Dustproof noise reduction rock breaking system and method
By using dust-proof and noise-reducing rock-breaking system in tunnel excavation projects and combining layered and grouped step-by-step construction, the problem of poor noise, dust and rock-breaking effects in traditional explosive blasting methods is solved, and more efficient Safer tunnel excavation process.
Patent Information
- Application Number
- CN202411121152.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-19
AI Technical Summary
In tunnel excavation projects, traditional explosive blasting methods have safety hazards and cannot effectively reduce noise and dust. The rock breaking effect is poor and the kinetic energy loss is large, especially in the field of urban rail transit.
Dust-proof and noise-reducing rock-breaking system, including cracking tubes, millisecond delayed explosion-induced devices, water packs, sound-absorbing plates and sealing materials, is constructed through layered and grouped step method, and is expanded by dry ice, liquid nitrogen and sodium bicarbonate. Material, spiral grooves and granular protrusions are provided to increase rock breaking kinetic energy and reduce noise and dust through water packs and sound absorbing plates.
It effectively reduces noise and dust during rock breaking, improves rock breaking efficiency and kinetic energy utilization, and ensures construction safety and environmental quality.
Smart Images

Figure CN118980298A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gas expansion blasting, and in particular to a dust-proof and noise-reducing rock-breaking system and method. Background Art
[0002] In tunnel excavation projects, explosive blasting is currently the main method used for construction. Traditional explosive blasting is powerful, especially in the field of urban rail transit, and has relatively strict usage restrictions, and requires high technical means of operators. Due to the unstable behavior of explosives, they are very likely to explode when exposed to high temperatures, impacts, and sparks. Therefore, dangers are very likely to occur during operation. Even if a professional blasting team performs blasting, there are many unsafe conditions. Therefore, the safety of operators cannot be effectively guaranteed, and the use of explosives for blasting may not be allowed in some occasions.
[0003] At present, some tunnel blasting adopts the method of gas expansion, using the thrust generated by gas expansion to complete the blasting operation. However, the existing gas blasting equipment cannot effectively improve the problems of high noise and high dust in the rock breaking process. In addition, the current blasting drills holes in the entire air-facing surface and blasts as a whole. Due to the limitation of the structural strength of the entire air-facing surface, there are problems such as poor rock breaking effect and large kinetic energy loss, and the blasting efficiency is low. Summary of the invention
[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a dust-proof and noise-reducing rock breaking system and method to solve the problems of high noise and dust in the rock breaking process, as well as poor rock breaking effect and large kinetic energy loss due to overall drilling and blasting of the entire air-facing surface.
[0005] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0006] In a first aspect, a dust and noise reduction rock breaking system includes:
[0007] Several fracturing tubes are evenly distributed in the blasthole. The inside of the fracturing tubes is filled with expansion materials. Water bags are arranged between adjacent fracturing tubes. Millisecond delay detonators are arranged inside the fracturing tubes. The millisecond delay detonators are connected in series through detonating wires. The inner side of the fracturing tube is provided with a spiral groove, the front end is provided with a convex thin wall, and the peripheral side is provided with granular protrusions to increase the kinetic energy of rock breaking;
[0008] The sound absorbing board and the blocking material are used, wherein the blocking material blocks the mouth of the blast hole, and the sound absorbing board is arranged in front of the blocking material.
[0009] As a further implementation, the sound absorbing panel is a honeycomb structure, and the size of the sound absorbing panel is adapted to the size of the blast hole.
[0010] As a further implementation method, the millisecond delay detonator is divided into two layers, an inner layer and an outer layer. The inner layer includes a resistor connected to the detonating wire, the outer side of the resistor is butane, and the outer layer is liquid oxygen.
[0011] As a further implementation, the outer layer of the millisecond delay detonator is connected to an infusion tube and an exhaust pipe.
[0012] As a further implementation, the interior of the fracturing tube is filled with dry ice and liquid nitrogen.
[0013] As a further implementation, the interior of the fracturing tube is also filled with sodium bicarbonate.
[0014] As a further implementation, the number of the water bags is the same as the number of the fracturing pipes, and each group of water bags is correspondingly arranged on a side of the fracturing pipe close to the tunnel face.
[0015] As a further implementation method, the plugging material is quick-drying plugging mud.
