Tower assembly safety detection system and method for capital construction site
Through multi-level division and analysis of structure, operation and climate detection at the infrastructure site, the problem of lack of multi-dimensional monitoring and analysis in the existing technology is solved, and all-round safety monitoring and timely alarms are realized at the infrastructure site, which improves tower safety sex.
Patent Information
- Application Number
- CN202411259752.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology lacks multi-dimensional monitoring and analysis in tower safety detection, resulting in lag in the alarm of abnormal status on the infrastructure site, affecting the safety of power infrastructure projects, and failing to fully deal with climate factors, posing safety hazards.
The infrastructure site area hierarchical division module is adopted to divide the detection into three sub-levels: structure, operation and climate, and safety detection information is collected and analyzed separately. It is determined and alarmed through the abnormal level alarm module, combined with hook load, rope scanning image, and work The personnel location, wind speed and other data are comprehensively evaluated.
It realizes all-round safety monitoring, timely identify abnormal states at the infrastructure site, improves the accuracy and comprehensiveness of tower safety detection, reduces risks, and ensures efficient and safe tower operation.
Smart Images

Figure CN118968722A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tower assembly safety detection, and in particular to a tower assembly safety detection system and method used at a construction site. Background Art
[0002] Transmission towers play a pivotal role in the field of power engineering. Their stability involves key factors such as height, load and stability. Once a transmission tower fails or is improperly constructed, it may lead to serious accidents, threaten the lives of workers, and even affect the progress of the entire project. Power infrastructure projects often involve complex and changeable meteorological and environmental conditions. Therefore, comprehensive tower safety testing at the power infrastructure site is an indispensable part of ensuring the safe operation of the transmission tower in the later stage.
[0003] Prior art, such as the invention patent application with publication number: CN115790715A, discloses a method, system, electronic device and storage medium for monitoring and early warning of a construction tower crane. The method includes the following steps: obtaining detection information of a detection device set at each detection node of the tower crane; analyzing the stress and wear information of each standard section constituting the tower crane from the detection information; and obtaining the tower crane early warning information based on the stress and wear information. By adopting the above technical solution, the detection device is used to detect the working status of each standard section and other components constituting the tower crane, wherein the working status includes information such as the magnitude of the force, the inclination angle, the moving speed, etc. Based on the information obtained, it can be determined whether the current working status of the tower crane is within the normal range. If it exceeds the safe range, the staff is reminded by generating an early warning message; the data detected by the sensor are displayed in real time on the terminal, so as to intuitively control the various parameters of the tower crane during operation.
[0004] Prior art, such as the invention patent application with publication number: CN101763053B, discloses a mobile bridge safety detection and analysis management system, which includes a sensor monitoring system, a data acquisition system, and a data analysis and processing system. The sensor monitoring system includes main beam vibration, main beam internal force, main beam temperature, bridge tower displacement, main beam line shape, bridge tower vibration, cable tension, and environmental monitoring. The data acquisition system uses a data collector to access temperature sensors, acceleration sensors, vibrating string strain gauges, total stations, anemometers, digital cameras, and ultrasonic flaw detectors. The data analysis and processing system is controlled by a data analysis and processing workstation computer. The structural working state and health status of the bridge are inverted based on the collected data and signals, the possible degree of structural damage and its location are identified, and the safety and reliability assessment of the bridge is given from the overall perspective, providing technical support for management and maintenance, and ensuring safe operation.
[0005] In combination with the above scheme, it is found that in the current tower assembly safety detection, there is rarely hierarchical monitoring and analysis of multiple monitoring coverage dimensions of the infrastructure site, so that it is impossible to obtain timely alarms for abnormal conditions at the infrastructure site, and there is also a lack of further processing of the climate at the infrastructure site, which affects the safety of the operation of the power infrastructure project. There may also be safety hazards in the tower assembly process. Therefore, the present invention proposes a tower assembly safety detection system and method for the infrastructure site. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a tower assembly safety detection system and method for use at an infrastructure construction site, which can effectively solve the problems involved in the above-mentioned background technology.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a tower assembly safety detection system for a construction site, including a construction site area hierarchy division module, which is used to divide the construction site area hierarchy into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, and the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively have corresponding safety detection information.
[0008] The safety detection abnormality level alarm module is used to determine the safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level respectively, and analyze and locate the safety detection abnormality level to issue a detection abnormality alarm.
[0009] Furthermore, the analysis locates the safety detection anomaly level and performs detection anomaly alarm. The specific analysis process is: based on the safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level, the detection anomaly assessment values of the structure detection sub-level, operation detection sub-level and climate detection sub-level are determined in turn.
