Power grid reliability improvement method and system based on load transfer and main and distribution cooperation
Through the grid reliability improvement method that coordinates load transfer and main distribution, the coordinated optimization model and dynamic network adjustment are used to solve the problem that the distribution network load transfer capability is ignored during grid failure recovery, and the stable operation and reliability improvement of the power system is achieved. .
Patent Information
- Application Number
- CN202411069563.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-15
AI Technical Summary
The prior art ignores the distribution network load transfer capability in power grid failure recovery, resulting in limited power supply reliability in some areas, making it difficult to meet the needs of complex structures and volatility of modern power grids.
The grid reliability improvement method based on the coordination of load transfer and main distribution is adopted, and the network topology is dynamically adjusted, and the load is transferred from the fault area to other areas to ensure the stable operation of the power system.
A better fault recovery strategy was generated, which improved the overall reliability and stability of the power grid, reduced the system risk index, and overcome the problem of insufficient coordination between the main network and the distribution network.
Smart Images

Figure CN118970932A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power grid operation and maintenance, and in particular, relates to a method and system for improving power grid reliability based on load transfer and main distribution coordination. Background Art
[0002] With the continuous increase in electricity demand and the complexity of the power grid structure, the stability and reliability of the power system are facing severe challenges. Traditional power dispatching and fault recovery strategies are difficult to meet the needs of modern power grids. How to quickly and effectively restore power supply and ensure the stable operation of the power grid has become an important issue in power system operations.
[0003] In traditional power systems, the main grid and distribution network operate independently. This separate operation mode limits the efficiency of grid fault recovery to a certain extent, and it is impossible to obtain the optimal recovery strategy. In recent years, the development of smart grids and distributed energy has made the grid structure more complex, and the volatility and uncertainty of the grid have increased. Through the collaborative work of the main grid and the distribution network, fault recovery and power dispatch can be carried out more efficiently, thereby improving the overall operation efficiency of the grid. In addition, by sending instructions through the remote control system, a large number of circuit breakers and switches can be operated in a short time, changing the grid topology, making it possible to transfer loads on a large scale when encountering faults. Modern smart grid systems can obtain a large amount of operating data in real time, and use these data for dynamic analysis and intelligent decision-making, which can further optimize the operation and fault recovery strategies of the grid and improve the reliability and stability of the grid.
[0004] Prior art 1 discloses a multi-dimensional smart grid planning and evaluation system based on main and distribution coordination, publication number: CN115733756A. The influencing factors of the main network and distribution network planning are collected, and a common grid planning evaluation index library for the main network and distribution network is constructed based on these factors. The index library contains primary indicators, secondary indicators and tertiary indicators. The indicator weights of the primary indicators and secondary indicators are determined, and the scoring criteria for the tertiary indicators are established. According to the scoring criteria of the tertiary indicators and the indicator weights of the primary indicators and secondary indicators, the grid planning scheme to be evaluated is scored, and finally the evaluation results are obtained.
[0005] Prior art 2 discloses a main distribution network integrated collaborative optimization flow calculation and load transfer supply system, publication number: CN116191434A. In view of the fact that the modules of the current distribution network management system are independent of each other, and some data are repeatedly calculated, resulting in waste of resources and low efficiency, the invention proposes an integrated system, including a power grid parameter module, a graphic data module, a load data module, a flow calculation module, a peak-shifting optimization module, a load transfer module and a statistical management module. The load transfer module is connected to the power grid parameter module, the graphic data module, the load data module, the flow calculation module, the peak-shifting optimization module and the statistical management module to obtain the optimal load transfer and power supply plan. The application layer has a variety of functional modules, and the modules are interconnected, so that the data is fully utilized, which is conducive to shortening the processing time and improving the real-time performance.
