Ultra-large type zinc concentrate fluidization roasting furnace and parameter determination method thereof
By using multiple Roots fans, differential air hoods with different diameters of connecting air ducts and air ducts, and multi-point throwing ports in zinc concentrate fluidized roasting furnaces, the boiling roasting of traditional zinc concentrate is solved. The problems of uneven gas distribution and unreasonable air inlet structure in the furnace have achieved the improvement of uniform air flow and baking effect in the furnace.
Patent Information
- Application Number
- CN202411285760.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-19
AI Technical Summary
In traditional zinc concentrate boiling roasting furnaces, the expansion of the furnace bed area leads to uneven distribution of fluidized gases in the furnace, resulting in insufficient or excessive fluidization in some areas, affecting the roasting effect and product quality, and at the same time, the lower air flow is also present. The unreasonable air inlet structure causes the airflow of the bellows inlet duct to directly rush to the pressure distribution plate, destroying the furnace body seal.
Design an ultra-large zinc concentrate fluidized roasting furnace, using multiple parallel Roots fans and gas mixing tanks, connecting air ducts and annular air ducts with different diameters to ensure uniform air flow distribution; on the air distribution plate Set up a differentiated air hood to reduce the number of air vents in the central area and increase the air vents in the peripheral area; and set up three material throwing ports at the bottom of the furnace body, and control the material throwing speed to 19-22m/s to ensure the uniform distribution of the furnace material.
The uniformity of the distribution of fluidized gases in the furnace is achieved, and the occurrence of insufficient or excessive airflow areas is avoided, and the roasting effect and product quality are ensured. At the same time, the bellows structure is improved to avoid direct flushing pressure of the bellows inlet duct. Destruction of the distribution board.
Smart Images

Figure CN118980255A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of nonferrous metallurgy, and specifically relates to an ultra-large zinc concentrate fluidized roasting furnace and a method for determining parameters thereof. Background Art
[0002] Traditional zinc concentrate fluidized bed roasting furnaces have different hearth areas according to their processing capacity, such as 48m 2 The boiling furnace processes 60,000 tons of zinc concentrate per year, 110m 2 The fluidized bed furnace processes 100,000 tons of zinc concentrate per year. 2 The boiling furnace processes 150,000 tons of zinc concentrate annually. In the process of expanding the furnace area and increasing the processing capacity, how to ensure the stability of roasting processes of different scales and product quality is the main direction of industry research and exploration. Most small-scale roasting furnaces use centralized air intake and relatively fixed feeding methods, which leads to high wind pressure near the drop point in the roasting furnace.
[0003] CN16294602 A discloses a zinc concentrate fluidized bed roasting furnace, in which the furnace body is designed as an upper enlarged structure, that is, the lower part of the furnace body is a straight cylinder and the upper part is an enlarged structure, the furnace bed is located at the bottom of the straight cylinder, and the furnace bed area is increased to 198m 2 , so that the zinc ferrite produced from 6-9% of zinc during the boiling furnace roasting process is reduced to 3-4%, a reduction of 50%. A plurality of sets of spatial step cooling buried pipe devices are arranged along the circumferential direction on the furnace wall above the furnace bed. Each set of spatial step cooling buried pipe devices includes two sets of independently detachable cooling circulation pipes, and the two sets of cooling circulation pipes are arranged up and down along the height direction of the boiling roasting furnace. Two sets of independently detachable cooling circulation pipes are provided, which can be controlled separately, so as to uniformize the temperature field and flow field of the boiling layer in the boiling furnace, ensure the roasting temperature and height of the boiling layer, avoid the local high or low temperature in the boiling layer due to the overall disassembly of a set of cooling circulation pipes, and break the conditions for the formation of zinc ferrite. The purpose of the above structure is to overcome the problem of increased zinc cost per ton caused by excessive zinc ferrite in zinc roasted sand,
[0004] However, after the furnace bed area of CN16294602 A is greatly increased, there will be a problem of uneven distribution of fluidized gas in the furnace, which will lead to insufficient fluidization in some areas and excessive fluidization in other areas. Uneven gas distribution in the furnace will lead to uneven temperature distribution in the furnace body. Areas with too much gas will affect the roasting effect and product quality due to local overheating or overcooling.