[0010] The detection anomaly assessment value of the structure detection sub-level is compared with the preset first structure detection anomaly assessment threshold. If the detection anomaly assessment value of the structure detection sub-level is higher than the first structure detection anomaly assessment threshold, the structure detection sub-level is used as a safety detection anomaly level for detection anomaly alarm.
[0011] The detection anomaly assessment value of the operation detection sub-level is compared with the preset second operation detection anomaly assessment threshold. If the detection anomaly assessment value of the operation detection sub-level is higher than the second operation detection anomaly assessment threshold, the operation detection sub-level is used as a safety detection anomaly level for detection anomaly alarm.
[0012] The detection anomaly assessment value of the climate detection sub-level is compared with the preset third climate detection anomaly assessment threshold. If the detection anomaly assessment value of the climate detection sub-level is higher than the third climate detection anomaly assessment threshold, the climate detection sub-level will be used as a safety detection anomaly level for detection anomaly alarm.
[0013] Furthermore, the detection anomaly assessment values of the structure detection sub-level, the operation detection sub-level and the climate detection sub-level, wherein the detection anomaly assessment value of the structure detection sub-level represents data obtained by analyzing the safety detection information of the structure detection sub-level and used to analyze and determine the degree of detection anomaly of the structure detection sub-level.
[0014] The detection anomaly assessment value of the operation detection sub-level represents data obtained by analyzing the safety detection information of the operation detection sub-level and used to analyze and determine the degree of detection anomaly of the operation detection sub-level.
[0015] The detection anomaly rating value of the climate detection sub-level represents data obtained by analyzing the safety detection information of the climate detection sub-level and used to analyze and determine the degree of detection anomaly of the climate detection sub-level.
[0016] Furthermore, the detection anomaly assessment value of the structural detection sub-level, the specific data acquisition and analysis process is: according to the tower assembly suspension hoisting device built in the infrastructure site area, the maximum use load value of each hook of the tower assembly suspension hoisting device during the monitoring period is collected and extracted.
[0017] The scanned images of each lifting rope of the tower suspension hoisting device are collected and extracted, and compared with the standard scanned images of each lifting rope of the tower suspension hoisting device stored in the database, thereby extracting the total broken area and the area of each wear area of each lifting rope of the tower suspension hoisting device.
[0018] The maximum usable load value of each hook of the tower suspension lifting device, the total broken area of each rope and the area of each wear area during the monitoring period are combined as the safety detection information of the structure detection sub-level, and the safety detection information of the structure detection sub-level is numerically compared and processed, and the detection abnormality assessment value of the structure detection sub-level is obtained by comprehensive analysis.
[0019] Furthermore, the detection anomaly assessment value of the operation detection sub-level, the specific data acquisition and analysis process is: monitor and identify the infrastructure site area, locate the location of each staff member in the infrastructure site area, and extract the location of each hazard source in the infrastructure site area monitoring area from the database, thereby extracting the distance between each staff member in the infrastructure site area and the adjacent hazard source.
[0020] The tilt angle of the central axis of the tower assembly and the frequency of the base vibration are monitored, thereby counting the tilt angle of the central axis of the tower assembly and the frequency of the base vibration.
[0021] The distance between each worker and the adjacent hazard source in the infrastructure site area, the inclination angle of the central axis of the tower assembly, and the frequency of the base vibration are combined as the safety detection information of the operation detection sub-level. The safety detection information of the operation detection sub-level is numerically processed, and the detection abnormality assessment value of the operation detection sub-level is obtained by comprehensive analysis.
[0022] Furthermore, the detection anomaly assessment value of the climate detection sub-level, the specific data acquisition and analysis process is: monitor the wind speed in the infrastructure site area, construct a schematic diagram of the vertical spatial distribution of the wind speed in the infrastructure site area, and arrange equally spaced screening points in the vertical direction for the constructed main body of the tower group, to obtain the screening points of each main body of the tower group, and extract the height of each screening point of the main body of the tower group, and match it with the maximum allowable wind speed of the tower group main body in each high zone stored in the database, to obtain the maximum allowable wind speed of each screening point of the main body of the tower group.
[0023] The actual wind speed and maximum allowable wind speed of each main screening point of the tower assembly are extracted, and the temperature of the infrastructure site area is monitored and extracted as the safety detection information of the climate detection sub-level. The safety detection information of the climate detection sub-level is numerically processed, and a comprehensive analysis is performed to obtain the detection anomaly assessment value of the detection sub-level.