[0006] Prior art 3 discloses a distribution network load precision control method based on main distribution coordination, publication number: CN116093957A. The load removal target value instruction is sent to the regional control system through the provincial dispatching automation system. After receiving the instruction, the regional control system inquires whether there is a dedicated line load. If there is a dedicated line load, the dedicated line load is cut off, and the remaining load removal target value is calculated, and then the instruction is sent to the regional distribution network system. After the regional distribution network system receives the load removal target value instruction, it queries each removable load and its removable load amount according to the pre-built controllable load resource pool. Based on the preset control strategy, a control plan is generated and precise load control is implemented.
[0007] Prior art 4 discloses a method and device for load transfer in an intelligent distribution network, with publication number CN110676844A. By acquiring and analyzing the current and future data of the distribution network system, load transfer is judged and executed in advance to achieve active operation and maintenance. First, the predicted data of the distribution network system at future times is obtained, the operating topology at the current time is determined, and the abnormal topological nodes of the distribution network system at future times are identified in combination with the future equipment operating status and the current topology. Based on these abnormal nodes, several operating topologies are re-determined, and corresponding load transfer strategies are generated. By combining the load amount of the future equipment load, the evaluation index of each load transfer strategy is calculated, and finally the strategy with the best evaluation index is selected as the load transfer plan.
[0008] The above-mentioned existing technologies all focus on the overall framework of main and distribution coordinated fault recovery, focusing on the fault information interaction between the main network and the distribution network. The specific strategies for main and distribution coordinated fault recovery are based on their own independent models. During the power supply restoration process, the power transmission capacity of the transmission network is limited due to the faulty line, and the power supply reliability of some areas is greatly affected. When dealing with these problems, existing methods often ignore the potential of the distribution network's load transfer capacity. If the load transfer capacity of the distribution network can be considered and the load in the affected area can be transferred to other unaffected areas, then the power supply reliability of these areas is expected to be significantly improved. To this end, the present invention proposes a method and system for improving power grid reliability based on load transfer and main and distribution coordination. Summary of the invention
[0009] The purpose of the present invention is to provide a method and system for improving the reliability of a power grid based on load transfer and coordination between the main network and the distribution network, which utilizes a collaborative optimization model, sets reasonable constraints, and jointly considers the restoration strategies of the main network and the distribution network. By dynamically adjusting the network topology and load distribution, an optimal solution for power supply restoration is achieved. When a fault occurs, part of the load is transferred from the fault area to other areas through a load transfer strategy to ensure the stable operation of the power system.
[0010] The technical solution of the present invention is: a method for improving power grid reliability based on load transfer and main distribution coordination, comprising the following steps: Step 1: When the fault detection module detects a system fault, the data monitoring module obtains data of the integrated transmission and distribution system, which includes the topological structure of the main network and the distribution network, real-time load data, and the operating status of each power system equipment; Step 2: The output execution module controls the relay protection equipment, locates the fault and removes it, and makes a preliminary assessment to determine the affected area and the load that needs to be restored; Step 3: Input the pre-acquired main and distribution network structure and operation data into the collaborative optimization module. With the goal of minimizing the total unpowered load, the main and distribution collaborative optimization model is used to solve the network reconstruction topology structure and the corresponding load transfer strategy to generate a collaborative optimization strategy. Step 4: The output execution module executes the collaborative optimization strategy, controls switches and circuit breakers according to the strategy to adjust the network topology, and outputs and adjusts the corresponding power system equipment operating status; Step 5: The data monitoring module obtains system data again, confirms the load recovery amount, records and analyzes the load results, forms a historical database, and calculates the reliability of the main grid power system.
[0011] As a preferred technical solution, the specific method for generating the collaborative optimization strategy in step 3 is as follows: Through the main network model constraints and distribution network model constraints in the main-distribution collaborative optimization model, the collaborative optimization goal is to minimize the total unpowered load, and obtain the reconstructed network topology structure after the fault, the optimal power supply restoration strategy and load transfer plan.