[0005] In addition, after the furnace body of CN16294602 A is enlarged, the lower air flow inlet structure is unreasonable, resulting in the air flow from the bellows inlet pipe directly hitting the pressure distribution plate, repeatedly damaging the furnace body seal. Therefore, the increase in the production capacity and hearth area of the boiling roasting furnace requires corresponding improvements to its bellows structure and material throwing method. Summary of the invention
[0006] The object of the present invention is to provide an ultra-large zinc concentrate fluidized roasting furnace capable of evenly distributing fluidized gas in the furnace and a method for determining its parameters.
[0007] The super-large zinc concentrate fluidized roasting furnace provided by the present invention has an air distribution plate connected to the bottom of the furnace body, and the air supply system connected below the air distribution plate includes a wind box, a blower, and a connecting air duct between the two. The blower includes a plurality of Roots blowers connected in parallel, and the connecting air duct includes a gas mixing tank and an annular air duct. The exhaust duct of each Roots blower is connected to the gas mixing tank, the gas mixing tank is connected to an air blast main pipe, the air blast main pipe is connected to the annular air duct, and a plurality of connecting air ducts are arranged between the annular air duct and the wind box.
[0008] When the above roasting furnace is implemented, there are two Roots blowers, which are symmetrically connected to the two sides of the mixing tank. The blast main pipe is located on the center plane between the two rows of air ducts, and the blast main pipe is connected to the outside of the annular air duct.
[0009] When the above-mentioned roasting furnace is implemented, the connecting air ducts have four connected air ducts evenly distributed on the inner side of the annular air duct, the pipe diameter ratio of the connecting air ducts is 0.43:1:1:1, and the wind speed in the connecting air ducts is not greater than 10m / s.
[0010] When the above roasting furnace is implemented, the diameters of the four connecting air ducts are 350mm, 800mm, 800mm and 800mm respectively, and the connecting air duct with a diameter of 350mm is arranged coaxially with the main blast pipe.
[0011] When the above-mentioned roasting furnace is implemented, the wind box is an inverted cone-shaped shell, the annular air duct is sleeved outside the bottom of the wind box, and the upper end of the wind box is connected to the air distribution plate.
[0012] When the above-mentioned roasting furnace is implemented, a hood is provided on the air distribution plate, and the air output of the hood in the central area is smaller than the air output of the hood in the peripheral area.
[0013] When the above roasting furnace is implemented, the hoods all adopt mushroom-head hoods with four air outlets with a diameter of 6 mm on the top. The hood in the central area only opens two air outlets facing outwards, and the four air outlets in the outer area are all open.
[0014] When the above-mentioned roasting furnace is implemented, the fluidized bed area of the furnace body is provided with three throwing ports, the angle between adjacent throwing ports is 90 degrees, and the throwing speed is 19-22 m / s.
[0015] The method for connecting the diameter of the air duct in the roasting furnace provided by the present invention comprises the following steps:
[0016] (1) Solve for the velocity of single-phase gas flow
[0017] (1.1) Continuity equation
[0018] For an incompressible fluid, the continuity equation is: Where u represents the fluid velocity vector;
[0019] (1.2) Momentum equation
[0020] For an incompressible fluid, the momentum equation is:
[0021] In the above formula, ρ represents fluid density, u represents fluid velocity vector, t represents time, p represents pressure, μ represents dynamic viscosity, and f represents volume force;
[0022] (1.3) Simulation comparison
[0023] The following three pipe diameters are selected for comparison:
[0024] The diameter of the four connecting air ducts is 500 mm. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that if the diameter of the air duct is too small, the air flow velocity will be too fast. After the air flow merges, it will directly impact the pressure distribution plate, causing uneven air flow movement;
[0025] The diameter of the four connecting air ducts is 800 mm. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that as the diameter of the air duct increases, the air flow velocity decreases. However, due to the uneven pressure distribution in the annular air duct, the air flow rate of the connecting air duct far away from the main air outlet pipe decreases, resulting in air flow deviation, which also causes uneven air flow movement;
[0026] The diameter of the three connecting air ducts is 800mm, and the diameter of the other connecting air duct is 350mm and is directly opposite to the blast main pipe. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that the flow in the annular air duct can be kept uniform.