[0024] Furthermore, the detection anomaly assessment value of the structure detection sub-level is specifically calculated as follows: ; In the formula, is the detection anomaly rating value of the structure detection sub-level, represents the maximum load value of the kth hook of the tower suspension lifting device, represents the reference maximum load value of the kth hook of the tower suspension hoisting device stored in the database, It represents the safety impact index of the cth hoist rope of the tower suspension hoisting device, , are the maximum load value and the impact weight coefficient corresponding to the safety impact index, respectively, and k represents the number of each hook. , f is the number of hooks, c is the number of each lifting rope, , b is the number of suspension ropes.
[0025] Furthermore, the specific calculation formula of the detection anomaly assessment value of the operation detection sub-level is: ; In the formula, The detection anomaly rating value for the operational detection sub-level, is the hazard source impact index of the infrastructure site area, To operate the tower impact index at the detection sub-level, and They are the impact weights corresponding to the hazard source impact index and tower group impact index of the set infrastructure site area.
[0026] Furthermore, the detection anomaly assessment value of the climate detection sub-level is specifically calculated as follows: ; In the formula, is the detection anomaly rating value of the climate detection sub-level, and They are the wind speed impact index and the temperature impact index of the climate detection sub-level, and are the climate impact index of the set climate detection sub-level and the impact weight corresponding to the temperature impact index of the climate detection sub-level, and e is a natural constant.
[0027] The second aspect of the present invention also provides a tower assembly safety detection method for a construction site, comprising: The infrastructure site area level is divided into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, and the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively have corresponding safety detection information.
[0028] The safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level are determined respectively, and the safety detection abnormality level is analyzed and located to issue detection abnormality alarm.
[0029] The present invention has the following beneficial effects: (1) The present invention divides the infrastructure site into different sub-levels, so that the system can comprehensively monitor the safety detection information of the structure, operation and climate, realize all-round safety monitoring, integrate the safety detection information of different levels, and obtain the abnormal status assessment results of the infrastructure site for timely alarm, thereby improving the overall efficiency of the system. At the same time, the hierarchical division and abnormal alarm provide a more comprehensive and accurate means for the safety detection of the tower assembly at the infrastructure site, which helps to improve the safety of the infrastructure site, reduce risks, and provide strong support for the continuous operation of the project.
[0030] (2) The present invention collects the maximum usable load value of each hook and the scanned image of each rope, and extracts the total fracture area and the wear area through comparison, and combines these data as the safety detection information of the structure detection sub-level, and performs numerical comparison processing. Finally, a comprehensive analysis is performed to obtain the detection abnormality assessment value of the structure detection sub-level, which is beneficial to improving the comprehensiveness and accuracy of the safety detection of tower assembly at the infrastructure site, discovering potential safety problems of the suspended lifting device at an early stage, preventing abnormal situations that may lead to accidents, and ensuring the efficiency and safety of the tower assembly operation.
[0031] (3) The present invention monitors the distance between the position of the workers and the hazard source, the inclination angle of the central axis of the tower assembly, the vibration frequency of the base, etc. at the infrastructure site, and combines this information as the safety detection information of the operation detection sub-level for numerical processing and comprehensive analysis. This is beneficial to a comprehensive understanding of the operating conditions at the infrastructure site, and improves the monitoring accuracy of the position relationship between the workers and the hazard source and the tower assembly operation status, thereby promoting the accuracy and comprehensiveness of tower assembly safety detection, helping to timely identify potential dangers and abnormal situations, and improving the safety level of tower assembly operations at the infrastructure site.
[0032] (4) The present invention monitors the wind speed and temperature at the infrastructure construction site, including constructing a schematic diagram of the vertical spatial distribution of wind speed, extracting the actual wind speed and the maximum allowable wind speed, and temperature information as safety detection information of the climate detection sub-level, and at the same time comprehensively monitoring and analyzing meteorological factors to obtain the detection anomaly assessment value of the climate detection sub-level, which is beneficial to a comprehensive understanding of the risk situation of tower assembly at different height intervals, and then helps to provide timely warnings and take corresponding measures to ensure that the tower assembly operation is carried out under appropriate meteorological conditions, thereby improving the safety of tower assembly at the infrastructure construction site.
[0033] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of system module connection of the present invention.