[0012] As a preferred technical solution, the main network model constraints include main network system model constraints and component operation constraints; The main grid system model constraints include linear power flow balance constraints and other inequality constraints, and its line power flow equation is: ; in , , , , , , and Node With Node The voltage, Is a node and nodes The voltage phase difference between Is a node and nodes The voltage phase difference between and Line The shunt conductance and shunt susceptance in the model, and They are main network slave nodes To Node The active power and reactive power of and They are main network slave nodes To Node The active power and reactive power of is the set of branch lines of the main network; formulas (1)-(4) describe the transmission of active power and reactive power, and express the symmetry of active power and reactive power; Linear power flow balance constraints: ; in, and They are Active power generation and reactive power generation, and The nodes are The active load and reactive load, and The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, is the main network node set; formulas (5) and (6) are the nodes The active power and reactive power balance constraint indicates that the input and output power of each node need to be balanced; The remaining inequality constraints are: ; in is the maximum node voltage angle, It is an associated line A binary variable; if the line Set to 1 if connected, and set to 0 if disconnected; and are the maximum and minimum node voltage amplitudes, respectively; The component operation constraints are: ; in It is a line Maximum power flow, and The nodes are The maximum / minimum output of the generator's active and reactive power. Formulas (11)-(13) represent the safe operation constraints of the distribution network components, including the maximum value limits of active power, reactive power and line current.
[0013] As a preferred technical solution, the distribution network model constraints include radial topology constraints, distribution network system model constraints, cone constraints, component safety constraints and boundary constraints; Radial topology constraints: ; In the formula, and Representation Node , Binary variables indicating upstream and downstream relationships between =1 means yes The parent node of =1 means yes The parent node of Representation Node Binary variables indicating upstream and downstream relationships between Indicates the distribution network branch line collection, Represents a set of distribution network nodes. represents the substation node set in the distribution system; Formula (14) represents the , if the switch is closed, then there must be yes The parent node or yes The parent node of =0, then ; Formula (15) indicates that each node has only one parent node; Formula (16) indicates that a substation node in the distribution system cannot be a child node of any other node; Distribution network system model constraints: ; in It is a distribution node provided by the main network. The active and reactive injected power, The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, and It is a line The series resistance and series reactance in the model, It is a line The square of the current amplitude, It is a distribution network node The load power; Formula (17) (18) represents the power balance condition of the distribution network; Cone Constraint: ; in , , For the network distribution node The voltage of; Formula (19) is the quadratic form of the quadratic constraint: ; Component security constraints: ; in and Distribution lines The active and reactive power flows of nodes and nodes The relationship between the voltage difference and power and current; Formulas (21)-(24) respectively ensure that the node voltage, current, active power and reactive power are within the normal range; Boundary constraints: ; in To connect to the distribution network substation The main network node set, is the substation node set in the distribution network, Main network node Active and reactive power losses provided to the distribution network, Main network node for connecting to the distribution network voltage; Formula (25) represents the correct relationship between power and voltage between the main distribution network.
[0014] As a preferred technical solution, the objective function of minimizing the total unpowered load is: ; in is the set of nodes where the generator is located, Is a node The cost of the generator, and They are main network and distribution network nodes respectively. Penalty factor for load loss, and are the active loads of the main network and distribution network nodes respectively, and They are respectively the sets of nodes with loads in the main network and the distribution network.
[0015] As a preferred technical solution, in step 5, the risk index is used to calculate and evaluate the risk level of the power system to determine the reliability of the main grid power system, which specifically includes the following steps: Step 5a: Calculate the expected unsupplied energy EENS: ; EENS is the expected energy that the system fails to supply in a year, is the load level duration, is the load level The system state set, Is the system status The probability of occurrence, Is the system status The total load reduction under is the total length of time recorded; Step 5b: Calculate the load shedding probability PLC: ; where PLC is the probability of load shedding occurring at all load levels; Step 5c: Calculate the severity index SI: ; where SI is the equivalent duration of a complete system outage under peak load conditions.