[0016] As a further implementation, the extension direction of the spiral groove converges toward the front end of the fracturing tube.
[0017] In a second aspect, a dust-proof and noise-reducing rock-breaking method is provided, characterized in that the dust-proof and noise-reducing rock-breaking system as described above is adopted, and the method comprises the following steps:
[0018] According to the tunnel construction plan, the rock and soil are layered, and each layer of rock and soil is divided into several groups for rock breaking in groups first and then in layers to achieve rock breaking in step-by-step construction;
[0019] When breaking rock in groups, blastholes are constructed first, and the fracturing tubes and water bags with millisecond delay detonators are arranged in the blastholes in sequence. The detonating wires connected to the millisecond delay detonators are led out of the blastholes, and a sound-absorbing panel is set on the rear side of the last group of water bags near the blasthole mouth. Then, the blasthole mouth is blocked with sealing materials; the fracturing tubes are detonated by the detonating wires.
[0020] The beneficial effects of the present invention are as follows:
[0021] 1. The present invention sets a water bag structure. After the water bag is broken, the water in the blast hole is atomized under high temperature and high pressure, which absorbs the dust in the blasting gas, plays a role in atomization and dust reduction, greatly reduces the pollution of dust to the environment, and improves the air quality in the cave; the setting of sound-absorbing panels and sealing materials can effectively reduce noise, solve the problem of high noise in the rock breaking process, and reduce the impact of blasting on the surrounding environment; the fracturing tube is provided with raised thin walls, granular protrusions and spiral grooves, which can effectively improve the kinetic energy of rock breaking.
[0022] 2. The dry ice and liquid nitrogen of the present invention absorb surrounding heat while vaporizing, so that the water vapor formed after the water bag is broken is condensed to form a white mist, which can absorb dust and reduce dust.
[0023] 3. The granular protrusions of the present invention can squeeze the kinetic energy toward the thinner granular protrusions during fracturing, and the gas flow rate can be increased after the breakthrough, so that the blasting funnel angle effect can be rapidly improved, which can effectively improve the rock-breaking kinetic energy of the unit granular protrusion; the structural form of protrusion thin wall + spiral groove can form annular energy concentration of gas kinetic energy during fracturing, so that the fracturing kinetic energy is reduced and ineffectively dispersed around, and the rock mass is radially struck.
[0024] 4. During blasting, the present invention adopts a step-type blasting method of first breaking the rock in groups and then breaking the rock in layers, which can promote the formation of blasting cracks, solve the problem of poor blasting effect due to the limitation of the strength of the entire free surface structure, and improve blasting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0026] Figure 1 Schematic diagram of the overall structure of the dust and noise reduction rock breaking system in an embodiment of the present invention;
[0027] Figure 2 2 is a schematic diagram of the structure of a millisecond delay detonator according to an embodiment of the present invention;
[0028] Figure 3 is a structural schematic diagram of step construction of rock and soil mass in an embodiment of the present invention;
[0029] Figure 4 It is a schematic diagram of the overall structure of step construction of rock and soil mass in an embodiment of the present invention;
[0030] Figure 5 is a schematic diagram of the cross-sectional structure of a fracturing tube in an embodiment of the present invention;
[0031] Figure 6 1 is a front view of a fracturing tube in an embodiment of the present invention.
[0032] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0033] Among them: 1. Fracture tube, 2. Millisecond delay detonator, 3. Water bag, 4. Sound absorbing board, 5. Sealing material, 6. Detonating wire, 7. Hole wall, 8. Hole, 9. Liquid oxygen, 10. Resistor, 11. Butane, 12. Infusion pipe, 13. Exhaust pipe, 14. Rock and soil, 15. Temporary support structure, 17. Step, 18. Tunnel secondary lining structure; 11. Granular protrusion, 12. Protrusion-shaped thin wall, 13. Spiral groove. DETAILED DESCRIPTION
[0034] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0035] Embodiment 1
[0036] In a typical embodiment of the present invention, reference is made to Figure 1-Figure 2 As shown, a dust and noise reduction rock breaking system includes a fracturing pipe 1, a millisecond delay detonator 2, a water bag 3, and a sound absorbing panel 4.
