Elevator steel structure construction method
By using liftable outer frame structures in the construction of elevator steel structures, the problems of angle offset and material waste in the construction of full frames are solved, and the construction effect with higher accuracy and lower cost is achieved, adapting to construction needs of different heights .
Patent Information
- Application Number
- CN202411176830.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-19
AI Technical Summary
In the construction of traditional elevator steel structures, the angular deviation is prone to occur when the full frame is constructed at a high place, resulting in reduced construction accuracy, waste of materials and increased costs.
The liftable outer frame structure is adopted, and the electric hoist lifting and steel pipe support is lifted and supported by electric hoist, ensuring that the outer frame is always located in the middle of the elevator steel structure, and assemble and curtain wall construction are carried out section by section to reduce material use and construction costs.
It improves construction accuracy, reduces material use and construction costs, ensures the smooth progress of curtain wall construction, and adapts to construction needs of different heights.
Smart Images

Figure CN118979636A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of elevator construction, and in particular to a method for constructing an elevator steel structure. Background Art
[0002] Elevators are an important part of modern buildings, providing safe, fast and comfortable vertical transportation. The steel structure construction of elevators is a key link in elevator installation, which directly affects the quality and safety of elevator operation. Before the construction of the elevator steel structure, a detailed survey of the construction site is required to understand the geological conditions, surrounding environment and other factors to provide a basis for construction. The location and height of the steel structure installation also need to meet the design requirements. The auxiliary tooling used in the construction process of traditional elevator steel structures is a full-height frame. The scaffolding is set up in advance according to the height of the shaft and construction requirements, and then the elevator steel structure is constructed. However, during the assembly of the full-height frame, the height of the shaft itself is too high. When the full-height frame is constructed to a higher height, it is inevitable that the angle will be offset. The full-height frame cannot remain completely vertical, which makes the elevator steel structure prone to offset during the assembly process, affecting the accuracy of the entire construction. At the same time, the auxiliary construction method of the full-height frame increases the amount of materials used and increases the cost of construction. Summary of the invention
[0003] The present invention aims to provide an elevator steel structure construction method to solve the problem that the existing elevator steel structure construction external frame using a full-frame method easily causes the elevator steel structure to be cheap and wastes materials.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for constructing an elevator steel structure, comprising the following steps:
[0005] S1. Set up the scaffolding outer frame. After the outer frame is set up, assemble the two sections of the elevator steel structure first. After the assembly is completed, use an electric hoist to lift the outer frame to the middle of the elevator steel structure, and use steel pipes to support the outer frame;
[0006] S2. Assemble the new section of the elevator steel structure. After the assembly is completed, use the electric hoist to lift the outer frame again. The top elevator steel structure is always located in the middle of the outer frame. Use steel pipes to support the outer frame and continue to install the new section of the elevator steel structure;
[0007] S3. Repeat the above steps to complete the main construction of the elevator steel structure;
[0008] S4. During curtain wall construction, work from the top to the bottom step by step. After the construction of the previous elevator steel structure curtain wall is completed, move the electric hoist from the top crossbar of the external frame to the steel beam on the top of the next steel structure. Use the electric hoist to gradually move the external frame down. Repeat the above steps to complete the construction of all elevator steel structures.
[0009] Furthermore, the outer frame includes a plurality of horizontal bars and vertical bars. The horizontal bars are connected between the vertical bars in groups of four in the form of rectangular surfaces. The intervals between the rectangular surfaces are equal. The electric hoist is connected to the horizontal bars.
[0010] Furthermore, the height of the vertical rod is greater than or equal to the height of two standard sections of the elevator steel structure.
[0011] Furthermore, there is a spacing between the crossbar and the elevator steel structure, and the spacing is 300 to 500 mm.
[0012] Furthermore, when assembling the elevator steel structure in step S1, the electric hoist can be placed on the cross bar at the top of the outer frame. After the two sections of the elevator steel structure are assembled, the electric hoist is placed on the cross bar in the middle of the top of the elevator steel structure to lift the outer frame.
