Hard alloy wire drawing die and manufacturing method thereof
By using the internal support layer combination structure of the supporting core and copper-oxide-based nano-composite cemented carbide sintered body in cemented carbide wire drawing mold, the problem of insufficient toughness of cemented carbide material is solved, and higher processing precision is achieved and grinding convenience.
Patent Information
- Application Number
- CN202411198898.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-19
AI Technical Summary
The material toughness of the existing cemented carbide wire drawing molds is not high enough, which makes it difficult to grind the outlet area after forming.
A combined structure of supporting mold core and inner support layer is adopted, where the supporting mold core is a mixture of cemented carbide powder and molybdenum manganese slurry, and the inner support layer is a copper oxide-based nanocomplex cemented carbide sintered body, passing through the indentation head The inner support layer is extruded and molded with the top pressure block to improve the toughness of the material and facilitate grinding and processing.
The toughness and precision of the cemented carbide wire drawing mold is improved, making it easier to grind the inner side of the inner support layer, and solving the problem of insufficient material toughness in traditional wire drawing molds.
Smart Images

Figure CN118976793A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wire drawing dies, and in particular to a hard alloy wire drawing die and a manufacturing method thereof. Background Art
[0002] A wire drawing die is a die that forces metal to pass through under external force during metal pressure processing. The metal cross-sectional area is compressed and the required cross-sectional shape and size are obtained. Wire drawing dies are widely used. High-precision wires used in electronic devices, radars, televisions, instruments, and aerospace, as well as commonly used tungsten wires, molybdenum wires, stainless steel wires, wire and cable wires, and various alloy wires are all drawn using diamond wire drawing dies. Diamond wire drawing dies mainly include a die core and a die sleeve. The materials used to make the die core are mostly cemented carbide or artificial diamond, and the materials used to make the die sleeve are mostly carbon steel, stainless steel, etc. However, the toughness of the cemented carbide material in existing cemented carbide wire drawing dies is not high enough. The cemented carbide wire drawing dies are all made of cemented carbide powder as a whole, and it is difficult to grind the exit area after forming. Summary of the invention
[0003] The main purpose of the present invention is to provide a cemented carbide wire drawing die and a manufacturing method thereof, aiming to solve the technical problem that the cemented carbide material in the existing wire drawing die is not tough enough, the cemented carbide wire drawing die is made of cemented carbide powder as a whole, and the grinding process of the outlet area after forming is difficult.
[0004] To achieve the above-mentioned object, in a first aspect, the present invention provides a cemented carbide wire drawing die, comprising an extrusion barrel assembly and a top pressing assembly;
[0005] The extrusion barrel assembly comprises an extrusion barrel, an extrusion groove is provided on the inner side of the extrusion barrel, the cemented carbide blank is provided on the inner side of the extrusion groove, a support mold core is fixedly connected to the inner side of the cemented carbide blank, an inner support layer is fixedly connected to the inner side of the support mold core, a through hole is provided on the inner side of the inner support layer, and an outlet hole is provided on the bottom of the cemented carbide blank;
[0006] The pressing assembly comprises a pressing block matched with the extrusion groove, and a pressing head matched with the through hole is fixedly connected to the bottom of the pressing block.
[0007] Preferably, the supporting mold core is a mixture of cemented carbide powder and molybdenum-manganese slurry; and the inner supporting layer is a copper oxide-based nano-composite cemented carbide sintered body.
[0008] Preferably, the through hole comprises an inlet area, an auxiliary inlet area, a compression area and a sizing area which are sequentially connected from top to bottom;
[0009] The pressure head comprises a pressure head inlet section, a pressure head auxiliary inlet section, a pressure head compression section, a pressure head sizing section and an external threaded top block which are sequentially connected from top to bottom.
[0010] Preferably, an annular pointed groove is provided on the outer side of the inner support layer and the inner side of the support mold core, a plurality of limiting grooves are provided at equal intervals on the outer side of the cemented carbide blank, and a movable block is installed in each limiting groove.
[0011] Preferably, a blocking opening is provided at the bottom of the extrusion tube, and a blocking assembly is installed at the bottom of the extrusion tube. The blocking assembly includes a blocking block matched with the blocking opening, and a connecting bottom plate fixedly connected to the blocking block.
[0012] Preferably, a plurality of top blocks are fixedly connected to the top of the cemented carbide blank at equal intervals, and a pressing groove cooperating with the top block is fixedly connected to the bottom of the top pressing block.
[0013] Preferably, the cemented carbide wire drawing die further comprises a grinding assembly, and the grinding assembly comprises a grinding head and a limiting ring fixedly connected to the grinding head.
