Gas-storage complementary combined cooling, heating and power system and operation method
By designing a gas-storage-complementary thermoelectric cooling system in the gas-steam combined cycle power generation system, the use of heat pumps and heat exchangers to recover the refrigerated natural gas energy, the problem of low energy utilization efficiency during peak shaving is solved and high efficiency is achieved The energy complementarity and the absorption of new energy power have improved the system's deep peak shaking capability.
Patent Information
- Application Number
- CN202411065453.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-19
AI Technical Summary
The existing gas-steam combined cycle power generation system has low energy utilization efficiency during peak shaving, and the parameter adjustment is not flexible enough, making it difficult to make full use of the cooling energy of liquefied natural gas, resulting in insufficient deep peak shaving capacity.
Design a gas-storage-complementary thermoelectric cooling system, through heat pumps, heat exchangers, heat storage tanks and other equipment, to recover liquefied natural gas cooling energy step by step, high-quality cooling energy is used for industrial cooling, medium- and low-quality cooling energy is Release during peak electricity is released to reduce the temperature of the cold source and increase the power generation; during low electricity periods, the power grid is used to drive the heat pump to recover waste heat, and achieve efficient integration of chemical energy, thermal energy and cold energy.
It improves the energy efficiency level and operation flexibility of the system, realizes the efficient utilization of liquefied natural gas cooling energy, enhances the consumption capacity of new energy power, and improves the power generation of gas-steam combined cycle.
Smart Images

Figure CN118979816A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical fields of gas-steam combined cycle, energy storage, heat pump, and new energy power consumption, and in particular to a gas-storage complementary heat-electricity-cooling combined supply system and an operation method thereof. Background Art
[0002] Renewable energy generation such as solar and wind power has strong volatility and anti-peak characteristics, which brings huge challenges to the peak regulation of the power grid. Thermal power is transforming from basic power to peak-shaving power, and deep peak-shaving operation of thermal power units will become the norm in the next few years. my country's imports of liquefied natural gas have increased year by year, and the comprehensive and efficient utilization of liquefied natural gas chemical energy and cold energy is an important part of building a new energy system. The gas-steam combined cycle power generation system is clean and efficient, and is an important and promising form of power generation. Improving the deep peak-shaving capacity of the gas-steam combined cycle power generation system while efficiently absorbing renewable energy such as wind and solar power generation, and cascading the use of liquefied natural gas cold energy and chemical energy are key technologies in the energy and power industry. The current conventional technologies have the following problems:
[0003] (1) The comprehensive energy utilization level of peak load regulation methods such as electric boilers and bypass main steam is low. In order to improve the heating capacity of the unit during the peak period, the comprehensive energy efficiency level of the unit will be further reduced.
[0004] (2) The existing gas-steam combined cycle power generation system has problems such as inflexible parameter adjustment and heat source selection, and the inability to fully utilize liquefied natural gas cooling energy. Conventional unit peak-shaving technology faces practical problems such as low energy utilization efficiency and small peak-shaving depth. Summary of the invention
