Ship rotary spraying device hoisting tool and mounting method

By designing the ship's rotary injector lifting workpiece, the three-dimensional position adjustment of the rotary injector is used to use columns, bases and adjustment components to adjust the rotary injector, the problem of poor lifting stability is solved and a more efficient installation process is achieved.

CN118978083APending Publication Date: 2024-11-19GUANGZHOU HUANGPU SHIPBUILDING OFFSHORE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188265.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The lifting method of the prior art transducer is poor in stability and cannot guarantee the safety of the transducer during the lifting process.

Method used

A ship spoiler lifting tool set is designed, including a column, a base, a vertical adjustment assembly, a first adjustment assembly and a second adjustment assembly, through which the position and attitude of the spoiler are adjusted in three-dimensional space, and using The crane is hoisted to ensure the stability and safety of the spoiler during the hoisting process.

Benefits of technology

It improves the accuracy and safety of the sprayer during the installation process, avoids repeated corrections, and improves work efficiency, so that the sprayer can be installed in place in one go.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118978083A_ABST
    Figure CN118978083A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of rotary spraying device installation, and discloses a ship rotary spraying device hoisting tool and an installation method.The ship rotary spraying device hoisting tool comprises a stand column, a base, a back shore base, a first adjusting assembly, a second adjusting assembly and a vertical adjusting assembly; the position and posture of the rotary sprayer in a three-dimensional space are adjusted through the first adjusting assembly, the second adjusting assembly and the vertical adjusting assembly, convenience is provided for the follow-up installation process of the rotary sprayer, meanwhile, positioning of the rotary sprayer relative to a hoisting tool is completed through the adjusting assemblies, safety and stability in the hoisting process are ensured, and the hoisting efficiency is improved. The precision of the rotary sprayer in the installation process is improved, the rotary sprayer can be installed in place at a time, repeated correction is avoided, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of installation of a rotary sprayer, and in particular to a hoisting tool and an installation method of a rotary sprayer for a ship. Background Art

[0002] The blowout preventer is one of the main equipment of the well control system and is used in offshore drilling operations. It is used as a well control device when surface drilling is carried out without a blowout preventer installed. When used in conjunction with an underwater blowout preventer group, it can be used for deep seabed drilling and production.

[0003] At present, the hoisting method used when installing the rotary sprayer is to directly tie the hoisting belt to the rotary sprayer for hoisting. This hoisting method has poor stability and cannot guarantee the safety of the rotary sprayer during the hoisting process. Summary of the invention

[0004] The object of the present invention is to provide a ship sprinkler lifting tool and installation method, which is used to solve the problem that direct lifting with a lifting belt in the prior art leads to poor stability and cannot ensure the safety of the sprinkler during the lifting process.

[0005] In order to achieve the above-mentioned object, in a first aspect, the present invention provides a ship sprayer lifting tool, which has a first direction and a second direction perpendicular to each other, and includes:

[0006] A column, wherein a first lifting lug is provided on the top of the column;

[0007] A base, the base being arranged at the bottom end of the column along an axial direction perpendicular to the column;

[0008] A vertical adjustment assembly is provided on the base and is used to abut against the bottom wall of the rotary sprayer;

[0009] At least two first adjustment components are provided and installed on the column and / or the base, and at least two first adjustment components are located on opposite sides of the column along the first direction; and

[0010] At least two groups of second adjustment components are installed on the column and / or the base, and at least two groups of the second adjustment components are respectively located on opposite sides of the column along the second direction;

[0011] When the transfer sprayer passes through the column and is placed on the base, the vertical adjustment component abuts against the bottom wall of the transfer sprayer; the first adjustment component abuts against the inner wall and / or outer wall of the transfer sprayer; the second adjustment component abuts against the inner wall and / or outer wall of the transfer sprayer.

[0012] In some embodiments of the present application, the first adjustment assembly includes a first side plate provided on the base, and a first stopper is provided on the first side plate for radial movement along the column;

[0013] The second adjustment assembly includes a second side plate disposed on the base, and a second stopper is disposed on the second side plate for radial movement along the column;

[0014] The first limiting member and the second limiting member are both used to abut against the outer wall of the rotary sprayer.

[0015] In some embodiments of the present application, the rotary sprayer lifting tool further includes a top support seat, which is arranged above the base in a direction perpendicular to the axis of the column and is spaced apart and connected to the column;

[0016] The first adjustment assembly includes a third side plate, the third side plate is arranged at one end of the top support seat away from the column, and the third side plate is provided with a third limiter for radial movement along the column;

[0017] The second adjustment assembly includes a fourth side plate, the fourth side plate is arranged at one end of the top support seat away from the column, and the fourth side plate is provided with a fourth limiter for radial movement along the column;

[0018] The third limiting member and the fourth limiting member are both used to abut against the inner wall of the rotary sprayer.

