Construction and installation equipment for highway prefabricated culvert pipe
By designing the climbing seat and clamping device, the corrugated culvert pipe is assembled on the ground, which solves the problem of crane and scaffolding in the existing technology, reduces construction costs and risks, and combines the functions of dust cleaning and painting to improve construction efficiency and security.
Patent Information
- Application Number
- CN202410877295.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, corrugated culvert assembly requires the use of cranes and scaffolding, resulting in high construction costs and high hidden risks, and inconvenient construction.
A prefabricated culvert construction and installation equipment was designed, using climbing seats, clamping plates, drive wheels and motors to realize assembly without the need for cranes and scaffolding, combining the functions of dust removal and painting to reduce construction risks and costs.
It has achieved the assembly of corrugated culverts on the ground, saving costs, reducing construction risks, reducing aerial operations, and has dust cleaning and painting functions, improving construction efficiency and safety.
Smart Images

Figure CN118979499A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of culvert installation, and more particularly to a highway prefabricated culvert construction and installation device. Background Art
[0002] A culvert is a pipe buried below the ground surface. In some highway construction sections, it is often buried below the road surface for drainage or for pedestrians, animals, etc. to pass through. Culverts are usually prefabricated in factories and then transported to the construction site for installation. At present, the culverts laid in some highway construction are steel corrugated culverts, also called metal corrugated culverts or corrugated culverts, which are made of corrugated metal sheets or semi-circular corrugated steel sheets. Most of the larger corrugated culverts are made of two groups of semi-circular corrugated steel sheets or even more than two groups of semi-circular corrugated steel sheets.
[0003] When assembling a corrugated culvert made of multiple groups of semicircular corrugated steel sheets, a lot of manpower is required, and usually a crane and scaffolding are used. Construction workers need to first lift the corrugated culvert with a crane and then splice it. During the splicing process, scaffolding must be built around the corrugated culvert to fix the top and sides of the corrugated culvert, and scaffolding must be built inside the corrugated culvert for construction. The corrugated culvert is circular after assembly. When scaffolding is built around and inside the corrugated culvert, there are many hidden risks, and the construction is not convenient. For this reason, a highway prefabricated culvert construction and installation equipment is proposed. Summary of the invention
[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a highway prefabricated culvert construction and installation equipment, which can realize the assembly of corrugated culverts without the use of cranes, scaffolding and other equipment, saving the construction cost of corrugated culverts and reducing the hidden risks during the construction of corrugated culverts, thereby achieving the purpose of assembling and constructing corrugated culverts only on the ground without the need for aerial operations.
[0005] To solve the above problems, the present invention adopts the following technical solutions.
[0006] A highway prefabricated culvert construction and installation device comprises a climbing seat, a second clamping component is fixedly installed at the front end of the climbing seat, a first clamping component is movably installed at the rear end of the climbing seat, the first clamping component comprises a first clamping plate, the first clamping plate is movably installed at the rear end of the climbing seat, the second clamping component comprises a second clamping plate, the second clamping plate is movably installed at the front end of the climbing seat, the left sides of the climbing seat, the first clamping plate and the second clamping plate are all arc-shaped, the arc-shaped walls on the left sides of the first clamping plate and the second clamping plate extend toward the climbing seat, and driving components are movably installed in the arc-shaped walls on the left sides of the first clamping plate and the second clamping plate extending toward the climbing seat; The driving component comprises driving wheels, and the driving wheels are provided in six groups in total, which are evenly distributed and movably mounted inside the arc-shaped wall extending toward the climbing seat on the left side of the first clamping plate and the second clamping plate.
[0007] Furthermore, a group of first motors are respectively installed on the side of the first clamping plate and the second clamping plate away from the climbing seat, and three groups of second slots are respectively opened on the inner walls of the arc-shaped walls extending toward the climbing seat on the left side of the first clamping plate and the second clamping plate, and the driving wheel leaks out through the second slots.