[0014] In a second aspect, the present invention further provides a method for manufacturing a cemented carbide wire drawing die, comprising:
[0015] Sintering the pre-prepared nano cemented carbide powder to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube;
[0016] The cemented carbide blank is taken out, and a mixture of cemented carbide powder and molybdenum-manganese slurry is added to the cemented carbide blank to sinter to obtain a supporting mold core;
[0017] A copper oxide-based nano-complex phase hard alloy sintered body is embedded in the inner side of the supporting mold core, and sintered to obtain an inner supporting layer;
[0018] The cemented carbide blank, the support mold core and the inner support layer are integrated, and after the temperature is raised to a preset first temperature again, the top pressure assembly is controlled to move downward at a constant speed, and the pressure head enters the inner side of the inner support layer, and a through hole is squeezed out on the inner side of the inner support layer, and the fixed pressure block is used for shaping and then cooling;
[0019] Grinding the bottom of the cemented carbide blank and grinding the outlet hole;
[0020] The pressing assembly is taken out, the formed through-hole is polished to obtain a smoothly connected through-hole, and the temperature is reduced to room temperature to obtain a cemented carbide wire drawing die.
[0021] Preferably, the step of entering the inner side of the inner support layer through a pressure head, extruding a through hole on the inner side of the inner support layer, and cooling after shaping through a fixed pressure block comprises:
[0022] The inlet and outlet area, the auxiliary inlet area, the compression area and the sizing area are squeezed out on the inner side of the inner support layer by a pressing head, and a pressing block presses the top of the cemented carbide blank during the squeezing;
[0023] The top block on the top of the cemented carbide blank is formed by the pressing groove at the bottom of the top pressing block, and the flatness of the top of the cemented carbide blank is guaranteed below the top pressing block, and the top of the cemented carbide blank is cooled after being kept warm for a period of time.
[0024] Preferably, before sintering the pre-prepared nano cemented carbide powder, the method further comprises:
[0025] Install the movable blocks equidistantly inside the extrusion cylinder, and install the plugging assembly at the bottom of the extrusion cylinder;
[0026] The method of grinding the bottom of the cemented carbide blank and grinding the outlet hole also includes:
[0027] Pull out the movable block, so that the outer side of the cemented carbide blank is provided with a limiting groove for the movable block to cooperate with;
[0028] The plugging assembly at the bottom of the extrusion barrel is removed, and the hard alloy blank, the supporting mold core and the inner support layer are re-cooled and heated to a preset second temperature.
[0029] The above-mentioned cemented carbide wire drawing die and its manufacturing method support the inner side of the cemented carbide blank through the support mold core and the inner support layer, and form the entrance area, auxiliary entrance area, compression area and sizing area on the inner side of the inner support layer through the pressure head entrance section, pressure head auxiliary entrance section, pressure head compression section, pressure head sizing section and external thread top block, which solves the problem that the core material used in traditional wire drawing dies is not tough enough, facilitates the grinding of the inner side of the inner support layer, and the structure of the cemented carbide wire drawing die is more precise. In addition, the support mold core is a mixture of cemented carbide powder and molybdenum manganese slurry, and the inner support layer is a copper oxide-based nano-complex cemented carbide sintered body, which improves the toughness of the cemented carbide wire drawing die. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of the internal structure of a cemented carbide wire drawing die in one embodiment of the present invention;
[0031] Figure 2 A top view of a cemented carbide blank of a cemented carbide wire drawing die in one embodiment of the present invention;
[0032] Figure 3 It is a schematic flow chart of a method for manufacturing a cemented carbide wire drawing die in one embodiment of the present invention;
[0033] Figure 4 for Figure 3A detailed flow chart of step S40 of the method for manufacturing a medium-hard alloy wire drawing die;
[0034] Figure 5 It is a schematic flow chart of a method for manufacturing a cemented carbide wire drawing die in another embodiment of the present invention.