[0019] In some embodiments of the present application, the first limiting member and the second limiting member are both first adjusting bolts, and the first adjusting bolts are threadedly assembled on the corresponding first side plate or second side plate.

[0020] In some embodiments of the present application, the third limiting member and the fourth limiting member are both second adjusting bolts, and the second adjusting bolts are threadedly assembled on the corresponding third side plate or fourth side plate.

[0021] In some embodiments of the present application, the vertical adjustment assembly is disposed on the base between the first side plate, the second side plate and the column;

[0022] The vertical adjustment assembly includes a vertical adjustment bolt which is threadedly mounted on the base along a plane perpendicular to the first direction and the second direction.

[0023] In some embodiments of the present application, a second lifting ear is provided on the upper end surface of one end of the base away from the column;

[0024] A third lifting ear is provided on a side wall of the base at one end away from the column, and the third lifting ear is arranged corresponding to the second lifting ear.

[0025] In some embodiments of the present application, at least one first reinforcing bracket is provided between the upper end surface of the base and the column;

[0026] At least one second reinforcing bracket is provided between the top support seat and the column.

[0027] In a second aspect, an embodiment of the present application provides a method for installing a transfer sprayer, comprising:

[0028] Support plates are respectively arranged on both sides of the rotary sprayer, and the support plates are connected to the rotary sprayer with bolts;

[0029] The transfer sprayer is installed on the ship transfer sprayer lifting tooling, and the position of the transfer sprayer is fine-tuned and positioned by the first adjustment component, the second adjustment component, and the vertical adjustment component;

[0030] Use a crane to lift the lifting tool to the installation position. When the rotary sprayer is lifted into place, adjust the position of the rotary sprayer so that the rotary sprayer is initially aligned with the wellhead. At this time, the upper surface of the support plate contacts the lower surface of the reverse position of the drilling platform.

[0031] A temporary hanging plate is set at the back of the drilling platform for hanging the hand chain hoist, and connected to the third lifting lug on the lifting tooling; a temporary hanging beam is set at the front of the drilling platform, and the sling passes through the front of the drilling platform and is connected to the second lifting lugs on the lifting tooling respectively;

[0032] One or more first yard plates are evenly spaced along the length direction of each support plate, the first yard plate is L-shaped, the vertical part of the first yard plate is welded to the reverse side of the drilling platform, and the horizontal part of the first yard plate is located below the support plate;

[0033] Remove the crane hook, remove the lifting equipment, and retract the crane sling;

[0034] A central bracket is respectively arranged at the upper opening and the lower opening of the rotating sprayer, a circular hole is arranged in the middle of the central bracket, and the position of the central bracket relative to the rotating sprayer is adjusted so that the circular hole and the rotating sprayer are coaxial;

[0035] The first and second pull-wire racks are respectively set at the front and back of the drilling platform, and a thin steel wire passing through the well center is pulled between the two. The position of the rotary sprayer is slowly and finely adjusted to make the front-to-back and left-to-right distances of the thin steel wire and the circular hole of the center bracket in the rotary sprayer equal. After the adjustment is in place, the support plate is welded at the back of the drill bit.

[0036] Remove the center support, lift the transfer sprayer assembly into the transfer sprayer and check whether the center is aligned;

[0037] Then remove the bolts on the support plate, remove the hand chain hoist and the sling connected to the second lifting lug, cut off the horizontal part of the first yard plate below the support plate, and use a crane to move the sprayer away;

[0038] After the welding is completed and the weld flaw detection is passed, remove the lifting plate and the first code plate in the installation area, and complete the grinding and repainting of the support plate. Use the crane and lifting tooling to lift the spray gun, install the gaskets and bolts after hoisting into place, and the installation of the spray gun is completed.

[0039] In some embodiments of the present application, the central bracket includes a supporting plate, the circular hole is arranged at the center of the supporting plate, four connecting plates are equidistantly arranged on the side walls of the supporting plate, a third adjusting bolt is threadedly mounted on one end of the connecting plate away from the supporting plate, and the third adjusting bolt abuts against the inner wall of the rotary sprayer.

