Power distribution network cooperative scheduling method and device based on electric vehicle charging flexibility
By establishing an adjustable charging power model for electric vehicle clusters and an optimized scheduling model for distribution networks, the charging power flexibility of electric vehicle clusters is used to solve the problems of distributed photovoltaic consumption and stability in the distribution network, and the cost reduction and Run optimization.
Patent Information
- Application Number
- CN202411005239.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-15
AI Technical Summary
The failure of the prior art to effectively utilize the charging power flexibility of electric vehicle clusters, resulting in limited distributed photovoltaic consumption and distribution network stability.
By establishing an adjustable charging power flexibility model for electric vehicle clusters, generating charging scenarios, establishing an optimization scheduling model for distribution networks, and using Matlab+YALMIP to call CPLEX for solving, it realizes charging power adjustment of electric vehicle clusters in the distribution network, and optimizes the charging power of electric vehicle clusters in the distribution network. The distribution network operates.
In order to meet users' charging needs, reduce energy storage utilization, increase photovoltaic consumption capacity, and reduce the operating costs of the distribution network.
Smart Images

Figure CN118971077A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of coordinated operation optimization of distribution networks, and in particular to a coordinated dispatching method and equipment for distribution networks based on the charging flexibility of electric vehicles. Background Art
[0002] Large-scale photovoltaic power generation is connected to the grid from the user side in a distributed power generation mode, which has become the main form of renewable energy grid connection. With the high penetration of distributed photovoltaic power generation connected to the distribution network, the safe operation of the traditional power system faces severe challenges. Giving full play to the flexible resources on the load side of the distribution network plays an important role in increasing the distributed absorption capacity and the stability of the distribution network. With the large-scale popularization of electric vehicles (EVs), compared with traditional power loads, the charging power of electric vehicle clusters has a lot of flexibility. It is a kind of distribution network operation load side flexible scheduling resource with huge potential, which has received extensive attention at home and abroad.
[0003] At present, the research on the participation of electric vehicle clusters in the flexible dispatching of distribution networks mainly focuses on potential assessment, market behavior and demand response, and has not studied the flexible adjustment of charging power of electric vehicle clusters. Summary of the invention
[0004] The present invention provides a distribution network coordinated dispatching method and device based on electric vehicle charging flexibility, so as to solve the defects of the prior art in the flexible regulation of charging power of electric vehicle clusters, realize the utilization of electric vehicle clusters, and improve the distributed photovoltaic consumption and distribution network operation stability.
[0005] The present invention provides a distribution network coordinated dispatching method based on electric vehicle charging flexibility, comprising the following steps: Establish an adjustable flexibility model for charging power of electric vehicle clusters; Generate electric vehicle charging scenarios; Establish distribution network optimization dispatch model; Solve the distribution network optimization model.
[0006] According to the distribution network coordinated dispatching method based on electric vehicle charging flexibility provided by the present invention, the establishment of an electric vehicle cluster charging power adjustable flexibility model includes: 1.1 Establish a single electric vehicle charging model; The actual charging power of a single electric vehicle is, (1) Where: for t The power of the electric vehicle before adjustment at that moment. for t The power of the electric vehicle after adjustment at any time, for t Electric vehicles adjust power at all times; The upper and lower limits of electric vehicle charging are: (2) Where: The maximum charging power for electric vehicles, Minimum value of charging power for electric vehicles; Electric Vehicles SOC It is expressed as, (3) Where: for t Moment Electric Vehicle SOC , is the battery capacity of electric vehicles; Electric Vehicles SOC Maintaining battery life range, (4) Where: For electric vehicles SOC Maximum value, For electric vehicles SOC Minimum value; When the electric car leaves, SOC The expected value achieved is , (5) Where: User expectations at the end of charging an electric vehicle; User's SOC Expected Value The relationship with charging time is: (6) Time to start charging your electric car SOC , When charging of electric vehicles is finished, When charging of electric vehicles starts, for t The power of the electric vehicle before adjustment at that moment. is the maximum SOC value of the electric vehicle; 1.2 Establish an electric vehicle aggregation (EVA) model; The charging power of the electric vehicle cluster is, (7) Where: For electric vehicle clusters t Total power before adjustment at all times, For electric vehicle clusters t Total power after adjustment at all times; For electric vehicle clusters t Adjust the power at all times; Total regulated power of electric vehicle cluster Equal to the sum of the adjusted powers of the individual electric vehicles: (8).