[0035] Figure 2 The figure is a schematic flow chart of the method steps of the present invention. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] In the description of the present invention, it should be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inside", "all around" and the like indicating orientation or positional relationship are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0038] See also Figure 1As shown, an embodiment of the present invention provides a tower assembly safety detection system for a construction site and a technical solution of the method thereof: the tower assembly safety detection system for a construction site includes a construction site area hierarchy division module, which is used to divide the construction site area hierarchy into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, and the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively have corresponding safety detection information.
[0039] The safety detection abnormality level alarm module is used to determine the safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level respectively, and analyze and locate the safety detection abnormality level to issue a detection abnormality alarm.
[0040] It should be noted that the tower assembly safety detection system used in the infrastructure construction site also includes a database for storing standard scanning images of each lifting rope of the tower assembly suspension lifting device, the location of each hazardous source in the infrastructure site area monitoring area, the maximum allowable wind speed of the tower assembly body in each high zone interval and the reference maximum use load value of each hook of the tower assembly suspension lifting device.
[0041] Specifically, the safety detection anomaly level is analyzed and located to perform detection anomaly alarm. The specific analysis process is: based on the safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level, the detection anomaly assessment values of the structure detection sub-level, operation detection sub-level and climate detection sub-level are determined in turn.
[0042] The detection anomaly assessment value of the structure detection sub-level is compared with the preset first structure detection anomaly assessment threshold. If the detection anomaly assessment value of the structure detection sub-level is higher than the first structure detection anomaly assessment threshold, the structure detection sub-level is used as a safety detection anomaly level for detection anomaly alarm.
[0043] The detection anomaly assessment value of the operation detection sub-level is compared with the preset second operation detection anomaly assessment threshold. If the detection anomaly assessment value of the operation detection sub-level is higher than the second operation detection anomaly assessment threshold, the operation detection sub-level is used as a safety detection anomaly level for detection anomaly alarm.
[0044] The detection anomaly assessment value of the climate detection sub-level is compared with the preset third climate detection anomaly assessment threshold. If the detection anomaly assessment value of the climate detection sub-level is higher than the third climate detection anomaly assessment threshold, the climate detection sub-level will be used as a safety detection anomaly level for detection anomaly alarm.
[0045] In this implementation plan, the safety detection information of the structural detection, operation detection and climate detection sub-levels is judged, compared according to the set abnormal assessment threshold, and an abnormal alarm is issued when the threshold is exceeded. This hierarchical and phased safety detection and alarm mechanism helps to promptly discover and respond to structural, operational and meteorological abnormalities that may exist in tower assembly operations at infrastructure sites.
[0046] In this implementation, the abnormal situations are carefully judged at different levels, avoiding the false positives or false negatives that may be caused by simple overall threshold judgment. The multi-level and differentiated threshold settings can more accurately capture abnormal situations at different levels, improving the accuracy and sensitivity of detection.
[0047] In this embodiment, when structural abnormalities, operational abnormalities or meteorological abnormalities occur, the system can issue targeted alarms based on the specific circumstances and provide timely safety prompts, so that operators can quickly take necessary measures to prevent potential risks, thereby ensuring efficient and safe tower assembly operations.
[0048] Specifically, the detection anomaly assessment values of the structural detection sub-level, the operation detection sub-level and the climate detection sub-level, wherein the detection anomaly assessment value of the structural detection sub-level represents the data obtained by analyzing the safety detection information of the structural detection sub-level, and is used to analyze and determine the degree of detection anomaly of the structural detection sub-level.
[0049] The detection anomaly assessment value of the operation detection sub-level represents data obtained by analyzing the safety detection information of the operation detection sub-level and used to analyze and determine the degree of detection anomaly of the operation detection sub-level.
[0050] The detection anomaly rating value of the climate detection sub-level represents data obtained by analyzing the safety detection information of the climate detection sub-level and used to analyze and determine the degree of detection anomaly of the climate detection sub-level.
[0051] In this implementation scheme, the detection anomaly assessment values of the structural detection, operation detection and climate detection sub-levels are obtained by analyzing the corresponding safety detection information. The assessment value of the structural detection sub-level reflects the analysis of the degree of structural anomaly, the assessment value of the operation detection sub-level expresses the analysis of the degree of operation anomaly, and the assessment value of the climate detection sub-level is obtained by analyzing meteorological information.
[0052] In this implementation plan, the degree of abnormality at different levels is carefully quantified and evaluated, providing more accurate and comprehensive information for tower assembly safety inspections at infrastructure sites. This can help staff more accurately identify possible structural problems, operational abnormalities, and meteorological risks in tower assembly operations, and help provide early warnings and take necessary measures to ensure the efficiency and safety of tower assembly operations. At the same time, through the analysis of abnormality assessment values at different sub-levels, the system can provide more targeted and detailed safety alarm information, and provide targeted guidance to staff to reduce potential risks and the possibility of accidents.
