency order demand and other ordinary orders; The sorting module is used to sort the orders based on the relevance and obtain the urgent order sequence; A comparison module, used to compare the emergency order sequence with the original order sequence, and determine an order insertion plan based on the comparison result; The optimization module is used to optimize the supply chain scheduling according to the order insertion plan.
9. The supply chain scheduling optimization device for urgent orders according to claim 8, characterized in that: The response module is used to rate suppliers based on their historical supply information through the collection platform, and select several suppliers based on the rating results; By comparing the urgent order demand with the supplier data through the collection platform, a target supplier is matched for the downstream customer from a number of suppliers; Through the collection platform, based on standard simplified processes, quick quotation, online negotiation and decision-making, and contract generation and signing operations are performed, so that the target supplier can quickly obtain the urgent order needs of the downstream customers.
10. The supply chain scheduling optimization device for urgent orders according to claim 8, characterized in that: The calculation module is used to obtain order evaluation results of urgent orders and other ordinary orders; Establishing an evaluation index set based on the number of evaluators of each order and the total number of evaluators of the order in the order evaluation results; Constructing a fuzzy evaluation matrix based on the evaluation index set; The correlation between the urgent order and other common orders is determined according to the fuzzy evaluation matrix.
Citation Information
Patent Citations
Supplier sorting method based on intelligent bidding platform
CN112819568A
Intelligent bid invitation method and device and computer readable medium
CN115619239A
Scheduling method and system based on order priority
CN115796498A
ERP-based tempered glass digital production management system
CN116862145A
Supplier screening method and device based on demand order, and medium
CN117196462A
Cited By
Production urgent order scheduling method and system, electronic equipment and computer readable storage medium
CN119151272A
B2B order intelligent management method and system based on reinforcement learning
CN120494920A