[0007] According to the distribution network coordinated dispatching method based on electric vehicle charging flexibility provided by the present invention, generating an electric vehicle charging scenario includes: The probability distribution of each data is obtained by using the nonparametric kernel density estimation method: (9) The kernel function selects the Gaussian type kernel function as follows: (10) Where: is the probability distribution, is the total number of samples, is the amount of data used for the estimation; is bandwidth; is the Gaussian kernel function; Determine sample data for a group; For other sample data; The Monte Carlo simulation method is used to generate the initial charging SOC, initial charging time and charging duration scenarios of electric vehicles according to the estimated probability distribution information. A group of single electric vehicle scenarios are extracted to obtain the charging load curves of electric vehicles in multiple periods of the day. N groups of electric vehicles are extracted, and the total electric vehicle charging load curve is formed by the accumulation of the charging load curves of each electric vehicle.
[0008] According to the distribution network coordinated dispatching method based on electric vehicle charging flexibility provided by the present invention, the establishment of the distribution network optimization dispatching model includes: 3.1 Establish the objective function: (11) Where: is the total cost of distribution network operation, The cost of purchasing electricity; Reduce costs for photovoltaic power generation; The operating cost of ES; For loss cost; (12) (13) (14) (15) Where: The unit electricity purchase cost, To reduce photovoltaic costs, Electric energy storage operating costs, is the line loss cost; For power distribution, Reduce the power of photovoltaic active power, is the line loss power; The distribution network power flow model adopts the DistFlow model after second-order cone relaxation; 3.2 Establish operational constraints; The charging power constraint of the electric energy storage is: (16) Where: is a Boolean variable, for t Energy storage charging power at all times, The maximum charging and discharging power of the electric energy storage; The discharge power constraint of the electric energy storage is: (17) Where: for t The discharge power of the energy storage at every moment; It is the maximum charging and discharging power of the electric energy storage; The SOC constraint of the electric energy storage device is, (18) Where: for t Always store energy SOC, For energy storage charging efficiency, is the energy storage discharge efficiency, is the energy storage capacity; The operating constraints of reactive power devices are: Distributed photovoltaic inverters provide reactive power support, and the distributed photovoltaic operation constraints are: (19) (20) (twenty one) for t Moment Cluster i Photovoltaic active power, for t Moment Cluster iThe maximum active power limit of photovoltaic power generation. is the photovoltaic reactive power of cluster i, for t Moment Cluster i The maximum reactive power limit of photovoltaic power generation is controlled by DG with constant power factor. is the power factor angle, take 0.8; The static reactive power compensation device realizes fast reactive power adjustment, and the operating constraints are: (twenty two) Where: is the upper limit of the operational capacity of the static reactive power compensation device at cluster i, is the lower limit of the operational capacity of the static reactive power compensation device at cluster i; for t The static reactive power compensation device adjusts the reactive power at all times; After the reactive device and the electric vehicle cluster coordinate the voltage control, the voltage of each node is within the range above: (twenty three) Where: for t Time Node j Voltage.
[0009] According to the distribution network coordinated dispatching method based on electric vehicle charging flexibility provided by the present invention, solving the distribution network optimization model includes: converting the day-ahead optimization problem into a linear programming problem, and using Matlab+YALMIP to call CPLEX for solving it.
[0010] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a distribution network coordinated dispatching method based on electric vehicle charging flexibility as described in any one of the above-mentioned methods is implemented.
[0011] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for coordinated dispatching of distribution networks based on electric vehicle charging flexibility as described in any one of the above is implemented.