[0040] In some embodiments of the present application, after the rotary sprayer is lifted off, an L-shaped second yard plate is welded on the reverse side of the drilling platform between two adjacent first yard plates, and the horizontal portion of the second yard plate is located below the support plate;

[0041] A plurality of support plates are welded at the reverse side of the drilling platform between two adjacent first code plates. The support plate is provided with an inclined surface on one side facing the rotary sprayer, and the inclined surface gradually moves away from the rotary sprayer from top to bottom.

[0042] In some embodiments of the present application, a plurality of support plates are temporarily welded on the reverse side of the drilling platform between two adjacent first code plates, and an inclined surface is provided on the side of the support plate facing the rotary sprayer, and the inclined surface gradually moves away from the rotary sprayer from top to bottom.

[0043] In some embodiments of the present application, the position of the rotary sprayer is adjusted by placing an iron wedge between the first code plate and the support plate and striking the iron wedge.

[0044] In some embodiments of the present application, a well center cross line is drawn on the back side of the drilling platform, and a center line is drawn on the side of the support plate. When the diverter is hoisted into place, the center line of the side of the support plate is aligned with the well center cross line by adjusting the position of the diverter.

[0045] Compared with the prior art, the ship switch sprayer lifting fixture and installation method of the embodiment of the present invention have the following beneficial effects: the switch sprayer is installed on the lifting fixture, and the position and posture of the switch sprayer in three-dimensional space are adjusted by the first adjustment component, the second adjustment component, and the vertical adjustment component arranged on the lifting fixture, which provides convenience for the subsequent installation process of the switch sprayer. At the same time, the above-mentioned adjustment components are used to complete the positioning of the switch sprayer relative to the lifting fixture, ensuring the safety and stability during the lifting process, improving the accuracy of the switch sprayer during the installation process, so that the switch sprayer can be installed in place at one time, avoiding repeated corrections, and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a schematic diagram of the overall structure of the lifting tooling of the present invention;

[0047] Figure 2 It is a top view schematic diagram of the lifting tool of the present invention;

[0048] Figure 3 It is a front view schematic diagram of the lifting tool of the present invention;

[0049] Figure 4 This is a schematic diagram of the state where the rotary sprayer of the present invention is installed on a lifting tool;

[0050] Figure 5 This is a schematic diagram of the state after the first code plate of the present invention is welded;

[0051] Figure 6 This is a schematic diagram of the state when the transfer sprayer is installed again in the present invention;

[0052] Figure 7 This is a schematic diagram of the installation and matching relationship between the central support and the rotary sprayer of the present invention;

[0053] Figure 8 This is a schematic diagram of the state after the first code plate of the present invention is partially cut off;

[0054] Fig. 9 This is a schematic diagram of the second code plate after welding of the present invention.

[0055] In the figure, 1, column; 11, first lifting eye; 12, first reinforcing bracket; 13, second reinforcing bracket;

[0056] 2. Base; 21. First side plate; 22. First stopper; 23. Second side plate; 24. Second stopper; 25. Vertical adjustment bolt; 26. Second lifting lug; 27. Third lifting lug; 28. Lateral support plate;

[0057] 3. Top support seat; 31. Third side plate; 32. Third stopper; 33. Fourth side plate; 34. Fourth stopper;

[0058] 4. Sprayer; 41. Support plate;

[0059] 5. The reverse side of the drilling platform; 51. The first yard board; 52. The second yard board; 53. The support board; 54. The second cable rack;

[0060] 6. Front position of the drilling platform; 61. First cable tie frame;

[0061] 7. Center bracket; 71. Load-bearing plate; 72. Connecting plate; 73. Third adjusting bolt; 74. Round hole; 8. Iron wedge; 9. Thin steel wire. DETAILED DESCRIPTION

[0062] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0063] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. It should be understood that the terms "first", "second", etc. are used in the present invention to describe various information, but such information should not be limited to these terms, which are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, "first" information may also be referred to as "second" information, and similarly, "second" information may also be referred to as "first" information.

[0064] First, as Figure 1-Figure 4 As shown, an embodiment of the present application proposes a ship sprinkler lifting tool, which has a first direction X and a second direction Y, and the first direction X is perpendicular to the second direction Y, and also includes a column 1, a base 2 is arranged at the bottom end of the column 1 along an axial direction perpendicular to the column 1, the base 2 cooperates with the column 1 to form a lifting platform, and the lifting platform is used to place the sprinkler 4, and first adjustment components are respectively provided on the lifting platform along the first direction X and on both sides of the column 1, and second adjustment components are respectively provided on the lifting platform along the second direction Y and on both sides of the column 1. When the sprinkler 4 is placed on the lifting platform, the first adjustment component and the second adjustment component abut against the inner wall and / or outer wall of the sprinkler 4.