[0008] Furthermore, a track wheel is fixedly installed at one end of the driving wheel close to the climbing seat, and a transmission track is meshed between the three groups of track wheels. The output ends of the two groups of the first motors respectively pass through the first clamping plate and the second clamping plate and are fixedly connected to the driving wheel.
[0009] Furthermore, a screw hole is provided at the bottom of the first clamping plate, and a group of limit holes are respectively provided at the two sides of the screw hole at the bottom of the first clamping plate, a second motor is fixedly installed at the bottom of the front end of the second clamping plate, a threaded rod is movably installed at the rear end of the second clamping plate, an output end of the second motor passes through the second clamping plate and is fixedly connected to the threaded rod, a group of limit rods are respectively fixedly installed at the two sides of the threaded rod at the rear end of the second clamping plate, a third motor is fixedly installed at the middle part of the front end of the second clamping plate, and a paint injection port is provided on the right side of the front end of the second clamping plate.
[0010] Furthermore, a first notch is provided on the left lower end surface of the climbing seat, an auxiliary wheel is movably installed inside the first notch, and a dust cleaning component is provided on the left surface of the climbing seat above the first notch.
[0011] Furthermore, the cleaning component includes a dust collecting groove, which is opened on the left middle end surface of the climbing seat. A dust exhaust channel is opened inside the climbing seat, and the dust exhaust channel is located directly below the dust collecting groove and is connected to the dust collecting groove.
[0012] Furthermore, a rotating rod is movably installed inside the dust collecting groove, and bristles are arranged on the surface of the rotating rod. A dust removal comb is fixedly installed on the inner wall of the dust collecting groove, and the dust removal comb is inclined to the upper left and in contact with the bristles.
[0013] Furthermore, a paint spraying component is provided on the left side surface of the climbing seat above the dust collecting groove, and the paint spraying component includes a paint storage chamber, and the paint storage chamber is opened inside the climbing seat.
[0014] Furthermore, a paint extraction pump is fixedly installed inside the climbing seat above the paint storage chamber, a paint spray head is fixedly installed on the left upper end surface of the climbing seat, and the paint spray head is fixedly connected to the paint extraction pump through a paint supply pipe, and a paint extraction head is placed inside the paint storage chamber, and the paint extraction head is fixedly connected to the paint extraction pump through a paint supply pipe.
[0015] Furthermore, a recovery bucket is fixedly installed on the left surface of the climbing seat below the paint spray head, and a reflux channel is opened inside the climbing seat, and both ends of the reflux channel are respectively connected to the inner wall of the recovery bucket and the paint storage chamber.
[0016] Compared with the prior art, the present invention has the following beneficial effects: (1) This scheme can realize the assembly of corrugated culverts without the use of cranes, scaffolding and other equipment by setting up devices such as a climbing seat, auxiliary wheels, a first clamping plate, a first motor, a driving wheel, a track wheel, a transmission track, a second clamping plate, a second motor, a threaded rod, and a limit rod, thereby saving the construction cost of the corrugated culvert and reducing the hidden risks during the construction of the corrugated culvert, and achieving the purpose of assembling the corrugated culvert only on the ground without the need for aerial work.
[0017] (2) This solution is provided with cleaning components, dust collecting troughs, dust exhaust channels, rotating rods, brushes and other devices, so that the device can clean the dust on the surface of the semi-circular corrugated steel sheet while controlling the semi-circular corrugated steel sheet to rise.
[0018] (3) This scheme sets up the paint spraying parts, paint storage room, paint pump, paint spray head, paint extraction head and other devices, so that the device can spray paint on the surface of the semi-circular corrugated steel sheet when controlling the semi-circular corrugated steel sheet to rise, eliminating the need for subsequent manual painting of the corrugated culvert, thus saving operation time and construction costs.