[0035] The following are marked in the figure:
[0036] 1. Extrusion barrel; 2. Extrusion groove; 3. Carbide blank; 4. Support mold core; 5. Inner support layer; 6. Through hole; 61. Inlet area; 62. Auxiliary inlet area; 63. Compression area; 64. Sizing area; 7. Exit hole; 8. Top pressure block; 9. Pressure head; 91. Pressure head inlet section; 92. Pressure head auxiliary inlet section; 93. Pressure head compression section; 94. Pressure head sizing section; 95. External threaded top block; 10. Annular pointed groove; 11. Limiting groove; 12. Movable block; 13. Blocking opening; 14. Blocking block; 15. Connecting bottom plate; 16. Top block; 17. Pressure groove; 18. Grinding head; 19. Limiting ring. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0038] refer to Figure 1 and Figure 2 An embodiment of the present invention provides a cemented carbide wire drawing die, comprising an extrusion barrel assembly and a top pressing assembly; wherein the extrusion barrel assembly comprises an extrusion barrel 1, an extrusion groove 2 is provided on the inner side of the extrusion barrel 1, the cemented carbide blank 3 is provided on the inner side of the extrusion groove 2, a support mold core 4 is fixedly connected to the inner side of the cemented carbide blank 3, an inner support layer 5 is fixedly connected to the inner side of the support mold core 4, a through hole 6 is provided on the inner side of the inner support layer 5, and an outlet hole 7 is provided at the bottom of the cemented carbide blank 3; the top pressing module comprises a top pressing block 8 matched with the extrusion groove 2, and a pressure head 9 matched with the through hole 6 is fixedly connected to the bottom of the top pressing block 8.
[0039] In this embodiment, the cemented carbide wire drawing die mainly includes an extrusion barrel assembly and a top pressing assembly installed on the top of the extrusion barrel assembly and used in conjunction with the top of the extrusion barrel assembly.
[0040] The extrusion barrel assembly mainly includes an extrusion barrel 1, an extrusion groove 2 installed inside the extrusion barrel 1, a cemented carbide blank 3, a support mold core 4 and an inner support layer 5 installed in the extrusion groove 2 from outside to inside, and a through hole 6 opened inside the inner support layer 5. Preferably, the through hole 6 includes an inlet area 61, an auxiliary inlet area 62, a compression area 63 and a sizing area 64 connected in sequence from top to bottom; the support mold core 4 is a mixture of cemented carbide powder and molybdenum-manganese slurry; and the inner support layer 5 is a copper oxide-based nano-complex cemented carbide sintered body.
[0041] As for the top pressing assembly, it mainly includes a top pressing block 8 matched with the extrusion groove 2, and a pressure head 9 matched with the through hole 6. Preferably, the pressure head 9 includes a pressure head inlet section 91, a pressure head auxiliary inlet section 92, a pressure head compression section 93, a pressure head sizing section 94 and an external thread top block 95 connected in sequence from top to bottom. The pressure head inlet section 91, the pressure head auxiliary inlet section 92 and the pressure head compression section 93 are all truncated cone-shaped, the pressure head sizing section 94 is cylindrical, the large diameter end of the pressure head inlet section 91 is connected to the top pressing block 8, the small diameter end of the pressure head inlet section 91 is connected to the pressure head auxiliary inlet section 92, the small diameter end of the pressure head auxiliary inlet section 92 is connected to the small diameter end of the pressure head compression section 93, and the small diameter end of the pressure head compression section 93 is connected to the pressure head sizing section 94.
[0042] It is understandable that the cemented carbide wire drawing die of this embodiment supports the inner side of the cemented carbide blank 3 through the support core 4 and the inner support layer 5, and forms the entrance area 61, auxiliary entrance area 62, compression area 63 and sizing area 64 on the inner side of the inner support layer 5 through the pressure head entrance section 91, the pressure head auxiliary entrance section 92, the pressure head compression section 93, the pressure head sizing section 94 and the external thread top block 95, which solves the problem that the toughness of the core material used in the traditional wire drawing die is not high enough, and it is convenient to grind the inner side of the inner support layer 5, and the structure of the cemented carbide wire drawing die is more precise. In addition, the support core 4 is a mixture of cemented carbide powder and molybdenum manganese slurry, and the inner support layer 5 is a copper oxide-based nano-complex cemented carbide sintered body, which improves the toughness of the cemented carbide wire drawing die.
[0043] Furthermore, an annular pointed groove 10 is provided on the outer side of the inner support layer 5 and the inner side of the supporting mold core 4 , and a plurality of limiting grooves 11 are equidistantly provided on the outer side of the cemented carbide blank 3 , and a movable block 12 is installed in each limiting groove 11 .
[0044] It is understandable that the cemented carbide wire drawing die of this embodiment is provided with an annular pointed groove 10 on the outer side of the inner support layer 5 and the inner side of the support mold core 4, and the inner support layer 5 and the support mold core 4 can be stably fixed by the annular pointed groove 10, thereby improving the support stability of the cemented carbide blank 3 by the inner support layer 5 and the support mold core 4. At the same time, the movable block 12 cooperates with the limiting groove 11 to stably fix the cemented carbide blank 3 in the extrusion barrel 1.