[0005] In order to solve the problems existing in the above-mentioned prior art, the purpose of the present invention is to provide a gas-storage complementary heat, power and cooling combined supply system and operation method, the system includes a hot gas-steam combined cycle unit, a heat pump, a heat exchanger, a new energy generator, a power controller, a heat storage tank and various pipeline valves, etc.; the system recovers liquefied natural gas cold energy in stages, high-quality cold energy is used for industrial cooling, and medium and low-quality cold energy is released during peak electricity hours to reduce the temperature of the cold source of the gas-steam combined cycle unit to increase power generation. During peak electricity hours, the heat energy is released to preheat the natural gas to increase the flue gas temperature and further increase the power generation of the gas-steam combined cycle. During the off-peak electricity period, the unabsorbed electricity of the power grid is used to drive the heat pump compressor to recover the waste heat of the gas-steam combined cycle unit and the storage tank. The present invention realizes the efficient integration of liquefied natural gas chemical energy with heat storage and cold storage, and the system energy efficiency level and operation flexibility are significantly improved.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A gas-storage complementary heat, power and cooling combined supply system, comprising an air duct, an air compressor 01, a combustion chamber 02, a gas turbine 03, and a flue gas duct side of a waste heat boiler 04, which are connected in sequence; an exhaust duct of a steam turbine unit 05 is connected in sequence to a shell side of a condenser 06, a steam-water duct side of a waste heat boiler 04, and an air intake duct of a steam turbine unit 05; a liquefied natural gas pipeline is connected in sequence to a natural gas valve 26, a cold fluid side of a heat exchanger C 16, a cold fluid side of a heat exchanger B 17, a cold fluid side of a heat exchanger A 11, and a combustion chamber 02; an industrial return cold pipeline is connected in sequence to a hot fluid side of a heat exchanger C 16, a cold supply valve 27, and an industrial cold supply pipeline; a heat return pipeline is connected in sequence to a heat return valve 37, a hot fluid side of a heat exchanger A 11, a control valve B 24, a heating valve 38, The hot water supply pump 41 and the heating pipeline; the normal temperature tank A09 is connected in sequence with the control valve C39, the water pump A40, the cold fluid side of the condenser 10, the control valve A23, the water pump B25, and the hot tank 12; the pipeline between the heat recovery valve 37 and the heat exchanger A11 is also connected with the pipeline between the water pump A40 and the condenser 10; the pipeline between the control valve B24 and the heating valve 38 is also connected with the pipeline between the control valve A23 and the water pump B25; the outlet pipeline of the heat pump compressor 14 is connected in sequence with the hot fluid side of the condenser 10, the throttle valve 15, the cold fluid side of the evaporator 13, and the inlet of the heat pump compressor 14; the cold tank 19 is connected in sequence with the water pump C34, the control valve D29, the hot fluid side of the heat exchanger B17, the control valve E30, and the water pump D3 5. Normal temperature tank B 20; the pipeline between heat exchanger B 17 and control valve E 30 is also connected in sequence to control valve S 33, cooling tower 18, water pump E 36, condenser 06 pipe side, control valve F 31, control valve C 28, evaporator 13 hot fluid side, water pump D 35, normal temperature tank B 20; the pipeline between control valve S 33 and cooling tower 18 is connected to the pipeline between condenser 06 and control valve F 31 through control valve G 32; the pipeline between control valve F 31 and control valve C 28 is also connected to the pipeline between control valve D 29 and heat exchanger B 17; air compressor 01, gas turbine 03 and gas turbine generator 07 are connected by mechanical shaft; steam turbine unit 05 and steam turbine generator 08 are connected by mechanical shaft The gas turbine generator 07 and the steam turbine generator 08 are connected to the inlet A of the power controller 22, the new energy generator 21 is electrically connected to the inlet B of the power controller 22, and the outlets A and B of the power controller 22 are electrically connected to the power grid and the heat pump compressor 14 through circuits respectively; the system recovers the cold energy of liquefied natural gas in stages, the high-quality cold energy is used for industrial cooling, and the medium and low-quality cold energy is released during the peak electricity period to reduce the temperature of the cold source of the gas-steam combined cycle unit to increase the power generation; during the peak electricity period, the heat energy is released to preheat the natural gas to increase the flue gas temperature and further increase the power generation of the gas-steam combined cycle; during the off-peak period, the unabsorbed electricity of the power grid is used to drive the heat pump compressor to recover the waste heat of the gas-steam combined cycle unit and the storage tank.