[0019] (4) This solution can catch the dripping asphalt paint and recycle it into the paint storage room by setting up devices such as a dust collecting trough, a dust exhaust channel, a dust removal comb, a recovery bucket, and a reflux channel, so as to achieve the purpose of not wasting asphalt paint. At the same time, a dust removal comb is set inside the dust collecting trough to clean the bristles to prevent the bristles from being filled with dust and affecting its cleaning ability of the semicircular corrugated steel sheet. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the climbing seat and the clamping component of the present invention; Figure 2 It is a schematic diagram of the structure of the climbing seat of the present invention; Figure 3 It is a schematic structural diagram of the first clamping component of the present invention; Figure 4 It is a schematic structural diagram of the second clamping component of the present invention; Figure 5 It is a schematic diagram of the structure of the driving component of the present invention; Figure 6 It is a schematic diagram of the internal planar structure of the climbing seat of the present invention; Figure 7 It is a schematic diagram of the auxiliary wheel structure of the present invention; Figure 8 It is a partial structural schematic diagram of the dust cleaning component of the present invention.
[0021] Description of the numbers in the figure: 1. Climbing seat; 11. First notch; 12. Auxiliary wheel; 2. Cleaning component; 21. Dust collecting groove; 22. Dust exhaust channel; 23. Rotating rod; 24. Bristles; 25. Dust removal comb; 3. Paint spraying component; 31. Paint storage chamber; 32. Paint extraction pump; 33. Paint spraying head; 34. Paint extraction head; 35. Recovery bucket; 36. Reflux channel; 4. First clamping component; 41. First clamping plate; 42. Screw hole; 43. Limiting hole; 44. First motor; 45. Second notch; 46. Driving component; 461. Driving wheel; 462. Track wheel; 463. Transmission track; 5. Second clamping component; 51. Second clamping plate; 52. Second motor; 53. Paint injection port; 54. Third motor; 55. Threaded rod; 56. Limiting rod. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.
[0023] See also Figures 1 to 7 , a highway prefabricated culvert construction and installation equipment, comprising a climbing seat 1, a second clamping component 5 is fixedly installed at the front end of the climbing seat 1, a first clamping component 4 is movably installed at the rear end of the climbing seat 1, the first clamping component 4 comprises a first clamping plate 41, the first clamping plate 41 is movably installed at the rear end of the climbing seat 1, the second clamping component 5 comprises a second clamping plate 51, the second clamping plate 51 is movably installed at the front end of the climbing seat 1, the left sides of the climbing seat 1, the first clamping plate 41, and the second clamping plate 51 are all arc-shaped, the arc-shaped walls on the left sides of the first clamping plate 41 and the second clamping plate 51 extend toward the climbing seat 1, and the driving components 46 are movably installed in the arc-shaped walls on the left sides of the first clamping plate 41 and the second clamping plate 51 extending toward the climbing seat 1; The driving component 46 includes a driving wheel 461, and a total of six groups of the driving wheels 461 are evenly distributed and movably installed inside the arc-shaped wall extending toward the climbing seat 1 on the left side of the first clamping plate 41 and the second clamping plate 51. A group of first motors 44 are respectively installed on the side of the first clamping plate 41 and the second clamping plate 51 away from the climbing seat 1. Three groups of second notches 45 are respectively opened on the inner wall of the arc-shaped wall extending toward the climbing seat 1 on the left side of the first clamping plate 41 and the second clamping plate 51. The driving wheel 461 leaks out through the second notches 45. A track wheel 462 is fixedly installed at one end of the driving wheel 461 close to the climbing seat 1. A transmission track 463 is meshed between the three groups of track wheels 462. The output ends of the two groups of the first motors 44 are respectively The first clamping plate 41 and the second clamping plate 51 are fixedly connected to the driving wheel 461, a screw hole 42 is opened at the bottom of the first clamping plate 41, and a group of limiting holes 43 are opened at the bottom of the first clamping plate 41 on both sides of the screw hole 42, a second motor 52 is fixedly installed at the bottom of the front end of the second clamping plate 51, a threaded rod 55 is movably installed at the rear end of the second clamping plate 51, the output end of the second motor 52 passes through the second clamping plate 51 and is fixedly connected to the threaded rod 55, a group of limiting rods 56 are fixedly installed on both sides of the threaded rod 55 at the rear end of the second clamping plate 51, a third motor 54 is fixedly installed in the middle of the front end of the second clamping plate 51, and a paint injection port 53 is opened on the right side of the front end of the second clamping plate 51.
