Precision adjusting method for bridge tower steel bar component profile steel combination section
By using the steel frame adjustment method of rotating connections and clamp locking parts in the construction of suspension bridge towers, the alignment deviation problem caused by deformation of the steel bar parts during the lifting process is solved, and construction efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202410915481.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-09
AI Technical Summary
During the construction of suspension bridge towers, the steel bar parts are deformed due to weight during the lifting process, resulting in a deviation in alignment of the upper and lower adjacent steel frames, which reduces the construction efficiency.
By prefabricated steel bar parts, the rotating connection of the steel frame and the clamp locking parts are provided to achieve the accuracy adjustment of the steel frame, the jack is used for rough adjustment, and the steel bar parts are fixed by pulling ribs to ensure position accuracy.
The construction efficiency of the bridge tower is improved, the alignment and position accuracy of the steel frame are ensured, and the installation efficiency of the steel bar parts is improved.
Smart Images

Figure CN118979439A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of bridge tower construction, and in particular to a method for adjusting the precision of a steel section joint of a bridge tower reinforcement component. Background Art
[0002] The cable tower of a suspension bridge is a tower-shaped structure that supports the main cable. Common cable tower forms include single column, A shape and inverted Y shape along the longitudinal direction of the bridge, and single column, double column, portal type, inclined leg portal type, inverted V shape, inverted Y shape, A shape, etc. along the transverse direction of the bridge. The cross section of the cable tower can adopt a solid interface according to the design requirements.
[0003] The tower columns of suspension bridge towers are generally constructed by climbing formwork. Before pouring each layer of concrete, the exposed steel bars on the top of the previous layer of concrete need to be extended. The steel bar connectors generally use threaded sleeves. The threaded sleeves have the advantage of low price, but they have high requirements for the alignment accuracy of the steel bars. In related technologies, in order to improve the overall installation efficiency of the steel bars, frame-type steel components such as steel bar components are used to position multiple steel bars, and then they are hoisted as a whole by a tower crane, and then the steel bars of the upper and lower adjacent steel bar components are connected. When the construction reaches the middle section of the tower body, it is necessary to add a cross brace between the two tower columns passing through the bridge tower. The connection between the tower column and the cross brace is the joint section of the tower column. The steel bar components at the joint section of the tower column need to have strong structural strength. Therefore, it is necessary to add a steel frame to the steel bar components at the joint section. During the hoisting process, since the steel bar components need to support the overall weight of the bearing steel bars and the steel frame, the steel bar components will be deformed, resulting in deviations in the alignment of the steel frames of the upper and lower adjacent steel bar components, resulting in reduced construction efficiency. Therefore, there is still room for improvement. Summary of the invention
[0004] In order to facilitate the docking of the steel frames of the upper and lower adjacent reinforcement components, the present application provides a method for adjusting the accuracy of the steel joint section of the reinforcement components of a bridge tower.
[0005] The present application provides a method for adjusting the precision of the steel section joint of a bridge tower reinforcement component, which adopts the following technical solution: A method for adjusting the precision of a steel section joint of a bridge tower reinforcement component comprises the following steps: S1: Construction preparation: prefabricated steel bar parts, the steel bar parts at the tower column joint section are divided into lower steel bar parts, middle steel bar parts and upper steel bar parts from bottom to top, the upper end of the steel frame in the lower steel bar parts is protruding, the upper and lower ends of the steel frame in the middle steel bar parts are protruding, the lower end of the steel frame in the upper steel bar parts is protruding, the steel frame of the middle steel bar parts is rotatably connected to the middle steel bar parts, the steel frame of the upper steel bar parts is rotatably connected to the upper steel bar parts, and the rotation axis of the steel frame is perpendicular to the steel frame; S2: Hoisting the lower steel bar parts: hoist the lower steel bar parts to the lower part of the tower column joint section for installation and fixation, and then cast the lower part of the tower column joint section; S3: Hoisting the middle steel bar component: hoist the middle steel bar component to the top of the lower steel bar component, then slowly lower the middle steel bar component, swing and adjust the steel frame of the middle steel bar component, align and connect the steel frames of the lower steel bar component and the middle steel bar component, and then cast the middle part of the tower column joint section; S4: Hoist the upper reinforcement component: hoist the upper reinforcement component to the top of the middle reinforcement component, then slowly lower it, swing and adjust the steel frame of the upper reinforcement component, align and connect the steel frames of the upper reinforcement component and the middle reinforcement component, and then cast the upper part of the tower column joint section.