[0037] Several groups of fracturing tubes 1 are evenly distributed in each group of blastholes. The fracturing tubes 1 are evenly distributed in the blastholes. The inside of the fracturing tubes 1 is filled with expansion materials. The water bags 3 and the fracturing tubes 1 are staggeredly distributed in the blastholes.
[0038] like Figure 1 As shown, the number of water bags 3 is the same as the number of fracturing pipes 1, and each group of water bags is correspondingly arranged on the side of the fracturing pipe 1 close to the tunnel face, so the water bags 3 are correspondingly arranged on the rear side of each group of fracturing pipes 1. After the fracturing pipes 1 and the water bags 3 are installed, a sound absorbing panel is installed near the blast hole mouth, and then the blast hole mouth is blocked with the blocking material 5.
[0039] Each group of fracturing tubes 1 is provided with a millisecond delay detonator 2 inside, and a plurality of millisecond delay detonators 2 are connected in series via a detonating wire 6 ; the detonating wire 6 is led out of the blast hole through the blast hole to detonate the fracturing tubes 1 .
[0040] It can be understood that the size of the sound absorbing panel 4 is adapted to the size of the blasthole. The sound absorbing panel 4 is a honeycomb structure, which can effectively reduce noise during blasting, solve the problem of high noise during rock breaking, and reduce the impact of blasting on the surrounding environment.
[0041] In order to solve the problem of excessive dust during blasting, the fracturing pipes 1 and the water bags 3 are arranged alternately, and the water bags 3 are installed behind each group of fracturing pipes 1. When the fracturing pipes 1 are blasted, the water bags rupture, and a high temperature of 800 degrees can be formed during fracturing. The water in the blasthole is atomized under high temperature and high pressure, absorbing the dust in the explosive gas, playing the role of atomization and dust reduction, greatly reducing the pollution of dust to the environment and improving the air quality in the cave.
[0042] like Figure 2As shown, the millisecond delay detonator 2 of this embodiment is divided into two layers, the inner layer includes a resistor 10 connected to the detonating wire 6, the outer side of the resistor 10 is butane 11, and the outer layer is liquid oxygen. The millisecond delay detonator 2 includes a first shell and a second shell, wherein the inside of the first shell is the inner side, and the space between the second shell and the first shell is the outer layer. The first shell is located inside the second shell, and the first shell is provided with a resistor 10, the inside of the first shell outside the resistor is filled with butane, and the space between the first shell and the second shell is filled with liquid oxygen. The second shell is also provided with a liquid infusion pipe and an exhaust pipe.
[0043] The multiple groups of millisecond delay detonators 2 form a millisecond delay effect through the resistance of the resistor 10. The current direction is from back to front. The resistors 10 are connected by detonating wires. The resistance of the resistors 10 is specifically set according to the delay requirements. The resistance of the front resistor 10 is relatively large. When the blasting is started, the detonating wire 6 is energized, and the resistor 10 is heated by electrochemical heat to ignite butane, and then ignite liquid oxygen.
[0044] When the millisecond delay detonator 2 is filled with liquid oxygen 9, the liquid oxygen 9 is input on-site through the infusion tube 12, and the air is exhausted through the exhaust pipe 13. When the exhaust pipe 13 flows out of the milky white liquid, it proves that the liquid oxygen 9 is full. The setting of multiple groups of millisecond delay detonators can achieve the predetermined rock breaking effect through delayed detonation, and reduce the charge amount of each detonator, reduce dust distribution and noise.
[0045] By plugging at the blasthole mouth, the plugging material 5 is quick-drying plugging mud, which can effectively reduce kinetic energy loss and improve rock breaking effect.
[0046] In order to further avoid poor rock breaking effect, the fracturing tube is made of flexible material to reduce the loss of fracturing kinetic energy. The inside of the fracturing tube is filled with powdered dry ice and liquid nitrogen, and the inside of the fracturing tube 1 is also filled with powdered sodium bicarbonate. These filled expansion materials are located on the outside of the millisecond delay detonator, and are detonated by the millisecond delay detonator to generate heat energy, which instantly vaporizes the dry ice to form CO2 and NO2, resulting in a 600-fold expansion to form rock-breaking kinetic energy. While vaporizing, dry ice and liquid nitrogen also absorb surrounding heat, causing water vapor to condense to form a white mist, which can absorb dust and reduce dust. In view of the fact that the high heat released by fracturing during blasting may ignite surrounding debris, this embodiment is provided with sodium bicarbonate (powdered) to prevent the heat from rising too quickly.