[0024] By adopting the above technical solution, when in use, the second motor 52 is first started, and the output end of the second motor 52 drives the threaded rod 55 to rotate. When the threaded rod 55 rotates, the first clamping plate 41 is restricted by the limiting rod 56, and the first clamping plate 41 can move forward and backward. The first clamping plate 41 first moves to the rear end driven by the threaded rod 55 to expand the distance between the first clamping plate 41 and the second clamping plate 51, and then the semicircular corrugated steel sheet is placed on the left side surface of the climbing seat 1 and the semicircular corrugated steel sheet is fit with the left side surface of the climbing seat 1. At this time, the first clamping plate 41 is driven by the threaded rod 55 to move forward, and the semicircular corrugated steel sheet is restricted by the first clamping plate 41 and the second clamping plate 51. At this time, the right side surface of the semicircular corrugated steel sheet is fit with the left side surface of the climbing seat 1 The auxiliary wheel 12 is also in a state of being in contact with the surface of the semicircular corrugated steel sheet. The arc-shaped wall extending from the left side of the first clamping plate 41 and the second clamping plate 51 toward the climbing seat 1 is buckled at the front and rear ends of the semicircular corrugated steel sheet. At the same time, the driving wheel 461 installed in the first clamping plate 41 and the second clamping plate 51 is in contact with the left surface of both ends of the semicircular corrugated steel sheet and has the friction force that can drive the semicircular corrugated steel sheet to move. At this time, the first motor 44 is started, and the output end of the first motor 44 drives the driving wheel 461 to rotate. When the driving wheel 461 rotates, it drives the other driving wheels 461 to rotate at the same time through the track wheel 462 and the transmission track 463, thereby driving the semicircular corrugated steel sheet to move upward. When the semicircular corrugated steel sheet rises to the lower left end and is in contact with the ground or close to the ground, the first motor 44 stops working. The semicircular corrugated steel sheet can be erected through the above operation, and the operation can be completed on the ground when it is assembled with the second semicircular corrugated steel sheet, without the need to use equipment such as cranes and scaffolding, thereby reducing the risk of assembling the semicircular corrugated steel sheets and improving the safety of the operation. For example, when assembling multiple groups of semicircular corrugated steel sheets, first assemble the first and second semicircular corrugated steel sheets through the last operation, and then start the first motor 44, so that the two groups of assembled semicircular corrugated steel sheets continue to rise along the climbing seat 1 until the lower left end of the semicircular corrugated steel sheet assembled later is close to the ground, and the first motor 44 stops working, and the above operation is continued until multiple groups of semicircular corrugated steel sheets are assembled into a corrugated culvert, and finally the second motor 52 is started to make the second motor 52 move in the opposite direction, and the first clamping plate 41 moves toward the rear end to release the restriction on the corrugated culvert, and then the assembled corrugated culvert is installed.
[0025] like Figures 2 to 7As shown, a first slot 11 is provided on the left lower end surface of the climbing seat 1, and an auxiliary wheel 12 is movably installed inside the first slot 11. A cleaning component 2 is provided on the left surface of the climbing seat 1 above the first slot 11, and the cleaning component 2 includes a dust collecting groove 21, and the dust collecting groove 21 is provided on the left middle end surface of the climbing seat 1. A dust exhaust channel 22 is provided inside the climbing seat 1, and the dust exhaust channel 22 is located directly below the dust collecting groove 21 and is connected to the dust collecting groove 21. A rotating rod 23 is movably installed inside the dust collecting groove 21, and bristles 24 are provided on the surface of the rotating rod 23.
