Unit module lifting device and method for metal roof construction integration
By using the I-shaped tooling body and force sensor monitoring device in metal roof construction, the problems of low efficiency and large deformation in traditional construction methods are solved, and the stable lifting and efficient construction of large-span roof unit modules are achieved.
Patent Information
- Application Number
- CN202411066221.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-05
AI Technical Summary
The traditional large-span metal roof construction method is inefficient and can easily lead to roof deformation during lifting. The existing integrated construction device is slow and difficult to lift, affecting roof performance.
Design a lifting device including an I-shaped tooling body, adjustable compression plate, a choke gasket, a force sensor and a driver. Through magnetic connection and force sensor monitoring, the stable lifting and disassembly of the metal roof unit module is realized, and the adjustment is adjusted. Lifting rate to reduce deformation.
The efficient lifting of the integrated unit module of large-span metal roof construction has been realized, which reduces roof deformation, improves construction efficiency and safety, and ensures the stability of roof performance.
Smart Images

Figure CN118978093A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of house construction, and in particular to a unit module lifting device and method for integrated metal roof construction. Background Art
[0002] At present, metal roofs are widely used in the field of large-span steel structures. The traditional construction method of large-span metal roofs is very cumbersome, and the metal roofs are hoisted layer by layer in sequence. This traditional sequential construction method has many disadvantages. The waiting time for each link of the construction is long, and because the high-altitude operation of the metal roof is large, the construction efficiency is low and the water-tightening time of the structure is late, which is not suitable for the construction technology requirements of the current era.
[0003] In response to the above construction problems, the prior art has proposed an integrated construction method for metal roofs. The metal roof is constructed in an integrated manner to form a unit module, which is hoisted using a through jack and a crane. Although the integrated construction has shortened the construction period and improved the construction efficiency to a certain extent, the weight and span of the integrated unit module of the metal roof are very large. The hoisting process will be very slow using the existing hoisting device, and the construction conditions are harsh and difficult, which can easily cause deformation of the metal roof and affect the performance of the metal roof. Therefore, how to reduce the deformation of the metal roof during the overall hoisting of the unit module, how to ensure the reliability of the connection between the hoisting device and the metal roof, and the tediousness of hoisting and disassembling the metal roof are still technical problems that cannot be solved at present. Therefore, it is urgent to solve them. Summary of the invention
[0004] In order to solve the above problems, the present invention aims to propose a unit module lifting device and method for integrated metal roof construction. The tooling body can control the deformation of the metal roof during the lifting process to the greatest extent on the basis of being perceptible, adjustable, disassembled and reusable, thereby realizing the unit module lifting requirements for integrated large-span metal roof construction.
[0005] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0006] A unit module lifting device for integrated metal roof construction, comprising an I-shaped tool body, wherein both sides of the upper end of the I-shaped tool body are respectively connected with adjustable clamping plates through rotating shafts, a bite-type gasket is detachably installed on the outer side of the adjustable clamping plate, a bite tooth is installed at the end of the bite-type gasket, a force sensor is installed in the bite tooth, a driver is installed in the adjustable clamping plate for driving the rotating shaft to rotate, and both sides of the lower end of the I-shaped tool body are respectively used for placing metal roofing units.
[0007] Furthermore, the I-shaped tooling body includes a T-shaped convex tooth connecting plate and a T-shaped concave tooth connecting plate, and the connecting ends of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate are respectively provided with mutually matching convex teeth and concave teeth, and the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate are magnetically connected and cooperate with the corresponding convex teeth and concave teeth to achieve fixed splicing to form the I-shaped tooling body.
[0008] Furthermore, the number of convex teeth is less than the number of concave teeth; the rotating shaft includes a motor connecting rod and a driving motor, and the driving motor is provided with two groups. The two groups of driving motors are respectively installed on both ends of one side of the T-shaped convex tooth connecting plate to drive the motor connecting rod to rotate to a set position; the motor connecting rod is integrally formed with the adjustable clamping plate.
[0009] Furthermore, the metal roofing units respectively placed on both sides of the lower end of the I-shaped tooling body are respectively abutted against the connecting ends of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate.