[0012] The present invention also provides a computer program product, comprising a computer program, which, when executed by a processor, implements any of the above-mentioned methods for coordinated dispatching of distribution networks based on electric vehicle charging flexibility.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: electric vehicle clusters can give full play to the role of energy storage substitution when participating in the operation and scheduling of distribution networks. Taking into account their charging flexibility, the scheduling strategy can reduce the energy storage utilization rate, increase the photovoltaic absorption capacity, and reduce the operation cost of the distribution network while meeting the charging needs of users. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a schematic diagram of adjustable charging power for an electric vehicle provided by an embodiment of the present invention; Figure 2 is a distribution network structure topology diagram provided by an embodiment of the present invention; Figure 3 is the electric vehicle cluster support power provided by the embodiment of the present invention; Figure 4 The comparison of energy storage charging and discharging power of two methods provided in the embodiment of the present invention is as follows Figure 5 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] This embodiment fully considers the flexibility of electric vehicle charging, studies the collaborative optimization scheduling, and utilizes electric vehicle clusters to improve the distributed photovoltaic consumption and distribution network operation stability.
[0018] This embodiment is realized by the following technical solutions: a distribution network coordinated dispatching method based on electric vehicle charging flexibility, considering the establishment of an adjustable charging flexibility model for electric vehicle clusters under the condition of meeting the charging needs of users' electric vehicles; using a non-parametric kernel density estimation method to obtain the probability distribution of electric vehicle operation data, and using a Monte Carlo method to generate electric vehicle operation scenarios; establishing an optimization dispatching model with the objective function of minimizing the comprehensive operation cost of the distribution network. The specific steps are as follows: Step 1: Establish an adjustable flexibility model for charging power of electric vehicle clusters; 1.1 Single electric vehicle charging model; The flexibility of electric vehicle charging power adjustment is as follows: within the electric vehicle charging power constraint range, the charging power of each scheduling period can be adjusted while meeting the user's charging needs, thus realizing the friendly interaction between electric vehicle charging and the distribution network. Figure 1 As shown, Indicates the scheduling period. and It is the initial charging SOC (state-of-charge) of electric vehicles. Refers to the state of charge of the car battery ) and the user's expected SOC when leaving. Before the charging power is adjusted, the line segment ag is directly connected to indicate that the rated power is used for charging during the full scheduling period of the EV. After the adjustment, the EV's output increases in the ab and de segments, providing upward flexibility; the output decreases in the cd segment, and the power is 0 in the remaining time periods, providing downward flexibility. The user's charging needs are met when the EV leaves, and the power size is adjusted during the charging process without affecting the user experience. The actual charging power of a single EV can be expressed by the following formula: (1) Where: for t The power of the electric vehicle before adjustment at that moment. for t The power of the electric vehicle after adjustment at any time, for t Electric vehicles adjust power at all times; The upper and lower limits of electric vehicle charging are: (2) Where: The maximum charging power for electric vehicles, Minimum value of charging power for electric vehicles; Electric Vehicles SOC It is expressed as, (3) Where: for t Moment Electric Vehicle SOC , is the battery capacity of electric vehicles; The SOC of electric vehicles should be within a certain range to maintain battery life: (4) Where: For electric vehicles SOC Maximum value, For electric vehicles SOC Minimum value; When the electric car leaves, ensure that SOC The expected value achieved is , (5) Where: User expectations at the end of charging an electric vehicle; The user's expected SOC value is related to the charging time and can be expressed as: (6) Time to start charging your electric car SOC , When charging of electric vehicles is finished, When charging of electric vehicles starts, for t The power of the electric vehicle before adjustment at that moment. is the maximum SOC value of the electric vehicle; 1.2 Electric vehicle cluster model; The electric vehicle aggregation (EVA) model is an aggregation of all individual EVs in it. In system-level clustering and cluster-level control, information aggregation is required for each electric vehicle. The charging power of an electric vehicle cluster is expressed as: (7) Where: For electric vehicle clusters t Total power before adjustment at all times, For electric vehicle clusters t Total power after adjustment at all times; For electric vehicle clusters t Adjust the power at all times; The total adjusted power of the EVA should be equal to the sum of the adjusted powers of the individual EVs: (8) Step 2: Generate an electric vehicle charging scenario; The historical data comes from the charging records of EV charging stations in a certain city. Each piece of data contains the initial charging SOC, the initial charging time and the charging duration. The probability distribution of each piece of data is obtained by using the non-parametric kernel density estimation method as shown in formula (9), and the kernel function selects the Gaussian type kernel function as shown in formula (10).