[0053] Specifically, the detection anomaly assessment value of the structural detection sub-level, the specific data acquisition and analysis process is: according to the tower assembly suspension lifting device built in the infrastructure site area, the maximum usage load value of each hook of the tower assembly suspension lifting device during the monitoring period is collected and extracted.
[0054] The scanned images of each lifting rope of the tower suspension hoisting device are collected and extracted, and compared with the standard scanned images of each lifting rope of the tower suspension hoisting device stored in the database, thereby extracting the total broken area and the area of each wear area of each lifting rope of the tower suspension hoisting device.
[0055] The maximum usable load value of each hook of the tower suspension lifting device, the total broken area of each rope and the area of each wear area during the monitoring period are combined as the safety detection information of the structure detection sub-level, and the safety detection information of the structure detection sub-level is numerically compared and processed, and the detection abnormality assessment value of the structure detection sub-level is obtained by comprehensive analysis.
[0056] In this implementation scheme, by collecting the maximum usable load value of each hook and the scanned image of each rope, and extracting the total fracture area and the wear area through comparison, these data are combined as the safety detection information of the structure detection sub-level, and numerical comparison processing is performed. Finally, a comprehensive analysis is performed to obtain the detection abnormality assessment value of the structure detection sub-level, which is beneficial to improving the comprehensiveness and accuracy of tower assembly safety inspections at infrastructure sites, discovering potential problems with suspended lifting devices at an early stage, preventing abnormal situations that may lead to accidents, and ensuring efficient and safe tower assembly operations.
[0057] Specifically, the detection anomaly assessment value of the operation detection sub-level, the specific data acquisition and analysis process is: monitor and identify the infrastructure site area, locate the location of each staff member in the infrastructure site area, and extract the location of each hazard source in the infrastructure site area monitoring area from the database, thereby extracting the distance between each staff member in the infrastructure site area and the adjacent hazard source.
[0058] Monitor the inclination angle of the central axis of the tower assembly and the frequency of the base vibration, and thereby calculate the inclination angle of the central axis of the tower assembly and the frequency of the base vibration; The distance between each worker and the adjacent hazard source in the infrastructure site area, the inclination angle of the central axis of the tower assembly, and the frequency of the base vibration are combined as the safety detection information of the operation detection sub-level. The safety detection information of the operation detection sub-level is numerically processed, and the detection abnormality assessment value of the operation detection sub-level is obtained by comprehensive analysis.
[0059] In this implementation scheme, the sources of danger in the infrastructure site area include charged objects and lifting poles within 5m vertically below the lifting components.
[0060] In this implementation scheme, by identifying the distance between the position of the workers at the infrastructure construction site and the hazard source, the inclination angle of the central axis of the tower assembly, the vibration frequency of the base, etc., and combining this information as safety detection information of the operation detection sub-level, numerical processing and comprehensive analysis are performed, which is beneficial to a comprehensive understanding of the operating conditions of the infrastructure construction site, and improves the monitoring accuracy of the relationship between the workers and the hazard source and the operation status of the tower assembly, thereby promoting the accuracy and comprehensiveness of tower assembly safety detection, helping to timely identify potential dangers and abnormal conditions, and improving the safety level of tower assembly operations at the infrastructure construction site.
[0061] Specifically, the detection anomaly assessment value of the climate detection sub-level, the specific data acquisition and analysis process is: monitor the wind speed in the infrastructure site area, construct a schematic diagram of the vertical spatial distribution of the wind speed in the infrastructure site area, and arrange equally spaced screening points in the vertical direction for the constructed main body of the tower group, obtain the screening points of each main body of the tower group, and extract the height of each screening point of the main body of the tower group, match it with the maximum allowable wind speed of the tower group main body in each high zone stored in the database, and obtain the maximum allowable wind speed of each screening point of the main body of the tower group.
[0062] The actual wind speed and maximum allowable wind speed of each main screening point of the tower assembly are extracted, and the temperature of the infrastructure site area is monitored and extracted as the safety detection information of the climate detection sub-level. The safety detection information of the climate detection sub-level is numerically processed, and a comprehensive analysis is performed to obtain the detection anomaly assessment value of the detection sub-level.