[0010] Furthermore, the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate are respectively located at the upper and lower ends of the I-shaped tooling body, and gripping gaskets are detachably installed on both sides of the bottom plate of the T-shaped concave tooth connecting plate, and a grip is provided at the end of the gripping gasket.
[0011] Furthermore, a hook is provided on the upper end of the T-shaped convex tooth connecting plate.
[0012] Furthermore, at least two groups of mounting holes are respectively provided in the length direction of the gripping gasket and the bite-type gasket, and the gripping gasket and the bite-type gasket are respectively detachably fixedly connected with the T-shaped concave tooth connecting plate and the adjustable clamping plate through their respective mounting holes in cooperation with bolts and nuts.
[0013] Furthermore, a force sensor is installed in the grip, and the force value monitored by the force sensor of the biting teeth and the grip assists in guiding the biting teeth and the grip to connect with the purlin at the upper part of the metal roof unit and the I-beam at the lower part in real time; the force value monitored by the force sensor can be calculated by the following steps:
[0014] S1. Calculate the horizontal friction force F between the teeth and purlins, the grip and the I-beam during the bite process m1 :
[0015]
[0016] Among them, f mz The friction generated by the purlin against the teeth, grip and I-beam;
[0017] r is the thickness of the contact purlin and I-beam;
[0018] S2. The following formula is used to calculate the vertical deformation Δ caused by the bite teeth on the purlin, grip and I-beam ye :
[0019]
[0020] S3. Calculate the pressure P exerted by the teeth on the purlin, grip and I-beam using the formula in S2:
[0021]
[0022] S4, the equilibrium differential equation is calculated from S2 and S3:
[0023]
[0024] Among them, σ p is the axial stress of purlin and I-beam;
[0025] μ is the friction coefficient between the bit and purlin, grip and I-beam;
[0026] S5. Calculate the axial friction force f of the purlin and I-beam by using formula S4 mz :
[0027]
[0028] S6, can be calculated from the above formula:
[0029] Thus, the bite force of the teeth on the purlin, and the grip force of the grip and I-beam can be obtained.
[0030] Furthermore, the connecting ends of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate are both strong electromagnets; the method for calculating the magnetic force of the strong electromagnets includes the following steps:
[0031] A1. The following formula is used to calculate the coil power supply voltage u(t):
[0032]
[0033] A2. Calculated by formula S1, φ(t) increases from 0 to φ, we can get:
[0034]
[0035] Where i(t) is the coil current;
[0036] R is the coil resistance;
[0037] φ(t) is the coil magnetic flux;
[0038] A3. Expression of electromagnetic coil inductance:
[0039]
[0040] A4. Expression of electromagnetic flux linkage current:
[0041]
[0042] A5. According to the law of conservation of energy, the electromagnetic force F can be obtained as:
[0043]
[0044] Where i is the current passing through the coil;
[0045] L i is the coil self-inductance;
[0046] a, b, c, d, e are the air gap z related parameter variables of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate.
[0047] In order to achieve the above object, the present invention also provides a method for lifting a unit module for integrated metal roof construction, comprising the following steps:
[0048] Step 1: Place the two integrated metal roof units to be connected between a T-shaped convex tooth connection plate and a T-shaped concave tooth connection plate with an adjustable clamping plate. The two connection plates can adjust the size of the connection space according to the height of the metal roof, and adjust the height according to the number of teeth of the two connection plates. After the height adjustment is completed, the two connection plates are made of strong magnet material and use magnetic force to connect the two.
