Anti-fatigue orthotropic steel-concrete combined bridge deck
By setting up multiple sets of long strip holes and welding grooves in the U ribs, double-sided welding is allowed, which solves the problem of low strength caused by insufficient U rib length and improves the service life of orthogonal opposite-sex steel bridge panels.
Patent Information
- Application Number
- CN202411221731.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-19
AI Technical Summary
The length of U ribs in existing orthogonal opposite-sex steel bridge decks is shorter due to the need for double-sided welding, resulting in low strength of spliced U ribs, which affects the life of the bridge.
A U-rib structure including a base plate, a first support plate, a second support plate, a first welding plate and a second welding plate is designed. By providing a plurality of long strip holes and welding grooves, the welding machine is allowed to directly from the outside and the inside. Welding to avoid U-rib breakage and double-sided welding is used to increase the connection strength.
The continuous installation of U-ribs along the length of the bridge deck is realized, the welding strength and convenience are improved, and the service life of the bridge deck is extended.
Smart Images

Figure CN118979437A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to an anti-fatigue orthotropic steel-concrete composite bridge deck. Background Art
[0002] Orthotropic steel bridge decks have become the preferred bridge deck structure for modern steel bridges due to their outstanding advantages such as light weight, high strength, easy assembly construction, and wide application range. Orthotropic steel bridge decks are composed of steel decks and a series of longitudinal stiffening ribs and transverse ribs (diaphragms) welded thereon, and the entire steel bridge deck is supported by the main beam. Due to the huge difference in stiffness between the longitudinal ribs and the transverse ribs (diaphragms) in two directions perpendicular to each other, the stress behavior of the orthotropic steel bridge deck has anisotropic characteristics under the action of local wheel loads.
[0003] U-ribs are essential parts for connecting the bridge deck and the supporting beams. In order to improve the strength of the orthotropic steel-concrete composite bridge deck, the U-ribs used are generally double-sided welded, which greatly improves the fatigue life of the welded joints between the U-ribs and the panel. However, in the prior art, the bridge deck is very long, and in order to be able to weld to the inside of the U-rib, the length of the U-rib is very short, so several shorter U-ribs are required to be connected in sequence to the same length as the bridge deck. However, the strength of several spliced U-ribs is lower than that of the one-piece U-ribs, so the spliced U-ribs have become the short board of the orthotropic steel bridge, affecting the life of the orthotropic steel bridge.
[0004] Therefore, the prior art needs to be improved. Summary of the invention
[0005] The technical problem to be solved by the present invention is that double-sided welding requires a shorter U-rib length, and the spliced U-ribs affect the life of the orthotropic steel bridge. The purpose is to provide a fatigue-resistant orthotropic steel-concrete composite bridge deck, which solves the problem that the spliced U-ribs affect the life of the orthotropic steel bridge, and has the beneficial effects of convenient welding and high bridge deck strength.
[0006] The present invention is achieved through the following technical solutions:
[0007] A fatigue-resistant orthotropic steel-concrete composite bridge deck, comprising a bridge deck, U-ribs and longitudinal and transverse support beams.
[0008] The U rib includes a bottom plate and a first support plate and a second support plate connected to both sides of the bottom plate, the first support plate is connected to a first welding plate, the second support plate is connected to a second welding plate, the bottom plate is fixedly connected to the longitudinal and transverse support beams, and the first welding plate and the second welding plate are fixedly connected to the bridge deck.
[0009] The first support plate is provided with multiple groups of first long strip holes along the length direction, and each group has multiple rows. The second support plate is provided with multiple groups of second long strip holes, and each group has multiple rows. The first welding plate is provided with a first welding groove aligned with the second long strip holes, and the second welding plate is provided with a second welding groove aligned with the first long strip holes. At least one row of the first long strip holes is a socket for inserting a welding rod when welding the second welding groove, and at least one row of the second long strip holes is a socket for inserting a welding rod when welding the first welding groove. At least one row of the first long strip holes or at least one row of the second long strip holes is an observation hole for welding at this group of positions.