[0006] By adopting the above technical scheme, the steel frame of the lower steel bar component protrudes from the upper surface of the lower steel bar component, the steel frame of the middle steel bar component is inserted through the middle steel bar component, and the steel frame of the upper steel bar component protrudes from the lower surface of the upper steel bar component, providing operating space for the docking position of the steel frame between the lower steel bar component and the middle steel bar component and between the middle steel bar component and the upper steel bar component. Moreover, a rotating connection method is adopted to realize the angle adjustment of the steel frame of the upper steel bar component and the middle steel bar component, so as to facilitate the adjustment and docking between the steel frames of the upper and lower adjacent steel bar components. In addition, after the installation of the lower steel bar component is completed, the casting construction of the lower position of the tower column joint section is carried out to form a construction platform, which is convenient for construction personnel to carry out the steel bar connection operation between the steel bar components and the steel frame docking operation, which is beneficial to improve the construction efficiency of the bridge tower.
[0007] Preferably, the steel frame is an I-beam, the rotating shaft of the steel frame is fixed on the outer sides of two flange plates of the steel frame, and the rotating shaft of the steel frame and the web of the steel frame are located in the same plane.
[0008] By adopting the above technical scheme, I-beams are used as the steel frame of the steel reinforcement component, and the rotating axis of the steel frame is set on the outside of the flange plate of the steel frame, and the rotating axis of the steel frame and the web of the steel frame are located in the same plane, so as to achieve the purpose of stable swinging of the steel frame.
[0009] Preferably, two clamps are arranged between the connecting ends of two adjacent steel frames, and the two clamps are respectively located on the outer sides of two flange plates of the steel frames. A locking piece is arranged between the two clamps, and the locking piece is used to drive the adjacent clamps to approach each other and lock the connecting ends of the two adjacent steel frames. When the inner sides of the two clamps are completely in contact with the outer sides of the flange plates of the steel frames, the connecting ends of the two adjacent steel frames are aligned with each other.
[0010] Since the rotating shaft and the web of the steel frame are in the same plane, the swinging steel frame can only adjust the webs of the two adjacent steel frames in the same plane, but the relative positions of the flange plates of the two adjacent steel frames cannot be adjusted. By adopting the above technical scheme, the two clamping plates are forced to approach each other by using the locking member, and the pressure plate moves toward the flange plate. Under the clamping action of the two clamping plates, the flange plates of the two adjacent steel frames are tightly fitted with the inner sides of the clamping plates and maintain the same verticality. When the inner side of the clamping plate is completely fitted with the outer side of the flange plate of the steel frame, the connecting ends of the two adjacent steel frames are aligned with each other, thereby achieving the purpose of fine-tuning the steel frame and facilitating the alignment of the steel frame.
[0011] Preferably, a screw is provided at the connecting end of the steel frame, and the screw vertically penetrates the two flange plates arranged on the steel frame. The clamping plate is provided with a through groove for the screw to pass through along its own thickness direction. The locking part includes a nut and an anti-loosening washer. The nut is threadedly connected to the end of the screw, and the anti-loosening washer is sleeved on the end of the screw, and the anti-loosening washer is clamped between the nut and the clamping plate.
[0012] By adopting the above technical solution, the screw rod plays a positioning role on the splint, and the thread locking of the splint is achieved through the cooperation between the nut and the thread of the screw rod, and the anti-loosening washer plays an anti-loosening effect, which is beneficial to improve the stability of the splint.
[0013] Preferably, the length direction of the through slot is consistent with the length direction of the steel frame; tension bolts are provided between the connecting ends of the upper and lower adjacent steel frames, and the tension bolts are used to lock the screws between the upper and lower adjacent steel frames.
[0014] By adopting the above technical solution, under the locking action of the tension bolts, the connection ends of the upper and lower adjacent steel frames are driven closer to each other until the two are abutted, so that construction workers can weld the connection between the steel frames.
[0015] Preferably, the lower steel bar component and the middle steel bar component are hooked and fixed by tie bars, and the middle steel bar component and the upper steel bar component are hooked and fixed by tie bars.