[0027] The method for determining the throwing speed in the above-mentioned roasting furnace provided by the present invention comprises the following steps:
[0028] (1) Solve the motion trajectory of the particle throwing process
[0029] (1.1) Translational motion equation
[0030] The translational motion equation for each particle i is: In the above formula: m i represents the particle mass, v i represents the particle velocity, F ij represents the force exerted on particle i by other particles j, F g Represents gravity, F d represents the drag force of the fluid on the particles;
[0031] (1.2) Rotational motion equation
[0032] The rotational motion equation for each particle i is: In the above formula: I i represents the moment of inertia of the particle, ω i represents the angular velocity of the particle, T ij represents the moment of force on particle i from other particles j, T d represents the moment of the fluid on the particle;
[0033] The coupled velocity field of the fluid and particles is obtained by calculating the drag force between the fluid and the particles. The drag force is usually calculated using the empirical formula: In the above formula, C d represents the drag coefficient, r represents the particle radius, u represents the fluid velocity, and v i represents the particle velocity,
[0034] Through calculation, it is found that the throwing speed of 19 to 22 m / s can ensure that the charge exceeds the center line of the furnace body and maintains a relatively uniform fluidized bed.
[0035] The present invention has the following advantages: the air supply system of the roasting furnace is innovatively improved, and the connecting air duct between the bellows and the annular air duct is determined by accurate calculation to adopt differential pipe diameters, so that the air flow in the annular air duct is uniform; the wind caps in different areas on the air distribution plate are set differently, so that the air flow sent in is diffused to the surroundings, ensuring the uniformity of the air flow and avoiding areas with insufficient and excessive air flow in the furnace; the throwing port is arranged in a multi-point ring shape, and the throwing speed is determined by accurate calculation, so that the furnace charge falls near the center of the furnace body, so that better fluidization conditions are formed in the furnace, so that the dynamic pressure generated by the super large air volume sent in by the bellows is slowly released into static pressure and diffused from bottom to top into the air distribution plate of the fluidized bed layer. The above advantages have well solved the defects of the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the overall structure of the roasting furnace and its air supply system in the present invention (the complete air supply system is not shown).
[0037] Figure 2 It is an enlarged schematic diagram of the structure of the air blowing part of the air supply system in the present invention.
[0038] Figure 3 for Figure 1 Schematic diagram of the overall components of the middle annular air duct, air blower main pipe, connecting air duct and bellows.
[0039] Figures 4 to 6 Schematic diagram of the process of determining the diameters of four connected air ducts in the present invention
[0040] Figure 7It is a schematic diagram of the arrangement of the wind caps on the wind distribution plate in the present invention.
[0041] Figure 8 It is a schematic diagram of the arrangement of the throwing port in the present invention.
[0042] Fig. 9 This is a diagram showing the effect of the simulated structure of the throwing particle field in the present invention.
[0043] Fig.10 This is the distribution diagram of the diffuse rising flow field of the airflow in the present invention.
[0044] Fig.11 This is a schematic diagram of hood pressure measurement points according to an embodiment of the present invention. DETAILED DESCRIPTION
[0045] like Figure 1 As shown, the super-large zinc concentrate fluidized roasting furnace disclosed in the present invention is based on the furnace type disclosed in CN16294602A, and adopts the following new technical means to solve the defects existing in CN16294602A.
[0046] 1. About the air supply system under the air distribution plate at the bottom of the furnace
[0047] The bellows 1 of the air supply system is in the shape of an inverted cone, and the annular air duct 2 is sleeved outside the bottom of the bellows, which are the same as those in CN16294602A, but the connecting air duct between the annular air duct and the bellows is specially designed.
[0048] There is also a special design for providing air source to the annular air duct.
[0049] 1.1. Configuration of air source for circular air duct
[0050] It includes a Roots blower and a gas mixing tank. Two Roots blowers are symmetrically arranged on both sides of the gas mixing tank. The exhaust pipes of the two blowers are connected to the gas mixing tank. The gas mixing tank is connected to a blast main pipe 3. Figure 2 shown.
[0051] 1.2 Number and location of connected air ducts
[0052] The number of connecting air ducts is four, and they are evenly distributed on the inner side of the annular air duct.
[0053] The blast main pipe is connected to the outside of the annular air duct, and one of the connecting air ducts is arranged coaxially with the blast main pipe, such as Figure 3 shown.