[0010] In the above technical solution, the top of the U-rib is fixedly connected to the bridge deck, the bottom of the U-rib is fixedly connected to the longitudinal and transverse support beams, and the first support plate and the second support plate are both inclined plates, which are used to support the bridge deck. In order to strengthen the connection between the first support plate, the second support plate and the bridge deck of the U-rib, the first welding plate of the first support plate and the second welding plate of the second support plate are welded on both sides, that is, the first welding plate and the second welding plate are welded on both sides. The worker can directly weld the outer sides of the first welding plate and the second welding plate by operating the welding machine, while the welding rod needs to be extended into the interior of the U-rib to weld the inner sides of the first welding plate and the second welding plate. By setting the first long strip hole and the second long strip hole, there is no need to break the U-rib into multiple sections like the prior art. The U-rib is installed in an uninterrupted manner along the length direction of the bridge deck, and double-sided welding is adopted, which has a higher connection strength, so that the service life of the fatigue-resistant orthotropic steel-concrete composite bridge deck is longer.
[0011] Furthermore, in the present invention, the length of the first welding groove is not greater than the length of the second elongated hole, and the length of the second welding groove is not greater than the length of the first elongated hole.
[0012] Furthermore, in the present invention, the edges and corners of the first welding groove and the second welding groove are both rounded.
[0013] Furthermore, in the present invention, the first welding plate and the second welding plate are provided with self-locking bolts which are pre-fixed with the bridge deck, and the first welding plate and the bridge deck are tightly fitted as well as the second welding plate and the bridge deck through the self-locking bolts.
[0014] Furthermore, in the present invention, the nut of the self-locking bolt is located on the top surface of the bridge deck.
[0015] Furthermore, in the present invention, a steel mesh is laid on the top of the bridge deck, and the steel mesh is cast and filled with UHPC ultra-high performance concrete mixed with steel fibers.
[0016] Furthermore, in the present invention, the first welding plate and the second welding plate both extend a portion inward, and the first welding groove and the second welding groove located in the extended portion are wavy.
[0017] Furthermore, in the present invention, the first support plate and the second support plate are installed with reinforcements after double-sided welding, the reinforcements cover the first elongated holes and the second elongated holes, and the reinforcements are provided with support blocks inserted into the first elongated holes and the second elongated holes.
[0018] Furthermore, in the present invention, a bottom support plate is provided on the top of the longitudinal and transverse support beams, the bottom support plate is connected to the bottom plate, and the longitudinal and transverse support beams include longitudinal beams and transverse beams, and the longitudinal beams and the transverse beams are cross-fixed to each other.
[0019] Furthermore, in the present invention, the thickness of the bridge deck is 12mm-20mm, the thickness of the U-rib is 8mm-12mm, and the thickness of the longitudinal beam and the transverse beam is 16mm-22mm.
[0020] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0021] The top of the U rib is fixedly connected to the bridge deck, and the bottom of the U rib is fixedly connected to the longitudinal and transverse support beams. The first support plate and the second support plate are both inclined plates, which are used to support the bridge deck. When the inner side of the first welding plate needs to be welded, the worker operates the welding machine to insert the welding rod from the second long strip hole. The worker observes through the other second long strip holes of the same group and aligns the welding rod with the connection between the first welding plate and the bridge deck for welding. When the inner side of the second welding plate needs to be welded, the worker operates the welding machine to insert the welding rod from the first long strip hole. The worker observes through the other first long strip holes of the same group and aligns the welding rod with the connection between the second welding plate and the bridge deck for welding. The operation is very convenient. By setting the first long strip hole and the second long strip hole, there is no need to break the U rib into multiple sections like the prior art. The U rib is installed in an uninterrupted manner along the length direction of the bridge deck, and double-sided welding is adopted, which has a higher connection strength, making the service life of the fatigue-resistant orthotropic steel-concrete composite bridge deck longer. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0023] Figure 1It is a structural schematic diagram of a fatigue-resistant orthotropic steel-concrete composite bridge deck of the present invention;
[0024] Figure 2 It is a schematic diagram of the connection between the bridge deck and the U-rib of the present invention;
[0025] Figure 3 It is a side view schematic diagram of a U-rib of the present invention;
[0026] Figure 4 for Figure 3 Schematic diagram of the first welding groove and the second welding groove of the middle U rib;
[0027] Figure 5 It is a side view schematic diagram of another U-rib of the present invention;
[0028] Figure 6 for Figure 5 Schematic diagram of the first welding groove and the second welding groove of the middle U rib;
[0029] Figure 7 It is a schematic diagram of the wavy first welding groove and the second welding groove of the present invention.