[0045] Preferably, the number of the limiting grooves 11 is four, and correspondingly, the number of the movable blocks 12 is four. At this time, the cemented carbide blank 3 is limited and fixed by the four movable blocks 12, so that the stability of the through hole 6 forming can be improved.
[0046] Furthermore, a blocking opening 13 is provided at the bottom of the extrusion tube 1 , and a blocking assembly is installed at the bottom of the extrusion tube 1 . The blocking assembly includes a blocking block 14 that cooperates with the blocking opening 13 , and a connecting bottom plate 15 that is fixedly connected to the blocking block 14 .
[0047] It is understandable that the cemented carbide wire drawing die of this embodiment has a plugging opening 13 at the bottom of the extrusion barrel 1. In this case, the cemented carbide wire drawing die includes a plugging assembly in addition to the extrusion barrel assembly and the top pressing assembly. The plugging assembly includes a plugging block 14 that cooperates with the plugging opening 13, and a connecting bottom plate 15 that is fixedly connected to the bottom of the plugging block 14. In this embodiment, the plugging opening 13 is sealed by setting the plugging assembly to seal the internal material, and the problem of excessive extrusion of the pressure head 9 of the top pressing assembly can be avoided.
[0048] Furthermore, a plurality of top blocks 16 are fixedly connected to the top of the cemented carbide blank 3 at equal intervals, and a pressing groove 17 cooperating with the top block 16 is fixedly connected to the bottom of the top pressing block 8 .
[0049] In this embodiment, the number of the top blocks 16 is four, and correspondingly, the number of the pressing grooves 17 is four.
[0050] It can be understood that the cemented carbide wire drawing die of this embodiment, through the coordinated use of the top block 16 and the pressing groove 17, can enable the bottom of the top pressing block 8 to better press the top of the cemented carbide blank 3, thereby improving the shaping stability.
[0051] Furthermore, the cemented carbide wire drawing die also includes a grinding assembly, and the grinding assembly includes a grinding head 18 and a limiting ring 19 fixedly connected to the grinding head 18 .
[0052] In this embodiment, the carbide wire drawing die includes a grinding assembly in addition to the extrusion barrel assembly, the pressing assembly and the sealing assembly. The grinding assembly mainly includes a grinding head 18 and a limit ring 19. The grinding head 18 is used to grind the outlet hole 7 of the extrusion barrel assembly.
[0053] In the above description of the present invention, it should be noted that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", and "fourth" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first", "second", "third", and "fourth" may explicitly or implicitly include at least one of the features.
[0054] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.
[0055] Based on the same inventive concept, an embodiment of the present invention further provides a method for manufacturing a cemented carbide wire drawing die, wherein the cemented carbide wire drawing die is the cemented carbide wire drawing die described in any of the above embodiments, Figure 3 , the manufacturing method specifically comprises the following steps:
[0056] Step S10, sintering the pre-prepared nano cemented carbide powder to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube.
[0057] Specifically, firstly, nano cemented carbide powder is prepared, and the prepared nano cemented carbide powder is sintered at a preset first sintering temperature to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube. Optionally, the preset first sintering temperature is 1100-1750°C.
[0058] Preferably, the configuration of nano cemented carbide powder includes the following steps: selecting high-purity cemented carbide raw materials, such as zirconium oxide, aluminum oxide, silicon oxide, performing preliminary treatment on the cemented carbide raw materials, such as cleaning, drying, etc., to remove impurities and moisture, and crushing or grinding the cemented carbide raw materials after preliminary treatment to make their particle size meet the set requirements, thereby obtaining nano cemented carbide powder. In other embodiments, the nano cemented carbide powder can be prepared by a sol-gel method, a precipitation method, or a gas phase method.
[0059] Step S20, taking out the cemented carbide blank, pouring a mixture of cemented carbide powder and molybdenum-manganese slurry into the cemented carbide blank, and sintering to obtain a supporting mold core.
[0060] Specifically, the cemented carbide blank obtained by sintering in step S10 is taken out, and a mixture of inner cemented carbide powder and molybdenum-manganese slurry is poured into the cemented carbide blank, and the inner support mold core is sintered at a preset second sintering temperature. The inner side of the sintered support mold core is arc-shaped, and an annular pointed groove is provided on the inner side of the support mold core. Optionally, the preset second sintering temperature is 1000-1500°C; the mass ratio between the cemented carbide powder and the molybdenum-manganese slurry is 10:3.
[0061] Step S30, embedding a copper oxide-based nano-composite cemented carbide sintered body on the inner side of the supporting mold core, and sintering to obtain an inner supporting layer.