[0008] The gas-storage complementary heat, power and cooling combined supply system is operated in the following manner during the off-peak period: the power controller 22 is adjusted according to the power load required by the power grid to preferentially absorb the power generation of the new energy generator 21; the power of the heat pump compressor 14 and the pressure and flow parameters of the throttle valve 15 are adjusted according to the power load required by the power grid, the load rate of the gas turbine generator 07 and the steam turbine generator 08, so that the temperatures of the condenser 10 and the evaporator 13 meet the predetermined temperatures of the heating tank and the cold tank 19 respectively; the control valve 31 and the control valve 33 are closed, and the control valve 31 and the control valve 33 are opened and adjusted. The opening of valve G32 also adjusts the flow of water pump E36, so that the fluid on the shell side of condenser 06 is cooled to a predetermined temperature; the opening of natural gas valve 26 is adjusted so that the liquefied natural gas flow matches the system requirements; the cooling valve 27 is adjusted according to the industrial cooling load and the LNG flow; according to the liquefied natural gas flow, the load of heat exchanger B17 and the power of heat pump compressor 14, the flow direction and flow of water pump C34 and water pump D35 are adjusted so that water flows into cold tank 19 and out of normal temperature tank B20 respectively, and control valve C28 and control valve D are opened and adjusted. 29. Control valve E 30 to make the outlet temperature of the hot fluid side of heat exchanger B 17 and evaporator 13 consistent and meet the set temperature of the fluid in cold tank 19; close control valve B 24 to make heat exchanger A 11 not work; open and adjust control valve A 23, heat recovery valve 37, heating valve 38, and control valve C 39 according to the heat load and the power of heat pump compressor 14; when the heat provided by condenser 10 is greater than the heating load, adjust the flow direction and flow rate of water pump A 40, hot water pump 41 and water pump B 25 to make water flow out of normal temperature tank A and 0 respectively. 9, flows to the heating pipe and into the hot tank 12; when the heat provided by the condenser 10 is less than the heating load, adjust the flow direction and flow rate of water pump A 40, hot water pump 41 and water pump B 25 to make the water flow into the normal temperature tank A 09, flow to the heating pipe and flow out of the hot tank 12 respectively; when the heat provided by the condenser 10 is equal to the heating load, close the control valve C 39, water pump A 40 and water pump B 25, open and adjust the control valve A 23, heat recovery valve 37 and heating valve 38 according to the heat load, and adjust the hot water pump 41 to make the water flow to the heating pipe.
[0009] The gas-storage complementary heat, power and cooling combined supply system is operated in the following manner during peak electricity hours: the power controller 22 is adjusted according to the power load required by the power grid to preferentially absorb the power generated by the new energy generator 21; the heat pump compressor 14 is turned off, and the control valve A 23 is closed; the opening of the return heat valve 37 and the heating valve 38 and the flow rate of the hot water pump 41 are adjusted according to the heating load; the flow direction of the water pump A 40 and the water pump B 25 is adjusted so that water flows into the normal temperature tank A 09 and flows out of the hot tank 12 respectively; the opening of the control valve B 24 is opened and adjusted so that the outlet temperature of the hot fluid of the heat exchanger A 11 is consistent with the return water temperature of the heating supply; the flow rates of the water pump A 40 and the water pump B 25 and the opening of the control valve C 39 are adjusted according to the heating load and the power of the heat exchanger A 11 so that the return heat water temperature is the same as the return heat water temperature. The water and the hot fluid of the heat exchanger A11 are completely recovered in the normal temperature tank A09; the opening of the natural gas valve 26 is adjusted to make the liquefied natural gas flow match the system requirements; the cooling valve 27 is adjusted according to the industrial cold load and the liquefied natural gas flow; the control valve G32 and the control valve C28 are closed; the flow direction of the water pump C34 and the water pump D35 are adjusted to make the water flow out of the cold tank 19 and flow into the normal temperature tank B20 respectively; the exhaust pressure of the turbine unit 05 and the pressure of the condenser 06 are reduced, and at the same time, the opening of the control valve D29, the control valve E30, the control valve F31 and the control valve S33 are adjusted to make the cooling water temperature entering the pipe side of the condenser 06 meet the vacuum requirement of the condenser 06, and make the fluid flow out of the cold tank 19 and flow into the normal temperature tank B20 equal.
[0010] Compared with the prior art, the present invention has the following advantages:
[0011] (1) An electric heat pump is used to recover the waste heat of the system, and a heat exchanger is used to recover the cold energy of different qualities of liquefied natural gas, thus realizing the orderly utilization of chemical energy, thermal energy, and cold energy.
[0012] (2) Comprehensive use of heat storage and cold storage equipment to achieve energy storage and utilization across time and space, improving the energy efficiency of the system.
[0013] (3) Through the linkage between heat pumps, heat storage and cold storage, the complementary exchange of electricity, heat and cold energy flows is achieved, thereby improving the operational flexibility of the unit.