[0016] By adopting the above technical solution, since there is a rotational relationship between the middle steel bar component and the steel frame, as well as between the upper steel bar component and the steel frame, the stability of the middle steel bar component and the upper steel bar component is insufficient. The upper and lower steel bar components are hooked and fixed by tie bars, which is beneficial to improving the position accuracy of each steel bar component in the tower column joint section.
[0017] Preferably, before lowering the lower steel bar component, a plurality of vertically arranged supporting steel members are pre-embedded on the top surface of the constructed section of the tower column, and the plurality of supporting steel members are distributed around the installation position of the lower steel bar component. A horizontal jack is installed on the side of the supporting steel member facing the lower steel bar component. When the lower steel bar component is lowered, the plurality of horizontal jacks are used to support and adjust the corner position of the lower steel bar component.
[0018] By adopting the above technical solution, the supporting steel member is used as the supporting point, and the top support is adjusted by the horizontal jack to achieve the purpose of coarse adjustment of the lower steel bar component, which is beneficial to improve the position accuracy of the installation of the steel bar component.
[0019] Preferably, before hoisting the middle steel bar component, the supporting steel member is first extended upward, and horizontal jacks are installed on the sides of the installation position of the middle steel bar component. When hoisting the middle steel bar component, several horizontal jacks are used to support and adjust the corner positions of the middle steel bar component.
[0020] By adopting the above technical solution, the purpose of coarse adjustment of the middle steel bar component can be achieved, which facilitates the alignment of the steel skeletons of the lower steel bar component and the middle steel bar component.
[0021] In summary, the present application includes at least one of the following beneficial technical effects: 1. By making the steel frame of the lower reinforcement component protrude from the upper surface of the lower reinforcement component, the steel frame of the middle reinforcement component is inserted into the middle reinforcement component, and the steel frame of the upper reinforcement component protrudes from the lower surface of the upper reinforcement component, an operating space is provided for the steel frame docking position between the lower reinforcement component and the middle reinforcement component and between the middle reinforcement component and the upper reinforcement component. In addition, the angle adjustment of the steel frame of the upper reinforcement component and the middle reinforcement component is achieved by adopting a rotating connection method, so as to facilitate the adjustment and docking between the steel frames of the upper and lower adjacent reinforcement components; 2. The locking piece is used to force the two clamps to approach each other, and the pressure plate moves toward the flange plate. Under the clamping action of the two clamps, the flange plates of the two adjacent steel frames above and below are tightly fitted with the inner side of the clamps and maintain the same verticality. When the inner side of the clamp is completely fitted with the outer side of the flange plate of the steel frame, the connection ends of the two adjacent steel frames above and below are aligned with each other, achieving the purpose of fine adjustment of the steel frame and facilitating the alignment of the steel frame; 3. Use supporting steel members as supporting points and adjust the top support through horizontal jacks to achieve the purpose of coarse adjustment of the lower steel bar components, which is beneficial to improve the position accuracy of the installation of steel bar components. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the position of a bridge tower joint section in a method for adjusting the accuracy of a bridge tower reinforcement component steel section joint section in an embodiment of the present application.
[0023] Figure 2 It is a schematic diagram of the state when a horizontal jack performs coarse adjustment on the supporting of the lower steel bar component in a method for adjusting the precision of the steel section joint section of a bridge tower steel bar component in an embodiment of the present application.
[0024] Figure 3 It is a schematic diagram of the assembled state of the lower steel bar component, the middle steel bar component and the lower steel bar component in a method for adjusting the accuracy of the steel section connection section of a bridge tower steel bar component in an embodiment of the present application.
[0025] Figure 4 yes Figure 3 A magnified schematic diagram of center A.
[0026] Explanation of the reference numerals in the accompanying drawings: 1. cross brace; 2. constructed section of tower column; 21. supporting steel member; 22. horizontal jack; 23. push plate; 24. tie bar; 3. tower column joint section; 4. lower steel bar component; 5. steel frame; 51. web; 52. flange plate; 53. screw; 54. nut; 55. splint; 6. middle steel bar component; 7. upper steel bar component; 8. tension bolt; 81. threaded rod; 82. bolt head; 83. pressure plate. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1-4 This application is described in further detail.