[0062] Specifically, a copper oxide-based nano-composite cemented carbide sintered body is embedded inside the support mold core obtained by sintering in step S20, and sintering is performed again to obtain an inner support layer.
[0063] Step S40, the cemented carbide blank, the supporting mold core and the inner support layer are integrated into one body, and after reheating to a preset first temperature, the top pressure assembly is controlled to move downward at a constant speed, the pressure head enters the inner side of the inner support layer, and a through hole is squeezed out on the inner side of the inner support layer, and the fixed pressure block is used for shaping and then cooling.
[0064] Specifically, the cemented carbide blank, the supporting mold core and the inner support layer obtained by sintering in sequence are first integrated, and then the temperature is raised to a preset first temperature, and then the top pressing block in the top pressing assembly is pressed downward by a hydraulic cylinder, so that the top pressing block moves downward at a constant speed, driving the pressure head at the bottom of the top pressing block to enter the inner side of the inner support layer to extrude a through hole on the inner side of the inner support layer, and finally the top pressing block is used to shape and cool down. Optionally, the preset first temperature is 1400-1690°C.
[0065] As a preference, refer to Figure 4When the ram includes a ram inlet section, a ram auxiliary inlet section, a ram compression section, a ram sizing section and an external thread top block connected in sequence from top to bottom, the step S40 of entering the inner side of the inner support layer through the ram, extruding a through hole on the inner side of the inner support layer, and cooling after shaping through the fixed pressure block may include the following steps:
[0066] Step S401, using a pressing head to press the inlet and outlet area, the auxiliary inlet area, the compression area and the sizing area on the inner side of the inner support layer, and pressing the top of the cemented carbide blank with a pressing block during the pressing;
[0067] Step S402, forming the top block on the top of the cemented carbide blank through the pressing groove at the bottom of the top pressing block, while the bottom of the top pressing block ensures the flatness of the top of the cemented carbide blank, and then cools down after keeping warm for a preset time.
[0068] That is, during the process of the top pressure block moving downward at a constant speed, the top pressure block enters the inner side of the inner support layer through the pressure head entrance section, the pressure head auxiliary entrance section, the pressure head compression section, the pressure head sizing section and the external thread top block at the bottom of the top pressure block, and squeezes the entrance and exit area, the auxiliary entrance area, the compression area and the sizing area on the inner side of the inner support layer. While squeezing, the top pressure block presses the top of the cemented carbide blank, and the top block on the top of the cemented carbide blank is formed through the pressure groove at the bottom of the top pressure block, and the flatness of the top of the cemented carbide blank is ensured by the bottom of the top pressure block, and the temperature is reduced to the preset cooling temperature with the furnace after the preset insulation time. Optionally, the preset time is 20-45 minutes, and the preset cooling temperature is 200-350℃.
[0069] Step S50, grinding the bottom of the cemented carbide blank and grinding the outlet hole.
[0070] Specifically, for the hard alloy blank, the supporting mold core and the inner supporting layer for extruding the through hole after cooling, the bottom of the hard alloy blank is ground by a grinding head, and the outlet hole is ground and formed.
[0071] Step S60, taking out the pressing assembly, grinding the formed through-holes to obtain smoothly connected through-holes, cooling to room temperature, and obtaining a cemented carbide wire drawing die.
[0072] Preferably, the top pressure block, the pressure head entrance section, the pressure head auxiliary entrance section, the pressure head compression section, the pressure head sizing section and the external thread top block are taken out upwards, and the formed entrance area, auxiliary entrance area, compression area and sizing area are polished to obtain smoothly connected areas, and the temperature is cooled to room temperature to obtain a cemented carbide wire drawing die with a specific precision structure.
[0073] Further, refer to Figure 3Another embodiment of the present invention provides a method for manufacturing a cemented carbide wire drawing die. The method further includes the following steps before step S10, i.e., sintering the pre-prepared nano cemented carbide powder to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube:
[0074] Step S70, installing the movable blocks equidistantly inside the extrusion cylinder, and installing the blocking assembly at the bottom of the extrusion cylinder.
[0075] Specifically, before step S10, four movable blocks are equidistantly installed inside the extrusion cylinder, and the plugging assembly is installed at the bottom of the extrusion cylinder, which can avoid the problem of excessive extrusion of the pressure head and improve the stability of through-hole forming.
[0076] For further reference, Figure 3 In step S50, i.e., before the bottom of the cemented carbide blank is ground and the outlet hole is ground and formed, the steps include:
[0077] Step S80, pulling out the movable block, so that a limiting groove cooperating with the movable block is formed on the outer side of the cemented carbide blank;
[0078] Step S90, removing the plugging assembly at the bottom of the extrusion barrel, and heating the cooled cemented carbide blank, the supporting mold core and the inner support layer to a preset second temperature again.