[0047] In order to improve the rock breaking effect and enable the kinetic energy generated by fracturing to fully act on the rock and soil body to be blasted, the fracturing tube structure of this embodiment is improved.
[0048] The granular protrusions 11 are evenly distributed around the fracturing tube 1, and the thickness of the protrusions is less than that of the fracturing tube. According to the "Bernoulli principle" and "fluid mechanics", the kinetic energy is squeezed toward the thinner granular protrusions 11 during fracturing, and the gas flow rate increases after the breakthrough, so that the blasting funnel angle effect is rapidly improved, which can effectively increase the rock breaking kinetic energy of the unit granular protrusion 11.
[0049] The calculation formula is:
[0050] Assume: the explosive gas has a unit concentrated force P (MN / m) along the granular protrusion thin wall, and there are 20 protrusions, then the expression is: P = Pc*B, Pc = 1 / 20*(Po*D2)
[0051] Where: Pc-gas extrusion pressure; B-granular protrusion diameter; Po-dry ice packing density; D-dry ice instantaneous vaporization speed.
[0052] In order to further improve the rock breaking effect, a protruding thin wall 12 is provided at the front end of each group of fracturing tubes 1, and a spiral groove 13 is provided on the inner side of the fracturing tube 1. The extension direction of the spiral groove 13 converges toward the front end of the fracturing tube, that is, the spiral center of the bolt groove 13 is emitted from the protruding thin wall 12 at the front end of the fracturing tube and spreads outward.
[0053] The structural form of the convex thin wall 12 + spiral groove 13 forms annular energy concentration when the gas kinetic energy is fractured, so that the fracture kinetic energy is reduced and ineffectively dispersed around, and the rock mass is radially struck.
[0054] In this embodiment, a water bag 3 structure is provided. After the water bag is broken, the dry ice and liquid nitrogen in the fracturing tube vaporize and absorb the surrounding heat, causing the water vapor to condense and form a white mist, which can absorb dust and effectively solve the problem of excessive dust. In this embodiment, the structure of the fracturing tube 1 is improved, so that the rock breaking effect in the rock breaking process is better, the kinetic energy is concentrated, and the kinetic energy loss is small.
[0055] Embodiment 2
[0056] In a typical embodiment of the present invention, reference is made to Figure 1-Figure 4 As shown, a dust-proof and noise-reducing rock-breaking method is disclosed, which adopts the dust-proof and noise-reducing rock-breaking system of embodiment 1.
[0057] It is understandable that in the prior art, the rock and soil body 14 is not divided into layers and groups. When drilling, the entire face is drilled and blasted in a concentrated manner. This form of blasting is limited by the strength of the air surface, and there are problems such as poor rock breaking effect and large kinetic energy loss. In addition, more blasting materials are required, which increases the cost. In order to solve this problem, this embodiment adopts a layered and grouped blasting method for blasting the rock and soil body. The specific method is the "layered and grouped rock breaking step method", that is, breaking the rock in groups first and then breaking it in layers.
[0058] The specific steps are as follows:
[0059] First, according to the tunnel construction plan and the height of the tunnel to be constructed, the rock and soil to be blasted are divided into upper and lower layers. Secondly, according to the width of the tunnel to be constructed, the rock and soil to be blasted are divided into left and right groups. Each layer of rock and soil is divided into several groups for rock breaking in groups first and then in layers to achieve rock breaking in step method.
[0060] By breaking the rock in groups first and then in layers, the formation of blasting cracks can be promoted and the blasting efficiency can be improved. In addition, the corresponding structure of the dust and noise reduction rock breaking system can be used to solve the problems of poor rock breaking effect and large kinetic energy loss.
[0061] When installing the fracturing tube and the millisecond delay detonator, the corresponding expansion materials and ignition materials need to be filled. When breaking rocks in groups, first construct a blasthole for one of the grouped rock and soil bodies, and arrange the fracturing tube and water bag with the millisecond delay detonator in the blasthole in sequence. The fracturing tube 1 and the water bag 3 should be pushed along the hole wall 7 to the front end of the hole 8 in sequence. The detonating wire 6 connected to the millisecond delay detonator is led out of the blasthole, and a sound-absorbing panel is set on the rear side of the last group of water bags near the blasthole mouth, and then the blasthole mouth is blocked with blocking materials; the fracturing tube is detonated by the detonating wire.