[0049] Step 2: A driver and a force sensor are provided in the adjustable clamping plate. The driver drives the rotating shaft to rotate, driving the adjustable clamping plate and the bite-type gasket and the grip-type gasket to move, adjusting the angle to facilitate construction and ensure that the adjustable clamping plate, the T-shaped convex tooth connecting plate, the T-shaped concave tooth connecting plate and the surface of the metal roof unit are in close contact;
[0050] Step 3: Bolt gaskets are in two types: bite-type gaskets and grip-type gaskets. The bite-type gasket adopts a bite-type structure. While playing the role of a gasket, the bite teeth are embedded in the metal roof unit; the grip-type gasket adopts a palm-type structure and adopts an articulated connector to imitate the palm, and use the palm to tightly grip the flange of the I-beam to ensure the load-bearing capacity; there are force sensors in the bite teeth and the grip to sense the change of force during the bite process, and receive and transmit signals to the computer through the signal station for real-time imaging analysis; when the bite teeth are connected to the upper main purlin of the metal roof unit, and the grip is connected to the lower I-beam of the metal roof unit, the computer-side data analysis is used to make them closely connected to ensure their load-bearing capacity;
[0051] Step 4: After the connection is completed, use bolts to provide compensation force. The bolts are embedded in the metal roof unit. The upper bolts pass through the bite-type gasket, the adjustable clamping plate and the metal roof unit, and are connected to the upper main purlin of the metal roof unit. The lower bolts pass through the grip-type gasket, the T-shaped concave tooth connection plate and the metal roof unit, and are connected to the lower I-shaped steel of the metal roof unit, so as to strengthen the fastening of the lifting tooling and the metal roof unit.
[0052] Step 5: After the metal roof unit and the lifting tooling are connected, the lifting hook is used to assist the lifting. At the same time, the force sensor is used to constantly sense the changes of the metal roof unit and the lifting tooling during the lifting process. The signal station is used to receive and transmit the signal to the computer, and the lifting construction process is monitored in real time to control the lifting speed and method, ensure smooth lifting, reduce deformation of the metal roof, and provide construction guidance.
[0053] Step 6: Since holes are generated in the connection between bolts, teeth and metal roof units, the bolts and teeth are only connected to the upper load-bearing structure of the metal roof unit, and the waterproof layer is not damaged, but the decorative layer is damaged to a certain extent. After the lifting is completed, the lifting tooling is disassembled, the holes are filled, and special waterproofing and decorative treatments are performed.
[0054] Beneficial effects: The tooling body of the present invention is perceptible, adjustable, detachable and reusable, and can control the deformation of the metal roof during the hoisting process to the greatest extent, thus realizing the unit module hoisting requirements of the integrated construction of the large-span metal roof. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0056] Figure 1 This is a schematic diagram of the three-dimensional structure of a unit module lifting device for integrated metal roof construction according to an embodiment of the present invention;
[0057] Figure 2 This is a schematic diagram of the bottom structure of a unit module lifting device for integrated metal roof construction according to an embodiment of the present invention;
[0058] Figure 3 It is a side view of a unit module lifting device for integrated metal roof construction according to an embodiment of the present invention;
[0059] Figure 4 It is a schematic diagram of a unit module lifting device for integrated metal roof construction according to an embodiment of the present invention grabbing a metal roof unit;
[0060] Figure 5It is a schematic diagram of the bottom surface of the unit module lifting device for integrated metal roof construction according to an embodiment of the present invention grabbing a metal roof unit;
[0061] Figure 6 It is a cross-sectional view of a unit module lifting device for integrated metal roof construction according to an embodiment of the present invention grabbing a metal roof unit;
[0062] Figure 7 A schematic diagram of the structure of the rotating shaft of the unit module lifting device for integrated metal roof construction according to an embodiment of the present invention
[0063] Figure 8 It is a schematic diagram of various metal roof units to be hoisted in the unit module hoisting device for integrated metal roof construction according to an embodiment of the present invention. DETAILED DESCRIPTION
[0064] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0065] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0066] Example 1
[0067] See also Figure 1-8 : A unit module lifting device for integrated metal roof construction, including an I-shaped tool body 1, the upper ends of the I-shaped tool body 1 are respectively connected with adjustable clamping plates 3 through a rotating shaft 2, the outer side of the adjustable clamping plate 3 is detachably installed with a bite-type gasket 4, the end of the bite-type gasket 4 is installed with a bite tooth 5, a force sensor is installed in the bite tooth 5, the adjustable clamping plate 3 is installed with a driver for driving the rotating shaft 2 to rotate, and the lower ends of the I-shaped tool body 1 are respectively used to place metal roofing units 6.