[0054] 1.3. Pipe diameter ratio and pipe diameter of connecting air duct
[0055] The pipe diameter ratio of the four connecting air ducts is 0.43:1:1:1, and the diameters are 350mm, 800mm, 800mm and 800mm respectively. The connecting air duct with a diameter of 350mm shares the same axial centerline with the main air blast pipe.
[0056] 1.3.1. Determination of the number and diameter of connected air ducts
[0057] Connecting air ducts are evenly distributed on the inner side of the annular air duct, and a connecting air duct is arranged on the axial center line of the main blower pipe, so that the airflow can form a more consistent wind speed in the annular air duct and evenly disperse the airflow.
[0058] The bellows is an inverted cone structure. When connecting the air duct to the bellows, a hole is made in the side wall of the cone and then welded and fixed. The stress around the cone hole will increase due to geometric discontinuity, and the stress concentration factor K t Used to describe this phenomenon.
[0059] Where d is the diameter of the hole and D is the diameter of the cone.
[0060] When K t <2 is usually a safe range. For conventional materials and designs, a stress concentration factor less than 2 usually does not cause serious safety issues. Therefore, when opening a hole, it is necessary to try to ensure that K t Within a safe range.
[0061] Opening position D = 7000mm, when four 800mm diameter circular holes are opened, K t =1.91, basically reaching the K value to ensure stress-safe opening t The upper limit of the value.
[0062] When four 500mm diameter circular holes are opened, the wind speed in the connecting air duct will exceed 10m / s, which will cause vibration of the connecting air duct. That is, the upper limit of the wind speed in the connecting air duct is 10m / s.
[0063] The layout and diameter of the connecting air duct have an important influence on the uniformity of the distribution in the furnace. The airflow velocity after the large flow of air enters the roasting furnace is calculated by computational fluid dynamics. The basic equations used to describe single-phase flow usually include the continuity equation and the momentum equation, as follows:
[0064] Continuity equation (mass conservation equation)
[0065] The continuity equation describes the principle of conservation of mass for a fluid. For an incompressible fluid (constant density), the continuity equation is: In the above formula, u represents the fluid velocity vector.
[0066] Momentum equation (Navier-Stokes equation)
[0067] The momentum equation describes the principle of conservation of momentum in a fluid. For an incompressible fluid, the Navier-Stokes equation is:
[0068] In the above formula, ρ represents fluid density, u represents fluid velocity vector, t represents time, p represents pressure, μ represents dynamic viscosity, and f represents volume force (such as gravity).
[0069] Based on a large number of numerical simulations, three specifications of connecting air ducts were selected for comparison.
[0070] Specification 1: four 500mm diameter connecting air ducts (the air inlet speed cannot exceed 10m / s).
[0071] The air flow velocity field in the furnace is simulated by numerical simulation ( Figure 4 ) It can be seen that if the diameter of the connecting air duct is too small, the air flow speed will be too fast. After converging, the air flow will directly impact the pressure distribution plate, causing uneven air flow movement.
[0072] Specification 2, four connecting air ducts with a diameter of 800mm.
[0073] The air flow velocity field in the furnace is simulated by numerical simulation ( Figure 5 ) It can be seen that as the diameter of the connecting air duct increases, the air flow velocity decreases. However, due to the uneven pressure distribution in the annular air duct, the air flow rate of the connecting air duct far away from the blower main pipe decreases, resulting in air flow deviation, which also causes uneven air flow movement.
[0074] Specification 3: From the previous simulation results, we know that the outlet wind speed of the connecting air duct facing the blast main pipe is high, which leads to insufficient outlet pressure of the subsequent connecting air duct. Therefore, reducing the diameter of the connecting air duct corresponding to the blast main pipe can keep the flow in the annular air duct uniform. Three connecting air ducts with a diameter of 800 mm and one with a diameter of 350 mm are used to simulate the wind box flow field ( Figure 6 ) It can be seen that this method solves the problem of uneven air flow distribution in the annular air duct. Fig.10 This is a front view of the velocity field in the wind box under the diameter of the connecting air duct, from which it can be seen that the airflow flows upward in a diffuse manner instead of directly rushing towards the air distribution plate at high speed.
[0075] 2. Setting of the hood on the air distribution plate
[0076] In the present invention, the hood adopts a conventional hood (a mushroom-shaped hood with four air outlets with a diameter of 6 mm on the top), but the number and positions of the air outlets opened in different areas of the hood on the air distribution plate are different from the conventional method.