[0079] Specifically, before step S50, the movable blocks installed at equal distances are pulled out, four limit grooves cooperating with the four movable blocks are opened on the outside of the cemented carbide blank, and then the plugging assembly at the bottom of the extrusion barrel is removed, and the cemented carbide blank, the supporting mold core and the inner support layer with through holes after cooling in step S40 are heated again until the inner support layer is heated to a preset second temperature. Optionally, the preset second temperature is 300-500°C.
[0080] Next, the present invention will illustrate an embodiment of the method for manufacturing the above-mentioned cemented carbide wire drawing die through the following embodiments.
[0081] In an optional implementation manner, this embodiment provides a method for manufacturing a cemented carbide wire drawing die, which may include the following steps:
[0082] Step S11, four movable blocks are installed at equal distances inside the extrusion cylinder, and the plugging assembly is installed at the bottom of the extrusion cylinder;
[0083] Step S12, sintering the pre-prepared nano cemented carbide powder at a temperature of 1100° C. to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube to prepare nano cemented carbide powder, wherein the cemented carbide blank is an aluminum oxide alloy;
[0084] Step S13, taking out the cemented carbide blank, pouring a mixture of cemented carbide powder and molybdenum-manganese slurry in a mass ratio of 10:3 into the inner side of the cemented carbide blank, sintering the mixture at a temperature of 1000° C. to obtain an inner support mold core, wherein the inner side of the sintered support mold core is arc-shaped, and an annular pointed groove is provided on the inner side of the support mold core;
[0085] Step S14, embedding a copper oxide-based nano-composite cemented carbide sintered body into the inner side of the supporting mold core, and sintering again to obtain an inner supporting layer;
[0086] Step S15, the cemented carbide blank, the support mold core and the inner support layer are integrated, and after the temperature is re-raised to 1400°C, the top pressure block is controlled to move downward at a constant speed, and the top pressure block enters the inner side of the inner support layer through the pressure head inlet section, the pressure head auxiliary inlet section, the pressure head compression section, the pressure head sizing section and the external thread top block at the bottom, and squeezes the inlet and outlet area, the auxiliary inlet area, the compression area and the sizing area on the inner side of the inner support layer. While extruding, the top pressure block presses the top of the cemented carbide blank, and the top block on the top of the cemented carbide blank is formed by the pressure groove at the bottom of the top pressure block. After keeping warm for 20 minutes, the temperature is cooled down to 200°C with the furnace;
[0087] Step S16, pull out the movable block, open four limit grooves on the outer side of the cemented carbide blank to match the four movable blocks, and then remove the plugging component at the bottom of the extrusion barrel;
[0088] Step S17, heating the cemented carbide blank, the supporting mold core and the inner supporting layer to 300° C. again, and then grinding the bottom of the cemented carbide blank by a grinding head to grind and shape the outlet hole;
[0089] Step S18, take out the top pressure block, the pressure head entrance section, the pressure head auxiliary entrance section, the pressure head compression section, the pressure head sizing section and the external thread top block, grind the formed entrance area, auxiliary entrance area, compression area and sizing area to obtain smoothly connected areas, cool them to room temperature, and obtain a cemented carbide wire drawing die.