[0065] During hoisting, firstly, the rotary sprayer 4 is mounted on the base 2 from top to bottom so that the bottom wall of the rotary sprayer 4 abuts against the vertical adjustment component, and then the front and rear and left and right positions of the rotary sprayer 4 along the horizontal direction are adjusted by the first adjustment component and the second adjustment component, and the vertical position of the rotary sprayer 4 is adjusted by the vertical adjustment component, thereby completing the adjustment of the state of the rotary sprayer 4 in three-dimensional space, providing convenient conditions for the subsequent installation process, and at the same time, the first adjustment component and the second adjustment component are used to complete the positioning of the rotary sprayer 4, so that the rotary sprayer 4 remains stable relative to the lifting tooling, and then the crane cooperates with the first lifting ear 11 to realize the lifting of the rotary sprayer 4 to the specified position. This embodiment ensures the stability and safety of the rotary sprayer 4 during the lifting process by installing the rotary sprayer 4 on the lifting tooling for lifting.

[0066] In some embodiments of the present application, the first adjustment component includes a first side plate 21 arranged on the base 2, and a first limit member 22 is provided on the first side plate 21 for radial movement along the column 1; the second adjustment component includes a second side plate 23 arranged on the base 2, and a second limit member 24 is provided on the second side plate 23 for radial movement along the column 1; the first limit member 22 and the second limit member 24 are both in contact with the outer wall of the transfer sprayer 4.

[0067] After the rotary sprayer 4 is mounted on the lifting tooling, the first side plate 21 and the second side plate 23 are located on the outside of the rotary sprayer 4. The two first limit members 22 are radially moved along the column 1 to adjust the position of the rotary sprayer 4 along the first direction X. The two second limit members 24 are radially moved along the column 1 to adjust the position of the rotary sprayer 4 along the second direction Y. Subsequently, the first limit member 22 is made to abut against the outer wall of the rotary sprayer 4 toward one end of the column 1 and the second limit member 24 is made to abut against the outer wall of the rotary sprayer 4 toward one end of the column 1, thereby completing the positioning of the rotary sprayer 4. In order to improve the strength of the first side plate 21 and the second side plate 23, a lateral support plate 28 may be provided on the side of the first side plate 21 and the second side plate 23 away from the column 1. One side wall of the lateral support plate 28 is connected to the first side plate 21 and the second side plate 23, and the other side wall is connected to the base 2.

[0068] In some embodiments of the present application, a top support seat 3 is further included, which is arranged above the base 2 along an axial direction perpendicular to the column 1 and at intervals. The first adjustment component includes a third side plate 31 arranged on the top support seat 3, and the third side plate 31 is provided with a third limit member 32 for radial movement along the column 1; the second adjustment component includes a fourth side plate 33 arranged on the top support seat 3, and the fourth side plate 33 is provided with a fourth limit member 34 for radial movement along the column 1; the third limit member 32 and the fourth limit member 34 are both in contact with the inner wall of the transfer sprayer 4.

[0069] After the rotary sprayer 4 is mounted on the lifting tooling, the third side plate 31 and the fourth side plate 33 are located on the inner side of the rotary sprayer 4, the third limit member 32 is moved radially along the column 1 and cooperates with the first limit member 22 to jointly adjust the position of the rotary sprayer 4 along the first direction X, the fourth limit member 34 is moved radially along the column 1 and cooperates with the second limit member 24 to jointly adjust the position of the rotary sprayer 4 along the second direction Y, and then the third limit member 32 and the fourth limit member 34 are made to abut against the inner wall of the rotary sprayer 4 at one end away from the column 1, thereby completing the positioning of the rotary sprayer 4.

[0070] In some embodiments of the present application, the first limit member 22 and the second limit member 24 are first adjustment bolts threadedly mounted on the first side plate 21 and the second side plate 23. The first adjustment bolt controller is moved radially along the column 1 through a knob to adjust the position of the rotating sprayer 4 and position it.

[0071] In some embodiments of the present application, the third limit member 32 and the fourth limit member 34 are second adjustment bolts threadedly mounted on the third side plate 31 and the fourth side plate 33. The second adjustment bolt controller is moved radially along the column 1 through a knob to adjust the position of the rotating sprayer 4 and position it.