[0077] Specifically, the hood corresponding to the central area of the air distribution plate (occupying about 1 / 3 of the entire air distribution plate area) has only two air outlets opening toward the outside, while the four air outlets of the hood in the peripheral area are all open, such as Figure 7 As shown. The effect of this setting is: while reducing the opening of the hood on the air distribution plate, the air flow is diffused to the surroundings. Because the air flow has the highest impact speed on the center of the air distribution plate, reducing the opening of the hood in the central area can make the hood air flow diffuse to the surroundings as much as possible.
[0078] The principle of the combustion of the hearth particles is as follows: the air flow delivered by the bellows is broken up by a large number of wind caps on the air distribution plate to form a high-speed airflow that causes the particles to be suspended and burn.
[0079] According to previous fluid mechanics calculations, the 1 / 3 radius area at the center of the furnace is a high-speed airflow area, where the pressure needs to be increased to distribute more high-speed airflow to the surrounding areas, thereby forming a uniform air distribution structure. Therefore, the hoods in the four quadrants of this area are reduced by two air outlets (the two inward air outlets are blocked), so that more airflow is distributed to the hoods in the peripheral areas. In this way, the opening of the hood in the central area is reduced, and the airflow is diffused to the surrounding areas.
[0080] 3. Throwing method
[0081] CN16294602 A is provided with only one throwing port. Since the furnace bed area is greatly increased, one throwing port will lead to uneven distribution of furnace charge.
[0082] In the present invention, three throwing ports are provided ( Figure 8 ), and at the same time, the material is thrown at a speed of 19-22m / s. At this throwing speed, the charge falls near the center of the furnace body, which can form better fluidization conditions.
[0083] 3.1. Determination of the number of throwing ports and throwing speed
[0084] After the furnace bed area is greatly increased, the speed and direction of the particles thrown from the throwing machine also play a vital role in the uniformity of the fluidized bed. The present invention obtains the optimal throwing speed and throwing method by calculating the particle movement process. The movement trajectory of the particle throwing process is obtained by solving the following equation:
[0085] Discrete phase (particle phase) equation
[0086] The behavior of the discrete phase is described by Newton's second law, which includes both translational and rotational motion.
[0087] (1) Translational motion equation
[0088] The translational motion equation for each particle i is:
[0089] In the above formula: m irepresents the particle mass, v i represents the particle velocity, F ij represents the force exerted on particle i by other particles j, F g Represents gravity, F d Represents the force exerted by the fluid on the particles (such as drag).
[0090] (2) Rotational motion equation
[0091] The rotational motion equation for each particle i is:
[0092] In the above formula: I i is the moment of inertia of the particle, ω i is the angular velocity of the particle, T ij is the moment of force on particle i from other particles j, T d is the torque of the fluid on the particle.
[0093] The coupled velocity field of the fluid and particles is obtained by calculating the drag force between the fluid and the particles. The drag force is usually calculated using the empirical formula:
[0094] In the above formula: C d is the drag coefficient, r is the particle radius, u is the fluid velocity, v i is the particle velocity.
[0095] Through calculation, it is found that the throwing speed of 19-22m / s can ensure that the charge exceeds the center line of the furnace body and maintains a relatively uniform fluidized bed ( Fig. 9 ).
[0096] The following is a specific test data of the present invention.
[0097] Blowing volume 80000Nm 3 / h, for 198m 2 The air distribution plate of the furnace bed area is pressure tested, and the furnace bed area is divided into 10 areas. In each area, the wind pressure test is performed on 4 radial points ( Fig.11 The wind box at the bottom of the furnace bed adopts the differential air duct structure of the present invention. The sizes of the four air inlet ducts are 350mm, 800mm, 800mm, and 800mm respectively. The wind pressure test results are shown in the following table. The wind pressure is relatively stable, the pressure difference is within 10%, and the air flow distribution is relatively uniform.
[0098] Table 1 Wind pressure at sampling points in different areas (kpa)
[0099]
Claims
1. An ultra-large zinc concentrate fluidized roasting furnace, wherein an air distribution plate is connected to the bottom of the furnace body, and an air supply system connected below the air distribution plate includes a wind box, a blower and a connecting air duct between the two, characterized in that: The blower includes a plurality of Roots blowers connected in parallel, the connecting air duct includes an air mixing tank and an annular air duct, the exhaust duct of each Roots blower is connected to the air mixing tank, the air mixing tank is connected to an air blast main pipe, the air blast main pipe is connected to the annular air duct, and a plurality of connecting air ducts are arranged between the annular air duct and the bellows.