[0090] In another optional implementation manner, this embodiment provides a method for manufacturing a cemented carbide wire drawing die, which may include the following steps:
[0091] Step S11, installing the movable blocks equidistantly inside the extrusion tube, and installing the plugging assembly at the bottom of the extrusion tube;
[0092] Step S12, sintering the pre-prepared nano cemented carbide powder at a temperature of 1750° C. to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube to prepare nano cemented carbide powder, wherein the cemented carbide blank is an aluminum oxide alloy;
[0093] Step S13, taking out the cemented carbide blank, pouring a mixture of cemented carbide powder and molybdenum-manganese slurry in a mass ratio of 10:3 into the inner side of the cemented carbide blank, sintering the mixture at a temperature of 1500° C. to obtain an inner support mold core, wherein the inner side of the sintered support mold core is in an arc shape, and an annular pointed groove is provided on the inner side of the support mold core;
[0094] Step S14, embedding a copper oxide-based nano-composite cemented carbide sintered body into the inner side of the supporting mold core, and sintering again to obtain an inner supporting layer;
[0095] Step S15, the cemented carbide blank, the support mold core and the inner support layer are integrated, and after the temperature is re-raised to 1690°C, the top pressure block is controlled to move downward at a constant speed, and the top pressure block enters the inner side of the inner support layer through the pressure head inlet section, the pressure head auxiliary inlet section, the pressure head compression section, the pressure head sizing section and the external thread top block at the bottom, and squeezes the inlet and outlet area, the auxiliary inlet area, the compression area and the sizing area on the inner side of the inner support layer. While extruding, the top pressure block presses the top of the cemented carbide blank, and the top block on the top of the cemented carbide blank is formed by the pressure groove at the bottom of the top pressure block. After keeping warm for 45 minutes, the temperature is cooled down to 350°C with the furnace;
[0096] Step S16, pull out the movable block, open four limit grooves on the outer side of the cemented carbide blank to match the four movable blocks, and then remove the plugging component at the bottom of the extrusion barrel;
[0097] Step S17, heating the cemented carbide blank, the supporting mold core and the inner supporting layer to 500° C. again, and then grinding the bottom of the cemented carbide blank by a grinding head to grind and shape the outlet hole;
[0098] Step S18, take out the top pressure block, the pressure head entrance section, the pressure head auxiliary entrance section, the pressure head compression section, the pressure head sizing section and the external thread top block, grind the formed entrance area, auxiliary entrance area, compression area and sizing area to obtain smoothly connected areas, cool them to room temperature, and obtain a cemented carbide wire drawing die.
[0099] In another optional implementation manner, this embodiment provides a method for manufacturing a cemented carbide wire drawing die, which may include the following steps:
[0100] Step S11, installing the movable blocks equidistantly inside the extrusion tube, and installing the plugging assembly at the bottom of the extrusion tube;
[0101] Step S12, sintering the pre-prepared nano cemented carbide powder at a temperature of 1500° C. to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube to prepare nano cemented carbide powder, wherein the cemented carbide blank is an aluminum oxide alloy;
[0102] Step S13, taking out the cemented carbide blank, pouring a mixture of cemented carbide powder and molybdenum-manganese slurry in a mass ratio of 10:3 into the inner side of the cemented carbide blank, sintering the mixture at a temperature of 1250° C. to obtain an inner support mold core, wherein the inner side of the sintered support mold core is arc-shaped, and an annular pointed groove is provided on the inner side of the support mold core;
[0103] Step S14, embedding a copper oxide-based nano-composite cemented carbide sintered body into the inner side of the supporting mold core, and sintering again to obtain an inner supporting layer;
[0104] Step S15, the cemented carbide blank, the support mold core and the inner support layer are integrated, and after the temperature is re-raised to 1550°C, the top pressure block is controlled to move downward at a constant speed, and the top pressure block enters the inner side of the inner support layer through the pressure head inlet section, the pressure head auxiliary inlet section, the pressure head compression section, the pressure head sizing section and the external thread top block at the bottom, and squeezes the inlet and outlet area, the auxiliary inlet area, the compression area and the sizing area on the inner side of the inner support layer. While extruding, the top pressure block presses the top of the cemented carbide blank, and the top block on the top of the cemented carbide blank is formed by the pressure groove at the bottom of the top pressure block. After keeping warm for 20 minutes, the temperature is cooled down to 300°C with the furnace;
[0105] Step S16, extract the movable block, open four limit grooves on the outer side of the cemented carbide blank to match the four movable blocks, and then remove the plugging component at the bottom of the extrusion barrel;
[0106] Step S17, heating the cemented carbide blank, the supporting mold core and the inner supporting layer to 400° C. again, and then grinding the bottom of the cemented carbide blank by a grinding head to grind and shape the outlet hole;
[0107] Step S18, take out the top pressure block, the pressure head entrance section, the pressure head auxiliary entrance section, the pressure head compression section, the pressure head sizing section and the external thread top block, grind the formed entrance area, auxiliary entrance area, compression area and sizing area to obtain smoothly connected areas, cool them to room temperature, and obtain a cemented carbide wire drawing die.
[0108] In the above description of the present invention, it is to be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0109] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A cemented carbide wire drawing die, characterized in that: It includes a barrel extrusion assembly and a top pressing assembly; The extrusion barrel assembly comprises an extrusion barrel, an extrusion groove is provided on the inner side of the extrusion barrel, the cemented carbide blank is provided on the inner side of the extrusion groove, a support mold core is fixedly connected to the inner side of the cemented carbide blank, an inner support layer is fixedly connected to the inner side of the support mold core, a through hole is provided on the inner side of the inner support layer, and an outlet hole is provided on the bottom of the cemented carbide blank; The pressing module comprises a pressing block matched with the extrusion groove, and a pressing head matched with the through hole is fixedly connected to the bottom of the pressing block.