[0019] (9) (10) Where: is the probability distribution, is the total number of samples, is the amount of data used for the estimation; is bandwidth; is the Gaussian kernel function; Determine sample data for a group; For other sample data; Based on the non-parametric estimation method, a probability distribution model of the initial charging SOC, initial charging time and charging duration of electric vehicles can be established.
[0020] Monte Carlo simulation method is used to generate the initial charging SOC, initial charging time and charging duration scenarios of electric vehicles based on the estimated probability distribution information, and a group of single electric vehicle scenarios are extracted to obtain the charging load curve of electric vehicles in multiple periods of the day. The number of extracted electric vehicles is N groups, and the total charging load curve of electric vehicles is accumulated by the charging load curve of each electric vehicle.
[0021] Step 3: Establish a distribution network optimization dispatching model; 3.1 Establish the objective function; The goal of the distribution network optimization problem is to minimize the cluster operation cost, including the cost of purchasing electricity from the upper power grid, DPV reduction cost, ES operation cost and loss cost. The optimization result ensures that all node voltages remain within an acceptable range and that the charging needs of all EVs in the cluster can meet user needs. Therefore, the objective function can be expressed as: (11) Where: is the total cost of distribution network operation, The cost of purchasing electricity; Reduce costs for photovoltaic power generation; The operating cost of ES; For loss cost.
[0022] (12) (13) (14) (15) Where: The unit electricity purchase cost, To reduce photovoltaic costs, Electric energy storage operating costs, is the line loss cost; For power distribution, Reduce the power of photovoltaic active power, The power loss of the line.
[0023] The distribution network flow model of this embodiment adopts the DistFlow model after second-order cone relaxation. The optimization model includes EVA operation constraints (Equations (1) to (8)).
[0024] Step 3.2: Establish operation constraints; The charge and discharge power constraints of electric energy storage (ES) can be expressed as: (16) Where: is a Boolean variable, for t Energy storage charging power at all times, It is the maximum charging and discharging power of the electric energy storage; The discharge power constraint of the electric energy storage is: (17) is the discharge power of the electric energy storage; It is the maximum charging and discharging power of the electric energy storage; The SOC constraint of the electric energy storage device is, (18) Where: for t Always store energy SOC, For energy storage charging efficiency, is the energy storage discharge efficiency, is the energy storage capacity; The operating constraints of reactive power devices are: Distributed photovoltaic inverters can provide a certain degree of reactive power support. The operating constraints of distributed photovoltaics are: (19) (20) (twenty one) Where: for t Moment Cluster i Photovoltaic active power, for t Moment Cluster i The maximum active power limit of photovoltaic power generation. is the photovoltaic reactive power of cluster i, for t Moment Cluster i The maximum reactive power limit of photovoltaic power generation is controlled by DG with constant power factor. is the power factor angle, take 0.8; The static reactive power compensation device SVC can achieve fast reactive power adjustment, and the operating constraints are: (twenty two) Where: is the upper limit of the operational capacity of the static reactive power compensation device at cluster i, is the lower limit of the operational capacity of the static reactive power compensation device at cluster i; for t The static reactive power compensation device adjusts the reactive power at all times; After the reactive device and EVA coordinate the voltage control, the voltage at each node should be within the acceptable range: (twenty three) Where: for t Time Node j Voltage.
[0025] Step 4: Use Matlab+YALMIP+CPLEX to achieve efficient solution.
[0026] The day-ahead optimization problem can be converted into a linear programming (LP) problem, and Matlab+YALMIP can be used to call CPLEX for efficient solution.
[0027] Example In order to verify the effectiveness of the distribution network cluster planning and coordinated operation strategy considering the flexibility of EV charging, the improved IEEE 33-bus system is taken as an example and simulated in the MATLAB 2018b environment. Figure 2 As shown in the figure, the access conditions of each unit in the distribution network system are as follows: (1) 10 DPV power generation systems; (2) 3 ES systems; (3) 3 SVCs; (4) 6 power-adjustable EV charging stations. The total number of EVs in EV1~EV6 is 3000, 1500, 4500, 2200, 1000, and 1000 respectively. The configuration capacity of ES1~ES3 is 5000kW, and the maximum charging and discharging power is 860kw.