[0068] A metal roofing unit can be placed on each side of the lower end of the I-shaped tooling body of the present embodiment. The rotation of the rotating shaft is controlled by a driver, thereby realizing the rotation of the adjustable clamping plate, and cooperating with the bite-type gasket and the bite teeth to clamp and fix the metal roofing units on both sides. Two metal roofing units can be lifted at one time, with good balance and high efficiency; at the same time, the safety and stability of the metal roofing units during lifting can be guaranteed; in addition, the bite teeth of the present embodiment have built-in force sensors, which can sense changes in force through the force sensors, provide assistance for lifting construction, adjust the lifting speed and method, reduce the deformation of the metal roof, and ensure its safety and usability; the bite-type gasket and the bite teeth of the present embodiment can be disassembled and replaced, so that it can be suitable for grasping metal roofing units of different shapes and sizes, thereby improving adaptability.
[0069] In a specific example, the I-shaped tooling body 1 includes a T-shaped convex tooth connecting plate 101 and a T-shaped concave tooth connecting plate 102, and the connecting ends of the T-shaped convex tooth connecting plate 101 and the T-shaped concave tooth connecting plate 102 are respectively provided with mutually matching convex teeth and concave teeth, and the T-shaped convex tooth connecting plate 101 and the T-shaped concave tooth connecting plate 102 are magnetically connected and matched with corresponding convex teeth and concave teeth to achieve fixed splicing to form the I-shaped tooling body 1.
[0070] The I-shaped tooling body of this embodiment is detachably spliced by the corresponding convex teeth and concave teeth between the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate. Since the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate have strong magnetism, the splicing structure of the two is firm.
[0071] In a specific example, the number of convex teeth is less than the number of concave teeth; the rotating shaft 2 includes a motor connecting rod 201 and a driving motor 202, and the driving motor 202 is provided with two groups. The two groups of driving motors 202 are respectively installed on both ends of one side of the T-shaped convex tooth connecting plate 101 to drive the motor connecting rod 201 to rotate to a set position; the motor connecting rod 201 is integrally formed with the adjustable clamping plate 3.
[0072] The number of convex teeth of the T-shaped convex tooth connecting plate of this embodiment is less than the number of concave teeth of the T-shaped concave tooth connecting plate, so the upper and lower heights between the connecting plates of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate of this embodiment can be adjusted, thereby achieving that the inner side accommodation height of the I-shaped tooling body can be adjusted, so that it can be suitable for the placement of metal roofing units of different thicknesses, and has strong adaptability;
[0073] In this embodiment, the driver can drive the driving motor installed at both ends of one side of the T-shaped convex tooth connection plate to drive the motor connecting rod to adjust the position, so as to drive the bite teeth to connect to the purlins on the upper part of the metal roof unit in place.
[0074] In a specific example, the metal roofing units 6 placed on both sides of the lower end of the I-shaped tooling body 1 are respectively abutted against the connecting ends of the T-shaped convex tooth connecting plate 101 and the T-shaped concave tooth connecting plate 102.
[0075] The strong magnetic attraction connection between the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate in this embodiment cooperates with the two metal roofing units placed on both sides of the lower end of the I-shaped tooling body to form abutment with the connecting ends of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate, thereby further preventing the risk of left and right displacement caused by the convex teeth and concave teeth at the connecting ends of the T-shaped convex tooth connecting plate and the T-shaped concave tooth connecting plate being detached, and the lifting safety can be further guaranteed.
[0076] In a specific example, the T-shaped convex tooth connecting plate 101 and the T-shaped concave tooth connecting plate 102 are respectively located at the upper and lower ends of the I-shaped tooling body 1, and the two sides of the bottom plate of the T-shaped concave tooth connecting plate 102 are detachably installed with gripping gaskets 7, and a grip 8 is provided at the end of the gripping gasket 7.
[0077] When metal roof units are placed at both ends of the bottom plate of the T-shaped concave tooth connecting plate of this embodiment, the metal roof can be tightly grasped by the gripping gasket and the gripping palm, thereby improving the safety of lifting.
[0078] In a specific example, a hook 9 is provided at the upper end of the T-shaped protruding tooth connecting plate 101 .
[0079] During the lifting process, the hook on the upper end of the T-shaped convex tooth connecting plate can assist the lifting and improve the safety of the lifting.