[0028] The present application embodiment discloses a method for adjusting the precision of the steel section of a bridge tower reinforcement component, wherein, with reference to Figure 1 The tower column connection section 3 is a section of the connection between the tower column and the cross brace 1.
[0029] Reference Figures 2 to 4 , including the following steps: S1: Construction preparation: prefabricated steel bar components, the steel bar components at the tower column joint section 3 are divided into lower steel bar components 4, middle steel bar components 6 and upper steel bar components 7 from bottom to top, the upper end of the steel frame 5 in the lower steel bar component 4 is protruding, the upper and lower ends of the steel frame 5 in the middle steel bar component 6 are protruding, and the lower end of the steel frame 5 in the upper steel bar component 7 is protruding, wherein the steel frame 5 of the middle steel bar component 6 is rotatably connected to the middle steel bar component 6, and the steel frame 5 of the upper steel bar component 7 is rotatably connected to the upper steel bar component 7, wherein the rotation axis of the steel frame is perpendicular to the length direction of the steel frame.
[0030] S2: Hoisting the lower steel bar component 4: first, embed a number of vertically arranged supporting steel members 21 in the constructed section 2 of the tower column. The number of supporting steel members 21 are distributed around the installation position of the lower steel bar component 4. A horizontal jack 22 is installed on the side of the supporting steel member 21 facing the installation position of the lower steel bar component 4. A push plate 23 is fixed to the telescopic end of the horizontal jack 22. When hoisting the lower steel bar component 4, the number of horizontal jacks 22 perform horizontal support and adjustment on the corner position of the lower steel bar component 4 to achieve the purpose of coarse adjustment of the lower steel bar component 4, which is beneficial to improve the position accuracy of the installation of the steel bar component. Then the lower steel bar component 4 is hoisted to the top of the constructed section 2 of the tower column. After the lower steel bar component 4 is in place at the installation position, the steel bars of the lower steel bar component 4 are connected to the exposed steel bars at the top of the constructed section 2 of the tower column, so that the lower steel bar component 4 is installed and fixed at the lower position of the tower column joint section 3. The horizontal jack 22 is moved up to the top of the supporting steel member 21, and a template is set up around the lower steel bar component 4. The template height is lower than the horizontal jack 22, and then the lower part of the tower column joint section 3 is cast. The top of the lower steel bar component 4 is exposed on the lower surface of the tower column joint section 3, providing a connection space for the installation of the tie bar 24 in the subsequent steps. The horizontal jack is not buried in the lower part of the tower column joint section, in preparation for the subsequent installation of the middle steel bar component.
[0031] S3: Hoisting the middle steel bar component 6: Extend the supporting steel member 21 upwards, and then move the horizontal jack 22 upwards to install the horizontal jack 22 to the side of the installation position of the middle steel bar component 6, hoist the middle steel bar component 6 to the top of the lower steel bar component 4, and then slowly lower the middle steel bar component 6. When hoisting the middle steel bar component 6, several horizontal jacks 22 support and adjust the corner position of the middle steel bar component 6 to achieve the purpose of coarse adjustment of the position of the middle steel bar component 6, so as to facilitate the alignment of the steel skeleton 5 of the lower steel bar component 4 and the middle steel bar component 6.
[0032] Then, the steel frame 5 of the middle steel bar component 6 is swung to adjust the steel frame 5 of the lower steel bar component 4 and the middle steel bar component 6, and the steel frame 5 of the lower steel bar component 4 and the middle steel bar component 6 are aligned and connected. Then, the lower steel bar component 4 and the middle steel bar component 6 are hooked and fixed with tie bars 24 to stabilize the middle steel bar component 6, and then the middle part of the tower column joint section 3 is cast.
[0033] Reference Figure 3 and Figure 4 In this embodiment, the steel frame 5 is an I-shaped steel, and the rotating shaft of the steel frame 5 is fixed to the outside of the two flange plates 52 of the steel frame 5, and the rotating shaft of the steel frame 5 and the web 51 of the steel frame 5 are located in the same plane. The rotating shaft of the steel frame 5 is set horizontally, and by swinging the steel frame 5, the webs 51 of the upper and lower adjacent steel frames 5 can be swung to the same horizontal plane.