[0063] In this implementation plan, the wind speed and temperature at the infrastructure construction site are monitored, including constructing a schematic diagram of the vertical spatial distribution of wind speed, extracting the actual wind speed and the maximum allowable wind speed, and temperature information as safety detection information for the climate detection sub-level, and at the same time, comprehensive monitoring and analysis of meteorological factors are performed to obtain detection anomaly assessment values for the climate detection sub-level, which is beneficial for a comprehensive understanding of the risk situation of tower assembly at different height intervals, and then helps to provide timely warnings and take corresponding measures to ensure that tower assembly operations are carried out under appropriate meteorological conditions, thereby improving the safety of tower assembly at the infrastructure construction site.
[0064] Specifically, the detection abnormality assessment value of the structural detection sub-level is calculated by using the maximum use load value of each hook, the total fracture area of each rope, and the wear area as the safety detection information of the structural detection sub-level, and performing numerical comparison processing, and provides data support for subsequent detection abnormality alarms. The specific calculation formula is: ; In the formula, is the detection anomaly rating value of the structure detection sub-level, represents the maximum load value of the kth hook of the tower suspension lifting device, represents the reference maximum load value of the kth hook of the tower suspension hoisting device stored in the database, It represents the safety impact index of the cth hoist rope of the tower suspension hoisting device, , are the maximum load value and the impact weight coefficient corresponding to the safety impact index, respectively, and k represents the number of each hook. , f is the number of hooks, c is the number of each lifting rope, , b is the number of suspension ropes.
[0065] It should be noted that the safety impact index of each hoisting rope of the tower suspension hoisting device in this embodiment is obtained by processing the total fracture area and the area of each wear area of each hoisting rope of the tower suspension hoisting device, and is used as the analysis basis of the detection abnormality assessment value of the structure detection sub-level. The calculation formula is: ; In the formula, It represents the safety impact index of the cth hoist rope of the tower suspension hoisting device, as well as represents the total fracture area of the cth suspension rope of the tower suspension hoisting device and the dth wear area, is the influence factor corresponding to the set unit suspension rope fracture area, represents the defined wear area of the cth rope of the preset tower suspension hoisting device, is the correction factor corresponding to the set wear area, d represents the number of each wear area, , t is the number of wear areas.
[0066] Specifically, the detection abnormality assessment value of the operation detection sub-level is obtained by identifying the distance between the construction site staff and the hazard source, the inclination angle of the tower assembly center axis, and the vibration frequency of the base, and combining this information as the safety detection information of the operation detection sub-level, and performing numerical processing and comprehensive analysis. It also provides data support for subsequent detection abnormality alarms. The specific calculation formula is: , where The detection anomaly rating value for the operational detection sub-level, is the hazard source impact index of the infrastructure site area, To operate the tower impact index at the detection sub-level, and are the impact weights corresponding to the hazard source impact index and tower group impact index of the set infrastructure site area, and e is a natural constant.
[0067] It should be noted that the hazard source impact index of the infrastructure site area is obtained by processing the data of the distance between each worker and the adjacent hazard source in the infrastructure site area, and is used as the analysis basis for the detection anomaly assessment value of the operation detection sub-level. The calculation formula is: ; In the formula, is the hazard source impact index of the infrastructure site area, is the distance between the i-th worker and the adjacent hazard source in the infrastructure site area, It represents the impact factor corresponding to the unit distance between the set worker and the adjacent hazard source, i represents the number of each worker, , n is the number of staff.
[0068] It should be noted that the tower impact index of the operation detection sub-level is obtained by data processing of the inclination angle of the central axis of the tower and the frequency of the base vibration, and is used as the basis for the classification of the detection abnormality assessment value of the operation detection sub-level. The calculation formula is: ; In the formula, To operate the tower impact index at the detection sub-level, is the inclination angle of the central axis of the tower group, is the frequency of base vibration, as well as Indicates the set tower center axis inclination limit angle and the reference frequency of the base vibration. and They are the correction factors corresponding to the set inclination angle of the central axis of the tower assembly and the frequency of the base vibration.
[0069] Specifically, the detection anomaly assessment value of the climate detection sub-level is calculated by the actual wind speed and the maximum allowable wind speed, as well as the combined temperature information, and provides data support for subsequent detection anomaly alarms. The specific calculation formula is: ; In the formula, is the detection anomaly rating value of the climate detection sub-level, and They are the wind speed impact index and the temperature impact index of the climate detection sub-level, and are the climate impact index of the set climate detection sub-level and the impact weight corresponding to the temperature impact index of the climate detection sub-level, and e is a natural constant.