2. The roasting furnace according to claim 1, characterized in that: There are two Roots blowers, which are symmetrically connected to the two sides of the mixing tank. The blast main pipe is located on the center plane between the two rows of air ducts, and the blast main pipe is connected to the outer side of the annular air duct.
3. The roasting furnace according to claim 2, characterized in that: The connecting air ducts have four ends which are evenly distributed on the inner side of the annular air duct, and the pipe diameter ratio thereof is 0.43:1:1:
1. The wind speed in the connecting air ducts is not greater than 10 m / s.
4. The roasting furnace according to claim 3, characterized in that: The diameters of the four connecting air ducts are 350mm, 800mm, 800mm and 800mm respectively, and the connecting air duct with a diameter of 350mm is arranged on a coaxial centerline with the main air blast pipe.
5. The roasting furnace according to claim 1, characterized in that: The bellows is an inverted cone-shaped shell, the annular air duct is sleeved outside the bottom of the bellows, and the upper end of the bellows is connected to the air distribution plate.
6. The roasting furnace according to claim 1, characterized in that: The air distribution plate is provided with a hood, and the air output of the hood in the central area is smaller than the air output of the hood in the peripheral area.
7. The roasting furnace according to claim 7, characterized in that: The hoods are all mushroom-head hoods with four air outlets with a diameter of 6 mm on the top. The hood in the center area has only two air outlets opening toward the outside, and the four air outlets in the outer area are all open.
8. The roasting furnace according to claim 1, characterized in that: The fluidized bed region of the furnace body is provided with three material throwing ports, the angle between adjacent material throwing ports is 90 degrees, and the material throwing speed is 19-22 m / s.
9. A method for determining the diameter of the connecting air duct as claimed in claim 4, comprising the following steps: (1) Solve for the velocity of single-phase gas flow (1.1) Continuity equation For an incompressible fluid, the continuity equation is: Where u represents the fluid velocity vector; (1.2) Momentum equation For an incompressible fluid, the momentum equation is: In the above formula, ρ represents fluid density, u represents fluid velocity vector, t represents time, p represents pressure, μ represents dynamic viscosity, and f represents volume force; (1.3) Simulation comparison The following three pipe diameters are selected for comparison: The diameter of the four connecting air ducts is 500 mm. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that if the diameter of the air duct is too small, the air flow velocity will be too fast. After the air flow merges, it will directly impact the pressure distribution plate, causing uneven air flow movement; The diameter of the four connecting air ducts is 800 mm. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that as the diameter of the air duct increases, the air flow velocity decreases. However, due to the uneven pressure distribution in the annular air duct, the air flow rate of the connecting air duct far away from the main air outlet pipe decreases, resulting in air flow deviation, which also causes uneven air flow movement; The diameter of the three connecting air ducts is 800mm, and the diameter of the other connecting air duct is 350mm and is directly opposite to the blast main pipe. Through numerical simulation of the air flow velocity field in the furnace, it can be seen that the flow in the annular air duct can be kept uniform.
10. A method for determining the throwing speed of claim 8, comprising the following steps: (1) Solve the motion trajectory of the particle throwing process (1.1) Translational motion equation The translational motion equation for each particle i is: In the above formula: m i represents the particle mass, v i represents the particle velocity, F ij represents the force exerted on particle i by other particles j, F g Represents gravity, F d represents the drag force of the fluid on the particles; (1.2) Rotational motion equation The rotational motion equation for each particle i is: In the above formula: I i represents the moment of inertia of the particle, ω i represents the angular velocity of the particle, T ij represents the moment of force on particle i from other particles j, T d represents the moment of the fluid on the particle; The coupled velocity field of the fluid and particles is obtained by calculating the drag force between the fluid and the particles. The drag force is usually calculated using the empirical formula: In the above formula, C d represents the drag coefficient, r represents the particle radius, u represents the fluid velocity, and v i It indicates the particle velocity. Through calculation, it is found that the throwing speed of 19 to 22 m / s can ensure that the charge exceeds the center line of the furnace body and maintains a relatively uniform fluidized bed.