[0028] Two distribution network cluster division schemes and collaborative operation strategies are set up.
[0029] Scheme 1: Cluster division and distributed operation optimization model considers the voltage sensitivity of the distribution network, the reactive power support capacity index, and the active power support index of the ES, while ignoring the active power support index of the EVA.
[0030] Scheme 2: Cluster division and distributed operation optimization model considers the voltage sensitivity of the distribution network, the reactive power support capacity index, the ES active power support index and the EVA active power support index.
[0031] Comparing the various costs of the operation optimization results of Scheme 1 and Scheme 2, compared with Scheme 1, Scheme 2 reduces various costs after using the adjustable flexibility of EVA charging power to participate in collaborative optimization scheduling, saving 52.1% of the total cost. After using EVA, the energy storage operation cost and photovoltaic reduction cost are significantly reduced, indicating that EVA plays a major role in absorbing distributed photovoltaic output.
[0032] In order to explore the active power support capability of EVA in participating in the operation and dispatch of distribution network, Figure 3 The 24-hour flexibility of EVA in Scheme 2 supports power changes, from Figure 3 It can be seen that EVA can give full play to the adjustable flexibility of charging power. During the period of high PV generation (11:00~13:00), EVA can provide a large upward flexibility power to increase the distributed photovoltaic absorption capacity of the distribution network. In other periods, EVA also plays a role in peak load reduction and valley filling by adjusting the charging power.
[0033] Figure 4 The comparison between the two schemes shows whether EVA is involved in the operation and scheduling of ES charging and discharging power over 24 hours. Figure 4 It can be found that the ES charging and discharging power is significantly reduced after considering EVA. During the high-generation period of PV in the distribution network, EVA is mainly used to participate in flexible scheduling to reduce the operating cost of energy storage. During the entire operating period, EVA can play the role of energy storage substitution, reduce energy storage utilization and reduce operating costs while meeting the charging needs of users.
[0034] Figure 5 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 5 As shown, the electronic device may include: a processor, a communications interface, a memory, and a communication bus, wherein the processor, the communications interface, and the memory communicate with each other through the communication bus. The processor may call the logic instructions in the memory to execute the distribution network coordinated scheduling method based on the charging flexibility of electric vehicles.
[0035] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program code.
[0036] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the distribution network coordinated scheduling method based on electric vehicle charging flexibility provided by the above-mentioned methods.
[0037] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the distribution network coordinated scheduling method based on electric vehicle charging flexibility provided by the above-mentioned methods.
[0038] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0039] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A distribution network coordinated dispatching method based on electric vehicle charging flexibility, characterized in that: The following steps are involved: Establish an adjustable flexibility model for charging power of electric vehicle clusters; Generate electric vehicle charging scenarios; Establish distribution network optimization dispatch model; Solve the distribution network optimization model.