[0070] It should be noted that the wind speed impact index of the climate detection sub-level is obtained by processing the wind speed of each main screening point of the tower group and the maximum allowable wind speed of each main screening point of the tower group, and is used as the analysis basis for the detection anomaly assessment value of the climate detection sub-level. The calculation formula is: ; In the formula, is the wind speed impact index at the climate detection sublevel, as well as are the wind speed at the jth main screening point of the tower group and the maximum allowable wind speed, It indicates the correction factor corresponding to the set wind speed, j indicates the number of each subject screening point, , m is the number of subject screening points.
[0071] It should be noted that the temperature impact index of the climate detection sub-level is obtained by data processing of the temperature of the infrastructure site area, and is used as the analysis basis for the detection anomaly assessment value of the climate detection sub-level. The calculation formula is: ; In the formula, is the temperature impact index at the climate detection sublevel, is the temperature of the infrastructure site area, is the reference temperature of the infrastructure site area, Indicates the correction factor corresponding to the set temperature.
[0072] See also Figure 2 As shown, the second aspect of the present invention also provides a tower assembly safety detection method for a construction site, comprising: dividing the construction site area hierarchy into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively having corresponding safety detection information.
[0073] The safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level are determined respectively, and the safety detection abnormality level is analyzed and located to issue detection abnormality alarm.
[0074] It should be noted that, in this article, relational terms such as structure and operation are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variation thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0075] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A tower assembly safety detection system for infrastructure construction sites, characterized in that: include: A construction site area hierarchical division module, used to divide the construction site area hierarchical into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, wherein the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively have corresponding safety detection information; The safety detection abnormality level alarm module is used to determine the safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level respectively, and analyze and locate the safety detection abnormality level to issue a detection abnormality alarm.
2. The tower assembly safety detection system for infrastructure construction site according to claim 1 is characterized in that: The analysis and positioning safety detection abnormal level is used to detect abnormal alarms. The specific analysis process is as follows: According to the safety detection information of the structure detection sub-level, the operation detection sub-level and the climate detection sub-level, the detection abnormality assessment values of the structure detection sub-level, the operation detection sub-level and the climate detection sub-level are determined in sequence; The detection anomaly assessment value of the structure detection sub-level is compared with the preset first structure detection anomaly assessment threshold. If the detection anomaly assessment value of the structure detection sub-level is higher than the first structure detection anomaly assessment threshold, the structure detection sub-level is used as a safety detection anomaly level to issue a detection anomaly alarm; The detection anomaly assessment value of the operation detection sub-level is compared with the preset second operation detection anomaly assessment threshold. If the detection anomaly assessment value of the operation detection sub-level is higher than the second operation detection anomaly assessment threshold, the operation detection sub-level is used as a safety detection anomaly level to issue a detection anomaly alarm; The detection anomaly assessment value of the climate detection sub-level is compared with the preset third climate detection anomaly assessment threshold. If the detection anomaly assessment value of the climate detection sub-level is higher than the third climate detection anomaly assessment threshold, the climate detection sub-level will be used as a safety detection anomaly level for detection anomaly alarm.
3. The tower assembly safety detection system for infrastructure construction site according to claim 1 is characterized in that: The detection anomaly assessment values of the structure detection sub-level, the operation detection sub-level and the climate detection sub-level, wherein the detection anomaly assessment value of the structure detection sub-level represents data obtained by analyzing the safety detection information of the structure detection sub-level and used to analyze and determine the degree of detection anomaly of the structure detection sub-level; The detection anomaly assessment value of the operation detection sub-level represents data obtained by analyzing the safety detection information of the operation detection sub-level and used to analyze and determine the degree of detection anomaly of the operation detection sub-level; The detection anomaly rating value of the climate detection sub-level represents data obtained by analyzing the safety detection information of the climate detection sub-level and used to analyze and determine the degree of detection anomaly of the climate detection sub-level.
4. The tower assembly safety detection system for infrastructure construction site according to claim 2 is characterized in that: The detection anomaly assessment value of the structure detection sub-level, the specific data acquisition and analysis process is: According to the tower assembly suspension hoisting device built in the infrastructure site area, collect and extract the maximum use load value of each hook of the tower assembly suspension hoisting device during the monitoring period; Collect and extract the scanned images of each suspension rope of the tower assembly suspension hoisting device, and compare them with the standard scanned images of each suspension rope of the tower assembly suspension hoisting device stored in the database, thereby extracting the total fracture area and each wear area of each suspension rope of the tower assembly suspension hoisting device; The maximum usable load value of each hook of the tower suspension lifting device, the total broken area of each rope and the area of each wear area during the monitoring period are combined as the safety detection information of the structure detection sub-level, and the safety detection information of the structure detection sub-level is numerically compared and processed, and the detection abnormality assessment value of the structure detection sub-level is obtained by comprehensive analysis.