[0026] By adopting the above technical scheme, a dust collecting groove 21 is opened in the middle of the left side of the climbing seat 1, and a rotating rod 23 is installed in the dust collecting groove 21, and bristles 24 are arranged on the surface of the rotating rod 23, and the length of the bristles 24 is sufficient to contact the semicircular corrugated steel sheet restricted by the first clamping plate 41 and the second clamping plate 51. When the first motor 44 drives the semicircular corrugated steel sheet to move, the third motor 54 is turned on at the same time. The output end of the third motor 54 passes through the second clamping plate 51 and the climbing seat 1 and is fixedly connected to the rotating rod 23. The third motor 54 controls the rotation of the rotating rod 23. When the rotating rod 23 rotates, the bristles 24 on the surface are driven to rotate to clean the surface of the semicircular corrugated steel sheet. Through the above structural design, the device can also clean the dust on the surface of the semicircular corrugated steel sheet when controlling the semicircular corrugated steel sheet to rise.
[0027] like Figures 2 to 5 As shown, a paint spraying component 3 is provided on the left side surface of the climbing seat 1 above the dust collecting trough 21, and the paint spraying component 3 includes a paint storage chamber 31, and the paint storage chamber 31 is opened inside the climbing seat 1, and a paint extraction pump 32 is fixedly installed inside the climbing seat 1 above the paint storage chamber 31, and a paint spraying head 33 is fixedly installed on the left upper end surface of the climbing seat 1, and the paint spraying head 33 is fixedly connected to the paint extraction pump 32 through a paint supply pipe, and a paint extraction head 34 is placed inside the paint storage chamber 31, and the paint extraction head 34 is fixedly connected to the paint extraction pump 32 through a paint supply pipe.
[0028] By adopting the above technical solution, before the corrugated culvert is assembled and laid, it is necessary to spray a layer of asphalt paint on the surface of the corrugated culvert to improve the anti-corrosion ability of the corrugated culvert. The device is provided with a paint storage chamber 31 inside the climbing seat 1, and a paint spraying head 33 is installed on the left surface of the climbing seat 1. The first clamping plate 41 and the second clamping plate 51 control the semicircular corrugated steel sheet to rise and open the paint pump 32. The paint pump 32 is connected to the paint pump head 34 in the paint storage chamber 31 through the paint supply pipe, and is connected to the paint spraying head 33 through the paint supply pipe. After the paint pump 32 is turned on, the paint pump 32 fills the paint storage chamber with paint. The asphalt paint in 31 is extracted and transported to the paint spraying head 33, and the paint spraying head 33 sprays paint on the rising semicircular corrugated steel sheet. Through the above-mentioned structural design, the device can spray paint on the surface of the semicircular corrugated steel sheet while controlling the semicircular corrugated steel sheet to rise, and there is no need for subsequent manual painting of the corrugated culvert, which saves operation time and construction costs. A paint injection port 53 is provided on the surface of the second clamping plate 51, and the paint injection port 53 passes through the second clamping plate 51 and the climbing seat 1 and is connected to the paint storage chamber 31 inside the climbing seat 1, and asphalt paint can be added to the paint storage chamber 31 through the paint injection port 53.
[0029] like Figures 2 to 5 As shown, a dust removal comb 25 is fixedly installed on the inner wall of the dust collecting groove 21, and the dust removal comb 25 is inclined to the upper left and in contact with the bristles 24. A recovery bucket 35 is fixedly installed on the left surface of the climbing seat 1 below the paint spray head 33. A reflux channel 36 is opened inside the climbing seat 1, and both ends of the reflux channel 36 are respectively connected to the inner wall of the recovery bucket 35 and the paint storage chamber 31.