[0072] In some embodiments of the present application, the vertical adjustment assembly includes a vertical adjustment bolt 25 which is threadedly mounted on the base 2 along a plane perpendicular to the first direction X and the second direction Y. When the rotary sprayer 4 is mounted on the lifting tooling, the bottom wall of the rotary sprayer 4 abuts against the upper end of the vertical adjustment bolt 25. By turning the knob of the vertical adjustment bolt 25, the vertical position of the rotary sprayer 4 can be fine-tuned.

[0073] In some embodiments of the present application, second ears 26 are provided on the upper end surface of the base 2 at the end of the first side plate 21 and the second side plate 23 away from the column 1; and third ears 27 corresponding to each second ear 26 are provided on the side wall of the base 2 away from the column 1.

[0074] By setting the third lifting lug 27 and cooperating it with the traction rope, it is used to control the adjustment of the position and posture of the lifting tooling during the lifting process of the rotary sprayer 4. By setting the second lifting lug 26, it is used to cooperate with the sling to realize temporary suspension and fixation of the rotary sprayer 4 when the rotary sprayer 4 is subsequently installed.

[0075] In some embodiments of the present application, at least one first reinforcing elbow plate 12 is provided between the upper end surface of the base 2 and the column 1, and at least one second reinforcing elbow plate 13 is provided between the top support seat 3 and the column 1. One side of the first reinforcing elbow plate 12 is fit-connected to the column 1 and the other side is fit-connected to the base 2. One side of the second reinforcing elbow plate 13 is fit-connected to the column 1 and the other side is fit-connected to the top support seat 3, so as to improve the stability of the connection between the top support seat 3, the base 2 and the column 1.

[0076] like Figure 5-Figure 9 As shown, in the second aspect, the embodiment of the present application provides a method for installing a ship spray nozzle, comprising:

[0077] First, support plates 41 are respectively provided on both sides of the transfer sprayer 4, and bolt holes are evenly distributed on the support plates 41. The screw parts of the bolts are inserted into the bolt holes from bottom to top to achieve the installation connection between the support plates 41 and the transfer sprayer 4.

[0078] A well center cross line (by a total station) is drawn at position 5 on the reverse side of the drilling platform, and a center line is drawn on the side of the support plate 41.

[0079] The rotary sprayer 4 is installed on the ship rotary sprayer 4 lifting tool in the above embodiment, and the position of the rotary sprayer 4 is fine-tuned and positioned through the first adjustment component, the second adjustment component, and the vertical adjustment component.

[0080] The lifting tool is hoisted to the auxiliary trolley by the crane, and the auxiliary trolley is used to move the diverter 4 to the position below the wellhead (the wellhead extends one end distance upward from the bottom of the ship, and the diverter 4 is moved to the position below the wellhead for easy lifting). The crane and the lifting tool are connected by a sling, and the traction rope is connected to the third lifting ear 27 before lifting. When the diverter 4 is hoisted into place, the direction is adjusted by the traction rope so that the center line of the side of the support plate 41 is aligned with the cross line of the well center (the preliminary alignment of the diverter 4 and the wellhead is completed). At this time, the upper end face of the support plate 41 is in contact with the lower end face of the reverse position 5 of the drilling platform; Note: When performing this step, first operate the crane slowly Slowly lift the rotary sprayer 4, lift it about 150mm and then suspend it briefly to observe whether there is any twisting. If there is twisting, wait until the rotary sprayer 4 is stable before lifting it again. If the rotary sprayer 4 twists more than 30 degrees, put the rotary sprayer 4 back on the auxiliary trolley, untie the connection between the sling and the lifting tooling, keep the lifting tooling stationary, lift the rotary sprayer 4 alone and adjust its direction to be consistent with the installation direction before lifting it again. When the rotary sprayer 4 is close to the installation position, the crane needs to be controlled to move slowly. Arrange a commander at the reverse position 5 of the drilling platform to carefully observe the lifting status and maintain smooth communication with the crane operator to avoid collision between the rotary sprayer 4 and other parts of the drilling platform during the lifting process.

[0081] A temporary hanging plate is set at the back position 5 of the drilling platform for hanging hand chain hoists. At least 4 hand chain hoists are set and connected to the third lifting lugs 27 on the lifting tool respectively. A temporary hanging beam is set at the front position 6 of the drilling platform and connected to the second lifting lugs 26 on the lifting tool respectively after the sling passes through the front position 6 of the drilling platform to prevent the hand chain hoist from falling off due to the failure to hang tightly. A hole is set through the center of the front position 6 of the drilling platform so that the sling passes from top to bottom and connects to the second lifting lug 26 on the lifting tool.