[0080] In a specific example, at least two groups of mounting holes are respectively provided in the length direction of the gripping gasket 7 and the bite-type gasket 4. The gripping gasket 7 and the bite-type gasket 4 are detachably fixedly connected to the T-shaped concave tooth connecting plate 102 and the adjustable clamping plate 3 through their respective mounting holes and bolts and nuts.
[0081] The gripping gaskets and biting gaskets of the present embodiment are both detachably fixedly installed with the T-shaped concave tooth connecting plate and the adjustable clamping plate by means of bolts and nuts. In addition, since the gripping gaskets and biting gaskets are provided with at least two groups of mounting holes in the length direction, the gripping gaskets and biting gaskets of the present embodiment can extend outward in the length direction, thereby improving the gripping and biting range of the palm and the biting teeth, being suitable for metal roofing units of different widths and improving applicability.
[0082] In a specific example, a force sensor is installed in the grip 8, and the bite teeth 5 and the grip 8 are used to assist in guiding the bite teeth 5 and the grip 8 to connect with the upper purlin and the lower I-beam of the metal roof unit 6 in real time through the force value monitored by the force sensor; the force value monitored by the force sensor can be calculated by the following steps:
[0083] S1. Calculate the horizontal friction force F between the biting teeth 5 and the purlin, the grip 8 and the I-beam during the bite process m1 :
[0084]
[0085] Among them, f mz The friction force generated by the purlin against the biting teeth 5, the grip 8 and the I-beam;
[0086] r is the thickness of the contact purlin and I-beam;
[0087] S2, the following formula is used to calculate the vertical deformation Δ caused by the biting teeth 5 on the purlin, the grip 8 and the I-beam ye :
[0088]
[0089] S3. Calculate the pressure P exerted by the biting teeth 5 on the purlins, grips 8 and I-beams using the formula in S2:
[0090]
[0091] S4, the equilibrium differential equation is calculated from S2 and S3:
[0092]
[0093] Among them, σ p is the axial stress of purlin and I-beam;
[0094] μ is the friction coefficient between the biting teeth 5 and the purlin, the grip 8 and the I-beam;
[0095] S5. Calculate the axial friction force f of the purlin and I-beam by using formula S4 mz :
[0096]
[0097] S6, can be calculated from the above formula:
[0098] Thus, the bite force of the bite teeth 5 on the purlin and the grip force of the grip palm 8 and the I-beam can be obtained.
[0099] It should be noted that after the connection with the metal roof unit is completed, the compensation force is provided by bolt connection to ensure the stability of the hoisting; the upper bolts connect the bite-type gasket, the adjustable plate and the metal roof unit, and the bolts are connected to the upper main purlin of the metal roof unit without damaging the waterproof layer of the metal roof; the lower bolts connect the grip-type gasket, the adjustable plate and the metal roof unit, and the bolts are connected to the I-beam at the bottom of the metal roof;
[0100] During the hoisting process, the hook on the top of the device is used to assist the hoisting. During the hoisting process, the intelligent force sensors in the teeth, grip and adjustable plate also sense the changes in force in real time, and receive and transmit signals to the computer through the signal station, and perform real-time imaging analysis to adjust the hoisting speed and method to ensure the smoothness of the hoisting, reduce the changes in the force of the metal roof unit, reduce the deformation of the metal roof unit during the hoisting process, and improve the safety of hoisting.
[0101] In a specific example, the connection ends of the T-shaped convex tooth connection plate 101 and the T-shaped concave tooth connection plate 102 are both strong electromagnets; the magnetic force calculation method of the strong electromagnets includes the following steps:
[0102] A1. The following formula is used to calculate the coil power supply voltage u(t):
[0103]
[0104] A2. Calculated by formula S1, φ(t) increases from 0 to φ, we can get:
[0105]
[0106] Where i(t) is the coil current;
[0107] R is the coil resistance;
[0108] φ(t) is the coil magnetic flux;
[0109] A3. Expression of electromagnetic coil inductance:
[0110]
[0111] A4. Expression of electromagnetic flux linkage current:
[0112]
[0113] A5. According to the law of conservation of energy, the electromagnetic force F can be obtained as:
[0114]
[0115] Where i is the current passing through the coil;
[0116] L i is the coil self-inductance;
[0117] a, b, c, d, e are the air gap z related parameter variables of the T-shaped convex tooth connecting plate 101 and the T-shaped concave tooth connecting plate 102.