[0034] In addition, two clamping plates 55 are arranged between the connecting ends of the two adjacent steel frame sections 5 above and below. The two clamping plates 55 are respectively located on the outer sides of the two flange plates 52 of the steel frame sections 5. A locking member is installed between the two clamping plates 55. The locking member is used to drive the adjacent clamping plates 55 to approach each other and lock the connecting ends of the two adjacent steel frame sections 5 above and below.
[0035] Specifically, a screw 53 is fixed to the connection end of the steel frame 5, wherein the screw 53 vertically penetrates the two flange plates 52 arranged on the steel frame 5. There are two screws 53 at the connection end of the steel frame 5, and the two screws 53 are arranged on both sides of the web 51 of the steel frame 5.
[0036] A through slot is formed through the clamping plate 55 along its thickness direction for the screw rod 53 to pass through, and the length of the through slot is consistent with the length of the steel frame 5 .
[0037] The locking member includes a nut 54 and a locking washer. The nut 54 is threadedly connected to the end of the screw rod 53, and the locking washer is sleeved on the end of the screw rod 53. The locking washer is clamped between the nut 54 and the clamping plate 55. The nut 54 is screwed in toward the clamping plate 55, so that the connecting ends of the two adjacent steel skeletons 5 are clamped between the two clamping plates 55. When the inner sides of the two clamping plates 55 are completely fitted with the outer sides of the flange plates 52 of the steel skeleton 5, the connecting ends of the two adjacent steel skeletons 5 are aligned with each other. The screw rod 53 plays a positioning role on the clamping plate 55, and the thread locking of the clamping plate 55 is achieved through the thread cooperation between the nut 54 and the screw rod 53. The locking washer plays an anti-loosening effect, which is conducive to improving the stability of the clamping plate 55.
[0038] In order to facilitate the docking of the upper and lower adjacent steel frames 5, a tension bolt 8 is provided between the connecting ends of the upper and lower adjacent steel frames 5, and the tension bolt 8 is used to lock the screw rod 53 between the upper and lower adjacent steel frames 5. The tension bolt 8 includes a threaded rod 81, two pressing plates 83 and two bolt heads 82. The length direction of the threaded rod 81 of the tension bolt 8 is consistent with the length direction of the steel frame 5, and the threaded rod 81 is located between the two screw rods 53. The two pressing plates 83 are distributed up and down, and the two bolt heads 82 are screwed in along the length direction of the threaded rod 81 toward the direction of the mutual space, thereby forcing the two pressing plates 83 to press the screw rod 53, thereby driving the connecting ends of the upper and lower adjacent steel frames 5 to dock, so as to facilitate the construction personnel to perform welding operations.
[0039] S4: Hoisting the upper reinforcement component 7: Extend the supporting steel member 21 upward, then move the horizontal jack 22 upward, install the horizontal jack 22 to the side of the installation position of the upper reinforcement component 7, hoist the upper reinforcement component 7 to the top of the middle reinforcement component 6, and then slowly lower the upper reinforcement component 7. When hoisting the upper reinforcement component 7, several horizontal jacks 22 support and adjust the corner position of the upper reinforcement component 7 to achieve the purpose of coarse adjustment of the position of the upper reinforcement component 7, so as to facilitate the alignment of the steel frame 5 of the upper reinforcement component 7 and the middle reinforcement component 6. Then, the upper reinforcement component 7 and the middle reinforcement component 6 are hooked and fixed with tie bars 24, and finally the upper part of the tower column joint section 3 is cast. Among them, the docking method of the steel frame 5 of the upper steel bar component 7 and the middle steel bar component 6 is the same as the docking method of the steel frame 5 of the lower steel bar component 4 and the middle steel bar component 6, which is also carried out by using the screw 53 and the pressure plate 83 to lock and the tension bolt 8 to pull and lock.