[0014] (4) The present invention improves the consumption level of new energy electricity such as wind energy and solar energy by rationally matching the system configuration and the operation method. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic diagram of a gas-storage complementary heat, power and cooling combined supply system and an operation method of the present invention. DETAILED DESCRIPTION
[0016] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0017] In order to realize the cross-time and space utilization technology of chemical energy, thermal energy and cold energy, the efficient and flexible coupling of electric heat pump technology and new energy power generation technology, the present invention provides a gas-storage complementary heat and power combined supply system, such as Figure 1As shown, it includes the air pipeline, air compressor 01, combustion chamber 02, gas turbine 03, and waste heat boiler 04 flue gas pipeline side connected in sequence; the exhaust pipeline of steam turbine unit 05 is connected in sequence to the shell side of condenser 06, the steam-water pipeline side of waste heat boiler 04, and the air intake pipeline of steam turbine unit 05; the liquefied natural gas pipeline is connected in sequence to the natural gas valve 26, the cold fluid side of heat exchanger C 16, the cold fluid side of heat exchanger B 17, the cold fluid side of heat exchanger A 11, and combustion chamber 02; the industrial return cooling pipeline is connected in sequence to the hot fluid side of heat exchanger C 16, the cooling valve 27, and the industrial cooling pipeline; the heat return pipeline is connected in sequence to the heat return valve 37, The hot fluid side of heat exchanger A11, control valve B24, heating valve 38, hot water pump 41, and heating pipeline; the normal temperature tank A09 is connected in sequence with control valve C39, water pump A40, cold fluid side of condenser 10, control valve A23, water pump B25, and hot tank 12; the pipeline between heat recovery valve 37 and heat exchanger A11 is also connected with the pipeline between water pump A40 and condenser 10; the pipeline between control valve B24 and heating valve 38 is also connected with the pipeline between control valve A23 and water pump B25; the outlet pipeline of heat pump compressor 14 is connected in sequence with the hot fluid side of condenser 10, throttle valve 15 , the cold fluid side of the evaporator 13, and the inlet of the heat pump compressor 14; the cold tank 19 is connected in sequence with the water pump C 34, the control valve D 29, the hot fluid side of the heat exchanger B 17, the control valve E 30, the water pump D 35, and the normal temperature tank B 20; the pipeline between the heat exchanger B 17 and the control valve E 30 is also connected in sequence with the control valve S 33, the cooling tower 18, the water pump E 36, the condenser 06 pipe side, the control valve J 31, the control valve C 28, the hot fluid side of the evaporator 13, the water pump D 35, and the normal temperature tank B 20; the pipeline between the control valve S 33 and the cooling tower 18 is connected to the condenser 06 and the control valve G 32 The pipeline between the control valve 31 and the control valve C 28 is also connected to the pipeline between the control valve D 29 and the heat exchanger B 17; the air compressor 01, the gas turbine 03 and the gas generator 07 are connected through a mechanical shaft; the steam turbine unit 05 and the steam turbine generator 08 are connected through a mechanical shaft; the gas generator 07 and the steam turbine generator 08 are connected to the inlet A of the power controller 22 through a circuit, the new energy generator 21 is connected to the inlet B of the power controller 22 through a circuit, and the two outlets A and B of the power controller 22 are respectively connected to the power grid and the heat pump compressor 14 through a circuit. Among them, the air compressor 01, the combustion chamber 02, the gas turbine 03, the waste heat boiler 04, the steam turbine unit 05, the condenser 06, the gas generator 07 and the steam turbine generator 08 constitute a gas-steam combined cycle unit. Through the above system design, the cross-time and space complementary exchange of liquefied natural gas chemical energy, thermal energy and cold energy can be realized, thereby greatly improving the system's flexible operation range and energy comprehensive utilization efficiency.