[0118] Through the above calculation, it can be known that the magnetic attraction force of the strong magnet connection ends of the U-shaped convex tooth connection plate and the T-shaped concave tooth connection plate of this embodiment meets the design requirements of safe connection.
[0119] Example 2
[0120] This embodiment also provides a method for lifting a unit module for integrated metal roof construction, comprising the following steps:
[0121] Step 1: Place two integrated metal roof units 6 to be connected between a T-shaped convex tooth connection plate 101 and a T-shaped concave tooth connection plate 102 with an adjustable clamping plate 3. The two connection plates can adjust the size of the connection space according to the height of the metal roof, and adjust the height according to the number of teeth of the two connection plates. After the height adjustment is completed, the two connection plates are made of strong magnet material and use magnetic force to connect the two.
[0122] Step 2: A driver and a force sensor are provided in the adjustable clamping plate 3. The driver drives the rotating shaft 2 to rotate, driving the adjustable clamping plate 3 and the bite-type gasket 4 and the grip-type gasket 7 to move, adjusting the angle to facilitate construction, and ensuring that the adjustable clamping plate 3, the T-shaped convex tooth connecting plate 101, and the T-shaped concave tooth connecting plate 102 are in close contact with the surface of the metal roofing unit 6;
[0123] Step 3: The bolt gasket adopts two types of gaskets, namely, the bite-type gasket 4 and the grip-type gasket 7. The bite-type gasket 4 adopts a bite-type structure. While playing the role of a gasket, the bite teeth 5 are embedded in the metal roof unit 6; the grip-type gasket 7 adopts a hand-grip structure and adopts an articulated connector to imitate the palm, and uses the grip 8 to tightly grip the flange of the I-shaped steel to ensure the load-bearing capacity; there are force sensors in the bite teeth 5 and the grip 8 to sense the change of force during the bite process, and receive and transmit signals to the computer through the signal station for real-time imaging analysis; when the bite teeth 5 are connected to the upper main purlin of the metal roof unit 6, and the grip 8 is connected to the lower I-shaped steel of the metal roof unit 6, the computer-side data analysis is used to make them closely connected to ensure their load-bearing capacity;
[0124] Step 4: After the connection is completed, the compensation force is provided by bolt connection. The bolts are embedded in the metal roof unit 6. The upper bolts pass through the bite-type gasket 4, the adjustable clamping plate 3 and the metal roof unit 6, and are connected with the upper main purlin of the metal roof unit 6. The lower bolts pass through the grip-type gasket 7, the T-shaped concave tooth connection plate 102 and the metal roof unit 6, and are connected with the lower I-shaped steel of the metal roof unit 6, so as to strengthen the fastening of the lifting tooling and the metal roof unit 6.
[0125] Step 5: After the metal roof unit 6 and the lifting tool are connected, the lifting hook 9 is used to assist the lifting. At the same time, the force sensor is used to sense the changes of the metal roof unit 6 and the lifting tool at all times during the lifting process. The signal station is used to receive and transmit the signal to the computer end, so as to monitor the lifting construction process in real time, control the lifting speed and method, ensure the smooth lifting, reduce the deformation of the metal roof, and provide construction guidance;
[0126] Step 6: Due to holes in the connection between the bolts, the teeth 5 and the metal roof unit, the bolts and the teeth 5 are only connected to the upper load-bearing structure of the metal roof unit 6, and the waterproof layer is not damaged, but the decorative layer is damaged to a certain extent; after the lifting is completed, the lifting tooling is disassembled, the holes are filled, and special waterproofing and decorative treatments are performed.
[0127] The method for lifting the unit module for integrated metal roof construction of this embodiment has the same advantages as the above-mentioned unit module lifting device for integrated metal roof construction over the prior art, which will not be described in detail here.