[0030] By adopting the above technical solution, a recovery bucket 35 is installed on the left side surface of the climbing seat 1 below the paint spraying head 33. The recovery bucket 35 can prevent the asphalt paint dripping from the paint spraying head 33 when spraying paint on the semicircular corrugated steel sheet from dripping down onto the bristles 24. The recovery bucket 35 can catch the dripping asphalt paint. A reflux channel 36 is opened inside the climbing seat 1. The reflux channel 36 is connected to the interior of the recovery bucket 35 and the paint storage chamber 31, so that the asphalt paint caught by the recovery bucket 35 can be recycled into the paint storage chamber 31, thereby achieving the purpose of not wasting asphalt paint. At the same time, before spraying paint on the semicircular corrugated steel sheet, The cleaning component 2 has completed the cleaning work of the semicircular corrugated steel sheet, which can improve the subsequent painting rate and prevent excessive dust on the surface of the semicircular corrugated steel sheet from affecting the spraying of asphalt paint. A dust removal comb 25 is arranged inside the dust collecting groove 21. The dust removal comb 25 can clean the bristles 24 to prevent the bristles 24 from being filled with dust and affecting its cleaning ability of the semicircular corrugated steel sheet. The dust removal comb 25 clears the dust rolled in the bristles 24, and finally discharges it from the dust collecting groove 21 through the dust exhaust channel 22, thereby ensuring the cleaning ability of the rotating rod 23 and the bristles 24 to the semicircular corrugated steel sheet, and can clear the dust out of the device.
[0031] Instructions for use: During operation, first start the second motor 52 to drive the first clamping plate 41 toward the rear end, then place the semicircular corrugated steel sheet on the left side of the climbing seat 1, and finally drive the first clamping plate 41 toward the front end through the second motor 52 to clamp the semicircular corrugated steel sheet between the first clamping plate 41 and the second clamping plate 51. At this time, start the first motor 44 again, and the first motor 44 drives the driving wheel 461 to rotate to control the semicircular corrugated steel sheet to rise. While the semicircular corrugated steel sheet rises, the third motor 54 and the paint pump 32 are started respectively, and the third motor 54 drives the rotating rod 23 to rotate. The rotating rod 23 cleans the dust on the surface of the semicircular corrugated steel sheet through the bristles 24 on the surface, and the paint pump 32 subsequently extracts the asphalt in the paint storage chamber 31 The paint is sprayed on the surface of the semicircular corrugated steel sheet. At the same time, when the rotating rod 23 rotates, the dust removal comb 25 cleans the dust involved in the bristles 24. The dust accumulates in the dust collecting groove 21 and is finally discharged into the device through the dust exhaust channel 22. When the paint spray head 33 is sprayed on the semicircular corrugated steel sheet, the asphalt paint dripping will be caught by the recovery bucket 35 and recovered into the paint storage chamber 31 through the reflux channel 36. When the first group of semicircular corrugated steel sheets rises to the lower left end close to the ground, the first motor 44 stops working, so as to achieve the purpose of standing up the semicircular corrugated steel sheets. At this time, the stood up semicircular corrugated steel sheets are assembled with the second group of semicircular corrugated steel sheets, so as to achieve the purpose of completing the assembly on the ground and reduce the construction risk. The above operations are repeated to complete the assembly of the semicircular corrugated steel sheets.
[0032] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A highway prefabricated culvert construction and installation device, comprising a climbing seat, characterized in that: A second clamping component is fixedly installed at the front end of the climbing seat, and a first clamping component is movably installed at the rear end of the climbing seat, the first clamping component includes a first clamping plate, and the first clamping plate is movably installed at the rear end of the climbing seat, the second clamping component includes a second clamping plate, and the second clamping plate is movably installed at the front end of the climbing seat, the left sides of the climbing seat, the first clamping plate, and the second clamping plate are all arc-shaped, and the arc-shaped walls on the left sides of the first clamping plate and the second clamping plate extend toward the climbing seat, and driving components are movably installed in the arc-shaped walls on the left sides of the first clamping plate and the second clamping plate extending toward the climbing seat; The driving component comprises driving wheels, and the driving wheels are provided in six groups in total, which are evenly distributed and movably mounted inside the arc-shaped wall extending toward the climbing seat on the left side of the first clamping plate and the second clamping plate.