[0013] The beneficial effects of the present invention are as follows: 1. By using a liftable external frame, the external frame is raised and lowered section by section during the construction of the elevator steel structure, ensuring that the external frame always remains in the middle of the steel structure, effectively avoiding the angular deviation that may occur during the construction of the full-frame, and improving the accuracy of the construction; 2. Compared with the traditional full-frame construction method, the present invention only carries out construction within the height range of the external frame, significantly reducing the use of scaffolding materials and reducing construction costs; 3. During the lifting and lowering of the external frame, the construction method takes into account the needs of curtain wall construction, ensuring that the curtain wall construction can be carried out step by step from the top to the bottom, avoiding the impact of the external frame on the curtain wall body; 4. The external frame has a simple structure and is easy to install and disassemble. The lifting and lowering of the external frame can be achieved through simple operations, which improves the flexibility of construction; 5. The design of the external frame takes into account the construction needs of elevator steel structures of different heights and can adapt to construction requirements of different heights. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the first step in a method for constructing an elevator steel structure according to the present invention;
[0015] Figure 2 It is a structural schematic diagram of the second step in an elevator steel structure construction method of the present invention. DETAILED DESCRIPTION
[0016] The following is further described in detail through specific implementation methods:
[0017] The embodiment is basically as shown in the attached Figure 1 -Attached Figure 2 As shown: A method for constructing an elevator steel structure, comprising the following steps:
[0018] S1. Set up the scaffolding outer frame. The height of the outer frame is greater than or equal to the height of the standard sections of the two elevator steel structures. The distance between the outer frame and the elevator steel structure is 400mm. After the outer frame is set up, assemble the two elevator steel structures first. After the assembly is completed, use an electric hoist to lift the outer frame to the middle of the elevator steel structure, and use steel pipes to support the outer frame;
[0019] S2. Assemble the new section of the elevator steel structure, place the electric hoist on the crossbar at the top of the outer frame. After the two sections of the elevator steel structure are assembled, place the electric hoist on the crossbar in the middle of the top of the elevator steel structure to lift the outer frame. The top elevator steel structure is always located in the middle of the outer frame. Use steel pipes to support the outer frame and continue to install the new section of the elevator steel structure;
[0020] S3. Repeat the above steps to complete the main construction of the elevator steel structure;
[0021] S4. During curtain wall construction, work from the top to the bottom step by step. After the construction of the previous elevator steel structure curtain wall is completed, move the electric hoist from the top crossbar of the external frame to the steel beam on the top of the next steel structure. Use the electric hoist to gradually move the external frame down. Repeat the above steps to complete the construction of all elevator steel structures.
[0022] An elevator steel structure construction frame Figure 1 As shown, it includes twenty-eight horizontal bars and four vertical bars. The twenty-eight horizontal bars are fixedly connected between the four vertical bars in a group of four to form a rectangular surface. One group of four horizontal bars is detachably connected between the four vertical bars. The spacing between the remaining rectangular surfaces is equal, and the electric hoist is detachably connected to the horizontal bar.
[0023] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A method for constructing an elevator steel structure, characterized in that: The following steps are involved: S1. Set up the scaffolding outer frame. After the outer frame is set up, assemble the two sections of the elevator steel structure first. After the assembly is completed, use an electric hoist to lift the outer frame to the middle of the elevator steel structure, and use steel pipes to support the outer frame; S2. Assemble the new section of the elevator steel structure. After the assembly is completed, use the electric hoist to lift the outer frame again. The top elevator steel structure is always located in the middle of the outer frame. Use steel pipes to support the outer frame and continue to install the new section of the elevator steel structure; S3. Repeat the above steps to complete the main construction of the elevator steel structure; S4. During curtain wall construction, work from the top to the bottom step by step. After the construction of the previous elevator steel structure curtain wall is completed, move the electric hoist from the top crossbar of the external frame to the steel beam on the top of the next steel structure. Use the electric hoist to gradually move the external frame down. Repeat the above steps to complete the construction of all elevator steel structures.
2. The elevator steel structure construction method according to claim 1, characterized in that: The outer frame comprises a plurality of cross bars and vertical bars. The cross bars are connected between the vertical bars in a group of four in the form of rectangular surfaces. The intervals between the rectangular surfaces are equal. The electric hoist is connected to the cross bars.
3. The elevator steel structure construction method according to claim 2, characterized in that: The height of the vertical rod is greater than or equal to the height of two standard sections of the elevator steel structure.
4. The elevator steel structure construction method according to claim 3, characterized in that: There is a distance between the crossbar and the elevator steel structure, and the distance is 300 to 500 mm.
5. The elevator steel structure construction method according to claim 4, characterized in that: When assembling the elevator steel structure in step S1, the electric hoist can be placed on the cross bar at the top of the outer frame. After the two sections of the elevator steel structure are assembled, the electric hoist is placed on the cross bar in the middle of the top of the elevator steel structure to lift the outer frame.