[0030] Markings and corresponding parts names in the accompanying drawings: 1-bridge deck, 2-U rib, 201-bottom plate, 202-first support plate, 203-second support plate, 204-first welding plate, 2041-first welding groove, 205-second welding plate, 2051-second welding groove, 3-longitudinal and transverse support beams, 4-first long strip hole, 5-second long strip hole, 6-self-locking bolt, 7-steel mesh, 8-UHPC ultra-high performance concrete, 9-welding rod, 10-reinforcement. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the embodiments and drawings. The schematic implementation mode of the present invention and its description are only used to explain the present invention and are not intended to limit the present invention. The following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0032] It should be noted that similar numbers and letters represent similar items in the following figures, so once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance. In the description of the embodiments of the present invention, it should also be noted that unless otherwise clearly specified and limited, the terms "setting", "installation", and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or it can be indirectly connected through an intermediate medium, and it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0033] Example 1
[0034] Combination Figure 1 and Figure 2 , shown is a fatigue-resistant orthotropic steel-concrete composite bridge deck of this embodiment, and the specific structure is described as follows.
[0035] Please refer to Figure 1 and Figure 2 As shown, the fatigue-resistant orthotropic steel-concrete composite bridge deck of the embodiment of the present invention mainly includes three parts: a bridge deck 1, a U-rib 2, and a longitudinal and transverse support beam 3. The longitudinal and transverse support beams 3 are installed on a reinforced concrete base or a cement pier, the U-rib 2 is used to support the bridge deck 1, and the bridge deck 1 is used for vehicles and people to pass.
[0036] Furthermore, the longitudinal and transverse support beams 3 include three parts: a longitudinal beam, a transverse beam, and a bottom support plate 301. The longitudinal beam and the transverse beam are both I-shaped steel beams, and the thickness of the longitudinal beam and the transverse beam is 16mm-22mm, preferably 22mm. The bottom support plate 301 is a steel plate with a thickness of 22mm. The two ends of the transverse beam pass through the longitudinal beam and are welded together, and the bottom support plate 301 is fixed to the top of the longitudinal beam and the transverse beam by bolts and welding.
[0037] Furthermore, the bridge deck 1 is also made of steel plate, and the thickness of the bridge deck 1 is 12 mm to 20 mm, preferably 18 mm. The bottom of the U rib 2 is fixedly connected to the bottom support plate 301 , and the top of the U rib 2 is fixedly connected to the bridge deck 1 .
[0038] In some implementations of this embodiment, Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, the thickness of the U rib 2 is 8 mm to 12 mm, preferably 10 mm. The U rib 2 mainly includes five parts, which are integrally die-casted, namely, a bottom plate 201, a first support plate 202, a second support plate 203, a first welding plate 204 and a second welding plate 205. Figure 3 The bottom plate 201 is a flat plate, and the top edges of the first support plate 202 and the second support plate 203 are respectively fixedly connected to the left and right sides of the bottom plate 201. The bottom edges of the first support plate 202 and the second support plate 203 are respectively fixedly connected to the first welding plate 204 and the second welding plate 205. The first support plate 202 and the second support plate 203 are inclined, so the side of the U rib 2 is a trumpet shape with the opening facing.
[0039] Further, combined with Figure 2 As described above, the first support plate 202 has a plurality of groups of first long holes 4 along the length direction, each group of first long holes 4 has three holes from top to bottom, and the direction of the first long holes 4 is parallel to the direction of the first support plate 202. Similarly, the second support plate 203 has a plurality of groups of second long holes 5 along the length direction, each group of second long holes 5 has three holes from top to bottom, and the direction of the second long holes 5 is parallel to the direction of the second support plate 203. Figure 3 As shown, when welding is required on the inner side of the second welding plate 205, the worker operates the welding rod 9 to be inserted from the first long hole 4 of the corresponding group, and observes the welding rod 9 to align with the welding point of the second welding plate 205 and the bridge deck 1 through the remaining two first long holes 4 of the group as observation holes, and performs electric welding. When welding, the welding rod 9 moves along the first long hole 4, which is convenient for welding along the welding point. Similarly, when welding is required on the inner side of the first welding plate 204, the worker operates the welding rod 9 to be inserted from the second long hole 5 of the corresponding group, and observes the welding rod 9 to align with the welding point of the first welding plate 204 and the bridge deck 1 through the remaining two second long holes 5 of the group as observation holes, and performs electric welding. When welding, the welding rod 9 moves along the second long hole 5, which is convenient for welding along the welding point.