[0016] A power grid reliability improvement system based on load transfer and main distribution coordination, including a fault detection module, an output execution module, a collaborative optimization module, a data monitoring module, a historical database and a data processing center; The fault detection module is used to monitor the operating status of the power system equipment in real time and transmit the fault information to the data processing center when a system fault is detected; The output execution module is used to control the execution of relay protection equipment, switches and circuit breakers on the line, and power system equipment; when receiving a fault removal instruction from the data processing center, it outputs to the relay protection device to remove the fault; when receiving a collaborative optimization instruction from the data processing center, it controls the switches and circuit breakers according to the strategy to adjust the network topology and adjust the operating status of the corresponding power system equipment; The collaborative optimization module is used to generate a collaborative optimization strategy, and when receiving a collaborative optimization strategy generation instruction from a data processing center, generates a collaborative optimization strategy and returns the strategy to the data processing center; The data monitoring module is used to obtain the real-time operation data of the integrated transmission and distribution system, and when receiving the instruction to obtain the real-time operation data from the data processing center, returns the obtained real-time operation data of the integrated transmission and distribution system to the data processing center; The historical database is used to store historical data of the integrated transmission and distribution system and receive real-time operation data from the data processing center to form a database; The data processing center is used to receive and process the information transmitted by the above-mentioned modules, and control each module to execute in sequence according to the steps of the above-mentioned method for improving the reliability of the power grid based on load transfer and main distribution coordination.
[0017] The advantages of the present invention are: 1. Better collaborative optimization strategy: The present invention can generate a better primary and secondary collaborative fault recovery strategy through a collaborative optimization model to achieve the best global recovery effect; 2. Intelligent fault prediction and prevention: The present invention introduces an intelligent fault prediction and prevention mechanism, which can prevent the occurrence of secondary faults and further improve the stability of the power grid; 3. Comprehensive risk assessment and optimization: The present invention evaluates the risk level of the power system through risk index calculation and generates the optimal power supply restoration strategy, which can significantly reduce the system risk index and improve system reliability; 4. Comprehensive information sharing and interaction mechanism: The present invention realizes the coordinated handling of power supply restoration of the main and distribution networks through the information sharing and interaction mechanism between the main network and the distribution network, overcomes the problem of insufficient coordination between the main network and the distribution network in the prior art, and ensures the global optimization of the power supply restoration strategy. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. The accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 is a flow chart of the method of the present invention; Figure 2 is a system structure block diagram of the present invention; Figure 3 This is a calculation example diagram of Example 1 of the present invention. DETAILED DESCRIPTION
[0020] The above scheme is further described below in conjunction with specific examples. It should be understood that these examples are used to illustrate the present invention and are not limited to the scope of the present invention. The implementation conditions adopted in the examples can be further adjusted according to the conditions of the specific manufacturer, and the unspecified implementation conditions are usually the conditions in conventional experiments.
[0021] Reference Figure 1 and Figure 2 As shown, a method for improving power grid reliability based on load transfer and main distribution coordination includes the following steps: Step 1: When the fault detection module detects a system fault, the data monitoring module obtains data of the integrated transmission and distribution system, which includes the topological structure of the main network and the distribution network, real-time load data, and the operating status of each power system equipment; Step 2: The output execution module controls the relay protection equipment, locates the fault and removes it, and makes a preliminary assessment to determine the affected area and the load that needs to be restored; Step 3: Input the pre-acquired main and distribution network structure and operation data into the collaborative optimization module. With the goal of minimizing the total unpowered load, the main and distribution collaborative optimization model is used to solve the network reconstruction topology structure and the corresponding load transfer strategy to generate a collaborative optimization strategy. The specific method for generating the collaborative optimization strategy in step 3 is as follows: Through the main network model constraints and distribution network model constraints in the main-distribution collaborative optimization model, the collaborative optimization goal is to minimize the total unpowered load, and obtain the reconstructed network topology structure after the fault, the optimal power supply restoration strategy and load transfer plan.