2. The distribution network coordinated dispatching method based on electric vehicle charging flexibility according to claim 1 is characterized in that: The establishment of an adjustable flexibility model for charging power of an electric vehicle cluster comprises: 1.1 Establish a single electric vehicle charging model; The actual charging power of a single electric vehicle is, (1) Where: for t The power of the electric vehicle before adjustment at that moment, for t The power of the electric vehicle after adjustment at any time, for t Electric vehicles adjust power at all times; The upper and lower limits of electric vehicle charging are: (2) Where: The maximum charging power for electric vehicles, Minimum value of charging power for electric vehicles; Electric Vehicles SOC It is expressed as, (3) Where: for t Moment Electric Vehicle SOC , is the battery capacity of electric vehicles; Electric Vehicles SOC Maintaining battery life range, (4) Where: For electric vehicles SOC Maximum value, For electric vehicles SOC Minimum value; When the electric car leaves, SOC The expected value achieved is , (5) Where: User expectations at the end of charging an electric vehicle; User's SOC Expected Value The relationship with charging time is: (6) Time to start charging your electric car SOC , When charging of electric vehicles is finished, When charging of electric vehicles starts, for t The power of the electric vehicle before adjustment at that moment, is the maximum SOC value of the electric vehicle; 1.2 Establish an electric vehicle cluster model; The charging power of the electric vehicle cluster is, (7) Where: For electric vehicle clusters t Total power before adjustment at all times, For electric vehicle clusters t Total power after adjustment at all times; For electric vehicle clusters t Adjust the power at all times; Total regulated power of electric vehicle cluster Equal to the sum of the adjusted powers of the individual electric vehicles: (8)。 3. The distribution network coordinated dispatching method based on electric vehicle charging flexibility according to claim 1 is characterized in that: The generating of electric vehicle charging scenario comprises: The probability distribution of each data is obtained by using the nonparametric kernel density estimation method: (9) The kernel function selects the Gaussian type kernel function as follows: (10) Where: is the probability distribution, is the total number of samples, is the amount of data used for the estimation; is bandwidth; is the Gaussian kernel function; Determine sample data for a group; For other sample data; The Monte Carlo simulation method is used to generate the initial charging SOC, initial charging time and charging duration scenarios of electric vehicles according to the estimated probability distribution information. A group of single electric vehicle scenarios are extracted to obtain the charging load curves of electric vehicles in multiple periods of the day. N groups of electric vehicles are extracted, and the total electric vehicle charging load curve is formed by the accumulation of the charging load curves of each electric vehicle.
4. The distribution network coordinated dispatching method based on electric vehicle charging flexibility according to claim 1 is characterized in that: The establishment of the distribution network optimization dispatching model comprises: 3.1 Establish the objective function: (11) Where: is the total cost of distribution network operation, The cost of purchasing electricity; Reduce costs for photovoltaic power generation; The operating cost of ES; For loss cost; (12) (13) (14) (15) Where: The unit electricity purchase cost, To reduce photovoltaic costs, Electric energy storage operating costs, is the line loss cost; For power distribution, Reduce the power of photovoltaic active power, is the line loss power; The distribution network power flow model adopts the DistFlow model after second-order cone relaxation; 3.2 Establish operational constraints; The charging power constraint of the electric energy storage is: (16) Where: is a Boolean variable, for t Energy storage charging power at all times, It is the maximum charging and discharging power of the electric energy storage; The discharge power constraint of the electric energy storage is: (17) Where: for t The discharge power of the energy storage at every moment; It is the maximum charging and discharging power of the electric energy storage; The SOC constraint of the electric energy storage device is, (18) Where: for t Always store energy SOC, For energy storage charging efficiency, is the energy storage discharge efficiency, is the energy storage capacity; The operating constraints of reactive power devices are: Distributed photovoltaic inverters provide reactive power support, and the distributed photovoltaic operation constraints are: (19) (20) (21) Where: for t Moment Cluster i Photovoltaic active power, for t Moment Cluster i The maximum active power limit of photovoltaic power generation. is the photovoltaic reactive power of cluster i, for t Moment Cluster i The maximum reactive power limit of photovoltaic power generation is controlled by DG with constant power factor. is the power factor angle, take 0.8; The static reactive power compensation device realizes fast reactive power adjustment, and the operating constraints are: (22) Where: is the upper limit of the operational capacity of the static reactive power compensation device at cluster i, is the lower limit of the operational capacity of the static reactive power compensation device at cluster i; for t The static reactive power compensation device adjusts the reactive power at all times; After the reactive device and the electric vehicle cluster coordinate the voltage control, the voltage of each node is within the range above: (23) Where: for t Time Node j Voltage.
5. The method for coordinated dispatching of distribution networks based on electric vehicle charging flexibility according to claim 1 is characterized in that: The solving of the distribution network optimization model includes: converting the day-ahead optimization problem into a linear programming problem, and using Matlab+YALMIP to call CPLEX for solving.
6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the distribution network coordinated scheduling method based on electric vehicle charging flexibility as described in any one of claims 1 to 5 is implemented.
7. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the distribution network coordinated dispatching method based on electric vehicle charging flexibility as described in any one of claims 1 to 5 is implemented.
8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the distribution network coordinated dispatching method based on electric vehicle charging flexibility as described in any one of claims 1 to 5 is implemented.