[0128] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A unit module lifting device for integrated metal roof construction, characterized in that: The utility model comprises an I-shaped tooling body (1), wherein the upper ends of the I-shaped tooling body (1) are connected to adjustable clamping plates (3) via rotating shafts (2), the outer sides of the adjustable clamping plates (3) are detachably mounted with bite-type gaskets (4), the ends of the bite-type gaskets (4) are mounted with bite teeth (5), a force sensor is mounted in the bite teeth (5), a driver is mounted in the adjustable clamping plate (3) for driving the rotating shaft (2) to rotate, and the lower ends of the I-shaped tooling body (1) are used to place metal roofing units (6) on both sides.
2. The unit module lifting device for integrated metal roof construction according to claim 1, characterized in that: The I-shaped tooling body (1) comprises a T-shaped convex tooth connection plate (101) and a T-shaped concave tooth connection plate (102); the connecting ends of the T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102) are respectively provided with mutually matching convex teeth and concave teeth; the T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102) are magnetically connected and matched with corresponding convex teeth and concave teeth to achieve fixed splicing to form the I-shaped tooling body (1).
3. The unit module lifting device for integrated metal roof construction according to claim 2, characterized in that: The number of the convex teeth is less than the number of the concave teeth; the rotating shaft (2) comprises a motor connecting rod (201) and a driving motor (202); the driving motor (202) is provided in two groups, and the two groups of driving motors (202) are respectively installed at two ends of one side of the T-shaped convex tooth connecting plate (101) for driving the motor connecting rod (201) to rotate to a set position; the motor connecting rod (201) and the adjustable clamping plate (3) are integrally formed.
4. The unit module lifting device for integrated metal roof construction according to claim 2, characterized in that: The metal roofing units (6) respectively placed on both sides of the lower end of the I-shaped tooling body (1) are respectively in contact with the connection ends of the T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102).
5. The unit module lifting device for integrated metal roof construction according to claim 2, characterized in that: The T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102) are respectively located at the upper and lower ends of the I-shaped tooling body (1), and gripping gaskets (7) are detachably mounted on both sides of the bottom plate of the T-shaped concave tooth connection plate (102), and a gripping palm (8) is provided at the end of the gripping gasket (7).
6. The unit module lifting device for integrated metal roof construction according to claim 5, characterized in that: A hook (9) is provided at the upper end of the T-shaped convex tooth connection plate (101).
7. The unit module lifting device for integrated metal roof construction according to claim 5, characterized in that: The gripping gasket (7) and the bite-type gasket (4) are respectively provided with at least two groups of mounting holes in the length direction, and the gripping gasket (7) and the bite-type gasket (4) are respectively detachably fixedly connected to the T-shaped concave tooth connecting plate (102) and the adjustable clamping plate (3) through the respective mounting holes and the matching bolts and nuts.
8. The unit module lifting device for integrated metal roof construction according to claim 5, characterized in that: A force sensor is installed in the grip (8), and the bite teeth (5) and the grip (8) use the force value monitored by the force sensor to assist in guiding the bite teeth (5) and the grip (8) to connect with the upper purlins and the lower I-beam of the metal roof unit (6) in real time; the force value monitored by the force sensor can be calculated by the following steps: S1. Calculate the horizontal friction force F between the biting teeth (5) and the purlin, the grip (8) and the I-beam during the bite process m1 : Among them, f mz The friction force generated by the purlin biting teeth (5), the grip (8) and the I-beam; r is the thickness of the contact purlin and I-beam; S2. The vertical deformation Δ caused by the bite teeth (5) on the purlin, grip (8) and I-beam is calculated by the following formula: ye : S3. Calculate the pressure P exerted by the biting teeth (5) on the purlin, grip (8) and I-beam using the formula in S2: S4, the equilibrium differential equation is calculated from S2 and S3: Among them, σ p is the axial stress of purlin and I-beam; μ is the friction coefficient between the biting teeth (5) and the purlin, the grip (8) and the I-beam; S5. Calculate the axial friction force f of the purlin and I-beam by using formula S4 mz : S6, can be calculated from the above formula: Thus, the bite force of the bite teeth (5) on the purlin and the grip force of the gripping palm (8) and the I-shaped steel can be obtained.