[0022] The main grid model constraints include the main grid system model constraints and component operation constraints; the main grid system model constraints include linear power flow balance constraints and other inequality constraints, and its line power flow equation is: ; in , , , , , , and Node With Node The voltage, Is a node and nodes The voltage phase difference between Is a node and nodes The voltage phase difference between and Line The shunt conductance and shunt susceptance in the model, and They are main network slave nodes To Node The active power and reactive power of and They are main network slave nodes To Node The active power and reactive power of is the set of branch lines of the main network; formulas (1)-(4) describe the transmission of active power and reactive power, and express the symmetry of active power and reactive power; Linear power flow balance constraints: ; in, and They are Active power generation and reactive power generation, and The nodes are The active load and reactive load, and The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, is the main network node set; formulas (5) and (6) are the nodes The active power and reactive power balance constraint indicates that the input and output power of each node need to be balanced; The remaining inequality constraints are: ; in is the maximum node voltage angle, It is an associated line A binary variable; if the line Set to 1 if connected, and set to 0 if disconnected; and are the maximum and minimum node voltage amplitudes, respectively; The component operation constraints are: ; in It is a line Maximum power flow, and The nodes are The maximum / minimum output of the generator's active and reactive power. Formulas (11)-(13) represent the safe operation constraints of the distribution network components, including the maximum value limits of active power, reactive power and line current.
[0023] The distribution network model constraints include radial topology constraints, distribution network system model constraints, cone constraints, component safety constraints and boundary constraints; Radial topology constraints: ; In the formula, and Representation Node , Binary variables indicating upstream and downstream relationships between =1 means yes The parent node of =1 means yes The parent node of Representation Node Binary variables indicating upstream and downstream relationships between Indicates the distribution network branch line collection, Represents a set of distribution network nodes. represents the substation node set in the distribution system; Formula (14) represents the , if the switch is closed, then there must be yes The parent node or yes The parent node of =0, then ; Formula (15) indicates that each node has only one parent node; Formula (16) indicates that a substation node in the distribution system cannot be a child node of any other node; Distribution network system model constraints: ; in It is a distribution node provided by the main network. The active and reactive injected power, The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, and It is a line The series resistance and series reactance in the model, It is a line The square of the current amplitude, It is a distribution network node The load power; Formula (17) (18) represents the power balance condition of the distribution network; Cone Constraint: ; in , , For the network distribution node The voltage of; Formula (19) is the quadratic form of the quadratic constraint: ; Component security constraints: ; in and Distribution lines The active and reactive power flows of nodes and nodes The relationship between the voltage difference and power and current; Formulas (21)-(24) respectively ensure that the node voltage, current, active power and reactive power are within the normal range; Boundary constraints: ; in To connect to the distribution network substation The main network node set, is the substation node set in the distribution network, Main network node Active and reactive power losses provided to the distribution network, Main network node for connecting to the distribution network voltage; Formula (25) represents the correct relationship between power and voltage between the main distribution network.
[0024] The objective function of minimizing the total unpowered load is: ; in is the set of nodes where the generator is located, Is a node The cost of the generator, and They are main network and distribution network nodes respectively. Penalty factor for load loss, and are the active loads of the main network and distribution network nodes respectively, and They are respectively the sets of nodes with loads in the main network and the distribution network.
[0025] Step 4: The output execution module executes the collaborative optimization strategy, controls switches and circuit breakers according to the strategy to adjust the network topology, and outputs and adjusts the corresponding power system equipment operating status; Step 5: The data monitoring module obtains system data again, confirms the load recovery amount, records and analyzes the load results, forms a historical database, and calculates the reliability of the main grid power system.