[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for adjusting the precision of the steel section of a bridge tower reinforcement component, characterized in that: The following steps are involved: S1: Construction preparation: prefabricating steel bar components, the steel bar components at the tower column joint section (3) are divided into a lower steel bar component (4), a middle steel bar component (6) and an upper steel bar component (7) from bottom to top, the upper end of the steel frame (5) in the lower steel bar component (4) is protruding, the upper and lower ends of the steel frame (5) in the middle steel bar component (6) are protruding, and the lower end of the steel frame (5) in the upper steel bar component (7) is protruding, the steel frame (5) of the middle steel bar component (6) is rotatably connected to the middle steel bar component (6), and the steel frame (5) of the upper steel bar component (7) is rotatably connected to the upper steel bar component (7), and the rotation axis of the steel frame is perpendicular to the steel frame; S2: hoisting the lower steel bar component (4): hoisting the lower steel bar component (4) to the lower position of the tower column joint section (3) for installation and fixation, and then casting the lower part of the tower column joint section (3); S3: hoisting the middle steel bar component (6): hoisting the middle steel bar component (6) to the top of the lower steel bar component (4), then slowly lowering the middle steel bar component (6), swinging and adjusting the steel frame (5) of the middle steel bar component (6), aligning and connecting the steel frames (5) of the middle steel bar component (6) and the lower steel bar component (4), and then casting the middle part of the tower column joint section (3); S4: hoisting the upper reinforcement component (7): hoisting the upper reinforcement component (7) to the top of the middle reinforcement component (6), then slowly lowering the upper reinforcement component (7), swinging and adjusting the steel frame (5) of the upper reinforcement component (7), aligning and connecting the steel frames (5) of the upper reinforcement component (7) and the middle reinforcement component (6), and then casting the upper part of the tower column joint section (3).
2. A method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 1, characterized in that: Two clamping plates (55) are arranged between the connection ends of two adjacent steel frames (5) above and below. The two clamping plates (55) are respectively located on both sides of the steel frame (5). A locking member is arranged between the two clamping plates (55). The locking member is used to drive the adjacent clamping plates (55) to approach each other and lock the connection ends of the two adjacent steel frames (5) above and below. When the inner sides of the two clamping plates (55) are completely in contact with the outer sides of the flange plates (52) of the steel frame (5), the connection ends of the two adjacent steel frames (5) above and below are aligned with each other.
3. A method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 2, characterized in that: The connecting end of the steel frame (5) is provided with a screw rod (53), and the screw rod (53) is vertically penetrated in the steel frame (5). The clamping plate (55) is provided with a through groove for the screw rod (53) to pass through along its thickness direction.
4. A method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 3, characterized in that: The locking member comprises a nut (54) and an anti-loosening washer, wherein the nut (54) is threadedly connected to the end of the screw rod (53), the anti-loosening washer is sleeved on the end of the screw rod (53), and the anti-loosening washer is clamped between the nut (54) and the clamping plate (55).
5. A method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 4, characterized in that: The length direction of the through groove is consistent with the length direction of the steel frame (5); a tension bolt (8) is arranged between the connecting ends of the upper and lower adjacent steel frames (5), and the tension bolt (8) is used to lock the screw rod (53) between the upper and lower adjacent steel frames (5).
6. The method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 1 is characterized in that: The lower steel bar component (4) and the middle steel bar component (6) are hooked and fixed via tie bars (24), and the middle steel bar component (6) and the upper steel bar component (7) are hooked and fixed via tie bars (24).
7. The method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 1 is characterized in that: Before the lower reinforcement component (4) is suspended, a plurality of vertically arranged supporting steel members (21) are pre-buried on the top surface of the constructed section (2) of the tower column. The plurality of supporting steel members (21) are distributed around the installation position of the lower reinforcement component (4). A horizontal jack (22) is installed on the side of the supporting steel member (21) facing the lower reinforcement component (4). When the lower reinforcement component (4) is suspended, the plurality of horizontal jacks (22) support and adjust the corner position of the lower reinforcement component (4).
8. The method for adjusting the precision of the steel section of a bridge tower reinforcement component according to claim 8 is characterized by: Before hanging the middle steel bar component (6), the supporting steel member (21) is first extended upward, and the horizontal jacks (22) are installed on the sides of the installation position of the middle steel bar component (6). When hanging the middle steel bar component (6), a plurality of horizontal jacks (22) are used to support and adjust the corner positions of the middle steel bar component (6).
Citation Information
Patent Citations
Construction method for block prefabrication and installation of variable cross-section leaning tower steel reinforcement framework
CN113494051A
Framework mechanism and structural cable bent tower
CN115717360A
Construction method of large-diameter circular steel reinforced concrete batter post
CN116856692A
Detachable steel bar component hoisting device and positioning control method thereof
CN117361295A
Stiff framework suitable for steel bar component
CN217923093U