9. The unit module lifting device for integrated metal roof construction according to claim 2, characterized in that: The connection ends of the T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102) are both strong electromagnets; the method for calculating the magnetic force of the strong electromagnets comprises the following steps: A1. The following formula is used to calculate the coil power supply voltage u(t): A2. Calculated by formula S1, φ(t) increases from 0 to φ, we can get: Where i(t) is the coil current; R is the coil resistance; φ(t) is the coil magnetic flux; A3. Expression of electromagnetic coil inductance: A4. Expression of electromagnetic flux linkage current: A5. According to the law of conservation of energy, the electromagnetic force F can be obtained as: Where i is the current passing through the coil; L i is the coil self-inductance; a, b, c, d, e are parameter variables related to the air gap z of the T-shaped convex tooth connection plate (101) and the T-shaped concave tooth connection plate (102).
10. A method for lifting a unit module lifting device for integrated metal roof construction according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Place two integrated metal roof units (6) to be connected between a T-shaped convex tooth connection plate (101) and a T-shaped concave tooth connection plate (102) with an adjustable clamping plate (3). The two connection plates can adjust the size of the connection space according to the height of the metal roof and adjust the height according to the number of teeth of the two connection plates. After the height adjustment is completed, the two connection plates are made of strong magnet material and are connected by magnetic force. Step 2: A driver and a force sensor are provided inside the adjustable clamping plate (3), and the driver drives the rotating shaft (2) to rotate, thereby driving the adjustable clamping plate (3) and the bite-type gasket (4) and the grip-type gasket (7) to move, so as to adjust the angle and facilitate the construction, thereby ensuring that the adjustable clamping plate (3), the T-shaped convex tooth connecting plate (101), the T-shaped concave tooth connecting plate (102) and the surface of the metal roof unit (6) are in close contact; Step 3: The bolt gasket adopts two types of gaskets: bite-type gaskets (4) and grip-type gaskets (7). The bite-type gasket (4) adopts a bite-type structure. While playing the role of a gasket, the bite teeth (5) are embedded in the metal roof unit (6); the grip-type gasket (7) adopts a hand-grip structure and adopts an articulated connector to imitate the palm, and uses the grip (8) to tightly grip the flange of the I-shaped steel to ensure load-bearing capacity; there are force sensors in the bite teeth (5) and the grip (8) to sense the change of force during the bite process, and receive and transmit signals to the computer through the signal station for real-time imaging analysis; when the bite teeth (5) are connected to the upper main purlin of the metal roof unit (6), and the grip (8) is connected to the lower I-shaped steel of the metal roof unit (6), the computer-side data analysis is used to make them closely connected to ensure their load-bearing capacity; Step 4: After the connection is completed, a compensation force is provided by bolt connection. The bolts are embedded in the metal roof unit (6). The upper bolts pass through the bite-type gasket (4), the adjustable clamping plate (3) and the metal roof unit (6) to connect with the upper main purlin of the metal roof unit (6). The lower bolts pass through the grip-type gasket (7), the T-shaped concave tooth connection plate (102) and the metal roof unit (6) to connect with the lower I-shaped steel of the metal roof unit (6), thereby strengthening the fastening of the lifting fixture and the metal roof unit (6); Step 5: After the metal roof unit (6) and the lifting tool are connected, the lifting is assisted by the lifting hook (9). At the same time, the force sensor is used to constantly sense the changes of the metal roof unit (6) and the lifting tool during the lifting process. The signal is received and transmitted to the computer through the signal station, and the lifting construction process is monitored in real time, the lifting speed and method are controlled, the lifting is ensured to be stable, the deformation of the metal roof is reduced, and construction guidance is provided; Step 6: Since holes are generated in the connection between the bolts, the teeth (5) and the metal roof unit, the bolts and the teeth (5) are only connected to the upper load-bearing structure of the metal roof unit (6), and the waterproof layer is not damaged, but the decorative layer is damaged to a certain extent; after the lifting is completed, the lifting tooling is disassembled, the holes are filled, and special waterproofing and decorative treatments are performed.
Citation Information
Patent Citations
Integrated modular house hanging basket system
CN109879156A
Out-of-domain integral hoisting method for large-span roof beam
CN118346068A
The invention discloses a building metal roof hoisting jig frame device
CN208898366U
Large-span roof purline hoisting device
CN219860095U
gripper for gripping coarse ceramic bodies
DE1252864B