5. The tower assembly safety detection system for infrastructure construction site according to claim 2 is characterized in that: The specific data acquisition and analysis process of the detection anomaly assessment value of the operation detection sub-level is as follows: Monitor and identify the infrastructure site area, locate the location of each worker in the infrastructure site area, and extract the location of each hazard source in the infrastructure site monitoring area from the database, thereby extracting the distance between each worker in the infrastructure site area and the adjacent hazard source; Monitor the inclination angle of the central axis of the tower assembly and the frequency of the base vibration, and thereby calculate the inclination angle of the central axis of the tower assembly and the frequency of the base vibration; The distance between each worker and the adjacent hazard source in the infrastructure site area, the inclination angle of the central axis of the tower assembly, and the frequency of the base vibration are combined as the safety detection information of the operation detection sub-level. The safety detection information of the operation detection sub-level is numerically processed, and the detection abnormality assessment value of the operation detection sub-level is obtained by comprehensive analysis.
6. The tower assembly safety detection system for infrastructure construction sites according to claim 2 is characterized in that: The detection anomaly assessment value of the climate detection sub-level, the specific data acquisition and analysis process is as follows: Monitor the wind speed in the infrastructure construction site, construct a schematic diagram of the vertical spatial distribution of the wind speed in the infrastructure construction site, and arrange equally spaced screening points in the vertical direction for the built main body of the tower assembly to obtain the screening points of each main body of the tower assembly, and extract the height of each screening point of the main body of the tower assembly, and match it with the maximum allowable wind speed of the main body of the tower assembly in each high zone stored in the database to obtain the maximum allowable wind speed of each screening point of the main body of the tower assembly; The actual wind speed and maximum allowable wind speed of each main screening point of the tower assembly are extracted, and the temperature of the infrastructure site area is monitored and extracted as the safety detection information of the climate detection sub-level. The safety detection information of the climate detection sub-level is numerically processed, and a comprehensive analysis is performed to obtain the detection anomaly assessment value of the detection sub-level.
7. The tower assembly safety detection system for infrastructure construction sites according to claim 4 is characterized in that: The specific calculation formula of the detection anomaly assessment value of the structure detection sub-level is: ; In the formula, is the detection anomaly rating value of the structure detection sub-level, represents the maximum load value of the kth hook of the tower suspension lifting device, represents the reference maximum load value of the kth hook of the tower suspension hoisting device stored in the database, It represents the safety impact index of the cth hoist rope of the tower suspension hoisting device, , are the maximum load value and the impact weight coefficient corresponding to the safety impact index, respectively, and k represents the number of each hook. , f is the number of hooks, c is the number of each lifting rope, , b is the number of suspension ropes.
8. The tower assembly safety detection system for infrastructure construction sites according to claim 5 is characterized in that: The specific calculation formula of the detection anomaly assessment value of the operation detection sub-level is: ; In the formula, The detection anomaly rating value for the operational detection sub-level, is the hazard source impact index of the infrastructure site area, To operate the tower impact index at the detection sub-level, and They are the impact weights corresponding to the hazard source impact index and tower group impact index of the set infrastructure site area.
9. The tower assembly safety detection system for infrastructure construction sites according to claim 6 is characterized in that: The specific calculation formula of the detection anomaly assessment value of the climate detection sub-level is: ; In the formula, is the detection anomaly rating value of the climate detection sub-level, and They are the wind speed impact index and the temperature impact index of the climate detection sub-level, and are the influence weights corresponding to the wind speed influence index of the set climate detection sub-level and the temperature influence index of the climate detection sub-level, and e is a natural constant.
10. A tower assembly safety detection method for a construction site, characterized in that: include: Dividing the infrastructure site area level into a structure detection sub-level, an operation detection sub-level and a climate detection sub-level, wherein the structure detection sub-level, the operation detection sub-level and the climate detection sub-level respectively have corresponding safety detection information; The safety detection information of the structure detection sub-level, operation detection sub-level and climate detection sub-level are determined respectively, and the safety detection abnormality level is analyzed and located to issue detection abnormality alarm.
Citation Information
Cited By
Intelligent remote early warning method and system for tower crane
CN119612389A