[0040] It should be noted that in order to facilitate workers to identify the welding points, Figure 4 As shown, a first welding groove 2041 and a second welding groove 2051 are provided on the inner side of the first welding plate 204 and the second welding plate 205. The first welding groove 2041 and the second welding groove 2051 are both grooves, and the welding rod 9 is inserted into the groove to start welding. The first welding groove 2041 and the second welding groove 2051 are aligned with the second long hole 5 and the first long hole 4. The length of the first welding groove 2041 is not greater than the length of the second long hole 5, and the length of the second welding groove 2051 is not greater than the length of the first long hole 4, ensuring that the welding rod 9 can completely weld the first welding groove 2041 and the second welding groove 2051 during welding.
[0041] In some implementations of this embodiment, Figure 2As shown, in order to avoid the first long strip hole 4 and the second long strip hole 5 affecting the strength of the U rib. After the U rib 2 is welded, a reinforcement 10 is welded to the outer wall of the first support plate 202 and the second support plate 203. The reinforcement 10 is a metal plate. The reinforcement 10 has a support block inserted into the first long strip hole 4 and the second long strip hole 5 on the inner side. The width of the support block is the same as the width of the first long strip hole 4 and the second long strip hole 5. Each group of the first long strip hole 4 and the second long strip hole 5 can be welded with one to three reinforcements 10 to increase the strength of the U rib 2 and avoid easy deformation due to the first long strip hole 4 and the second long strip hole 5.
[0042] Example 2
[0043] The fatigue-resistant orthotropic steel-concrete composite bridge deck of this embodiment has the same basic structure as that of embodiment 1, and the main difference lies in the U rib 2 of this embodiment. Figure 5 and Figure 6 As shown, the U-rib 2 of this embodiment has a first welding plate 204 and a second welding plate 205. Figure 3 and Figure 5 In this embodiment, the first welding plate 204 and the second welding plate 205 both extend inwardly, so that the first welding groove 2041 and the second welding groove 2051 can be set deeper.
[0044] In some implementations of this embodiment, Figure 6 As shown, the edges and corners inside the first welding groove 2041 and the second welding groove 2051 are both rounded to avoid stress concentration at the edges and corners after welding.
[0045] In some implementations of this embodiment, Figure 7 As shown, the first welding groove 2041 and the second welding groove 2051 can be set to a wavy shape. After welding, the first welding plate 204 and the second welding plate 205 have a longer weld seam, and the strength after welding is higher. At the same time, when the worker is welding, the welding rod 9 is pressed against the bottom of the first welding groove 2041 and the second welding groove 2051. The wavy first welding groove 2041 and the second welding groove 2051 are fed back to the worker's hand through the abutment, indicating that welding is required at this place. When the worker's hand does not feel the feedback of the wavy first welding groove 2041 and the second welding groove 2051, it means that the welding is completed at this place, which is conducive to blind welding for the worker.
[0046] Example 3
[0047] The fatigue-resistant orthotropic steel-concrete composite bridge deck of this embodiment is based on the fatigue-resistant orthotropic steel-concrete composite bridge deck of Example 1, and self-locking bolts 6 are added.
[0048] Further, combined with Figure 1As shown, the first welding plate 204 and the second welding plate 205 both have mounting holes aligned with the bridge deck 1. Before welding, the first welding plate 204 and the bridge deck 1, the second welding plate 205 and the bridge deck 1 are pre-connected with self-locking bolts 6 to ensure that the first welding plate 204 and the bridge deck 1, the second welding plate 205 and the bridge deck 1 are tightly fitted, and the welding is more stable.