2. A highway prefabricated culvert construction and installation equipment according to claim 1, characterized in that: A group of first motors are respectively installed on the side of the first clamping plate and the second clamping plate away from the climbing seat, and three groups of second notches are respectively opened on the inner walls of the arc-shaped walls extending toward the climbing seat on the left side of the first clamping plate and the second clamping plate, and the driving wheel leaks out through the second notches.
3. A highway prefabricated culvert construction and installation equipment according to claim 2, characterized in that: A track wheel is fixedly installed at one end of the driving wheel close to the climbing seat, and a transmission track is meshed between the three groups of track wheels. The output ends of the two groups of the first motors respectively pass through the first clamping plate and the second clamping plate and are fixedly connected to the driving wheel.
4. A highway prefabricated culvert construction and installation equipment according to claim 2, characterized in that: A screw hole is provided at the bottom of the first clamping plate, and a group of limiting holes are respectively provided at the two sides of the screw hole at the bottom of the first clamping plate, a second motor is fixedly installed at the bottom of the front end of the second clamping plate, a threaded rod is movably installed at the rear end of the second clamping plate, an output end of the second motor passes through the second clamping plate and is fixedly connected to the threaded rod, a group of limiting rods are respectively fixedly installed at the two sides of the threaded rod at the rear end of the second clamping plate, a third motor is fixedly installed at the middle part of the front end of the second clamping plate, and a paint injection port is provided on the right side of the front end of the second clamping plate.
5. The highway prefabricated culvert construction and installation equipment according to claim 1 is characterized by: A first notch is provided on the left lower end surface of the climbing seat, an auxiliary wheel is movably installed inside the first notch, and a dust cleaning component is provided on the left surface of the climbing seat above the first notch.
6. A highway prefabricated culvert construction and installation equipment according to claim 5, characterized in that: The dust cleaning component comprises a dust collecting groove, which is arranged on the left middle end surface of the climbing seat. A dust exhaust passage is arranged inside the climbing seat, and the dust exhaust passage is located directly below the dust collecting groove and is connected with the dust collecting groove.
7. A highway prefabricated culvert construction and installation equipment according to claim 6, characterized in that: A rotating rod is movably installed inside the dust collecting groove, and bristles are arranged on the surface of the rotating rod. A dust removal comb is fixedly installed on the inner wall of the dust collecting groove, and the dust removal comb is inclined to the upper left and in contact with the bristles.
8. The highway prefabricated culvert construction and installation equipment according to claim 1 is characterized by: A paint spraying component is arranged on the left side surface of the climbing seat above the dust collecting groove. The paint spraying component comprises a paint storage chamber, and the paint storage chamber is opened inside the climbing seat.
9. The highway prefabricated culvert construction and installation equipment according to claim 8, characterized in that: A paint extraction pump is fixedly installed inside the climbing seat above the paint storage chamber, a paint spray head is fixedly installed on the left upper end surface of the climbing seat, and the paint spray head is fixedly connected to the paint extraction pump through a paint supply pipe, and a paint extraction head is placed inside the paint storage chamber, and the paint extraction head is fixedly connected to the paint extraction pump through a paint supply pipe.
10. The highway prefabricated culvert construction and installation equipment according to claim 9, characterized in that: A recovery bucket is fixedly mounted on the left surface of the climbing seat below the paint spray head, and a reflux channel is provided inside the climbing seat, with two ends of the reflux channel respectively connected to the inner wall of the recovery bucket and the paint storage chamber.