[0018] In order to more scientifically and effectively develop the economic and flexibility potential of the gas-storage complementary heat, power and cooling combined supply system, the system operates in the following manner during the off-peak period: according to the power load required by the power grid, the power controller 22 is adjusted to preferentially absorb the power generation of the new energy generator 21; according to the power load required by the power grid, the load rate of the gas turbine generator 07 and the steam turbine generator 08, the power of the heat pump compressor 14 and the pressure and flow parameters of the throttle valve 15 are adjusted, so that the temperatures of the condenser 10 and the evaporator 13 meet the predetermined temperatures of the heating and cold tanks 19 respectively, so that the electric heat pump can be used to recover waste heat for system heating; close the control valve 31 and the control valve 33, open and adjust the control valve The opening of G32 adjusts the flow of water pump E36 at the same time, so that the shell side fluid of condenser 06 is cooled to a predetermined temperature. At this time, the outlet water temperature of cooling tower 18 meets the vacuum requirement of condenser 06; the opening of natural gas valve 26 is adjusted so that the liquefied natural gas flow matches the system requirements and the system electrical load rate is at a low state; the cooling valve 27 is adjusted according to the industrial cooling load and the liquefied natural gas flow, so that the outlet temperature of the cold fluid side of heat exchanger C16 reaches a predetermined value; according to the liquefied natural gas flow, the load of heat exchanger B17 and the power of heat pump compressor 14, the flow direction and flow of water pump C34 and water pump D35 are adjusted so that water flows into cold tank 19 and flows out of normal temperature tank B20 respectively, and the control is opened and adjusted. Valve C 28, control valve D 29, and control valve E 30 make the outlet temperatures of the hot fluid side of heat exchanger B 17 and evaporator 13 consistent and meet the predetermined temperature of the fluid in cold tank 19; close control valve B 24 to make heat exchanger A 11 not work; open and adjust control valve A 23, heat recovery valve 37, heating valve 38, and control valve C 39 according to the heat load and the power of heat pump compressor 14; when the heat provided by condenser 10 is greater than the heating load, adjust the flow direction and flow rate of water pump A 40, hot water pump 41, and water pump B 25 so that water flows out of normal temperature tank A 09, flows to the heating pipe, and flows into hot tank 12 respectively. At this time, part of the heat provided by condenser 10 is used to meet the external The remaining part is stored in the heat tank 12; when the heat provided by the condenser 10 is less than the heating load, the flow direction and flow rate of the water pump A40, the hot water pump 41 and the water pump B25 are adjusted to make the water flow into the normal temperature tank A09, flow to the heating pipe, and flow out of the hot tank 12. At this time, the heat provided by the condenser 10 is used for external heating together with the hot tank 12; when the heat provided by the condenser 10 is equal to the heating load, the control valve C39, the water pump A40 and the water pump B25 are closed, and the control valve A23, the heat recovery valve 37 and the heating valve 38 are opened and adjusted according to the heat load, and the hot water pump 41 is adjusted to make the water flow to the heating pipe. At this time, the hot tank 12 and the normal temperature tank A09 do not work. Through the above operation mode, the system can realize the efficient consumption of new energy electricity during the off-peak period of electricity, and replace electricity storage with heat storage and cold storage, so as to prepare for the release of heat energy and cold energy into electricity during the peak period of electricity.
[0019] In order to more scientifically and effectively develop the economic and flexibility potential of the gas-storage complementary heat, power and cooling combined supply system, the system operates in the following manner during peak hours: according to the power load required by the power grid, the power controller 22 is adjusted to preferentially absorb the power generation of the new energy generator 21; the heat pump compressor 14 is turned off, and the control valve A 23 is closed, at which time the condenser 10, the evaporator 13, the heat pump compressor 14 and the throttle valve 15 are all not working; according to the heating load, the opening of the reheating valve 37 and the heating valve 38 is adjusted, and the The flow rate of the hot water supply pump 41 is adjusted to meet the external heat load demand; the flow direction of the water pump A40 and the water pump B25 is adjusted to make the water flow into the normal temperature tank A09 and out of the hot tank 12 respectively, so that the heat energy in the hot tank 12 is used for external heating; open and adjust the opening of the control valve B24, so that the outlet temperature of the hot fluid of the heat exchanger A11 is consistent with the return water temperature of the heating supply; according to the heating load and the power of the heat exchanger A11, the flow rate of the water pump A40 and the water pump B25 and the opening of the control valve C39 are adjusted, so that the return water of the heating supply and the heat exchanger A11 are consistent. The hot fluid is completely recovered in the normal temperature tank A09; the opening of the natural gas valve 26 is adjusted to make the liquefied natural gas flow match the system requirements. At this time, the system electrical load rate is at a high level; according to the industrial cold load and the liquefied natural gas flow, the cooling valve 27 is adjusted to make the outlet temperature of the cold fluid side of the heat exchanger C16 reach a predetermined value; the control valve G32 and the control valve C28 are closed. At this time, the outlet water of the cooling tower 18 is further cooled by the heat exchanger B17 and mixed with the cold water in the cold tank 19 for cooling the condenser 06; the cooling valve 26 ... The flow direction of water-saving pump C34 and water pump D35 makes water flow out of cold tank 19 and flow into normal temperature tank B20 respectively; reduce the exhaust pressure of steam turbine unit 05 and the pressure of condenser 06, and at the same time adjust the opening of control valve D29, control valve E30, control valve F31 and control valve S33, so that the temperature of cooling water entering the pipe side of condenser 06 meets the vacuum requirement of condenser 06, and makes the fluid flow out of cold tank 19 and flow into normal temperature tank B20 equal, at this time the work of the unit increases and the power generation of the system increases. Through the above operation mode, the system can realize the conversion of heat storage and cold storage into electrical energy during the peak period of electricity, thereby greatly improving the flexibility of system operation.