[0082] One or multiple first code plates 51 (the width of the first code plate is 150 mm and the thickness is not less than 15 mm) are arranged in the length direction of each support plate 41, and the first code plate 51 is L-shaped, and the vertical part of the first code plate 51 is double-sidedly welded to the reverse position 5 of the drilling platform, and the horizontal part of the first code plate 51 is located below the support plate 41 to prevent the sprayer 4 from falling accidentally.

[0083] Release the crane hook, put the lifting equipment back to the auxiliary trolley, and retract the crane sling.

[0084] A central bracket 7 is respectively arranged at the upper opening and the lower opening of the rotary sprayer 4 (the installation position of the central bracket 7 is as close as possible to the upper and lower edges of the rotary sprayer 4, avoiding the installation sealing ring area), and a circular hole 74 is provided on the central bracket 7. The position of the central bracket 7 relative to the rotary sprayer 4 is adjusted so that the circular hole 74 is coaxial with the rotary sprayer 4 (the above adjustment process is completed by measuring the distance from the center of the circular hole 74 to the inner wall of the rotary sprayer 4).

[0085] A first pulling wire rack 61 and a second pulling wire rack 54 are respectively arranged at the front position 6 and the back position 5 of the drilling platform, and a thin steel wire 9 passing through the well center is pulled between the two. The position of the rotary sprayer 4 is slowly and finely adjusted so that the front-to-back and left-to-right distances of the thin steel wire 9 and the circular hole 74 of the center bracket 7 in the rotary sprayer 4 are equal. After the adjustment is in place, the support plate 41 is spot welded to the back position of the drill bit. There are no less than 4 spot welding positions on each support plate 41, and the length of each spot welding is not less than 30 mm.

[0086] Remove the center support 7, and hoist the transfer sprayer assembly into the transfer sprayer 4 to check whether the center is aligned.

[0087] Then remove the bolts on the support plate 41, and then remove the hand chain hoist and the sling connected to the second lifting lug 26, such as Figure 8 As shown, the portion of the first code plate 51 that is horizontally arranged below the support plate 41 is cut off, and the rotary sprayer 4 is placed back on the auxiliary trolley using a crane. The horizontal portion of the first code plate 51 is cut off to provide a return space for removing the rotary sprayer 4 and placing it back on the auxiliary trolley.

[0088] After the welding of the support plate 41 is completed and the weld flaw detection of the support plate 41 is passed, the hoisting plate, the first code plate 51 and other components in the installation area are removed, and the polishing and repainting of the support plate 41 are completed. The rotary sprayer 4 is lifted by a crane and a lifting tool, and the gasket and bolts are installed after the hoisting is in place. Before installing the bolts, ensure that the surface of the bolts is clean and no grease is required for the bolts. First, tighten the installation bolts with a conventional wrench, and then tighten the installation bolts with a hydraulic torque wrench in two steps. At this point, the installation of the rotary sprayer 4 is completed.

[0089] In some embodiments of the present application, Figure 7 As shown, the central bracket 7 includes a bearing plate 71 and a circular hole 74 is arranged at the center of the bearing plate 71, and four connecting plates 72 are equidistantly arranged on the side wall of the bearing plate 71, and a third adjusting bolt 73 is threadedly installed at one end of the connecting plate 72 away from the bearing plate 71, and the end edge of the third adjusting bolt 73 is chamfered and polished to prevent the third adjusting bolt 73 from damaging the equipment body when it abuts against the inner wall of the rotary sprayer 4. When installing the central bracket 7, firstly, the four third adjusting bolts 73 are respectively abutted against the inner wall of the rotary sprayer 4, and the distances between the center of the circular hole 74 arranged on the bearing plate 71 and the abutting positions of the four third adjusting bolts 73 and the inner wall of the rotary sprayer 4 are measured to keep the above four distances equal, then it is determined that the center of the circular hole 74 and the rotary sprayer 4 are coaxial at this time; when installing the central bracket 7, a safety rope is required to suspend the central bracket 7 to avoid accidental falling off.

[0090] In some embodiments of the present application, after the transfer sprayer 4 is lifted off, a second code plate 52 is welded to the reverse position 5 of the drilling platform between two adjacent first code plates 51, and the second code plate 52 is arranged in an L shape, and the horizontal part of the second code plate 52 is located below the support plate 41, which is used to prevent the support plate 41 of the transfer sprayer 4 from falling accidentally.