[0062] like Figure 3 and Figure 4 As shown, when breaking the rock in layers, the order of breaking the rock is first from the top and then from the bottom. When breaking the rock in groups, the order of breaking the rock is first from the sides and then from the middle. This order of breaking the rock forms a step 17 structure when breaking the rock. According to the tunnel excavation direction, the construction is gradually carried out forward, and the tunnel secondary lining structure 18 is constructed in time. The step method of breaking the rock in this embodiment can effectively improve the rock breaking effect and efficiency.
[0063] It should be noted that during the construction process, the temporary support structure 15 should be constructed in time.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A dust and noise reduction rock breaking system, characterized in that: include: Several fracturing tubes are evenly distributed in the blasthole. The inside of the fracturing tubes is filled with expansion materials. Water bags are arranged between adjacent fracturing tubes. Millisecond delay detonators are arranged inside the fracturing tubes. The millisecond delay detonators are connected in series through detonating wires. The inner side of the fracturing tube is provided with a spiral groove, the front end is provided with a convex thin wall, and the peripheral side is provided with granular protrusions to increase the kinetic energy of rock breaking; The sound absorbing board and the blocking material are used, wherein the blocking material blocks the mouth of the blast hole, and the sound absorbing board is arranged in front of the blocking material.
2. The dust and noise reduction rock breaking system according to claim 1, characterized in that: The sound absorbing panel is a honeycomb structure, and the size of the sound absorbing panel is adapted to the size of the blast hole.
3. The dust and noise reduction rock breaking system according to claim 1, characterized in that: The millisecond delay detonator is divided into two layers, the inner layer comprises a resistor connected to the detonating wire, the outer side of the resistor is butane, and the outer layer is liquid oxygen.
4. The dust and noise reduction rock breaking system according to claim 2, characterized in that: The outer layer of the millisecond delay detonator is connected to the infusion tube and the exhaust pipe.
5. The dust and noise reduction rock breaking system according to claim 1, characterized in that: The fracturing tube is filled with dry ice and liquid nitrogen.
6. The dust and noise reduction rock breaking system according to claim 5, characterized in that: The interior of the fracturing tube is also filled with sodium bicarbonate.
7. The dust and noise reduction rock breaking system according to claim 2, characterized in that: The number of the water bags is the same as the number of the fracturing pipes, and each group of water bags is correspondingly arranged on one side of the fracturing pipe close to the tunnel face.
8. The dust and noise reduction rock breaking system according to claim 1, characterized in that: The plugging material is quick-drying plugging mud.
9. The dust and noise reduction rock breaking system according to claim 1, characterized in that: The extension direction of the spiral groove converges toward the front end of the fracturing tube.
10. A dust-proof and noise-reducing rock-breaking method, characterized in that: The dust and noise reduction rock breaking system according to any one of claims 1 to 9 comprises the following steps: According to the tunnel construction plan, the rock and soil are layered, and each layer of rock and soil is divided into several groups for rock breaking in groups first and then in layers to achieve rock breaking in step-by-step construction; When breaking rock in groups, blastholes are constructed first, and the fracturing tubes and water bags with millisecond delay detonators are arranged in the blastholes in sequence. The detonating wires connected to the millisecond delay detonators are led out of the blastholes, and a sound-absorbing panel is set on the rear side of the last group of water bags near the blasthole mouth. Then, the blasthole mouth is blocked with sealing materials; the fracturing tubes are detonated by the detonating wires.
Citation Information
Patent Citations
Millisecond multilevel directional blasting dry ice fracturing method and exploding pipe
CN106930744A
Slotting method of staged loading of small hole strengthened crack-causing grains in center cutting hole
CN111637804A
Advanced wall protection and dust suppression method for underground tunneling blasting
CN113551571A
Liquid oxygen phase change gas expansion tunnel blasting method based on accurate time delay
CN117433378A
Portable tunnel blasting hole plug
CN210981042U