Claims
1. A gas-storage complementary heat, power and cooling system, characterized by: The invention comprises an air pipeline, an air compressor (01), a combustion chamber (02), a gas turbine (03), and a flue gas pipeline side of a waste heat boiler (04) which are connected in sequence; an exhaust pipeline of a steam turbine unit (05) is connected in sequence to a shell side of a condenser (06), a steam-water pipeline side of a waste heat boiler (04), and an air intake pipeline of a steam turbine unit (05); a liquefied natural gas pipeline is connected in sequence to a natural gas valve (26), a cold fluid side of a heat exchanger C (16), a cold fluid side of a heat exchanger B (17), a cold fluid side of a heat exchanger A (11), and a combustion chamber (02); an industrial return cooling pipeline is connected in sequence to a hot fluid side of a heat exchanger C (16), a cold supply valve (27), and an industrial cold supply pipeline; a heat return pipeline is connected in sequence to a heat return valve (37), a heat exchanger A (11 ) hot fluid side, control valve B (24), heating valve (38), hot water pump (41), heating pipeline; normal temperature tank A (09) is connected in sequence to control valve C (39), water pump A (40), cold fluid side of condenser (10), control valve A (23), water pump B (25), hot tank (12); the pipeline between heat recovery valve (37) and heat exchanger A (11) is also connected to the pipeline between water pump A (40) and condenser (10); the pipeline between control valve B (24) and heating valve (38) is also connected to the pipeline between control valve A (23) and water pump B (25); the outlet pipeline of heat pump compressor (14) is connected in sequence to the hot fluid side of condenser (10), throttle valve (15) , the cold fluid side of the evaporator (13), and the inlet of the heat pump compressor (14); the cold tank (19) is connected in sequence to the water pump C (34), the control valve D (29), the hot fluid side of the heat exchanger B (17), the control valve E (30), the water pump D (35), and the normal temperature tank B (20); the pipeline between the heat exchanger B (17) and the control valve E (30) is also connected in sequence to the control valve S (33), the cooling tower (18), the water pump E (36), the pipe side of the condenser (06), the control valve F (31), the control valve C (28), the hot fluid side of the evaporator (13), the water pump D (35), and the normal temperature tank B (20); the pipeline between the control valve S (33) and the cooling tower (18) is connected through the control valve G (32) A pipeline is connected between the condenser (06) and the control valve (31); the pipeline between the control valve (31) and the control valve (28) is also connected to the pipeline between the control valve (29) and the heat exchanger (17); the air compressor (01), the gas turbine (03) and the gas turbine generator (07) are connected via a mechanical shaft; the steam turbine unit (05) and the steam turbine generator (08) are connected via a mechanical shaft; the gas turbine generator (07) and the steam turbine generator (08) are electrically connected to the inlet A of the power controller (22), the new energy generator (21) is electrically connected to the inlet B of the power controller (22), and the two outlets A and B of the power controller (22) are electrically connected to the power grid and the heat pump compressor (14) respectively;The system recovers liquefied natural gas cold energy in stages, with high-quality cold energy used for industrial cooling, and medium- and low-quality cold energy released during peak electricity hours to reduce the cold source temperature of the gas-steam combined cycle unit to increase power generation; during peak electricity hours, heat energy is released to preheat natural gas to increase flue gas temperature and further increase gas-steam combined cycle power generation; during off-peak electricity hours, the unabsorbed electricity of the grid is used to drive the heat pump compressor to recover waste heat from the gas-steam combined cycle unit and storage tank. ; 2. The method for operating a gas-storage complementary heat, power and cooling system according to claim 1, characterized in that: During the off-peak period, the power controller (22) is adjusted according to the power load required by the power grid to give priority to absorbing the power generated by the new energy generator (21); the power of the heat pump compressor (14) and the pressure and flow parameters of the throttle valve (15) are adjusted according to the power load required by the power grid, the load rate of the gas turbine generator (07) and the steam turbine generator (08), so that the temperatures of