[0049] At the same time, the nut of the self-locking bolt 6 is located on the top surface of the bridge deck 1. A steel mesh 7 is laid on the top of the bridge deck 1. The steel mesh 7 is filled with UHPC ultra-high performance concrete 8 mixed with steel fibers. It has a uniform and dense microstructure. Its tensile strength, bending strength, shear strength, bonding strength, peak strain, etc. are much greater than ordinary concrete. The addition of steel fibers significantly increases the toughness of UHPC. The anti-fatigue performance is greatly enhanced and the occurrence of fatigue cracks is reduced.
[0050] The working principle of the present invention is as follows:
[0051] The top of the U rib 2 is fixedly connected to the bridge deck 1, and the bottom of the U rib 2 is fixedly connected to the longitudinal and transverse support beams 3. The first support plate 202 and the second support plate 203 are both inclined plates, which are used to support the bridge deck 1. The double-sided welding method is adopted, that is, the inner and outer sides of the first welding plate 204 and the second welding plate 205 are welded. When it is necessary to weld the inner side of the first welding plate 204, the worker operates the welding machine to insert the welding rod 9 from the second long strip hole 5, and the worker observes through the other second long strip holes 5 of the same group to align the welding rod 9 with the connection between the first welding plate 204 and the bridge deck 1 for welding. When it is necessary to weld the inner side of the second welding plate 205, the worker operates the welding machine to insert the welding rod 9 from the first long strip hole 4, and the worker observes through the other first long strip holes 4 of the same group to align the welding rod 9 with the connection between the second welding plate 205 and the bridge deck 1 for welding, which is very convenient to operate. By setting the first long hole 4 and the second long hole 5, there is no need to break the U-rib 2 into multiple sections as in the prior art. The U-rib 2 can be installed in an uninterrupted manner along the length direction of the bridge deck 1 and double-sided welding is adopted, which has higher connection strength, thereby extending the service life of the fatigue-resistant orthotropic steel-concrete composite bridge deck.
[0052] In summary, the present invention provides a fatigue-resistant orthotropic steel-concrete composite bridge deck, which includes a bridge deck 1, a U-rib 2 and a longitudinal and transverse support beam 3. The U-rib 2 includes a bottom plate 201 and a first support plate 202 and a second support plate 203 connected on both sides of the bottom plate 201. The first support plate 202 is connected to a first welding plate 204, and the second support plate 203 is connected to a second welding plate 205. The bottom plate 201 is fixedly connected to the longitudinal and transverse support beams 3, and the first welding plate 204 and the second welding plate 205 are fixedly connected to the bridge deck 1. The first support plate 202 is provided with a plurality of groups along the length direction, and each group has a plurality of The first long strip holes 4 are arranged in a row, the second support plate 203 is provided with multiple groups of second long strip holes 5, each group has multiple rows, the first welding plate 204 is provided with a first welding groove 2041 aligned with the second long strip holes 5, the second welding plate 205 is provided with a second welding groove 2051 aligned with the first long strip holes 4, at least one row of the first long strip holes 4 is a plug hole for inserting the welding rod 9 when welding the second welding groove 2051, at least one row of the second long strip holes 5 is a plug hole for inserting the welding rod 9 when welding the first welding groove 2041, at least one row of the first long strip holes 4 or at least one row of the second long strip holes 5 is an observation hole when welding at the position of the group. The length of the first welding groove 2041 is not greater than the length of the second long strip holes 5, and the length of the second welding groove 2051 is not greater than the length of the first long strip holes 4. The edges and corners of the first welding groove 2041 and the second welding groove 2051 are both rounded. The first welding plate 204 and the second welding plate 205 are provided with self-locking bolts 6 which are pre-fixed with the bridge deck 1. The self-locking bolts 6 allow the first welding plate 204 and the bridge deck 1, and the second welding plate 205 and the bridge deck 1 to fit tightly. The nuts of the self-locking bolts 6 are located on the top surface of the bridge deck 1. A steel mesh 7 is laid on the top of the bridge deck 1, and the steel mesh 7 is cast and filled with UHPC ultra-high performance concrete 8 mixed with steel fibers. The first welding plate 204 and the second welding plate 205 both extend a portion inward, and the first welding groove 2041 and the second welding groove 2051 located in the extended portion are wavy. After double-sided welding, the first support plate 202 and the second support plate 203 are installed with a reinforcement 10, which covers the first long hole 4 and the second long hole 5, and the reinforcement 10 is provided with a support block inserted into the first long hole 4 and the second long hole 5. A bottom support plate is provided on the top of the longitudinal and transverse support beams 3, and the bottom support plate is connected to the bottom plate 201. The longitudinal and transverse support beams 3 include longitudinal beams and transverse beams, and the longitudinal beams and transverse beams are cross-fixed to each other. The thickness of the bridge deck 1 is 12mm-20mm, the thickness of the U rib 2 is 8mm-12mm, and the thickness of the longitudinal beams and transverse beams is 16mm-22mm.