[0026] In step 5 of the present invention, the risk index is used to calculate and evaluate the risk level of the power system to determine the reliability of the main grid power system, which specifically includes the following steps: Step 5a: Calculate the expected unsupplied energy EENS: ; EENS is the expected energy that the system fails to supply in a year, is the load level duration, is the load level The system state set, Is the system status The probability of occurrence, Is the system status The total load reduction under is the total length of time recorded; Step 5b: Calculate the load shedding probability PLC: ; where PLC is the probability of load shedding occurring at all load levels; Step 5c: Calculate the severity index SI: ; where SI is the equivalent duration of a complete system outage under peak load conditions.
[0027] Reference Figure 2 As shown, a power grid reliability improvement system based on load transfer and main distribution coordination includes a fault detection module, an output execution module, a collaborative optimization module, a data monitoring module, a historical database and a data processing center; The fault detection module is used to monitor the operating status of the power system equipment in real time and transmit the fault information to the data processing center when a system fault is detected; The output execution module is used to control the execution of relay protection equipment, switches and circuit breakers on the line, and power system equipment; when receiving the fault removal instruction from the data processing center, it outputs to the relay protection device to remove the fault; when receiving the collaborative optimization instruction from the data processing center, it controls the switches and circuit breakers according to the strategy to adjust the network topology structure and adjust the corresponding power system equipment operation status; A collaborative optimization module, used for generating a collaborative optimization strategy, and when receiving a collaborative optimization strategy generating instruction from a data processing center, generating a collaborative optimization strategy and returning the strategy to the data processing center; The data monitoring module is used to obtain the real-time operation data of the integrated transmission and distribution system, and when receiving the instruction to obtain the real-time operation data from the data processing center, the acquired real-time operation data of the integrated transmission and distribution system is returned to the data processing center; The historical database is used to store the historical data of the integrated transmission and distribution system and receive the real-time operation data from the data processing center to form a database; The data processing center is used to receive and process the information transmitted by the above modules, and control each module to execute in sequence according to the steps of the above method for improving the reliability of the power grid based on load transfer and main distribution coordination.
[0028] In this embodiment 1, the IEEE case 14 and IEEE case 16 integrated transmission and distribution systems are taken as examples to introduce the method process of the present invention. This embodiment 1 includes a 14-node main network and a 16-node distribution network. The three feeders of case 16 are respectively connected to node 5, node 11, and node 14 of case 14. The specific connection method and network structure are shown in the attached Figure 3 .
[0029] According to network data, the total load of this integrated transmission and distribution system is 287.7MW; Assumption: The total load of the system remains unchanged, that is, Considering only single-line and double-line faults, a year is divided into 8760 time units in hours. The probability of a single-line fault occurring in each time unit is , the probability of a double line failure is , the faults occurring in each unit time do not affect each other, that is, all faults act within one unit time.
[0030] In this embodiment 1, all single-line and dual-line fault conditions are simulated. For example, within a certain unit time, line 1 (i.e., Figure 3The line connecting node 1 and node 2 in the network fails. After network reconstruction and load transfer, the main changes in the load of each node are as follows: the load of node 9 increases by 1.62MW, the load of node 10 increases by 1.90MW, and the load of node 14 decreases by 3.52MW. The total load remains basically unchanged, and the total load reduction is ,It can be seen that the influence of the faulty components can be reduced or eliminated through ,cooperative optimization model processing.
[0031] After a one-year time dimension simulation, the risk level of the main grid power system with and without collaborative optimization is calculated respectively: 1. Calculate the total load reduction under each fault condition , The number of main network nodes is 14 in this embodiment 1.
[0032] 2. Since the simulation unit time is 1 hour and the time dimension is 1 year, the load level duration , total time length If the load reduction is greater than 1MW, it is considered as load reduction. All load reduction situations are filtered out and stored in the system status set. .
[0033] 3. By The data can be used to calculate the expected energy not supplied (EENS) according to formula (27).
[0034] 4. By The data can be used to calculate the probability of load curtailment (PLC) according to formula (28).
[0035] 5. The EENS calculated in step 3 and The severity index (SI) can be calculated according to formula (29).
[0036] The calculation results of the two cases in this embodiment 1 are shown in Table 1.