[0091] In some embodiments of the present application, a plurality of supporting plates 53 are temporarily welded at the reverse side 5 of the drilling platform between two adjacent first code plates 51, such as Figure 6 As shown, the support plate 53 is provided with an inclined surface on the side facing the transfer sprayer 4, and the inclined surface gradually moves away from the transfer sprayer 4 from top to bottom. The support plate 53 is provided for: when the welding of the support plate 41 is completed and the weld flaw detection of the support plate 41 is passed, when the transfer sprayer 4 is installed again, the inclined surface provided on the support plate 53 facing the transfer sprayer 4 is used for guiding, so that the transfer sprayer 4 can quickly slide into the designated position under the guiding action of the inclined surface, which helps to realize the rapid installation and positioning of the transfer sprayer 4.

[0092] In some embodiments of the present application, the position of the rotary sprayer 4 is finely adjusted by placing an iron wedge 8 between the first code plate 51 and the support plate 41 and striking the iron wedge 8 .

[0093] The working process of the present invention is: the rotary sprayer 4 is mounted on the lifting fixture so that the bottom wall of the rotary sprayer 4 abuts against the vertical adjusting bolt 25, and the front and rear and left and right positions of the rotary sprayer 4 on the horizontal plane are fine-tuned by the first adjusting component and the second adjusting component, and the vertical position of the rotary sprayer 4 is fine-tuned by the vertical adjusting bolt 25. Finally, the first adjusting component and the second adjusting component are used to complete the positioning of the rotary sprayer 4 relative to the lifting fixture, and then the rotary sprayer 4 is lifted to the installation position by a crane and the installation is completed.

[0094] In summary, the embodiment of the present invention provides a ship switch sprayer lifting tool and installation method, the switch sprayer 4 is installed on the lifting tool, and the position and posture of the switch sprayer 4 in three-dimensional space are adjusted by the first adjustment component and the second adjustment component arranged on the lifting tool, which provides convenience for the subsequent installation process of the switch sprayer 4. At the same time, the above-mentioned adjustment components are used to complete the positioning of the switch sprayer 4 relative to the lifting tool, ensuring the safety and stability during the lifting process, improving the accuracy of the switch sprayer 4 during the installation process, so that the switch sprayer 4 can be installed in place at one time, avoiding repeated corrections, and improving work efficiency.

[0095] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A ship sprayer lifting tool, having a first direction and a second direction perpendicular to each other, characterized in that: include: A column, wherein a first lifting lug is provided on the top of the column; A base, the base being arranged at the bottom end of the column along an axial direction perpendicular to the column; A vertical adjustment assembly is provided on the base and is used to abut against the bottom wall of the rotary sprayer; At least two first adjustment components are provided and installed on the column and / or the base, and at least two first adjustment components are located on opposite sides of the column along the first direction; as well as At least two groups of second adjustment components are installed on the column and / or the base, and at least two groups of the second adjustment components are respectively located on opposite sides of the column along the second direction; When the transfer sprayer passes through the column and is placed on the base, the vertical adjustment component abuts against the bottom wall of the transfer sprayer; the first adjustment component abuts against the inner wall and / or outer wall of the transfer sprayer; the second adjustment component abuts against the inner wall and / or outer wall of the transfer sprayer.

2. The ship sprayer lifting tool according to claim 1 is characterized in that: The first adjustment assembly includes a first side plate disposed on the base, and a first stopper is disposed on the first side plate for radial movement along the column; The second adjustment assembly includes a second side plate disposed on the base, and a second stopper is disposed on the second side plate for radial movement along the column; The first limiting member and the second limiting member are both used to abut against the outer wall of the rotary sprayer.

3. The ship sprayer lifting tool according to claim 1 is characterized in that: The ship sprayer lifting tool also includes a top support seat, which is arranged above the base in a direction perpendicular to the axis of the column and is spaced apart and connected to the column; The first adjustment assembly includes a third side plate, the third side plate is arranged at one end of the top support seat away from the column, and the third side plate is provided with a third limiter for radial movement along the column; The second adjustment assembly includes a fourth side plate, the fourth side plate is arranged at one end of the top support seat away from the column, and the fourth side plate is provided with a fourth limiter for radial movement along the column; The third limiting member and the fourth limiting member are both used to abut against the inner wall of the rotary sprayer.

4. The ship sprayer lifting tool according to claim 2 is characterized in that: The first limiting member and the second limiting member are both first adjusting bolts, and the first adjusting bolts are threadedly assembled on the corresponding first side plate or second side plate.

5. The ship sprayer lifting tool according to claim 3 is characterized in that: The third limiting member and the fourth limiting member are both second adjusting bolts, and the second adjusting bolts are threadedly assembled on the corresponding third side plate or fourth side plate.