2. The cemented carbide wire drawing die according to claim 1, characterized in that: The supporting mold core is a mixture of cemented carbide powder and molybdenum-manganese slurry; the inner supporting layer is a copper oxide-based nano-complex phase cemented carbide sintered body.
3. The cemented carbide wire drawing die according to claim 2, characterized in that: The through hole comprises an inlet area, an auxiliary inlet area, a compression area and a sizing area which are connected in sequence from top to bottom; The pressure head comprises a pressure head inlet section, a pressure head auxiliary inlet section, a pressure head compression section, a pressure head sizing section and an external threaded top block which are sequentially connected from top to bottom.
4. The cemented carbide wire drawing die according to claim 3, characterized in that: The outer side of the inner support layer and the inner side of the support mold core are both provided with annular pointed grooves, and the outer side of the cemented carbide blank is provided with a plurality of limiting grooves at equal intervals, and a movable block is installed in each limiting groove.
5. The cemented carbide wire drawing die according to claim 4, characterized in that: A blocking opening is provided at the bottom of the extrusion tube, and a blocking assembly is installed at the bottom of the extrusion tube. The blocking assembly includes a blocking block matched with the blocking opening and a connecting bottom plate fixedly connected to the blocking block.
6. The cemented carbide wire drawing die according to claim 5, characterized in that: A plurality of top blocks are fixedly connected to the top of the cemented carbide blank at equal intervals, and a pressing groove matched with the top block is fixedly connected to the bottom of the top pressing block.
7. The cemented carbide wire drawing die according to claim 1, characterized in that: The cemented carbide wire drawing die also includes a grinding assembly, and the grinding assembly includes a grinding head and a limiting ring fixedly connected to the grinding head.
8. The method for manufacturing a cemented carbide wire drawing die according to any one of claims 1 to 7, characterized in that: The manufacturing method of the wire drawing die comprises: Sintering the pre-prepared nano cemented carbide powder to obtain a cemented carbide blank consistent with the inner wall of the extrusion tube; The cemented carbide blank is taken out, and a mixture of cemented carbide powder and molybdenum-manganese slurry is added to the cemented carbide blank to sinter to obtain a supporting mold core; A copper oxide-based nano-complex phase hard alloy sintered body is embedded in the inner side of the supporting mold core, and sintered to obtain an inner supporting layer; The cemented carbide blank, the support mold core and the inner support layer are integrated, and after the temperature is raised to a preset first temperature again, the top pressure assembly is controlled to move downward at a constant speed, and the pressure head enters the inner side of the inner support layer, and a through hole is squeezed out on the inner side of the inner support layer, and the fixed pressure block is used for shaping and then cooling; Grinding the bottom of the cemented carbide blank and grinding the outlet hole; The pressing assembly is taken out, the formed through-hole is polished to obtain a smoothly connected through-hole, and the temperature is reduced to room temperature to obtain a cemented carbide wire drawing die.
9. The method for manufacturing a cemented carbide wire drawing die according to claim 8, characterized in that: The pressure head enters the inner side of the inner support layer, extrude through holes on the inner side of the inner support layer, and cools after shaping by a fixed pressure block, including: The inlet and outlet areas, the auxiliary inlet area, the compression area and the sizing area are squeezed on the inner side of the inner support layer by a pressing head, and a pressing block presses the top of the cemented carbide blank during the squeezing; The top block on the top of the cemented carbide blank is formed by the pressing groove at the bottom of the top pressing block, and the flatness of the top of the cemented carbide blank is guaranteed below the top pressing block, and the top of the cemented carbide blank is cooled after being kept warm for a period of time.
10. The method for manufacturing a cemented carbide wire drawing die according to claim 8, wherein: Before sintering the pre-prepared nano cemented carbide powder, the method further comprises: Install the movable blocks equidistantly inside the extrusion cylinder, and install the plugging assembly at the bottom of the extrusion cylinder; The method of grinding the bottom of the cemented carbide blank and grinding the outlet hole also includes: Pull out the movable block, so that a limiting groove cooperating with the movable block is formed on the outer side of the cemented carbide blank; The plugging assembly at the bottom of the extrusion barrel is removed, and the hard alloy blank, the supporting mold core and the inner supporting layer are heated up to a preset second temperature after being cooled.
Citation Information
Patent Citations
Wire drawing die and method of making the same
CA1086261A
Light weight alloy ceramic body for die
CN101544495A
Manufacturing process of microporous wire-drawing die core made of hard alloy
CN103949641A
Wire drawing die
CN115989096A
Forming mould for wire drawing die
CN204338857U