[0037] Table 1 Comparison of power system risk levels:
[0038] It can be seen that after optimization by the collaborative optimization model, the risk index of the main network system has dropped significantly and the system reliability has improved, indicating that the reliability of the main network system can be significantly improved through collaborative optimization.
[0039] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A method for improving power grid reliability based on load transfer and main distribution coordination, characterized in that: The following steps are involved: Step 1: When the fault detection module detects a system fault, the data monitoring module obtains data of the integrated transmission and distribution system, which includes the topological structure of the main network and the distribution network, real-time load data, and the operating status of each power system equipment; Step 2: The output execution module controls the relay protection equipment, locates the fault and removes it, and makes a preliminary assessment to determine the affected area and the load that needs to be restored; Step 3: Input the pre-acquired main and distribution network structure and operation data into the collaborative optimization module. With the goal of minimizing the total unpowered load, the main and distribution collaborative optimization model is used to solve the network reconstruction topology structure and the corresponding load transfer strategy to generate a collaborative optimization strategy. Step 4: The output execution module executes the collaborative optimization strategy, controls switches and circuit breakers according to the strategy to adjust the network topology, and outputs and adjusts the corresponding power system equipment operating status; Step 5: The data monitoring module obtains system data again, confirms the load recovery amount, records and analyzes the load results, forms a historical database, and calculates the reliability of the main grid power system.
2. The method for improving power grid reliability based on load transfer and main distribution coordination according to claim 1 is characterized in that: The specific method for generating the collaborative optimization strategy in step 3 is as follows: Through the main network model constraints and distribution network model constraints in the main-distribution collaborative optimization model, the collaborative optimization goal is to minimize the total unpowered load, and obtain the reconstructed network topology structure after the fault, the optimal power supply restoration strategy and load transfer plan.
3. The method for improving power grid reliability based on load transfer and main distribution coordination according to claim 2 is characterized in that: The main network model constraints include main network system model constraints and component operation constraints; The main grid system model constraints include linear power flow balance constraints and other inequality constraints, and its line power flow equation is: ; in , , , , , , and Node With Node The voltage, Is a node and nodes The voltage phase difference between Is a node and nodes The voltage phase difference between and Line The shunt conductance and shunt susceptance in the model, and They are main network slave nodes To Node The active power and reactive power of and They are main network slave nodes To Node The active power and reactive power of is the set of branch lines of the main network; formulas (1)-(4) describe the transmission of active power and reactive power, and express the symmetry of active power and reactive power; Linear power flow balance constraints: ; in, and They are Active power generation and reactive power generation, and The nodes are The active load and reactive load, and The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, is the main network node set; formulas (5) and (6) are the nodes The active power and reactive power balance constraint indicates that the input and output power of each node need to be balanced; The remaining inequality constraints are: ; in is the maximum node voltage angle, It is an associated line A binary variable; if the line Set to 1 if connected, and set to 0 if disconnected; and are the maximum and minimum node voltage amplitudes respectively; the component operation constraints are: ; in It is a line Maximum power flow, and The nodes are The maximum / minimum output of the generator's active and reactive power. Formulas (11)-(13) represent the safe operation constraints of the distribution network components, including the maximum value limits of active power, reactive power and line current.