[0053] Therefore, the fatigue-resistant orthotropic steel-concrete composite bridge deck of the present invention solves the problem that the spliced U-ribs 2 affect the life of the orthotropic steel bridge, and has the beneficial effects of convenient welding and high bridge deck strength.
[0054] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A fatigue-resistant orthotropic steel-concrete composite bridge deck. It is characterized in that It comprises a bridge deck (1), a U-rib (2) and longitudinal and transverse supporting beams (3). The U-rib (2) comprises a bottom plate (201) and a first support plate (202) and a second support plate (203) connected to both sides of the bottom plate (201); the first support plate (202) is connected to a first welding plate (204); the second support plate (203) is connected to a second welding plate (205); the bottom plate (201) is fixedly connected to the longitudinal and transverse support beams (3); the first welding plate (204) and the second welding plate (205) are fixedly connected to the bridge deck (1); The first support plate (202) is provided with a plurality of groups of first elongated holes (4) along the length direction, and each group is provided with a plurality of rows; the second support plate (203) is provided with a plurality of groups of second elongated holes (5) and each group is provided with a plurality of rows; the first welding plate (204) is provided with a first welding groove (2041) aligned with the second elongated holes (5); the second welding plate (205) is provided with a second welding groove (2051) aligned with the first elongated holes (4); at least one row of the first elongated holes (4) is a plug hole for inserting a welding rod when welding the second welding groove (2051); at least one row of the second elongated holes (5) is a plug hole for inserting a welding rod when welding the first welding groove (2041); and at least one row of the first elongated holes (4) or at least one row of the second elongated holes (5) is an observation hole when welding at the position of the group.
2. The fatigue-resistant orthotropic steel-concrete composite bridge deck according to claim 1, It is characterized in that The length of the first welding groove (2041) is not greater than the length of the second elongated hole (5), and the length of the second welding groove (2051) is not greater than the length of the first elongated hole (4).
3. According to the fatigue-resistant orthotropic steel-concrete composite bridge deck of claim 2, the edges and corners of the first weld groove (2041) and the second weld groove (2051) are both rounded.
4. In the fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 1, the first welded plate (204) and the second welded plate (205) are provided with self-locking bolts (6) pre-fixed with the bridge deck (1), and the first welded plate (204) and the bridge deck (1), as well as the second welded plate (205) and the bridge deck (1) are tightly fitted through the self-locking bolts (6).
5. In the fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 4, the nuts of the self-locking bolts (6) are located on the top surface of the bridge deck (1).
6. The fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 1, wherein a steel mesh (7) is laid on the top of the bridge deck (1), and the steel mesh (7) is cast and filled with UHPC ultra-high performance concrete (8) mixed with steel fibers.
7. In the fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 1, the first welding plate (204) and the second welding plate (205) both extend a portion inward, and the first welding groove (2041) and the second welding groove (2051) located in the extended portion are wavy.
8. The fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 1, the first support plate (202) and the second support plate (203) are installed with a reinforcement (10) after double-sided welding is completed, the reinforcement (10) covers the first elongated hole (4) and the second elongated hole (5), and the reinforcement (10) is provided with a support block inserted into the first elongated hole (4) and the second elongated hole (5).
9. The fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 8, wherein a bottom support plate (301) is provided on the top of the longitudinal and transverse support beams (3), and the bottom support plate (301) is connected to the bottom plate (201), and the longitudinal and transverse support beams (3) include longitudinal beams and transverse beams, and the longitudinal beams and the transverse beams are cross-fixed to each other.
10. The fatigue-resistant orthotropic steel-concrete composite bridge deck described in claim 9, wherein the thickness of the bridge deck (1) is 12mm-20mm, the thickness of the U-rib (2) is 8mm-12mm, and the thickness of the longitudinal beam and the cross beam is 16mm-22mm.