the condenser (10) and the evaporator (13) meet the predetermined temperatures of the heating and cooling tanks (19) respectively; the control valve (31) and the control valve (33) are closed, the opening of the control valve (32) is opened and adjusted, and the flow of the water pump (36) is adjusted. The shell side fluid of the condenser (06) is cooled to a predetermined temperature; the opening of the natural gas valve (26) is adjusted so that the liquefied natural gas flow rate matches the system requirements; the cooling valve (27) is adjusted according to the industrial cooling load and the liquefied natural gas flow rate; according to the liquefied natural gas flow rate, the load of the heat exchanger B (17) and the power of the heat pump compressor (14), the flow direction and flow rate of the water pump C (34) and the water pump D (35) are adjusted so that the water flows into the cold tank (19) and flows out of the normal temperature tank B (20) respectively; the control valve C (28), the control valve D (29) and the control valve E (30) are opened and adjusted so that the heat exchanger B (17) and the outlet temperature of the hot fluid side of the evaporator (13) are consistent and meet the predetermined temperature of the fluid in the cold tank (19); the control valve B (24) is closed so that the heat exchanger A (11) does not work; the control valve A (23), the heat recovery valve (37), the heating valve (38), and the control valve C (39) are opened and adjusted according to the heat load and the power of the heat pump compressor (14); when the heat provided by the condenser (10) is greater than the heating load, the flow direction and flow rate of the water pump A (40), the hot water pump (41) and the water pump B (25) are adjusted so that the water flows out of the normal temperature tank A (09) and flows into the heating pipe. , flows into the hot tank (12); when the heat provided by the condenser (10) is less than the heating load, the flow direction and flow rate of the water pump A (40), the hot water pump (41) and the water pump B (25) are adjusted so that the water flows into the normal temperature tank A (09), flows to the heating pipe, and flows out of the hot tank (12); when the heat provided by the condenser (10) is equal to the heating load, the control valve C (39), the water pump A (40) and the water pump B (25) are closed, and the control valve A (23), the heat recovery valve (37) and the heating valve (38) are opened and adjusted according to the heat load, and the hot water pump (41) is adjusted so that the water flows to the heating pipe; During the peak electricity period, the power controller (22) is adjusted according to the power load required by the power grid to give priority to absorbing the power generated by the new energy generator (21); the heat pump compressor (14) is turned off, and the control valve A (23) is closed; the opening of the return heat valve (37) and the heating valve (38) and the flow rate of the hot water pump (41) are adjusted according to the heating load; the flow direction of the water pump A (40) and the water pump B (25) is adjusted so that the water flows into the normal temperature tank A (09) and flows out of the hot tank (12) respectively; the opening of the control valve B (24) is opened and adjusted so that the outlet temperature of the hot fluid of the heat exchanger A (11) is consistent with the temperature of the heating return water; the flow rates of the water pump A (40) and the water pump B (25) and the opening of the control valve C (39) are adjusted according to the heating load and the power of the heat exchanger A (11) so that the heating return water and the hot fluid of the heat exchanger A (11) are completely Recover in normal temperature tank A (09); adjust the opening of natural gas valve (26) so that the liquefied natural gas flow rate matches the system requirement; adjust the cooling valve (27) according to the industrial cooling load and the liquefied natural gas flow rate; close control valve G (32) and control valve C (28); adjust the flow direction of water pump C (34) and water pump D (35) so that water flows out of the cold tank (19) and flows into normal temperature tank B (20) respectively; reduce the exhaust pressure of the steam turbine unit (05) and the pressure of the condenser (06), and at the same time adjust the opening of control valve D (29), control valve E (30), control valve F (31) and control valve Sin (33) so that the temperature of the cooling water entering the condenser (06) tube side meets the vacuum requirement of the condenser (06), and the flow rate of the fluid flowing out of the cold tank (19) and flowing into the normal temperature tank B (20) is equal.