4. The method for improving power grid reliability based on load transfer and main distribution coordination according to claim 3 is characterized in that: The distribution network model constraints include radial topology constraints, distribution network system model constraints, cone constraints, component safety constraints and boundary constraints; Radial topology constraints: ; In the formula, and Representation Node , Binary variables indicating upstream and downstream relationships between =1 means yes The parent node of =1 means yes The parent node of Representation Node Binary variables indicating upstream and downstream relationships between Indicates the distribution network branch line collection, Represents a set of distribution network nodes. represents the substation node set in the distribution system; Formula (14) represents the , if the switch is closed, then there must be yes The parent node or yes The parent node of =0, then ; Formula (15) indicates that each node has only one parent node; Formula (16) indicates that a substation node in the distribution system cannot be a child node of any other node; Distribution network system model constraints: ; in It is a distribution network node provided by the main network The active and reactive injected power, The lines are The active and reactive power flows, Is with the node The set of adjacent nodes, and It is a line The series resistance and series reactance in the model, It is a line The square of the current amplitude, It is a distribution network node The load power; Formula (17) (18) represents the power balance condition of the distribution network; Cone Constraint: ; in , , For network distribution nodes The voltage of; Formula (19) is the quadratic form of the quadratic constraint: ; Component security constraints: ; in and Distribution lines The active and reactive power flows of nodes and nodes The relationship between the voltage difference and power and current; Formulas (21)-(24) respectively ensure that the node voltage, current, active power and reactive power are within the normal range; Boundary constraints: ; in To connect to the distribution network substation The main network node set, is the substation node set in the distribution network, Main network node Active and reactive power losses provided to the distribution network, Main network node for connecting to the distribution network voltage; Formula (25) represents the correct relationship between power and voltage between the main distribution network.
5. The method for improving power grid reliability based on load transfer and main distribution coordination according to claim 4 is characterized in that: The objective function of minimizing the total unpowered load is: ; in is the set of nodes where the generator is located, Is a node The cost of the generator, and They are main network and distribution network nodes respectively. Penalty factor for load loss, and are the active loads of the main network and distribution network nodes respectively, and They are respectively the sets of nodes with loads in the main network and the distribution network.
6. The method for improving power grid reliability based on load transfer and main distribution coordination according to claim 1 is characterized in that: In step 5, the risk index is used to calculate and evaluate the risk level of the power system to determine the reliability of the main grid power system, which specifically includes the following steps: Step 5a: Calculate the expected unsupplied energy EENS: ; EENS is the expected energy that the system fails to supply in a year, is the load level duration, is the load level The system state set, Is the system status The probability of occurrence, Is the system status The total load reduction under is the total length of time recorded; Step 5b: Calculate the load shedding probability PLC: ; where PLC is the probability of load shedding occurring at all load levels; Step 5c: Calculate the severity index SI: ; ; where SI is the equivalent duration of a complete system outage under peak load conditions.
7. A power grid reliability improvement system based on load transfer and main distribution coordination, characterized in that: It includes fault detection module, output execution module, collaborative optimization module, data monitoring module, historical database and data processing center; The fault detection module is used to monitor the operating status of the power system equipment in real time and transmit the fault information to the data processing center when a system fault is detected; The output execution module is used to control the execution of relay protection equipment, switches and circuit breakers on the line, and power system equipment; when receiving a fault removal instruction from the data processing center, it outputs to the relay protection device to remove the fault; when receiving a collaborative optimization instruction from the data processing center, it controls the switches and circuit breakers according to the strategy to adjust the network topology and adjust the operating status of the corresponding power system equipment; The collaborative optimization module is used to generate a collaborative optimization strategy, and when receiving a collaborative optimization strategy generation instruction from a data processing center, generates a collaborative optimization strategy and returns the strategy to the data processing center; The data monitoring module is used to obtain the real-time operation data of the integrated transmission and distribution system, and when receiving the instruction to obtain the real-time operation data from the data processing center, returns the obtained real-time operation data of the integrated transmission and distribution system to the data processing center; The historical database is used to store historical data of the integrated transmission and distribution system and receive real-time operation data from the data processing center to form a database; The data processing center is used to receive and process the information transmitted by the above-mentioned fault detection module, output execution module, collaborative optimization module, data monitoring module, and historical database, and to execute the steps of the power grid reliability improvement method based on load transfer and main distribution coordination according to any one of claims 1 to 6 in sequence.
Citation Information
Cited By
Emergency control method for information-physical cross-space cooperation under false data injection attack and medium
CN119728453A
An emergency control method and medium for information-physical cross-space collaboration under false data injection attacks
CN119728453B