6. The ship sprayer lifting tool according to claim 2, characterized in that: The vertical adjustment assembly is disposed on the base between the first side plate, the second side plate and the column; The vertical adjustment assembly includes a vertical adjustment bolt which is threadedly mounted on the base along a plane perpendicular to the first direction and the second direction.

7. The ship sprayer lifting tool according to claim 2, characterized in that: A second lifting ear is provided on the upper end surface of one end of the base away from the column; A third lifting ear is provided on the side wall of the base at one end away from the column, and the third lifting ear is arranged corresponding to the second lifting ear.

8. The ship sprayer lifting tool according to claim 3 is characterized in that: At least one first reinforcing bracket is provided between the upper end surface of the base and the column; At least one second reinforcing bracket is provided between the top support seat and the column.

9. A method for installing a transfer sprayer, characterized in that: The following steps are involved: Support plates are respectively arranged on both sides of the rotary sprayer, and the support plates are connected to the rotary sprayer with bolts; The switch sprayer is installed on the ship switch sprayer lifting tool as described in any one of claims 1 to 8, and the position of the switch sprayer is fine-tuned and positioned by the first adjustment component, the second adjustment component, and the vertical adjustment component; Use a crane to lift the lifting tool to the installation position. When the rotary sprayer is lifted into place, adjust the position of the rotary sprayer so that the rotary sprayer is initially aligned with the wellhead. At this time, the upper surface of the support plate contacts the lower surface of the reverse position of the drilling platform. A temporary hanging plate is set at the back of the drilling platform for hanging the hand chain hoist, and connected to the third lifting lug on the lifting tooling; a temporary hanging beam is set at the front of the drilling platform, and the sling passes through the front of the drilling platform and is connected to the second lifting lugs on the lifting tooling respectively; One or more first yard plates are evenly spaced along the length direction of each support plate, the first yard plate is L-shaped, the vertical part of the first yard plate is welded to the reverse side of the drilling platform, and the horizontal part of the first yard plate is located below the support plate; Remove the crane hook, remove the lifting equipment, and retract the crane sling; A central bracket is respectively arranged at the upper opening and the lower opening of the rotating sprayer, a circular hole is arranged in the middle of the central bracket, and the position of the central bracket relative to the rotating sprayer is adjusted so that the circular hole and the rotating sprayer are coaxial; The first and second pull-wire racks are respectively set at the front and back of the drilling platform, and a thin steel wire passing through the well center is pulled between the two. The position of the rotary sprayer is slowly and finely adjusted to make the front-to-back and left-to-right distances of the thin steel wire and the circular hole of the center bracket in the rotary sprayer equal. After the adjustment is in place, the support plate is welded at the back of the drill bit. Remove the center support, lift the transfer sprayer assembly into the transfer sprayer and check whether the center is aligned; Then remove the bolts on the support plate, remove the hand chain hoist and the sling connected to the second lifting lug, cut off the horizontal part of the first yard plate below the support plate, and use a crane to move the sprayer away; After the welding is completed and the weld flaw detection is passed, remove the lifting plate and the first code plate in the installation area, and complete the grinding and repainting of the support plate. Use the crane and lifting tooling to lift the spray gun, install the gaskets and bolts after hoisting into place, and the installation of the spray gun is completed.

10. The method for installing a diverter according to claim 9, characterized in that: The central bracket includes a bearing plate, the circular hole is arranged at the center of the bearing plate, four connecting plates are equidistantly arranged on the side wall of the bearing plate, a third adjusting bolt is threadedly mounted on one end of the connecting plate away from the bearing plate, and the third adjusting bolt abuts against the inner wall of the rotary sprayer.

11. The method for installing a diverter according to claim 9, characterized in that: After the rotary sprayer is lifted off, an L-shaped second yard plate is welded on the reverse side of the drilling platform between two adjacent first yard plates, and the horizontal part of the second yard plate is located below the support plate; A plurality of support plates are welded at the reverse side of the drilling platform between two adjacent first code plates. The support plate is provided with an inclined surface on one side facing the rotary sprayer, and the inclined surface gradually moves away from the rotary sprayer from top to bottom.

12. The method for installing a diverter according to claim 9, characterized in that: The position of the rotary sprayer is adjusted by placing an iron wedge between the first code plate and the support plate and striking the iron wedge.

13. The method for installing a diverter according to claim 9, characterized in that: Draw a well center cross line on the back side of the drilling platform, and draw a center line on the side of the support plate. When the diverter is hoisted into place, adjust the position of the diverter to align the center line on the side of the support plate with the well center cross line.